Loading...
2003-371RESOLUTION NO. 2003-371 A Resolution authorizing interfund borrowing to provide interim funding for the Safe Drinking Water Fund Project and to comply with requirements of the Wisconsin Safe Drinking Water Fund Loan Program WHEREAS, the City of Janesville has entered into an engineering agreement for engineering services for the construction plans and specifications for an additional water pumping station for the City of Janesville, in cooperation with Strand Associates, Inc.; and WHEREAS, the Water Utility will make application for a Wisconsin Safe Drinking Water Fund Loan to assist in the financing of the design and construction of said facility; and WHEREAS, the City desires to comply in all respects with the requirements of the Wisconsin Safe Drinking Water Fund Loan Program and to refrain from any financial activity which may be considered impermissible arbitrage; NOW, THEREFORE BE IT RESOLVED, by the Common Council of the City of Janesville that it hereby sets forth as its policy compliance with all requirements of the Wisconsin Safe Drinking Water Fund Loan Program so as to avoid impermissible arbitrage in financing and refinancing of the water pumping station design and construction, and otherwise; and BE IT FURTHER RESOLVED, that the City pay for services received from its Engineer prior to the approval of any loan(s) from the Wisconsin Safe Drinking Water Fund Loan Program and that such expenditures be paid from the general funds of the Utility; and BE IT FURTHER RESOLVED, that the City has the intent to seek financing and refinancing with the Wisconsin Safe Drinking Water Fund Loan to pay $750,000 of the expenditures for the design and construction of the water pumping station, all said financing and refinancing to be in compliance with the Wisconsin Safe Drinking Water Fund Loan Program so that the City may be eligible for all monies available under said program; and BE IT FURTHER RESOLVED, that the City may pay for services provided in conjunction with the design and construction of the water pumping station performed by independent contractors which may not be included in billing for engineering services provided by Strand Associates, Inc. and seek reimbursement from the Wisconsin Safe Drinking Water Fund Loan Program from the general funds of the Utility; and BE IT FURTHER RESOLVED, that the City has the intent that Safe Drinking Water Fund Loan repayments be repaid with the revenues of the City water user charge system. ADOPTED: April 28, 2003 APPROVED: Steven E. Sheiffer, C'i~y Manager ATTEST: MOTION BY: Steeber SECOND BY: Murphy COUNCILMEMBER AYE NAY PASS ABSENT ADDLE X MURPHY X DEGARMO X STEEBER X WILLIAMS X BRIEN X WELLNITZ X  e urer ~Kit~man, Deputy City Clerk-Tr as APPROVED AS TO FORM: City Attorney ' ' ~''' '/ / Proposed by: Utility Director Prepared by: Utility Director