Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
C2024-6 Bid Tab
C2024‐6 Street Rehabilitation (#8958816)Owner: Janesville WI, City ofSolicitor: Janesville WI, City of02/28/2024 02:00 PM CSTRock Road Companies, Inc.Payne & Dolan, Inc.Section TitlLine Item Item CodeItem DescriptionUofM QuantityUnit Price Extension Unit Price ExtensionC2024‐6$3,712,079.39 $4,131,856.3311RAsphaltic Concrete Pavement, Type 4 LT, Lower LayerTON 6383.2 $60.54 $386,438.93 $65.75 $419,695.4022RAsphaltic Concrete Pavement, Type 5 LT, Upper LayerTON 17368.2 $61.82 $1,073,702.12 $69.00 $1,198,405.8033RAsphaltic Concrete Pavement, Type 4 MT, Upper LayerTON 8090.2 $59.39 $480,476.98 $66.00 $533,953.2044RTack CoatGAL 15438 $2.86 $44,152.68 $2.10 $32,419.8055RMiscellaneous Asphalt Paving (Machine Method), 1.5" or ThickerTON 50 $111.74 $5,587.00 $90.00 $4,500.0066RMiscellaneous Asphalt Paving (Hand Method), 1.5" or ThickerTON 20 $171.55 $3,431.00 $125.00 $2,500.0077RLeveling Layer (Unspecified Locations, In Addition to Per Ton Price for Upper Layer Pavements)TON 1031.5 $7.00 $7,220.50 $12.00 $12,378.0088RAsphalt Pavement Milling, Full Width, 0"‐2.0" DepthSY 152985 $0.90 $137,686.50 $1.85 $283,022.2599RAsphalt Pavement Milling, Full Width, 2.1"‐2.5" DepthSY 22081 $1.10 $24,289.10 $1.85 $40,849.8510 10RExtra Depth MillingSY 100 $7.50 $750.00 $7.50 $750.0011 11RStreet Resurfacing Base/Subgrade RepairCY 150 $33.38 $5,007.00 $55.00 $8,250.0012 12RAsphalt Pavement Milling, Variable Depth (Driveway Ends and / or Butt Joints)SY 160 $25.00 $4,000.00 $15.00 $2,400.0013 13RMiscellaneous MillingSY 200 $10.00 $2,000.00 $10.00 $2,000.0014 14RConcrete Pavement Milling, Full Width, 2.0" DepthSY 20 $50.00 $1,000.00 $4.50 $90.0015 15RPulverize and ShapeSY 6475 $2.05 $13,273.75 $1.96 $12,691.0016 16RCast Iron Adjusting Rings, 1.5"EA 20 $336.48 $6,729.60 $335.00 $6,700.0017 17RCast Iron Adjusting Rings, 2.0"EA 10 $464.55 $4,645.50 $460.00 $4,600.0018 18R4.0" Asphaltic Pavement Patching, GeneralSY 50 $86.34 $4,317.00 $115.00 $5,750.0019 19R5.0" Asphaltic Pavement Patching, GeneralSY 50 $115.54 $5,777.00 $125.00 $6,250.0020 20R4.0" Asphaltic Pavement Patching, SpecialSY 25 $235.04 $5,876.00 $180.00 $4,500.0021 21R5.0" Asphaltic Pavement Patching, SpecialSY 25 $253.26 $6,331.50 $200.00 $5,000.0022 22RMarking Island Nose, Epoxy, YellowEA 1 $504.97 $504.97 $500.00 $500.0023 23RMarking Parking Stall, Epoxy, 4‐Inch, WhiteLF 815 $6.06 $4,938.90 $6.00 $4,890.0024 24RMarking Line, Epoxy, 4‐Inch, WhiteLF 25890 $0.64 $16,569.60 $0.63 $16,310.7025 25RMarking Line, Epoxy, 4‐Inch, YellowLF 22171 $0.64 $14,189.44 $0.63 $13,967.7326 26RMarking Line, Epoxy, 8‐Inch, WhiteLF 1413 $1.34 $1,893.42 $1.33 $1,879.2927 27RMarking Stop Line, Epoxy, 18‐Inch, WhiteLF 338.1 $13.13 $4,439.25 $13.00 $4,395.3028 28RMarking Crosswalk, Epoxy, 6‐Inch, WhiteLF 1575 $10.10 $15,907.50 $10.00 $15,750.0029 29RMarking Crosswalk, Epoxy, 12‐Inch, WhiteLF 473 $12.62 $5,969.26 $12.50 $5,912.5030 30RMarking Diagonal, Epoxy, 12‐Inch, YellowLF 244 $11.11 $2,710.84 $11.00 $2,684.00 31 31RMarking ‐ Handicap Parking Stall Symbol, Epoxy, WhiteEA 3 $403.98 $1,211.94 $400.00 $1,200.0032 32RMarking Arrow, Type 1, Epoxy, WhiteEA 1 $504.97 $504.97 $500.00 $500.0033 33RMarking Arrow, Type 2, Epoxy, WhiteEA 26 $181.79 $4,726.54 $180.00 $4,680.0034 34RMarking Arrow, Type 3, Epoxy, WhiteEA 1 $504.97 $504.97 $500.00 $500.0035 35RMarking Word, "ONLY" Epoxy, WhiteEA 5 $252.49 $1,262.45 $250.00 $1,250.0036 36RMarking Arrow, Bike Lane Arrow, Epoxy, WhiteEA 41 $181.79 $7,453.39 $180.00 $7,380.0037 37RMarking Symbol, Bike Lane Symbol, Epoxy, WhiteEA 41 $181.79 $7,453.39 $180.00 $7,380.0038 38RMarking Removal, Line, 4‐InchLF 230 $2.02 $464.60 $2.00 $460.0039 39RSawing Concrete or Composite Asphalt over Concrete Pavement, Full DepthLF 136 $1.20 $163.20 $4.50 $612.0040 40RSawing Asphalt Pavement, Full DepthLF 1081 $1.20 $1,297.20 $4.50 $4,864.5041 41RRemove Existing Concrete Collar From Existing Structure CastingEA 6 $151.74 $910.44 $175.00 $1,050.0042 42RAsphalt Pavement RemovalSY 27957.5 $2.08 $58,151.60 $2.20 $61,506.5043 43RConcrete or Composite Asphalt over Concrete Pavement RemovalSY 1188.5 $7.67 $9,115.80 $4.50 $5,348.2544 44RCurb & Gutter RemovalLF 12860 $4.56 $58,641.60 $4.00 $51,440.0045 45RConcrete Sidewalk/ Driveway RemovalSF 22691 $0.67 $15,202.97 $0.65 $14,749.1546 46RUnclassified ExcavationCY 24682 $15.36 $379,115.52 $13.50 $333,207.0047 47RExcavation Below SubgradeCY 200 $16.14 $3,228.00 $25.00 $5,000.0048 48RCoarse Gradation AggregateTON 38255 $11.44 $437,637.20 $14.00 $535,570.0049 49RFine Gradation AggregateTON 16479 $16.10 $265,311.90 $17.00 $280,143.0050 50RProof Rolling STATION 2 $125.98 $251.96 $55.00 $110.0051 51RStructure Frame ResettingEA 15 $998.29 $14,974.35 $975.00 $14,625.0052 52RStructure ReconstructionIN 24 $136.79 $3,282.96 $175.00 $4,200.0053 53RChimney SealEA 4 $779.13 $3,116.52 $775.00 $3,100.0054 54RMaintain and Remove Inlet Protection, Type C or Type D Installed by OthersEA 21 $75.00 $1,575.00 $40.00 $840.0055 55RInlet Protection, Type CEA 18 $75.00 $1,350.00 $65.00 $1,170.0056 56RErosion Bale Ditch CheckEA 3 $225.00 $675.00 $125.00 $375.0057 57RRestorationSY 4700 $12.95 $60,865.00 $7.00 $32,900.0058 58RCulvert Pipe CheckEA 4 $45.00 $180.00 $75.00 $300.0059 59RTraffic Control, For River View Drive Street Closure to Pulverize and PaveLS 1 $500.00 $500.00 $1,300.00 $1,300.0060 60RTraffic Control and Detour for N Harmony Town Hall Road ResurfacingLS 1 $500.00 $500.00 $1,700.00 $1,700.0061 61RTraffic Control, For N. Pontiac Drive & Morse Street Phase 1 Closure and ReconstructionLS 1 $500.00 $500.00 $1,300.00 $1,300.0062 62RTraffic Control, For Elliott Street and Jerome Avenue Closure & ReconstructionLS 1 $500.00 $500.00 $1,500.00 $1,500.0063 63RTraffic Control, For Morse Street Phase 2 and Ryan Road Closure and ReconstructionLS 1 $500.00 $500.00 $1,300.00 $1,300.00 64 64RTraffic Control, For S. Blackhawk Street Closure and ReconstructionLS 1 $500.00 $500.00 $800.00 $800.0065 65RTraffic Control, For Lombard Avenue Closure and ReconstructionLS 1 $500.00 $500.00 $800.00 $800.0066 66RTraffic Control, For N. Pontiac Drive (Holiday Dr to Pontiac Place) Closure and ReconstructionLS 1 $500.00 $500.00 $900.00 $900.0067 67RShoulder, Harmony Town Hall Road LF 3065 $2.89 $8,857.85 $2.00 $6,130.0068 68RShoulder, River View Drive LF 4176 $1.29 $5,387.04 $2.00 $8,352.0069 69RGeogrid, Type SRSY 22960 $1.39 $31,914.40 $1.90 $43,624.0070 70RVRAM Void Reucing Asphalt MembraneLF 14059 $2.31 $32,476.29 $2.29 $32,195.1171 71RTemporary MailboxesLS 1 $1,000.00 $1,000.00 $4,500.00 $4,500.00Base Bid Total:$3,712,079.39 $4,131,856.33