Loading...
C2024-8 Bid TabC2024‐8 Innovation Park Phase 1A (#8958830)Owner: Janesville WI, City ofSolicitor: Janesville WI, City of02/28/2024 02:00 PM CSTRock Road Companies, Inc.Globe Contractors, Inc. TOWNSEND CONSTRUCTION INC Fischer Excavating, Inc. E & N Hughes Co. Inc. Maddrell Excavating, LLC Parisi Construction , LLC. R.T. Fox Contractors, IncSection TitlLine Item Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price ExtensionC2024‐8$952,811.83$1,133,333.00$1,211,600.00$1,254,942.00$1,266,184.00$1,412,188.00$1,463,431.06$1,477,650.001 1R Traffic Control LS 1 $35,016.18$35,016.18$5,448.00$5,448.00$27,408.63 $27,408.63 $3,100.00$3,100.00$30,642.00$30,642.00$4,500.00$4,500.00$81,910.56$81,910.56$1,000.00$1,000.002 2R Silt Fence LF 2000 $1.98 $3,960.00$2.00 $4,000.00$3.19 $6,380.00$1.85 $3,700.00$2.25 $4,500.00$3.00 $6,000.00$1.96 $3,920.00$2.00 $4,000.003 3R Stone Tracking Pad EA 2 $788.48$1,576.96$2,000.00$4,000.00$4,497.27$8,994.54$1,730.00$3,460.00$1,335.00$2,670.00$1,100.00$2,200.00$1,248.47$2,496.94$1,500.00$3,000.004 4R Right‐of‐Way Restoration SY 800 $4.95 $3,960.00$9.00 $7,200.00$6.87 $5,496.00$7.00 $5,600.00$9.75 $7,800.00$0.01 $8.00 $6.70 $5,360.00$20.00$16,000.005 5R Agricultural Field Restoration LS 1 $34,146.80$34,146.80$45,000.00$45,000.00$22,946.76$22,946.76$48,544.00$48,544.00$53,175.00$53,175.00$12,500.00$12,500.00$146,881.70$146,881.70$30,000.00$30,000.006 6R Utility Line Opening (ULO) to Determine Utility Depth and Location LS 1 $2,570.57$2,570.57$1,500.00$1,500.00$830.55 $830.55 $9,528.00$9,528.00$11,409.00$11,409.00$2,525.00$2,525.00$6,121.05 $6,121.05 $1,500.00$1,500.0077R 8‐inch SDR 26 Sanitary Sewer LF 20 $83.59 $1,671.80$100.00$2,000.00$190.00$3,800.00$81.00$1,620.00$203.00$4,060.00$175.00$3,500.00$89.50$1,790.00$100.00$2,000.0088R 10‐inch PS 115 Sanitary Sewer LF 20 $95.33 $1,906.60$115.00$2,300.00$207.55 $4,151.00$94.00$1,880.00$206.00$4,120.00$190.00$3,800.00$103.56$2,071.20$100.00$2,000.0099R 12‐inch SDR 26 Sanitary Sewer LF 20 $107.56$2,151.20$131.00$2,620.00$221.14$4,422.80$108.00$2,160.00$212.00$4,240.00$205.00$4,100.00$180.98$3,619.60$100.00$2,000.0010 10R 15‐inch SDR 26 Sanitary Sewer LF 1220 $101.18$123,439.60$127.00$154,940.00$110.16$134,395.20$130.00$158,600.00$116.60$142,252.00$181.00$220,820.00$133.60$162,992.00$145.00$176,900.0011 11R 18‐inch PS 115 Sanitary Sewer LF 3725 $116.07 $432,360.75$139.00$517,775.00$121.30$451,842.50$156.00$581,100.00$156.20$581,845.00$205.00$763,625.00$153.04$570,074.00$190.00$707,750.0012 12R 18‐inch PS 115 Sanitary Sewer (EX 1‐MH 1) LF 180 $53.18 $9,572.40$85.00$15,300.00$144.97 $26,094.60$328.00$59,040.00$317.50$57,150.00$245.00$44,100.00$160.02 $28,803.60$175.00$31,500.0013 13R 48‐inch Sanitary Sewer Manhole Structure EA 15 $8,516.85 $127,752.75$6,500.00$97,500.00$12,145.33 $182,179.95$9,908.00$148,620.00$7,006.00$105,090.00$6,850.00$102,750.00$10,812.98$162,194.70$12,000.00$180,000.0014 14R Sanitary Structure Invert/Bench Repair EA 1 $776.22 $776.22 $4,500.00$4,500.00$1,824.82 $1,824.82 $9,535.00$9,535.00$8,961.00$8,961.00$1,250.00$1,250.00$7,639.06$7,639.06$2,000.00$2,000.0015 15R Utility Pipe Jacking (Sanitary) LF 135 $740.00$99,900.00$1,200.00$162,000.00$1,632.09 $220,332.15$893.00$120,555.00$1,100.00$148,500.00$1,080.00$145,800.00$1,396.79 $188,566.65$1,500.00$202,500.0016 16R Utility Pipe Jacking (Water) LF 110 $655.00$72,050.00$975.00$107,250.00$1,004.55 $110,500.50$890.00$97,900.00$907.00$99,770.00$861.00$94,710.00$809.00$88,990.00$1,050.00$115,500.00Base Bid Total:$952,811.83$1,133,333.00$1,211,600.00$1,254,942.00$1,266,184.00$1,412,188.00$1,463,431.06$1,477,650.00