Loading...
2015-1244 RESOLUTION NO. 2015 -1244 A resolution calling on the Governor and Legislature of the State of Wisconsin to release the contingency bonding for full funding of the 1 -39/90 corridor project. WHEREAS, Governor Walker and the State Legislature have made the transportation system a high priority, and WHEREAS, the state highway system including the 1 -39/90 corridor is vital to the transportation system at both a local and state level, and WHEREAS, the corridor was built in the early 1960s and has outdated design features operating at substandard levels and with an aging infrastructure contributing to safety concerns, and WHEREAS, the 1 -39/90 corridor is forecasted to increase in traffic levels by as much as 50 percent by the year 2030, and WHEREAS, the corridor is designated as a federal truck route signifying the importance to operate efficiently and safely, and WHEREAS, the 1 -39/90 corridor has a total traffic volume comprised of 35 percent heavy trucks compared to other interstate segments in the state averaging between 14 and 20 percent of heavy truck volume, and WHEREAS, without corrective action, all sections of the 1 -39/90 corridor are expected to operate at unacceptable levels of service, meaning unstable traffic flow and stop- and -go conditions, and WHEREAS, from 2008 to 2012, there were 1,920 vehicle crashes resulting in 543 injuries and 20 fatalities along the 1 -39 -90 corridor, and WHEREAS, the 1 -39/90 corridor has a 20 percent higher state average crash rate thus meeting WisDOT's threshold for priority safety projects, and WHEREAS, the 1 -39/90 corridor project in the City of Janesville will help in the continued growth of the City, and WHEREAS, the construction of the 1 -39/90 corridor project is important to Wisconsin, Rock County and the City of Janesville because transportation is an essential and vital part of the economy, and WHEREAS, the 1 -39/90 corridor project is pivotal to workforce development, providing a direct link to crucial industrial and commercial employment to and from the city, county, and across state borders, and WHEREAS, the University of Wisconsin Center for Freight and Infrastructure estimates between $650 million and $800 million in economic activity is generated per day on the 1 -39/90 corridor, and WHEREAS, the 1 -39/90 corridor serves as a gateway for in -state and out -of -state travel and tourism to Northern Wisconsin and regional destinations, and WHEREAS, the 1 -39/90 corridor is a gateway to the major cities of Madison, St. Paul, and Minneapolis, and WHEREAS, the recently - passed 2015 -17 State budget constrained $350 million in contingency bonding that could be applied to projects including the 1 -39/90 corridor project, and WHEREAS, the Legislature has not approved the release of the contingency funds which could help mitigate the announced two -year delay of the 1 -39/90 corridor project, and WHEREAS, without full funding of the 1 -39/90 corridor project, construction is expected to be delayed by two or more years, and NOW THEREFORE BE IT RESOLVED, that the City of Janesville in Rock County, Wisconsin, urges the Governor and the Legislature of the State of Wisconsin to release the contingency bonding for full funding of the 1 -39/90 corridor project. ADOPTED: October 26, 2015 Motion by: Consent Second by: APPROVED: Councilmember Aye Nay Pass Absent Bobzien X Deupree X l •� • Farrell X Mark Freitag, City Man `,--r Gruber X Liebert X ATT' Marklein X a;p% Tidwell X David T. Godek, City Clerk- Treasurer APPROVED AS TO FORM: - 44/& ) // Wald Klimczyk, City Attorney Proposed by: Public Works Department Prepared by: Public Works Department