Loading...
CP078 (Special Assessments for Street Lighting Systems)CITY OF JANESVILLE Policy No. 78 Page 1 of 2 CITY COUNCIL POLICY STATEMENT Date Issued 11/11/97 General Subject: Administration Revised 12/4/2000 9/28/2015 1/10/2022 Effective Date 1/11/2022 Specific Subject: Special Assessments For Street Lighting Cancellation Date Systems Supersedes No. 30 Responsible Dept./Div: Engineering Division PURPOSE: To record and establish a policy to levy and recover Special Assessments for the installation of municipally-owned street light systems to facilitate traffic flow, pedestrian safety and property security; and to further facilitate the general safety and welfare of the City’s neighborhoods. STATEMENT OF POLICY: I. GENERAL: Special Assessments shall be levied against all property having frontage on a public street for the cost of the initial installation of street light systems. These street lights shall be assessed 100%. The amount of the Special Assessment shall be determined annually. Construction of street light systems will normally follow the installation of curb and gutter. The street light installation would normally occur in the year following installation of curb and gutter. II. RESIDENTIAL STREET LIGHTING: The amount of the Assessment shall be based upon those costs associated with the lighting standards established for streets in residential subdivisions and will be converted to a lot front assessment. Street lights are installed at every intersection and mid-block, 300-400 feet apart. III. COMMERCIAL AND INDUSTRIAL LIGHTING: There are additional costs associated with the higher, greater intensity lighting in commercial and industrial surveys. The amount of the assessment shall be based upon those costs associated with the lighting standards established for streets in commercial or industrial areas and will be converted to a lot front assessment. In commercial areas and along arterial streets, street lights are installed at every intersection and mid- CITY OF JANESVILLE Policy No. 78 Page 2 of 2 CITY COUNCIL POLICY STATEMENT Date Issued 11/11/97 General Subject: Administration Revised 12/4/2000 9/28/2015 1/10/2022 Effective Date 1/11/2022 Specific Subject: Special Assessments For Street Lighting Cancellation Date Systems Supersedes No. 30 Responsible Dept./Div: Engineering Division block, 200-350 feet apart. IV. METHOD OF DETERMINING SPECIAL ASSESSMENT: The Assessment cost for a subdivision shall be established by multiplying the average cost per street light per year by the number of lights needed in each subdivision. The total cost for the subdivision would then be divided equally for each lot in the subdivision. Payment in accordance with Council Policy # 95 shall be made prior to the City Clerk-Treasurer signing the plat. In lieu of a street light assessment, the developer of a subdivision may be required to install street lighting, in accordance with City street lighting standards, as part of their public improvements and as outlined in the Memorandum of Understanding (MOU) for the proposed subdivision. V. ASSESSMENTS FOR CERTIFIED SURVEYS: When the division of land occurs as a Certified Survey, rather than a subdivision plat, the assessment cost as established for subdivisions in section IV above shall be converted to a lot front assessment, and the total amount for the certified survey shall be established and paid as provided for above. VI. EXEMPTIONS UPON IMPLEMENTATION: All existing subdivisions and surveys, which are on record prior to the effective date of this policy, are exempt from this policy.