Loading...
C2023-15 Part 16 DrawingsProject:ARCHITECTURAL "A" SERIESSTRUCTURAL "S" SERIESPLUMBING "P" SERIESMECHANICAL "M" SERIESELECTRICAL "E" SERIESARCHITECT:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:CIVIL/LANDSCAPE "C" SERIESREFRIGERATION "R" SERIESDASHER BOARD "DB" SERIESPERMIT SET DOCUMENTSWOODMAN'S SPORTS & CONVENTION CENTERWOODMAN'S SPORTS &CONVENTION CENTER10/13/20232510 Milton AvenueJanesville, WI 53545 A0.010/13/2023220025.00C2023-15SHEET INDEXSHEET NO. SHEET NAMECODE A0.0 COVER SHEET A0.1 TYPICAL MOUNTING HEIGHTS AND CLEARANCES A0.2 FIRST FLOOR LIFE SAFETY PLAN A0.3 MEZZANINE FLOOR LIFE SAFETY PLAN A0.4 LIFE SAFETY - OCCUPANCY AND FIXTURESCIVIL C1.10 PROJECT LOCATION AND GENERAL NOTES C1.11 SITE PLAN - OVERALL C1.12 SITE PLAN - NORTH C1.13 SITE PLAN - SOUTH C1.20 GRADING PLAN - NORTH C1.21 GRADING PLAN - SOUTH C1.30 DEMOLITION PLAN C1.40 EROSION CONTROL PLAN C1.50 EXISTING SURVEY C5.00 CONSTRUCTION DETAILS C5.01 CONSTRUCTION DETAILSLANDSCAPING L1.00 LANDSCAPE PLAN OVERALL L1.01 LANSCAPE PLAN NORTH L1.02 LANSCAPE PLAN SOUTH L1.03 LANDSCAPE PLAN - BID ALTERNATIVES L2.00 LANDSCAPE DETAILS & NOTESDEMOLITION AD2.1 FIRST FLOOR DEMOLITION PLAN - OVERALL AD2.1a FIRST FLOOR DEMOLITION PLAN - ENLARGED AD2.2 SECOND FLOOR DEMOLITION PLAN - OVERALL AD2.2a SECOND FLOOR DEMOLITION PLAN - ENLARGEDARCHITECTURAL A1.0 ARCHITECTURAL SITE PLAN A1.1 ARCHITECTURAL SITE PLAN - OVERALL A2.1 FIRST FLOOR PLAN - OVERALL A2.1a FIRST FLOOR PLAN - SE QUAD A2.1b FIRST FLOOR PLAN - NE QUAD A2.1c FIRST FLOOR PLAN - NW QUAD A2.1d FIRST FLOOR PLAN - SW QUAD A2.2 MEZZANINE FLOOR PLAN A2.2a MEZZANINE FLOOR PLAN - SE QUAD A2.2b MEZZANINE FLOOR PLAN - SW QUAD A2.3 ROOF PLAN A2.9 FIRST FLOOR PLAN - PRECAST PANELS A3.1 FIRST FLOOR REFLECTED CEILING PLAN A3.1a FIRST FLOOR REFLECTED CEILING PLAN - NE QUAD A3.1b FIRST FLOOR REFLECTED CEILING PLAN - SE QUAD A3.1c FIRST FLOOR REFLECTED CEILING PLAN - SW QUAD A3.1d FIRST FLOOR REFLECTED CEILING PLAN - NW QUAD A3.2 MEZZANINE FLOOR REFLECTED CEILING PLAN A3.2a MEZZANINE FLOOR REFLECTED CEILING PLAN - SE QUAD A3.2b MEZZANINE FLOOR REFLECTED CEILING PLAN - SW QUAD A4.0 EXTERIOR ELEVATIONS A4.1ENLARGED EXTERIOR ELEVATIONS A4.2 ENLARGED EXTERIOR ELEVATIONS A4.5 ELEVATIONS - PRECAST PANELS A4.6 ELEVATIONS - PRECAST PANELS A5.0 BUILDING SECTIONS A5.1 BUILDING SECTIONS A5.5 INTERIOR SECTIONS A5.6 MAIN RINK SECTIONS A5.7 MULTIPURPOSE AREA RINK SECTIONS A6.0 WALL SECTIONS A6.1 WALL SECTIONS A6.2 WALL SECTIONS A6.3 WALL SECTIONS A6.4 WALL SECTIONS A6.5 WALL SECTIONS A7.0 EXTERIOR DETAILS A7.1 EXTERIOR DETAILS A7.2 EXTERIOR DETAILS A7.3 INTERIOR DETAILS A7.4 INTERIOR DETAILS A7.5 INTERIOR DETAILS A7.6 INTERIOR DETAILS A8.0 ENLARGED FLOOR PLANS - RESTROOMS A8.1 ENLARGED FLOOR PLANS - ADMINISTRATION AND CONCESSIONS A8.2 ENLARGED FLOOR PLANS - SPORT COURTS A8.3 MALL CONNECTION LAYOUT PLAN - NE & SE A8.4 ENLARGED FLOOR PLANS AND SECTIONS - STAIRS AND O.H. DOORS A8.5 ENLARGED FLOOR PLANS AND SECTIONS - RAMPS A8.6 ENLARGED FLOOR PLANS - YOUTH HOCKEY & STORAGE ROOMS A8.7 ENLARGED SECTION AND PLANS - YOUTH HOCKEY ROOMSSHEET INDEXSHEET NO. SHEET NAME A8.8 ENLARGED FLOOR PLANS - CONVENTION DIAGRAMS A8.9 ENLARGED FLOOR PLANS AND ELEVATIONS - SPONSOR SUITE AND PRESS BOX A9.0 INTERIOR ELEVATIONS A9.1 INTERIOR ELEVATIONS A10.0 WALL TYPES A10.1 DOOR AND FRAME TYPES A10.2 DOOR AND FRAME DETAILS A10.3 WINDOW TYPES A11.0 FINISH SCHEDULE A11.1 FIRST FLOOR FINISH PLAN - OVERALL A11.2 MEZZANINE FLOOR FINISH PLAN A13.0 FIRST FLOOR FURNITURE PLAN A13.1 MEZZANINE FLOOR FURNITURE PLANADD ALTERNATE 1 A2.4 FIRST FLOOR PLAN - ADD ALT 1 A2.4a FIRST FLOOR PLAN - ADD ALT 1 - NW QUAD A2.5 ROOF PLAN - ADD ALT 1 A3.3a FIRST FLOOR REFLECTED CEILING PLAN - ADD ALT 1 - NW QUAD A4.3 EXTERIOR ELEVATIONS - ADD ALT 1 A5.2 BUILDING/WALL SECTIONS - ADD ALT 1 A8.10 ENLARGED FLOOR PLANS - SPORT COURTS - ADD ALT 1 A11.1.1 FIRST FLOOR FINISH PLAN - ADD ALT 1ADD ALTERNATE 2 A2.6FIRST FLOOR PLAN - ADD ALT 2 A2.6a FIRST FLOOR PLAN - ADD ALT 2 - SE QUAD A2.6b FIRST FLOOR PLAN - ADD ALT 2 - SW QUAD A2.7 ROOF PLAN - ADD ALT 2 A4.4 EXTERIOR ELEVATIONS - ADD ALT 2 A5.3 BUILDING/WALL SECTIONS - ADD ALT 2ADD ALTERNATE 3 A2.8 FIRST FLOOR PLAN - ADD ALT 3 A2.8a FIRST FLOOR PLAN - ADD ALT 3 - SE QUAD A2.8b FIRST FLOOR PLAN - ADD ALT 3 - SW QUAD A3.4 FIRST FLOOR REFLECTED CEILING PLAN - ADD ALT 3 A9.2 INTERIOR ELEVATIONS & ENLARGED FLOOR PLANS - ADD ALT 3 A11.1.2 FIRST FLOOR FINISH PLAN - ADD ALT 3STRUCTURAL S1.0 FOUNDATION PLAN - OVERALL S1.0a FOUNDATION - SE QUAD S1.0b FOUNDATION - NE QUAD S1.0c FOUNDATION - NW QUAD S1.0d FOUNDATION - SW QUAD S2.0 MEZZANINE FLOOR FRAMING PLAN - OVERALL S2.0a MEZZANINE FLOOR FRAMING PLAN - SE QUAD S2.0b MEZZANINE FLOOR FRAMING PLAN - SW QUAD S2.1 ROOF FRAMING PLAN - OVERALL S2.1a ROOF FRAMING PLAN - SE QUAD S2.1b ROOF FRAMING PLAN - NE QUAD S2.1c ROOF FRAMING PLAN - NW QUAD S2.1d ROOF FRAMING PLAN - SW QUAD S5.0 DETAILS S5.1 DETAILS S5.2 DETAILS S5.3 DETAILS S5.4 DETAILS S5.5 DETAILS S9.0 GENERAL NOTES AND SCHEDULES S9.1 SCHEDULES S9.2 SNOW DRIFT PLAN S1.0 ALT FOUNDATION PLAN - OVERALL S2.1 ALT ROOF FRAMING PLAN AT ALTERNATE 1 & 2PLUMBING P0.1 PLUMBING DETAILS AND NOTES P0.2 PLUMBING DETAILS AND CALCULATIONS P1.0 FOUNDATION PLUMBING - OVERALL P1.0a FOUNDATION PLUMBING - SE - QUAD P1.0b FOUNDATION PLUMBING - NE QUAD P1.0c FOUNDATION PLUMBING - NW QUAD P1.0d FOUNDATION PLUMBING - SW QUAD P1.1 FIRST FLOOR PLUMBING PLAN - OVERALL P1.1a FIRST FLOOR PLUMBING PLAN - SE QUAD P1.1b FIRST FLOOR PLUMBING PLAN - NE QUAD P1.1c FIRST FLOOR PLUMBING PLAN - NW QUAD P1.1d FIRST FLOOR PLUMBING PLAN - SW QUAD P1.2 MEZZANINE FLOOR PLUMBING PLAN - OVERALL P1.2a MEZZANINE FLOOR PLUMBING PLAN - SE QUAD P1.2bMEZZANINE FLOOR PLUMBING PLAN -SW QUAD P1.3ROOF PLUMBING PLAN OVERALL P2.0 WASTE AND VENT PIPING ISOMETRICS P2.1 WASTE AND VENT PIPING ISOMETRICSSHEET INDEXSHEET NO. SHEET NAME P2.2 WASTE AND VENT PIPING ISOMETRICS P3.0 WATER PIPING ISOMETRICS P3.1 WATER PIPING ISOMETRICS P3.2 WATER PIPING ISOMETRICS P4.0 STORM PIPING ISOMETRICSFIRE PROTECTION FP1.1 FIRST FLOOR FIRE PROTECTION PLAN FP1.2 MEZZANINE FLOOR FIRE PROTECTION PLANMECHANICAL M1.0 MECHANICAL TITLE SHEET, SYMBOLS & ABBREVIATION M1.1 FIRST FLOOR MECHANICAL DEMOLITION PLAN OVERALL M2.1 FIRST FLOOR MECHANICAL PLAN - OVERALL M2.1A FIRST FLOOR MECHANICAL PLAN - SE QUAD M2.1B FIRST FLOOR MECHANICAL PLAN - NE QUAD M2.1C FIRST FLOOR MECHANICAL PLAN - NW QUAD M2.1D FIRST FLOOR MECHANICAL PLAN - SW QUAD M2.2 MEZZANINE FLOOR MECHANICAL PLAN - OVERALL M2.3 MECHANICAL ROOF PLAN - OVERALL M2.4 FIRST FLOOR MECHANICAL PLAN - OVERALL - ADD ALT 1 M2.4A FIRST FLOOR MECHANICAL PLAN - ADD ALT 1 - NW QUAD M2.4B MEZZANINE FLOOR MECHANICAL PLAN - ADD ALT 1 - NW QUAD M2.5 MECHANICAL ROOF PLAN - OVERALL - ADD ALT 1 M2.6 FIRST FLOOR MECHANICAL PLAN - OVERALL - ADD ALT 2 M2.6A FIRST FLOOR MECHANICAL PLAN - ADD ALT 2 - SE QUAD M2.6B FIRST FLOOR MECHANICAL PLAN - ADD ALT 2 - SW QUAD M2.7 MECHANICAL ROOF PLAN - OVERALL - ADD ALT 2 M2.8 FIRST FLOOR MECHANICAL PLAN - OVERALL - ADD ALT 3 M2.8A FIRST FLOOR MECHANICAL PLAN - ADD ALT 3 - SE QUAD M2.8B FIRST FLOOR MECHANICAL PLAN - ADD ALT 2 - SW QUAD M5.0 MECHANICAL DETAILS M5.1 MECHANICAL GAS RISER M6.0 MECHANICAL SCHEDULES M6.1 MECHANICAL SCHEDULESELECTRICAL EL ELECTRICAL SYMBOLS ABBREVIATIONS AND NOTES ESD1.0 ELECTRICAL SITE PLAN + DEMO ES1.0 ELECTRICAL SITE PLAN - NEW E1.1 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL E1.1a FIRST FLOOR REFLECTED CEILING PLAN A - SE QUAD E1.1b FIRST FLOOR REFLECTED CEILING PLAN B - NE QUAD E1.1c FIRST FLOOR REFLECTED CEILING PLAN C - NW QUAD E1.1d FIRST FLOOR REFLECTED CEILING PLAN D - SW QUAD E1.2 MEZZANINE FLOOR REFLECTED CEILING PLAN - OVERALL E1.2a MEZZANINE FLOOR REFLECTED CEILING PLAN A - SE QUAD E1.2b MEZZANINE FLOOR REFLECTED CEILING PLAN B - NE QUAD E1.2c MEZZANINE FLOOR REFLECTED CEILING PLAN C - NW QUAD E1.2d MEZZANINE FLOOR REFLECTED CEILING PLAN D - SW QUAD E2.1 FIRST FLOOR POWER AND SYSTEMS PLAN - OVERALL E2.1a FIRST FLOOR POWER AND SYSTEMS PLAN A - SE QUAD E2.1b FIRST FLOOR POWER AND SYSTEMS PLAN B - NE QUAD E2.1cFIRST FLOOR POWER AND SYSTEMS PLAN C - NW QUAD E2.1d FIRST FLOOR POWER AND SYSTEMS PLAN D - SW QUAD E2.2a MEZZANINE FLOOR POWER AND SYSTEMS PLAN A - SE QUAD E2.2b MEZZANINE FLOOR POWER AND SYSTEMS PLAN B - NE QUAD E2.3 ROOF POWER AND SYSTEMS PLAN - OVERALL E2.3a ROOF POWER AND SYSTEMS PLAN A - SE QUAD E2.3b ROOF POWER AND SYSTEMS PLAN B - NE QUAD E2.3c ROOF POWER AND SYSTEMS PLAN C - NW QUAD E2.3d ROOF POWER AND SYSTEMS PLAN D - SW QUAD E2.4 FIRST FLOOR POWER AND LIGHTING - ADD ALT 1, ALT 2, ALT 3 E5.0 LIGHTING SCHEDULES E5.1 ELECTRICAL SCHEDULES E5.2 ELECTRICAL SCHEDULES E5.3 ELECTRICAL SCHEDULES E5.4 ELECTRICAL SCHEDULES E5.5 ELECTRICAL SCHEDULES E5.6 ELECTRICAL SCHEDULES E6.1 POWER DETAILS E6.2 POWER DETAILS E6.3 ELECTRICAL DETAILS E7.1 TELECOMMUNICATIONS RISER DIAGRAM E7.2 MATRIX E7.3 CARD ACCESS E7.4 CAMERA SCHEDULE E7.5 SYSTEM DETAILS - ELEC RM 134 E7.6 SYSTEM DETAILS - IT RM 150 E7.7 SYSTEM DETAILS - IT/GEN STORAGE RM 176SHEET INDEXSHEET NO. SHEET NAME E7.8 SYSTEM DETAILS - STORAGE RM 104 E7.9 INTERCOM DETAILS E8.0 ELECTRICAL RISER DIAGRAMFOOD SERVICE FS100 FOODSERVICE - OVERALL PLAN FS101 FOODSERVICE - EQUIPMENT PLAN FS102 FOODSERVICE - ELECTRICAL PLAN FS103 FOODSERVICE - PLUMBING PLAN FS104 FOODSERVICE - CONDITIONS PLANAUDIO VISUAL AV0.0 INDEX SHEET AV0.1 LEGENDS SYMBOLS AND ABBREVIATIONS AV0.2 GENERAL AUDIOVISUAL INFORMATION AV2.1 FIRST FLOOR PLAN OVERALL AV2.1a FIRST FLOOR PLAN - SE QUAD AV2.1b FIRST FLOOR PLAN - NE QUAD AV2.1c FIRST FLOOR PLAN - NW QUAD AV2.1d FIRST FLOOR PLAN - SW QUAD AV2.2a MEZZANINE FLOOR PLAN - SE QUAD AV2.2d MEZZANINE FLOOR PLAN - SW QUAD AV3.1a FIRST FLOOR PLAN RCP- SE QUAD AV3.1b FIRST FLOOR PLAN RCP- NE QUAD AV3.1c FIRST FLOOR PLAN RCP- NW QUAD AV3.1d FIRST FLOOR PLAN RCP- SW QUAD AV4.1 LOBBY AND BREAKROOM SECTIONS AND ELEVATIONS AV4.2 MERCYHEALTH ARENA SECTIONS AND ELEVATIONS AV4.3MULTI-PURPOSE ARENA SECTIONS AND ELEVATIONS AV4.4 MULTI-PURPOSE ARENA SECTIONS AND ELEVATIONS AV4.5 MULTI-USE CONVETION SECTIONS AND ELEVATIONS AV4.9a STANDARD AV DETAILS AV4.9b ADA DETAILS AV5.1 EQUIPMENT RACK ELEVATIONS AV5.2 EQUIPMENT RACK ELEVATIONS AV6.1 PANEL ELEVATIONS AND DETAILS AV6.2 PANEL ELEVATIONS AND DETAILS AV6.3 PANEL ELEVATIONS AND DETAILS AV7.0 AUDIO TERMINATIONS AND WIRING AV7.1a LOBBY / BREAKROOM SCHEMATICS AV7.1b LOBBY / BREAKROOM SCHEMATICS AV7.1c LOBBY / BREAKROOM SCHEMATICS AV7.2a MERCYHEALTH ARENA SCHEMATICS AV7.2b MERCYHEALTH ARENA SCHEMATICS AV7.2c MERCYHEALTH ARENA SCHEMATICS AV7.2d MERCYHEALTH ARENA SCHEMATICS AV7.2e MERCYHEALTH ARENA SCHEMATICS AV7.3a MULIPURPOSE ARENA SCHEMATICS AV7.3b MULTIPURPOSE ARENA SCHEMATICS AV7.3c MULIPURPOSE ARENA SCHEMATICS AV7.3d MULTIPURPOSE ARENA SCHEMATICS AV7.3e MULTIPURPOSE ARENA SCHEMATICS AV7.3f MULTIPURPOSE ARENA SCHEMATICS AV7.4a MULTI-USE CONVENTION SPACE SCHEMATICS AV7.4b MULTI-USE CONVENTION SPACE SCHEMATICS AV7.4c MULTI-USE CONVENTION SPACE SCHEMATICS AV7.4d MULTI-USE CONVENTION SPACE SCHEMATICS AV7.4e MULTI-USE CONVENTION SPACE SCHEMATICS AV7.4f MULTI-USE CONVENTION SPACE SCHEMATICS AV9.1 AV POWER, DATA, & BOX SCHEDULES AV9.2 AV CONDUIT SPECIFICATIONS AND DETAILS AV9.3 LOBBY AV CONDUIT RISER AV9.4 MERCYHEALTH ARENA AV CONDUIT AND RISER AV9.5 MULIPURPOSE ARENA AV CONDUIT AND RISER AV9.6 MULTI-USE CONVENTION AV CONDUIT AND RISERREFRIGERATION R0.1 ICE RINK LEGEND AND SYMBOLS R1.0 ICE RINK SUBFLOOR PLAN R1.1 ICE RINK FLOOR PLAN R2.0 ICE EQUIPMENT ROOM PLAN R5.0 ICE RINK DETAILS AND SECTIONS R5.1 ICE RINK DETAILS AND SECTIONS R5.2 ICE RINK DETAILS AND SECTIONS R5.3 ICE RINK DETAILS AND SCHEDULE R6.0 AMMONIA FLOW DIAGRAM R6.1 SECONDARY REFRIGERANT FLOW DIAGRAM R6.2 WASTE HEAT RECOVERY FLOW DIAGRAMDASHER BOARDS DB1.0 ICE RINK DASHER BOARD PLAN DB5.0 ICE RINK DASHER BOARD SECTIONS AND DETAILS DB5.1 ICE RINK DASHER BOARD SECTIONS AND DETAILSBID SET DOCUMENTS10/04/202310/04/2023BID DOCUMENT SETSHEET INDEXSHEET NO. SHEET NAMECODEA0.0 COVER SHEETA0.1 TYPICAL MOUNTING HEIGHTS AND CLEARANCESA0.2 FIRST FLOOR LIFE SAFETY PLANA0.3 MEZZANINE FLOOR LIFE SAFETY PLANA0.4 LIFE SAFETY - OCCUPANCY AND FIXTURESCIVILC1.10 PROJECT LOCATION AND GENERAL NOTESC1.11 SITE PLAN - OVERALLC1.12 SITE PLAN - NORTHC1.13 SITE PLAN - SOUTHC1.20 GRADING PLAN - NORTHC1.21 GRADING PLAN - SOUTHC1.30 DEMOLITION PLANC1.40 EROSION CONTROL PLANC1.50 EXISTING SURVEYC5.00 CONSTRUCTION DETAILSC5.01 CONSTRUCTION DETAILSLANDSCAPINGL1.00 LANDSCAPE PLAN OVERALLL1.01 LANSCAPE PLAN NORTHL1.02 LANSCAPE PLAN SOUTHL1.03 LANDSCAPE PLAN - BID ALTERNATIVESL2.00 LANDSCAPE DETAILS & NOTESDEMOLITIONAD2.1 FIRST FLOOR DEMOLITION PLAN - OVERALLAD2.1a FIRST FLOOR DEMOLITION PLAN - ENLARGEDAD2.2 SECOND FLOOR DEMOLITION PLAN - OVERALLAD2.2a SECOND FLOOR DEMOLITION PLAN - ENLARGEDARCHITECTURALA1.0 ARCHITECTURAL SITE PLANA1.1 ARCHITECTURAL SITE PLAN - OVERALLA2.1 FIRST FLOOR PLAN - OVERALLA2.1a FIRST FLOOR PLAN - SE QUADA2.1b FIRST FLOOR PLAN - NE QUADA2.1c FIRST FLOOR PLAN - NW QUADA2.1d FIRST FLOOR PLAN - SW QUADA2.2 MEZZANINE FLOOR PLANA2.2a MEZZANINE FLOOR PLAN - SE QUADA2.2b MEZZANINE FLOOR PLAN - SW QUADA2.3 ROOF PLANA2.9 FIRST FLOOR PLAN - PRECAST PANELSA3.1 FIRST FLOOR REFLECTED CEILING PLANA3.1a FIRST FLOOR REFLECTED CEILING PLAN - NE QUADA3.1b FIRST FLOOR REFLECTED CEILING PLAN - SE QUADA3.1c FIRST FLOOR REFLECTED CEILING PLAN - SW QUADA3.1d FIRST FLOOR REFLECTED CEILING PLAN - NW QUADA3.2 MEZZANINE FLOOR REFLECTED CEILING PLANA3.2a MEZZANINE FLOOR REFLECTED CEILING PLAN - SE QUADA3.2b MEZZANINE FLOOR REFLECTED CEILING PLAN - SW QUADA4.0 EXTERIOR ELEVATIONSA4.1 ENLARGED EXTERIOR ELEVATIONSA4.2 ENLARGED EXTERIOR ELEVATIONSA4.5 ELEVATIONS - PRECAST PANELSA4.6 ELEVATIONS - PRECAST PANELSA5.0 BUILDING SECTIONSA5.1 BUILDING SECTIONSA5.5 INTERIOR SECTIONSA5.6 MAIN RINK SECTIONSA5.7 MULTIPURPOSE AREA RINK SECTIONSA6.0 WALL SECTIONSA6.1 WALL SECTIONSA6.2 WALL SECTIONSA6.3 WALL SECTIONSA6.4 WALL SECTIONSA6.5 WALL SECTIONSA7.0 EXTERIOR DETAILSA7.1 EXTERIOR DETAILSA7.2 EXTERIOR DETAILSA7.3 INTERIOR DETAILSA7.4 INTERIOR DETAILSA7.5 INTERIOR DETAILSA7.6 INTERIOR DETAILSA8.0 ENLARGED FLOOR PLANS - RESTROOMSA8.1 ENLARGED FLOOR PLANS - ADMINISTRATION AND CONCESSIONSA8.2 ENLARGED FLOOR PLANS - SPORT COURTSA8.3 MALL CONNECTION LAYOUT PLAN - NE & SEA8.4 ENLARGED FLOOR PLANS AND SECTIONS - STAIRS AND O.H. DOORSA8.5 ENLARGED FLOOR PLANS AND SECTIONS - RAMPSSHEET INDEXSHEET NO. SHEET NAMEA8.6 ENLARGED FLOOR PLANS - YOUTH HOCKEY & STORAGE ROOMSA8.7 ENLARGED SECTION AND PLANS - YOUTH HOCKEY ROOMSA8.8 ENLARGED FLOOR PLANS - CONVENTION DIAGRAMSA8.9 ENLARGED FLOOR PLANS AND ELEVATIONS - SPONSOR SUITE AND PRESS BOXA9.0 INTERIOR ELEVATIONSA9.1 INTERIOR ELEVATIONSA10.0 WALL TYPESA10.1 DOOR AND FRAME TYPESA10.2 DOOR AND FRAME DETAILSA10.3 WINDOW TYPESA11.0 FINISH SCHEDULEA11.1 FIRST FLOOR FINISH PLAN - OVERALLA11.2 MEZZANINE FLOOR FINISH PLANA13.0 FIRST FLOOR FURNITURE PLANA13.1 MEZZANINE FLOOR FURNITURE PLANADD ALTERNATE 1A2.4 FIRST FLOOR PLAN - ADD ALT 1A2.4a FIRST FLOOR PLAN - ADD ALT 1 - NW QUADA2.5 ROOF PLAN - ADD ALT 1A3.3a FIRST FLOOR REFLECTED CEILING PLAN - ADD ALT 1 - NW QUADA4.3 EXTERIOR ELEVATIONS - ADD ALT 1A5.2 BUILDING/WALL SECTIONS - ADD ALT 1A8.10 ENLARGED FLOOR PLANS - SPORT COURTS - ADD ALT 1A11.1.1 FIRST FLOOR FINISH PLAN - ADD ALT 1ADD ALTERNATE 2A2.6 FIRST FLOOR PLAN - ADD ALT 2A2.6a FIRST FLOOR PLAN - ADD ALT 2 - SE QUADA2.6b FIRST FLOOR PLAN - ADD ALT 2 - SW QUADA2.7 ROOF PLAN - ADD ALT 2A4.4 EXTERIOR ELEVATIONS - ADD ALT 2A5.3 BUILDING/WALL SECTIONS - ADD ALT 2ADD ALTERNATE 3A2.8 FIRST FLOOR PLAN - ADD ALT 3A2.8a FIRST FLOOR PLAN - ADD ALT 3 - SE QUADA2.8b FIRST FLOOR PLAN - ADD ALT 3 - SW QUADA3.4 FIRST FLOOR REFLECTED CEILING PLAN - ADD ALT 3A9.2 INTERIOR ELEVATIONS & ENLARGED FLOOR PLANS - ADD ALT 3A11.1.2 FIRST FLOOR FINISH PLAN - ADD ALT 3STRUCTURALS1.0 FOUNDATION PLAN - OVERALLS1.0a FOUNDATION - SE QUADS1.0b FOUNDATION - NE QUADS1.0c FOUNDATION - NW QUADS1.0d FOUNDATION - SW QUADS2.0 MEZZANINE FLOOR FRAMING PLAN - OVERALLS2.0a MEZZANINE FLOOR FRAMING PLAN - SE QUADS2.0b MEZZANINE FLOOR FRAMING PLAN - SW QUADS2.1 ROOF FRAMING PLAN - OVERALLS2.1a ROOF FRAMING PLAN - SE QUADS2.1b ROOF FRAMING PLAN - NE QUADS2.1c ROOF FRAMING PLAN - NW QUADS2.1d ROOF FRAMING PLAN - SW QUADS5.0 DETAILSS5.1 DETAILSS5.2 DETAILSS5.3 DETAILSS5.4 DETAILSS5.5 DETAILSS9.0 GENERAL NOTES AND SCHEDULESS9.1 SCHEDULESS9.2 SNOW DRIFT PLANS1.0 ALT FOUNDATION PLAN - OVERALLS2.1 ALT ROOF FRAMING PLAN AT ALTERNATE 1 & 2PLUMBINGP0.1 PLUMBING DETAILS AND NOTESP0.2 PLUMBING DETAILS AND CALCULATIONSP1.0 FOUNDATION PLUMBING - OVERALLP1.0a FOUNDATION PLUMBING - SE - QUADP1.0b FOUNDATION PLUMBING - NE QUADP1.0c FOUNDATION PLUMBING - NW QUADP1.0d FOUNDATION PLUMBING - SW QUADP1.1 FIRST FLOOR PLUMBING PLAN - OVERALLP1.1a FIRST FLOOR PLUMBING PLAN - SE QUADP1.1b FIRST FLOOR PLUMBING PLAN - NE QUADP1.1c FIRST FLOOR PLUMBING PLAN - NW QUADP1.1d FIRST FLOOR PLUMBING PLAN - SW QUADP1.2 MEZZANINE FLOOR PLUMBING PLAN - OVERALLP1.2a MEZZANINE FLOOR PLUMBING PLAN - SE QUADP1.2b MEZZANINE FLOOR PLUMBING PLAN -SW QUADSHEET INDEXSHEET NO. SHEET NAMEP1.3 ROOF PLUMBING PLAN OVERALLP2.0 WASTE AND VENT PIPING ISOMETRICSP2.1 WASTE AND VENT PIPING ISOMETRICSP2.2 WASTE AND VENT PIPING ISOMETRICSP3.0 WATER PIPING ISOMETRICSP3.1 WATER PIPING ISOMETRICSP3.2 WATER PIPING ISOMETRICSP4.0 STORM PIPING ISOMETRICSFIRE PROTECTIONFP1.1 FIRST FLOOR FIRE PROTECTION PLANFP1.2 MEZZANINE FLOOR FIRE PROTECTION PLANMECHANICALM1.0 MECHANICAL TITLE SHEET, SYMBOLS & ABBREVIATIONM1.1 FIRST FLOOR MECHANICAL DEMOLITION PLAN OVERALLM2.1 FIRST FLOOR MECHANICAL PLAN - OVERALLM2.1A FIRST FLOOR MECHANICAL PLAN - SE QUADM2.1B FIRST FLOOR MECHANICAL PLAN - NE QUADM2.1C FIRST FLOOR MECHANICAL PLAN - NW QUADM2.1D FIRST FLOOR MECHANICAL PLAN - SW QUADM2.2 MEZZANINE FLOOR MECHANICAL PLAN - OVERALLM2.3 MECHANICAL ROOF PLAN - OVERALLM2.4 FIRST FLOOR MECHANICAL PLAN - OVERALL - ADD ALT 1M2.4A FIRST FLOOR MECHANICAL PLAN - ADD ALT 1 - NW QUADM2.4B MEZZANINE FLOOR MECHANICAL PLAN - ADD ALT 1 - NW QUADM2.5 MECHANICAL ROOF PLAN - OVERALL - ADD ALT 1M2.6 FIRST FLOOR MECHANICAL PLAN - OVERALL - ADD ALT 2M2.6A FIRST FLOOR MECHANICAL PLAN - ADD ALT 2 - SE QUADM2.6B FIRST FLOOR MECHANICAL PLAN - ADD ALT 2 - SW QUADM2.7 MECHANICAL ROOF PLAN - OVERALL - ADD ALT 2M2.8 FIRST FLOOR MECHANICAL PLAN - OVERALL - ADD ALT 3M2.8A FIRST FLOOR MECHANICAL PLAN - ADD ALT 3 - SE QUADM2.8B FIRST FLOOR MECHANICAL PLAN - ADD ALT 2 - SW QUADM5.0 MECHANICAL DETAILSM5.1 MECHANICAL GAS RISERM6.0 MECHANICAL SCHEDULESM6.1 MECHANICAL SCHEDULESELECTRICALEL ELECTRICAL SYMBOLS ABBREVIATIONS AND NOTESESD1.0 ELECTRICAL SITE PLAN + DEMOES1.0 ELECTRICAL SITE PLAN - NEWE1.1 FIRST FLOOR REFLECTED CEILING PLAN - OVERALLE1.1a FIRST FLOOR REFLECTED CEILING PLAN A - SE QUADE1.1b FIRST FLOOR REFLECTED CEILING PLAN B - NE QUADE1.1c FIRST FLOOR REFLECTED CEILING PLAN C - NW QUADE1.1d FIRST FLOOR REFLECTED CEILING PLAN D - SW QUADE1.2 MEZZANINE FLOOR REFLECTED CEILING PLAN - OVERALLE1.2a MEZZANINE FLOOR REFLECTED CEILING PLAN A - SE QUADE1.2b MEZZANINE FLOOR REFLECTED CEILING PLAN B - NE QUADE1.2c MEZZANINE FLOOR REFLECTED CEILING PLAN C - NW QUADE1.2d MEZZANINE FLOOR REFLECTED CEILING PLAN D - SW QUADE2.1 FIRST FLOOR POWER AND SYSTEMS PLAN - OVERALLE2.1a FIRST FLOOR POWER AND SYSTEMS PLAN A - SE QUADE2.1b FIRST FLOOR POWER AND SYSTEMS PLAN B - NE QUADE2.1c FIRST FLOOR POWER AND SYSTEMS PLAN C - NW QUADE2.1d FIRST FLOOR POWER AND SYSTEMS PLAN D - SW QUADE2.2a MEZZANINE FLOOR POWER AND SYSTEMS PLAN A - SE QUADE2.2b MEZZANINE FLOOR POWER AND SYSTEMS PLAN B - NE QUADE2.3 ROOF POWER AND SYSTEMS PLAN - OVERALLE2.3a ROOF POWER AND SYSTEMS PLAN A - SE QUADE2.3b ROOF POWER AND SYSTEMS PLAN B - NE QUADE2.3c ROOF POWER AND SYSTEMS PLAN C - NW QUADE2.3d ROOF POWER AND SYSTEMS PLAN D - SW QUADE2.4 FIRST FLOOR POWER AND LIGHTING - ADD ALT 1, ALT 2, ALT 3E5.0 LIGHTING SCHEDULESE5.1 ELECTRICAL SCHEDULESE5.2 ELECTRICAL SCHEDULESE5.3 ELECTRICAL SCHEDULESE5.4 ELECTRICAL SCHEDULESE5.5 ELECTRICAL SCHEDULESE5.6 ELECTRICAL SCHEDULESE6.1 POWER DETAILSE6.2 POWER DETAILSE6.3 ELECTRICAL DETAILSE7.1 TELECOMMUNICATIONS RISER DIAGRAME7.2 MATRIXE7.3 CARD ACCESSE7.4 CAMERA SCHEDULEE7.5 SYSTEM DETAILS - ELEC RM 134E7.6 SYSTEM DETAILS - IT RM 150E7.7 SYSTEM DETAILS - IT/GEN STORAGE RM 176SHEET INDEXSHEET NO. SHEET NAMEE7.8 SYSTEM DETAILS - STORAGE RM 104E7.9 INTERCOM DETAILSE8.0 ELECTRICAL RISER DIAGRAMFOOD SERVICEFS100 FOODSERVICE - OVERALL PLANFS101 FOODSERVICE - EQUIPMENT PLANFS102 FOODSERVICE - ELECTRICAL PLANFS103 FOODSERVICE - PLUMBING PLANFS104 FOODSERVICE - CONDITIONS PLANAUDIO VISUALAV0.0 INDEX SHEETAV0.1 LEGENDS SYMBOLS AND ABBREVIATIONSAV0.2 GENERAL AUDIOVISUAL INFORMATIONAV2.1 FIRST FLOOR PLAN OVERALLAV2.1a FIRST FLOOR PLAN - SE QUADAV2.1b FIRST FLOOR PLAN - NE QUADAV2.1c FIRST FLOOR PLAN - NW QUADAV2.1d FIRST FLOOR PLAN - SW QUADAV2.2a MEZZANINE FLOOR PLAN - SE QUADAV2.2d MEZZANINE FLOOR PLAN - SW QUADAV3.1a FIRST FLOOR PLAN RCP- SE QUADAV3.1b FIRST FLOOR PLAN RCP- NE QUADAV3.1c FIRST FLOOR PLAN RCP- NW QUADAV3.1d FIRST FLOOR PLAN RCP- SW QUADAV4.1 LOBBY AND BREAKROOM SECTIONS AND ELEVATIONSAV4.2 MERCYHEALTH ARENA SECTIONS AND ELEVATIONSAV4.3 MULTI-PURPOSE ARENA SECTIONS AND ELEVATIONSAV4.4 MULTI-PURPOSE ARENA SECTIONS AND ELEVATIONSAV4.5 MULTI-USE CONVETION SECTIONS AND ELEVATIONSAV4.9a STANDARD AV DETAILSAV4.9b ADA DETAILSAV5.1 EQUIPMENT RACK ELEVATIONSAV5.2 EQUIPMENT RACK ELEVATIONSAV6.1 PANEL ELEVATIONS AND DETAILSAV6.2 PANEL ELEVATIONS AND DETAILSAV6.3 PANEL ELEVATIONS AND DETAILSAV7.0 AUDIO TERMINATIONS AND WIRINGAV7.1a LOBBY / BREAKROOM SCHEMATICSAV7.1b LOBBY / BREAKROOM SCHEMATICSAV7.1c LOBBY / BREAKROOM SCHEMATICSAV7.2a MERCYHEALTH ARENA SCHEMATICSAV7.2b MERCYHEALTH ARENA SCHEMATICSAV7.2c MERCYHEALTH ARENA SCHEMATICSAV7.2d MERCYHEALTH ARENA SCHEMATICSAV7.2e MERCYHEALTH ARENA SCHEMATICSAV7.3a MULIPURPOSE ARENA SCHEMATICSAV7.3b MULTIPURPOSE ARENA SCHEMATICSAV7.3c MULIPURPOSE ARENA SCHEMATICSAV7.3d MULTIPURPOSE ARENA SCHEMATICSAV7.3e MULTIPURPOSE ARENA SCHEMATICSAV7.3f MULTIPURPOSE ARENA SCHEMATICSAV7.4a MULTI-USE CONVENTION SPACE SCHEMATICSAV7.4b MULTI-USE CONVENTION SPACE SCHEMATICSAV7.4c MULTI-USE CONVENTION SPACE SCHEMATICSAV7.4d MULTI-USE CONVENTION SPACE SCHEMATICSAV7.4e MULTI-USE CONVENTION SPACE SCHEMATICSAV7.4f MULTI-USE CONVENTION SPACE SCHEMATICSAV9.1 AV POWER, DATA, & BOX SCHEDULESAV9.2 AV CONDUIT SPECIFICATIONS AND DETAILSAV9.3 LOBBY AV CONDUIT RISERAV9.4 MERCYHEALTH ARENA AV CONDUIT AND RISERAV9.5 MULIPURPOSE ARENA AV CONDUIT AND RISERAV9.6 MULTI-USE CONVENTION AV CONDUIT AND RISERREFRIGERATIONR0.1 ICE RINK LEGEND AND SYMBOLSR1.0 ICE RINK SUBFLOOR PLANR1.1 ICE RINK FLOOR PLANR2.0 ICE EQUIPMENT ROOM PLANR5.0 ICE RINK DETAILS AND SECTIONSR5.1 ICE RINK DETAILS AND SECTIONSR5.2 ICE RINK DETAILS AND SECTIONSR5.3 ICE RINK DETAILS AND SCHEDULER6.0 AMMONIA FLOW DIAGRAMR6.1 SECONDARY REFRIGERANT FLOW DIAGRAMR6.2 WASTE HEAT RECOVERY FLOW DIAGRAMDASHER BOARDSDB1.0 ICE RINK DASHER BOARD PLANDB5.0 ICE RINK DASHER BOARD SECTIONS AND DETAILSDB5.1 ICE RINK DASHER BOARD SECTIONS AND DETAILS "C" SERIES10-04-23MICHAEL DAVIDWOEHRLEE-41050-6P ENGINEEFO ESSIOALMINNEAPOLIS,MNNRRwISCONSIN 10/4/2023 i0||c0|p3 4 ; B o t t l e s s a v e d i 0 | | c 0 | p 3 4 ; F i l t e r s t a t u sN97'-6"20A8.210011234 A701MATCHLINE1001.1315A2A6.216'-0"18'-0"SAMPLE ROOM8CMU WALLPRECAST CONCRETE WALL PANEL W/ INSULATIONGYPSUM BOARD/STUD WALLDOOR NUMBER, DERIVED FROM ROOM #DETAIL NUMBERSHEET NUMBERENLARGED PLAN INDICATORCOLUMN GRID LINECOLUMN GRID IDENTIFICATIONROOM NAME & NUMBERSECTION CUT INDICATORDETAIL NUMBERSHEET NUMBERFLOOR PENETRATIONGYPSUM WALL W/ METAL STUD,NON-INSULATEDSPOT FLOOR ELEVATION OF ROOMNOMINAL ROOM DIMENSIONPLAN NORTH INDICATORMATCHLINE BETWEEN PLANQUADRANTSTYPICAL DRAWING NOTATION TAGWALL TYPE INDICATORSBREAKLINEBRICK & CMU CAVITY WALL W/ INSULATIONSHEET NUMBERDIRECTION OF ELEVATIONELEVATION DRAWING NUMBERINTERIOR ELEVATION INDICATORBORROWED LITE TAG, DERIVED FROM ROOM #4KEY NOTENOTE:ALL THE SYMBOLS SHOWN HERE ARE NOTNECESSARILY USED ON THESE DRAWINGS.NEW DOORIN NEW WALLEXISTING DOOR INEXISTING WALLGRAPHIC LEGENDICE RINK WALLDRAWING NAME#DRAWING SCALE## SFW10##12" Max.42" MIN.39" - 41"40" Typ.33" - 36"34" Typ.1 1/2" MIN.18" Min.39" - 41"40" Typ.54" Min.ALLOWABLE MOUNTING ZONE FOR PROTRUDING TOILET PAPER DISPENSER.Min.1' - 3"1' - 4"7" - 9" 8"1' - 4"FIG. 604.5.1 and 604.7 (a)SIDE WALL GRAB BARS - PROTRUDING DISPENSERS BELOW GRAB BARLIGHT FIXTURE CENTERED ON SINK (SEE ELECTRIC)MIRROR CENTERED ON SINK(PER SPECIFICATIONS)6"3' - 0"1' - 0"2' - 0"34" Max.2' - 10"15" Typ.SOAP DISPENSERPAPER TOWEL DISPENSER ON SIDEWALLELECTRICAL OUTLET MOUNTED UNDER SINK - AS REQ'D FOR AUTOSENSOR FAUCET. CONFIRM WITH OWNER IF PLUG IN OR HARD WIRED.40" Max.1' - 6" MIN.17" - 19"3' - 3"16" - 18"17" Typ.SINK AND TOILET PER PLUMBING.36" GRAB BAR.18" & 42" GRAB BARS. SEE SIDEWALL ELEVATION.SANITARY NAPKIN DISPOSAL AND TOILET PAPER DISPENSER ON SIDEWALL.FIG. 604.2 (a), 604.4, 604.5.2 and 606.3SIDEWALL, REAR GRAB BARS, TOILET SEAT and SINK HEIGHTS44" DOOR SHOWN60x59 CLEAR FLOOR SPACE @FLOOR MOUNTEDTOILET18"X60" CLEAR FLOOR SPACE @ PULL SIDE OF DOOR30X48 CLEARFLOOR SPACE,CENTERED ON SINK60" WHEELCHAIRTURNING DIAMETERLIGHT SWITCHTOILET (PER PLUMBING)36" HORIZONTAL GRAB BAR42" HORIZONTAL GRAB BAR18" VERTICAL GRAB BARSINK (PER PLUMBING)FAUCET (PER PLUMBING)*ELECTRIC OUTLET BELOW (UNDER) SINK IF AUTOSENSOR. VERIFY WITH OWNER IF DIRECT CONNECT OR PLUG IN. FRAMED MIRROR (PER SPECIFICATION)PAPER TOWEL DISPENSERSOAP DISPENSER1' - 6"7' - 6"5' - 0"2' - 6"1' - 3"16" - 18"TOILET PAPER DISPENSER1' - 6"NOTE:DIMENSIONS AND CLEARANCE REQUIREMENTS SHOWN ORIGINATING FROM A WALL ARE FROM THE FACE OF THE FINISHED WALL. THAT IS THE FACE OF WALL TILE, WHEN USED. REFER TO THE ROOM FINISH AND MATERIAL SCHEDULES FOR FINISH SELECTIONS.BABY CHANGING STATION34" MAX TO HIGHEST PART OF WORK SURFACE27" MIN TO BOTTOM OF WORK SURFACEEQUIPMENT ABOVE COUNTER / COUNTER WITH SINKPT= PAPER TOWELSP=SOAPBATTERY OPERATED CLOCK . 7' - 0"1' - 11"PTDSP2' - 2"2' - 10"OPEN2' - 0"ALIGN BOTTOMS2' - 10"1"1"knee space1"3' - 10"SWITCHESTHERMOSTAT OUTLETSTELECOM.OUTLETS/SWITCHESABOVE COUNTER6"3' - 10"1' - 6"1' - 6"CARD READERFIRE STROBEFIRE ALARM PULL STATION6' - 8"3' - 10"3' - 10"3' - 10"SOAP DISPENSER ON MIRRORPAPER TOWEL DISPENSER TO DISPENSE48" Max.1' - 6"TABLE 603.6MAXIMUM REACH HEIGHT and DEPTH34" Max.ABHRABHR= ALCOHOL BASED HAND RUBNOTE: ANY EDGE OF ABHR TO BE MIN. 1" CLEAR OF ANY ELECTRIFIED DEVICE.2" MIN. CLEARANCE IS PREFERRED.SWITCHT-STAT1" min.MINOUTLET/ TELECOM1" min.1" min.ABHR3' - 9"TELECOM/OUTLET1" min.ALCOHOL BASED HAND RUB LOCATIONS SHOWN ARE PER NFPA 101, LIFE SAFETY CODE 2012ed. SECTION 19.3.2.6* Alcohol-Based Hand-RubDispensers.PAPER TOWEL DISPENSERSTOWEL DISPENSER AND WASTE RECEPTACLE4'-0"ELECTRIC HAND DRYERSACCESSIBLE COAT HOOKTOWEL BARCUP DISPENSERELECTRIC HAND DRYERS3'-4"NOTE: ALL DIMENSIONS INCLUDE ALL OPERABLE LEVERS, INCLUDING COIN SLOTSCONTROL HEIGHTFIRE EXTINGUISHERWALL MOUNTED CABINETTypical4'-0" max4'-0" MAX4'-0" MAXIMUM3'-6"FIRE EXTINGUISHER -WALL HUNG (under 40 lbs.)FIRE EXTINGUISHER IN SEMI-RECESSED CABINETFIRE EXTINGUISHER AND FIRE HOSE VALVE IN RECESSED CABINETFIRE EXTINGUISHER, FIRE HOSE VALVE AND FIRE DEPARTMENT VALVE IN RECESSED CABINETFIRE DEPARTMENT VALVE IN RECESSED CABINETFIREFIGHTER'S HANDSETFH10 1/2"1'-4"4'-11"min1'-3"2'-0 1/4"6' - 8"FIRE EXTINGUISHER SIGNAGE. 48" MAX.R R48" Max.15" Min.10" Max.R46" Max.34" Max.> 10" - 24">20" - 25"20" Max.34" Max.48" Max.10" Max.46" Max.34" Max.48" Max.48" Max.15" Min.FIG. 308.2.1UNOBSTRUCTED FORWARD REACHFIG. 308.2.2 (a)OBSTRUCTED HIGH FORWARD REACHFIG. 308.2.2 (b)OBSTRUCTED HIGH FORWARD REACHFIG. 308.3.2 (b)OBSTRUCTED HIGH SIDE REACHFIG. 308.3.2 (a)OBSTRUCTED HIGH SIDE REACHFIG. 308.3.1UNOBSTRUCTED SIDE REACHTV - 32"CLTV - 65" ED3"3"VESA 200EDVESA 400VESA 4002'-0"2'-0"10"ED8"8"32" TV W/ DUAL SWING ARMEDCHIEF TS318SU43" TV W/ DUAL SWING ARM1'-4" 1'-4"8"patterns based on CHIEF LTM1U-T, MTM1U-T, MTMP1U-Tpatterns based on CHIEF TS318SU1'-4"PCOUTLETS BEHIND MONITORS AT CENTER OF BRACKET -UNLESS NOTED OTHERWISEdatapowerCPU slotdatapowerCPU slotPer Project LocationdatapowerCPU slotPer Project LocationdatapowerCPU slotPer Project LocationMONITOR - 42'-48"Per Project LocationPCPCD ED ED ED EPCPCD EMONITOR - 55"MONITOR - 65"MONITOR - 70"-90"(b) ElevationFIG. 602.5DRINKING FOUNTAIN SPOUT LOCATION(a) Plan36" Max. ADAStanding Person38" - 43"15" Min.5" Max.Controls & Hand Shower AreaControl Wall41"38" min48" maxSHOWER COMPARTMENT4" max15" max36"Shower Compartment36" Clear18"CONTROL WALLStandard Fixed Shower Head Height6' - 6"4" maxControl WallSeat WallLCLC36" Min.(Fin. Face)36" Clear48" Min.(Fin. Face to Fin. Face)36" ClearSeat where indicatedSHOWER COMPARTMENTSIZE AND CLEARANCES (TRANSFER TYPE)PLAN VIEWLCSeat where indicatedVertical Grab BarClear Floor SpaceShower Compartment36" ClearSIDE WALL34" GB18" GB36"18" GB(Detention Shower Head Height Per Manufacturer)Hand Shower Fixed Shower HeadSeatWall(Fin. Face to Fin. Face)60" ClearSeat where indicated3' - 0"6" max6" max1' - 9" 2' - 9"PLAN VIEWSHOWER COMPARTMENT (ROLL-IN TYPE)Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedTYPICAL MOUNTINGHEIGHTS ANDCLEARANCESWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A0.110/13/2023220025.00C2023-15NOTE:LOCATIONS AND DIMENSIONS SHOWN ON THIS SHEET ARE TYPICAL WHERE NO DIMENSIONS OR LOCATIONS ARE INDICATED IN A SPECIFIC ELEVATION. IF A DIMENSION OR LOCATION SHOWN IN A SPECIFIC ELEVATION DIFFERS FROM THOSE SHOWN ON THIS SHEET, THE ELEVATION WHERE SHOWN SHALL GOVERN.3/8" = 1'-0"4TYPICAL MOUNTING HEIGHT -TOILET ROOM ACCESSORY -Sidewall3/8" = 1'-0"5TYPICAL MOUNTING HEIGHTS -TOILET ROOM ACCESSORY -Wet Wall1/2" = 1'-0"7TYPICAL TOILET ROOM ACCESSORY CLEARANCES3/8" = 1'-0"13TYPICAL MOUNTING HEIGHTS -EQUIPMENT AND ACCESSORIES3/8" = 1'-0"12TYPICAL MOUNTING HEIGHTS -ELECTRIC3/8" = 1'-0"6TYPICAL MOUNTING HEIGHTS -Sink Profile Wall1/2" = 1'-0"3TYPICAL MOUNTING HEIGHTS - ABHR MOUNTING3/8" = 1'-0"11EQUIPMENT AND ACCESSORIES3/8" = 1'-0"10FIRE PROTECTION EQUIPMENT3/8" = 1'-0"8TYPICAL REACH REQUIREMENTS3/8" = 1'-0"1TV AND MONITORS3/8" = 1'-0"2DRINKING FOUNTAIN3/8" = 1'-0"9ADA SHOWERS10/04/2023BID DOCUMENT SET HCHCHCHCHCHCHCHCHCHCDNDNHCHCHCDNG24"X60"24"X60" 24"X48"24"X60"24"X48"18"X60"18"X36"18"X48"18"X60" 18"X60"CHCHCHCHCH HCHCHCHCH CHCH CS2FB 2FB2FB 2FB 2FB 2FB 2FB 2FB 2FB 2FB 2FB 2FB 2FB 2FB 2FB 2FB 2FB2FB 2FB 2FB 2FB 2FB 2FB 2FB 1FB 1FB 1FB 1FB1FB 1FB 1FB 1FB1FB1FB 1FB1FB1FB1FB1FB1FB1FB1FB1FB1FB1FB LIFE SAFETY LEGEND= ACCESSIBLE TOILET ROOMS/WC= MEANS OF EGRESSTD=50'= TOTAL EGRESS TRAVEL DISTANCE= ACCESSIBLE ENTRANCE/EXIT= FIRE EXTINGUISHER LOCATION WITH 75' RADIUSSR = SEMI RECESSED SM = SURFACE MOUNTED = 1 HOUR FIRE BARRIER• ALL PENETRATIONS SEALED FOR ONE HOUR FIRE RATING / DAMPERS AT DUCT PENETRATIONS• DOORS: 45-MINUTE RATED IN FIRE RATED FRAME WITH CLOSER & POSITIVE LATCHING= ASSEMBLY (A-3)34"/236 OCC.. = EGRESS COMPONENT & INCHES OF EGRESS WIDTH / OCC.. LOAD CAPACITYOCCUPANCYFIRE RATING1FB1FBSYMBOLSUSEAREASF/OccOccsSTORAGE2400300= ROOM / SPACE OCCUPANCY TAGDOOR = 2 HOUR FIRE BARRIER• ALL PENETRATIONS SEALED FOR TWO HOUR FIRE RATING / DAMPERS AT DUCT PENETRATIONS• DOORS: 90 MINUTE RATED IN FIRE-RATED FRAME WITH CLOSER & POSITIVE LATCHING2FB 2FB 2FB 2FB 2FB1FB 1FB= FLOOR 1 EGRESS DISTANCE= MEZZANINE EGRESS DISTANCE= ASSEMBLY (A-4)= MEZZANINE FIRE AREA 56' TRAVEL DISTANCE18" PER SEAT25 SEATS PER ROW2 ROWS50 SEATS18" PER SEAT25 SEATS PER ROW2 ROWS50 SEATS18" PER SEAT25 SEATS PER ROW2 ROWS50 SEATS189 TOTAL SEATSABEFHJKMPQCDN12345687F.3F.9GG.8LL.6M.45.87.292 HOUR FIRE BARRIER - TO BOTTOM OF DECK PER CODE SECTION IBC 2015 -706.5 (REFER TO CODE ANALYSIS 402.4.2.246' - 0 3/8"56' - 4 3/4"68' - 2 3/4"405' - 8"325' - 3 1/2"A-3 ASSEMBLY A-4 ASSEMBLY A-4 ASSEMBLY EGRESS WIDTH 68" EW = 453 OCCEGRESS WIDTH 68" EW = 453 OCCEGRESS WIDTH 68" EW = 453 OCCEGRESS WIDTH 68" EW = 453 OCCEGRESS WIDTH 34" EW = 226 OCCEGRESS WIDTH 102" EW = 680 OCCEGRESS WIDTH 68" EW = 453 OCCEGRESS WIDTH 40" EW = 266 OCCEGRESS WIDTH 136" EW = 906 OCC164' TRAVEL DISTANCE174' TRAVEL DISTANCE172' TRAVEL DISTANCE1 7 2 ' T R A V E L D I ST A N C E 243' TRAVEL DISTANCE246' TRAVEL DISTANCE128' TRAVEL DISTANCE176' TRAVEL DISTANCE249' TRAVEL DISTANCE210' TRAVEL DISTANCE14 0 ' T RAV E L DI S TAN CE SEATING COUNT =228 SEATS196 SFCONCESSIONS115 (B)153 SFBEER SALES116481 SFFOOD PREP115 (A)797 SFWARMING ROOM1591175 SFLOADING/RECEIVING/STORAGE16016327 SFMERCYHEALTHARENA13616333 SFMULTI-PURPOSEAREA15419343 SFMULTI-USECONVENTIONSPACE15653 SFGEN STORAGE153176 SFMECHANICAL168207 SFMETER/RISER179665 SFMEETING ROOM(B)103666 SFMEETING ROOM(A)102152 SFSTOR104171 SFFIRST AID105273 SFSTORAGE158143 SFELECTRIC1572479 SFGENERALBUILDINGSTORAGE16798 SFF.S. STORAGE1751443 SFRESURFACER/SHOPTOOLS/LAUNDRY170966 SFREFRIGERATION172161 SFELECTRICAL169210 SFELEC134190 SFMAIN COACH1331227 SFMAIN TEAMROOM13297 SFLAUNDRY131265 SFTRAINING129336 SFTEAM ROOM 4127342 SFTEAM ROOM 5126377 SFWET TEAMROOM 3125360 SFWET TEAMROOM 4123671 SFY.H. STORAGE137347 SFWET TEAMROOM #1138444 SFWET TEAMROOM #2140273 SFYH COACH14374 SFJ.C.142224 SFREFEREE145347 SFTEAM ROOM 1147347 SFTEAM ROOM 2148347 SFTEAM ROOM 3149154 SFIT15059 SFJ.C.11442 SFJ.C.163371 SFADMIN112112 SFOFFICE110158 SFOFFICE111184 SFBREAKROOM109350 SFSKATE RENTAL108240 SFCHECK-IN/RENTAL107101 SFCOPY AREA112 (A)EGRESS WIDTH 207" EW =1,379 OCC84 SFTEMP STORAGE174224 SFHOCKEYSTORAGE17398 SFIT/GENSTORAGE17612GENDERWCLVSHWUR1311UNISEXGENDERWCLVSHWUR1001UNISEXGENDERWCLVSHWUR3512UNISEXGENDERWCLVSHWUR6065MALEGENDERWCLVSHWUR1001UNISEXGENDERWCLVSHWUR70028FEMALEGENDERWCLVSHWUR2011MENGENDERWCLVSHWUR1001UNISEXGENDERWCLVSHWUR4053MALEGENDERWCLVSHWUR70011FEMALEGENDERWCLVSHWUR1311UNISEXGENDERWCLVSHWUR1101UNISEXGENDERWCLVSHWUR1001UNISEXF.4F.63043 SFMERCYHEALTHARENA NORTHSEATING136 (A)3311 SFMERCYHEALTHARENA SOUTHSEATING136 (B)EGRESS WIDTH 68" EW = 453 OCC72 SFDRY STORAGE115 (C)53 SFELECTRICAL11377 SFLOCKERALCOVE101 (A)1963 SFMULTIPURPOSESEATING154 (A)TD = 102' TD = 46' TD = 91' TD = 117' -6" 1441 SFICE RINKCIRCULATION1351165 SFICE RINKCIRCULATION1512089 SFPASSAGE1443543 SFPASSAGE130MULTIPURPOSESEATING154 (A)5198 SFMULTIPURPOSEAREACIRCULATION154 (B)4218 SFICE ARENALOBBY117M.377 SFVESTIBULE171154 SFSTORAGE135(A)37' - 6"37' - 6"37' - 6"L.4L.8SRSRSRSRSRSRSMSRSRSRSMSMSRSMSMSRSREGRESS WIDTH 68" EW = 453 OCCEGRESS WIDTH 102" EW = 680 OCCEGRESS WIDTH 34" EW = 226 OCCEGRESS WIDTH 40" EW = 266 OCCEGRESS WIDTH 34" EW = 226 OCCEGRESS WIDTH 68" EW = 453 OCCEGRESS WIDTH 68" EW = 453 OCCEGRESS WIDTH 34" EW = 226 OCCTOT EGRESS WIDTH 173" EW =1,153 OCC69 SFAV CLOSET157 (A)54 SFAV CLOSET167 (B)210' TRAVEL DISTANCE240' TRAVEL DISTANCE18 SFCLOSET172(A)64 SFCLOSET133(A)L.7857 SFMALLCONNECTION164GENDERWCLVSHWUR1001UNISEXGENDERWCLVSHWUR3004WOMENADD ALT 2/3 SEE CODE SHEET A0.3ADD ALT 1 SEE CODE SHEET A0.3SMSMSMSRSMSMSRSR59 SFWELLNESSROOM119EXISTING MALL EGRESS PATH TO BE MAINTAINED WITH NO MODIFICAITIONS FROM PREVIOUS APPROVED EGRESS PATH.79' - 0 3/8"THE DRAWINGS CONTAINED IN THIS SET DESCRIBE A 111,862 SF, 1-STORY (A) ASSEMBLY BUILDING WITH UPPER MEZZANINE - NEW CONSTRUCTION BUILDING WITH BUSINESS AND FOOD SERVICE AS ACCESSORIES. EXTERIOR WORK INCLUDES LANDSCAPING, STORM / SANITARY SEWER MODIFICATIONS, PAVING, AND EXTERIOR LIGHTING IMPROVEMENTS.FIRE AREAFIRST FLOOR 111,862 SFMEZZANINE FLOOR (YELLOW AREA ON 2/A0.4) 13,446 SFTOTAL 125,308 SFBUILDING AREA (NOT INCLUDING ALTERNATES)TOTAL 111,862 SFBUILDING CONSTRUCTIONEXTERIOR WALLS: PREFAB PRECAST WALL PANELS w/ METAL PANEL / STONE / CMU CLADDINGINTERIOR WALLS: MASONRY, METAL STUD & GYP BRDFLOOR DECK: PRECAST PLANK, CONCRETEROOF: METAL DECK/ FLAT ROOF (≤2/12 SLOPE): MEMBRANE / INSULATION / STEEL FRAMING FULL AUTOMATIC SPRINKLER SYSTEM IS PROVIDED IN ACCORDANCE WITH NFPA-13.CHAPTER 3 USE AND OCCUPANCY CLASSIFICATIONMAIN OCCUPANCY: ASSEMBLY GROUP A303.4 A-3 ASSEMBLY (25,642 SF) INCLUDING FOOD SERVICE (797 SF) AS AN ACCESSORY OCCUPANCY 303.5 A-4 ASSEMBLY (86,220 SF)INCLUDING FOOD SERVICE (911 SF) AND OFFICE (3,927 SF) AS AN ACCESSORY OCCUPANCYADD ALT 1 303.4 A3 ASSEMBLY (6,320 SF) INCLUDING OFFICE (1,305 SF) AS AN ACCESSORY OCCUPANCYADD ALT 2/3303.5 A-4 ASSEMBLY (3,678 SF)INCLUDING OFFICE (374 SF) AS AN ACCESSORY OCCUPANCYTOTAL ACCESSORY AREA WITHOUT ALT 1-3 = 5,635 SFTOTAL ACCESSORY AREA WITH ALT 1-3 = = 7,314 SFCHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY402.4.1.2. ANCHOR BUILDINGS - THE BUILDING AREA AND BUILDING HEIGHT OF ANY ANCHOR BUILDING SHALL BE BASED ON THE TYPE OF CONSTRUCTION AS REQUIRED BY SECTION 503 AS MODIFIED BY SECTION 504 AND 506- EXCEPTION: THE BUILDING AREA OF ANY ANCHOR BUILDING SHALL NOT BE LIMITED PROVIDED THE ANCHOR BUILDING IS NOT MORE THAN 3 STORIES ABOVE GRADE PLAN, AND IS OF TYPE I,II,III,IV CONSTRUCTION402.4.2.2 AN ANCHOR BUILDING SHALL BE SEPARATED FROM COVERED MALL BUILDING BY FIRE WALLS COMPLYING WITH SECTION 706-EXCEPTION #1 - ANCHOR BUILDINGS OF NOT MORE THAN 3 STORIES ABOVE GRADE THAT HAVE AN OCCUPANCY CLASSIFICATION THE SAME AS THAT PERMITTED FOR TENANTS OF THE MALL BUILDING SHALL BE SEPARATED BY 2 HOUR FIRE RESISTANCE RATED FIRE BARRIERS COMPLYING WITH SECTION 707402.4.2.2.1 OPENINGS BETWEEN ANCHOR BUILDINGS OF TYPE IA,IB,IIA,IIB CONSTRUCTION AND THE MALL NEED NOT BE PROTECTEDCHAPTER 5 GENERAL BUILDING HEIGHTS AND AREAS504.3(T) MAXIMUM ALLOWABLE HEIGHT: A-3 & A-4: 75 FEET (SPRINKLERED PER 903.3.1.1 NFPA 13)504.4(T) MAXIMUM ALLOWABLE STORIES:: A-3 & A-4: 3 STORIES (SPRINKLERED PER 903.3.1.1 NFPA 13)505.2 MEZZANINES - A MEZZANINE IN COMPLIANCE WITH SECTION 505.2 SHALL BE CONSIDERED A PORTION OF THE STORY BELOW. SUCH MEZZANINES SHALL BE INCLUDED IN DETERMINING FIRE AREA. THE CLEAR HEIGHT ABOVE AND BELOW THE MEZZANINE FLOOR CONSTRUCTION SHALL BE NOT LESS THAN 7 FT.505.2.1 THE AGGREGATE AREA OF A MEZZ IN BUILDINGS I AND II CONSTRUCTION SHALL BE NOT GREATER THAN 1/2 OF THE FLOOR AREA OF THE ROOM IN BUILDINGS EQUIPPED WITH AND APPROVED AUTOMATIC SPRINKLER SYSTEM (MERCYHEALTH ARENA = 34,629 SF)507.4 THE AREA OF A GROUP A-4 BUILDING NO MORE THAN ONE STORY ABOVE GRADE PLANE OF OTHER THAN TYPE V CONSTRUCTION, OR THE AREA OF A GROUP B, F, M OR S BUILDING NO MORE THAN ONE STORY ABOVE GRADE PLANE OF ANY CONSTRUCTION TYPE, SHALL NOT BE LIMITED WHERE THE BUILDING IS PROVIDED WITH AN AUTOMATIC SPRINKLER SYSTEM THROUGHOUT IN ACCORDANCE WITH SECTION 903.3.1.1 AND IS SURROUNDED AND ADJOINED BY PUBLIC WAYS OR YARDS NOT LESS THAN 60 FEET (18288 MM) IN WIDTH.508.2.3 AGGREGATE ACCESSORY OCCUPANCIES SHALL NOT OCCUPY MORE THAN 10% OF THE FLOOR AREA OF THE STORY IN WHICH THEY ARE LOCATED AND SHALL NOT EXCEED THE TABULAR VALUES FOR NONSPRINKLERED BUILDINGS IN TABLE 506.2 FOR EACH SUCH ACCESSORY OCCUPANCY.(REFER TO CODE ANALYSIS CHAPTER 3)509 INCIDENTAL USE REFRIGERANT MACHINERY ROOM - 1 HR RATING IS NOT REQUIRED WHEN AN AUTOMATIC SPRINKLER SYSTEM IS PROVIDED (1-HOUR FIRE-RATED ENCLOSURE AND DOOR ARE PROVIDED IN THIS PROJECT).CHAPTER 6 TYPES OF CONSTRUCTION601 TYPE II-B (TWO-B) CONSTRUCTION (NON-COMBUSTIBLE, UNPROTECTED)0 HR PRIMARY STRUCTURAL FRAME0 HR EXTERIOR BEARING WALLS0 HR INTERIOR BEARING WALLS 0 HR EXTERIOR NON BEARING WALLS (PER TBL 602)0 HR INTERIOR NON BEARING WALLS0 HR FLOOR CONSTRUCTION (INCL. SECONDARY MEMBERS)0 HR ROOF CONSTRUCTION (INCL. SECONDARY MEMBERS) 0 HR EXIT ENCLOSURES (PER 1023.2)- OPEN STAIRWAY 1 HR ELEVATOR SHAFT (PER 3002.1 AND 713.4)CHAPTER 7 FIRE RESISTANCE RATED CONSTRUCTION703.3 PERSPECTIVE DESIGNS OF FIRE RESISTANCE RATINGS ARE ALLOWED FROM APPROVED SOURCES, FROM SECTION 721 OR CALCULATIONS FROM SECTION 722.705.2.1 PROJECTIONS FROM EXTERIOR WALLS OF TYPE II CONSTRUCTION SHALL BE NON-COMBUSTIBLE OR AS ALLOWED BY 1406.3 AND 1406.4705.8 NO LIMIT ON EXTERIOR WALL OPENINGS IN SPRINKLERED BUILDINGS WITH 30' OR GREATER FIRE SEPARATION DISTANCECHAPTER 8 INTERIOR FINISHES803.11(T) WALL/CEILING FINISHES IN SPRINKLERED SPACES (ASSEMBLY - A3 & A4)TO BE CLASS "C" @ ROOMS/ENCLOSED SPACES CHAPTER 9 FIRE PROTECTION SYSTEMS903.2.1.3 AUTOMATIC SPRINKLER SYSTEM IS REQUIRED IN OCCUPANCY A-3/A-4 WHERE FIRE AREA EXCEEDS 12,000 SQUARE FEET OR OCCUPANT LOAD IS GREATER THAN 300903.3.1.1 AUTOMATIC SPRINKLER SYSTEM TO BE INSTALLED PER NFPA 13.905.3.1 CLASS "1" STANDPIPE SYSTEM IS ALLOWED WHEN AN AUTOMATIC SPRINKELER SYSTEM IS PROVIDED906.3(T) PORTABLE FIRE EXTINGUISHERS ARE REQUIRED PER CLASS A FIRE HAZARDS (MAX 75' TRAVEL DISTANCE)907.2.1.1 ACTIVATION OF THE FIRE ALARM IN GROUP A OCCUPANCIES WITH AN OCCUPANT LOAD OF 1,000 OR MORE SHALL INITIATE A SIGNAL USING AN EMERGENCY VOICE/ALARM COMMUNICATIONS SYSTEM IN ACCORDANCE WITH SECTION 907.5.2.2CHAPTER 10 MEANS OF EGRESS1004.1.2 DESIGN OCCUPANT LOAD (FLOOR AREA IN SF/OCC) 4,849 OCCTOTAL BUILDING OCCUPANTS (ASSUMES EVERY SPACE IS FULLY AND CONCURRENTLY OCCUPIED ACCORDING TO CODE RATIOS) A3 MULTI-USE CONVENTION SPACE: 1,475 OCC (SEATING LAYOUT + PLATFORM)A4 MULTIPURPOSE AREA: 1,621 OCC (SEATING LAYOUT + PLATFORM)A-4 MERCY HEALTH ARENA: 1,568 OCC (SEATING LAYOUT + TWO TEAMS,COACHES & TRAINERS)MEETING ROOMS: 90 OCC (15 NET)OFFICE/FOOD SERVICE: 42 OCC (100/200 GROSS)UTILITY/MECH: 25 OCC (300 GROSS)STORAGE: 28 OCC (300 GROSS)1005.3.2 A MEANS OF EGRESS FACTOR OF 0.15" PER OCCUPANT IS PERMITTED WHEN (1) AN AUTOMATIC SPRINKLER SYSTEM IS PROVIDED(2) AN EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM IS PROVIDED0.15 PER OCCUPANT, DOORS, HORIZONTAL EXITS AND CORRIDORS4,849 OCCUPANTS EXITING728" REQUIRED (927" EGRESS WIDTH PROVIDED)1006.3.1(T) MINIMUM EXITS PER STORYGREATER THAN 1,000 OCCUPANTS = 4 EXITS MINIMUM (11 MEANS OF EGRESS PROVIDED)1007.1.1 WHERE TWO EXITS AREA REQUIRED, THEY MUST BE SEPARATED BY 1/3 THE MAX DIAGONAL DIMENSION OF THE ROOM. 1009.1 WHERE MORE THAN ONE MEANS OF EGRESS IS REQUIRED BY SECTION 1006.2 OR 1006.3 FROM ANY ACCESSIBLE SPACE, EACH PORTION OF THAT SPACE SHALL BE SERVED BY NOT LESS THAN TWO ACCESSIBLE MEANS OF EGRESS.1009.8 2-WAY COMMUNICATION IS NOT REQUIRED AT MEZZ ELEVATOR LANDING1010.1.1 CLEAR WIDTH OF DOOR OPENING TO BE 32" MIN.1010.1.2.1 DOORS SHALL SWING IN THE DIRECTION OF EGRESS TRAVEL WHERE SERVING AN OCCUPANT LOAD OF 50 OR MORE PERSONS1011.12.2 IN BUILDINGS WITHOUT AN OCCUPIED ROOF, ACCESS TO THE ROOF SHALL BE PERMITTED TO BE A ROOF HATCH NOT LESS THAN 16 SQUARE FEET AND A MINIMUM DIMENSION OF 2'.1017.2 MAXIMUM EXIT ACCESS TRAVEL DISTANCE = 250 FEET IN SPRINKLERED ASSEMBLY (A3 & A4 ASSEMBLY) 1020.4 DEAD END CORRIDORS LIMITED TO 20' IN LENGTH IN SPRINKLERED GROUP ASSEMBLY BUILDINGS. CHAPTER 11 ACCESSIBILITY1103.2.9 EQUIPMENT SPACES - SPACES FREQUENTED ONLY BY SERVICE PERSONNEL ARE NOT REQUIRED TO COMPLY WITH THIS CHAPTER 1104.1 SITE ARRIVAL POINTS - AT LEAST ONE ACCESSIBLE ROUTE WITHIN THE SITE SHALL BE PROVIDED FROM PUBLIC TRANSPORTATION, ACCESSIBLE PARKING, ACCESSIBLE PASSENGER LOADING ZONES AND PUBLIC STREETS OR SIDEWALKS TO THE ACCESSIBLE ENTRANCE (3 ACCESSIBLE ENTRANCES PROVIDED)1104.2 AT LEAST ONE ACCESSIBLE ROUTE SHALL CONNECT ACCESSIBLE BUILDINGS, FACILITIES, ELEMENTS, AND SPACES ON THE SAME SITE1105.1 IN ADDITION TO ACCESSIBLE ENTRANCES REQ'D BY SECTION 1105.1.1 THROUGH 1107.1.7, AT LEAST 60% OF ALL PUBLIC ENTRANCES TO BE ACCESSIBLE (3 ACCESSIBLE ENTRANCES PROVIDED)1109.2 AT LEAST ONE OF EACH TYPE OF ELEMENT OR FIXTURE IS PROVIDED TO BE ACCESSIBLE.ELEMENTS AND FIXTURES INCLUDE SUCH THINGS AS WATER CLOSETS, LAVATORIES, MIRRORS, PAPER TOWEL DISPENSERS AND ELECTRIC HAND DRYERS AND OTHER DEVICES USED BY OCCUPANTS1109.2.1 IN ASSEMBLY OCCUPANCY, AN ACCESSIBLE FAMILY OR ASSISTED-USE TOILET ROOM SHALL BE PROVIDED WHERE AN AGGREGATE OF SIX OR MORE MALE AND FEMALE WATER CLOSETS IS REQUIRED. FIXTURES LOCATED WITHIN FAMILY OR ASSISTED-USE TOILET AND BATHING ROOMS SHALL BE INCLUDED IN DETERMINING THE NUMBER OF FIXTURES PROVIDED IN AN OCCUPANCY.1109.2.2 WHERE WATER CLOSET COMPARTMENTS ARE PROVIDED IN A TOILET ROOM OR BATHING ROOM, AT LEAST 5% OF THE TOTAL NUMBER OF COMPARTMENTS SHALL BE WHEELCHAIR ACCESSIBLE. WHERE THE COMBINED TOTAL WATER CLOSET COMPARTMENTS AND URINALS PROVIDED IN A TOILET ROOM OR BATHING ROOM IS SIX OR MORE, AT LEAST 5 % OF THE TOTAL NUMBER OF COMPARTMENTS SHALL BE AMBULATORY ACCESSIBLE, PROVIDED IN ADDITION TO THE WHEELCHAIR-ACCESSIBLE COMPARTMENT.1109.2.3 WHERE SINKS ARE PROVIDED, AT LEAST 5% BUT NOT LESS THAN ONE MUST BE ACCESSIBLE. (ALL LAVATORIES PROVIDED IN THIS PROJECT ARE ACCESSIBLE)1109.4 KITCHENS AND KITCHENETTES SHALL BE ACCESSIBLE1109.5.2 DRINKING FOUNTAINS - 50% OF PROVIDED DRINKING FOUNTAINS SHALL BE ACCESSIBLE1109.7 ELEVATORS SHALL BE ACCESSIBLECHAPTER 15 ROOFING1505.1 PROVIDE A MIN. CLASS "C" ROOF ASSEMBLY FOR TYPE II-B BUILDINGS.CHAPTER 24 GLASS AND GLAZING2406.1 SAFETY GLAZING IS REQUIRED AT HAZARDOUS LOCATIONS LISTED BELOW AND SHALL COMPLY WITH CATEGORY II OF CPSC 16 CFR 12012406.4.1 GLAZING IN DOORS 2406.4.2 GLAZING ADJACENT TO DOORS WITHIN 24" ARC AND BOTTOM OF GLAZING IS LESS THAN 60" AFF2406.4.3 GLAZING IN WINDOWS WHERE INDIVIDUAL PANE IS GREATER THAN 9 SQUARE FEET AND BOTTOM EDGE IS WITHIN 18" AFF AND TOP EDGE OF GLAZING IS GREATER THAN 36" AFF OR IF WALKING SURFACE IS WITHIN 36" OF THE WINDOW SURFACE2406.4.4 GLAZING IN GUARDS AND RAILINGSCHAPTER 26 PLASTIC2603.4.1.5 A THERMAL BARRIER IS NOT REQUIRED FOR FOAM PLASTIC INSULATION THAT IS PART OF A CLASS A, B, OR C ROOF COVERING ASSEMBLY, PROVIDED THE ASSEMBLY WITH THE FOAM PLASTIC SATISFACTORILY PASSES NFPA 276 OR UL 1256LENGTH (NORTH/SOUTH): 405'-8"'WIDTH (EAST/WEST): 338'-6"PERIMETER LENGTH: 1,522'-0"HEIGHT: 32' - 4"OCCUPANCY: PRIMARY OCCUPANCY (A-3 & A-4) CONSTRUCTION TYPE: IIB (TWO-B) UNPROTECTEDAPPLICABLE BUILDING CODES:• IBC 2015 • WISCONSIN COMMERCIAL BUILDING CODE (CH. SPS 318) ELEVATORS, ESCALATORS, AND LIFT DEVICES(CH. SPS 361-366)• IFGC 2015 • IMC 2015• IEBC 2015• IECC 2015 • ICC/A 117.1-2009 • IFC (WHERE REFERENCED BY OTHER I-CODES) • WISCONSIN ADMINISTRATIVE PLUMBING CODES (SPS 381-384) • 2017 NATIONAL ELECTRICAL CODE & WISCONSIN (SPS 316)• COJ SIGN CODE – CHAPTER 28BUILDING DATANNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR LIFE SAFETYPLANWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A0.210/13/2023220025.00C2023-153/64" = 1'-0"1FIRST FLOOR LIFE SAFETY -OVERALLTOTAL PLUMBING FIXTURESTITLEMEN WOMEN UNISEX TOTALBASE BIDWATER CLOSET9 43 10 62ADA STALLS3 4 9 16AMBULATORY STALLS2 3 0 5URINALS12 0 3 15LAVATORIES12 17 11 40SHOWERS0 0 12 12SERVICE SINKS0 0 4 4DRINKING FOUNTAINS0 0 10 10ADD ALT 3WATER CLOSET0 0 6 68ADA STALLS0 0 3 19AMBULATORY STALLS0 0 0 5URINALS0 0 2 18LAVATORIES0 0 5 45SHOWERS0 0 10 22SERVICE SINKS0 0 0 4DRINKING FOUNTAINS0 0 0 10*ALL LAVATORIES ARE ADA ACCESSIBLE *NOTE IN REGARDS TO CONVENTION/SEASONAL EVENTSPER SPS 362.2900 ADDITIONAL CRITERIA FOR TOILETS:(1) PLUMBING FIXTURE ALTERNATIVES 3. PORTABLE RESTROOMS RECOGNIZED UNDER CH SPS391 MAYBE SUBSTITUTED FOR WATER CLOSETS REQUIRED UNDER IBC CHAPTER 29 FOR BUILDINGS ACCOMODATING EVENTS OR TEMPORARY OCCUPANCIES NOT EXCEEDING 12 CONSECUTIVE DAYS OR AS APPROVED BY THE DEPARTMENT10/04/2023BID DOCUMENT SET HCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCDNCC1FB1FB1FB1FB1FB1FB1FB1FB HCHCHCHCDNLIFE SAFETY LEGEND= ACCESSIBLE TOILET ROOMS/WC= MEANS OF EGRESSTD=50'= TOTAL EGRESS TRAVEL DISTANCE= ACCESSIBLE ENTRANCE/EXIT= FIRE EXTINGUISHER LOCATION WITH 75' RADIUSSR = SEMI RECESSED SM = SURFACE MOUNTED = 1 HOUR FIRE BARRIER• ALL PENETRATIONS SEALED FOR ONE HOUR FIRE RATING / DAMPERS AT DUCT PENETRATIONS• DOORS: 45-MINUTE RATED IN FIRE RATED FRAME WITH CLOSER & POSITIVE LATCHING= ASSEMBLY (A-3)34"/236 OCC.. = EGRESS COMPONENT & INCHES OF EGRESS WIDTH / OCC.. LOAD CAPACITYOCCUPANCYFIRE RATING1FB1FBSYMBOLSUSEAREASF/OccOccsSTORAGE2400300= ROOM / SPACE OCCUPANCY TAGDOOR = 2 HOUR FIRE BARRIER• ALL PENETRATIONS SEALED FOR TWO HOUR FIRE RATING / DAMPERS AT DUCT PENETRATIONS• DOORS: 90 MINUTE RATED IN FIRE-RATED FRAME WITH CLOSER & POSITIVE LATCHING2FB 2FB 2FB 2FB 2FB1FB 1FB= FLOOR 1 EGRESS DISTANCE= MEZZANINE EGRESS DISTANCE= ASSEMBLY (A-4)= MEZZANINE FIRE AREA ABEFHJKMPQCDN12345687F.3F.9GG.8LL.6M.45.87.29MECHANICAL COURTROOFROOFROOFROOFROOF ACCESSMATCHLINE BB46' - 0 1/2"ROOFROOF142' TRAVEL DISTANCE 144' TRAVEL DISTANCE142' - 5" TRAVEL DISTANCE125' TRAVEL DISTANCE53 SFROOF ACCESS204380 SFSPONSOR SUITE202208 SFPRESS BOX2038495 SFMEZZANINE20112F.4F.691 SEATS135 SEATS93 SEATS119 SEATS89 SEATS44 SEATS571 SEATS187 SEATS75 SEATS62 SEATS126 SEATS126 SEATS622 SEATS1,193 SEATS206 STANDING RAIL33 CORNER RINK SUITES38 CENTER RINK SUITES15 HC + 15 COMPANION1,500 TOTAL SPECTATOR COUNT46 SEATS213 SFCORNER SUITE205148 SFADA ANDCOMPANION206205 SFADA ANDCOMPANION207258 SFCORNER SUITE208164 SFADA ANDCOMPANION209MERCYHEALTHARENA NORTHSEATING136 (A)MERCYHEALTHARENA SOUTHSEATING136 (B)17 SRT17 SRT 8 SRT28 SRT6 SRT 5 SRT 4 SRT 17 SRT 5 SRT3 SRTM.326' - 11 5/8"L.4L.8SMSRSM SMSRSMEGRESS WIDTH 76" EW = 506 OCCEGRESS WIDTH 76" EW = 506 OCCEGRESS WIDTH 48" EW = 320 OCCEGRESS WIDTH 68" EW = 266 OCCEGRESS WIDTH 48" EW = 320 OCC8 SFAV CLOSET21021 SRT 21 SRT21 SRT21 SRTL.758 SFELEV152PQ5ADD ALT TEAMROOM (B)18220 PERSONS993 SF LOCKER ROOM163 SFCOACHESOFFICE183ADD ALT TEAMROOM (C)18414 PERSONS714 SF LOCKER ROOMCOACHESOFFICE1852 PERSONS124 SF OFFICEADD ALT TEAMROOM (A)18120 PERSONS946 SF LOCKER ROOMCOACHESOFFICE1801 PERSONS87 SF OFFICEGENDERWCLVSHWUR2412UNISEXGENDERWCLVSHWUR2412UNISEXGENDERWCLVSHWUR1202UNISEXSR68" EGRESS WIDTH = 453 OCCABEFCD45687F.35.87.29EGRESS WIDTH 68" EW = 453 OCCEGRESS WIDTH 34" EW = 226 OCCEGRESS WIDTH 68" EW = 453 OCCF.46338 SFEXPANDEDMULTIPURPOSEROOM186SRSRSREGRESS WIDTH 68" EW = 453 OCC576 SFADD ALT 1MEETING ROOM(B)187576 SFADD ALT 1MEETING ROOM(A)18898 SFADD ALT 1 FIRSTAID190104 SFADD ALT 1STORAGE189186' TRAVEL DISTANCE234' TRAVEL DISTANCE71 SFFAMILYRESTROOM191Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedMEZZANINE FLOOR LIFESAFETY PLANWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A0.310/13/2023220025.00C2023-153/64" = 1'-0"2MEZZANINE FLOOR PLAN -OVERALL -LIFE SAFETY3/64" = 1'-0"1FIRST FLOOR LIFE SAFETY -ADD ALT 2/3 -ENLARGED3/64" = 1'-0"3FIRST FLOOR LIFE SAFETY -ADD ALT 1 -ENLARGEDOCCUPANCY AND OCCUPANCY LOAD TABLE - ADD ALT 2/3ROOMNUMBERROOM NAMEUSEDESCRIPTIONAREA AREA/OCC GROSS/NET OCC180 COACHES OFFICE OFFICE 87 SF 100 GROSS 1181 ADD ALT TEAM ROOM (A) LOCKER ROOM 946 SF 50 GROSS 20182 ADD ALT TEAM ROOM (B) LOCKER ROOM 993 SF 50 GROSS 20183 COACHES OFFICE OFFICE 163 SF 100 GROSS 2184 ADD ALT TEAM ROOM (C) LOCKER ROOM 714 SF 50 GROSS 14185 COACHES OFFICE OFFICE 124 SF 100 GROSS 2OCCUPANCY AND OCCUPANCY LOAD TABLE - ADD ALT 1ROOMNUMBERROOM NAMEUSEDESCRIPTIONUSE DESCRIPTION AREA ROOM NUMBERAREA/OCCGROSS/NET OCC186 EXPANDED MULTIPURPOSE ROOM A-3 A-3 6338 SF 186 15 NET 1711187 ADD ALT 1 MEETING ROOM (B) A-3 A-4 576 SF 187 15 NET 39188 ADD ALT 1 MEETING ROOM (A) A-3 A-4 576 SF 188 15 NET 39189 ADD ALT 1 STORAGE OFFICE A-4 104 SF 189 300 GROSS 1190 ADD ALT 1 FIRST AID OFFICE A-4 98 SF 190 100 GROSS 2191 FAMILY RESTROOM RESTROOM A-4 71 SF 191OCCUPANCY AND OCCUPANCY LOAD TABLEROOMNUMBERROOM NAMEUSE DESCRIPTIONPER 1004OCCUPANCY AREAAREA/OCCGROSS/NET OCC100 VESTIBULE CIRCULATION A-3 491 SF101 MAIN LOBBY CIRCULATION A-4 4743 SF101 (A) LOCKER ALCOVE STORAGE A-4 77 SF 300 GROSS 1102 MEETING ROOM (A) A-3 A-4 666 SF 100 GROSS 45103 MEETING ROOM (B) A-3 A-4 665 SF 100 GROSS 45104 STOR STORAGE A-4 152 SF 300 GROSS 1105 FIRST AID OFFICE A-4 171 SF 100 GROSS 2106 FAMILY RR RESTROOM A-4 52 SF106A MENS RESTROOM A-4 172 SF106B WOMENS RESTROOM A-4 226 SF107 CHECK-IN/RENTAL OFFICE A-4 240 SF 100 GROSS 3108 SKATE RENTAL OFFICE A-4 350 SF 100 GROSS 4109 BREAKROOM OFFICE A-4 184 SF 100 GROSS 2110 OFFICE OFFICE A-4 112 SF 100 GROSS 2111 OFFICE OFFICE A-4 158 SF 100 GROSS 2112 ADMIN OFFICE A-4 371 SF 100 GROSS 4112 (A) COPY AREA STORAGE A-4 101 SF 300 GROSS 1113 ELECTRICAL UTILITY A-4 53 SF 300 GROSS 1114 J.C. UTILITY A-4 59 SF 300 GROSS 1115 (A) FOOD PREP COMMMERCIAL KITCHEN A-4 481 SF 200 GROSS 3115 (B) CONCESSIONS COMMMERCIAL KITCHEN A-4 196 SF 200 GROSS 2115 (C) DRY STORAGE COMMMERCIAL KITCHEN A-4 72 SF 200 GROSS 1116 BEER SALES COMMMERCIAL KITCHEN A-4 153 SF 200 GROSS 1117 ICE ARENA LOBBY CIRCULATION A-4 4218 SF118 VESTIBULE CIRCULATION A-4 210 SF119 WELLNESS ROOM OFFICE A-4 Not Placed 100 GROSS 1119 WELLNESS ROOM OFFICE A-4 59 SF 100 GROSS 1120 FAMILY RESTROOM RESTROOM A-4 Not Placed120 FAMILY RESTROOM RESTROOM A-4 70 SF121 MEN'S RESTROOM A-4 647 SF122 WOMENS RESTROOM A-4 1059 SF123 WET TEAM ROOM 4 LOCKER ROOM A-4 360 SF 50 GROSS 8124 WET TEAM RR RESTROOM A-4 205 SF125 WET TEAM ROOM 3 LOCKER ROOM A-4 377 SF 50 GROSS 8126 TEAM ROOM 5 LOCKER ROOM A-4 342 SF 50 GROSS 7127 TEAM ROOM 4 LOCKER ROOM A-4 336 SF 50 GROSS 7128 UNISEX TLT RESTROOM A-4 53 SF129 TRAINING OFFICE A-4 265 SF 100 GROSS 3130 PASSAGE CIRCULATION A-4 3543 SF131 LAUNDRY UTILITY A-4 97 SF 300 GROSS 1132 MAIN TEAM ROOM LOCKER ROOM A-4 1227 SF 50 GROSS 25133 MAIN COACH OFFICE A-4 190 SF 100 GROSS 2133(A) CLOSET STORAGE A-4 64 SF 300 1134 ELEC UTILITY A-4 210 SF 300 GROSS 1135 ICE RINK CIRCULATION CIRCULATION A-4 1441 SF135(A) STORAGE STORAGE A-4 154 SF 300 GROSS 1136 MERCYHEALTH ARENA ICE RINK A-4 16327 SF 50 GROSS 327136 (A) MERCYHEALTH ARENA NORTH SEATING SPECTATING A-43043 SF 1.5 18" PER OCC 571136 (B) MERCYHEALTH ARENA SOUTH SEATING SPECTATING A-43311 SF 1.5 18" PER OCC 622137 Y.H. STORAGE STORAGE A-4 671 SF 300 GROSS 3138 WET TEAM ROOM #1 LOCKER ROOM A-4 347 SF 50 GROSS 7139 WET TEAM RR RESTROOM A-4 206 SF140 WET TEAM ROOM #2 LOCKER ROOM A-4 444 SF 50 GROSS 9141 UNISEX TLT RESTROOM A-4 58 SF142 J.C. UTILITY A-4 74 SF 300 GROSS 1143 YH COACH OFFICE A-4 273 SF 100 GROSS 3144 PASSAGE CIRCULATION A-4 2089 SF145 REFEREE OFFICE A-4 224 SF 100 GROSS 3146 REFEREE RR RESTROOM A-4 136 SF147 TEAM ROOM 1 LOCKER ROOM A-4 347 SF 50 GROSS 7148 TEAM ROOM 2 LOCKER ROOM A-4 347 SF 50 GROSS 7149 TEAM ROOM 3 LOCKER ROOM A-4 347 SF 50 GROSS 7150 IT UTILITY A-4 154 SF 100 GROSS 1151 ICE RINK CIRCULATION CIRCULATION A-4 1165 SF152 ELEV CIRCULATION A-4 58 SF153 GEN STORAGE UTILITY OR STORAGE A-4 53 SF 100 GROSS 1154 MULTI-PURPOSE AREA ASSEMBLY / ICE RINK A-4 16333 SF50 GROSS 327154 (A) MULTIPURPOSE SEATING SPECTATING A-4 1963 SF 18" PER OCC 228154 (B) MULTIPURPOSE AREA CIRCULATION CIRCULATION/ ASSEMBLY A-4 5198 SF 50 GROSS 104155 LOBBY / LINK CIRCULATION A-3 2667 SF156 MULTI-USE CONVENTION SPACE ASSEMBLY A-3 19343 SF 7 NET 1475157 ELECTRIC UTILITY A-3 143 SF 300 GROSS 1157 (A) AV CLOSET UTILITY A-3 69 SF 50 GROSS 1158 STORAGE STORAGE A-3 273 SF 300 GROSS 1159 WARMING ROOM FOOD SERVICE A-3 797 SF 200 GROSS 4160 LOADING/RECEIVING/STORAGE STORAGE A-3 1175 SF 300 GROSS 5162 FAMILY TLT RESTROOM A-4 68 SF163 J.C. UTILITY A-3 42 SF 300 GROSS 1164 MALL CONNECTION CIRCULATION A-4 857 SF165 WOMEN'S RESTROOM A-4 503 SF166 MEN'S RESTROOM A-4 468 SF167 GENERAL BUILDING STORAGE STORAGE A-4 2479 SF 300 GROSS 9167 (B) AV CLOSET UTILITY A-4 54 SF 50 GROSS 1168 MECHANICAL UTILITY A-4 176 SF 300 GROSS 1169 ELECTRICAL UTILITY A-4 161 SF 300 GROSS 1170 RESURFACER/ SHOP TOOLS/LAUNDRY UTILITY A-4 1443 SF 300 GROSS 5171 VESTIBULE CIRCULATION A-4 77 SF172 REFRIGERATION UTILITY A-4 966 SF 300 GROSS 4172(A) CLOSET STORAGE A-4 18 SF 300 1173 HOCKEY STORAGE STORAGE A-4 224 SF 300 GROSS 1174 TEMP STORAGE STORAGE A-3 84 SF 300 GROSS 1175 F.S. STORAGE STORAGE A-4 98 SF 300 GROSS 1176 IT/GEN STORAGE STORAGE A-3 98 SF 300 GROSS 1179 METER/RISER UTILITY A-4 207 SF 300 GROSS 1201 MEZZANINE SPECTATING A-4 8495 SF 1.5 18" PER OCC 206202 SPONSOR SUITE SPECTATING A-4 380 SF 15 GROSS 16203 PRESS BOX A-4 A-4 208 SF 15 GROSS 15204 ROOF ACCESS UTILITY A-4 53 SF 300 GROSS 1205 CORNER SUITE SPECTATING A-4 213 SF 15 NET 15206 ADA AND COMPANION SPECTATING A-4 148 SF 36" PER OCC 6207 ADA AND COMPANION SPECTATING A-4 205 SF 36" PER OCC 6208 CORNER SUITE SPECTATING A-4 258 SF 15 NET 18209 ADA AND COMPANION SPECTATING A-4 164 SF 36" PER OCC 6210 AV CLOSET UTILITY A-4 8 SF 50 GROSS 1OPEN TO BELOWOPEN TO BELOWOPEN TO BELOW10/04/2023BID DOCUMENT SET Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:LIFE SAFETY -OCCUPANCY ANDFIXTURESWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A0.410/13/2023220025.00C2023-15THIS BUILDING IS COMPRISED OF THREE MAJOR USE SPACES, TWO MINOR USE SPACES AND ACCESSORY USE SPACES DESCRIBED AS FOLLOWS:1. MULTI-USE CONVENTION SPACE, USES INCLUDE:A. DRY-FLOOR SPORTING EVENT TOURNAMENTS, PRACTICES (BASKETBALL, VOLLEYBALL, PICKLEBALL, ETC)B. CONVENTION SPACE (BOOTHS, DINING, BREAKOUT SESSIONS, COMBINATIONS THEREOF)C. CONFERENCES AND SEMINARS (CHAIRS IN AN AUDIENCE SETTING, PORTABLE STAGE AND PRESENTER)2. MULTI-PURPOSE AREAA. ICE SKATING RINK – SEASONAL (6 MONTHS OUT OF THE YEAR). PRACTICES, GAMES, OPEN-SKATEB. DRY-FLOOR SPORTING EVENT TOURNAMENTS, PRACTICES (BASKETBALL, VOLLEYBALL, PICKLEBALL, ETC)C. CONVENTION SPACE (BOOTHS, DINING, BREAKOUT SESSIONS, COMBINATIONS THEREOF)D. CONFERENCES AND SEMINARS (CHAIRS IN AN AUDIENCE SETTING, PORTABLE STAGE AND PRESENTER))3. MERCYHEALTH ARENAA. FIXED ICE ARENA WITH FIXED SEATING BLEACHERS, STANDING RAIL (RINK-SIDE AND MEZZANINE) AND SUITE SEATINGB. LOCKER ROOM AND TEAM ROOM SPACES SUPPORTING THE ARENA.4. MEETING ROOMA. DIVISIBLE MEETING ROOM, GENERALLY USED IN SUPPORT/COMBINATION OF CONVENTION OR CONFERENCE EVENTS5. OFFICE SUITEA. TWO PRIVATE OFFICES, FOUR OPEN OFFICES AND TWO RECEPTION STATIONS.6. ACCESSORY STORAGE AND MECHANICALA. COMBINED SQUARE FOOTAGE OF ALL STORAGE AND MECHANICAL ROOMSTHE OCCUPANT LOAD OF THE BUILDING COULD VARY SIGNIFICANTLY, DEPENDING ON THE USE OF THE SPACE AND THE OPERATIONAL SCHEDULING OF THE SPACE. THE FOLLOWING ARE SITUATIONAL OCCUPANT LOADS DEPENDING ON THE ANTICIPATED USES. THE “POTTY-PARITY” CODE REQUIREMENT IN SPS 362.2902 (WHEREVER MORE THAN 500 PEOPLE CONGREGATE AND MORE THAN THE REQUIRED MINIMUM NUMBER OF WATER CLOSETS OR URINALS ARE PROVIDED FOR MALES, TWICE AS MANY OF THOSE ADDITIONAL TOILET FACILITIES SHALL BE PROVIDED FOR FEMALES) IS SATISFIED IN MOST SCENARIOS. . SPS362.2902 AMENDMENTS TO THE IBC FOR A-4 OCCUPANCIES ARE INCORPORATED INTO THESE CALCULATIONS. NOTE: EGRESS WIDTH HAS BEEN CALCULATED BASED ON SCENARIO A (WORST-CASE MAXIMUM CAPACITY) OCCUPANT LOADING. CHAPTER 29 PLUMBING SYSTEMS2902.1 SEE PLUMBING CALCULATION BELOWWATER CLOSETSASSEMBLY (A3) - 1 PER 125 MALE & 1 PER 65 FEMALEASSEMBLY (A4) - 1 PER FIRST 75 FOR FIRST 1,500 THEN 1 PER 120 REMAINING FOR MALES - 1 PER FIRST 37 FOR FIRST 1,500 THEN 1 PER 60 REMAINING FOR FEMALES (SPS 362.2902(1)(C)(3))BUSINESS - 1 PER 25 FOR THE FIRST 50 AND 1 PER 50 FOR THE REMAINDER EXCEEDING 50S-2 - 1 PER 100OCCUPANT LOAD APPROACH• EACH OF THE THREE MAJOR SPACES IS FULLY OCCUPIED IN THE HIGHEST EXPECTED CAPACITYTHIS IS THE WORST-CASE SCENARIO, BUT IN REALITY, IS NOT POSSIBLE BECAUSE IT REQUIRES THE MERCYHEALTH ARENA TO BE HOSTING A MAX CAPACITY GAME EVENT AT THE SAME TIME THE MULTI-PURPOSE AREA HAS NO ICE AND IS HOSTING A MAX CAPACITY CONFERENCE/SEMINAR. ICE SEASONS FOR THE MERCYHEALTH ARENA AND THE MULTI-PURPOSE AREA WILL CLOSELY COINCIDE, SO IF THE MERCYHEALTH ARENA IS HOSTING A GAME, IT IS VERY LIKELY THE MULTI-PURPOSE AREA STILL HAS ICE. • EACH OF THE TWO MINOR SPACES IS FULLY OCCUPIED IN THE HIGHEST EXPECTED CAPACITY.• ALL OF THE STORAGE AND MECHANICAL AREAS ARE OCCUPIED.MAXIMUM CAPACITY - SCENARIO AMAXIMUM CAPACITY - SCENARIO B (6 MONTHS OUT OF THE YEAR DURING OFF-ICE SEASON• MAX CAPACITY CONFERENCE IN SPACE 1.• MAX CAPACITY CONFERENCE IN SPACE 2.• OPEN SKATE ICE RINK IN SPACE 3.• EACH OF THE TWO MINOR SPACES IS FULLY OCCUPIED IN THE HIGHEST EXPECTED CAPACITY.• ALL OF THE STORAGE AND MECHANICAL AREAS ARE OCCUPIED.HEAVY CAPACITY – SCENARIO C (6 MONTHS OUT OF THE YEAR DURING ICE SEASON)• MAX CAPACITY CONFERENCE IN SPACE 1.• ICE SKATING IN SPACE 2.• MAX CAPACITY IN SPACE 3.• EACH OF THE TWO MINOR SPACES IS FULLY OCCUPIED IN THE HIGHEST EXPECTED CAPACITY.• ALL OF THE STORAGE AND MECHANICAL AREAS ARE OCCUPIED.MODERATE CAPACITY – SCENARIO D• SPORTING EVENT IN SPACE 1• CONVENTION EVENT (DINING) IN SPACE 2.• OPEN SKATE ICE RINK IN SPACE 3.• EACH OF THE TWO MINOR SPACES IS FULLY OCCUPIED IN THE HIGHEST EXPECTED CAPACITY.• ALL OF THE STORAGE AND MECHANICAL AREAS ARE OCCUPIED.MODERATE CAPACITY – SCENARIO E• SPORTING EVENT IN SPACE 1• SPORTING EVENT IN SPACE 2• OPEN SKATE ICE RINK IN SPACE 3.• MEETING ROOMS UNOCCUPIED. OFFICE SPACE FULLY OCCUPIED.• ALL OF THE STORAGE AND MECHANICAL AREAS ARE OCCUPIED.10/04/2023BID DOCUMENT SET C1.10PROJECTLOCATION &GENERAL NOTESSCALE: 1" = 200'NorthLEGEND:WWEEOHWOHWGASGASSANSANSANSTSTSTWATERMAINUTILITYEXISTING:BURIED ELECTRICGAS LINESANITARY SEWEROVERHEAD WIRESTORM SEWERUTILITY POLELIGHT POLESANITARY MANHOLEFIRE HYDRANTWATER VALVESTORM SEWER STRUCTUREPROPOSED:WWEEGASGASSANSANSANSTSTSTWATERMAINELECTRICAL LINEGAS LINESANITARY SEWERSTORM SEWERWATER VALVESTORM SEWER STRUCTUREFLARED END SECTIONGRADINGEXISTING:PROPOSED:MAJOR CONTOURMINOR CONTOUR100.00EXISTEXISTING SPOT ELEVATION160160MAJOR CONTOURMINOR CONTOUR100.00SPOT ELEVATION(FINISHED GRADE, TOP OF PAVEMENT, FLANGE OF CURB)100.00DOOR ELEVATIONDOOR100.00GROUND GRADE AT BUILDINGGR100.00E/P100.50T/CSPOT ELEVATION(T/C - TOP OF CURB, E/P - EDGE OF PAVEMENT)100.00B/W100.50T/WRETAINING WALL SPOT ELEVATION(T/W - TOP OF WALL, B/W - GROUND GRADE AT BOTTOM)DRAINAGE FLOW DIRECTIONEMERGENCY OVERFLOW ROUTE100.00B/W12" FESFLARED END SECTION(PIPE SIZE, INVERT ELEVATION)SITEEXISTING:XEXISTING PARKING COUNTEXISTING SIGNEXISTING ADA PARKING SPACEPROPOSED:XPARKING COUNTADA PARKING SPACESIGNTRUNCATED DOMESPAVEMENT MARKING DIRECTIONAL ARROWS1.THE EXISTING SITE INFORMATION ON THIS PLAN WAS TAKEN FROM A SITE SURVEY PROVIDED BYCAPITOL SURVEY ENTERPRISES. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALLEXISTING SITE CONDITIONS INCLUDING UNDERGROUND UTILITIES, UNDERGROUND UTILITYELEVATIONS, BUILDING SETBACKS AND EXISTING BUILDING LOCATIONS. INFORM THE OWNER ANDENGINEER OF ANY DISCREPANCIES PRIOR TO COMMENCING WITH WORK.2.BEFORE PROCEEDING WITH ANY UTILITY CONSTRUCTION, CONTRACTOR SHALL EXCAVATE EACHEXISTING LATERAL TO BE CONNECTED TO (VERIFYING ELEVATION, LOCATION AND SIZE). SHOULDTHE EXISTING UTILITY NOT BE AS INDICATED ON THE PLAN, THE ENGINEER SHALL BE NOTIFIEDIMMEDIATELY FOR EVALUATION.3.ALL UTILITY CONSTRUCTION SHALL ADHERE TO THE STANDARD SPECIFICATIONS FOR SEWER ANDWATER CONSTRUCTION IN WISCONSIN (2003), AS WELL AS, CITY OF JANESVILLE STANDARDSPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION AND THE DEPT. OF SAFETY ANDPROFESSIONAL SERVICES SEC. 382-387.4.ALL PERMITS MUST BE RECEIVED FROM THE MUNICIPALITY AND WDNR PRIOR TO THE START OFCONSTRUCTION. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE ALL APPLICABLE PERMITSARE RECEIVED PRIOR TO STARTING CONSTRUCTION.5.NOTIFY THE PUBLIC WORKS INSPECTION DEPT. AT LEAST 48 HOURS BEFORE STARTINGCONSTRUCTION.6.BACKFILL REQUIREMENTS AND ROADWAY/SIDEWALK RESTORATION SHALL ADHERE TO LOCALSTANDARDS (GRANULAR BACKFILL UNDER OR WITHIN 5' OF CURBS, SIDEWALK, OR PAVEMENT.SPOIL MAY BE USED ELSEWHERE. SLURRY BACKFILL WILL BE REQUIRED IN PUBLIC ROADWAYS.)7.ALL BUILDING UTILITIES SHALL BE VERIFIED WITH THE ARCHITECTURAL PLANS PRIOR TOCONSTRUCTION.8.ALL PROPOSED WATERMAIN SHALL BE PVC AND MEET CITY OF JANESVILLE STANDARDSPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. ALL PROPOSED HYDRANTS ARE PRIVATEAND ARE TO BE PAINTED RED.9.PROPOSED SANITARY SEWER PIPE SHALL BE PVC, ASTM D-3034, SDR 35 WITH RUBBER GASKETEDJOINTS CONFORMING TO ASTM D-3212.10.PROPOSED STORM SEWER SHALL BE DUAL WALL HDPE ASTM F-2648 (UNLESS OTHERWISE NOTED).11.A MEANS TO LOCATE BURIED UNDERGROUND EXTERIOR NONMETALLIC UTILITIES MUST BEPROVIDED. PROVIDE TRACER WIRE IN ORDER TO BE LOCATED IN ACCORD WITH THE PROVISIONSSECTIONS 182.0715(2R) OF THE STATE STATUTES AND THE DEPARTMENT OF SAFETY ANDPROFESSIONAL SERVICES SECTION 382.13.ALL MANHOLES, CATCH BASINS, INLETS, VALVES BOXES, ETC WITHIN THE PROJECT AREA SHALLBE RESET AND ADJUSTED TO MATCH FINISH GRADE.14.PRIOR TO STARTING CONSTRUCTION INSPECT ALL EXISTING STRUCTURES WITHIN THE PROJECTAREA AND REPORT ANY DAMAGED STRUCTURES TO THE CITY AND ENGINEER. ANY STRUCTURESFOUND TO BE DAMAGED AND NOT IDENTIFIED PRIOR TO STARTING CONSTRUCTION SHALL BEREPAIRED AT THE CONTRACTORS EXPENSE.14.ALL EXCAVATED OR STRIPPED MATERIALS NOT BEING REPLACED IN UTILITY TRENCHES OR BEINGUSED FOR FILL SHALL BE REMOVED FROM THE SITE, UNLESS OTHERWISE DIRECTED BY THEOWNER.15.SEE ARCHITECTURAL PLANS FOR EXACT BUILDING & FOUNDATION DETAILS AND ORIENTATION.16.ALL ON-SITE CONCRETE CURB AND GUTTER TO BE 18" WIDE VERTICAL FACE, UNLESS OTHERWISENOTED. REVERSE OR REGULAR STYLE CURB DENOTED ON PLANS.17.ALL CURB ELEVATIONS ARE EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. SEE CURB DETAILFOR TOP OF CURB ELEVATIONS.18.ALL CURB RADII ARE MEASURED TO THE FACE OF CURB UNLESS OTHERWISE NOTED.19.MATCH PROPOSED CONCRETE CURB AND GUTTER, SIDEWALK AND PAVEMENT TO EXISTING INELEVATION AND ALIGNMENT.20.REMOVAL OF CURB AND GUTTER, SIDEWALK AND PAVEMENT SHALL BE IN ACCORDANCE WITH THESTANDARD SPECIFICATIONS OF THE WISCONSIN D.O.T.23.REPAIR ANY DAMAGE TO EXISTING UTILITIES OR SITE IMPROVEMENTS. CONTRACTOR SHALLDOCUMENT ALL EXISTING DAMAGE PRIOR TO START OF CONSTRUCTION AND NOTIFY CITY ANDENGINEER OF ANY FINDINGS. ANY ITEMS NOT NOTED AS DAMAGED PRIOR TO STARTINGCONSTRUCTION AND FOUND DAMAGED SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE.24.CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE OWNER WITH A SET OF PLANS SHOWING ANYCHANGES DURING CONSTRUCTION.GENERAL NOTES AND SPECIFICATIONS:CIVIL SHEET INDEX:C1.10PROJECT LOCATION & GENERAL NOTESC1.11SITE PLAN - OVERALLC1.12SITE PLAN - NORTHC1.13SITE PLAN - SOUTHC1.20GRADING PLAN - NORTHC1.21GRADING PLAN - SOUTHC1.30DEMOLITION PLANC1.40EROSION CONTROL PLANC1.50EXISTING SURVEYC5.00CONSTRUCTION DETAILSC5.01CONSTRUCTION DETAILSMI L T O N A V E HOLIDAY DRLIBERTY LNREFSET DRKENNEDY RD Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:WOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2510 Milton AvenueJanesville, WI 5354510/04/2023220025.00C2023-15Bid Set DocumentsREFSET DRPROJECT LOCATIONGAS & ELECTRIC: ALLIANT ENERGYRON ROHM608-751-7935RONALDROHM@ALLIANTENERGY.COMBILL ALT608-490-1757WILLIAMALT@ALLIANTENERGY.COMFIBER & CABLE: AT&TAARON ANDERSON608-698-1186AA8616@ATT.COMCITY OF JANESVILLE WATER AND SANITARYCRAIG THIESENHUSEN123 EAST DELAVAN DRIVEJANESVILLE, WI 53546608-373-3471THIESENHUSENC@CI.JANESVILLE.WI.US10/13/202310/04/2023BID DOCUMENT SET DNDNDNUPDNUPUPDNUPDNDNDNDNUPUPDNST ST STSTSTSTSTSTSTSTST STST ST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTST E E E STGASGASEEEEE EGASGAS GASGASGASGASGASGASGASEEEEEEEEEEEEEEEEEE E E WWSTEGASGASGASEEEEEEEEEE EEEEEEEEEEEEEEEEEWWWWWWWWWWWWWWWSTSTSTSTSTSTSTSTSTSTSTSTGASGASGASGASW W WWWWWWWWWWWEEESAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SA N SAN SAN SA N SAN SAN SAN SA N SAN SAN SAN SAN W W W W W W W W W W W W W W W W W W W W W W31 5133034302828374320151017374123SANSANSANSANSANSANSANSANSANSANSANSANWWWWWWWWWWWWWWWSA N DO NOT ENTERDRIVETHRUDRIVEDRIVETHRUDRIVETHRUWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W STSTSTSTSTSTSTSTSTSTSTSTSTST ST STST ST ST ST ST STSTSTSTSTSTSTSTSTST161627STSTSTSTConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:WOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2510 Milton AvenueJanesville, WI 5354510/04/2023220025.00C2023-15Bid Set DocumentsEXISTINGBUILDINGMILTON AVE PROPOSEDBUILDINGEXISTING PROPERTYBOUNDARYC1.11SITE PLAN -OVERALLSCALE: 1" = 40'NorthEXISTING PROPERTYBOUNDARYEXISTING PROPERTYBOUNDARYEXISTING PARKINGLOT TO REMAINREFSET DREXISTING PROPERTYBOUNDARYPROPOSED STARBUCKSDEVELOPMENT (BY OTHERS)PROPOSED SNOWSTORAGE LOCATIONPROPOSED SNOWSTORAGE LOCATIONPROPOSED BIO-RETENTION BASINPROPOSED TRASH ENCLOSUREPROPOSED CONCRETE SIDEWALKPROPOSED REGULAR DUTY ASPHALT PAVEMENTPROPOSED HEAVY DUTY ASPHALT PAVEMENTPROPOSED PAVEMENT TO BE REMOVED AND REPLACEDPROPOSED CONCRETE PAVEMENTDENOTES PROPOSED TRANSFORMER.SEE ELECTRICAL PLANS.TOTAL SITE AREA 7.87 ACTOTAL DISTURBED AREA 5.87 ACPROPOSED IMPERVIOUS AREA 7.22 ACPROPOSED GREENSPACE 0.66 AC(8.4% OF SITE)PROPOSED REGULAR PARKING SPACES 490PROPOSED HANDICAP PARKING 11PROPOSED TOTAL PARKING 501EXISTING IMPERVIOUS AREA 7.29 ACEXISTING PUMPBUILDINGDENOTES PROPOSED PARKINGSTRIPINGDENOTES EXISTINGPYLON SIGN TO REMAINPROPOSED DEPRESSED CURBPROPOSED TAPER CURBPROPOSED REVERSE CURBPROPOSED BIDALTERNATIVE #2PROPOSED BIDALTERNATIVE #1DENOTES PROPOSEDOUTDOOR TABLES. SEELANDSCAPE PLANSDENOTES PROPOSEDBIKE RACK. SEELANDSCAPE PLANSDENOTES PROPOSEDOUTDOOR TABLES. SEELANDSCAPE PLANSDENOTES PROPOSEDBIKE RACK. SEELANDSCAPE PLANSPROPOSED BUS STOP CONCRETE PAVEMENT10/13/202310/04/2023BID DOCUMENT SET DN1" / 1'-0"1" / 1'-0"SANSAN SANSANSANSANEESANSAN ST STSTSTSTSTSTSTSTST STST STST STSTSTSTSTSTSTSTSTST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST STST E E E E E E E ST ST STEEEEEEEEEEEEEEEE EEGASGASGAS GAS GASGASGASGASGASGASEE STST GASGASGASGASGASGASGASGASGASGASGASEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEWWWWWSTSTEEEGASGASGASGASGASGASGASEEEEEEEEEEEEEEEEEEEEEEE E E EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTW W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWSANSAN SANSANEESANSANEEEEEEESANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN SAN SAN SAN SAN SAN SAN SANSANWWWWWWWWWWWWWWWWWWWWWWWWWWWWW30343028 28374320DRIVETHRUDRIVETHRUWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W WWST ST ST ST ST ST ST ST ST ST STST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST1627STSTSTSTSTSTST W Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:WOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2510 Milton AvenueJanesville, WI 5354510/04/2023220025.00C2023-15Bid Set DocumentsEXISTINGBUILDINGMILTON AVE PROPOSEDBUILDINGPROPOSED DROP OFF LANEEXISTING PROPERTYBOUNDARYEXISTING PUMPBUILDINGPROPOSED DROPOFF LANEEXISTING PROPERTYBOUNDARYMATCH LINESEE SHEET C1.13C1.12SITE PLAN -NORTHSCALE: 1" = 20'NorthDENOTES PROPOSEDROOF OVERHANG. SEEARCHITECTURAL PLANSPROPOSED HEAVY DUTYASPHALT PAVEMENT (TYP)PROPOSED REGULAR DUTYASPHALT PAVEMENT (TYP)1.DENOTES PROPOSED 6" x 6" TEE, 6" AUX VALVE, 35L.F. 6" PVC WATERMAIN, HYDRANT LEAD ANDHYDRANT ASSEMBLY. CONNECT TO EXISTING 6"WATERMAIN PER CITY OF JANESVILLEREQUIREMENTS.2.DENOTES PROPOSED PRIVATE FIRE HYDRANT.3.DENOTES PROPOSED WATERMAIN CONNECTION.LIVE TAP EXISTING WATERMAIN PER CITY OFJANESVILLE REQUIREMENTS. INSTALL 9 L.F. 6" PVCWATERMAIN AND 6" GATE VALVE.4.DENOTES PROPOSED WATERMAIN CONNECTION.LIVE TAP EXISTING WATERMAIN PER CITY OFJANESVILLE REQUIREMENTS. INSTALL 13 L.F. 6" PVCWATERMAIN AND 6" GATE VALVE.5.DENOTES PROPOSED 4 L.F. 6" PVC WATERMAIN.6.DENOTES PROPOSED 7 L.F. 6" PVC WATERMAIN.7.DENOTES PROPOSED 6" 45° BEND.8.DENOTES PROPOSED 20 L.F. 6" PVC WATERMAIN.#3713125111423541.EXIST. 6" WATERMAIN I.E. = 875.35PROP. 6" WATERMAIN (INSTALL OFFSET PACKAGE) I.E. = 874.352.PROP. 18" STORM I.E. = 876.84PROP. 6" WATERMAIN I.E. = 873.90 3.PROP. 18" STORM I.E. = 876.82PROP. 6" WATERMAIN I.E. = 873.904.PROP. 18" STORM I.E. = 876.91PROP. 6" WATERMAIN I.E. = 873.755.PROP. 18" STORM I.E. = 876.79PROP. 6" WATERMAIN I.E. = 873.756.PROP. 12" STORM I.E. = 876.99PROP. 6" WATERMAIN I.E. = 873.357.PROP. 12" STORM I.E = 876.95PROP. 6" WATERMAIN I.E. = 873.358.PROP. 12" STORM I.E. = 877.15PROP. 6" WATERMAIN I.E. = 872.509.PROP. 12" STORM I.E. = 877.11PROP. 6" WATERMAIN I.E. = 872.50#(CAUTION! UTILITY CROSSING. VERIFY EXACT LOCATION ANDELEVATION PRIOR TO STARTING CONSTRUCTION. ADJUSTWATERMAIN IF NEEDED TO MAINTAIN A MINIMUM OF 18" VERTICALSEPARATION BETWEEN SEWER AND WATERMAIN AND MAINTAINMINIMUM 6' OF COVER ABOVE WATERMAIN.) CONTRACTOR TOINSTALL 4' x 8' x 2" SHEET OF INSULATION BOARD CENTERED ONWATERMAIN AT ALL CROSSINGS WITH THE WATERMAIN ANDSEWER.612151.DENOTES PROPOSED 18" CURB AND GUTTER.2.DENOTES EXISTING CURB AND GUTTER TO REMAIN.3.DENOTES PROPOSED REVERSE STYLE CURB AND GUTTER.4.DENOTES PROPOSED TYPE 1 ADA RAMP WITH 8 L.F.DEPRESSED CURB AND 6' CURB TAPERS ON EACH SIDE. SEEDETAIL ON SHEET C5.00.5.PROPOSED CONCRETE SIDEWALK.6.DENOTES PROPOSED ADA PARKING STALL. SEE DETAIL ONSHEET C5.01 FOR DETAILED INFORMATION.7.DENOTES PROPOSED PARKING COUNT.8.CAUTION! UTILITIES. VERIFY EXACT LOCATION ANDELEVATION PRIOR TO STARTING CONSTRUCTION.9.DENOTES PROPOSED DIRECTIONAL PAVEMENT MARKING(TYP).10.PROPOSED CONCRETE PAVEMENT.11.PROPOSED STOOP AND FROST WALL AT DOOR. SEEARCHITECTURAL AND STRUCTURAL PLANS.12.DENOTES PROPOSED SITE LIGHTING (TYP). SEE ELECTRICALPLANS.13.DENOTES PROPOSED BARRIER STYLE CURB#1111112122333141431431341055556677PROPOSED HEAVY DUTYASPHALT PAVEMENT (TYP)DENOTES PROPOSED 8.5'OF DEPRESSED CURBWITH 6' OF CURB TAPERON EACH SIDEDENOTES PROPOSED 43.5' OFDEPRESSED CURB WITH 6' OFCURB TAPER ON WEST SIDE AND2' CURB TAPER ON EAST SIDE888PROPOSED CONCRETE SIDEWALKPROPOSED HEAVY DUTY ASPHALT PAVEMENTPROPOSED PAVEMENT TO BE REMOVED AND REPLACEDPROPOSED CONCRETE PAVEMENTPROPOSED DEPRESSED CURBPROPOSED TAPER CURBPROPOSED REVERSE CURB991111111111111111111111PROPOSED REGULAR DUTY ASPHALT PAVEMENT8769812121212121212DENOTES PROPOSED PAVEMENT STRIPING.REMOVE EXISTING PAVEMENT MARKINGSAS REQUIRED TO INSTALL PROPOSEDIMPROVEMENTS13489109.DENOTES PROPOSED 22 L.F. 6" PVC WATERMAIN.10.DENOTES PROPOSED 6" 22.5° BEND..11.DENOTES PROPOSED 126 L.F. 6" PVC WATERMAIN.12.DENOTES PROPOSED 124 L.F. 6" PVC WATERMAIN.13.DENOTES PROPOSED 6" 22.5° BEND.14.DENOTES PROPOSED 272 L.F. 6" PVC WATERMAIN.15.DENOTES PROPOSED 288 L.F. 6" PVC WATERMAIN.16.COORDINATE WITH MALL ON ANY WATER SERVICESHUTDOWNS. WATER TO MALL CAN ONLY BE OUT OFSERVICE BETWEEN THE HOURS OF 10:00 PM AND 6:00AM.17.DENOTES PROPOSED OFFSET PACKAGE. INSTALL TOASSURE SEPARATION BETWEEN PROPOSEDWATERMAIN AND EXISTING WATERMAIN.PROPOSED BIDALTERNATIVE #19999999915151515222213333331616161616161616MATCH PROPOSED CONCRETEPAVEMENT INTO EXISTINGCONCRETE COMPACTOR PAD12181916162014.DENOTES PROPOSED THICKENED EDGE CONCRETESIDEWALK (TYP)15.DENOTES PROPOSED PAVEMENT REMOVAL ANDREPLACEMENT. REMOVE EXISTING ASPHALT AND INSTALLNEW REGULAR DUTY ASPHALT. EXISTING STONE BASE TOREMAIN. RESHAPE AS NEEDED TO MAINTAIN MINIMUMPAVEMENT THICKNESS SHOWN ON THE DETAILS. IF EXISTINGASPHALT IS THICKER THAN PROPOSED SECTION, INSTALLAND SHAPE ADDITIONAL STONE BASE COURSE AS NEEDEDTO MAINTAIN PROPOSED PAVEMENT SECTION.16.SAWCUT EXISTING PAVEMENT AND CREATE BUTT JOINTWHERE PROPOSED MEETS EXISTING.17.DENOTES PROPOSED 2' CURB TAPER.18.REMOVE AND REPLACE EXISTING ASPHALT PAVEMENT ASNEEDED TO INSTALL WATERMAIN. MATCH EXISTINGSECTIONS AND ELEVATIONS.19.DENOTES PROPOSED STOP SIGN AND STOP BAR.20.DENOTES PROPOSED TYPE 1 ADA RAMP WITH 6 L.F.DEPRESSED CURB AND 6' CURB TAPERS ON EACH SIDE. SEEDETAIL ON SHEET C5.00.21.MAINTAIN 4' HORIZONTAL SEPARATION BETWEEN PROPOSEDPARALLEL WATERMAIN.8888117212121DENOTES PROPOSED BOLLARD (TYP.).SEE ARCHITECTURAL PLANS FORLOCATION AND DETAILSDENOTES PROPOSED BOLLARD (TYP.).SEE ARCHITECTURAL PLANS FORLOCATION AND DETAILS10/13/202310/04/2023BID DOCUMENT SET UPDNDNDNUPUP1" / 1'-0"1" / 1'-0"1" / 1'-0"SANSANEESTSTST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST GASGASGAS GAS GA S GASE E E E E E E GASGASGAS GASSAN GASGASGASGASGASGASGASGASSANSANSANSANSANSANSANSANSANSANSANSANSAN SAN SAN SAN SAN SAN SAN SANSANSANSANSANSANSANWWWWWWWWWWW31 51334151017374123SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWSA N SAN WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W WW W W W W WW W STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST ST ST STST STSTSTSTSTSTSTST16STSTSTWWSTSTSTSTSTWConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:WOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2510 Milton AvenueJanesville, WI 5354510/04/2023220025.00C2023-15Bid Set DocumentsPROPOSED TRASH ENCLOSURE.SEE ARCHITECTURAL PLANSEXISTINGBUILDINGPROPOSEDBUILDINGEXISTING PROPERTYBOUNDARYEXISTING PROPERTYBOUNDARYMATCH LINESEE SHEET C1.12PROPOSED DROP OFF LANEPROPOSED HEAVY DUTYASPHALT PAVEMENTC1.13SITE PLAN -SOUTHSCALE: 1" = 20'NorthPROPOSED BIO-RETENTION BASINPROPOSED CROSSWALKDENOTESPROPOSEDCROSSWALKPROPOSED CONCRETE PAVEMENTDENOTES PROPOSED TRANSFORMER.SEE ELECTRICAL PLANSDENOTES PROPOSED FIRE DEPARTMENTCONNECTION. SEE PLUMBING PLANSPROPOSED HEAVY DUTYASPHALT PAVEMENT (TYP)PROPOSED REGULAR DUTYASPHALT PAVEMENT (TYP)12312341.CONNECT TO EXISTING 8" WATERMAIN VIA LIVE TAP PERCITY REQUIREMENTS. ESTABLISHMENT OF THE NEW WATERCONNECTION TO THE PUBLIC WATERMAIN REQUIRESCOORDINATION WITH THE JANESVILLE WATER UTILITY. THEWATER UTILITY MUST PERFORM THE TAP AND BE GIVEN ATLEAST 24 HOURS ADVANCE NOTICE IN ORDER TO COMPLETETHE TAP. THE WATER UTILITY CHARGES A FEE FOR THISWORK. THE CONTRACTOR MUST PROVIDE THE NECESSARYMATERIALS (PER CITY OF JANESVILLE STANDARDS) ANDPERFORM ALL EXCAVATION/RESTORATION ASSOCIATEDWITH THE LIVE TAP. INSTALL 8" TAPPING VALVE AND 11 L.F. 8"DUCTILE IRON WATERMAIN. TRANSITION FROM DUCTILEIRON PIPE TO PVC AFTER PROPERTY BOUNDARY.2.REMOVE AND REPLACE EXISTING PAVEMENT AS REQUIREDTO INSTALL PROPOSED UTILITY (SEE PAVEMENT PATCHDETAIL). TRAFFIC CONTROL MUST BE SET UP INACCORDANCE WITH MUTCD STANDARDS WHILE WORKOCCURS IN THE R.O.W. A TRAFFIC CONTROL PLAN SHALL BESUBMITTED TO THE CITY ENGINEERING DIVISION FORAPPROVAL PRIOR TO ANY WORK IN THE STREET.#1.PROPOSED 33 L.F. 8" PVC SANITARY SEWER SEWER @S=2.12%. INV @ BLDG = 875.46. SEE PLUMBING PLANSFOR CONTINUATION INTO BUILDING.2.PROPOSED SANITARY MANHOLERIM = 881.688" N INV = 874.868" W INV = 874.763.PROPOSED 316 L.F. 8" PVC SANITARY SEWER @S=1.00%.4.PROPOSED SANITARY MANHOLERIM = 885.10 ±PROP. 8" E INV = 871.69EXIST. 12" N INV = 871.64EXIST. 12" S INV = 871.59#567891.EXIST. 24" STORM I.E. = 875.21PROP. 8" SANITARY I.E. = 873.772.PROP. 8" SANITARY I.E. = 874.18PROP. 6" WATERMAIN I.E. = 872.133.PROP. 8" SANITARY I.E. = 874.23PROP. 6" WATERMAIN I.E. = 872.134.PROP. 15" STORM I.E. = 875.92PROP. 8" SANITARY I.E. = 874.515.PROP. 6" WATERMAIN I.E. = 878.50EXIST. 12" SANITARY I.E. = 871.526.EXIST. 24" STORM I.E. = 875.19PROP. 6" WATERMAIN I.E. = 873.097.PROP. 6" WATERMAIN I.E. = 874.61PROP. 6" WATERMAIN (PARALLEL) I.E.= 872.038.PROP 6" WATERMAIN I.E. = 874.52PROP 6" WATERMAIN (PARALLEL) I.E.= 872.03#9.PROP. 15" STORM I.E. = 875.82PROP. 6" WATERMAIN (INSTALLOFFSET PACKAGE) I.E. = 873.7210.PROP. 24" STORM I.E. = 875.57PROP. 6" WATERMAIN I.E. = 872.0311.PROP. 24" STORM I.E. = 875.58PROP. 6" WATERMAIN I.E. = 872.0312.PROP 15" STORM I.E. = 876.10PROP 6" WATERMAIN I.E. = 872.9013.PROP 15" STORM I.E. = 876.13PROP 6" WATERMAIN I.E. = 872.9014.PROP 6" WATERMAIN I.E. = 874.50PROP 6" WATERMAIN (PARALLEL) I.E.= 873.0015.PROP 6" WATERMAIN I.E. = 874.39PROP 6" WATERMAIN (PARALLEL) I.E.= 872.8916.PROP 15" STORM I.E. = 876.71PROP 6" WATERMAIN I.E. =874.29(CAUTION! UTILITY CROSSING. VERIFY EXACT LOCATION AND ELEVATION PRIOR TOSTARTING CONSTRUCTION. ADJUST WATERMAIN IF NEEDED TO MAINTAIN A MINIMUMOF 18" VERTICAL SEPARATION BETWEEN SEWER AND WATERMAIN AND MAINTAINMINIMUM 6' OF COVER ABOVE WATERMAIN.) CONTRACTOR TO INSTALL 4' x 8' x 2" SHEETOF INSULATION BOARD CENTERED ON WATERMAIN AT ALL CROSSINGS WITH THEWATERMAIN AND SEWER.147853612111315181920212223242814163.DENOTES PROPOSED 454 L.F. 8" PVC WATERMAIN.4.DENOTES PROPOSED 8" x 6" TEE, 6" AUX VALVE, 37 L.F. 6"PVC WATERMAIN, HYDRANT LEAD AND HYDRANTASSEMBLY.5.DENOTES PROPOSED PRIVATE FIRE HYDRANT.6.DENOTES PROPOSED 52 L.F. 8" PVC WATERMAIN.7.DENOTES PROPOSED 8" 45° BEND.8.DENOTES PROPOSED 24 L.F. 8" PVC WATERMAIN.9.DENOTES PROPOSED 8" 45° BEND AND 6 L.F. 8" PVCWATERMAIN. SEE PLUMBING PLANS FOR CONTINUATIONINTO BUILDING.10.DENOTES PROPOSED 6" 22.5° BEND.11.DENOTES PROPOSED 126 L.F. 6" PVC WATERMAIN.12.DENOTES PROPOSED 124 L.F. 6" PVC WATERMAIN.13.DENOTES PROPOSED 6" 45° BEND.14.DENOTES PROPOSED 15 L.F. 6" PVC WATERMAIN.15.DENOTES PROPOSED 13 L.F. 6" PVC WATERMAIN.16.DENOTES PROPOSED 6" 22.5° BEND.17.DENOTES PROPOSED 296 L.F. 6" PVC WATERMAIN.18.DENOTES PROPOSED 291 L.F. 6" PVC WATERMAIN19.DENOTES PROPOSED 6" 90° BEND.20.DENOTES PROPOSED 86 L.F. 6" PVC WATERMAIN.21.DENOTES PROPOSED 89 L.F. 6" PVC WATERMAIN.22.DENOTES PROPOSED 6" 45° BEND.23.DENOTES PROPOSED 25 L.F. 6" PVC WATERMAIN.24.DENOTES PROPOSED 22 L.F. 6" PVC WATERMAIN.101.DENOTES PROPOSED 18" CURB AND GUTTER.2.DENOTES EXISTING CURB AND GUTTER TO REMAIN.3.DENOTES PROPOSED REVERSE STYLE CURB AND GUTTER.4.DENOTES PROPOSED TYPE 1 ADA RAMP WITH 6 L.F.DEPRESSED CURB AND 6' CURB TAPERS ON BOTH SIDES. SEEDETAIL ON SHEET C5.00.5.DENOTES PROPOSED TYPE 2 ADA RAMP. SEE DETAIL ONSHEET C5.00.6.DENOTES PROPOSED TYPE 4 ADA RAMP WITH 6 L.F.DEPRESSED CURB AND 2' CURB TAPERS ON BOTH SIDES. SEEDETAIL ON SHEET C5.00.7.PROPOSED CONCRETE SIDEWALK.8.DENOTES PROPOSED ADA PARKING STALL. SEE DETAIL ONSHEET C5.01 FOR DETAILED INFORMATION.9.DENOTES PROPOSED PARKING COUNT.10.CAUTION! UTILITIES. VERIFY EXACT LOCATION ANDELEVATION PRIOR TO STARTING CONSTRUCTION.#PROPOSED CONCRETE SIDEWALKPROPOSED REGULAR DUTY ASPHALT PAVEMENTPROPOSED HEAVY DUTY ASPHALT PAVEMENTPROPOSED PAVEMENT TO BE REMOVED AND REPLACEDPROPOSED DEPRESSED CURBPROPOSED TAPER CURBPROPOSED REVERSE CURBPROPOSED CONCRETE PAVEMENT11132233171733456666PROPOSED HEAVY DUTYASPHALT PAVEMENT (TYP)77777899EXISTING PROPERTYBOUNDARY1010DENOTES PROPOSED ROOF OVERHANG.SEE ARCHITECTURAL PLANSDENOTES PROPOSED ROOF OVERHANG.SEE ARCHITECTURAL PLANS25.DENOTES PROPOSED 6" 45° BEND.26.DENOTES PROPOSED 26 L.F. 6" PVC WATERMAIN.27.DENOTES PROPOSED 22 L.F. 6" PVC WATERMAIN.28.CONNECT TO EXISTING 6" WATERMAIN.29.DENOTES PROPOSED OFFSET PACKAGE. INSTALL TOASSURE 1.5' SEPARATION BETWEEN WATERMAIN ANDSTORM SEWER.2PROPOSED PAVEMENT REMOVAL AND REPLACEMENT101213141516DENOTES PROPOSEDBUS SHELTER LOCATION1112121311.REMOVE AND REPLACE EXISTING CONCRETE CURB ANDCONCRETE SIDEWALK AS NEEDED TO INSTALL UTILITIES.MATCH EXISTING GRADES OF SIDEWALK. COORDINATE WITHTHE CITY OF JANESVILLE ON CLOSURE OF SIDEWALK.CONCRETE SIDEWALK SHALL BE PERMENENTLY RESTOREDWITHIN TWO WEEKS OF THE DISTURBANCE. PERMISSION TOCLOSE SIDEWALKS WITH THE USE OFCONTRACTOR-FURNISHED "SIDEWALK CLOSED" AND"SIDEWALK CLOSED USE OTHER SIDE" SIGNAGE MAY OR MAYNOT BE GRANTED.12.DENOTES PROPOSED DIRECTIONAL PAVEMENT MARKING13.DENOTES PROPOSED "DO NOT ENTER" SIGN14.PROPOSED STOOP AND FROST WALL AT DOOR. SEEARCHITECTURAL AND STRUCTURAL PLANS.15.DENOTES PROPOSED SITE LIGHTING (TYP). SEE ELECTRICALPLANS.16.DENOTES PROPOSED UTILITY CROSSING. CONTRACTOR TOINSTALL CONCRETE CRADLE ON STORM SEWER. SEE SHEETC5.00 FOR DETAILS.17.DENOTES PROPOSED THICKENED EDGE CONCRETESIDEWALK (TYP).141414141414417252627291515151515151515151618.DENOTES PROPOSED ELECTRICAL METER. SEE ELECTRICALPLANS.19.DENOTES PROPOSED ELECTRICAL QUAZITE BOX. SEEELECTRICAL PLANS.20.DENOTES PROPOSED PAVEMENT REMOVAL ANDREPLACEMENT. REMOVE EXISTING ASPHALT AND INSTALLNEW REGULAR DUTY ASPHALT. EXISTING STONE BASE TOREMAIN. RESHAPE AS NEEDED TO MAINTAIN MINIMUMPAVEMENT THICKNESS SHOWN ON THE DETAILS. IF EXISTINGASPHALT IS THICKER THAN PROPOSED SECTION, INSTALLAND SHAPE ADDITIONAL STONE BASE COURSE AS NEEDEDTO MAINTAIN PROPOSED PAVEMENT SECTION.21.SAWCUT EXISTING PAVEMENT AND CREATE BUTT JOINTWHERE PROPOSED MEETS EXISTING.22.DENOTES PROPOSED CURB OPENING WITH 3 L.F. DEPRESSEDCURB AND 3' CURB TAPERS ON BOTH SIDES.23.DENOTES PROPOSED STOP SIGN.24.MAINTAIN 4' HORIZONTAL SEPARATION BETWEEN PROPOSEDPARALLEL WATERMAIN.PROPOSED REGULAR DUTYASPHALT PAVEMENT (TYP)910111819PROPOSED BIDALTERNATIVE #220202222222221212121212121MATCH PROPOSED CURB INTOEXISTING SIDEWALK103321717MATCH PROPOSED CONCRETEPAVEMENT INTO EXISTINGCONCRETE COMPACTOR PAD1242424131919192123PROPOSED BUS STOP CONCRETE PAVEMENTPROPOSED BUS STOPCONCRETE PAVEMENT161212DENOTES PROPOSED BOLLARD (TYP.).SEE ARCHITECTURAL PLANS FORLOCATION AND DETAILS10/13/202310/04/2023BID DOCUMENT SET DNDNSANSAN SANSANSANSANEESANSAN ST STSTSTSTSTSTSTSTST STST STST STSTSTSTSTSTSTSTSTST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST STST E E E E E E E ST ST STEEEEEEEEEEEEEEEE EEGASGASGAS GAS GASGASGASGASGASGASEE STST GASGASGASGASGASGASGASGASGASGASGASEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEWWWWWSTSTEEEGASGASGASGASGASGASGASEEEEEEEEEEEEEEEEEEEEEEE E E EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTW W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWSANSAN SANSANEESANSANEEEEEEESANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN SAN SAN SAN SAN SAN SAN SANSANWWWWWWWWWWWWWWWWWWWWWWWWWWWWW DRIVETHRUDRIVETHRUWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W WW WWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWST ST ST ST ST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTRIM881.95RIM881.95RIM881.50RIM881.20RIM881.05RIM881.00RIM881.00RIM880.88RIM880.33RIM880.10STSTSTSTST881RIM881.00881 881HPHPHPHP881RIM881.00STSTSTSTSTSTRIM881.00RIM881.1588 2 HP882ST882DOOR882.25DOOR882.25DOOR882.25DOOR882.25DOOR882.25DOOR882.25DOOR882.25(;,67“882.00(;,67“882.26DOOR882.25DOOR882.25DOOR882.250$7&+“881.720$7&+“881.550$7&+“881.250$7&+“881.360$7&+“881.600$7&+“881.640$7&+“881.500$7&+“881.600$7&+“881.77881.57881.35881.650$7&+“881.900$7&+“882.290$7&+“880.980$7&+“881.020$7&+“DOOR882.25T/C882.14881.75881.56881.38881.27881.950$7&+“881.85881.620$7&+“881.00881.08880.900$7&+“881.42881.38881.10881.86880.38880.21880.57880.85880.68881.35881.29881.53882.00881.95881.53881.81881.59881.39881.48881.20880.48881.87GR882.25GR881.750$7&+“883.000$7&+“883.00882.19882.19884.34884.12884.00883.80883.840$7&+“882.480$7&+“882.170$7&+“881.950$7&+“882.220$7&+“882.71882.76882.76HP882.250$7&+“882.61881.950$7&+“881.90HP882.930$7&+“880.850$7&+“880.770$7&+“881.04880.62880.56880.62880.76880.87881.04880.93881.27881.18881.670$7&+“881.60880.55HP880.630$7&+“882.04HP881.50HP881.66880.72880.70881.61881.57880.89881.59880.48881.97882.18DOOR882.30(;,67“882.260$7&+“882.16GR882.25GR882.25GR881.40GR882.25GR882.15881.34881.80882.17GR882.25GR882.25DOOR882.25GR882.25882.16882.16882.12881.72GR882.25880.55GR881.95881.81T/C881.31E/P881.74T/C881.24E/P881.67T/C881.17E/P881.14881.54T/C881.04E/P881.00880.60881.00T/C880.50E/P880.90882.15T/C881.65E/PT/C882.14882.15T/C881.65E/PT/C882.14T/C882.14T/C882.03872.10T/C871.60E/P881.75DOOR882.25HP881.00HP881.40HP881.50881.67E/P881.84882.15T/C881.65E/PE/P881.84E/P881.74E/P882.14E/P882.14E/P882.14E/P882.03E/P882.14881.70T/C881.20E/P881.400$7&+“881.810$7&+“881.95883.78883.67883.50883.50883.78883.67884.00883.90883.68883.68883.57883.57883.66883.66GR881.66GR882.00T/C881.98E/P881.68T/C882.30E/P882.00881.49881.55HP881.75W W 882T/C882.140$7&+“882.000$7&+“881.98882T/C882.14T/C882.14882882 882882.14882882.150$7&+“881.8388 2 DOOR882.25x Pipe - 112Pipe - 111Pipe - 110Pipe - 109Pipe - 108Pipe - 107Pipe - 106APipe - 105Pipe - 106Pipe - 103Pipe - 104Pipe - 105BPipe - 105APipe - 113Pipe - 114104114113112111110109108107106105103102Pipe - 102A103APipe - 103A105APipe - 114AStorm Structure Table#100101102102A103103A104105105A106107Structure DetailsCATCH BASIN - CURB (6' DIA)RIM = 880.25Pipe - 101 = 875.20Pipe - 100 = 875.20EXISTING CATCH BASINRIM = 879.82Pipe - 102 = 875.08Pipe - 200 = 875.35Pipe - 101 = 875.15CATCH BASINRIM = 881.00Pipe - 103 = 875.66Pipe - 102A = 877.00Pipe - 102 = 875.66CATCH BASINRIM = 881.35Pipe - 102A = 877.46CATCH BASINRIM = 881.00Pipe - 104 = 875.83Pipe - 103A = 876.85Pipe - 103 = 875.83CATCH BASINRIM = 881.15Pipe - 103A = 877.30CATCH BASINRIM = 881.00Pipe - 105 = 876.03Pipe - 104 = 876.03CATCH BASIN (7' DIA)RIM = 880.10Pipe - 106 = 876.55Pipe - 105A = 876.55Pipe - 105 = 876.46STORM MANHOLERIM = 882.15Pipe - 105B = 877.82Pipe - 105A = 877.72CATCH BASIN (7' DIA)RIM = 880.33Pipe - 106A = 876.78Pipe - 107 = 876.78Pipe - 106 = 876.78CATCH BASINRIM = 880.88Pipe - 108 = 877.14Pipe - 107 = 877.14108109110111112113114200201201A202CATCH BASIN - CURBRIM = 881.00Pipe - 109 = 877.56Pipe - 108 = 877.56CATCH BASIN - CURBRIM = 881.00Pipe - 110 = 877.60Pipe - 109 = 877.60CATCH BASINRIM = 881.05Pipe - 111 = 877.93Pipe - 110 = 877.93CATCH BASINRIM = 881.20Pipe - 112 = 878.09Pipe - 111 = 878.09CATCH BASINRIM = 881.50Pipe - 113 = 878.30Pipe - 112 = 878.30CATCH BASIN (6' DIA)RIM = 881.95Pipe - 114 = 878.61Pipe - 114A = 878.61Pipe - 113 = 878.61CATCH BASINRIM = 881.95Pipe - 114 = 878.78CATCH BASINRIM = 880.40Pipe - 201 = 875.53Pipe - 200 = 875.53STORM MANHOLERIM = 881.16Pipe - 202 = 875.70Pipe - 201A = 875.70Pipe - 201 = 875.60STORM MANHOLE (3' DIA)RIM = 878.51Pipe - 201B = 876.40Pipe - 201A = 876.40STORM MANHOLERIM = 880.74Pipe - 203 = 876.04Pipe - 202A = 876.04Pipe - 202 = 875.94202A202B203204205206206A207208300OUTLET CONTROL STRUCTURERIM = 879.80Pipe - 202B = 876.50Pipe - 202A = 876.50CLEANOUTRIM = 880.00Pipe - 202B = 876.50CATCH BASINRIM = 880.34Pipe - 204 = 876.83Pipe - 203 = 876.83CATCH BASINRIM = 881.02Pipe - 205 = 877.16Pipe - 204 = 877.16CATCH BASINRIM = 881.21Pipe - 206 = 877.56Pipe - 205 = 877.56CATCH BASINRIM = 881.70Pipe - 206A = 877.77Pipe - 207 = 877.77Pipe - 206 = 877.77CATCH BASINRIM = 881.20Pipe - 206A = 877.94CATCH BASINRIM = 881.40Pipe - 208 = 877.90Pipe - 207 = 877.90CATCH BASINRIM = 881.96Pipe - 208 = 878.13CURB INLETNEENAH R-3165 FRAMEW/ TYPE A GRATERIM = 880.58Pipe - 300 = 879.20Storm Pipe TablePipe NamePipe - 100Pipe - 101Pipe - 102Pipe - 102APipe - 103Pipe - 103APipe - 104Pipe - 105Pipe - 105APipe - 105BPipe - 106Pipe - 106APipe - 107Pipe - 108Pipe - 109Pipe - 110Pipe - 111Pipe - 112Size303024122412242418182121181515121212MaterialRCPRCPRCPHDPERCPHDPERCPRCPHDPESCHD 40RCPRCPHDPEHDPEHDPEHDPEHDPEHDPELength44115183465345611366847722472849504471Slope0.04%0.05%0.32%1.00%0.32%1.00%0.32%0.32%1.71%1.00%0.29%0.25%0.50%0.50%0.50%0.65%0.36%0.30%DescriptionEXISTING STORM SEWEREXISTING STORM SEWEREXISTING STORM SEWEREXISTING STORM SEWEREXISTING STORM SEWEREXISTING STORM SEWEREXISTING STORM SEWEREXISTING STORM SEWERPipe NamePipe - 113Pipe - 114Pipe - 114APipe - 200Pipe - 201Pipe - 201APipe - 201BPipe - 202Pipe - 202APipe - 202BPipe - 203Pipe - 204Pipe - 205Pipe - 206Pipe - 206APipe - 207Pipe - 208Pipe - 300Size121262424151518861512121212121212MaterialHDPEHDPEHDPEHDPEHDPEHDPESCHD 40HDPEHDPEHDPEHDPEHDPEHDPEHDPEHDPEHDPEHDPERCPLength413519662571545577415672903429223815Slope0.74%0.50%1.00%0.28%0.28%0.99%1.00%0.54%0.79%0.00%0.50%0.46%0.45%0.60%0.60%0.60%0.60%1.37%DescriptionPERFORATED UNDERDRAINW/ RCP FESConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:WOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2510 Milton AvenueJanesville, WI 5354510/04/2023220025.00C2023-15Bid Set DocumentsC1.20GRADING PLAN -NORTHSCALE: 1" = 20'NorthEXISTINGBUILDINGPROPOSEDBUILDINGFFE = 882.25MATCH LINESEE SHEET C1.20MILTON AVE DENOTES EXISTINGPROPERTY BOUNDARYDENOTES EXISTINGPROPERTY BOUNDARYPROPOSED ADA PARKING. SHEETSHEET C5.01 FOR DETAILS.RAMP ASPHALT UP TO MATCHGRADES SHOWN. TOP OF CURBTO REMAIN FLAT AS SHOWNRAMP ASPHALT UP TO MATCHGRADES SHOWN. TOP OF CURBTO REMAIN FLAT AS SHOWNDENOTES PROPOSEDSTORM SEWERCONNECTION. SEEPLUMBING PLANS FORCONTINUATION INTOBUILDING.PROPOSED BIDALTERNATIVE #11.REMOVE EXISTING PVC ROOF DRAIN FROM SCREEN WALL.MODIFY TO TURN DOWN BELOW GRADE AND CONNECT TOPIPE-114A. MAINTAIN EXISTING HEAT TRACE.2.INSTALL NEW CATCH BASIN ON EXISTING STORM SEWER.3.CAUTION! UTILITIES. VERIFY EXACT LOCATION AND ELEVATIONPRIOR TO STARTING CONSTRUCTION.4.ADJUST CURB HEIGHT TO MATCH ELEVATIONS SHOWN.#22222144543333SITE BENCHMARKNORTH RIM OF MANHOLEEL = 887.2010/13/202310/04/2023BID DOCUMENT SET DNDNDNUPDNUPUPUPDNDNDNDNUPUPSANSANEESTSTST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST GASGASGAS GAS GA S GASE E E E E E E GASGASGAS GASSAN GASGASGASGASGASGASGASGASSANSANSANSANSANSANSANSANSANSANSANSANSAN SAN SAN SAN SAN SAN SAN SANSANSANSANSANSANSANWWWWWWWWWWWSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN SANSANSANSANSANSANSANSANSANSANSANSANSANWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWSA N SAN 882 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W WW881880879W W W W W W W WWW W W HPHP HPSTSTSTSTST ST ST ST ST ST STSTST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST ST ST STST ST ST ST ST RIM879.82RIM880.25RIM881.16RIM880.74RIM879.80RIM880.58RIM880.34RIM881.21RIM881.20RIM881.70RIM881.40RIM881.96ST ST ST ST ST ST 881881881881HP88 1 HP881882881 STSTSTRIM881.00RIM881.35880HP881881WWWWSTSTSTSTSTS TRIM880.40882 WWDOOR882.25880.56880.25881.06DOOR882.25880.96880.400$7&+“881.480$7&+“881.800$7&+“881.540$7&+“881.510$7&+“881.510$7&+“881.400$7&+“881.480$7&+“881.46DOOR882.25HP881.17HP881.00GR882.00(;,67“881.92DOOR882.25HP881.700$7&+“880.92881.51881.56881.510$7&+“881.340$7&+“881.240$7&+“881.190$7&+“880.790$7&+“881.000$7&+“881.410$7&+“881.800$7&+“881.750$7&+“881.900$7&+“822.250$7&+“881.890$7&+“880.990$7&+“882.880$7&+“880.620$7&+“880.33881.22881.40881.17881.30T/C880.80E/P880.79880.57880.38881.15881.540$7&+“881.51882.25HP881.10880.71881.40HP881.50881.30881.400$7&+“882.90881.15882.76882.150$7&+“881.000$7&+“882.00881.51881.40881.35880.98880.60880.60880.72880.790$7&+“881.480$7&+“881.20880.40880.40880.20880.63GR881.75GR882.250$7&+“880.81881.69880.61HP880.85HP881.50881.38881.07881.14881.15881.18881.00881.47880.56HP881.60881.25881.15882.08881.06881.56881.21881.71881.45881.350$7&+“884.340$7&+“884.44881.50880.75881.25880.00880.00HP881.15HP881.60DOOR882.25DOOR882.250$7&+“882.210$7&+“882.11GR882.25HP882.06881.39881.18881.87GR882.0512" FES879.00DOOR882.25GR882.25881.87882.16881.76GR882.25GR882.15881.55T/C881.05E/P881.10881.60T/C881.10E/P881.14881.14881.64T/C881.14E/P881.64T/C881.14E/P881.09881.00HP881.19881.64T/C881.14E/P881.49881.32881.46881.24882.25T/C881.75E/P881.81T/C881.31E/PHP881.60HP881.10881.100$7&+“882.00GR881.66882.00881 881.96881881.85GR882.05882882GR881.670$7&+“880.390$7&+“880.290$7&+“883.500$7&+“882.000$7&+“882.110$7&+“883.580$7&+“880.590$7&+“881.120$7&+“881.00881881.40881.85881.73881.64881.55881.74RIM881.02HP881.30881.41GR881.758818828 8 2 x x Pipe - 206APipe - 206Pipe - 205Pipe - 204Pipe - 203Pipe - 202Pipe - 202APipe - 208Pipe - 207Pipe - 202BPipe - 101Pipe - 100Pipe - 201BPipe - 201APipe - 102Pipe - 300101201202202A202B203205206207208206A100300Pipe - 102A102A201A200Pipe - 201Pipe - 200204Storm Pipe TablePipe NamePipe - 100Pipe - 101Pipe - 102Pipe - 102APipe - 103Pipe - 103APipe - 104Pipe - 105Pipe - 105APipe - 105BPipe - 106Pipe - 106APipe - 107Pipe - 108Pipe - 109Pipe - 110Pipe - 111Pipe - 112Size303024122412242418182121181515121212MaterialRCPRCPRCPHDPERCPHDPERCPRCPHDPESCHD 40RCPRCPHDPEHDPEHDPEHDPEHDPEHDPELength44115183465345611366847722472849504471Slope0.04%0.05%0.32%1.00%0.32%1.00%0.32%0.32%1.71%1.00%0.29%0.25%0.50%0.50%0.50%0.65%0.36%0.30%DescriptionEXISTING STORM SEWEREXISTING STORM SEWEREXISTING STORM SEWEREXISTING STORM SEWEREXISTING STORM SEWEREXISTING STORM SEWEREXISTING STORM SEWEREXISTING STORM SEWERPipe NamePipe - 113Pipe - 114Pipe - 114APipe - 200Pipe - 201Pipe - 201APipe - 201BPipe - 202Pipe - 202APipe - 202BPipe - 203Pipe - 204Pipe - 205Pipe - 206Pipe - 206APipe - 207Pipe - 208Pipe - 300Size121262424151518861512121212121212MaterialHDPEHDPEHDPEHDPEHDPEHDPESCHD 40HDPEHDPEHDPEHDPEHDPEHDPEHDPEHDPEHDPEHDPERCPLength413519662571545577415672903429223815Slope0.74%0.50%1.00%0.28%0.28%0.99%1.00%0.54%0.79%0.00%0.50%0.46%0.45%0.60%0.60%0.60%0.60%1.37%DescriptionPERFORATED UNDERDRAINW/ RCP FESStorm Structure Table#100101102102A103103A104105105A106107Structure DetailsCATCH BASIN - CURB (6' DIA)RIM = 880.25Pipe - 101 = 875.20Pipe - 100 = 875.20EXISTING CATCH BASINRIM = 879.82Pipe - 102 = 875.08Pipe - 200 = 875.35Pipe - 101 = 875.15CATCH BASINRIM = 881.00Pipe - 103 = 875.66Pipe - 102A = 877.00Pipe - 102 = 875.66CATCH BASINRIM = 881.35Pipe - 102A = 877.46CATCH BASINRIM = 881.00Pipe - 104 = 875.83Pipe - 103A = 876.85Pipe - 103 = 875.83CATCH BASINRIM = 881.15Pipe - 103A = 877.30CATCH BASINRIM = 881.00Pipe - 105 = 876.03Pipe - 104 = 876.03CATCH BASIN (7' DIA)RIM = 880.10Pipe - 106 = 876.55Pipe - 105A = 876.55Pipe - 105 = 876.46STORM MANHOLERIM = 882.15Pipe - 105B = 877.82Pipe - 105A = 877.72CATCH BASIN (7' DIA)RIM = 880.33Pipe - 106A = 876.78Pipe - 107 = 876.78Pipe - 106 = 876.78CATCH BASINRIM = 880.88Pipe - 108 = 877.14Pipe - 107 = 877.14108109110111112113114200201201A202CATCH BASIN - CURBRIM = 881.00Pipe - 109 = 877.56Pipe - 108 = 877.56CATCH BASIN - CURBRIM = 881.00Pipe - 110 = 877.60Pipe - 109 = 877.60CATCH BASINRIM = 881.05Pipe - 111 = 877.93Pipe - 110 = 877.93CATCH BASINRIM = 881.20Pipe - 112 = 878.09Pipe - 111 = 878.09CATCH BASINRIM = 881.50Pipe - 113 = 878.30Pipe - 112 = 878.30CATCH BASIN (6' DIA)RIM = 881.95Pipe - 114 = 878.61Pipe - 114A = 878.61Pipe - 113 = 878.61CATCH BASINRIM = 881.95Pipe - 114 = 878.78CATCH BASINRIM = 880.40Pipe - 201 = 875.53Pipe - 200 = 875.53STORM MANHOLERIM = 881.16Pipe - 202 = 875.70Pipe - 201A = 875.70Pipe - 201 = 875.60STORM MANHOLE (3' DIA)RIM = 878.51Pipe - 201B = 876.40Pipe - 201A = 876.40STORM MANHOLERIM = 880.74Pipe - 203 = 876.04Pipe - 202A = 876.04Pipe - 202 = 875.94202A202B203204205206206A207208300OUTLET CONTROL STRUCTURERIM = 879.80Pipe - 202B = 876.50Pipe - 202A = 876.50CLEANOUTRIM = 880.00Pipe - 202B = 876.50CATCH BASINRIM = 880.34Pipe - 204 = 876.83Pipe - 203 = 876.83CATCH BASINRIM = 881.02Pipe - 205 = 877.16Pipe - 204 = 877.16CATCH BASINRIM = 881.21Pipe - 206 = 877.56Pipe - 205 = 877.56CATCH BASINRIM = 881.70Pipe - 206A = 877.77Pipe - 207 = 877.77Pipe - 206 = 877.77CATCH BASINRIM = 881.20Pipe - 206A = 877.94CATCH BASINRIM = 881.40Pipe - 208 = 877.90Pipe - 207 = 877.90CATCH BASINRIM = 881.96Pipe - 208 = 878.13CURB INLETNEENAH R-3165 FRAMEW/ TYPE A GRATERIM = 880.58Pipe - 300 = 879.20Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:WOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2510 Milton AvenueJanesville, WI 5354510/04/2023220025.00C2023-15Bid Set DocumentsC1.21GRADING PLAN -SOUTHSCALE: 1" = 20'NorthEXISTINGBUILDINGPROPOSEDBUILDINGFFE = 882.25MATCH LINESEE SHEET C1.20PROPOSED BIO-RETENTION BASINDENOTES PROPOSED STORM SEWERCONNECTION. SEE PLUMBING PLANSFOR CONTINUATION INTO BUILDING.EXISTING PROPERTYBOUNDARYEXISTING PROPERTYBOUNDARYEXISTING PROPERTYBOUNDARYPROPOSED ADA PARKING. SHEETSHEET C5.01 FOR DETAILS.PROPOSED BIDALTERNATIVE #21.REMOVE EXISTING CASTING, REPAIR ANY BROKENADJUSTMENT RINGS, AND INSTALL NEW NEENAH R-2505FRAME AND TYPE D GRATE.2.INSTALL NEW CATCH BASIN ON EXISTING STORM SEWER.3.CAUTION! UTILITIES. VERIFY EXACT LOCATION AND ELEVATIONPRIOR TO STARTING CONSTRUCTION.4.DENOTES EXISTING STORM SEWER TO BE REPAIRED. LOCATESECTION OF 24" PIPE CONFLICTED WITH EXISTING SANITARYLATERAL. REMOVE AND REPLACE DAMAGED PIPE SECTIONS.#1234SITE BENCHMARKCHISELED CROSSEL = 882.1310/13/202310/04/2023BID DOCUMENT SET xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x xxxxx xxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x xxxxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x xx x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xx x xx x xx x x x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxx x x xxxxxxxxxxx x x x xxxxxxxxx x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x xx xxxxxxxxx x x xxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x xxxxxxxxxxx xx xx xx xxxxxxxxxxx xxx xx x xx x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x xxxxxxxxxxxx x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xx x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x xxxxxxxx xxxxxxxxxxxxxx x x x x x xxx x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x x x x xx x x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x xx x x x x x x x x x x xx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xx x x x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxx x x x xxxx x x x x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x ST ST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST ST STSTSTST STST STSTSTSTSTSTSTSTST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTSTSTST E E E E ST STGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGA S GAS GASEEEEEEEEEEEEGASGAS GASGASGASGASGASGASGASGASGASGASGASGASGASGASEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE E E E E E E E E EEEEEE E E E E GASGASWWWWWSTEGASGASGASGASEEEEEEEEEEEEEEEEEEEEEEEEEEEEE E EEEEEEEEEEEEEEEEEEEEEEEEWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTGASGASGASGASGASWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W WWWWWWWWWWWWWWWWWWEEEEESAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SA N SAN SAN SA N SAN SAN SA N SA N SAN SAN SA N SAN SAN SA N SAN SAN SA N SAN SAN W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W xxxxxxxxxxxxxxxConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:WOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2510 Milton AvenueJanesville, WI 5354510/04/2023220025.00C2023-15Bid Set DocumentsC1.30DEMOLITIONPLANSCALE: 1" = 30'NorthDENOTES ITEM TO BE REMOVED OR DEMOLISHEDDENOTES PAVEMENT REMOVAL AREADENOTES CONCRETE REMOVAL AREADENOTES ITEM TO BE ABANDONED OR REMOVEDEXISTINGBUILDING(BUILDING TO BE REMOVED.SEE ARCHITECTURAL PLANS)EXISTINGBUILDING1.DENOTES EXISTING PAVEMENT TO BE REMOVED (TYP)2.DENOTES EXISTING CONCRETE TO BE REMOVED (TYP)3.DENOTES EXISTING SCREEN WALL TO BE REMOVED. REMOVEWALL FOOTING TO 18" BELOW FINISH GRADE4.DENOTES EXISTING CURB AND GUTTER TO BE REMOVED(TYP)5.DENOTES EXISTING TREE TO BE REMOVED (TYP)6.DENOTES EXISTING WATERMAIN TO BE ABANDONED (TYP)7.DENOTES EXISTING CROSSWALK TO BE REMOVED (TYP)8.DENOTES EXISTING BUS STOP SHELTER TO BE REMOVED BYTHE CITY OF JANESVILLE9.DENOTES EXISTING CONCRETE STAIRS TO BE REMOVED(TYP)10.DENOTES EXISTING STORM SEWER TO BE ABANDONED (TYP)11.DENOTES EXISTING ELECTRIC TO BE ABANDONED (TYP)12.DENOTES EXISTING TRANSFORMER TO BE REMOVED (TYP)(COORDINATE WITH UTILITY COMPANY)13.DENOTES EXISTING SANITARY SEWER TO BE REMOVED (TYP).CONTRACTOR TO MORTAR AND ABANDON EXISTINGSANITARY LATERAL IN PLACE AFTER CROSSING EXISTING 24"STORM SEWER.14.DENOTES EXISTING GAS TO BE ABANDONED (TYP)15.DENOTES EXISTING LIGHT POLE TO BE REMOVED (TYP).COORDINATE WITH ELECTRICAL16.DENOTES EXISTING STORM STRUCTURE TO BE REMOVED(TYP)17.DENOTES EXISTING FIRE HYDRANT TO BE REMOVED (TYP)18.DENOTES EXISTING SANITARY LATERAL CONNECTION TO BEREMOVED. MORTAR SOUTHWEST BENCH.19.DENOTES EXISTING GATE VALVE TO BE REMOVED.20.DENOTES EXISTING POST INDICATOR VALVE TO BEREMOVED.21.DENOTES EXISTING ELECTRIC VAULT TO BE ABANDONED.#6655555555822223391111110107444444444422443324410101111612131414146DENOTES PROPOSEDBUILDING FOOTPRINTDENOTES PROPOSEDBUILDING FOOTPRINTMILTON AVEREFSET DRDENOTES TREE TO BE REMOVED(MARK ALL TREE REMOVALS IN THE FIELD AND VERIFY WITH OWNERPRIOR TO REMOVAL)11151515151616161616161643111414617171610572113154435551511111111119201813131515151644446666610/13/202310/04/2023BID DOCUMENT SET SDSDSDHCHCHCHCHCHCHCHCHCHCDNDNDNHCHCHCHCHCHCDWUPDNUPUPDNSDSDSDUPHCHCHCHCHCHCHCHCHCHCDNDNDNDNUPUPHCHCHCHCHCHCDWDNSTSTSTST STST STSTSTSTSTSTST ST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTST E E E STGASGA S EEEEEEGASGAS GASGASGASGASGASGASEEEEEEEEEEEEEEEEEE E E WWSTEGASGASGASEEEEEEEEEE EEEEEEEEEEEEEEEEEWWWWWWWWWWWWWWWSTSTSTSTSTSTSTSTSTSTSTSTGASGASGASGASW W WWWWWWWWWWWEEESAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SANSANSANWWWWWWWWWWWWWWWWWWWWWWSANSANSANSANSANSANSANSANSANSANSANSANSANSANWWWWWWWWWWWWW WWWWWWWWSAN DRIVETHRUDRIVETHRU882 WWWWWW W W W W W W W WWWWWWWWWW WWWWWW W W W W W W W WWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWW W W W W881880879W W WW W W WW HPHP HPSTSTST ST STSTST STSTSTSTSTSTSTSTSTST ST ST ST ST STSTSTSTSTSTSTSTSTSTSTSTSTSTST STST881881881881881 881881HP881 HPHPHPHPHP881881882881 STST880HP88188188 2 HPWWSTST882882882 W882882881 882882 88288288188288288188188288 2 8 8 2 1.WDNR PERMIT COVERAGE IS REQUIRED. POST WDNR CERTIFICATE OF PERMIT COVERAGE ON SITE AND MAINTAIN UNTILCONSTRUCTION ACTIVITIES HAVE CEASED, THE SITE IS STABILIZED, AND A NOTICE OF TERMINATION IS FILED WITHWDNR.2.KEEP A COPY OF THE CURRENT EROSION CONTROL PLAN ON SITE THROUGHOUT THE DURATION OF THE PROJECT.3.SUBMIT PLAN REVISIONS OR AMENDMENTS TO THE ENGINEER AT LEAST 5 DAYS PRIOR TO FIELD IMPLEMENTATION.4.CONTRACTOR IS RESPONSIBLE FOR ROUTINE SITE INSPECTIONS AT LEAST ONCE EVERY 7 DAYS AND WITHIN 24 HOURSAFTER A RAINFALL EVENT OF 0.5 INCHES OR GREATER. KEEP INSPECTION REPORTS ON-SITE AND MAKE THEM AVAILABLEUPON REQUEST.5.INSPECT AND MAINTAIN ALL INSTALLED EROSION CONTROL PRACTICES UNTIL THE CONTRIBUTING DRAINAGE AREA HASBEEN STABILIZED.6.WHEN POSSIBLE: PRESERVE EXISTING VEGETATION (ESPECIALLY ADJACENT TO SURFACE WATERS), MINIMIZELAND-DISTURBING CONSTRUCTION ACTIVITY ON SLOPES OF 20% OR MORE, MINIMIZE SOIL COMPACTION, AND PRESERVETOPSOIL.7.REFER TO THE WDNR STORMWATER CONSTRUCTION TECHNICAL STANDARDS AThttp://dnr.wi.gov/topic/stormwater/standards/const_standards.html.8.INSTALL PERIMETER EROSION CONTROLS, (IF REQUIRED) AND TRACKOUT CONTROL PRACTICES PRIOR TO ANYLAND-DISTURBING ACTIVITIES, INCLUDING CLEARING AND GRUBBING. USE WDNR TECHNICAL STANDARD 1057 FORTRACKOUT CONTROL AT CONSTRUCTION ENTRANCE(S) (IF REQUIRED).9.INSTALL INLET PROTECTION PRIOR TO LAND-DISTURBING ACTIVITIES IN THE CONTRIBUTING DRAINAGE AREA AND/ORIMMEDIATELY UPON INLET INSTALLATION. COMPLY WITH WDNR TECHNICAL STANDARD STORM DRAIN INLET PROTECTIONFOR CONSTRUCTION SITES #1060.10.STAGE CONSTRUCTION GRADING ACTIVITIES TO MINIMIZE THE CUMULATIVE EXPOSED AREA. CONDUCT TEMPORARYGRADING FOR EROSION CONTROL PER WDNR TECHNICAL STANDARD TEMPORARY GRADING PRACTICES FOR EROSIONCONTROL #1067.11.PERMITTING OF GROUNDWATER DEWATERING IS THE RESPONSIBILITY OF THE CONTRACTOR. GROUNDWATERDEWATERING IS SUBJECT TO A DNR WASTEWATER DISCHARGE PERMIT AND A DNR HIGH CAPACITY WELL APPROVAL IFCUMULATIVE PUMP CAPACITY IS 70 GPM OR MORE.12.PROVIDE ANTI-SCOUR PROTECTION AND MAINTAIN NON-EROSIVE FLOW DURING DEWATERING. PERFORM DEWATERINGOF ACCUMULATED SURFACE RUNOFF IN ACCORDANCE WITH WDNR TECHNICAL STANDARD DE-WATERING #1061.13.BIORETENTION BASIN WILL SERVE AS SEDIMENT BASIN DURING CONSTRUCTION. INSTALL OUTLET CONTROLSTRUCTURE, STORM PIPING, AND GRADE BASIN AS SHOWN ON THE PLAN BUT DO NOT INSTALL ENGINEERED SOIL ANDSTONE STORAGE LAYER UNTIL SITE IS FINISH GRADED AND STABILIZED. CONTACT THE ENGINEER PRIOR TOINSTALLING STONE STORAGE LAYER AND ENGINEERED SOIL. UPON APPROVAL FROM THE ENGINEER, REMOVEACCUMULATED SEDIMENT AND EXCAVATE BASIN TO BOTTOM ELEVATION SHOWN ON THE DETAILS. INSTALLUNDERDRAIN, STONE STORAGE LAYER, AND ENGINEERED SOIL. IMMEDIATELY PROTECT THE BIORETENTION BASIN ANDVEGETATION FROM RUNOFF AND SEDIMENT DURING CONSTRUCTION. REFERENCE THE WDNR TECHNICAL STANDARDBIORETENTION FOR INFILTRATION # 1004.14.INSTALL AND MAINTAIN SILT FENCING PER WDNR TECHNICAL STANDARD SILT FENCE #1056. REMOVE SEDIMENT FROMBEHIND SILT FENCES AND SEDIMENT BARRIERS BEFORE SEDIMENT REACHES A DEPTH THAT IS EQUAL TO ONE-HALF OFTHE FENCE AND/OR BARRIER HEIGHT.15.REPAIR BREAKS AND GAPS IN SILT FENCES AND BARRIERS IMMEDIATELY. REPLACE DECOMPOSING STRAW BALES(TYPICAL BALE LIFE IS 3 MONTHS). LOCATE, INSTALL, AND MAINTAIN STRAW BALES PER WDNR TECHNICAL STANDARDDITCH CHECKS #1062.16.INSTALL AND MAINTAIN FILTER SOCKS IN ACCORDANCE WITH WDNR TECHNICAL STANDARD INTERIM MANUFACTUREDPERIMETER CONTROL AND SLOPE INTERRUPTION PRODUCTS # 1071.17.IMMEDIATELY STABILIZE STOCKPILES AND SURROUND STOCKPILES AS NEEDED WITH SILT FENCE OR OTHER PERIMETERCONTROL IF STOCKPILES WILL REMAIN INACTIVE FOR 7 DAYS OR LONGER.18.IMMEDIATELY STABILIZE ALL DISTURBED AREAS THAT WILL REMAIN INACTIVE FOR 14 DAYS OR LONGER.- BETWEEN SEPTEMBER 15 AND OCTOBER 15: STABILZE WITH MULCH, TACKIFIER, AND A PERENNIAL SEED MIXED WITH WINTER WHEAT, ANNUAL OATS, OR ANNUAL RYE, AS APPROPRIATE FOR REGION AND SOIL TYPE- OCTOBER 15 THROUGH COLD WEATHER: STABILIZE WITH A POLYMER AND DORMANT SEED MIX, AS APPROPRIATE FOR REGION AND SOIL TYPE.19.STABILIZE AREAS OF FINAL GRADING WITHIN 7 DAYS OF REACHING FINAL GRADE.20.SWEEP/CLEAN UP ALL SEDIMENT/TRASH THAT MOVES OFF-SITE DUE TO CONSTRUCTION ACTIVITY OR STORM EVENTSBEFORE THE END OF THE SAME WORKDAY OR AS DIRECTED BY THE WDNR/MUNCIPALITY. SEPARATE SWEPT MATERIALS(SOILS AND TRASH) AND DISPOSE OF APPROPRIATELY.21.CONTRACTOR IS RESPONSIBLE FOR CONTROLLING DUST PER WDNR TECHNICAL STANDARD DUST CONTROL ONCONSTRUCTION SITES # 1068.22.PROPERLY DISPOSE OF ALL WASTE AND UNUSED BUILDING MATERIALS (INCLUDING GARBAGE, DEBRIS, CLEANINGWASTES, OR OTHER CONSTRUCTION MATERIALS) AND DO NOT ALLOW THESE MATERIALS TO BE CARRIED BY RUNOFFINTO THE RECEIVING CHANNEL.25. FOR NON-CHANNELIZED FLOW ON DISTURBED OR CONSTRUCTED SLOPES 4:1 OR GREATER (OR AS SHOWN ON THEPLAN), PROVIDE CLASS I TYPE TYPE A (WITH ACCELERATED DEGRADABLE NETTING) EROSION CONTROLMATTING. SELECT EROSION MATTING FROM WDOT’S PRODUCT ACCEPTABILITY LIST (PAL); INSTALL AND MAINTAIN PERWDNR TECHNICAL STANDARD NON-CHANNEL EROSION MAT #1052.23.FOR CHANNELIZED FLOW ON DISTURBED OR CONSTRUCTED AREAS (OR AS SHOWN ON THE PLANS), PROVIDE NORTHAMERICAN GREEN SC150 (OR APPROVED EQUAL) EROSION CONTROL MATTING. INSTALL AND MAINTAIN PER WDNRTECHNICAL STANDARD CHANNEL EROSION MAT #1053.24.MAKE PROVISIONS FOR WATERING DURING THE FIRST 8 WEEKS FOLLOWING SEEDING OR PLANTING OF DISTURBEDAREAS WHENEVER MORE THAN 7 CONSECUTIVE DAYS OF DRY WEATHER OCCUR.25.INSTALL ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES (SUCH AS TEMPORARY SEDIMENT BASINS, DITCHCHECKS, EROSION CONTROL MATTING, SILT FENCING, FILTER SOCKS, WATTLES, SWALES, ETC.), OR AS DIRECTED BYWDNR/MUNICIPALITY26.NOTICE OF TERMINATION: WHEN THE SITE HAS BEEN FULLY STABILIZED AND ALL STORMWATER DISCHARGES FROM THESITE AUTHORIZED UNDER THE NOI PERMIT HAVE BEEN ELIMINATED, A NOTICE OF TERMINATION SHALL BE FILED WITHTHE DNR. CONTRACTOR SHALL SUBMIT A COMPLETED NOTICE OF TERMINATION APPLICATION IN ACCORDANCE WITHTHE PERMIT REQUIREMENTS PRIOR TO FINAL PAYMENT.Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:WOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2510 Milton AvenueJanesville, WI 5354510/04/2023220025.00C2023-15Bid Set DocumentsC1.40EROSIONCONTROL PLANSCALE: 1" = 40'NorthPROPOSEDBUILDINGSEDIMENT LOGCONSTRUCTION ENTRANCEEROSION MATINLET SEDIMENT GUARDDENOTES EROSION MAT (TYPE 1, CLASS A) WITHACCELERATED DEGRADABLE NETTING. NORTHAMERICAN GREEN S75 (OR APPROVED EQUIV.)DENOTES PROPOSEDSEDIMENT LOG (TYP.)MILTON AVEREFSET DRDENOTES PROPOSED FIELDSTONECOBBLES (6"-8" DIA) W/ GEOFABRIC LINERDENOTES EXISTINGPROPERTY BOUNDARYDENOTES EXISTINGPROPERTY BOUNDARYDENOTES EXISTINGPROPERTY BOUNDARYDENOTES PROPOSEDSEDIMENT LOG (TYP.)DENOTES PROPOSEDSEDIMENT LOG (TYP.)DENOTES PROPOSEDSEDIMENT LOG (TYP.)PROPOSED CONSTRUCTION ENTRANCE.IMPLEMENT TRACKOUT CONTROL MEASURESPER WDNR TECHNICAL STANDARD 1057PROPOSED BIDALTERNATIVE #2PROPOSED BIDALTERNATIVE #1DENOTES PROPOSEDSEDIMENT LOG (TYP.)1.DENOTES PROPOSED TYPE B INLETPROTECTION. SEE SHEET C5.01 FOR DETAILS2.DENOTES PROPOSED TYPE C INLETPROTECTION. SEE SHEET C5.01 FOR DETAILS#122221111111111111111111111111DENOTES EXISTINGPROPERTY BOUNDARYDENOTES EXISTINGPROPERTY BOUNDARYDENOTES EXISTINGPROPERTY BOUNDARY10/13/202310/04/2023BID DOCUMENT SET 8798808818818818818818818 8 1 881881881881881881881881881881881881881 881 881881 881881881881881881881882882882882882 882882882882882882882 8828 8 2 8 8 2 882882882 882882882 8828828828828828828828828828838838838838838 8 3 8848848848848848848848848848848848858858858858858858858868868868868868868868868868868878878870( IN FEET )1 inch = ft.Graphic Scale3060301530NorthFOREXISTING CONDITIONS SURVEYJANESVILLE MALL2500 MILTON AVEJANESVILLE, WIofDate:Drawing No.SheetCSE Job No.:Checked By:Drawn By:11EC - 309/21/202222 - 009NJFRAPCSECAPITOL SURVEY ENTERPRISES220 REGENCY CT. STE. 210BROOKFIELD, WI 53045Ph: (262) 786-6600Fax: (414) 786-6608www.capitolsurvey.comLEGENDSCALE: 1" = 30'Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:WOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2510 Milton AvenueJanesville, WI 5354510/04/2023220025.00C2023-15Bid Set DocumentsC1.50EXISTINGSURVEYNorth10/13/202310/04/2023BID DOCUMENT SET VANACCESSIBLERESERVEDPARKINGVEHICLES WITH VET ORDIS PLATES OR STATEDISABLED CARDTHIS SPACE············Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:WOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2510 Milton AvenueJanesville, WI 5354510/04/2023220025.00C2023-15Bid Set DocumentsC5.00CONSTRUCTIONDETAILS10/13/202310/04/2023BID DOCUMENT SET ST ST ST ST ST ST ST EEEEE E EEEEEW W W W W W W W W W 881HPHP882.67882.40882.19882.46882.67882.46882.40882.190$7&+“882.480$7&+“882.710$7&+“883.000$7&+“883.000$7&+“882.610$7&+“882.220$7&+“881.900$7&+“881.950$7&+“882.17882.76882.76HP882.84HP882.25881.95881.53881.53881.95882.32882.27882.49882.11882.03882.49882.32882.27882.11882.03882.69T/C882.19E/P882.69T/C882.19E/P881.75881.40881.86HP882.75HP882.54882882WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W HPSTSTSTSTSTSTSTSTSTSTST881881881.64T/C881.14E/P881.62T/C881.12E/P881.11T/C881.06E/P881.72881.22881.03T/C880.98E/P880.95T/C880.90E/P880.87T/C880.82E/P880.82T/C880.77E/P881.21T/C880.71E/P881.06880.94880.76880.64880.57880.93881.64880.93881.09881.19881.14881Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:WOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2510 Milton AvenueJanesville, WI 5354510/04/2023220025.00C2023-15Bid Set DocumentsC5.01CONSTRUCTIONDETAILSSCALE: 1" = 10'North1.DENOTES PROPOSED ADA PARKING 1.8% MAX SLOPE IN ANYDIRECTION (TYP)2.DENOTES PROPOSED BARRIER STYLE CURB3.DENOTES PROPOSED TRUNCATED DOMES (TYP)4.DENOTES PROPOSED RAMP 8% MAX SLOPE5.DENOTES PROPOSED HANDICAP SIGN (TYP)6.DENOTES PROPOSED ADA RAMP#1111112231.DENOTES PROPOSED ADA PARKING 1.8% MAX SLOPE IN ANYDIRECTION (TYP)2.DENOTES PROPOSED 5' CURB TAPER3.DENOTES PROPOSED TRUNCATED DOMES (TYP)4.DENOTES PROPOSED 1.8% MAX SLOPE5.DENOTES PROPOSED RAMP 8% MAX SLOPE6.DENOTES PROPOSED HANDICAP SIGN (TYP)7.DENOTES PROPOSED HANDICAP RAMP - TYPE 2#115523347666655554SCALE: 1" = 10'North53210/13/202310/04/2023BID DOCUMENT SET UPDNDNDNDNUPUPDN1" / 1'-0"1" / 1'-0"1" / 1'-0"ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST ST ST ST ST ST ST EEEESTSTGAS GASGASEEEEEEEEEEGASGASGASGASGA S GASGAS GAS GAS GAS GAS GA S GASEEEEEEEEEEEEEEEEEEEEEEEEGAS GAS W W WST EGASGASGASGASEEEEE E E E E E E E EE E E E E E E E EE EEEEE E E E E E E WWWWWW W W W WWWWWWW W W W W ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST GASGASGASGASGASWWWWWWWWW W W W W WWWWE E E E SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANWWWWWWWWWWWWWWWWWWWWWWWWWW31 5 13 30 34 30 28 28 37 43 20 15 10 19 37 41 23 SA N SAN SAN SAN SAN SAN SAN SAN SA N SA N SAN SAN SAN SAN SANWW W W W W W W W W W W W W W W W W W W W W WSANSANDO NOT ENT E R DO N O T E N T E R DRIVETHRU DRIVETHRUDRIVETHRUDRIVETHRU DRIVETHRUWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W WWW WWWW W W W WWW WSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST18 16 27 STSTL1.00 EXISTING BUILDING MILTON AVERE F S E T D R PROPOSED BUILDING PROPOSED TRANSFORMER PROPOSED DROP OFF LANE PROPOSED BIORETENTION BASIN PROPOSED BUS STOP PROPOSED PROPERTY BOUNDARY EXISTING PUMP BUILDING PROPOSED TRASH ENCLOSURE AREA Site Summary Street Frontage 645 LF Paved Areas 164,096 SF Building Foundations 1,376 LF Code Category Ratio Requirement Provided Street Frontage 1 Tree / 50 LF 12.9 Trees 9 Trees (L1.01) 4 Trees (L1.02) 13 Trees Paved Areas 150 Points / 3,000 SF 8,204.8 Points 5,400 Points (L1.01) 3,130 Points (L1.02) 8,530 Points Building Foundations 300 Points / 100 LF 4,128.0 Points 2,270 Points (L1.01) 1,870 Points (L1.02) 4,140 Points LANDSCAPE REQUIREMENTS GENERAL NOTES Lawn areas to be seeded with premium commercial grade bluegrass seed mix, see specifications. Plant beds and parking lot islands to receive a 3-4" deep layer of shredded hardwood mulch. All plantings shall comply with standards as described in the American Standard of Nursery Stock - ANSI Z60.1 (Latest Version) LAWN LAWN LAWN LAWN LAWN LAWN LAWN LAWN EX. SIGN OUTDOOR SEATING AREA OUTDOOR SEATING AREA L1.01 L1.02 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 10/13/2023 220025.00 C2023-15 Permit Resubmittal Set L1.01 L1.02 EXISTING BUILDING SCALE: 1" = 40' North LANDSCAPE PLAN OVERALL LAWN SNOW STORAGE SNOW STORAGE LAWN LAWN LAWN PUBLIC WALK PUBLIC WALK LAWN WALK BIKE RACKS BIKE RACKS PROPOSED DROP OFF LANE LAWN LAWN LAWN 10/04/2023 BID DOCUMENT SET DNST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTSTSTSTSTSTSTEEEESTSTEEEEEEEEEEGASGASGASGASGA S GASGAS GA S GA S GA S GA S GA S GASEEEEEEEEEEEEEEEEEEEEW WST EGASGASGASGASEEEEE E E E E E E E EE E E E E E E E EE EEEEE E E E E E E WWWWWW W W W WWWWWWW W W W W ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST WWWWWWWWW W W W W WWWWE E E E SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANWWWWWWWWWWWWWWWWWWWWDO NOT E N T E R DO N O T E N T E R DRIVETHRU DRIVETHRUDRIVETHRUDRIVETHRU DRIVETHRU882WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST8818818 8 2 88 2 88288 1 882881881ST(12) LBS (3) LQF (20) PDG (3) JUN (3) BMV (3) IHD (6) DY (17) PDG (3) DY (1) CWH (3) SSP LAWN EX. LAWN EX. LAWN PROPOSED BUILDING EX. SIGN EXISTING PUMP BUILDING PROPOSED PROPERTY BOUNDARY LAWN STONE MAINTENANCE STRIP TYP. (24) LSR OUTDOOR SEATING AREA FUTURE BUILDING ADDITION EX. LAWN EXISTING TREE TO REMAIN EX. LAWN LAWN LAWN LAWN (14) RUD (32) KKC CONCRETE WALK (3) AH (13) RUD (1) IHD SNOW STORAGE BIKE RACKS DROP OFF LANE (5) ARO (1) SKH (24) ARO (1) VFE (17) ARO (20) ARO (9) SYM (9) SYM (7) KFG (13) ARO (2) RPO (25) SYM (27) SYM (24) SYM (7) KFG (13) ARO (2) RPO (3) VFE (2) RPO (2) CHB (2) ZEL (2) RPO (3) ZEL (2) RPO (2) RPO (1) SWO (1) SWO (1) RPO (2) RPO (1) HEP (16) KKC (1) HEP (3) HEP LAWN (2) RPO STONE MAINTENANCE STRIP, TYP. CONCRETE WALK (5) DY (5) DY (4) JUN (3) SSP (4) JUN (3) SSP (3) JUN DROP OFF LANE STONE MAINTENANCE STRIP, TYP. PUBLIC WALK NEW PAVEMENT SECTION LIMIT LINE DECIDUOUS TREES BOTANICAL / COMMON NAME SIZE ROOT QTY CHB Celtis occidentalis / Prairie Sentinel Hackberry 2" Cal.B&B 2 RPO Quercus robur x bicolor 'Long' TM / Regal Prince Oak 2" Cal.B&B 4 VFE Ulmus americana 'Frontier Elm' / Frontier American Elm 2" Cal.B&B 3 PLANT SCHEDULE NORTH STREET FRONT DECIDUOUS TREES BOTANICAL / COMMON NAME SIZE ROOT QTY SKH Gleditsia triacanthos inermis 'Draves' TM / Street Keeper Honey Locust 2" Cal.B&B 1 SWO Quercus bicolor / Swamp White Oak 2" Cal.B&B 2 RPO Quercus robur x bicolor 'Long' TM / Regal Prince Oak 2" Cal.B&B 13 VFE Ulmus americana 'Frontier Elm' / Frontier American Elm 2" Cal.B&B 1 ZEL Zelkova serrata / Japanese Zelkova 7` Ht.B&B 5 DECIDUOUS SHRUBS BOTANICAL / COMMON NAME SIZE ROOT QTY ARO Aronia melanocarpa / Low Scape Mound® Black Chokeberry 18" Ht.Cont.92 SYM Symphoricarpos x doorenbosii 'Kolmcan' / First Editions® Candy™ Snowberry 36" Ht.Cont.94 ORNAMENTAL GRASSES BOTANICAL / COMMON NAME SIZE ROOT QTY KFG Calamagrostis x acutiflora 'Karl Foerster' / Karl Foerster Feather Reed Grass 1 Gal.Pot 14 PLANT SCHEDULE NORTH PARKING LOT ORNAMENTAL TREES BOTANICAL / COMMON NAME SIZE ROOT QTY CWH Hamamelis virginiana / Common Witch Hazel 5` Ht.B&B 1 EVERGREEN TREES BOTANICAL / COMMON NAME SIZE ROOT QTY SSP Pinus cembra 'Chalet' / Chalet Swiss Stone Pine 5` Ht.B&B 9 DECIDUOUS TREES BOTANICAL / COMMON NAME SIZE ROOT QTY HEP Heptacodium miconioides / Seven Son Flower 7` Ht.B&B 5 DECIDUOUS SHRUBS BOTANICAL / COMMON NAME SIZE ROOT QTY IHD Cornus alba 'Bailhalo' TM / Ivory Halo Dogwood 36" Ht.Cont.4 AH Hydrangea arborescens 'Annabelle' / Annabelle Hydrangea 24" Ht.Cont.3 LQF Hydrangea paniculata 'SMHPFL' / Little Quick Fire Hydrangea 24" Ht.Cont.3 BMV Viburnum dentatum 'Blue Muffin' / Blue Muffin Arrowwood Viburnum 36" Ht.Cont.3 EVERGREEN SHRUBS BOTANICAL / COMMON NAME SIZE ROOT QTY JUN Juniperus x pfitzeriana 'Monsan' / Sea of Gold® Pfitzer Juniper 24" Ht.Pot 14 DY Taxus x media 'Densiformis' / Dense Japanese Yew 24" Sprd.Cont.19 ORNAMENTAL GRASSES BOTANICAL / COMMON NAME SIZE ROOT QTY LBS Schizachyrium scoparium / Little Bluestem 1 Gal.Pot 12 PDG Sporobolus heterolepis / Prairie Dropseed 1 Gal.Pot 37 PERENNIALS BOTANICAL / COMMON NAME SIZE ROOT QTY KKC Echinacea purpurea 'Kim's Knee High' / Kim's Knee High Coneflower 4.5"Pot 48 LSR Perovskia atriplicifolia 'Little Spire' / Little Spire Russian Sage 4.5"Pot 24 RUD Rudbeckia hirta / Black-eyed Susan 4.5"Pot 27 PLANT SCHEDULE NORTH BUILDING FRONT POINTS PER TOTAL POINTS 150 150 150 300 60 780 150 150 60 300 20 1,880 20 1,840 -- 5,400 POINTS PER TOTAL POINTS 150 300 150 600 150 450 1,350 POINTS PER TOTAL POINTS 60 60 60 540 150 750 20 80 20 60 20 60 20 60 20 280 20 380 -- -- -- - - - - 2,270 L1.01 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 10/13/2023 220025.00 C2023-15 Permit Resubmittal SetMILTON AVESCALE: 1" = 20' North LANDSCAPE PLAN NORTH MATCH LINE L1.02 10/04/2023 BID DOCUMENT SET UPDNDNDNDNUPUP1" / 1'-0"1" / 1'-0"1" / 1'-0"ST ST STSTSTSTSTSTSTSTSTST ST ST ST ST ST ST GA S GASGASEEEEGA S GA SGAS GASGASGASGASSANSANSANSANSANSANSANSANSANSANSANWWWWWWWSA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA NWW W W W W W W W W W W W W W W W W W W W W WSANSAN881882WWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W WWW 881880 879882 W W W WWW WSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST881 881881881 881 8818818828 8 1 881 880 ST880 881881882 (1) AMH (1) AMH (1) VFE (3) SSP (5) PFG (3) PFG (3) SSP (1) QFH (3) PFG (1) SSP (1) QFH (13) PDG (5) PFG (3) LQF PROPOSED BUILDING PROPOSED DROP OFF LANE PROPOSED TRASH ENCLOSURE AREA TRANSFORMER EXISTING BUILDING STONE MAINTENANCE STRIP, TYP. LAWN OUTDOOR SEATING AREA FUTURE BUILDING ADDITION WA L K WALKLAWN LAWN BIKE RACKS (28) KKC (14) RUD SNOW STORAGE LAWN LA W N LAWN (3) DKL (2) DKL (23) PDG (8) RUD (16) KKC LAWN LAWN (19) RUD (1) VFE BIORETENTION BASIN (WETLAND SEED MIX) (19) ARO (16) ARO (1) AMH (3) SKH (1) SWO (2) BC (1) BC (2) WS (5) CHB (1) VFE (2) RPO (1) CHB (1) HEP (1) ABS (1) SWO (1) SWO (1) ABS LAWN LAWN WA L K WA L K LAWN LAWN STONE MAINTENANCE STRIP, TYP. LAWN PROPOSED BUS STOP (3) BMV (3) SSP (3) SSP (4) BMV (9) KCJ (5) BMV (4) JUN (6) JUN PUBLIC WALK NEW PAVEMENT SECTION LIMIT LINE WA L K DECIDUOUS TREES BOTANICAL / COMMON NAME SIZE ROOT QTY CHB Celtis occidentalis / Prairie Sentinel Hackberry 2" Cal.B&B 1 RPO Quercus robur x bicolor 'Long' TM / Regal Prince Oak 2" Cal.B&B 2 VFE Ulmus americana 'Frontier Elm' / Frontier American Elm 2" Cal.B&B 1 PLANT SCHEDULE SOUTH STREET FRONT ORNAMENTAL TREES BOTANICAL / COMMON NAME SIZE ROOT QTY AMH Carpinus caroliniana / Wisconsin Red Musclewood 2" Cal.B&B 3 EVERGREEN TREES BOTANICAL / COMMON NAME SIZE ROOT QTY WS Picea glauca / White Spruce 7` Ht.B&B 2 BC Taxodium distichum / Bald Cypress 7` Ht.B&B 3 DECIDUOUS TREES BOTANICAL / COMMON NAME SIZE ROOT QTY CHB Celtis occidentalis / Prairie Sentinel Hackberry 2" Cal.B&B 5 SKH Gleditsia triacanthos inermis 'Draves' TM / Street Keeper Honey Locust 2" Cal.B&B 3 SWO Quercus bicolor / Swamp White Oak 2" Cal.B&B 3 VFE Ulmus americana 'Frontier Elm' / Frontier American Elm 2" Cal.B&B 2 DECIDUOUS SHRUBS BOTANICAL / COMMON NAME SIZE ROOT QTY ARO Aronia melanocarpa / Low Scape Mound® Black Chokeberry 18" Ht.Cont.35 PLANT SCHEDULE SOUTH PARKING LOT ORNAMENTAL TREES BOTANICAL / COMMON NAME SIZE ROOT QTY ABS Amelanchier x grandiflora 'Autumn Brilliance' / Autumn Brilliance Apple Serviceberry 7` Ht.B&B 2 EVERGREEN TREES BOTANICAL / COMMON NAME SIZE ROOT QTY SSP Pinus cembra 'Chalet' / Chalet Swiss Stone Pine 5` Ht.B&B 13 DECIDUOUS TREES BOTANICAL / COMMON NAME SIZE ROOT QTY HEP Heptacodium miconioides / Seven Son Flower 7` Ht.B&B 1 DECIDUOUS SHRUBS BOTANICAL / COMMON NAME SIZE ROOT QTY QFH Hydrangea paniculata 'Quick Fire' / Quick Fire Hydrangea 36" Ht.Cont.2 LQF Hydrangea paniculata 'SMHPFL' / Little Quick Fire Hydrangea 24" Ht.Cont.3 DKL Syringa meyeri 'Palibin' / Dwarf Korean Lilac 36" Ht.Cont.5 BMV Viburnum dentatum 'Blue Muffin' / Blue Muffin Arrowwood Viburnum 36" Ht.Cont.12 EVERGREEN SHRUBS BOTANICAL / COMMON NAME SIZE ROOT QTY KCJ Juniperus x pfitzeriana 'Kallay's Compact' / Kallay's Compact Pfitzer Juniper 24" Sprd.Cont.9 JUN Juniperus x pfitzeriana 'Monsan' / Sea of Gold® Pfitzer Juniper 24" Ht.Pot 10 ORNAMENTAL GRASSES BOTANICAL / COMMON NAME SIZE ROOT QTY PFG Miscanthus sinensis 'Purpurescens' / Purple Flame Grass 1 Gal.Pot 16 PDG Sporobolus heterolepis / Prairie Dropseed 1 Gal.Pot 36 PERENNIALS BOTANICAL / COMMON NAME SIZE ROOT QTY KKC Echinacea purpurea 'Kim's Knee High' / Kim's Knee High Coneflower 4.5"Pot 44 RUD Rudbeckia hirta / Black-eyed Susan 4.5"Pot 41 PLANT SCHEDULE SOUTH BUILDING FRONT POINTS PER TOTAL POINTS 60 180 60 120 60 180 150 750 150 450 150 450 150 300 20 700 3,130 POINTS PER TOTAL POINTS 150 150 150 300 150 150 600 POINTS PER TOTAL POINTS 60 120 60 780 150 150 20 40 20 60 20 100 20 240 20 180 20 200 -- -- -- -- 1,870 L1.02 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 10/13/2023 220025.00 C2023-15 Permit Resubmittal Set SCALE: 1" = 20' North LANDSCAPE PLAN SOUTH RE F S E T D RMILTON AVEMATCH LINE L1.01 10/04/2023 BID DOCUMENT SET DNUPUPA8.112SimA8.111SimDNUPUPSA N SA N W W W W W W W WSANWW W W W W W W W W W W W W W W W W W W W W W W WWW881880 879 WWWW881 881 881 880 881881882881 882 (1) AMH (1) AMH BUILDING ADDITION WA L K WALKLAWN BIORETENTION BASIN (WETLAND SEED MIX) (3) SKH (1) SWO (2) BC (1) BC (2) WS LAWN LAWN (3) SSP (3) DKL (1) QFH (5) BMV (1) QFH (11) KCJ (1) QFH (5) BMV (1) QFH (16) KKC (8) RUD (6) DMP (23) PDG (1) VFE (19) AWS LAWN (4) AH (13) RUD (10) RUD (3) SSP (3) DKL (4) PFG (3) AH (2) DKL (7) AH (5) SSP BUS STOP LIGHT, TYP. E E E E E E E EWW WWWWWWWWWWWWWWWW881881881 8 8 2 882882 882(24) GLS (20) GLS (9) DBH (2) RPO (1) SWO (1) SWO LAWN (3) BMV (2) IHD (13) RUD (16) KKC (3) SSP (17) PDG (2) IHD(1) ABS BUILDING ADDITION (5) RUD (5) LBS (5) DMP (5) LQF (13) RUD (9) PDG (10) KKC (3) AH (1) RPO (3) AH (3) DMP LIGHT, TYP. ORNAMENTAL TREES BOTANICAL / COMMON NAME SIZE ROOT QTY ABS Amelanchier x grandiflora 'Autumn Brilliance' / Autumn Brilliance Apple Serviceberry 7` Ht.B&B 1 EVERGREEN TREES BOTANICAL / COMMON NAME SIZE ROOT QTY SSP Pinus cembra 'Chalet' / Chalet Swiss Stone Pine 5` Ht.B&B 3 DECIDUOUS TREES BOTANICAL / COMMON NAME SIZE ROOT QTY RPO Quercus robur x bicolor 'Long' TM / Regal Prince Oak 2" Cal.B&B 1 DECIDUOUS SHRUBS BOTANICAL / COMMON NAME SIZE ROOT QTY IHD Cornus alba 'Bailhalo' TM / Ivory Halo Dogwood 36" Ht.Cont.4 AH Hydrangea arborescens 'Annabelle' / Annabelle Hydrangea 24" Ht.Cont.6 LQF Hydrangea paniculata 'SMHPFL' / Little Quick Fire Hydrangea 24" Ht.Cont.5 BMV Viburnum dentatum 'Blue Muffin' / Blue Muffin Arrowwood Viburnum 36" Ht.Cont.3 EVERGREEN SHRUBS BOTANICAL / COMMON NAME SIZE ROOT QTY DMP Pinus mugo 'Pumilio' / Dwarf Mugo Pine 24" Ht.B&B 8 ORNAMENTAL GRASSES BOTANICAL / COMMON NAME SIZE ROOT QTY LBS Schizachyrium scoparium / Little Bluestem 1 Gal.Pot 5 PDG Sporobolus heterolepis / Prairie Dropseed 1 Gal.Pot 26 PERENNIALS BOTANICAL / COMMON NAME SIZE ROOT QTY KKC Echinacea purpurea 'Kim's Knee High' / Kim's Knee High Coneflower 4.5"Pot 26 RUD Rudbeckia hirta / Black-eyed Susan 4.5"Pot 31 PLANT SCHEDULE ALTERNATE #1 EVERGREEN TREES BOTANICAL / COMMON NAME SIZE ROOT QTY SSP Pinus cembra 'Chalet' / Chalet Swiss Stone Pine 5` Ht.B&B 11 DECIDUOUS TREES BOTANICAL / COMMON NAME SIZE ROOT QTY VFE Ulmus americana 'Frontier Elm' / Frontier American Elm 2" Cal.B&B 1 DECIDUOUS SHRUBS BOTANICAL / COMMON NAME SIZE ROOT QTY AH Hydrangea arborescens 'Annabelle' / Annabelle Hydrangea 24" Ht.Cont.14 QFH Hydrangea paniculata 'Quick Fire' / Quick Fire Hydrangea 36" Ht.Cont.4 AWS Spiraea x bumalda 'Anthony Waterer' / Anthony Waterer Spiraea 18" Ht.Cont.19 DKL Syringa meyeri 'Palibin' / Dwarf Korean Lilac 36" Ht.Cont.8 BMV Viburnum dentatum 'Blue Muffin' / Blue Muffin Arrowwood Viburnum 36" Ht.Cont.10 EVERGREEN SHRUBS BOTANICAL / COMMON NAME SIZE ROOT QTY KCJ Juniperus x pfitzeriana 'Kallay's Compact' / Kallay's Compact Pfitzer Juniper 24" Sprd.Cont.11 DMP Pinus mugo 'Pumilio' / Dwarf Mugo Pine 24" Ht.B&B 6 ORNAMENTAL GRASSES BOTANICAL / COMMON NAME SIZE ROOT QTY PFG Miscanthus sinensis 'Purpurescens' / Purple Flame Grass 1 Gal.Pot 4 PDG Sporobolus heterolepis / Prairie Dropseed 1 Gal.Pot 23 PERENNIALS BOTANICAL / COMMON NAME SIZE ROOT QTY KKC Echinacea purpurea 'Kim's Knee High' / Kim's Knee High Coneflower 4.5"Pot 16 RUD Rudbeckia hirta / Black-eyed Susan 4.5"Pot 31 PLANT SCHEDULE ALTERNATE #2 L1.03 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 10/04/2023 220025.00 C2023-15 Bid Set Documents SCALE: 1" = 20' North LANDSCAPE PLAN BID ALTERNATIVES LANDSCAPEDETAILS &NOTESFinished gradeNOTES:RootballMulch3x DIA. OF ROOTBALLdepth ofrootball6"6" min.Approved backfill, thoroughlymixed prior to installation.Native grade or certifiedcompacted grade.-See planting specifications priorto installation of plants.Existing soil.Soil under rootball undisturbed tosupport root ball and reduce settling.Remove transit guard.Backfill: Use approved backfill perspecification. Water thoroughly toeliminate air pockets. Do not tamp!2-4" depth of woody mulch: Shredded hardwoodbark, aged or similar mulch. Keep mulch 6"back from trunk.Remove wire baskets completely or cut top(minimum 12 of the basket) and fold down in the pitafter positioned and backfilled halfway. Cut andremove all poly ties.Remove excess soil from top of ball to naturalsurface of rootball-if needed.Prune tree as required- methodsvary depending on species andtime of year. (See specification)Wrap trunk of tree if required (See specifications).Plant tree at 1"-2" above level offinish grade. Allow for settling.4" soil saucer.Rootball - Remove burlap andtwine from top 13 rootball. Ifsynthetic matr'l - removecompletely once in place.Notes: -See plantingspecifications prior to installationof plants.8' Long hardwood stake placed on windward andleeward side of tree. Galvanized wire with rubberhose (typical) Alternate: Nylon strapping1.01 All landscape installation & maintenance to conform with all applicable local codes & ordinances.1.02 See Site dwgs. for work limits, scope of construction, hardscape, dimensions &/or construction notes. SeeCivil dwgs. for all hardscape, grading, stormwater management, site utilities & erosion control. SeeLandscape dwgs. for landscape plans, site amenities, details, schedules, notes. See Architectural dwgs.for all construction. See Electrical drawings for all power, circuiting, lighting & security. See Mechanicaldrawings for other site equipment.1.03 Contractor shall provide shop drawings and material submittals of all hardscape & landscape constructionelements shown in plan set for Landscape Architect review prior to construction.1.04 Contractor to provide samples for Landscape Architect's approval on all colors, finishes & materials prior toconstruction, including (but not limited to) topsoil, gravels, mulches, seed mixes et al.1.05 Caution: underground utilities are present on site. The Contractor shall verify location of all above- andbelow-grade utilities, both public & private, prior to commencement of site construction. If unanticipatedabove- or below-grade conditions are encountered, notify Client & Landscape Architect prior toproceeding. Coordinate with local public utility locating entity as needed.1.06 Contractor to verify hardscape layout prior to construction. Contact Landscape Architect if discrepanciesare found.1.07 Contractor to limit construction traffic to within work limit lines. All adjacent damage shall be theresponsibility of the contractor to restore. See Civil drawings for limits of disturbance.1.08All written dimensions supersede scaled dimensions. All dimensions are taken from face of curb, wall orexisting building foundations.2.01 Rough grading & topsoil import/spreading are to be completed by others. Finish grading, seed area andplanting bed preparation shall be the landscape contractor's responsibility. Verify all existing site andgrading conditions prior to construction.2.02 All areas disturbed by site construction shall be fine graded and restored with vegetative cover as shown.See plans for cover types & locations, see specifications for materials & installation.2.03 Contractor shall verify plant quantities shown on plan. Symbol quantities take precedence over plant keys,except as noted in the plant schedule. Contractor shall forward a material list to the Landscape Architectprior to construction identifying species, sizes & plant sources to be used on the project.2.04 All plant materials shall conform to the schedule and shall meet quality requirements outlined in the ANLA"American Standard for Nursery Stock", ANSI Z60.1-2004.The Landscape Architect reserves the right toreject any substandard planting material. Such rejected material shall be removed from the project siteimmediately.2.05An Owner's representative shall be allowed to inspect and approve trees at the nursery prior to delivery tothe site.2.06 All nursery tags/labels shall be left on plant materials until the project punch-list inspection is completed bythe Landscape Architect. Untagged materials will be assumed to be deficient.2.07 Topsoil requirements:- All planting beds shall contain screened blended topsoil mix to a min. depth of 18". All raised plantersshall have a min. depth of 14". All turf areas shall have a min. depth of 6".- Existing topsoil meeting project specifications may be stripped, stored & re-used if previously approved.Contractor shall remove all excessive clay, gravel & stones detrimental to healthy plant growth. Contractorshall remove all debris greater than 1" diameter.- Contaminated soil shall be removed from the project site if discovered.- Subgrade shall be tilled and/or scarified prior to placement of topsoil.- Contractor shall be responsible for obtaining soil tests for existing or imported topsoil. Soil testing resultsshall include (but are not limited to) soil pH, % organic matter, % nitrogen / phosphorus / potassium, %calcium, and soil texture (percentages of sand, silt and/or clay.) Soil testing shall include recommendationsfor soil amendments if required to support growth of standard ornamental landscape materials.2.08 Contractor is responsible for ensuring that all tree pits & planting areas drain properly. Notify LandscapeArchitect if drainage or moisture problems are encountered while planting.2.09 Contractor shall backfill all trees, shrubs & evergreens with a mix of 1/3 plant starter mix & 2/3 remainingsoil. Plant Starter Mix shall be 40% organic black topsoil, 30% sphagnum moss, 20% composted manure& 10% coarse sand by volume. Submit material information for review.2.10Contractor shall provide a tree watering bag for each new tree, treegator original slow release wateringbags or approved equal.2.11 All perennial and groundcover areas shall receive a 3" layer of plant starter mix and perennial starterfertilizer, rototilled into the top 6" of blended topsoil in beds.2.12 Unless otherwise shown, all perennials & shrubs to be planted in triangular arrangements. For plants notshown individually, refer to the spacing shown in the plant schedule.2.13Natural Mulch: All tree circles and plant beds to receive a 3" deep layer of high quality shredded hardwoodbark mulch.2.14 Edging (Natural Mulch): Edge all planting beds with a 4" deep spaded edge (shovel cut or mechanical).Bedlines are to be cut per plan. A clean definintion between the lawn and plant bed is required.2.15Decorative stone maintenance strips shall contain 2-3" of Mississippi washed @ min. 1" dia installed overnon-woven geotextile fabric over compacted subgrade. Edge with steel edging.2.16 Edging (Stone): Shall be 5" ht., 12-gauge steel, galvanized / powdercoated finish, color TBD from standardrange. Colmet 'Commercial-Grade Steel Edging' available from Colmet, Garland TX, 800-829-8225. Orapproved equal. Install per mfr's requirements.2.17 Contractor shall provide positive drainage away from all structures for a minimum of 10'.2.18Contractor shall be responsible for providing base bid comprehensive landscape establishment,maintenance and warranty care for one year after installation. Work shall include all watering (as neededfor establishment), weeding (once monthly), pruning (twice per season), fertilizing (twice per season), pestmanagement (as needed, min 3 visits per season) and spring / fall clean-ups. Prior to beginninginstallation, the contractor shall submit a 12-mo. calendar for review/approval including all anticipatedmaintenance activities & dates.Landscape NotesGeneral Notes3.01 This work shall consist of preparing the seed beds and furnishing, sowing and mulching the required seedon the various seeded areas, as outlined in the site plans and specifications. All turf restoration shall beseeded turf unless otherwise noted.3.02 Rough grading, drainage work, topsoiling and fine grading shall be completed before sowing the seedmixes. The areas to be seeded shall be worked with plow chisels, discs & harrows, soil finishers and/orother appropriate equipment until a reasonably even and loose seedbed is obtained. Seed beds shall beprepared immediately in advance of the seeding. If proposed seed areas are weedy, contractor to applyherbicide or other weed control measures to eliminate weeds. Conform with seed supplier's specificationsif required.3.03 Confirm that anticipated project schedule date(s) fall within the respective seed supplier's approvedcalendar prior to installation. Installations completed outside of acceptable seeding dates shall be theperformed at the sole responsibility and expense of the contractor. For dormant seeding, a min. of oneover-seed application in the following season will be required.3.04 Seeds shall be PLS and will be mixed in accordance w/ mfr's specifications. Provide invoices, bag-tags ormix analysis results for approval prior to installation.3.05 The seed mixtures shall be sown by means of equipment adapted to the purpose. Mechanical distributionof seed (i.e. Truax seed drill, Brillion seeder, cultipacker, slit-seeder, drop spreader or broadcast spreader)are the only accepted methods. No hand-broadcasting of seed.3.06 No seeding shall occur if the wind exceeds 12 MPH.3.07 Coordinate erosion control and/or mulching with Civil dwgs:- In sloped areas steeper than 4:1, erosion matting shall be installed by others. Landscape installation shallbe coordinated with the erosion control contractor.- In areas with slopes between 4:1 and 8:1, landscape contractor shall apply clean hay or straw mulch, freeof debris and seeds, on all newly seeded areas. Mulch shall be uniformly spread over the designated areaat a rate of 55 bales per acre or as indicated in the respective seed supplier's specifications. Mulch materialshall be chopped and blown into the seeded area.- Lightweight E.C. matting and/or hydromulch will be accepted as a no-cost alternate if approved byLandscape Architect prior to application.3.08 See Civil dwgs for erosion control devices. Coordinate with erosion control contractor where required toensure that topsoil, seeding and/or mat installations are properly coordinated.3.09Seed mix substitutions will be considered only if submitted for approval 10 days before the close of bidding.All mixes shall be installed & maintained per supplier's specifications.BLUEGRASS MIX:"Deluxe 50 Mix" shall be supplied by Reinders, Madison WI, 608-244-0200. Apply @ 6 lbs per 1000 GSF.3.10Contractor shall be responsible for providing base bid comprehensive seed area establishment,maintenance and warranty care for all seeded areas:- Bluegrass areas shall be for 60 days after installation. Work shall include all watering (min. 1" per week,or as needed), weeding & mowing. Assume 2 mowings prior to Owner hand-off.- All other seed areas (wet-tolerant) shall be for three years after installation. Work shall include allwatering (as needed for establishment), weeding (both spot herbicide and/or hand-pulling, depending onnecessity, once per month), spring / fall clean-up & mowing. Expect 4-5 mowings in the first year, 3-4mowings in the second year and 2-3 mowings in the third year. All mowings shall be timed to cutgerminating weeds but not desirable forbs / grasses. Overseed each spring any bare areas larger than 1sq. ft.- Prior to beginning installation, the contractor shall submit a 36-month calendar for review/approvalincluding all anticipated maintenance activities.Seeding Notes & Mixes4.01Bike racks: Shall be Inverted-U style, powdercoat finish, color TBD to match building (selected fromstandard range), surface-mounted w/ stainless steel hardware, 'Square U Bike Rack.' Shall be furnished byMadrax, Madison WI, 608-849-1080. Or approved equal. Locations TBD By Owner, coordinate withLandscape Architect.- Qty. 44.02Outdoor site furnishings: Shall be By Owner:- Qty. (10) fixed-seating tablesHardscape / Amenity NotesTree Planting DetailShrub Planting DetailConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:WOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2510 Milton AvenueJanesville, WI 5354510/13/2023220025.00C2023-15Permit Resubmittal SetSCALE: NTSL2.0010/04/2023BID DOCUMENT SET UPUPUPUPUP25' - 0 5/8" 72' - 7 3/8" 40' - 0" 80' - 0" 44' - 0"BASE BID: NO DRAIN TILE TO BE INSTALLEDADD ALT: DRAIN TILE TO BE DETERMINED AFTER DEMO AND ADDITIONAL BORINGS ARE TAKEN WITHIN THE SEARS FOOTPRINT. PLEASE PROVIDE AN ALLOWANCE FOR DRAIN TILE TO BE INSTALLED IF REQUIREDGENERAL DEMOLITION NOTES:EXISTING WALLS TO REMAINITEMS FOR DEMOLITIONCONSTRUCTION LIMITSTEMPORARY DUST PARTITION. SEE NOTE 12 BELOWEXISTING COLUMN TO BE REMOVED1. GENERAL CONTRACTOR SHALL PROTECT AREAS ADJACENT TO PROJECT CONSTRUCTION. ANY AND ALL DAMAGE IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AT CONTRACTORS EXPENSE. 2. ADDITIONAL DEMOLITION, REMOVAL OR REFINISHING INFORMATION MAY ALSO BE FOUND ON THE NEW CONSTRUCTION PLANS.3. ALL EXISTING CONDITIONS SHALL BE REMOVED AS REQUIRED TO ACCOMMODATE PROPOSED CONSTRUCTION WHETHER OR NOT NOTED ON DEMOLITION DRAWINGS.4. FIELD VERIFY THAT PARTITIONS SCHEDULED FOR REMOVAL ARE NOT STRUCTURAL AND CONTAIN NO LOAD BEARING ELEMENTS. IF ANY CONFLICTS OCCUR, CONTACT THE ARCHITECT IMMEDIATELY.5. SEE MECHANICAL, ELECTRICAL, PLUMBING & NEW CONSTRUCTION PLANS FOR ADDITIONAL DEMOLITION, REMOVAL OR REFINISHING INFORMATION, CUT OUT LOCATIONS, INFILL AND PATCHING OF FLOORS AND WALLS.6. EXISTING FIXTURES AND EQUIPMENT THAT ARE REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER. IF SAID FIXTURES AND EQUIPMENT IS NOT DESIRED BY OWNER, IT SHOULD BE DISPOSED.7. DEMOLITION AROUND COLUMNS AND OF FIRE RATED ENCLOSURES NEED TO BE VERIFIED BY THE ARCHITECT. 8. ALL DIMENSIONS GIVEN ON DEMOLITION DRAWING ARE TO BE FIELD VERIFIED AND COORDINATED AGAINST NEW CONSTRUCTION PLANS.9. ALL FOOTINGS AND FOUNDATIONS TO BE DEMOLISHED AND REMOVED10. DEMOLISH ALL ABANDONED SITE UTILITIES, VERIFY WITH MECHANICAL, ELECTRICAL, AND PLUMBING.11. REFER TO STRUCTURAL FOR BACKFILL AND COMPACTION REQUIREMENTS OF VOID WHERE FOUNDATIONS PREVIOUSLY EXISTED12. PROVIDE FULL HEIGHT, TO STRUCTURE/SOFFITS, 6" METAL STUDS 16" O.C. WITH 5/8", FULL HEIGHT, GYPSUM BOARD ON MALL SIDE. TAPE, FINISH AND PAINT GYPSUM BOARD. PROVIDE CONTINUOUS PERIMETER SEALANT AT ALL GYPSUM BOARD EDGES FOR A DUST PROOF PARTITION. FIELD VERIFY EXISTING CONDITIONS AND HEIGHT TRANSITIONS.NESESWNWBUILDING DIAGRAMNOT TO SCALENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR DEMOLITIONPLAN -OVERALLWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 AD2.110/13/2023220025.00C2023-151/16" = 1'-0"1LEVEL 1 DEMO PLAN -OVERALL10/04/2023BID DOCUMENT SET UPUPUPUPUPGENERAL DEMOLITION NOTES:EXISTING WALLS TO REMAINITEMS FOR DEMOLITIONCONSTRUCTION LIMITSTEMPORARY DUST PARTITION. SEE NOTE 12 BELOWEXISTING COLUMN TO BE REMOVED1. GENERAL CONTRACTOR SHALL PROTECT AREAS ADJACENT TO PROJECT CONSTRUCTION. ANY AND ALL DAMAGE IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AT CONTRACTORS EXPENSE. 2. ADDITIONAL DEMOLITION, REMOVAL OR REFINISHING INFORMATION MAY ALSO BE FOUND ON THE NEW CONSTRUCTION PLANS.3. ALL EXISTING CONDITIONS SHALL BE REMOVED AS REQUIRED TO ACCOMMODATE PROPOSED CONSTRUCTION WHETHER OR NOT NOTED ON DEMOLITION DRAWINGS.4. FIELD VERIFY THAT PARTITIONS SCHEDULED FOR REMOVAL ARE NOT STRUCTURAL AND CONTAIN NO LOAD BEARING ELEMENTS. IF ANY CONFLICTS OCCUR, CONTACT THE ARCHITECT IMMEDIATELY.5. SEE MECHANICAL, ELECTRICAL, PLUMBING & NEW CONSTRUCTION PLANS FOR ADDITIONAL DEMOLITION, REMOVAL OR REFINISHING INFORMATION, CUT OUT LOCATIONS, INFILL AND PATCHING OF FLOORS AND WALLS.6. EXISTING FIXTURES AND EQUIPMENT THAT ARE REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER. IF SAID FIXTURES AND EQUIPMENT IS NOT DESIRED BY OWNER, IT SHOULD BE DISPOSED.7. DEMOLITION AROUND COLUMNS AND OF FIRE RATED ENCLOSURES NEED TO BE VERIFIED BY THE ARCHITECT. 8. ALL DIMENSIONS GIVEN ON DEMOLITION DRAWING ARE TO BE FIELD VERIFIED AND COORDINATED AGAINST NEW CONSTRUCTION PLANS.9. ALL FOOTINGS AND FOUNDATIONS TO BE DEMOLISHED AND REMOVED10. DEMOLISH ALL ABANDONED SITE UTILITIES, VERIFY WITH MECHANICAL, ELECTRICAL, AND PLUMBING.11. REFER TO STRUCTURAL FOR BACKFILL AND COMPACTION REQUIREMENTS OF VOID WHERE FOUNDATIONS PREVIOUSLY EXISTED12. PROVIDE FULL HEIGHT, TO STRUCTURE/SOFFITS, 6" METAL STUDS 16" O.C. WITH 5/8", FULL HEIGHT, GYPSUM BOARD ON MALL SIDE. TAPE, FINISH AND PAINT GYPSUM BOARD. PROVIDE CONTINUOUS PERIMETER SEALANT AT ALL GYPSUM BOARD EDGES FOR A DUST PROOF PARTITION. FIELD VERIFY EXISTING CONDITIONS AND HEIGHT TRANSITIONS.D2D1D1D1D1D1D1D1D1D1D1D1D1D1D1D1D1D1D9D9D2D2D8D6D5D5D1D1D8D6D9D1D1D1D1D1D1D1D1D1D1D1D1D7D7D2D5D5D1D1D10D10D10D8D1D1D11D11D1D1D8D9GENERAL NOTE: AFTER DEMO -FIELD VERIFY THE MALL FINISHED FLOOR ELEVATION & PROVIDED WSCC FINISHED FLOOR GRADE MATCH. NOTIFIY ARCHITECT FOR INFOMATION IF NECESSARYD12GENERAL NOTE: ALL EXISTING MECHANICAL, PLUMBING AND ELECTRICAL TO BE REPLACED TO "AS NEW" CONDITION AS PART OF DEMO & NEW WORK IN THE MALL AREA.NE SESWNWBUILDING DIAGRAMNOT TO SCALEConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR DEMOLITIONPLAN -ENLARGEDWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 AD2.1a10/13/2023220025.00C2023-15DEMOLITION KEY NOTES#D1 REMOVE EXISTING WALL INCLUDING ASSOCIATED FOUNDATION WALL & FOOTINGD2 REMOVE EXISTING STRUCTURED5 REMOVE EXISTING FLOOR SYSTEM, COMPLETED6 PROTECT EXISTING MALL DURING ALL PHASES OF CONSTRUCTIOND7 REMOVE EXISTING ESCALATOR SYSTEM, COMPLETED8 REMOVE EXISTING STAIR, COMPLETED9 REMOVE EXISTING DOOR AND ASSOCIATED HARDWARE, SILL, AND FRAME, COMPLETED10 REMOVE EXISTING LOADING DOCK AND ASSOCIATED EQUIPMENTD11 REMOVE LOADING DOCK RAMP AND ANY DRAINAGED12 TEMPORARY WALL TO ENCLOSE EXISTING BUILDING3/32" = 1'-0"1LEVEL 1 DEMO PLAN -ENLARGED10/04/2023BID DOCUMENT SET DNDNDNDNDNGENERAL DEMOLITION NOTES:EXISTING WALLS TO REMAINITEMS FOR DEMOLITIONCONSTRUCTION LIMITSTEMPORARY DUST PARTITION. SEE NOTE 12 BELOWEXISTING COLUMN TO BE REMOVED1. GENERAL CONTRACTOR SHALL PROTECT AREAS ADJACENT TO PROJECT CONSTRUCTION. ANY AND ALL DAMAGE IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AT CONTRACTORS EXPENSE. 2. ADDITIONAL DEMOLITION, REMOVAL OR REFINISHING INFORMATION MAY ALSO BE FOUND ON THE NEW CONSTRUCTION PLANS.3. ALL EXISTING CONDITIONS SHALL BE REMOVED AS REQUIRED TO ACCOMMODATE PROPOSED CONSTRUCTION WHETHER OR NOT NOTED ON DEMOLITION DRAWINGS.4. FIELD VERIFY THAT PARTITIONS SCHEDULED FOR REMOVAL ARE NOT STRUCTURAL AND CONTAIN NO LOAD BEARING ELEMENTS. IF ANY CONFLICTS OCCUR, CONTACT THE ARCHITECT IMMEDIATELY.5. SEE MECHANICAL, ELECTRICAL, PLUMBING & NEW CONSTRUCTION PLANS FOR ADDITIONAL DEMOLITION, REMOVAL OR REFINISHING INFORMATION, CUT OUT LOCATIONS, INFILL AND PATCHING OF FLOORS AND WALLS.6. EXISTING FIXTURES AND EQUIPMENT THAT ARE REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER. IF SAID FIXTURES AND EQUIPMENT IS NOT DESIRED BY OWNER, IT SHOULD BE DISPOSED.7. DEMOLITION AROUND COLUMNS AND OF FIRE RATED ENCLOSURES NEED TO BE VERIFIED BY THE ARCHITECT. 8. ALL DIMENSIONS GIVEN ON DEMOLITION DRAWING ARE TO BE FIELD VERIFIED AND COORDINATED AGAINST NEW CONSTRUCTION PLANS.9. ALL FOOTINGS AND FOUNDATIONS TO BE DEMOLISHED AND REMOVED10. DEMOLISH ALL ABANDONED SITE UTILITIES, VERIFY WITH MECHANICAL, ELECTRICAL, AND PLUMBING.11. REFER TO STRUCTURAL FOR BACKFILL AND COMPACTION REQUIREMENTS OF VOID WHERE FOUNDATIONS PREVIOUSLY EXISTED12. PROVIDE FULL HEIGHT, TO STRUCTURE/SOFFITS, 6" METAL STUDS 16" O.C. WITH 5/8", FULL HEIGHT, GYPSUM BOARD ON MALL SIDE. TAPE, FINISH AND PAINT GYPSUM BOARD. PROVIDE CONTINUOUS PERIMETER SEALANT AT ALL GYPSUM BOARD EDGES FOR A DUST PROOF PARTITION. FIELD VERIFY EXISTING CONDITIONS AND HEIGHT TRANSITIONS.NE SESWNWBUILDING DIAGRAMNOT TO SCALEConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedSECOND FLOORDEMOLITION PLAN -OVERALLWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 AD2.210/13/2023220025.00C2023-151/16" = 1'-0"1LEVEL 2 DEMO PLAN -OVERALL10/04/2023BID DOCUMENT SET DNDNDNDNDNGENERAL DEMOLITION NOTES:EXISTING WALLS TO REMAINITEMS FOR DEMOLITIONCONSTRUCTION LIMITSTEMPORARY DUST PARTITION. SEE NOTE 12 BELOWEXISTING COLUMN TO BE REMOVED1. GENERAL CONTRACTOR SHALL PROTECT AREAS ADJACENT TO PROJECT CONSTRUCTION. ANY AND ALL DAMAGE IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AT CONTRACTORS EXPENSE. 2. ADDITIONAL DEMOLITION, REMOVAL OR REFINISHING INFORMATION MAY ALSO BE FOUND ON THE NEW CONSTRUCTION PLANS.3. ALL EXISTING CONDITIONS SHALL BE REMOVED AS REQUIRED TO ACCOMMODATE PROPOSED CONSTRUCTION WHETHER OR NOT NOTED ON DEMOLITION DRAWINGS.4. FIELD VERIFY THAT PARTITIONS SCHEDULED FOR REMOVAL ARE NOT STRUCTURAL AND CONTAIN NO LOAD BEARING ELEMENTS. IF ANY CONFLICTS OCCUR, CONTACT THE ARCHITECT IMMEDIATELY.5. SEE MECHANICAL, ELECTRICAL, PLUMBING & NEW CONSTRUCTION PLANS FOR ADDITIONAL DEMOLITION, REMOVAL OR REFINISHING INFORMATION, CUT OUT LOCATIONS, INFILL AND PATCHING OF FLOORS AND WALLS.6. EXISTING FIXTURES AND EQUIPMENT THAT ARE REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER. IF SAID FIXTURES AND EQUIPMENT IS NOT DESIRED BY OWNER, IT SHOULD BE DISPOSED.7. DEMOLITION AROUND COLUMNS AND OF FIRE RATED ENCLOSURES NEED TO BE VERIFIED BY THE ARCHITECT. 8. ALL DIMENSIONS GIVEN ON DEMOLITION DRAWING ARE TO BE FIELD VERIFIED AND COORDINATED AGAINST NEW CONSTRUCTION PLANS.9. ALL FOOTINGS AND FOUNDATIONS TO BE DEMOLISHED AND REMOVED10. DEMOLISH ALL ABANDONED SITE UTILITIES, VERIFY WITH MECHANICAL, ELECTRICAL, AND PLUMBING.11. REFER TO STRUCTURAL FOR BACKFILL AND COMPACTION REQUIREMENTS OF VOID WHERE FOUNDATIONS PREVIOUSLY EXISTED12. PROVIDE FULL HEIGHT, TO STRUCTURE/SOFFITS, 6" METAL STUDS 16" O.C. WITH 5/8", FULL HEIGHT, GYPSUM BOARD ON MALL SIDE. TAPE, FINISH AND PAINT GYPSUM BOARD. PROVIDE CONTINUOUS PERIMETER SEALANT AT ALL GYPSUM BOARD EDGES FOR A DUST PROOF PARTITION. FIELD VERIFY EXISTING CONDITIONS AND HEIGHT TRANSITIONS.D1D1D1D1D1D1D1D1D1D1D1D1D1D1D1D8D2D6D5D5D1D1D8D2D1D1D1D6D5D5D7D7D1D1D1D1D1D1D1D1D1D8D6D6NE SESWNWBUILDING DIAGRAMNOT TO SCALEConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedSECOND FLOORDEMOLITION PLAN -ENLARGEDWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 AD2.2a10/13/2023220025.00C2023-15DEMOLITION KEY NOTES#D1 REMOVE EXISTING WALL INCLUDING ASSOCIATED FOUNDATION WALL & FOOTINGD2 REMOVE EXISTING STRUCTURED5 REMOVE EXISTING FLOOR SYSTEM, COMPLETED6 PROTECT EXISTING MALL DURING ALL PHASES OF CONSTRUCTIOND7 REMOVE EXISTING ESCALATOR SYSTEM, COMPLETED8 REMOVE EXISTING STAIR, COMPLETE3/32" = 1'-0"1LEVEL 2 DEMO PLAN -SOUTH10/04/2023BID DOCUMENT SET HCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCF-150 SuperCrew 4x4 STYLESIDE 5.5' Box315133034302828374320151017374123161627ABEFHJKMPQCDN12345687F.3F.9GG.8LL.6M.45.87.29SIGNAGEPROPOSEDBUILDING405' x 338'(116,064 SF)WOODMAN'S SPORTS AND CONVENTION CENTER594' - 5 5/8"TOTAL SITE AREA = 342,817.20 SFTOTAL IMPERVIOUS AREA = 314,503.20 SFTOTAL PAVED AREA = 317,988.00 SFTOTAL GREEN AREA = 28749.6.00 SFWOODMAN'S SPORTS AND CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545SITE TOTALS 91.6% Pavement/Building8.4% Green SpacePAVEMENT/BUILDINGGREEN SPACESITE KEY11 Stalls - ADA0 Trailer StallsTotal Required Stalls on Woodmans Center lot:501 ParkingStalls Total500 Stalls RequiredTotal Provided Stalls on Woodmans Center lot: 501ZONING REQUIREMENTS AND CLEARANCESALLIANT PERMISSABLETRANSFORMER ZONE = 12F.4F.6ADD ALTERNATE ADDITONAL BUILDING FOOTPRINTM.3EXISTING MALLL.4L.8L.7PROPERTY LINENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1" = 40'-0"ARCHITECTURAL SITEPLANWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A1.010/13/2023220025.00C2023-151" = 40'-0"1OVERALL ARCHITECTURAL SITE PLAN10/04/2023BID DOCUMENT SET NConsultant:Project:Location:Sheet:Plan NorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1 1/2" = 1'-0"ARCHITECTURAL SITEPLAN -OVERALLWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A1.110/13/2023220025.00C2023-151 1/2" = 1'-0"1ARCHITECTURAL SITE PLAN -OVERALL10/04/2023BID DOCUMENT SET UPHCHCHCHCHCHCHCHCHCHCDNDNDNUPUPHCHCHCHCHCHCDNJ.C.114CONCESSIONS115 (B)BEER SALES116FOOD PREP115 (A)SKATE RENTAL108CHECK-IN/RENTAL107VESTIBULE100MAIN LOBBY101MENS106AMEETING ROOM(A)102MEETING ROOM(B)103STOR104FIRST AID105LOBBY / LINK155STORAGE158ELECTRIC157WARMING ROOM159LOADING/RECEIVING/STORAGE160FAMILY TLT162J.C.163MEN'S166GENERALBUILDINGSTORAGE167REFRIGERATION172Y.H. STORAGE137WET TEAMROOM #1138WET TEAMROOM #2140UNISEX TLT141YH COACH143ICE ARENALOBBY117MEN'S121ELEC134MAIN COACH133MAIN TEAMROOM132LAUNDRY131TRAINING129UNISEX TLT128TEAM ROOM 4127TEAM ROOM 5126WET TEAMROOM 3125WET TEAM RR124WET TEAMROOM 4123IT150TEAM ROOM 3149TEAM ROOM 1147WOMEN'S165F.S. STORAGE175TEAM ROOM 2148REFEREE1452 A5.01 A5.1MATCHLINE BBMATCHLINE BBMATCHLINE AAMATCHLINE AAREFEREE RR146WET TEAM RR139MERCYHEALTHARENA136MULTI-PURPOSEAREA154MULTI-USECONVENTIONSPACE156ICE RINKCIRCULATION151PASSAGE130ICE RINKCIRCULATION135PASSAGE1444 A5.03 A5.01 A5.0ABEFHJKMPQCDN123456878' - 2 1/4" 11' - 4 1/2" 12' - 11"2' - 11"2' - 11"5' - 1"26' - 6" 30' - 8" 188' - 4" 28' - 0" 20' - 3 1/2"1' - 2"10"8' - 1" 56' - 10" 28' - 0" 11' - 11" 12' - 6" 12' - 0" 13' - 10" 16' - 8" 13' - 10" 26' - 10" 16' - 7 1/2" 9' - 2 1/2" 7' - 2" 21' - 3" 19' - 2 3/4" 31' - 7" 15' - 8"10 1/4"6' - 10 1/2" 10' - 2" 4' - 5" 39' - 1 1/2"2' - 6"18' - 10"190' - 0"4"19' - 5 1/2"28' - 0"8' - 0"25' - 8"187' - 0"35' - 5 3/4"21' - 6 3/4"12' - 0 1/4"220' - 8"49' - 6"2 A5.14 A8.4F.3F.9GG.8LL.6M.45.87.291" / 1'-0"1" / 1'-0"SLOPESLOPESLOPE3 A6.4ADD ALT 2 SEE SHEET A2.6 -2.8ADD ALT 1 SEE SHEET A2.4TRASH/RECYCLE3 A6.32 A6.4385' - 4"SIMTRASH/RECYCLERESURFACER/SHOPTOOLS/LAUNDRY170MECHANICAL168ELECTRICAL169MALLCONNECTION164IT/GENSTORAGE176TEMP STORAGE174HOCKEYSTORAGE173METER/RISER1795 A6.112ELECTRICAL113BREAKROOM109ADMIN112OFFICE110OFFICE111COPY AREA112 (A)F.4F.6GEN STORAGE153LOCKERALCOVE101 (A)J.C.1421" / 1'-0"1' - 2 3/4"7 1/4"13' - 10" 16' - 8" 13' - 10"7 1/4"1' - 2 3/4"64' - 0" 34' - 4"2' - 0"48' - 0"2' - 0"94' - 8" 71' - 11" 40' - 5"AV CLOSET157 (A)AV CLOSET167 (B)STORAGE135(A)M.3CLOSET133(A)VESTIBULE171CLOSET172(A)MULTIPURPOSESEATING154 (A)VESTIBULE118EXISTING MALL337' - 6 1/4"338' - 4 1/4"404' - 10"1" / 1'-0"1" / 1'-0"105' - 4" 12' - 10" 109' - 10" 6' - 4" 24' - 0" 97' - 4"23' - 11" 7' - 3"28' - 0"220' - 8"34' - 9 3/4"16' - 7"ELEV15217' - 8" 25' - 4 3/4" 26' - 10" 8' - 10" 201' - 4" 8' - 10" 48' - 7 1/2"50' - 9" 40' - 0" 80' - 0" 44' - 0"46' - 11"54' - 6" 134' - 4" 79' - 0"L.4L.810 A9.1125' - 0"BOLLARD SPACING 6'-0" LOCATED 3'-0" OFF BACK OF CURB. (INCLUDE CURB TAPER SECTIONS) - SEE CIVIL DRAWINGS FOR LOCATION FOR COORDINATION WITH UTILITIES. (V.I.F.)L.7WOMENS106BFAMILY RR106WOMENS12228' - 0"10' - 9" 5' - 11"5' - 9 3/4"17' - 5" 19' - 2" 63' - 1 3/4"TO COL.4' - 9"8" TO COL.10" TO COL.FAMILYRESTROOM120WELLNESSROOM1193' - 7" 11' - 0" 3' - 6"0"3' - 4 1/8"10 5/8"2' - 1"12' - 4 1/8"5 7/8"NE SESWNWBUILDING DIAGRAMNOT TO SCALENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR PLAN -OVERALLWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.110/13/2023220025.00C2023-151/16" = 1'-0"1FIRST FLOOR PLAN -OVERALL10/04/2023BID DOCUMENT SET UPDNDNHCHCHC3 A8.41 A5.1RESURFACER/SHOPTOOLS/LAUNDRY170Y.H. STORAGE137WET TEAMROOM #1138WET TEAMROOM #2140UNISEX TLT141YH COACH143ELEC134MAIN COACH133MAIN TEAMROOM132TRAINING129UNISEX TLT128 A8.04 A8.05 A8.08 A8.09MATCHLINE AAMATCHLINE BBLAUNDRY131WET TEAM RR139A128.1A132.1A133.1A135.2A138.1A140.1A141.1A143.1A144.2A170.5A170.2A170.4A135.1A134.2A134.1A131.1A142.1A139.2A139.1ICE RINKCIRCULATION135HJKMPQ1232 A5.1MATCHLINE BB7' - 2" 21' - 3" 19' - 2 3/4" 31' - 7" 15' - 8"10 1/4"6' - 10 1/2" 18' - 10"10"LL.68' - 10" 4' - 0" 6' - 6" 6' - 4" 9' - 4" 43' - 2" 12' - 2" 7' - 0" 14' - 8" 7' - 2"7' - 2"13' - 0"22' - 10"6' - 4"9' - 6"9' - 0"5' - 10"5' - 4" 15' - 2 3/8" 6' - 5" 18' - 10"1" / 1'-0"1" / 1'-0"30 A8.411 A8.49 A8.49Sim A8.49Sim A8.416ADD ALT 2 SEE SHEET A2.6 - A2.82 A7.436A170.1A172.1A171.3A168.17' - 4"4' - 3"15' - 7"9' - 8"12' - 4" 12' - 6"40REFER TO REFRIGERATION DRAWINGS9' - 8 1/2"10' - 11"8' - 10"18' - 4"11178' - 6"10' - 11 1/2" 12' - 0" 9' - 2" 3' - 10" 11' - 6" 8' - 6"27' - 1 1/2"158' - 1 1/2"83' - 1" 56' - 2 1/2" 18' - 10"28' - 0"1' - 2"6' - 6"4"6' - 4"3' - 4"102' - 4"(2) 6'-0" x 6'-0" ROLL OUT DUMPSTER5453714' - 7 1/2" 6' - 0" 8' - 10 1/2"BL2W202' - 9" 12' - 11" 8' - 3" 6' - 5"12' - 11" 4' - 0" 3' - 7 3/8"46" SILLA179.1A169.1MECHANICAL168ELECTRICAL169METER/RISER179REFRIGERATION172MERCYHEALTHARENA136PASSAGE130PASSAGE14427' - 7" 9' - 5" 20' - 8"1' - 5"8' - 10" 20' - 2" 24' - 0" 10' - 0" 24' - 0" 11' - 11"MAIN TEAMROOM13266808119' - 2 1/2"STORAGE135(A)AV CLOSET167 (B)1M81M8848540 A7.12787888888888787872' - 6 1/2" 6' - 7 1/2" 4' - 5 1/2" 6' - 6" 33' - 2"1M8VESTIBULE171CLOSET172(A)A172aA171.1A171.22 A5.63 A5.64 A5.618' - 0"56' - 2 1/2"167' - 5 1/2"J.C.14246' - 4" 21' - 3" 8' - 3 1/2" 86' - 3 1/2" 5' - 6" 23' - 11" 7' - 3"21' - 4" 23' - 6 3/4" 11' - 1" 39' - 8"GENERAL NOTE: FUTURE SOLAR INVERTERS WILL BE INSTALLED ON THE SE CORNER OF THE BUILDING - KEEP WALL CLEAR FOR FUTURE COORDINATION REQUIRED IF SOLAR PROJECT IF INSTALLED.2 A8.415' - 4" 7' - 2" 12' - 6" 15' - 6" 20' - 7 1/2"7 A8.55 A8.5 A8.56A167.3L.4L.8REFER TO B32 DRAWINGS FOR ICE AND DASHER BOARD SCOPE OF WORKA129.12M6103103a103103a1 A6.52 A6.53232A137.1BEAM O.H.656482 A7.0118213030L.7A133.26' - 4" 37' - 4"1M8135.00°1' - 2"34' - 2 1/2" 6' - 0" 16' - 0"1' - 11"135.00°46" SILL6' - 1 3/8"2' - 8 5/8"RADIUS OF SEATING & RAILING TO ALWAYS FOLLOW ICE ARENA BOARDS2M82M12STRUCTURE (ABV.)119' - 2" 28' - 0"10"19' - 5 1/2"1 A7.41. ALL DIMENSIONS ON PLAN ARE ACTUAL UNLESS NOTED OTHERWISE. DIMENSIONS ON PLAN ARE FROM FACE OF FINISH UNLESS NOTED OTHERWISE.2. WALLS ARE TO BE PARALLEL & PERPENDICULAR TO ADJACENT WALLS UNLESS OTHERWISE NOTED. ALIGN WALLS WHERE APPARENT.3. WALL TYPES ARE LOCATED ON SHEET A10.0. 4. PROVIDE BLOCKING AS REQUIRED TO SUPPORT ALL CABINETS, SHELVES, BUILT-INS, EQUIPMENT OR ACCESSORIES. COORDINATE WITH VENDOR DOCUMENTS WHERE SUCH CONDITIONS APPLY.5. ALL FLOORS ARE TO BE LEVEL AND CLEAN PRIOR TO INSTALLATION OF NEW FLOOR COVERINGS. ALL FLOOR SURFACES AND TRANSITIONS BETWEEN SURFACE TYPES SHALL COMPLY WITH ADA GUIDELINES.6. FOR OPENING LOCATIONS AND DIMENSIONS, SEE PANEL DRAWINGS, INTERIOR ELEVATIONS, AND WINDOW ELEVATIONS.7. REFER TO SHEETS A0.2 AND A0.3 FOR LOCATIONS OF WHERE FIRE EXTINGUISHERS TO BE PROVIDED AND HOW THEY ARE TO BE MOUNTED8. SEE SHEET A10.3 FOR ALL KEYNOTES STARTING WITH "W" AND "BL"9. ALL FLOOR ELEVATIONS ARE BASED OFF OF FIRST FLOOR ELEVATION OF 100'-0". ARCHITECTURAL ELEVATION 100'-0" CORRESPONDS TO CIVIL ELEVATION OF FFE = 882.25.GENERAL CONSTRUCTION NOTESFLOOR PLAN LEGENDDOOR PER TAG. SEE DOOR SCHEDULE SHEET A10.1##WALL TAG. SEE WALL TYPES SHEET A10.0#KEYNOTE. SEE KEYNOTES, THIS SHEET.CMU WALLPRECAST CONCRETE WALLINTERIOR METAL STUD PARTITION WALL#STRUCTURAL GRIDNOT IN SCOPENE SESWNWBUILDING DIAGRAMNOT TO SCALENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR PLAN -SEQUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.1a10/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR PLAN -SE QUADKEYNOTES PER SHEET#1 ADA COMPLIANT DRINKING FOUNTAIN WITH BOTTLE FILLER4 FLOOR SINK WITH FRP PANEL TO 4'-0" A.F.F. (2) SIDES7 CONCRETE STOOP 4'-10" X 4'-0", SLOPE 1/4" PER FOOT18 CONCRETE STOOP 5'-4" X 4'-0", SLOPE 1/4" PER FOOT21 CONCRETE STOOP 8'-6" X 4'-0"30 STEEL CONCRETE FILLED BOLLARDS (4) TYP. AT OVERHEAD DOORS U.N.O32 MAIN TEAM LOCKERS PROVIDED BY USER.36 STACKABLE WASHER DRYER BY OTHERS - SEE SPECIFICATIONS40 STICK RACK- SEE DETAIL 13/A7.553 CONCRETE STOOP 6'-10" X 4'-0", SLOPE 1/4" PER FOOT54 CONCRETE STOOP 12'-0" X 4'-0", SLOPE 1/4" PER FOOT64 6 MINI NETS65 4 INTERMEDIATE NETS66 4 REGULATION NETS80 BUMPERS PROVIDED BY YOUTH HOCKEY81 SKATE ASSIST STORAGE82 TRAINING TIRES PROVIDED BY YOUTH HOCKEY84 2 HOUR FIRE RATED WALL PRECAST JOINT AT FIRE RATED WALLS TYP.85 1 HOUR FIRE RATED WALL PRECAST JOINT AT FIRE RATED WALLS TYP.87 WALL BUTT JOINT TYP.88 WALL MITER JOINT TYP.103 SPORTS EQUIPMENT HOOK 66" AFF103a SPORTS EQUIPMENT HOOK ADA, 48" AFFREFER TO FF&E MATRIX FOR ALL RESPONSIBILITIES OF FURNITURE AND EQUIPMENT 10/04/2023BID DOCUMENT SET UPHCHCHCHC3 A8.42 A5.0LOBBY / LINK155STORAGE158ELECTRIC157WARMING ROOM159LOADING/RECEIVING/STORAGE160FAMILY TLT162J.C.163MEN'S166GENERALBUILDINGSTORAGE167RESURFACER/SHOPTOOLS/LAUNDRY170WOMEN'S165F.S. STORAGE175 A8.03MATCHLINE AAMATCHLINE BBMULTI-USECONVENTIONSPACE156MULTI-PURPOSEAREA154A135.2A160.1A159.4A156.3A156.4A156.6A144.2A167.1A170.5A156.5A160.2A155.3A155.4A155.5A155.84 A5.03 A5.0ABEFHCD123MATCHLINE BB8' - 0 5/8" 39' - 6 3/8" 8' - 8 1/4" 5' - 8 3/4" 8' - 0 5/8" 44' - 10" 7' - 5"8' - 10" 10' - 8" 31' - 3" 46' - 6" 12' - 0"F.3F.9GG.83030 A8.41333A164.2A160.3A159.3A160.4A155.7A155.6438' - 11" 56' - 10" 28' - 0" 11' - 11" 12' - 6" 12' - 0" 13' - 10" 16' - 8" 13' - 10" 26' - 10" 16' - 7 1/2" 9' - 2 1/2"8' - 1" 96' - 5" 122' - 8"21' - 4"7' - 6"1' - 2"20' - 3 1/2"28' - 0"113' - 4"7162' - 9 1/2"42' - 0 5/8" 6' - 4" 4' - 4 5/8" 6' - 4" 37' - 3 3/4" 50' - 9" 71' - 11"20' - 7 1/2"14' - 4"3' - 4"10' - 4"10"6' - 6"3' - 7"14' - 0"50' - 9"6' - 6"25' - 6"6' - 6"10764747995112' - 1 7/8"7 5/8"7' - 0"20' - 0"8' - 0"TEMP STORAGE174HOCKEYSTORAGE173IT/GENSTORAGE17610"7' - 5"10' - 10"8' - 6"25' - 6"7' - 5"7' - 0"7' - 5"40' - 2"7' - 5"13' - 0 1/4" 31' - 0"MALLCONNECTION164A176.1A174.1A173.11F.4F.61 A5.5A167.2MULTIPURPOSESEATING154 (A)MULTIPURPOSEAREACIRCULATION154 (B)A175.16565707273787977776867707169828' - 0"19' - 1"A159.12' - 4" 3' - 5 3/8"3' - 7 3/8" 2' - 9" 3' - 0"5' - 9 3/8"6' - 0" 10' - 0"6" 2' - 9" 4' - 9" 10' - 8"5' - 10"2' - 4"6"AV CLOSET157 (A)AV CLOSET167 (B)838484848788888887A157aA157.1A157.2A159.2A158.183135.00°5 A5.73 A5.72 A5.72 A5.53 A5.5779' - 9" 8' - 6" 8' - 10"104' - 6" 12' - 10" 109' - 10"6' - 8" 4' - 4"4 1/2"3' - 0" 12' - 0" 3' - 0" 36' - 0" 3' - 0" 14' - 0 3/8" A8.479A167.3A169.1A168.1 A7.126REFER TO B32 DRAWINGS FOR ICE AND DASHER BOARD SCOPE OF WORK2 A6.53 A6.55 A6.54 A6.51011021009898 A7.020A164.1A164.3A164.47' - 8"2' - 11 3/4"A163.1A162.1A155.93838W18AV EQUIPMENTAV EQUIPMENT3' - 2"13' - 2 7/8"6' - 5"302' - 6" 3' - 9" 5' - 1 1/2"4' - 8"7' - 1" 59' - 7 1/2"90.00°19' - 7 7/8"15' - 7 3/4"13' - 3 7/8"2" + -4' - 5 7/8"12' - 6"3' - 7 3/4"52' - 3" 16' - 0"6' - 8" 10' - 3 1/2" 27' - 0 3/4"10"64A159.101. ALL DIMENSIONS ON PLAN ARE ACTUAL UNLESS NOTED OTHERWISE. DIMENSIONS ON PLAN ARE FROM FACE OF FINISH UNLESS NOTED OTHERWISE.2. WALLS ARE TO BE PARALLEL & PERPENDICULAR TO ADJACENT WALLS UNLESS OTHERWISE NOTED. ALIGN WALLS WHERE APPARENT.3. WALL TYPES ARE LOCATED ON SHEET A10.0. 4. PROVIDE BLOCKING AS REQUIRED TO SUPPORT ALL CABINETS, SHELVES, BUILT-INS, EQUIPMENT OR ACCESSORIES. COORDINATE WITH VENDOR DOCUMENTS WHERE SUCH CONDITIONS APPLY.5. ALL FLOORS ARE TO BE LEVEL AND CLEAN PRIOR TO INSTALLATION OF NEW FLOOR COVERINGS. ALL FLOOR SURFACES AND TRANSITIONS BETWEEN SURFACE TYPES SHALL COMPLY WITH ADA GUIDELINES.6. FOR OPENING LOCATIONS AND DIMENSIONS, SEE PANEL DRAWINGS, INTERIOR ELEVATIONS, AND WINDOW ELEVATIONS.7. REFER TO SHEETS A0.2 AND A0.3 FOR LOCATIONS OF WHERE FIRE EXTINGUISHERS TO BE PROVIDED AND HOW THEY ARE TO BE MOUNTED8. SEE SHEET A10.3 FOR ALL KEYNOTES STARTING WITH "W" AND "BL"9. ALL FLOOR ELEVATIONS ARE BASED OFF OF FIRST FLOOR ELEVATION OF 100'-0". ARCHITECTURAL ELEVATION 100'-0" CORRESPONDS TO CIVIL ELEVATION OF FFE = 882.25.GENERAL CONSTRUCTION NOTESFLOOR PLAN LEGENDDOOR PER TAG. SEE DOOR SCHEDULE SHEET A10.1##WALL TAG. SEE WALL TYPES SHEET A10.0#KEYNOTE. SEE KEYNOTES, THIS SHEET.CMU WALLPRECAST CONCRETE WALLINTERIOR METAL STUD PARTITION WALL#STRUCTURAL GRIDNOT IN SCOPENE SESWNWBUILDING DIAGRAMNOT TO SCALENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR PLAN -NEQUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.1b10/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR PLAN -NE QUADKEYNOTES PER SHEET#1 ADA COMPLIANT DRINKING FOUNTAIN WITH BOTTLE FILLER6 CONCRETE STOOP 17'-0" X 4'-0", SLOPE 1/4" PER FOOT7 CONCRETE STOOP 4'-10" X 4'-0", SLOPE 1/4" PER FOOT9 CONCRETE STOOP 6'-6" X 4'-0", SLOPE 1/4" PER FOOT30 STEEL CONCRETE FILLED BOLLARDS (4) TYP. AT OVERHEAD DOORS U.N.O33 ADA PUSH BUTTON DOOR OPENER38 BABY CHANGING STATION, PROVIDE ADJ ASCENT COAT HOOK AT 48" AFF43 WOOD LOOK METAL WALL PANEL, SEE INTERIORS SHEETS AND 10/A9.147 TWO ROWS OF PERMANENT RETRACTABLE PLASTIC BLEACHER SEATING.51 CONCRETE STOOP 14'-0" X 4'-0", SLOPE 1/4" PER FOOT64 6 MINI NETS65 4 INTERMEDIATE NETS67 TEMP BOARDS PROVIDED BY YOUTH HOCKEY - 192 LINEAR FEET68 TURF CARTS - 14 TOTAL 15' X 48" ROLLS69 PLEXI GLASS CARTS - 6 TOTAL 8' X 5' CARTS70 SPORT COURT FLOORING71 DASHER BOARDS 10 TOTAL 8'X8' DASHER CARTS72 HIGH DENSITY POLYPROPYLENE STACKING CHAIR - 320 CHAIRS REQ: 40PER DOLLY73 60" ROUND FOLDING TABLE - DINING: 40 TABLES77 RECTANGULAR FOLDING TABLE - 1 PER BOOTH - 96" X 24"78 STORAGE TRANSPORTATION CARTS79 MISC. GYM EQUIPMENTS82 TRAINING TIRES PROVIDED BY YOUTH HOCKEY83 TEMPORARY RUBBER TILE FLOORING84 2 HOUR FIRE RATED WALL PRECAST JOINT AT FIRE RATED WALLS TYP.87 WALL BUTT JOINT TYP.88 WALL MITER JOINT TYP.98 MANUALLY RETRACTABLE ACOUSTIC PARTITION WALL - FILL JOUSTSPACE ABOVE WITH ACOUSTIC PANEL TO CREATE ACOUSTIC BARRIERWHEN PARTITION WALL IS IN USE.100 20' X 48" OVERALL MOVEABLE PLATFORM STORAGE101 MOVEABLE PLATFORM STEPS STORAGE (3 TOTAL)102 MOVEABLE PLATFORM RAMP STORAGE (3 TOTAL)107 CONCRETE STOOP 12'-6" X 4'-0", SLOPE 1/4" PER FOOTREFER TO FF&E MATRIX FOR ALL RESPONSIBILITIES OF FURNITURE AND EQUIPMENT 10/04/2023BID DOCUMENT SET HCHCHCHCHCHCDNHCHCH 2 A5.0CONCESSIONS115 (B)FOOD PREP115 (A)OFFICE111SKATE RENTAL108CHECK-IN/RENTAL107VESTIBULE100MAIN LOBBY101MENS106AMEETING ROOM(A)102MEETING ROOM(B)103STOR104FIRST AID105LOBBY / LINK155 A8.01MATCHLINE AAMATCHLINE BBMULTI-USECONVENTIONSPACE156MULTI-PURPOSEAREA154A101.2A101.3A156.1A156.3A144.1A111.1A112.1A105.1A104.1A103.1A155.1A155.2A155.3A102.1A115.3A115.24 A5.03 A5.01 A5.0ABEFHCD45684 A8.411' - 4 1/2" 17' - 0 1/4" 8' - 0" 12' - 0" 16' - 0" 12' - 0" 15' - 1 3/4" 10" 6' - 6" 68' - 6"64' - 0" 28' - 0" 34' - 4" 2' - 0" 1' - 8 1/2" 44' - 7" 1' - 8 1/2" 2' - 0" 32' - 4" 8' - 4" 8' - 2"28' - 4 3/4" 63' - 1 3/4" 75' - 10" 6' - 6"12' - 8"22' - 1 1/8"5' - 1"22' - 0 1/4"28' - 0" 24' - 6 1/4" 19' - 1 7/8" 17' - 6" 18' - 9" 11' - 8" 16' - 9" 16' - 0 1/2" 11' - 7"24' - 10" 15' - 2 3/4" 10' - 2"F.3F.9GG.85.8A117.19ADMIN112OFFICE110BREAKROOM109A110.1A109.148 A7.129ADD ALT 1 SEE SHEET A2.4 A8.12Sim A8.14SimA100.6A100.9136A100.8A100.7A100.10A101.142A107.1A107.3A107.243434343227' - 2"6' - 4" 14' - 8" 7' - 0"13' - 7"3' - 4 1/4"1' - 11 3/4"799W1W2A100.1A100.2A100.4A100.5A100.34 A6.21 A6.4F.4F.61 A5.5MULTIPURPOSESEATING154 (A)GEN STORAGE15380818' - 0 5/8"6' - 4 3/8"8' - 0 5/8"44' - 2 3/8"8' - 0 5/8"7 1/4"7 1/4"44' - 7"13' - 11 1/2" 16' - 8" 13' - 11 1/2"83ELEV152W6W7W5W10W4W11W11W14834 A5.71 A5.76 A5.7BENCHCUBBIES1" / 1'-0"1" / 1'-0"A101.424' - 11"9' - 11"7' - 10"51' - 6 7/8"8' - 8" 2' - 8"4' - 6" 20' - 2" 4' - 0" 20' - 0" 6' - 0" 2' - 4" 6' - 0"13' - 6" 6' - 0"1' - 10"18' - 9" 6' - 9"BL3BL3BL2BL48' - 10"3' - 0"6' - 0"3' - 0"32' - 6"3' - 0"5' - 0"17' - 4 1/8"6' - 8"5' - 1"7' - 7 3/4"[No Slope]104' - 6" 12' - 10" 109' - 10"7' - 5"7' - 0"7' - 5"44' - 10"7' - 5"23' - 8"7' - 0 1/8"27' - 1 7/8"23' - 9 1/2"11' - 4 1/2" 18' - 9" 5' - 1" 26' - 6" 30' - 8" 81' - 6"8' - 1" 56' - 10" 28' - 0" 11' - 7" 12' - 10" 12' - 0" 13' - 10" 16' - 8" 13' - 10" 26' - 10" 16' - 7 1/2" 9' - 2 1/2"4' - 8"3' - 4" A8.53A153.1REFER TO B32 DRAWINGS FOR ICE AND DASHER BOARD SCOPE OF WORKSKATE SHARPENER10 A9.19898BOLLARD SPACING 6'-0" LOCATED 3'-0" OFF BACK OF CURB. (INCLUDE CURB TAPER SECTIONS) - SEE CIVIL DRAWINGS FOR LOCATION FOR COORDINATION WITH UTILITIES. (V.I.F.)KNOX BOXES FITTED WITH A SPRING-LOADED DRY LOCK LID -STL. BOX FITS 13 KEYSCOORDINATE FINAL LOCATION WITH JANESVILLE FIRE DEPARTMENT/MARSHALLWOMENS106BFAMILY RR106 A8.0108' - 5 5/8" 8' - 7 3/4" MINA152.1A106.117' - 8"DNA2431M811' - 6" 86' - 2" 11' - 4"59' - 7 1/2" 7' - 1" 8' - 3 1/2"5' - 7" 5' - 10"1. ALL DIMENSIONS ON PLAN ARE ACTUAL UNLESS NOTED OTHERWISE. DIMENSIONS ON PLAN ARE FROM FACE OF FINISH UNLESS NOTED OTHERWISE.2. WALLS ARE TO BE PARALLEL & PERPENDICULAR TO ADJACENT WALLS UNLESS OTHERWISE NOTED. ALIGN WALLS WHERE APPARENT.3. WALL TYPES ARE LOCATED ON SHEET A10.0. 4. PROVIDE BLOCKING AS REQUIRED TO SUPPORT ALL CABINETS, SHELVES, BUILT-INS, EQUIPMENT OR ACCESSORIES. COORDINATE WITH VENDOR DOCUMENTS WHERE SUCH CONDITIONS APPLY.5. ALL FLOORS ARE TO BE LEVEL AND CLEAN PRIOR TO INSTALLATION OF NEW FLOOR COVERINGS. ALL FLOOR SURFACES AND TRANSITIONS BETWEEN SURFACE TYPES SHALL COMPLY WITH ADA GUIDELINES.6. FOR OPENING LOCATIONS AND DIMENSIONS, SEE PANEL DRAWINGS, INTERIOR ELEVATIONS, AND WINDOW ELEVATIONS.7. REFER TO SHEETS A0.2 AND A0.3 FOR LOCATIONS OF WHERE FIRE EXTINGUISHERS TO BE PROVIDED AND HOW THEY ARE TO BE MOUNTED8. SEE SHEET A10.3 FOR ALL KEYNOTES STARTING WITH "W" AND "BL"9. ALL FLOOR ELEVATIONS ARE BASED OFF OF FIRST FLOOR ELEVATION OF 100'-0". ARCHITECTURAL ELEVATION 100'-0" CORRESPONDS TO CIVIL ELEVATION OF FFE = 882.25.GENERAL CONSTRUCTION NOTESFLOOR PLAN LEGENDDOOR PER TAG. SEE DOOR SCHEDULE SHEET A10.1##WALL TAG. SEE WALL TYPES SHEET A10.0#KEYNOTE. SEE KEYNOTES, THIS SHEET.CMU WALLPRECAST CONCRETE WALLINTERIOR METAL STUD PARTITION WALL#STRUCTURAL GRIDNOT IN SCOPENE SESWNWBUILDING DIAGRAMNOT TO SCALENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR PLAN -NWQUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.1c10/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR PLAN -NW QUADKEYNOTES PER SHEET#1 ADA COMPLIANT DRINKING FOUNTAIN WITH BOTTLE FILLER7 CONCRETE STOOP 4'-10" X 4'-0", SLOPE 1/4" PER FOOT9 CONCRETE STOOP 6'-6" X 4'-0", SLOPE 1/4" PER FOOT36 STACKABLE WASHER DRYER BY OTHERS - SEE SPECIFICATIONS42 HYDRAULIC PASSENGER ELEVATOR43 WOOD LOOK METAL WALL PANEL, SEE INTERIORS SHEETS AND10/A9.148 CONCRETE STOOP 44'-7" X 4'-0", SLOPE 1/4" PER FOOT80 BUMPERS PROVIDED BY YOUTH HOCKEY81 SKATE ASSIST STORAGE83 TEMPORARY RUBBER TILE FLOORING98 MANUALLY RETRACTABLE ACOUSTIC PARTITION WALL - FILL JOUSTSPACE ABOVE WITH ACOUSTIC PANEL TO CREATE ACOUSTICBARRIER WHEN PARTITION WALL IS IN USE.REFER TO FF&E MATRIX FOR ALL RESPONSIBILITIES OF FURNITURE AND EQUIPMENT 10/04/2023BID DOCUMENT SET DNUPUPHCHCHC1 A8.42 A5.01 A5.1J.C.114BEER SALES116FOOD PREP115 (A)YH COACH143ICE ARENALOBBY117MEN'S121UNISEX TLT128TEAM ROOM 4127TEAM ROOM 5126WET TEAMROOM 3125WET TEAM RR124WET TEAMROOM 4123IT150TEAM ROOM 3149TEAM ROOM 1147TEAM ROOM 2148 A8.02 A8.06 A8.07MATCHLINE AAMATCHLINE BBREFEREE RR146 A8.05SimA123.1A125.1A126.1A127.1A128.1A143.1A147.1A149.1A150.1A148.1A144.1A114.1A115.1A124.1A124.2A142.1A115.3A116.1A145.1A146.1HJKPN45872 A5.14 A8.4MATCHLINE AAMATCHLINE BB2' - 3"8' - 0"5' - 8"8' - 10 1/8"5' - 4 1/8"20' - 1 1/2" +/-6' - 6"4' - 0"8' - 10"6' - 4"18' - 4"17' - 8"19' - 5"12' - 4"25' - 9"6' - 4" 20' - 7 3/8" 103' - 11 1/4" 20' - 8 3/8" 6' - 5"6' - 10" 8' - 4" 18' - 0" 18' - 0" 18' - 0" 21' - 10" 6' - 4" 5' - 10" 9' - 0" 8' - 6 3/8"LL.6M.45.87.21" / 1'-0" A8.453 A6.4A117.5 A8.49Sim A8.49Sim A8.415Sim A8.415SimPASSAGE144ADD ALT 2 SEE SHEET A2.6 - A2.8A118.1A118.2A118.3A118.6A118.5A118.42 A6.411434A117.2434321' - 6 3/4" 35' - 5 3/4"10" 1' - 0"6' - 4" 23' - 4" 88' - 6"158' - 10"4 A6.4ELECTRICAL113CONCESSIONS115 (B)ICE RINKCIRCULATION151MERCYHEALTHARENA136PASSAGE130TRAINING1295 A6.1125 A7.5M.349A116.287W8W8W3aW3W13W52 A5.63 A5.65 A5.6VESTIBULE1181 A5.66 A5.633RAISED DECK ABOVE8' - 10"12' - 11" 2' - 11" 8' - 0" 26' - 6" 30' - 8" 60' - 6" 6' - 4" 24' - 2"65' - 1 3/8" 8' - 10" 8' - 9 3/8" 46' - 8"4' - 0"27' - 6"4' - 0"27' - 2 3/8"6' - 0"7' - 9 5/8"4' - 0"39' - 0"4' - 0"30' - 2"7' - 0"6' - 10"4J.C.1427' - 2" 21' - 3" 19' - 2 3/4" 17' - 5" 14' - 2" 15' - 8"10 1/4"17' - 0 1/2" 4' - 5" 39' - 1 1/2" 2' - 6"3' - 10 1/2"PASS THROUGH5' - 0" 3' - 10 1/2" A8.51A151.1L.4L.8353535REFER TO B32 DRAWINGS FOR ICE AND DASHER BOARD SCOPE OF WORKA113.1A153.1103103a103103a103a103103103a103a103103a103103a10353A117.3(5) STL CONC. FILLED BOLLARDS 5'-0" O.C. - REFER TO CIVIL FOR LOCATION WITH SITE LAYOUTL.7 A7.119WOMENS122335 A6.414' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"4' - 0"32' - 0"72' - 0"1' - 10 5/8"STUD FACE7"STUD FACE7" A7.11530' - 10 7/8" 3' - 10 7/8"1' - 2"6 A6.512' - 4" 16' - 0" 12' - 0"8"W8W8W893.00°93.00°37A37A103103103103158' - 10"1' - 6"1' - 2"58 SFUNISEX TLT141224 SFREFEREE1452089 SFPASSAGE14459 SFWELLNESSROOM11970 SFFAMILYRESTROOM12077 SFLOCKERALCOVE101 (A)3' - 0"9"10" 12' - 8" 7"A117.4A120.1A119.11. ALL DIMENSIONS ON PLAN ARE ACTUAL UNLESS NOTED OTHERWISE. DIMENSIONS ON PLAN ARE FROM FACE OF FINISH UNLESS NOTED OTHERWISE.2. WALLS ARE TO BE PARALLEL & PERPENDICULAR TO ADJACENT WALLS UNLESS OTHERWISE NOTED. ALIGN WALLS WHERE APPARENT.3. WALL TYPES ARE LOCATED ON SHEET A10.0. 4. PROVIDE BLOCKING AS REQUIRED TO SUPPORT ALL CABINETS, SHELVES, BUILT-INS, EQUIPMENT OR ACCESSORIES. COORDINATE WITH VENDOR DOCUMENTS WHERE SUCH CONDITIONS APPLY.5. ALL FLOORS ARE TO BE LEVEL AND CLEAN PRIOR TO INSTALLATION OF NEW FLOOR COVERINGS. ALL FLOOR SURFACES AND TRANSITIONS BETWEEN SURFACE TYPES SHALL COMPLY WITH ADA GUIDELINES.6. FOR OPENING LOCATIONS AND DIMENSIONS, SEE PANEL DRAWINGS, INTERIOR ELEVATIONS, AND WINDOW ELEVATIONS.7. REFER TO SHEETS A0.2 AND A0.3 FOR LOCATIONS OF WHERE FIRE EXTINGUISHERS TO BE PROVIDED AND HOW THEY ARE TO BE MOUNTED8. SEE SHEET A10.3 FOR ALL KEYNOTES STARTING WITH "W" AND "BL"9. ALL FLOOR ELEVATIONS ARE BASED OFF OF FIRST FLOOR ELEVATION OF 100'-0". ARCHITECTURAL ELEVATION 100'-0" CORRESPONDS TO CIVIL ELEVATION OF FFE = 882.25.GENERAL CONSTRUCTION NOTESFLOOR PLAN LEGENDDOOR PER TAG. SEE DOOR SCHEDULE SHEET A10.1##WALL TAG. SEE WALL TYPES SHEET A10.0#KEYNOTE. SEE KEYNOTES, THIS SHEET.CMU WALLPRECAST CONCRETE WALLINTERIOR METAL STUD PARTITION WALL#STRUCTURAL GRIDNOT IN SCOPENE SESWNWBUILDING DIAGRAMNOT TO SCALENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR PLAN -SWQUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.1d10/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR PLAN -SW QUADKEYNOTES PER SHEET#1 ADA COMPLIANT DRINKING FOUNTAIN WITH BOTTLE FILLER4 FLOOR SINK WITH FRP PANEL TO 4'-0" A.F.F. (2) SIDES33 ADA PUSH BUTTON DOOR OPENER34 CANOPY35 WALL MOUNTED TV SCREEN37A RECYCLED PLASTIC BENCH MOUNTED AT 17-19" AFF, DEPTH TO MATCH LOCKERS43 WOOD LOOK METAL WALL PANEL, SEE INTERIORS SHEETS AND 10/A9.149 CONCRETE STOOP 9'-8" X 4'-0", SLOPE 1/4" PER FOOT53 CONCRETE STOOP 6'-10" X 4'-0", SLOPE 1/4" PER FOOT87 WALL BUTT JOINT TYP.103 SPORTS EQUIPMENT HOOK 66" AFF103a SPORTS EQUIPMENT HOOK ADA, 48" AFFREFER TO FF&E MATRIX FOR ALL RESPONSIBILITIES OF FURNITURE AND EQUIPMENT 10/04/2023BID DOCUMENT SET HCHCHCHCHCHCHCHCHCUPCNE SESWNWBUILDING DIAGRAMNOT TO SCALE2 A5.01 A5.14 A5.03 A5.0ABEFHJMPQCDN12345682 A5.14 A8.4F.3F.9GLM.4MECHANICAL COURTROOFROOFROOFROOF ACCESSMATCHLINE BBMATCHLINE BBMATCHLINE AAMATCHLINE AA248' - 1 3/4" 8' - 0"19' - 7 3/4" 18' - 9" 62' - 3" 188' - 4" 48' - 3 1/2"64' - 0" 28' - 0" 36' - 7" 47' - 6" 96' - 11" 75' - 11 1/2" 36' - 4 1/2" A8.414 A8.410 A8.46ADD ALT 2 SEE SHEET A2.6 - A2.822' - 1" 12' - 0" 24' - 0" 12' - 0" 43' - 2" 12' - 0" 12' - 0" 12' - 0" 52' - 0"ROOFCEILING BELOWROOFMEZZANINE201SPONSOR SUITE202PRESS BOX20312MERCYHEALTHARENA SOUTHSEATING136 (B)MERCYHEALTHARENA NORTHSEATING136 (A)17' - 6 3/8"4' - 0"27' - 6"4' - 0"26' - 2"4' - 0"10' - 2"20' - 6"6' - 4"4' - 0"39' - 0"4' - 0"30' - 2"6' - 0 3/8"7' - 9 5/8" 6' - 0" 27' - 2 3/8" 4' - 0" 27' - 6" 4' - 0" 16' - 6" 6' - 10" 15' - 4" 4' - 0" 6' - 4" 4' - 0" 13' - 0" 18' - 2" 4' - 0" 42' - 2 3/8" 4' - 0"ROOF ACCESS20425' - 4"12' - 1 1/2" 6' - 5"34' - 0"6' - 4" 12' - 1 1/2"MERCYHEALTH ARENA136MULTI-PURPOSE ARENA154MULTI-USE CONVENTION SPACE156ADA ANDCOMPANION209MEZZANINE201CORNER SUITE205ADA ANDCOMPANION206ADA ANDCOMPANION207CORNER SUITE208AV CLOSET210M.314' - 8"8' - 1" 56' - 10" 28' - 0" 11' - 11" 12' - 6" 12' - 0" 44' - 4" 26' - 10" 25' - 10" 7' - 2" 40' - 5 3/4" 54' - 11 3/4" 10' - 2" 4' - 5" 39' - 1 1/2" 2' - 6" 18' - 10"19' - 7 3/4" 18' - 9" 31' - 7" 30' - 8" 188' - 4" 28' - 0" 20' - 3 1/2"L.4L.832' - 9" 26' - 6"26' - 6" 31' - 7" 16' - 2"12' - 1 3/4" 35' - 1 1/4"RAILING26' - 6"RAILING10' - 0"RAILING26' - 6"RAILING32' - 0" 13' - 3"2' - 6"12' - 1 1/2"RAILING42' - 2"RAILING4' - 7"RAILING13' - 0"RAILING27' - 6"RAILING27' - 2"13' - 10"RAILING9' - 0"RAILING8' - 0"RAILING6' - 0"RAILING26' - 0"RAILING8' - 6"L.7NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedMEZZANINE FLOOR PLANWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.210/13/2023220025.00C2023-151/16" = 1'-0"2MEZZANINE FLOOR PLAN -OVERALL10/04/2023BID DOCUMENT SET HCHCHCHCHCHCHCHCHC3 A8.42 A5.01 A5.1HJMPQN1232 A5.1G.8ROOFROOFROOF ACCESSMATCHLINE BB6' - 11 5/8" 12' - 0"49' - 11"12' - 0"22' - 0 3/4"8' - 0 5/8"7' - 3"8' - 0"12' - 0"11' - 2"4' - 0"42' - 2 3/8"4' - 0"8' - 1 5/8"ROOFROOF A8.412A203.1A202.1A200.1A200.2 A8.415Sim A8.415Sim A7.127 A8.414Sim A8.410SimADD ALT 2 SEE SHEET A2.6 - A2.8BL5BL5W16W16MEZZANINE201MATCHLINE AAMEZZANINE201SPONSOR SUITE202PRESS BOX203CORNER SUITE205ADA ANDCOMPANION206ADA ANDCOMPANION209MERCYHEALTHARENA SOUTHSEATING136 (B)MERCYHEALTHARENA NORTHSEATING136 (A)MERCYHEALTH ARENA1363' - 2"3' - 0"2' - 9"3' - 0"8' - 9"2' - 4 5/8"3' - 2 3/8"848788888787882 A5.63 A5.65 A5.74 A5.6349' - 2 1/2" 7' - 2" 57' - 10 3/4" 29' - 10"10 1/4"6' - 10 1/2" 53' - 8 1/2" 2' - 6" 18' - 10"28' - 0"20' - 3 1/2"16' - 0" 19' - 10 1/2" 86' - 3"11' - 0 1/2"8' - 10"16' - 0"12' - 1 3/4" 2' - 10"RAILING 9' - 11"RAILING22' - 4"RAILING26' - 6"RAILING10' - 0"RAILING26' - 6"RAILING32' - 0" 15' - 9"2 A8.43' - 10" 21' - 0"7 A8.5A210.1AV CLOSET210L.4L.81 A6.52 A6.5110110109110112110110110111111112110110109109RAILING42' - 2"RAILING4' - 7"RAILING4' - 6"6' - 4"6' - 2 3/8"RAILING26' - 0"RAILING8' - 6"14' - 7 5/8"2' - 7 3/4"L.7111108135.00°19' - 10 1/2"5/8"4' - 0"4' - 0"112 ' - 6"MEZZANINE ELEV100' - 0"ICE RINK ELEV112 ' - 6"MEZZANINE ELEV1. ALL DIMENSIONS ON PLAN ARE ACTUAL UNLESS NOTED OTHERWISE. DIMENSIONS ON PLAN ARE FROM FACE OF FINISH UNLESS NOTED OTHERWISE.2. WALLS ARE TO BE PARALLEL & PERPENDICULAR TO ADJACENT WALLS UNLESS OTHERWISE NOTED. ALIGN WALLS WHERE APPARENT.3. WALL TYPES ARE LOCATED ON SHEET A10.0. 4. PROVIDE BLOCKING AS REQUIRED TO SUPPORT ALL CABINETS, SHELVES, BUILT-INS, EQUIPMENT OR ACCESSORIES. COORDINATE WITH VENDOR DOCUMENTS WHERE SUCH CONDITIONS APPLY.5. ALL FLOORS ARE TO BE LEVEL AND CLEAN PRIOR TO INSTALLATION OF NEW FLOOR COVERINGS. ALL FLOOR SURFACES AND TRANSITIONS BETWEEN SURFACE TYPES SHALL COMPLY WITH ADA GUIDELINES.6. FOR OPENING LOCATIONS AND DIMENSIONS, SEE PANEL DRAWINGS, INTERIOR ELEVATIONS, AND WINDOW ELEVATIONS.7. REFER TO SHEETS A0.2 AND A0.3 FOR LOCATIONS OF WHERE FIRE EXTINGUISHERS TO BE PROVIDED AND HOW THEY ARE TO BE MOUNTED8. SEE SHEET A10.3 FOR ALL KEYNOTES STARTING WITH "W" AND "BL"9. ALL FLOOR ELEVATIONS ARE BASED OFF OF FIRST FLOOR ELEVATION OF 100'-0". ARCHITECTURAL ELEVATION 100'-0" CORRESPONDS TO CIVIL ELEVATION OF FFE = 882.25.GENERAL CONSTRUCTION NOTESFLOOR PLAN LEGENDDOOR PER TAG. SEE DOOR SCHEDULE SHEET A10.1##WALL TAG. SEE WALL TYPES SHEET A10.0#KEYNOTE. SEE KEYNOTES, THIS SHEET.CMU WALLPRECAST CONCRETE WALLINTERIOR METAL STUD PARTITION WALL#STRUCTURAL GRIDNOT IN SCOPENE SESWNWBUILDING DIAGRAMNOT TO SCALENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedMEZZANINE FLOOR PLAN -SE QUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.2a10/13/2023220025.00C2023-151/8" = 1'-0"2MEZZANINE FLOOR PLAN -ENLARGED -SE QUADKEYNOTES PER SHEET#34 CANOPY84 2 HOUR FIRE RATED WALL PRECAST JOINT AT FIRE RATED WALLS TYP.87 WALL BUTT JOINT TYP.88 WALL MITER JOINT TYP.108 GUARDRAIL @ CONCOURSE SCOREBOARD - SEE DETAIL 2/A7.6109 GUARDRAIL @ CONCOURSE TRACK - SEE DETAIL 4/A7.6110 STANDING DRINK RAIL - SEE DETAIL 6/A7.6111 GUARDRAIL @ STAIRS EXTENDED GLASS - SEE DETAIL 5/A7.6112 DRINK RAIL @ ADA SEATING - SEE DETAIL 7/A7.6REFER TO FF&E MATRIX FOR ALL RESPONSIBILITIES OF FURNITURE AND EQUIPMENT DNDNDNDNDNDNDN10/04/2023BID DOCUMENT SET HCHCHC1 A8.42 A5.01 A5.11 A5.0HJKMPQN45872 A5.14 A8.4G.8LM.45.8MATCHLINE BBMATCHLINE AA7' - 5"13' - 0"4' - 0"8' - 1 1/2"11' - 10 1/2"7' - 6"31' - 2 3/8"6' - 0"7' - 9 5/8"19' - 1 1/2"11' - 2"14' - 8"4' - 0"30' - 2"6' - 4 3/8"7' - 5 5/8"6' - 11 5/8" A8.48A203.2A203.1A202.1A202.2A204.1A204.2 A8.415Sim A8.46Sim34ADD ALT 2 SEE SHEET A2.6 - A2.8BL5BL5W16W16W16W16 A8.414SimROOF A8.97 A8.98SPONSOR SUITE202PRESS BOX203MEZZANINE20112CORNER SUITE208ADA ANDCOMPANION207MERCYHEALTHARENA NORTHSEATING136 (A)MERCYHEALTHARENA SOUTHSEATING136 (B)MERCYHEALTH ARENA136M.3AV CLOSET21087 A7.127A210.13' - 10" 12' - 2" 19' - 10 1/2" 86' - 3" 19' - 10 1/2" 12' - 2" 3' - 10"7' - 9 5/8"HCHCHC9' - 2 1/2" 7' - 2" 21' - 3" 19' - 2 3/4" 54' - 11 3/4"10' - 2" 4' - 5" 39' - 1 1/2" 2' - 6" 18' - 10"15' - 10"8' - 0"26' - 6"30' - 8"158' - 0"ROOF ACCESS204ELEV152ROOF ACCESS DOOR110110109109110110110112110110111111111111111111110110110109RAILING32' - 9"RAILING26' - 6"RAILING10' - 0"RAILING26' - 6"RAILING31' - 7"RAILING27' - 2"RAILING27' - 6"RAILING13' - 0"RAILING4' - 8 1/4"RAILING4' - 6"6' - 4"6' - 4"3' - 5 1/2"14' - 4 1/8"RAILING9' - 0"RAILING8' - 0"25' - 1 5/8"RAILING6' - 0"7' - 5 1/2"30' - 8"6' - 4"108135.00°1 3 5 .0 0 °1 3 5 .0 0 °1. ALL DIMENSIONS ON PLAN ARE ACTUAL UNLESS NOTED OTHERWISE. DIMENSIONS ON PLAN ARE FROM FACE OF FINISH UNLESS NOTED OTHERWISE.2. WALLS ARE TO BE PARALLEL & PERPENDICULAR TO ADJACENT WALLS UNLESS OTHERWISE NOTED. ALIGN WALLS WHERE APPARENT.3. WALL TYPES ARE LOCATED ON SHEET A10.0. 4. PROVIDE BLOCKING AS REQUIRED TO SUPPORT ALL CABINETS, SHELVES, BUILT-INS, EQUIPMENT OR ACCESSORIES. COORDINATE WITH VENDOR DOCUMENTS WHERE SUCH CONDITIONS APPLY.5. ALL FLOORS ARE TO BE LEVEL AND CLEAN PRIOR TO INSTALLATION OF NEW FLOOR COVERINGS. ALL FLOOR SURFACES AND TRANSITIONS BETWEEN SURFACE TYPES SHALL COMPLY WITH ADA GUIDELINES.6. FOR OPENING LOCATIONS AND DIMENSIONS, SEE PANEL DRAWINGS, INTERIOR ELEVATIONS, AND WINDOW ELEVATIONS.7. REFER TO SHEETS A0.2 AND A0.3 FOR LOCATIONS OF WHERE FIRE EXTINGUISHERS TO BE PROVIDED AND HOW THEY ARE TO BE MOUNTED8. SEE SHEET A10.3 FOR ALL KEYNOTES STARTING WITH "W" AND "BL"9. ALL FLOOR ELEVATIONS ARE BASED OFF OF FIRST FLOOR ELEVATION OF 100'-0". ARCHITECTURAL ELEVATION 100'-0" CORRESPONDS TO CIVIL ELEVATION OF FFE = 882.25.GENERAL CONSTRUCTION NOTESFLOOR PLAN LEGENDDOOR PER TAG. SEE DOOR SCHEDULE SHEET A10.1##WALL TAG. SEE WALL TYPES SHEET A10.0#KEYNOTE. SEE KEYNOTES, THIS SHEET.CMU WALLPRECAST CONCRETE WALLINTERIOR METAL STUD PARTITION WALL#STRUCTURAL GRIDNOT IN SCOPENE SESWNWBUILDING DIAGRAMNOT TO SCALENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedMEZZANINE FLOOR PLAN -SW QUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.2b10/13/2023220025.00C2023-151/8" = 1'-0"2MEZZANINE FLOOR PLAN -ENLARGED -SW QUADKEYNOTES PER SHEET#87 WALL BUTT JOINT TYP.108 GUARDRAIL @ CONCOURSE SCOREBOARD - SEE DETAIL 2/A7.6109 GUARDRAIL @ CONCOURSE TRACK - SEE DETAIL 4/A7.6110 STANDING DRINK RAIL - SEE DETAIL 6/A7.6111 GUARDRAIL @ STAIRS EXTENDED GLASS - SEE DETAIL 5/A7.6112 DRINK RAIL @ ADA SEATING - SEE DETAIL 7/A7.6REFER TO FF&E MATRIX FOR ALL RESPONSIBILITIES OF FURNITURE AND EQUIPMENT 112 ' - 6"MEZZANINE LEVEL10O ' -0"ICE RINK ELEV112 ' - 6"MEZZANINE ELEV102 ' - 0" MEZZANINE LEVEL 10/04/2023BID DOCUMENT SET SDSDSD3 A8.42 A5.01 A5.14 A5.03 A5.01 A5.0ABEFHJKMPQCDN123456872 A5.1MATCHLINE AAMATCHLINE BBMATCHLINE AAF.3F.9GG.8LL.6M.45.87.293 A6.41/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" slope2 A6.4+7+7 +7+7+9+9+9+7+7+7+7+7+7+7+7 +7+8.5+8.5+8.5+8.53434ADD ALT 2 SEE SHEET A2.6-2.8TYP4' - 0"TYP4' - 0"ADD ALT 1 SEE SHEET A2.4+7 +7+7+7+7+7 +7+7+7+7+7+7+9.5+9.5+9.5+9.5+9.5+9.5+9.5+9.5+9.5+9.5+9.5+9.5+9.5+9.5+9.5+9.53424' - 5"47' - 1"47' - 1"47' - 1"24' - 5"54' - 9"54' - 9"54' - 9"E21E21E21E21E19E19E19E19E19E19E19E23E24E24E24E2446464623' - 11"66' - 5"11' - 6"+95 A6.1126262626262626262F.4F.61 A5.5M.36262E1962626262462' - 4 3/8"14' - 8"6211' - 4 1/2"12' - 11"2' - 11"2' - 11"5' - 1"26' - 6"30' - 8"188' - 4"28' - 0"20' - 3 1/2"8' - 1" 56' - 10" 28' - 0" 11' - 11" 12' - 6" 12' - 0" 13' - 10" 16' - 8" 13' - 10" 26' - 10" 16' - 7 1/2" 9' - 2 1/2" 7' - 2" 21' - 3" 19' - 2 3/4" 17' - 5" 14' - 2" 15' - 8"10 1/4"6' - 10 1/2" 10' - 2" 4' - 5" 39' - 1 1/2" 2' - 6" 18' - 10"7' - 1 5/8" 9' - 6 5/8" 7' - 7 5/8" 79' - 11" 24' - 10 3/4"19' - 9"59' - 4 1/4"16' - 10 3/4"97' - 9"16' - 9"14' - 3 1/4" 24' - 6 3/4"4' - 0"6' - 11 7/8"3' - 3"6' - 4"6' - 4"7' - 7 5/8"7' - 1 5/8"7' - 6 5/8"6' - 1 1/2"6' - 10 5/8"5' - 8 1/2"6' - 1 5/8"616161616162L.4L.841E22E22E23E23E23E24E19 A7.014+4+4+4+41/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1061/4" SLOPE1/4" SLOPEROOF MEMBRANE 02GENERAL NOTE: ROOF CURBS & HVAC WALL/ROOF PENETRATIONS TO BE COORDINATED WITH MECHANICAL DRAWINGS & EQUIPMENT MANUFACTURER SPECIFICATIONS.L.71/4" SLOPE1/4" SLOPEMATCHLINE BB624 A5.0F.3F.991 A6.4F.4F.611 1/2"11 1/2"1/4" SLOPE+3.5+3.51/4" SLOPE1/4" SLOPE+3.562+3.51/4" SLOPE621/4" SLOPE1/4" SLOPECOMPOUND CEILING METAL SOFFIT7M.47.23 A6.44 A6.4+3+3+31/4" SLOPE1/4" SLOPE1/4" SLOPE6212M.3NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedROOF PLANWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.310/13/2023220025.00C2023-151/16" = 1'-0"3ROOF PLAN -OVERALLKEYNOTES PER SHEET#34 CANOPY41 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - SEE DETAIL21/A7.046 ROOF ACCESS LADDER, WALL-MOUNT GALVANIZED STEEL LADDER (PAINT) ONEACH SIDE OF THE PARAPET WALL (2ND LADDER ONLY REQUIRED ON THEROOF SIDE OF THE PARAPET DEPENDING UPON THE PARAPET HEIGHT)W/PLATFORM, 3'-6" HIGH HANDRAILS ABOVE PLATFORM61 UNIT MOUNTED MECHANICAL SCREEN62 ROOF CRICKET AROUND RTU106 RUBBER WALKWAY PADS BY MANUFACTURER. SPACING TO BE SPECIFIED BYMANUFACTURER. FIELD FIT FOR PLACEMENT OF PADS IN CONJUNCTION WITHMECHANICAL UNIT SERVICE AREASE19 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOMELEVATION AT 20' - 3"E21 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOMELEVATION AT 32' - 4"E22 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOMELEVATION AT 27' - 3"E23 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOMELEVATION AT 29' - 4 1/2"E24 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOMELEVATION AT 15' - 7"1/8" = 1'-0"2VESTIBULE 100 CANOPY ROOF PLAN1/8" = 1'-0"1VESTIBULE 118 CANOPY ROOF PLANSOLAR ARRAY BY ALLIANT ENERGY. ARCHITECTURAL DRAWINGS NOT TO BE USED FOR CONSTRUCTION. GRIDLINE H REPRESENTS THE HIGH POINT OF THE ROOF SLOPES FOR ROOF COVERING ARENA AND CONVENTION SPACES10/04/2023BID DOCUMENT SET ABEFHMPQ12345LF.6 A4.5 A4.5 A4.5 A4.5MATCHLINE BBMATCHLINE BBMATCHLINE AAMATCHLINE AA3142 A4.681 A4.62 A4.65 A4.64 A4.69 A4.63 A4.67 A4.6108' - 1" 42' - 0 5/8" 6' - 4" 4' - 4 5/8" 6' - 4" 37' - 3 3/4" 50' - 9" 17' - 4 3/8" 102' - 7 5/8" 55' - 4 1/2" 56' - 2 1/2" 18' - 10"19' - 9 1/2"28' - 0"1' - 2"6' - 6"4"6' - 4"3' - 4"16' - 0"178' - 10"6' - 4"1' - 10"7' - 0 1/8" 22' - 10" 7' - 4" 68' - 6" 6' - 6" 25' - 6" 6' - 6" 50' - 8 5/8" 14' - 0 5/8"3' - 6 5/8"6' - 6"10"10' - 4" 3' - 4" 14' - 4" 20' - 7 1/2"10' - 11 1/2" 12' - 0" 9' - 2" 3' - 10" 11' - 6" 8' - 6"27' - 1 1/2"105' - 8" 11' - 8" 84' - 9" 15' - 6" 41' - 4 1/4" 8' - 1 1/2" 52' - 7" 67' - 2 1/4"15' - 1" 5' - 4" 3' - 3" 19' - 5 3/4" 3' - 4"4' - 3 5/8"3' - 4" 18' - 3 1/2" 12' - 0 5/8" 12' - 3 3/4" 11' - 8"24' - 0" 6' - 4" 47' - 8" 3' - 4"2' - 10" 23' - 3" 33' - 8 3/4" 3' - 3 7/8"3' - 2 3/8"20' - 8" 44' - 1 1/2" 10" 34' - 2 1/2" 6' - 0" 16' - 0"7' - 5"44' - 10"7' - 5"7' - 0"7' - 5"40' - 2"14' - 5"7' - 5"44' - 10"7' - 5"185' - 3"8' - 6"3' - 5"3' - 4"11' - 6"9' - 1" 3' - 10" 78' - 3" 6' - 4" 24' - 4" 6' - 4" 84' - 2" 6' - 4" 4"4' - 10 1/4"6' - 4"12' - 9 3/4"L.4L.8L.7 A5.59 A5.5 A5.58765419a A9.112 A9.113 A9.015NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/16" = 1'-0"FIRST FLOOR PLAN -PRECAST PANELSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.910/13/2023220025.00C2023-151/16" = 1'-0"1FIRST FLOOR PLAN -PRECAST REFERENCE PLAN10/04/2023BID DOCUMENT SET NE SESWNWBUILDING DIAGRAMNOT TO SCALEABEFHJKMPQCDN123456874 A8.4J.C.114CONCESSIONS115 (B)BEER SALES116FOOD PREP115 (A)OFFICE111SKATE RENTAL108CHECK-IN/RENTAL107VESTIBULE100MAIN LOBBY101MENS106AMEETING ROOM(A)102MEETING ROOM(B)103STOR104FIRST AID105LOBBY / LINK155STORAGE158ELECTRIC157WARMING ROOM159LOADING/RECEIVING/STORAGE160FAMILY TLT162J.C.163MEN'S166GENERALBUILDINGSTORAGE167RESURFACER/SHOPTOOLS/LAUNDRY170REFRIGERATION172Y.H. STORAGE137WET TEAMROOM #1138WET TEAMROOM #2140UNISEX TLT141YH COACH143ICE ARENALOBBY117MEN'S121ELEC134MAIN COACH133MAIN TEAMROOM132LAUNDRY131TRAINING129UNISEX TLT128TEAM ROOM 4127TEAM ROOM 5126WET TEAMROOM 3125WET TEAM RR124WET TEAMROOM 4123IT150TEAM ROOM 3149TEAM ROOM 1147WOMEN'S165F.S. STORAGE175TEAM ROOM 2148J.C.142REFEREE145REFEREE RR146WET TEAM RR139MERCYHEALTHARENA136MULTI-PURPOSEAREA154MULTI-USECONVENTIONSPACE156GEN STORAGE153ICE RINKCIRCULATION151ICE RINKCIRCULATION135PASSAGE144PASSAGE130ELEV152MATCHLINE BBMATCHLINE AAMATCHLINE AAMATCHLINE BBMATCHLINE BBF.3F.9GG.8L5.87.29BREAKROOM109OFFICE110ADMIN1123 A6.42 A6.4MALLCONNECTION164C3ADD ALT 3 SEE SHEET A3.4ADD ALT 1 SEE SHEET A2.4C4C4C4C4C4C4C4STORAGE135(A)MECHANICAL168EXPOSEDMETER/RISER17934ELECTRICAL113C8aC85 A6.112F.61 A5.5ELECTRICAL169TEMP STORAGE174HOCKEYSTORAGE173IT/GENSTORAGE176M.3C4C4C9C4C4C4C4C4C4C4C4C4C4C4C4C4C4C4C4C4C4C4C3C3C3C3C4C3C4C4VESTIBULE171AV CLOSET167 (B)VESTIBULE1188989898' - 0 5/8" 43' - 6 3/4" 23' - 1 1/4" 38' - 10 3/4" 22' - 5 5/8" 44' - 2 3/8" 8' - 0 5/8"7' - 5"42' - 0"2' - 10"21' - 10"2' - 1"36' - 0"2' - 1"21' - 10"2' - 10"42' - 0"7' - 5"9292L.4L.8C9C4L.7FAMILY RR106WOMENS106BWOMENS12281' - 6"6' - 6"25' - 6"0"74' - 10"C4C4FAMILYRESTROOM120WELLNESSROOM119CLOSE OVERHEAD SPACE ABOVE DIVIDER WALL WITH ACOUSTIC PANELSCLOSE OVERHEAD SPACE ABOVE DIVIDER WALL WITH ACOUSTIC PANELSCEILING PLAN LEGENDWOOD LOOK METAL PANEL INT./EXT. CEILING PANEL (SIZE VARIES) GWB CEILING2 X 2 ACT CEILING2 X 4 VCT CEILINGSTADIUM SEATING ABOVESEE STRUCTURAL FOR ROOF JOIST LOCATIONSNNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR REFLECTEDCEILING PLANWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A3.110/13/2023220025.00C2023-151/16" = 1'-0"1FIRST FLOOR RCPKEYNOTES PER SHEET#34 CANOPY89 SCOREBOARD BY OTHERS92 WOOD LOOK CEILING 8'X2'C3 EXPOSED METAL JOISTC4 EXPOSED CONCRETE PLANKC8 NEW FIGURE SKATING HARNESS AND PULLEY SYSTEM MOUNTED TOUNDERSIDE OF JOISTS.C8a FUTURE FIGURE SKATING HARNESS AND PULLEY SYSTEM MOUNTED TOUNDERSIDE OF JOISTS.C9 JOIST MOUNTED RADIANT HEATING SYSTEMSEE SHEET A11.0 FOR COLOR AND MATERIAL FINISH SCHEDULE AND ROOM FINISH SCHEDULE.10/04/2023BID DOCUMENT SET 3 A8.42 A5.04 A5.03 A5.0ABEFHJ123LOBBY / LINK155STORAGE158ELECTRIC157WARMING ROOM159LOADING/RECEIVING/STORAGE160FAMILY TLT162J.C.163MEN'S166GENERALBUILDINGSTORAGE167RESURFACER/SHOPTOOLS/LAUNDRY170WOMEN'S165F.S. STORAGE175MULTI-USECONVENTIONSPACE156F.3MULTI-PURPOSEAREA154MALLCONNECTION164C4C4C3C4C4SOFFIT9' -6" AFFSOFFIT9' -6" AFFSOFFIT9' -6" AFF12' -0"AFF13' -6"AFF13' -6"AFF11' -11"AFF10' -0"AFF10' -2"AFF8' -0"AFF10' -0"AFF9' -0"AFFMATCHLINE AAMATCHLINE BBC6C6C6C6C6F.61 A5.5HOCKEYSTORAGE173TEMP STORAGE174IT/GENSTORAGE176LOBBY / LINK155AV CLOSET157 (A)AV CLOSET167 (B)C8aSOFFIT9' -6" AFFC4C92 A5.53 A5.57' - 5"42' - 0"2' - 10"1' - 8"18' - 6"1' - 8"2' - 1"36' - 0"2' - 1"1' - 8"2' - 0" 8' - 0" 2' - 0"12' - 5"BULKHEAD11' - 10"ROLL DOWN METAL SECURITY GATETYPICAL -ALL BASKETBALL HOOPS STORAGE FUNCTION TO BE COORDINATED WITH A/V AND ASSOCIATED DISCIPLINE BEFORE PURCHASEDC3C4C410 A7.52' - 0" 8' - 0" 2' - 0"C3C3BULKHEAD10' - 0"EXPOSED STRUCTURE -PAINTED BLACK2 A6.53 A6.55 A6.54 A6.598982' - 0"4"2' - 0"4"2' - 0"4"2' - 0"4"2' - 0"4"2' - 0"4"2' - 0"4"2' - 0"11' -11"AFFGWBROOF ACCESS PLATFORMMEZZANINE LEVEL STAIR PLATFORM14' -8"AFF14' -8"AFF14' -8"AFFC4C4C6C6CLOSE OVERHEAD SPACE ABOVE DIVIDER WALL WITH ACOUSTIC PANELSCLOSE OVERHEAD SPACE ABOVE DIVIDER WALL WITH ACOUSTIC PANELSNE SESWNWBUILDING DIAGRAMNOT TO SCALECEILING PLAN LEGENDWOOD LOOK METAL PANEL INT./EXT. CEILING PANEL (SIZE VARIES) GWB CEILING2 X 2 ACT CEILING2 X 4 VCT CEILINGSTADIUM SEATING ABOVESEE STRUCTURAL FOR ROOF JOIST LOCATIONSNNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR REFLECTEDCEILING PLAN -NE QUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A3.1a10/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR RCP -NE QUADKEYNOTES PER SHEET#98 MANUALLY RETRACTABLE ACOUSTIC PARTITION WALL - FILL JOUSTSPACE ABOVE WITH ACOUSTIC PANEL TO CREATE ACOUSTIC BARRIERWHEN PARTITION WALL IS IN USE.C3 EXPOSED METAL JOISTC4 EXPOSED CONCRETE PLANKC6 CEILING MOUNTED MOTORIZED UPWARD SWINGING BASKETBALL HOOPLOCATION. HOOP TO SWING BACKWARDS IN BETWEEN JOISTS ANDMAINTAIN A 23'-0" CLEAR HEIGHT ABOVE VOLLEYBALL COURT LINES.FALLS IN THE SCOPE OF FF&EC8a FUTURE FIGURE SKATING HARNESS AND PULLEY SYSTEM MOUNTED TOUNDERSIDE OF JOISTS.C9 JOIST MOUNTED RADIANT HEATING SYSTEMSEE SHEET A11.0 FOR COLOR AND MATERIAL FINISH SCHEDULE AND ROOM FINISH SCHEDULE.10/04/2023BID DOCUMENT SET 1 A5.1HJKMPQ1232 A5.1RESURFACER/SHOPTOOLS/LAUNDRY170REFRIGERATION172Y.H. STORAGE137WET TEAMROOM #1138WET TEAMROOM #2140UNISEX TLT141YH COACH143ELEC134MAIN COACH133MAIN TEAMROOM132LAUNDRY131TRAINING129UNISEX TLT128J.C.142WET TEAM RR139MERCYHEALTHARENA136ICE RINKCIRCULATION135PASSAGE144PASSAGE130MATCHLINE AAMATCHLINE AAMATCHLINE BBG.812' - 0"BULKHEAD HEIGHTC4C4C4C4C4C4C4C4C4C4C4C4STORAGE135(A)ADD ALT 2 SEE SHEET A3.49' -0"AFFC4C4C4C4C434C8ELECTRICAL169MECHANICAL168ICE RINKCIRCULATION135METER/RISER179AV CLOSET167 (B)C4VESTIBULE171CLOSET172(A)8' -0"AFF7 A8.55 A8.5L.4L.8C9C9C41 A6.52 A6.5L.711' -7"AFF11' -7"AFF11' -7"AFF11' -7"AFF11' -7"AFF11' -7"AFF11' -7"AFF11' -7"AFF11' -7"AFF11' -7"AFF14' -8"AFF14' -8"AFF14' -8"AFF14' -8"AFFC4C4C414' -8"AFF14' -8"AFF14' -8"AFFNE SESWNWBUILDING DIAGRAMNOT TO SCALECEILING PLAN LEGENDWOOD LOOK METAL PANEL INT./EXT. CEILING PANEL (SIZE VARIES) GWB CEILING2 X 2 ACT CEILING2 X 4 VCT CEILINGSTADIUM SEATING ABOVESEE STRUCTURAL FOR ROOF JOIST LOCATIONSNNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR REFLECTEDCEILING PLAN -SE QUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A3.1b10/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR RCP -SE QUADKEYNOTES PER SHEET#34 CANOPYC4 EXPOSED CONCRETE PLANKC8 NEW FIGURE SKATING HARNESS AND PULLEY SYSTEM MOUNTED TOUNDERSIDE OF JOISTS.C9 JOIST MOUNTED RADIANT HEATING SYSTEMSEE SHEET A11.0 FOR COLOR AND MATERIAL FINISH SCHEDULE AND ROOM FINISH SCHEDULE.10/04/2023BID DOCUMENT SET 1 A8.42 A5.01 A5.11 A5.0HJKPQN45872 A5.14 A8.4J.C.114CONCESSIONS115 (B)BEER SALES116FOOD PREP115 (A)UNISEX TLT141YH COACH143ICE ARENALOBBY117MEN'S121LAUNDRY131TRAINING129UNISEX TLT128TEAM ROOM 4127TEAM ROOM 5126WET TEAMROOM 3125WET TEAM RR124WET TEAMROOM 4123IT150TEAM ROOM 3149TEAM ROOM 1147TEAM ROOM 2148J.C.142REFEREE145REFEREE RR146MERCYHEALTHARENA136ICE RINKCIRCULATION151PASSAGE144PASSAGE130MATCHLINE BBMATCHLINE AAMATCHLINE AALL.6M.45.8MATCHLINE BB3 A6.42 A6.4C3C4C4C4C4C4C4C4C4C4C4C4C4C4ADD ALT 2 SEE SHEET A2.510' -0" AFF9' -0" AFF10' -6" AFF10' -6" AFFC48' -0" AFFC33458585858ELECTRICAL1134 A6.4C85 A6.112PASSAGE130DRY STORAGE115 (C)8' -0" AFF11' -7" AFF11' -7" AFF11' -7" AFF10' -0" AFF10' -0" AFF9' -0" AFF10' -0" AFF8' -0" AFF5 A7.5VESTIBULE118BULKHEAD7' - 4"C9C9L.7WOMENS1225 A6.48' -0" AFF6 A6.511' -7" AFF11' -7" AFF11' -7" AFF11' -7" AFF11' -7" AFF11' -7" AFF11' -7" AFF11' -7" AFF11' -7" AFFC4BULKHEAD7' - 4"8' -0" AFFFAMILYRESTROOM120WELLNESSROOM119STAINLESS STEEL CASE OPENING UNDER BULKHEADNE SESWNWBUILDING DIAGRAMNOT TO SCALECEILING PLAN LEGENDWOOD LOOK METAL PANEL INT./EXT. CEILING PANEL (SIZE VARIES) GWB CEILING2 X 2 ACT CEILING2 X 4 VCT CEILINGSTADIUM SEATING ABOVESEE STRUCTURAL FOR ROOF JOIST LOCATIONSNNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR REFLECTEDCEILING PLAN -SW QUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A3.1c10/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR RCP -SW QUADKEYNOTES PER SHEET#34 CANOPY58 MOTORIZED SHADESC3 EXPOSED METAL JOISTC4 EXPOSED CONCRETE PLANKC8 NEW FIGURE SKATING HARNESS AND PULLEY SYSTEM MOUNTED TOUNDERSIDE OF JOISTS.C9 JOIST MOUNTED RADIANT HEATING SYSTEMSEE SHEET A11.0 FOR COLOR AND MATERIAL FINISH SCHEDULE AND ROOM FINISH SCHEDULE.10/04/2023BID DOCUMENT SET 2 A5.04 A5.03 A5.01 A5.0AEFHJCD45684 A8.4CONCESSIONS115 (B)FOOD PREP115 (A)OFFICE111SKATE RENTAL108CHECK-IN/RENTAL107VESTIBULE100MAIN LOBBY101MENS106AMEETING ROOM(A)102MEETING ROOM(B)103STOR104FIRST AID105LOBBY / LINK155MULTI-PURPOSEAREA154MULTI-USECONVENTIONSPACE156GEN STORAGE153PASSAGE144ELEV152MATCHLINE BBMATCHLINE AAMATCHLINE BBMATCHLINE AAF.3F.9GG.85.89BREAKROOM109OFFICE110ADMIN11234C5C3C3C410' -4" AFF10' -4" AFF9' -0" AFF9' -0" AFF9' -0" AFF10' -0" AFF10' -0" AFF10' -0" AFF10' -0" AFF10' -0" AFF10' -0" AFF10' -0" AFF16'-4" AFFGWB11' -11" AFF13' -6" AFF12' -0" AFF13' -6" AFFSOFFIT9 -6" AFFC6C6C6C6C6C6C611' - 10"BULKHEAD5757585858575858C8a4 A6.21 A6.4SOFFIT9 -6" AFF1 A5.5LOBBY / LINK155LOBBY / LINK15515' -0" AFF10' -0" AFFCOPY AREA112 (A)10' -0" AFFICE ARENALOBBY117C92' - 1"1' - 8"18' - 6"1' - 8"2' - 10"42' - 0"7' - 5"2' - 0" 8' - 0" 2' - 0"6' - 2" 4" 8' - 0" 4" 8' - 0" 4" 8' - 0" 4" 8' - 0" 4" 6' - 2"46' - 2"1' - 7 3/4"2' - 0"2' - 0"2' - 0"2' - 0"2' - 0"2' - 0"2' - 0"2' - 0"2' - 0"1' - 7 3/4"1' - 4" 21' - 5 3/8"1' - 6 1/4"LOCKERALCOVE101 (A)ELECTRICAL11310' -0" AFF10' -0" AFF8923' - 6 1/4"2' - 2"23' - 6 1/8"9' - 6"BULKHEADC32' - 0" 8' - 0" 2' - 0"98982' - 0" 8' - 0" 2' - 0"WOMENS106B9' - 0"BULKHEADFAMILY RR1068' -0" AFF9' -0" AFF2' - 0"4"2' - 0"4"2' - 0"4"2' - 0"4"2' - 0"4"2' - 0"4"2' - 0"4"2' - 0"SOFFIT9 -6" AFFFRAME OPENING WITH TRIM ON WALLS AND B/O SOFFIT12' - 6"TYP.1' - 0"44' - 1 1/4"10' - 2 3/8"1' - 1 1/4"2' - 0"2' - 0"2' - 0"2' - 0"1' - 1 1/4"117117CLOSE OVERHEAD SPACE ABOVE DIVIDER WALL WITH ACOUSTIC PANELSNE SESWNWBUILDING DIAGRAMNOT TO SCALECEILING PLAN LEGENDWOOD LOOK METAL PANEL INT./EXT. CEILING PANEL (SIZE VARIES) GWB CEILING2 X 2 ACT CEILING2 X 4 VCT CEILINGSTADIUM SEATING ABOVESEE STRUCTURAL FOR ROOF JOIST LOCATIONSNNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR REFLECTEDCEILING PLAN -NW QUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A3.1d10/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR RCP -NW QUADKEYNOTES PER SHEET#34 CANOPY57 MANUAL SHADES58 MOTORIZED SHADES89 SCOREBOARD BY OTHERS98 MANUALLY RETRACTABLE ACOUSTIC PARTITION WALL - FILL JOUSTSPACE ABOVE WITH ACOUSTIC PANEL TO CREATE ACOUSTIC BARRIERWHEN PARTITION WALL IS IN USE.117 LIGHTING FIXTURE - PRUDENTIALC3 EXPOSED METAL JOISTC4 EXPOSED CONCRETE PLANKC5 GYPSUM BOARD SOFFITC6 CEILING MOUNTED MOTORIZED UPWARD SWINGING BASKETBALL HOOPLOCATION. HOOP TO SWING BACKWARDS IN BETWEEN JOISTS ANDMAINTAIN A 23'-0" CLEAR HEIGHT ABOVE VOLLEYBALL COURT LINES.FALLS IN THE SCOPE OF FF&EC8a FUTURE FIGURE SKATING HARNESS AND PULLEY SYSTEM MOUNTED TOUNDERSIDE OF JOISTS.C9 JOIST MOUNTED RADIANT HEATING SYSTEMSEE SHEET A11.0 FOR COLOR AND MATERIAL FINISH SCHEDULE AND ROOM FINISH SCHEDULE.10/04/2023BID DOCUMENT SET NE SESWNWBUILDING DIAGRAMNOT TO SCALE2 A5.04 A5.03 A5.0AEFHPN3452 A5.14 A8.4C3C3C3136MULTI PURPOSE REC AREA 1154MULTI PURPOSE REC AREA 2156C6C6C6C6C6C6C6C6C6C6MATCHLINE AAMATCHLINE AAMATCHLINE BBMATCHLINE BBF.4F.61 A5.5C9C8MERCYHEALTH ARENAPRESS BOX203SPONSOR SUITE202AV CLOSET210C9C9CEILING PLAN LEGENDWOOD LOOK METAL PANEL INT./EXT. CEILING PANEL (SIZE VARIES) GWB CEILING2 X 2 ACT CEILING2 X 4 VCT CEILINGSTADIUM SEATING ABOVESEE STRUCTURAL FOR ROOF JOIST LOCATIONSNNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedMEZZANINE FLOORREFLECTED CEILING PLANWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A3.210/13/2023220025.00C2023-151/16" = 1'-0"1MEZZANINE FLOOR RCPKEYNOTES PER SHEET#C3 EXPOSED METAL JOISTC6 CEILING MOUNTED MOTORIZED UPWARD SWINGING BASKETBALL HOOPLOCATION. HOOP TO SWING BACKWARDS IN BETWEEN JOISTS ANDMAINTAIN A 23'-0" CLEAR HEIGHT ABOVE VOLLEYBALL COURT LINES.FALLS IN THE SCOPE OF FF&EC8 NEW FIGURE SKATING HARNESS AND PULLEY SYSTEM MOUNTED TOUNDERSIDE OF JOISTS.C9 JOIST MOUNTED RADIANT HEATING SYSTEMSEE SHEET A11.0 FOR COLOR AND MATERIAL FINISH SCHEDULE AND ROOM FINISH SCHEDULE.10/04/2023BID DOCUMENT SET 3 A8.42 A5.01 A5.1HPN32 A5.1G.8C3136MATCHLINE AAMATCHLINE AAMATCHLINE BBC8C9C9MERCYHEALTH ARENA9' - 2 1/2" 156' - 4" 2' - 6"L.7NE SESWNWBUILDING DIAGRAMNOT TO SCALECEILING PLAN LEGENDWOOD LOOK METAL PANEL INT./EXT. CEILING PANEL (SIZE VARIES) GWB CEILING2 X 2 ACT CEILING2 X 4 VCT CEILINGSTADIUM SEATING ABOVESEE STRUCTURAL FOR ROOF JOIST LOCATIONSNNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedMEZZANINE FLOORREFLECTED CEILING PLAN-SE QUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A3.2a10/13/2023220025.00C2023-151/8" = 1'-0"1MEZZANINE FLOOR RCP -SE QUADKEYNOTES PER SHEET#C3 EXPOSED METAL JOISTC8 NEW FIGURE SKATING HARNESS AND PULLEY SYSTEM MOUNTED TOUNDERSIDE OF JOISTS.C9 JOIST MOUNTED RADIANT HEATING SYSTEMSEE SHEET A11.0 FOR COLOR AND MATERIAL FINISH SCHEDULE AND ROOM FINISH SCHEDULE.10/04/2023BID DOCUMENT SET 2 A5.01 A5.1HJP452 A5.14 A8.4PRESS BOX203SPONSOR SUITE202C3MERCY HEALTH ARENA136C8C9C99' -0"AFF MOISTURE RESISTANT GYP9' - 1"AFF MOISTURE RESISTANT ACTMATCHLINE AAMATCHLINE AAMATCHLINE BBMATCHLINE BB2' - 0" 10' - 0" 4"11 1/2"1' - 8 1/2"HOLD20' - 0"1' - 8 1/2"11 1/2"AV CLOSET2106 1/4"1' - 6"30' - 0"1' - 6"5 3/4"8" 10' - 0" 2' - 0"12' - 8"12' - 8"9' -1"AFF MOISTURE RESISTANT ACT9' -0"AFF MOISTURE RESISTANT GYPCHASE WALLS ON MEZZANINE TO GO UP TO 127' - 6"NE SESWNWBUILDING DIAGRAMNOT TO SCALECEILING PLAN LEGENDWOOD LOOK METAL PANEL INT./EXT. CEILING PANEL (SIZE VARIES) GWB CEILING2 X 2 ACT CEILING2 X 4 VCT CEILINGSTADIUM SEATING ABOVESEE STRUCTURAL FOR ROOF JOIST LOCATIONSNNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedMEZZANINE FLOORREFLECTED CEILING PLAN-SW QUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A3.2b10/13/2023220025.00C2023-151/8" = 1'-0"1MEZZANINE FLOOR RCP -SW QUADKEYNOTES PER SHEET#C3 EXPOSED METAL JOISTC8 NEW FIGURE SKATING HARNESS AND PULLEY SYSTEM MOUNTED TOUNDERSIDE OF JOISTS.C9 JOIST MOUNTED RADIANT HEATING SYSTEMSEE SHEET A11.0 FOR COLOR AND MATERIAL FINISH SCHEDULE AND ROOM FINISH SCHEDULE.10/04/2023BID DOCUMENT SET FIRST FLOOR100' -0"T.O. PARAPET123' -4"T.O. PRECAST -132' -4"T.O. PRECAST136' -0"2 A5.021' - 2 1/2" 27' - 7"10"6' - 6" 3' - 7" 14' - 0" 50' - 9" 6' - 6" 25' - 6" 6' - 6" 68' - 6" 6' - 6"10"15' - 1 3/4" 12' - 0" 16' - 0" 12' - 0" 8' - 0"1' - 11 3/4"16' - 11 1/4" 17' - 8"E3E10E10E10E10E1 A4.111 A5.0134568W11W11W4W17W17W17W17T.O. PRECAST .121' -0"E3E6E6E6E6E10E4E10E1934E194614' - 0"6' - 6" 68' - 4"6' - 6" 25' - 6"6' - 6" 68' - 6"1/8" 30' - 8"10"E17E1748' - 3 1/2" 188' - 4" 30' - 8" 31' - 7" 18' - 9" 19' - 3"E18E18E1861E2E23E19E23E23E23E2230EXISTING MALL336' - 10 1/2"FIRST FLOOR100' -0"T.O. PARAPET123' -4"T.O. PARAPET -ENTRY128' -0"T.O. PRECAST -132' -4"T.O. PRECAST136' -0"1 A5.1E3E4E2E1 A4.12 A4.214 A5.03 A5.0AFPQCDN2 A5.1F.3F.9LM.4W10W6W7W5W13W8W8T.O. PRECAST .121' -0"E1E3E3E4E6E6E6E634E6E1E6E19E1934E5E19E19E20E195 A6.11 A5.5W14646314' - 0" 36' - 0" 36' - 0"11 1/4"45' - 1 1/4"E16E16E16E1618' - 10"2' - 6"39' - 1 1/2"47' - 3"100' - 3 3/4"44' - 4"12' - 0"24' - 5"28' - 0"64' - 11"E18E18E18E185' - 8" 22' - 4"CJ7' - 10 1/2"E18E1861616146CJ9' - 3 5/8"E18E812' - 4" 16' - 0"CJ12' - 0" 19' - 6"L.722' - 3 3/4"2510 ADDRESS LOCATION TO BE DETERMINED BY OWNERW8W8W8FIRST FLOOR100' -0"T.O. PARAPET -ENTRY128' -0"T.O. PRECAST136' -0"2 A5.0E4 A4.131 A5.012357.2W3T.O. PRECAST .121' -0"E6E1E13 A6.43434E6E19E534E21E21E21E6E646E628' - 0 1/2" 19' - 9 1/2"12' - 0" 12' - 0" 36' - 0" 12' - 0" 24' - 0" 12' - 0" 8' - 8" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 8' - 0"E17E17E17E17E1732' - 2" 37' - 5" 219' - 0" 28' - 0" 20' - 3 1/2"E18616161E248' - 0"E21E19EXISTING MALL25' - 7 1/2"336' - 10 1/2"E10E10FIRST FLOOR100' -0"T.O. PRECAST -132' -4"T.O. PRECAST136' -0"3 A8.41 A5.14 A5.03 A5.0ABEFHMPQ2 A5.1T.O. PRECAST .121' -0"CONNECTION TO MALLW20E6E6E1E6E134E6E6E11 A5.5M.3E10E10E10E1046E818' - 0"268' - 8"12' - 0"12' - 0"12' - 0"12' - 0"7' - 4"7' - 4"12' - 0"21' - 6"14' - 6"12' - 0"12' - 0"6' - 6"12' - 0"12' - 0"12' - 0"8' - 4"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"16' - 0"7' - 2"11' - 2"12' - 0"12' - 0"12' - 0"13' - 4"8' - 0"12' - 0"12' - 0"12' - 4"11' - 8"8' - 1"96' - 9"12' - 6"10' - 2"46' - 0 1/2"18' - 10"E24E24E24T.O. PRECAST18' - 3"15' - 11"211' - 7 1/2"143' - 0 1/2"Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/16" = 1'-0"EXTERIOR ELEVATIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A4.010/13/2023220025.00C2023-151/16" = 1'-0"1NORTH BUILDING ELEVATION1/16" = 1'-0"2WEST BUILDING ELEVATION1/16" = 1'-0"3SOUTH BUILDING ELEVATION1/16" = 1'-0"4EAST BUILDING ELEVATIONKEYNOTES PER SHEET#30 STEEL CONCRETE FILLED BOLLARDS (4) TYP. AT OVERHEAD DOORS U.N.O34 CANOPY46 ROOF ACCESS LADDER, WALL-MOUNT GALVANIZED STEEL LADDER (PAINT) ON EACH SIDE OFTHE PARAPET WALL (2ND LADDER ONLY REQUIRED ON THE ROOF SIDE OF THE PARAPETDEPENDING UPON THE PARAPET HEIGHT) W/PLATFORM, 3'-6" HIGH HANDRAILS ABOVEPLATFORM61 UNIT MOUNTED MECHANICAL SCREENE1 10" THICK, INSULATED - PROVIDE R12- 3" CONCRETE +4" RIGID INSULATION + 3" CONCRETE WETCAST EXPOSED AGGREGATE, LOAD BEARING PRECAST CONCRETE WALL. EXTERIOR FACE TOHAVE EXPOSED AGGREGATE SIZED 3/8 STANDARDE2 VERTICAL METAL PANEL (COLOR: JANESVILLE GREEN) STAGGER SEAM WHERE ONE PANELMEETS OTHER ONLY AT THE MAIN ENTRY - SEE SPECIFICATIONSE3 4" X 16" RUNNING BOND PREMIUM FILLED AND POLISHED ARCHITECTURAL MASONRY UNITS.BASIS OF DESIGN - TRENDSTONE PLUS (COLOR: LIMESTONE)E4 4" X 16" RUNNING BOND PREMIUM FILLED AND POLISHED ARCHITECTURAL MASONRY UNITS.BASIS OF DESIGN - TRENDSTONE PLUS (COLOR: SHADOW GRAY)E5 PERFORATED METAL PANEL WITH BACK-LIT SIGN ATTACHMENTE6 COPING TO MATCH WALLE8 ROOF ACCESS DOORE10 HOLLOW METAL DOORE16 TINTED TO MATCH JANESVILLE GREEN - SEE GL-8 IN GLAZING STYLESE17 10" INSULATED LOAD BEARING PRECAST WALL W/ EXPOSED AGGREGATE FINISH. APPLY SEALERFULL HEIGHT AS ACCENTE18 CONTROL JOINTE19 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOM ELEVATION AT 20' - 3"E20 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOM ELEVATION AT 27' - 1"E21 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOM ELEVATION AT 32' - 4"E22 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOM ELEVATION AT 27' - 3"E23 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOM ELEVATION AT 29' - 4 1/2"E24 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOM ELEVATION AT 15' - 7"10/04/2023BID DOCUMENT SET FIRST FLOOR100' -0"T.O. PARAPET123' -4"T.O. PRECAST136' -0"E4E31 A5.04568T.O. PRECAST .121' -0"W11W11W4E6E6E334E19E19E144 A6.21 A6.446E2E14E14E630' - 8" 10" 4' - 0" 26' - 9" 18' - 9" 19' - 3"E18E18E18E22STAGGER PANEL BUTT JOINTS SO SEAMS ARE DIMINISHED AS MUCH AS POSSIBLE IF VERTICAL PANEL DOES NOT COME IN FULL LENGTH OF ENTRY WALL HEIGHT100' - 2 3/8"1' - 6"11' - 2"2' - 4"8' - 4"2' - 6"4' - 2"6' - 0"FIRST FLOOR100' -0"T.O. PARAPET123' -4"T.O. PRECAST136' -0"4 A5.0F.3F.936' - 0"E1E6E534E151' - 6"1' - 0"10' - 2"7' - 0"3' - 8"2' - 6"10' - 2"46F.4F.6E19E19W1E64613' - 10" 16' - 8" 13' - 10"E19E1944' - 4"W1COORDINATE BUILDING ADDRESS SIGNAGE DESIGN AND LOCATION WITH COJ & SIGNAGE SUPPLIERFIRST FLOOR100' -0"T.O. PARAPET -ENTRY128' -0"1 A5.077.2T.O. PRECAST .121' -0"W312' - 2 7/8" 21' - 4 1/8" 31' - 1 1/4"E43 A6.42 A6.4E6E19E54 A6.21 A6.434E6E18E22E18E15STAGGER PANEL BUTT JOINTS SO SEEMS ARE DIMINISHED AS MUCH AS POSSIBLE IF VERTICAL PANEL DOES NOT COME IN FULL LENGTH OF ENTRY WALL HEIGHT14 A7.16' - 0"21' - 10"2' - 6"10' - 2"34' - 6"6' - 6"7' - 0"15' - 0"6' - 0"46E2Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/4" = 1'-0"ENLARGED EXTERIORELEVATIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A4.110/13/2023220025.00C2023-151/4" = 1'-0"1NORTH BUILDING ELEVATION -ENLARGED1/4" = 1'-0"2WEST BUILDING ELEVATION -ENLARGED1/4" = 1'-0"3SOUTH BUILDING ELEVATION -ENLARGEDKEYNOTES PER SHEET#34 CANOPY46 ROOF ACCESS LADDER, WALL-MOUNT GALVANIZED STEEL LADDER (PAINT) ON EACH SIDE OFTHE PARAPET WALL (2ND LADDER ONLY REQUIRED ON THE ROOF SIDE OF THE PARAPETDEPENDING UPON THE PARAPET HEIGHT) W/PLATFORM, 3'-6" HIGH HANDRAILS ABOVEPLATFORME1 10" THICK, INSULATED - PROVIDE R12- 3" CONCRETE +4" RIGID INSULATION + 3" CONCRETE WETCAST EXPOSED AGGREGATE, LOAD BEARING PRECAST CONCRETE WALL. EXTERIOR FACE TOHAVE EXPOSED AGGREGATE SIZED 3/8 STANDARDE2 VERTICAL METAL PANEL (COLOR: JANESVILLE GREEN) STAGGER SEAM WHERE ONE PANELMEETS OTHER ONLY AT THE MAIN ENTRY - SEE SPECIFICATIONSE3 4" X 16" RUNNING BOND PREMIUM FILLED AND POLISHED ARCHITECTURAL MASONRY UNITS.BASIS OF DESIGN - TRENDSTONE PLUS (COLOR: LIMESTONE)E4 4" X 16" RUNNING BOND PREMIUM FILLED AND POLISHED ARCHITECTURAL MASONRY UNITS.BASIS OF DESIGN - TRENDSTONE PLUS (COLOR: SHADOW GRAY)E5 PERFORATED METAL PANEL WITH BACK-LIT SIGN ATTACHMENTE6 COPING TO MATCH WALLE14 CAST STONE SILL, WIDTH TO MATCH OPENINGE15 HALO ILLUMINATED BACKLIT SIGNAGE - SEE MANUFACTURER DRAWINGS- CURRENTREPRESENTATION OF SIGNAGE IS NOT REPRESENTATIVE OF FINAL SIGNAGE DESIGN - FF&EITEME18 CONTROL JOINTE19 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOM ELEVATION AT 20' - 3"E22 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOM ELEVATION AT 27' - 3"SEE SHEET A10.3 FOR ALL KEYNOTES STARTING WITH "W"AND "BL"10/04/2023BID DOCUMENT SET FIRST FLOOR100' -0"T.O. PARAPET -ENTRY128' -0"T.O. PRECAST136' -0"PN2 A5.1LM.48' - 0"7' - 0"4' - 8"10' - 4"4' - 4"1' - 8"T.O. PRECAST .121' -0"W8W8W8W8W8 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 32' - 1 1/4" 12' - 4" 16' - 0" 12' - 0"4 A6.472' - 0" 40' - 4 3/8"W1334E19E2E14E669' - 6 3/4" 39' - 1 1/2" 2' - 6"618' - 0"7' - 0"21' - 0"E19E1824' - 8" 27' - 4" 20' - 0"5 A6.46 A6.5E6E6E3E4E11' - 10"10' - 2"2510 ADDRESS LOCATION TO BE DETERMINED BY OWNERConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/4" = 1'-0"ENLARGED EXTERIORELEVATIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A4.210/13/2023220025.00C2023-151/4" = 1'-0"1WEST BUILDING ELEVATION -ENLARGED 2KEYNOTES PER SHEET#34 CANOPY61 UNIT MOUNTED MECHANICAL SCREENE1 10" THICK, INSULATED - PROVIDE R12- 3" CONCRETE +4" RIGID INSULATION + 3" CONCRETE WETCAST EXPOSED AGGREGATE, LOAD BEARING PRECAST CONCRETE WALL. EXTERIOR FACE TOHAVE EXPOSED AGGREGATE SIZED 3/8 STANDARDE2 VERTICAL METAL PANEL (COLOR: JANESVILLE GREEN) STAGGER SEAM WHERE ONE PANELMEETS OTHER ONLY AT THE MAIN ENTRY - SEE SPECIFICATIONSE3 4" X 16" RUNNING BOND PREMIUM FILLED AND POLISHED ARCHITECTURAL MASONRY UNITS.BASIS OF DESIGN - TRENDSTONE PLUS (COLOR: LIMESTONE)E4 4" X 16" RUNNING BOND PREMIUM FILLED AND POLISHED ARCHITECTURAL MASONRY UNITS.BASIS OF DESIGN - TRENDSTONE PLUS (COLOR: SHADOW GRAY)E6 COPING TO MATCH WALLE14 CAST STONE SILL, WIDTH TO MATCH OPENINGE18 CONTROL JOINTE19 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOM ELEVATION AT 20' - 3"SEE SHEET A10.3 FOR ALL KEYNOTES STARTING WITH "W"10/04/2023BID DOCUMENT SET FIRST FLOOR100' -0"T.O. PRECAST -132' -4"1234T.O. PRECAST .121' -0"10" 6' - 6" 3' - 7" 14' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 2' - 9" 6' - 6" 2' - 9" 10' - 0" 10' - 0" 12' - 0"12' - 0" 12' - 0" 12' - 0" 12' - 0" 10' - 6" 7' - 3" 6' - 6"10"33' - 3"3' - 8"18' - 3"8' - 7 1/2" 12' - 5"15' - 7" 12' - 0"11"1' - 8" 1' - 8"14' - 0"2' - 0"4' - 0"1' - 7 1/2"1' - 0"SPACED REVEALS9 E.Q 1' - 0 3/8"SPACED REVEALS9 E.Q 11 7/8"SPACED REVEAL1 E.Q 2' - 0"SPACED REVEALS3 E.Q 3' - 6" W/ CENTERED OPENING6 E.Q 8 1/4" SPACED REVEALSSPACED REVEALS TYP. 23 E.Q 1' - 0"SPACED REVEALS3 E.Q 3' - 6"7' - 4"11"11"14' - 0"FIRST FLOOR100' -0"T.O. PRECAST136' -0"12345T.O. PRECAST .121' -0"9' - 0" 10' - 10"9' - 4" 9' - 3 1/2" 9' - 4"11' - 7" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 8' - 8" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 8' - 0" 12' - 0"36' - 11"18' - 4"BUILDING IN FOREGROUND6' - 4"1' - 7 3/4"3' - 4 1/2"4' - 4" 6' - 6"8' - 3"6' - 4"3' - 10"11"3' - 7"SPACED REVEALS7 E.Q 1' - 2"SPACED REVEALS7 E.Q 1' - 1 1/2"SPACED REVEALS11 E.Q 10 7/8"11"7' - 4"FIRST FLOOR100' -0"T.O. PRECAST -132' -4"T.O. PRECAST136' -0"ABEFHJKMPQCDNF.3F.9GG.8LL.6M.4T.O. PRECAST .121' -0"F.4F.6M.312' - 0"12' - 0"12' - 0"12' - 0"13' - 4"8' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"7' - 4"7' - 4"12' - 0"9' - 6"12' - 0"12' - 0"12' - 0"6' - 6"12' - 0"12' - 0"12' - 0"8' - 4"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"9' - 5" 9' - 5"21' - 11"BUILDING IN FOREGROUND2' - 0"6' - 0"4' - 9"3' - 6"12' - 5"9' - 0 1/2"3' - 4"2' - 0"3' - 4"3' - 4 1/8"8' - 3"1' - 8 1/4"1' - 7 3/4"4' - 3 5/8" 3' - 4"10' - 11"12' - 11"8' - 3"6' - 4"8' - 3"3' - 4"3' - 4"3' - 4"6' - 6 3/8"5' - 6"12' - 0"3' - 2"1' - 4 1/2"8' - 10 1/2"11"32' - 4"11' - 8"SPACED REVEALS21 E.Q 9 3/8"SPACED REVEALS6 E.Q 1' - 0 1/2"SPACED REVEALS7 E.Q 9 3/4"SPACED REVEALS5 E.Q 1' - 2"SPACED REVEALS6 E.Q 1' - 0"8' - 3"L.4L.88' - 3"11' - 8"12' - 0"L.7FIRST FLOOR100' -0"T.O. PRECAST -132' -4"T.O. PRECAST136' -0"ABEFHJKMPCDNF.3F.9GG.8LL.6M.4F.4F.6M.336' - 11"5"11' - 7"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"26' - 10"12' - 0"12' - 0"12' - 0"12' - 0"5' - 8"6' - 4"12' - 0"12' - 0"12' - 0"12' - 0"7' - 4"7' - 4"12' - 0"12' - 0"12' - 0"12' - 0"10" 11' - 2" 12' - 0" 12' - 0" 12' - 0" 9' - 4" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0"33' - 3"BUILDING IN FOREGROUND10' - 11"12' - 0" 14' - 10" 4' - 9 3/4"7' - 2 1/4"8' - 11 1/4"3' - 0 3/4"5' - 0 3/4"6' - 11 1/4"3' - 10 7/8"3' - 4"4' - 9 1/8"7' - 4"21' - 5"10' - 11"4' - 4"3' - 11"6' - 0"1' - 6 3/8" 2' - 7 5/8"12' - 0"1' - 8"4"5' - 8"1' - 8"8"6' - 0"8"4' - 2"3' - 11"4' - 4"3' - 11"4' - 4"3' - 11"8"4' - 0"12' - 4"10' - 11"11"SPACED REVEALS7 E.Q 1' - 2"L.4L.8L.7FIRST FLOOR100' -0"T.O. PRECAST -132' -4"33' - 3"4' - 0"4' - 0"4' - 0" REVEAL TYP.11 E.Q 1' - 0"12' - 0"11"7' - 4"6' - 8"14' - 11"Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/16" = 1'-0"ELEVATIONS -PRECASTPANELSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A4.510/13/2023220025.00C2023-151/16" = 1'-0"1NORTH PRECAST -OVERALL1/16" = 1'-0"2SOUTH PRECAST -OVERALL1/16" = 1'-0"3EAST PRECAST -OVERALL1/16" = 1'-0"4WEST PRECAST -OVERALL1/16" = 1'-0"5PRECAST PANEL 12'-0 @ 4'-0" INCREMENT TYP. PANEL10/04/2023BID DOCUMENT SET FIRST FLOOR100' -0"T.O. PRECAST136' -0"34512' - 0" 12' - 0" 12' - 0"4' - 6" 7' - 6"5' - 1"36' - 11"31' - 10"6' - 3" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 9' - 7"3' - 4" 3' - 5"8' - 6"8' - 3"10' - 11"11"8' - 3"FIRST FLOOR100' -0"T.O. PRECAST136' -0"3458' - 0" 8' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 9' - 7" 9' - 7" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 7' - 10" 8' - 0"36' - 11"6' - 0"16' - 6"12' - 0"16' - 6"6' - 0"12' - 0"6' - 4"8' - 4"8' - 4"6' - 4"16' - 6"6' - 0"12' - 0"16' - 6"6' - 0"12' - 0"4"6' - 4"7' - 4"5' - 2"8' - 4"7' - 4"5' - 2"8' - 4"3' - 10"1' - 1" 6"3' - 4"3' - 10"1' - 1" 6"3' - 4"4' - 2"7' - 4"13' - 6"1' - 0"1"6' - 4"FIRST FLOOR100' -0"PQT.O. PRECAST .121' -0"9' - 5" 9' - 5"21' - 11"11"8' - 3"6' - 8"14' - 11"FIRST FLOOR100' -0"PQT.O. PRECAST .121' -0"9' - 0" 9' - 0"17' - 5"11"4' - 6"FIRST FLOOR100' -0"EFHJKF.3F.9GG.8LT.O. PRECAST .121' -0"F.4F.612' - 0"12' - 0"12' - 0"7' - 0"6' - 11"11' - 7 1/2"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 4 1/2"21' - 11"2' - 8"11"11' - 7 1/2"5' - 9"10' - 11"MATCH EXISTING HEIGHT OF PRECAST SEE WALL SECTION ON 6.5 AND DETAILS ON 7.1FIRST FLOOR100' -0"T.O. PRECAST .121' -0"13' - 8" 12' - 0"21' - 11"11"2' - 4"3' - 4"8' - 3"FIRST FLOOR100' -0"T.O. PARAPET123' -4"3411' - 8" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 7' - 0" 12' - 0" 12' - 0" 7' - 0" 12' - 0" 12' - 0" 7' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 11' - 8"31' - 6 7/8"10' - 5"10' - 5"10' - 5"7' - 5"10' - 5"10' - 5"7' - 3 7/8"11"7' - 5"7' - 5"7' - 5"7' - 5"7' - 5"10' - 5"FIRST FLOOR100' -0"PQT.O. PRECAST .121' -0"9' - 5"9' - 5"21' - 11"11"FIRST FLOOR100' -0"T.O. LOW WALL116' -6"BEKMCDLL.63' - 6" 12' - 0" 12' - 0" 12' - 0" 9' - 4" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 141' - 4 1/2" 5' - 3 1/2" 10' - 6"12' - 0" 12' - 0" 8' - 0" 12' - 4" 12' - 0" 10' - 11 1/2"18' - 3"11"10"8' - 3"2' - 1 5/8"6' - 4"10 3/8" 3' - 6 1/4"6' - 4"2' - 1 3/4"6' - 6" 4' - 0" 8' - 0" 4' - 0"12' - 11"8' - 3"5' - 2"3' - 10"3' - 0"8' - 3"6"8' - 6" 3' - 4"L.4L.8L.7Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/16" = 1'-0"ELEVATIONS -PRECASTPANELSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A4.610/13/2023220025.00C2023-151/16" = 1'-0"1NORTH INTERIOR PRECAST -MULTI-PURPOSE AREA1/16" = 1'-0"2NORTH INTERIOR PRECAST -MERCYHEALTH ARENA1/16" = 1'-0"3EAST PRECAST -METER/RISER AND ELEC1/16" = 1'-0"4EAST PRECAST -ELEC1/16" = 1'-0"6N/A1/16" = 1'-0"5EAST PRECAST -MALL CONNECTION1/16" = 1'-0"7SOUTH PRECAST -METER/RISER AND ELEC1/16" = 1'-0"8SOUTH PRECAST -MULTI-USE CONVENTION SPACE1/16" = 1'-0"9WEST PRECAST -METER/RISER AND ELEC1/16" = 1'-0"10EAST PRECAST -SERVICE AREA10/04/2023BID DOCUMENT SET T e c t o n i c C o p y r i g h t 2 0 0 7 T e c t o n i c C o p y r i g h t 2 0 0 7 FIRST FLOOR100' -0"T.O. PARAPET123' -4"T.O. PARAPET -ENTRY128' -0"T.O. PRECAST -132' -4"4 A5.03 A5.0AEFHP A6.03 A6.04 A6.05117' - 4" 10" 109' - 10"2 A5.1F.3G.8MEZZANINEFLOOR LEVEL112' -6"80" DEEP RF FRAMING60" DEEP RF FRAMING/4'-9" SLOPE96" DEEP RF FRAMING/3'-4" SLOPEDECK BRG28' - 5 1/2"32' - 4"11"386' - 0"79' - 0" 79' - 0"DECK BRG34' - 7"54' - 6"54' - 6"21' - 9 1/4"55555555B32 SCOPE OF WORKB32 SCOPE OF WORKCLEAR TO B.O. STRUCT.23' - 0 9/16"9' - 7 7/8"6' - 2"3' - 10"CLEAER TO B.O. STRUCT.27' - 1" A5.629090CLEAR TO B.O. STRUCT.24' - 11 1/4"FIRST FLOOR100' -0"T.O. PARAPET123' -4"1 A5.14 A5.0FPCDN A6.012 A5.1 A6.02 A6.01F.3F.9GG.8 A6.02OPPT.O. PRECAST .121' -0"OPP28' - 0" 24' - 5" 12' - 0" 44' - 4" 26' - 10" 16' - 7 1/2" 10 1/4"2' - 6"320' - 3"L.8L.760' - 7"104' - 1 1/4"34' - 6"FIRST FLOOR100' -0"T.O. PRECAST -132' -4"2 A5.01234 A6.13 A6.14 A6.12T.O. PRECAST .121' -0"20' - 3 1/2" 28' - 0" 188' - 4"236' - 7 1/2"17' - 4"FIRST FLOOR100' -0"T.O. PARAPET123' -4"T.O. PRECAST -132' -4"T.O. PRECAST136' -0"2 A5.01 A5.01234587 A6.21 A6.235.87.29 A6.22CLEAR14' - 8"55B32 SCOPE OF WORK20' - 3 1/2" 28' - 0" 188' - 4" 30' - 8" 26' - 6" 8' - 0" 2' - 11" 12' - 11" 11' - 4 1/2"5510' - 0"329' - 0"C6C6C6C6SECTION PLAN LEGENDPLEXI ON ICE RINK WALL- B32 B32 SCOPE OF WORKNE SESWNWBUILDING DIAGRAMNOT TO SCALEConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedBUILDING SECTIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A5.010/13/2023220025.00C2023-151/16" = 1'-0"2BUILDING SECTION THROUGH MULTI-USE CONVENTION SPACE/MULT-PURPOSE AREA & MERCYHEALTH ARENA -EAST1/16" = 1'-0"1BUILDING SECTION THROUGH LOBBIES -SOUTH1/16" = 1'-0"3BUILDING SECTION THROUGH MULTIUSE CONVENTION SPACE -SOUTH1/16" = 1'-0"4BUILDING SECTION THROUGH MULTIPURPOSE AREA -SOUTHKEYNOTES PER SHEET#55 THICKENED CONCRETE SLAB AT ICE RINK EDGE. SEE DETAIL11/A7.290 STADIA SEATING BY PRECASTC6 CEILING MOUNTED MOTORIZED UPWARD SWINGING BASKETBALLHOOP LOCATION. HOOP TO SWING BACKWARDS IN BETWEENJOISTS AND MAINTAIN A 23'-0" CLEAR HEIGHT ABOVE VOLLEYBALLCOURT LINES. FALLS IN THE SCOPE OF FF&E10/04/2023BID DOCUMENT SET T e c t o n i c C o p y r i g h t 2 0 0 7 T e c t o n i c C o p y r i g h t 2 0 0 7 T e c t o nic Cop y r i g h t 2 0 0 7 T e c t o n i c C o p y r i g h t 2 0 0 7 T e c t o n i c C o p y r i g h t 2 0 0 7 T e c t o n i c C o p y r i g h t 2 0 0 7 T e c t o n i c C o p y r i g h t 2 0 0 7 T e c t o nic Cop y r i g h t 2 0 0 7 FIRST FLOOR100' -0"T.O. PARAPET123' -4"T.O. PRECAST136' -0"2 A5.01 A5.01235875.87.2 A6.31 A6.32 A6.33 A6.32SIMOPPMEZZANINEFLOOR LEVEL112' -6"T.O. PRECAST .121' -0"20' - 3 1/2" 28' - 0" 219' - 0" 26' - 6"8' - 0"2' - 11" 12' - 11"317' - 7 1/2"C9FIRST FLOOR100' -0"T.O. PARAPET -ENTRY128' -0"T.O. PRECAST136' -0"2 A5.01 A5.01235875.87.29 A6.34SIMOPP A6.32 A6.35MEZZANINEFLOOR LEVEL112' -6"T.O. PRECAST .121' -0"20' - 3 1/2" 28' - 0" 219' - 0" 26' - 6" 8' - 0"2' - 11"12' - 11" 11' - 4 1/2"329' - 0"55B32 SCOPE OF WORK A6.42SIM A6.15 A5.65SECTION PLAN LEGENDPLEXI ON ICE RINK WALL- B32 B32 SCOPE OF WORKNE SESWNWBUILDING DIAGRAMNOT TO SCALEConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedBUILDING SECTIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A5.110/13/2023220025.00C2023-151/16" = 1'-0"1BUILDING SECTION THROUGH MERCY HEALTH ARENA SUPPORT SPACES -SOUTH1/16" = 1'-0"2BUILDING SECTION THROUGH MERCY HEALTH ARENA -SOUTHKEYNOTES PER SHEET#55 THICKENED CONCRETE SLAB AT ICE RINK EDGE. SEE DETAIL11/A7.2C9 JOIST MOUNTED RADIANT HEATING SYSTEM10/04/2023BID DOCUMENT SET NE SESWNWBUILDING DIAGRAMNOT TO SCALEFIRST FLOOR100' -0"T.O. PRECAST -132' -4"T.O. PRECAST136' -0"2 A5.0345T.O. PRECAST .121' -0"439293929318' - 3" 34' - 0" 21' - 10" 40' - 2" 21' - 10" 52' - 3" 23' - 8" 7' - 0 1/8"11' - 11"1"1' - 6"A.F.F13' - 6"942 A5.53 A5.595188' - 4" 30' - 8" A7.51295954311' - 10"11' - 11"13' - 6"959593959512' - 0"10' - 0"11' - 10"11' - 11"6' - 0"9' - 0"1' - 4"1' - 4"CEILING CLOUD WITH DECORATIVE WOOD LOOK METAL 16" TRIM - TYP. WOOD LOOK CEILING CLOUDS1' - 4"A243 A6.23OPP1' - 4"<CLG 01>1' - 0"5' - 4"3' - 8"COILING DOOR POCKETFIRST FLOOR100' -0"EFLOBBY / LINK155MULTI-USECONVENTIONSPACE1569312' - 6"459892FIRST FLOOR100' -0"EFDLOBBY / LINK155MULTI-USECONVENTIONSPACE156A.F.F11' - 11"95A.F.F9' - 6"11' - 11" 12' - 6"10' - 0"5' - 0"5' - 0"10' - 0"SPONSORVERIFY IN FEILD11' - 4"7' - 0"10' - 0"FIRST FLOOR100' -0"MEZZANINEFLOOR LEVEL112' -6"SPONSOR10' - 0"7' - 0"VERIFY IN FEILD11' - 4"VERIFY IN FEILD11' - 0"2' - 0"4' - 0"8' - 0"SPONSORSPONSORConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedINTERIOR SECTIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A5.510/13/2023220025.00C2023-15KEYNOTES PER SHEET#43 WOOD LOOK METAL WALL PANEL, SEE INTERIORS SHEETS AND10/A9.145 PERMANENT SPORT COURT WALL PADDING- MOUNTED 1' - 0" AFF6' - 0" TALL PADS. PADS LOCATED ON A CORNER SHOULD BEMOUNTED ALIGNED WITH FINISH FLOOR AND UP 7' - 0" AFF92 WOOD LOOK CEILING 8'X2'93 COMPOUND CEILING ACT 2X2 ON MTL. STUD94 ROOF STEEL TRUSS - INSULATION ON 3" METAL DECK - EPDM95 COMPOUND CEILING GWB ON MTL. STUD98 MANUALLY RETRACTABLE ACOUSTIC PARTITION WALL - FILLJOUST SPACE ABOVE WITH ACOUSTIC PANEL TO CREATEACOUSTIC BARRIER WHEN PARTITION WALL IS IN USE.<CLG 01> SUSPENDED ACT SYSTEM1/8" = 1'-0"1ROOM 155 -LOBBY / LINK INTERIOR SECTION1/8" = 1'-0"4ROOM 101 - MAIN LOBBY -NORTH1/8" = 1'-0"3ROOM 155 -LOBBY / LINK SECTION 11/8" = 1'-0"2ROOM 155 -LOBBY / LINK SECTION 21/8" = 1'-0"5MERCYHEALTH ARENA 11/8" = 1'-0"6MERCYHEALTH ARENA 21/8" = 1'-0"7MULTI PURPOSE AREA 11/8" = 1'-0"8MULTI PURPOSE AREA 21/8" = 1'-0"9MULTI USE CONVENTION SPACE10/04/2023BID DOCUMENT SET FIRST FLOOR100' -0"T.O. PRECAST136' -0"5MEZZANINEFLOOR LEVEL112' -6"T.O. PRECAST .121' -0"8"1 1/2"6 1/2"55110FIRST FLOOR100' -0"T.O. PRECAST136' -0"3MEZZANINEFLOOR LEVEL112' -6"8' - 10" 8"1 1/2"8' - 11 1/2"6 1/2"SCOREBOARD TO BE MOUNTED TO MEZZ5510880FIRST FLOOR100' -0"PMEZZANINEFLOOR LEVEL112' -6"2' - 9 1/2"2' - 9"2' - 9"2' - 9"2' - 9"2' - 9" 19' - 4"1" GAPC910311255C9 A7.31 A7.66FIRST FLOOR100' -0"HJKMEZZANINEFLOOR LEVEL112' -6"1" GAP2' - 9 1/2"2' - 9"2' - 9"2' - 9"24' - 10"C955103 A7.31 A7.030HJK2' - 9"2' - 9"2' - 9"2' - 9"19' - 4"55C9 A7.31 A7.030PV ARRAY BY ALLIANT ENERGYT.O. PRECAST136' -0"P A8.952' - 9"2' - 9" 19' - 4"2' - 9"2' - 9" A6.11C955 A7.31Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/4" = 1'-0"MAIN RINK SECTIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A5.610/13/2023220025.00C2023-151/4" = 1'-0"5MERCYHEALTH ARENA SECTION WEST1/4" = 1'-0"4MERCYHEALTH ARENA SECTION EAST1/4" = 1'-0"1MERCYHEALTH ARENA SECTION SOUTH 11/4" = 1'-0"6MERCYHEALTH ARENA NORTH 21/4" = 1'-0"3MERCYHEALTH ARENA SECTION NORTH 11/4" = 1'-0"2MERCYHEALTH ARENA SECTION SOUTH 2KEYNOTES PER SHEET#55 THICKENED CONCRETE SLAB AT ICE RINK EDGE. SEE DETAIL 11/A7.280 BUMPERS PROVIDED BY YOUTH HOCKEY103 SPORTS EQUIPMENT HOOK 66" AFF108 GUARDRAIL @ CONCOURSE SCOREBOARD - SEE DETAIL 2/A7.6110 STANDING DRINK RAIL - SEE DETAIL 6/A7.6112 DRINK RAIL @ ADA SEATING - SEE DETAIL 7/A7.6C9 JOIST MOUNTED RADIANT HEATING SYSTEMDASHER BOAD BEYOND10/04/2023BID DOCUMENT SET FIRST FLOOR100' -0"T.O. PRECAST136' -0"HMEZZANINEFLOOR LEVEL112' -6"5' - 10"5' - 0"7 1/2"1"11' - 11 1/2"55116FIRST FLOOR100' -0"T.O. PRECAST136' -0"56 1/2"8' - 11 1/2"8"8' - 10"1 1/2"55FIRST FLOOR100' -0"31 1/2"8"8' - 10"6 1/2"8' - 11 1/2"5545H7 1/2"1"11' - 11 1/2"55116FIRST FLOOR100' -0"F8 1/2"2"1 1/2"12' - 0 1/2"6' - 4 1/2"RAILING OR STAIRS BEYONDBLEACHER DRAWINGS BY MANUFACTURERSREMOVABLE GUARD RAIL55C9116FIRST FLOOR100' -0"F7' - 0 1/2"8 1/2"2"12' - 0 1/2" GAP1 1/2"RAILING OR STAIRS BEYONDBLEACHER DRAWINGS BY MANUFACTURERS55REMOVABLE GUARD RAILC9116Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/4" = 1'-0"MULTIPURPOSE AREARINK SECTIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A5.710/13/2023220025.00C2023-151/4" = 1'-0"5MULTIPURPOSE AREA -BENCH SECTION1/4" = 1'-0"4MULTIPURPOSE AREA -RINK SECTION EAST1/4" = 1'-0"2MULTIPURPOSE AREA -RINK SECTION WEST1/4" = 1'-0"1MULTIPURPOSE AREA -RINK SECTION SOUTH1/4" = 1'-0"6MULTIPURPOSE AREA -RINK AND FIXED BLEACHER SEATING 21/4" = 1'-0"3MULTIPURPOSE AREA -RINK AND FIXED BLEACHER SEATING 1KEYNOTES PER SHEET#45 PERMANENT SPORT COURT WALL PADDING- MOUNTED 1' - 0" AFF 6' - 0" TALL PADS. PADSLOCATED ON A CORNER SHOULD BE MOUNTED ALIGNED WITH FINISH FLOOR AND UP 7' - 0" AFF55 THICKENED CONCRETE SLAB AT ICE RINK EDGE. SEE DETAIL 11/A7.2116 ROOF MOUNTED PHOTOVOLTAIC ARRAY BY OTHERSC9 JOIST MOUNTED RADIANT HEATING SYSTEM10/04/2023BID DOCUMENT SET CDECK BRG119'-4"TOP OF STUD121'-0"FIRST FLOOR100'-0"10' - 8"10' - 4"WINDOW SILL101'-8"WINDOW HEAD110'-4"1' - 8"9' - 0"8' - 8"1' - 8"21' - 0"8" A7.01016 A7.0 A7.022<COPING 03><EXT WALL 01><WINDOW 01><GRADE 01><FLOOR 01><INSUL 02><FND 01><EXT WALL 05><CLG 01><MEMBRN RF 01><WTRPRFG 02>STUD FACE6 1/4" A7.02FFIRST FLOOR100'-0"DECK BRG130'-11 1/16"+/-DECK BRG130'-10 13/16"+/-TOP OF PRECAST BEYOND136'-0"<MEMBRN RF 06><EXT WALL 03><FLOOR 01><INSUL 03><FTG 01>30' - 10 7/8" ±11"<CLG 02>BLEACHER DRAWINGS BY MANUFACTURER<PCKT 01><CLG 03>F.3FIRST FLOOR100'-0"DECK BRG119'-4"TOP OF STUD134'-6"DECK BRG126'-4"<EXT WALL 02> A7.023<COPING 01><MEMBRN RF 02> A7.024 A7.023SIMOPP8' - 2"7' - 0"19' - 4"PROVIDE 6" STEEL STUD IN EACH STUD SPACE TO SPRAY FOAM INSULATION AGAINST -THICKNESS TO MATCH PERIMETER ROOF INSULATION ABOVE ROOF DECK<MEMBRN RF 02>STUD FACE7 1/4"<EXT WALL 09>34' - 6"<CLG 02>AFIRST FLOOR100'-0"TOP OF PRECAST132'-4"DECK BRG128'-5 1/2"<EXT WALL 03><MEMBRN RF 06><FLOOR 01><SIDEWALK><INSUL 02><FND 01><EXT WALL 05>32' - 4"11"<INSUL 03>3' - 10 1/2"28' - 5 1/2"<COPING 01><PCKT 01><DOOR 05>21' - 1 1/2"7' - 4" A7.130HFIRST FLOOR100'-0"DECK BRG134'-7"TOP OF PRECAST135'-2"MEZZANINE112'-6"DECK BRG133'-2 1/2"TOP OF PRECAST BEYOND136'-0"<MEMBRN RF 06><EXT WALL 03><MEMBRN RF 06>22' - 8"12' - 6"35' - 2"11"<INSUL 03><FLOOR 01><EXT WALL 05> A7.030<PCKT 01><PCKT 01><FLOOR 02><FND 01>Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/2" = 1'-0"WALL SECTIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A6.010/13/2023220025.00C2023-151/2" = 1'-0"1ASHLAR MASONRY WITH STUD BACKUP1/2" = 1'-0"4INSULATED PRECAST WALL PANEL1/2" = 1'-0"2METAL PANEL WALL SYSTEM HVAC SCREEN WALL1/2" = 1'-0"3INSULATED PRECAST WALL PANEL1/2" = 1'-0"5INTERIOR PRECAST WALL PANELKEYNOTES PER SHEET#<CLG 01> SUSPENDED ACT SYSTEM<CLG 02> PREFINISHED ALUMINUM WOOD-LOOK CEILING SYSTEM<CLG 03> 5/8" GYPSUM BOARD & 3 5/8" METAL STUD FRAMING @ 1'-4" O.C.<COPING 01> PREFINISHED ALUMINUM COPING WITH CLEAT ATTACHMENT, 3/4" TREATED PLYWOOD, TREATED 2X6 SHAPED FOR 1 1/2" SLOPE & FILL VOID SOLID W/SPRAYED CLOSED-CELLPOLYURETHANE FOAM INSULATION - SEE WALL SECTIONS FOR THE RESPECTIVE WIDTH<COPING 03> PREFINISHED ALUMINUM FASCIA W/ANCHOR BAR ATTACHMENT, NON-CURING SEALANT, 2X TREATED BLOCKING, WRAP MEMBRANE AROUND BLOCKING ATTACH PERMANUFACTURER'S RECOMMENDATIONS<DOOR 05> PREFINISHED, INSULATED ALUMINUM DOOR & FRAME (FRP)<EXT WALL 01> CONCRETE BRICK (4" X 4" X 16" NOMINAL) IN RUNNING BOND W/MASONRY TIES @ 1'-4" O.C. VERTICAL SPACE, 1 1/2" AIR SPACE, CONTINUOUS 3" SPRAYED CLOSED-CELLPOLYURETHANE FOAM INSULATION (R-18 MINIMUM), 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C., 7/8" HORIZONTAL FURRING @ 1'-4" O.C.VERICALLY & 5/8" GYPSUM BOARD<EXT WALL 02> VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM, 7/8" HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONAL FURRING MAY BE REQUIRED, COORDINATE W/PANEL SYSTEMMANUFACTURER AIR BARRIER, 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 3" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. (ALIGN W/STEEL STUD SPACING), 3" SPRAYEDCLOSED-CELL POLYURETHANE FOAM INSULATION, 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C. & 5/8" GYPSUM BOARD<EXT WALL 03> 10" INSULATED ARCHITECTURAL PRECAST WALL PANEL<EXT WALL 05> 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 2" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. & 2" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION<EXT WALL 09> VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM, 7/8" HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONAL FURRING MAY BE REQUIRED, COORDINATE W/PANEL SYSTEMMANUFACTURER), AIR BARRIER, 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 3" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. (ALIGN W/STEEL STUD SPACING), 5/8" EXTERIORGYPSUM BOARD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C. 5/8" EXTERIOR GYPSUM BOARD SHEATHING, AIR BARRIER, 7/8" HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONALFURRING MAY BE REQUIRED, COORDINATE W/PANEL SYSTEM MANUFACTURER), AIR BARRIER, & VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM<FLOOR 01> REINFORCED CONCRETE SLAB-ON-GRADE FLOOR, MINIMUM 6" COMPACTED GRANULAR FILL<FLOOR 02> CONCRETE FLOOR SYSTEMKEYNOTES PER SHEET#<FND 01> REINFORCED CONCRETE FOOTING AND FOUNDATION SYSTEM<FTG 01> CONCRETE FOOTING<GRADE 01> FINISH GRADE<INSUL 02> 2" RIGID INSULATION DOWN TO TOP OF FOOTING, 4'-0" MINIMUM IF THERE IS NO FOOTING<INSUL 03> 1/2" EXPANSION FELT<MEMBRN RF 01> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), WRAP MEMBRANE AROUND THE SLOPED PLYWOOD & LAP JOINT BETWEEN PLYWOOD & MASONRY 1" MINIMUM - ATTACHPER MANUFACTURER'S RECOMMENDATIONS, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM) AT ROOF DRAIN, TAPERED INSULATION, VAPOR RETARDER (SEALAGAINST VERTICAL SURFACE), ROOF DECK, ANGLE & STRUCTURAL FRAMING- SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATIONAT THE PERIMETER OF ROOF DRAIN LOCATIONS<MEMBRN RF 02> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), EXTEND MEMBRANE 1'-0" MINIMUM VERTICALLY TO TERMINATION BAR (SEAL PER MEMBRANE MANUFACTURER'SREQUIREMENTS), PREFINISHED ALUMINUM FLASHING & COUNTERFLASHING, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM), TAPERED INSULATION, VAPORRETARDER (SEAL AGAINST VERTICAL SURFACE), ROOF DECK & STRUCTURAL FRAMING - SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPEREDINSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<MEMBRN RF 06> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), WRAP MEMBRANE AROUND THE SLOPED PLYWOOD & LAP JOINT BETWEEN PLYWOOD & MASONRY 1" MINIMUM - ATTACHPER MANUFACTURER'S RECOMMENDATIONS, 1/2" COVER BOARD, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM), VAPOR RETARDER (SEAL AGAINST VERTICALSURFACE), 1/2" THERMAL BARRIER, SLOPED ACOUSTICAL ROOF DECK & STRUCTURAL FRAMING - SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THETAPERED INSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<PCKT 01> 2" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION AT EXTERIOR EDGE OF JOIST POCKET, BACK-PATCH FLUSH TO INSIDE FACE OF PRECAST<SIDEWALK> CONCRETE SIDEWALK<WINDOW 01> THERMALLY BROKEN PREFINISHED ALUMINUM STOREFRONT FRAMING SYSTEM WITH 1" INSULATED GLASS, LAP CONCRETE BRICK MASONRY RETURN 1/2" MINIMUM<WTRPRFG 02> WATERPROOFING, PROVIDE MORTAR CANT, LAP FOOTING & LAP JOINT BETWEEN SHEATHING & TOP OF FOUNDATION WALL10/04/2023BID DOCUMENT SET 2FIRST FLOOR100'-0"TOP OF PRECAST117'-4"PRECAST BRG114'-8"14' - 8"2' - 8"11"17' - 4"<COPING 03><EXT WALL 05><FLOOR 01><INSUL 01><INSUL 02><FND 01><GRADE 01><CLG 01><EXT WALL 03><MEMBRN RF 01> A7.1103FIRST FLOOR100'-0"TOP OF PRECAST132'-4"DECK BRGVARIES A7.028<MEMBRN RF 06> A7.029<MEMBRN RF 01><CLG 01>11"32' - 4"<FLOOR 01><INSUL 03><FTG 01><COPING 01>14' - 8"VARIESVARIES<EXT WALL 05>PRECAST BRG114'-8"<FLOOR 01><EXT WALL 03>4FIRST FLOOR100'-0"DECK BRGVARIESTOP OF PRECAST132'-4" A7.028OPP<COPING 01><EXT WALL 05><MEMBRN RF 06><EXT WALL 03><GRADE 01><FND 01><FLOOR 01><INSUL 01><INSUL 02>11"32' - 4"VARIESVARIESPFIRST FLOOR100'-0"MEZZANINE112'-6"TOP OF PRECAST136'-0"DECK BRG131'-3"4' - 9"18' - 9"12' - 6" A7.028OPP36' - 0"11"<MEMBRN RF 06><EXT WALL 05><COPING 01><GRADE 01><EXT WALL 03><FND 01><INSUL 01><FLOOR 01><INSUL 02><PCKT 01><FLOOR 02>12FIRST FLOOR100'-0"WINDOW HEAD116'-4"WINDOW SILL101'-8"DECK BRG126'-0"TOP OF STUD128'-0" A7.022OPP11' - 8"14' - 8"1' - 8"9' - 8"2' - 0" A7.03 A7.0916 A7.0OPP15 A7.0<GRADE 01><FND 01><FLOOR 01><INSUL 02><COPING 03><MEMBRN RF 01><WINDOW 03><EXT WALL 02><WINDOW 03><WTRPRFG 02>STUD FACE7"8"28' - 0"Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/2" = 1'-0"WALL SECTIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A6.110/13/2023220025.00C2023-151/2" = 1'-0"2INSULATED PRECAST WALL PANEL AT BACK OF HOUSE1/2" = 1'-0"3INSULATED PRECAST WALL PANEL1/2" = 1'-0"4INSULATED PRECAST WALL PANELKEYNOTES PER SHEET#<CLG 01> SUSPENDED ACT SYSTEM<COPING 01> PREFINISHED ALUMINUM COPING WITH CLEAT ATTACHMENT, 3/4" TREATED PLYWOOD, TREATED 2X6 SHAPED FOR 1 1/2" SLOPE & FILL VOID SOLID W/SPRAYED CLOSED-CELLPOLYURETHANE FOAM INSULATION - SEE WALL SECTIONS FOR THE RESPECTIVE WIDTH<COPING 03> PREFINISHED ALUMINUM FASCIA W/ANCHOR BAR ATTACHMENT, NON-CURING SEALANT, 2X TREATED BLOCKING, WRAP MEMBRANE AROUND BLOCKING ATTACH PERMANUFACTURER'S RECOMMENDATIONS<EXT WALL 02> VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM, 7/8" HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONAL FURRING MAY BE REQUIRED, COORDINATE W/PANEL SYSTEMMANUFACTURER AIR BARRIER, 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 3" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. (ALIGN W/STEEL STUD SPACING), 3" SPRAYEDCLOSED-CELL POLYURETHANE FOAM INSULATION, 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C. & 5/8" GYPSUM BOARD<EXT WALL 03> 10" INSULATED ARCHITECTURAL PRECAST WALL PANEL<EXT WALL 05> 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 2" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. & 2" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION<FLOOR 01> REINFORCED CONCRETE SLAB-ON-GRADE FLOOR, MINIMUM 6" COMPACTED GRANULAR FILL<FLOOR 02> CONCRETE FLOOR SYSTEM<FND 01> REINFORCED CONCRETE FOOTING AND FOUNDATION SYSTEM<FTG 01> CONCRETE FOOTING<GRADE 01> FINISH GRADE<INSUL 01> 1/2" RIGID INSULATION FOR THERMAL CONTINUITY THROUGH CONCRETE FLOOR SLAB<INSUL 02> 2" RIGID INSULATION DOWN TO TOP OF FOOTING, 4'-0" MINIMUM IF THERE IS NO FOOTING<INSUL 03> 1/2" EXPANSION FELT<MEMBRN RF 01> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), WRAP MEMBRANE AROUND THE SLOPED PLYWOOD & LAP JOINT BETWEEN PLYWOOD & MASONRY 1" MINIMUM - ATTACHPER MANUFACTURER'S RECOMMENDATIONS, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM) AT ROOF DRAIN, TAPERED INSULATION, VAPOR RETARDER (SEALAGAINST VERTICAL SURFACE), ROOF DECK, ANGLE & STRUCTURAL FRAMING- SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATIONAT THE PERIMETER OF ROOF DRAIN LOCATIONS<MEMBRN RF 06> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), WRAP MEMBRANE AROUND THE SLOPED PLYWOOD & LAP JOINT BETWEEN PLYWOOD & MASONRY 1" MINIMUM - ATTACHPER MANUFACTURER'S RECOMMENDATIONS, 1/2" COVER BOARD, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM), VAPOR RETARDER (SEAL AGAINST VERTICALSURFACE), 1/2" THERMAL BARRIER, SLOPED ACOUSTICAL ROOF DECK & STRUCTURAL FRAMING - SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THETAPERED INSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<PCKT 01> 2" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION AT EXTERIOR EDGE OF JOIST POCKET, BACK-PATCH FLUSH TO INSIDE FACE OF PRECAST<WINDOW 03> THERMALLY BROKEN PREFINISHED ALUMINUM CURTAINWALL FRAMING SYSTEM WITH 1" INSULATED GLASS<WTRPRFG 02> WATERPROOFING, PROVIDE MORTAR CANT, LAP FOOTING & LAP JOINT BETWEEN SHEATHING & TOP OF FOUNDATION WALL1/2" = 1'-0"1INSULATED PRECAST WALL PANEL AT LOW END OF ROOF SLOPE1/2" = 1'-0"5WINDOW IN VERTICAL ALUM PANEL/MASONRY CLAD WALL10/04/2023BID DOCUMENT SET 3FIRST FLOOR100'-0"DECK BRG114'-8"TOP OF PRECAST136'-0"DECK BRGVARIES11"36' - 0" A7.028<COPING 01><EXT WALL 03>VARIESVARIES14' - 8"<EXT WALL 05><MEMBRN RF 06><MEMBRN RF 01> A7.029<FLOOR 01><INSUL 03><PCKT 01>5FIRST FLOOR100'-0"TOP OF PRECAST136'-0"DECK BRGVARIESDECK BRG125'-4"3' - 0"4' - 2"18' - 2"VARIESVARIESBL SILL103'-0"BL HEAD107'-2" A7.028OPP<COPING 01><MEMBRN RF 05><MEMBRN RF 03><EXT WALL 03>11"36' - 0"<INSUL 03><FLOOR 01><FTG 01><WINDOW 02><EXT WALL 05> A7.029OPP<PCKT 01> A7.02626 A7.0SIM A7.026SIM89FIRST FLOOR100'-0"TOP OF STUD134'-6"SOFFIT /WINDOW HEAD116'-4"DECK BRG125'-4"CANOPY/WINDOW HEAD110'-2"TOP OF STUD112'-5"<COPING 01> A7.027<COPING 02><MEMBRN RF 04><SOFFIT 01> A7.07 A7.013 A7.113<CONC STOOP><SIDEWALK><INSUL 02><WINDOW 01><WINDOW 01><DOOR 04><DOOR 04><FLOOR 01> A7.02312' - 11" 4"DECK BRG111'-5"6' - 3"STUD FACE6"1' - 0"1' - 3"9' - 2"9' - 0"3' - 11"2' - 3"FASCIA SYSTEM FRAMING TO OVERLAP VERTICAL WALL SYSTEM 8"+/- THEN RETURN TO WALLSTUD FACE8"4 A6.21 A6.4<EXT WALL 07><MEMBRN RF 02>BACKLIT SIGN18' - 2"16' - 4"12' - 11"<EXT WALL 04>18' - 9"<CLG 02>16 A7.0 A7.019<INSUL 04>(TYP)STUD FACE6"SIMOPP15 A7.0SIM<BOX HDR 02>5/8" GYPSUM BOARD, 6" STEEL STUD FRAMING @ 1'-4" O.C. & 5/8" GYPSUM BOARD A7.1934' - 6"<INSUL 05>14 A7.1 A10.218<FND 01>F.9FIRST FLOOR100'-0"DECK BRG125'-4"TOP OF STUD134'-6"34' - 6"8"9' - 2"19' - 4"6' - 0"TOP OF MASONRY106'-0" A7.025<COPING 01> A7.022SIMOPP<EXT WALL 01><FND 01><EXT WALL 06><MEMBRN RF 02> A7.023SIMOPP<INSUL 02><GRADE 01>PROVIDE 6" STEEL STUD IN EACH STUD SPACE TO SPRAY FOAM INSULATION AGAINST -THICKNESS TO MATCH PERIMETER ROOF INSULATION ABOVE ROOF DECK A7.024OPP<CLG 02><WTRPRFG 02><EXT WALL 09>Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/2" = 1'-0"WALL SECTIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A6.210/13/2023220025.00C2023-151/2" = 1'-0"1INSULATED PRECAST WALL PANEL1/2" = 1'-0"2INSULATED PRECAST WALL PANEL1/2" = 1'-0"3VESTIBULE 100 SECTIONKEYNOTES PER SHEET#<BOX HDR 02> BOX HEADER<CLG 02> PREFINISHED ALUMINUM WOOD-LOOK CEILING SYSTEM<CONC STOOP> POURED CONCRETE SLAB-ON-GRADE (1/4" PER FOOT SLOPE )W/FOUNDATION WALLS 4'-0" DEEP MINIMUM UNLESS NOTED OTHERWISE<COPING 01> PREFINISHED ALUMINUM COPING WITH CLEAT ATTACHMENT, 3/4" TREATED PLYWOOD, TREATED 2X6 SHAPED FOR 1 1/2" SLOPE & FILL VOID SOLID W/SPRAYED CLOSED-CELL POLYURETHANE FOAMINSULATION - SEE WALL SECTIONS FOR THE RESPECTIVE WIDTH<COPING 02> PREFINISHED ALUMINUM GRAVEL STOP W/CLEAT ATTACHMENT, 2X TREATED BLOCKING, WRAP MEMBRANE AROUND BLOCKING ATTACH PER MANUFACTURER'S RECOMMENDATIONS<DOOR 04> PREFINISHED ALUMINUM MEDIUM STYLE DOOR WITH 1" INSULATED FULL GLASS<EXT WALL 01> CONCRETE BRICK (4" X 4" X 16" NOMINAL) IN RUNNING BOND W/MASONRY TIES @ 1'-4" O.C. VERTICAL SPACE, 1 1/2" AIR SPACE, CONTINUOUS 3" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION(R-18 MINIMUM), 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C., 7/8" HORIZONTAL FURRING @ 1'-4" O.C. VERICALLY & 5/8" GYPSUM BOARD<EXT WALL 03> 10" INSULATED ARCHITECTURAL PRECAST WALL PANEL<EXT WALL 04> 1/8" THICK PREFINISHED PERFORATED ALUMINUM PANEL, 2" LONG STAINLESS STEEL OR ALUMINUM HOLLOW SPACER FOR PERFORATED ALUMINUM PANEL FASTENER TO FIT THROUGH - FASTENER TYPEEQUALLY SPACED HORIZONTALLY AND VERTICALLY DETERMINED BY STRUCTURAL ENGINEER, PREFINISHED ALUMINUM PANEL, AIR BARRIER, FIRE-TREATED 5/8" PLYWOOD SHEATHING, 6" STEEL STUDFRAMING @ 1'-4" O.C., 5/8" EXTERIOR GYPSUM BOARD SHEATHING, AIR BARRIER & VERTICAL FLUSH PREFINISHED ALUMINUM PANEL SYSTEM<EXT WALL 05> 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 2" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. & 2" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION<EXT WALL 06> VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM, 7/8" EXTERIOR GRADE HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONAL FURRING MIGHT BE REQUIRED, COORDINATE W/PANEL MANUFACTURER), AIRBARRIER, 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 3" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C., 3" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION, 5/8" EXTERIOR GYPSUM BOARDSHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C., & 5/8" GYPSUM BOARD<EXT WALL 07> 6" STEEL STUD FRAMING @ 1'-4" O.C., 5/8" EXTERIOR GYPSUM BOARD SHEATHING & 3" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION<EXT WALL 09> VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM, 7/8" HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONAL FURRING MAY BE REQUIRED, COORDINATE W/PANEL SYSTEM MANUFACTURER), AIR BARRIER, 5/8"EXTERIOR GYPSUM BOARD SHEATHING, 3" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. (ALIGN W/STEEL STUD SPACING), 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C.5/8" EXTERIOR GYPSUM BOARD SHEATHING, AIR BARRIER, 7/8" HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONAL FURRING MAY BE REQUIRED, COORDINATE W/PANEL SYSTEM MANUFACTURER), AIRBARRIER, & VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM<FLOOR 01> REINFORCED CONCRETE SLAB-ON-GRADE FLOOR, MINIMUM 6" COMPACTED GRANULAR FILL<FND 01> REINFORCED CONCRETE FOOTING AND FOUNDATION SYSTEM<FTG 01> CONCRETE FOOTING<GRADE 01> FINISH GRADE<INSUL 02> 2" RIGID INSULATION DOWN TO TOP OF FOOTING, 4'-0" MINIMUM IF THERE IS NO FOOTING<INSUL 03> 1/2" EXPANSION FELT<INSUL 04> SPRAY 1" THICK MINIMUM CLOSED-CELL POLYURETHANE FOAM INSULATION ON 1'-6" EXTERIOR/INTERIOR LENGTH OF THE WIDE FLANGE STEEL BEAM, PROVIDE PERIMETER 1/2" SOFT JOINT (SEALANTW/BACKER ROD) AROUND THE INTERIOR/EXTERIOR STEEL FRAMING PENETRATIONS - TYPICALKEYNOTES PER SHEET#<INSUL 05> FILL INTERIOR SIDE OF DECK FLUTES FULL FOR PARTITION WIDTH & LENGTH OF EXTERIOR PARTITION WALL W/SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION<JOINT 02 TYP.><MEMBRN RF 01> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), WRAP MEMBRANE AROUND THE SLOPED PLYWOOD & LAP JOINT BETWEEN PLYWOOD & MASONRY 1" MINIMUM - ATTACH PER MANUFACTURER'SRECOMMENDATIONS, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM) AT ROOF DRAIN, TAPERED INSULATION, VAPOR RETARDER (SEAL AGAINST VERTICAL SURFACE), ROOF DECK, ANGLE& STRUCTURAL FRAMING- SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<MEMBRN RF 02> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), EXTEND MEMBRANE 1'-0" MINIMUM VERTICALLY TO TERMINATION BAR (SEAL PER MEMBRANE MANUFACTURER'S REQUIREMENTS), PREFINISHEDALUMINUM FLASHING & COUNTERFLASHING, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM), TAPERED INSULATION, VAPOR RETARDER (SEAL AGAINST VERTICAL SURFACE), ROOF DECK& STRUCTURAL FRAMING - SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<MEMBRN RF 03> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), 1/2" POLYISOCYANURATE COVER BOARD, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM), VAPOR RETARDER (SEAL AGAINSTVERTICAL SURFACE) & SLOPED ROOF DECK (1/4" PER FOOT) & STRUCTURAL FRAMING - SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATION AT THE PERIMETEROF ROOF DRAIN LOCATIONS<MEMBRN RF 04> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), TAPERED POLYISOCYANURATE ROOF INSULATION (1" MINIMUM THICKNESS AT ROOF DRAIN, VAPOR RETARDER (SEAL AGAINST VERTICAL SURFACE)& ROOF STRUCTURAL FRAMING - EXTEND MEMBRANE 1'-0" MINIMUM VERTICALLY TO TERMINATION BAR LAP MEMBRANE AROUND BLOCKING, LAP JOINT BETWEEN PLYWOOD & PANEL SYSTEM & ATTACHPER MANUFACTURER'S RECOMMENDATIONS, ROOF DECK & STRUCTURAL FRAMING<MEMBRN RF 05> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM), TAPERED INSULATION, VAPOR RETARDER (SEAL AGAINST VERTICAL SURFACE),ROOF DECK & STRUCTURAL FRAMING - EXTEND MEMBRANE 1'-0" MINIMUM VERTICALLY TO TERMINATION BAR, SEAL ATTACHMENT (SEAL PER MEMBRANE MANUFACTURER'S REQUIREMENTS) & PROVIDECONTINUOUS SEALANT BEAD AT THE TOP OF THE TERMINATION BAR - SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATION AT THE PERIMETER OF ROOF DRAINLOCATIONS<MEMBRN RF 06> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), WRAP MEMBRANE AROUND THE SLOPED PLYWOOD & LAP JOINT BETWEEN PLYWOOD & MASONRY 1" MINIMUM - ATTACH PER MANUFACTURER'SRECOMMENDATIONS, 1/2" COVER BOARD, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM), VAPOR RETARDER (SEAL AGAINST VERTICAL SURFACE), 1/2" THERMAL BARRIER, SLOPEDACOUSTICAL ROOF DECK & STRUCTURAL FRAMING - SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<PCKT 01> 2" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION AT EXTERIOR EDGE OF JOIST POCKET, BACK-PATCH FLUSH TO INSIDE FACE OF PRECAST<SIDEWALK> CONCRETE SIDEWALK<SOFFIT 01> SUSPENDED PREFINISHED ALUMINUM VENTED PANEL SYSTEM (12" WIDE, ALIGN JOINTS W/FASCIA JOINTS), 7/8" FURRING @ 1'-4" O.C. & 1 1/2" CHANNELS @ 4'-0" O.C. - VERIFY SPACING OF SUPPORTFRAMING W/PANEL MANUFACTURER<WINDOW 01> THERMALLY BROKEN PREFINISHED ALUMINUM STOREFRONT FRAMING SYSTEM WITH 1" INSULATED GLASS, LAP CONCRETE BRICK MASONRY RETURN 1/2" MINIMUM<WINDOW 02> BORROWED LITE, 1/4" GLASS SET INTO HOLLOW METAL FRAME<WTRPRFG 02> WATERPROOFING, PROVIDE MORTAR CANT, LAP FOOTING & LAP JOINT BETWEEN SHEATHING & TOP OF FOUNDATION WALL1/2" = 1'-0"4VESTIBULE 100 INSULATED WALL SYSTEM10/04/2023BID DOCUMENT SET 1EXISTING NEW ADDITION14' - 8"<ROOF 01><EXT WALL 03><FLOOR 01><FND 01>1' - 7"1' - 8"EXISTING FOUNDATION SYSTEM. VERIFY IN FIELD EXACT CONDITIONS AND SIZES.DOWEL NEW FOUNDATION INTO EXISTING. SEE STRUCTURAL.PRECAST BRG114'-8"FIRST FLOOR100'-0" A7.14<EXT WALL 03>D5b2"2"2 5/8" 10" 4"TOP OF PRECAST126'-8"1' - 0"25' - 0"1' - 8"2" A7.029<EXIST 01><EXIST 01>3FIRST FLOOR100'-0"TOP OF PRECAST136'-0"MEZZANINE112'-6"DECK BRGVARIES A7.028PRECAST BRG114'-8"<COPING 01><MEMBRN RF 06><MEMBRN RF 02> A7.0294' - 0"36' - 0"VARIESVARIES2' - 2"12' - 6"1' - 0"<FLOOR 01><FLOOR 02><PCKT 01><EXT WALL 03>ICE PIT SLAB96'-0"<INSUL 03><FND 01>SEALANT W/BACKER RODCONFIRM ICE PIT FINISH W/ICE RINK CONSULTANTCOVERED DUMPSTER AREA8FIRST FLOOR100'-0"TOP OF STUD123'-4"WINDOW SILL101'-8"WINDOW HEAD116'-4"DECK BRG119'-4"<COPING 01><EXT WALL 01><WINDOW 01><GRADE 01><FLOOR 01><INSUL 02>2' - 4"14' - 8"3' - 0"4' - 0"24' - 0"TOP OF GIRT110'-6" A7.04OPPOPP A7.010 A7.022OPP16 A7.0OPP<EXT WALL 05>GRID LINE & DECK DIRECTION ARE DIFFERENT AT SIM CONDITION<MEMBRN RF 01><GIRT 01> A7.49<WTRPRFG 02><FND 01>STUD FACE8"2FIRST FLOOR100'-0"TOP OF PRECAST117'-4"PRECAST BRG114'-8"2' - 8"7' - 4"7' - 3 7/8"<MEMBRN RF 02><COPING 01><EXT WALL 03><FLOOR 01>17' - 4" A7.028<INSUL 02><FND 01><THRSHLD><CONC STOOP><INSUL 03><DOOR 05> A10.218 A10.25 A10.245FIRST FLOOR100'-0"MEZZANINE112'-6"TOP OF PRECAST136'-0"DECK BRG119'-4"DECK BRGVARIES A7.028OPP A7.029OPPVARIESVARIES6' - 10"12' - 6"36' - 0"<COPING 01><MEMBRN RF 06><EXT WALL 03><MEMBRN RF 02><FLOOR 02>Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/2" = 1'-0"WALL SECTIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A6.310/13/2023220025.00C2023-151/2" = 1'-0"1NEW MASONRY WALL AT EXISTING WALL SYSTEM1/2" = 1'-0"2INSULATED PRECAST WALL PANEL1/2" = 1'-0"3STOREFRONT WINDOW SYSTEM1/2" = 1'-0"4DOOR SYSTEM IN PRECAST PANEL1/2" = 1'-0"5INSULATED PRECAST WALL PANEL AT LOW ROOFKEYNOTES PER SHEET#<CONC STOOP> POURED CONCRETE SLAB-ON-GRADE (1/4" PER FOOT SLOPE )W/FOUNDATION WALLS 4'-0" DEEP MINIMUM UNLESS NOTED OTHERWISE<COPING 01> PREFINISHED ALUMINUM COPING WITH CLEAT ATTACHMENT, 3/4" TREATED PLYWOOD, TREATED 2X6 SHAPED FOR 1 1/2" SLOPE & FILL VOID SOLID W/SPRAYED CLOSED-CELL POLYURETHANE FOAMINSULATION - SEE WALL SECTIONS FOR THE RESPECTIVE WIDTH<DOOR 05> PREFINISHED, INSULATED ALUMINUM DOOR & FRAME (FRP)<EXIST 01> EXISTING CONSTRUCTION TO REMAIN. VERIFY IN FIELD THE EXACT CONDITIONS, HEIGHTS, DIMENSIONS AND MAKE UP OF CONSTRUCTION. CONTRACTOR RESPONSIBLE FOR REPAIR & REPLACEMENTOF EXISTING MALL ROOFING TO MATCH EXISTING CONDITIONS AFTER DEMO AND NEW SCOPE OF WORK IS COMPLETED<EXT WALL 01> CONCRETE BRICK (4" X 4" X 16" NOMINAL) IN RUNNING BOND W/MASONRY TIES @ 1'-4" O.C. VERTICAL SPACE, 1 1/2" AIR SPACE, CONTINUOUS 3" SPRAYED CLOSED-CELL POLYURETHANE FOAMINSULATION (R-18 MINIMUM), 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C., 7/8" HORIZONTAL FURRING @ 1'-4" O.C. VERICALLY & 5/8" GYPSUM BOARD<EXT WALL 03> 10" INSULATED ARCHITECTURAL PRECAST WALL PANEL<EXT WALL 05> 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 2" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. & 2" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION<FLOOR 01> REINFORCED CONCRETE SLAB-ON-GRADE FLOOR, MINIMUM 6" COMPACTED GRANULAR FILL<FLOOR 02> CONCRETE FLOOR SYSTEM<FND 01> REINFORCED CONCRETE FOOTING AND FOUNDATION SYSTEM<GIRT 01> TUBE STEEL GIRT (PAINT)<GRADE 01> FINISH GRADE<INSUL 02> 2" RIGID INSULATION DOWN TO TOP OF FOOTING, 4'-0" MINIMUM IF THERE IS NO FOOTINGKEYNOTES PER SHEET#<INSUL 03> 1/2" EXPANSION FELT<MEMBRN RF 01> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), WRAP MEMBRANE AROUND THE SLOPED PLYWOOD & LAP JOINT BETWEEN PLYWOOD & MASONRY 1" MINIMUM - ATTACH PER MANUFACTURER'SRECOMMENDATIONS, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM) AT ROOF DRAIN, TAPERED INSULATION, VAPOR RETARDER (SEAL AGAINST VERTICAL SURFACE), ROOF DECK,ANGLE & STRUCTURAL FRAMING- SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<MEMBRN RF 02> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), EXTEND MEMBRANE 1'-0" MINIMUM VERTICALLY TO TERMINATION BAR (SEAL PER MEMBRANE MANUFACTURER'S REQUIREMENTS), PREFINISHEDALUMINUM FLASHING & COUNTERFLASHING, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM), TAPERED INSULATION, VAPOR RETARDER (SEAL AGAINST VERTICAL SURFACE), ROOFDECK & STRUCTURAL FRAMING - SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<MEMBRN RF 06> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), WRAP MEMBRANE AROUND THE SLOPED PLYWOOD & LAP JOINT BETWEEN PLYWOOD & MASONRY 1" MINIMUM - ATTACH PER MANUFACTURER'SRECOMMENDATIONS, 1/2" COVER BOARD, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM), VAPOR RETARDER (SEAL AGAINST VERTICAL SURFACE), 1/2" THERMAL BARRIER, SLOPEDACOUSTICAL ROOF DECK & STRUCTURAL FRAMING - SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<PCKT 01> 2" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION AT EXTERIOR EDGE OF JOIST POCKET, BACK-PATCH FLUSH TO INSIDE FACE OF PRECAST<ROOF 01> FULLY ADHERED ROOF MEMBRANE SYSTEM, TAPERED RIGID POLYISOCYANURATE INSULATION, PRECAST CONCRETE PLANK. SEE STRUCTURAL AND ROOF PLAN.<THRSHLD> ALUMINUM THRESHOLD SET ONTO SEALANT BED<WINDOW 01> THERMALLY BROKEN PREFINISHED ALUMINUM STOREFRONT FRAMING SYSTEM WITH 1" INSULATED GLASS, LAP CONCRETE BRICK MASONRY RETURN 1/2" MINIMUM<WTRPRFG 02> WATERPROOFING, PROVIDE MORTAR CANT, LAP FOOTING & LAP JOINT BETWEEN SHEATHING & TOP OF FOUNDATION WALL10/04/2023BID DOCUMENT SET M.4FIRST FLOOR100'-0"TOP OF STUD128'-0"DECK BRG126'-0"WINDOW HEAD/SOFFIT116'-4"WINDOW HEAD/SOFFIT110'-2"TOP OF STUD111'-10"DECK BRG111'-1"4 A6.48"4"9"11"28' - 0"11' - 8"6' - 2"10' - 2"2' - 0"9' - 8"4' - 6"1' - 8"4' - 2"6' - 0"M.37' - 9 1/8"STUD FACE9' - 2 7/8"STUD FACE7 1/8"STUD FACE3' - 0"BACKLIT SIGN<EXT WALL 04> A7.07 A7.013SIM15 A7.0 A7.027 A7.113 A7.19SIM16 A7.0SIMSIMOPP<MEMBRN RF 01><EXT WALL 07>5/8" GYPSUM BOARD, 6" STEEL STUD FRAMING @ 1'-4" O.C. & 5/8" GYPSUM BOARD<WINDOW 01><DOOR 04><FLOOR 01><FND 01><INSUL 02><SOFFIT 01><WINDOW 01><COPING 02><MEMBRN RF 04><SOFFIT 01><DOOR 04><CONC STOOP><SIDEWALK><INSUL 05> A7.218<CLIP ANGLE> A10.218LFIRST FLOOR100'-0"TOP OF STUD128'-0"DECK BRG119'-4"DECK BRG126'-0"6' - 8"19' - 4"<MEMBRN RF 01> A7.03OPP<COPING 03><MEMBRN RF 02><FLOOR 01><EXT WALL 02> A7.023STUD FACE9 1/4"<CLIP ANGLE>77.2FIRST FLOOR100'-0"TOP OF STUD128'-0"DECK BRG119'-4"DECK BRG126'-0" A7.024WINDOW HEAD/SOFFIT110'-2"DECK BRG111'-1"28' - 0"<EXT WALL 12><EXT WALL 13><SIDEWALK><FND 01><WTRPRFG 02><COPING 01><MEMBRN RF 02>SIM<FLOOR 01><INSUL 01><INSUL 02> A7.022SIMSTUD FACE1' - 2"STUS FACE7"6" STEEL STUD FRAMING @ 1'-4" O.C. A7.0236' - 0"5' - 2"1' - 0"4' - 2"3' - 0"8' - 8" A7.023<FASCIA 02><SOFFIT 01> A7.123SIMM6<CLG 01>F.9FIRST FLOOR100'-0"TOP OF STUD134'-6"DECK BRG125'-4" A7.023SIM<COPING 01>CANOPY110'-2"CONCRETE BRICK106'-0"<MEMBRN RF 02> A7.024OPP<EXT WALL 09>9' - 2"9' - 0 5/8"10' - 3 3/8"28' - 6"6' - 0"34' - 6"8"<CONC STOOP><GRADE 01> A7.025SIM<FND 01><WTRPRFG 02> A7.116<EXT WALL 11>DECK BRG111'-5" A7.023<FASCIA 02><SOFFIT 01><INSUL 02><CLIP ANGLE>77.2FIRST FLOOR100'-0"TOP OF STUD128'-0"DECK BRG119'-4"DECK BRG126'-0" A7.023OPP A7.03<MEMBRN RF 01><COPING 03><MEMBRN RF 02><FLOOR 01>STUD FACE1' - 2"STUD FACE7 1/8"<EXT WALL 12><CLIP ANGLE>19' - 4"6' - 8"2' - 0"28' - 0"M6D6<FND 01><FLOOR 01><CLG 01>Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/2" = 1'-0"WALL SECTIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A6.410/13/2023220025.00C2023-15KEYNOTES PER SHEET#<CLG 01> SUSPENDED ACT SYSTEM<CLIP ANGLE> COLD-FORMED SLOTTED STEEL CLIPS AT EACH STUD<CONC STOOP> POURED CONCRETE SLAB-ON-GRADE (1/4" PER FOOT SLOPE )W/FOUNDATION WALLS 4'-0" DEEP MINIMUM UNLESS NOTED OTHERWISE<COPING 01> PREFINISHED ALUMINUM COPING WITH CLEAT ATTACHMENT, 3/4" TREATED PLYWOOD, TREATED 2X6 SHAPED FOR 1 1/2" SLOPE & FILL VOID SOLID W/SPRAYEDCLOSED-CELL POLYURETHANE FOAM INSULATION - SEE WALL SECTIONS FOR THE RESPECTIVE WIDTH<COPING 02> PREFINISHED ALUMINUM GRAVEL STOP W/CLEAT ATTACHMENT, 2X TREATED BLOCKING, WRAP MEMBRANE AROUND BLOCKING ATTACH PER MANUFACTURER'SRECOMMENDATIONS<COPING 03> PREFINISHED ALUMINUM FASCIA W/ANCHOR BAR ATTACHMENT, NON-CURING SEALANT, 2X TREATED BLOCKING, WRAP MEMBRANE AROUND BLOCKING ATTACH PERMANUFACTURER'S RECOMMENDATIONS<DOOR 04> PREFINISHED ALUMINUM MEDIUM STYLE DOOR WITH 1" INSULATED FULL GLASS<EXT WALL 02> VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM, 7/8" HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONAL FURRING MAY BE REQUIRED, COORDINATE W/PANEL SYSTEMMANUFACTURER AIR BARRIER, 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 3" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. (ALIGN W/STEEL STUD SPACING), 3" SPRAYEDCLOSED-CELL POLYURETHANE FOAM INSULATION, 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C. & 5/8" GYPSUM BOARD<EXT WALL 04> 1/8" THICK PREFINISHED PERFORATED ALUMINUM PANEL, 2" LONG STAINLESS STEEL OR ALUMINUM HOLLOW SPACER FOR PERFORATED ALUMINUM PANEL FASTENER TOFIT THROUGH - FASTENER TYPE EQUALLY SPACED HORIZONTALLY AND VERTICALLY DETERMINED BY STRUCTURAL ENGINEER, PREFINISHED ALUMINUM PANEL, AIRBARRIER, FIRE-TREATED 5/8" PLYWOOD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C., 5/8" EXTERIOR GYPSUM BOARD SHEATHING, AIR BARRIER & VERTICAL FLUSHPREFINISHED ALUMINUM PANEL SYSTEM<EXT WALL 07> 6" STEEL STUD FRAMING @ 1'-4" O.C., 5/8" EXTERIOR GYPSUM BOARD SHEATHING & 3" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION<EXT WALL 09> VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM, 7/8" HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONAL FURRING MAY BE REQUIRED, COORDINATE W/PANEL SYSTEMMANUFACTURER), AIR BARRIER, 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 3" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. (ALIGN W/STEEL STUD SPACING), 5/8"EXTERIOR GYPSUM BOARD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C. 5/8" EXTERIOR GYPSUM BOARD SHEATHING, AIR BARRIER, 7/8" HORIZONTAL FURRING @ 1'-4"O.C. (ADDITIONAL FURRING MAY BE REQUIRED, COORDINATE W/PANEL SYSTEM MANUFACTURER), AIR BARRIER, & VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM<EXT WALL 11> 4" CONC BRICK, 3 1/2" AIR SPACE, 5/8" EXTERIOR GYPSUM BOARD SHEATHING (LAP CONCRETE 1" MINIMUM), 6" STEEL STUD FRAMING @ 1'-4" O.C., 5/8" EXTERIOR GYPSUMBOARD SHEATHING (EXTEND DOWN TO TOP OF GROUT), 1 1/2" AIR SPACE & 4" CONC BRICK<EXT WALL 12> VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM, 7/8" HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONAL FURRING MAY BE REQUIRED, COORDINATE W/PANEL SYSTEMMANUFACTURER), AIR BARRIER, 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 3" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. (ALIGN W/STEEL STUD SPACING),CONTINUOUS 3" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION (R-18 MINIMUM), 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4"O.C. 5/8" EXTERIOR GYPSUM BOARD SHEATHING, AIR BARRIER, 7/8" HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONAL FURRING MAY BE REQUIRED, COORDINATE W/PANELSYSTEM MANUFACTURER), AIR BARRIER, & VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM1/2" = 1'-0"3VESTIBULE 118 SECTION1/2" = 1'-0"2LOBBY 117 SECTION1/2" = 1'-0"4VESTIBULE 118 ACCENT WALL1/2" = 1'-0"1UNINSULATED WALL SYSTEM AT VESTIBULE 100KEYNOTES PER SHEET#<EXT WALL 13> 4" CONC BRICK, 1 1/2" AIR SPACE, CONTINUOUS 3" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION (R-18 MINIMUM), 5/8" EXTERIOR GYPSUM BOARDSHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C. & 5/8" GYPSUM BOARD<FASCIA 02> PREFINISHED ALUMINUM PANEL SYSTEM J-CHANNEL BY PANEL MANUFACTURER<FLOOR 01> REINFORCED CONCRETE SLAB-ON-GRADE FLOOR, MINIMUM 6" COMPACTED GRANULAR FILL<FND 01> REINFORCED CONCRETE FOOTING AND FOUNDATION SYSTEM<GRADE 01> FINISH GRADE<INSUL 01> 1/2" RIGID INSULATION FOR THERMAL CONTINUITY THROUGH CONCRETE FLOOR SLAB<INSUL 02> 2" RIGID INSULATION DOWN TO TOP OF FOOTING, 4'-0" MINIMUM IF THERE IS NO FOOTING<INSUL 05> FILL INTERIOR SIDE OF DECK FLUTES FULL FOR PARTITION WIDTH & LENGTH OF EXTERIOR PARTITION WALL W/SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION<MEMBRN RF 01> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), WRAP MEMBRANE AROUND THE SLOPED PLYWOOD & LAP JOINT BETWEEN PLYWOOD & MASONRY 1" MINIMUM -ATTACH PER MANUFACTURER'S RECOMMENDATIONS, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM) AT ROOF DRAIN, TAPERED INSULATION, VAPORRETARDER (SEAL AGAINST VERTICAL SURFACE), ROOF DECK, ANGLE & STRUCTURAL FRAMING- SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THETAPERED INSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<MEMBRN RF 02> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), EXTEND MEMBRANE 1'-0" MINIMUM VERTICALLY TO TERMINATION BAR (SEAL PER MEMBRANE MANUFACTURER'SREQUIREMENTS), PREFINISHED ALUMINUM FLASHING & COUNTERFLASHING, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM), TAPERED INSULATION,VAPOR RETARDER (SEAL AGAINST VERTICAL SURFACE), ROOF DECK & STRUCTURAL FRAMING - SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THETAPERED INSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<MEMBRN RF 04> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), TAPERED POLYISOCYANURATE ROOF INSULATION (1" MINIMUM THICKNESS AT ROOF DRAIN, VAPOR RETARDER(SEAL AGAINST VERTICAL SURFACE) & ROOF STRUCTURAL FRAMING - EXTEND MEMBRANE 1'-0" MINIMUM VERTICALLY TO TERMINATION BAR LAP MEMBRANE AROUNDBLOCKING, LAP JOINT BETWEEN PLYWOOD & PANEL SYSTEM & ATTACH PER MANUFACTURER'S RECOMMENDATIONS, ROOF DECK & STRUCTURAL FRAMING<SIDEWALK> CONCRETE SIDEWALK<SOFFIT 01> SUSPENDED PREFINISHED ALUMINUM VENTED PANEL SYSTEM (12" WIDE, ALIGN JOINTS W/FASCIA JOINTS), 7/8" FURRING @ 1'-4" O.C. & 1 1/2" CHANNELS @ 4'-0" O.C. -VERIFY SPACING OF SUPPORT FRAMING W/PANEL MANUFACTURER<WINDOW 01> THERMALLY BROKEN PREFINISHED ALUMINUM STOREFRONT FRAMING SYSTEM WITH 1" INSULATED GLASS, LAP CONCRETE BRICK MASONRY RETURN 1/2" MINIMUM<WTRPRFG 02> WATERPROOFING, PROVIDE MORTAR CANT, LAP FOOTING & LAP JOINT BETWEEN SHEATHING & TOP OF FOUNDATION WALL1/2" = 1'-0"5WALL SYSTEM AT ROOF DECK STEP10/04/2023BID DOCUMENT SET 12 5/8" 10" 4"<EXIST 01><EXT WALL 03><FLOOR 01><FND 01><EXIST 01>TOP OF PRECAST123'-8"2"2"2"+- 9 1/4"22' - 0"1' - 8" A7.14 A7.029<EXT WALL 03>1<EXT WALL 03><EXIST 01><EXT WALL 03><FLOOR 01><FND 01>10' - 0" A7.08<ROOF 01>D5b<EXIST 01> A7.08SIM<EXIST 01>TOP OF PRECAST126'-8"2"2"2" A7.1425' - 0" A7.0292 5/8" 10" 4"1<EXT WALL 03><EXIST 01><EXT WALL 03><FLOOR 01><FND 01><ROOF 01>D5b<EXIST 01><EXIST 01>2"2"2"2 5/8" 10" 4"TOP OF PRECAST126'-8" A7.1425' - 0" A7.0292 5/8" 10" 4"1<EXT WALL 03><EXIST 01><EXT WALL 03><FLOOR 01><FND 01><ROOF 01>D5b<EXIST 01><EXIST 01>2"2"2"2 5/8" 10" 4"TOP OF PRECAST126'-8" A7.1425' - 0"1' - 8" A7.0291<EXT WALL 03><CLG 05><EXT WALL 03><FLOOR 01><FND 01><ROOF 02>D5b<EXIST 01><EXIST 01>FIRST FLOOR100'-0"DECK BRG115'-0"2"2"2"2 5/8" 10" 4"TOP OF PRECAST126'-8" A7.1425' - 0"1' - 8" A7.0297FIRST FLOOR100'-0"DECK BRG119'-4"TOP OF CMU121'-0"WINDOW SILL101'-8"WINDOW HEAD110'-4 3/8"11' - 3 5/8"10' - 4 3/8"2' - 4"8' - 11 5/8"8' - 8 3/8"1' - 8"21' - 8"8" A7.171 A7.1 A7.18 A7.12<COPING 01><MEMBRN RF 01><CLG 01><EXT WALL 14><WINDOW 01><FLOOR 01><INSUL 02><GRADE 01><WTRPRFG 02><FND 01><LINTEL 02>CMU FACE5 3/4"Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/2" = 1'-0"WALL SECTIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A6.510/13/2023220025.00C2023-151/2" = 1'-0"5WALL SECTION 1 -NORTH EAST QUAD1/2" = 1'-0"4WALL SECTION 2 -NORTH EAST QUAD1/2" = 1'-0"3WALL SECTION 3 -NORTH EAST QUAD1/2" = 1'-0"2WALL SECTION 4 -NORTH EAST QUAD1/2" = 1'-0"1WALL SECTION 1 -SOUTH EAST QUADKEYNOTES PER SHEET#<CLG 01> SUSPENDED ACT SYSTEM<CLG 05> EXISTING SUSPENDED ACOUSTICAL PANEL / GYPSUM BOARD CEILING SYSTEM. VERIFY IN FIELD. REMOVE PORTIONS REQUIRED FOR NEW CONSTRUCTION. PATCH INTO NEW WALL.<COPING 01> PREFINISHED ALUMINUM COPING WITH CLEAT ATTACHMENT, 3/4" TREATED PLYWOOD, TREATED 2X6 SHAPED FOR 1 1/2" SLOPE & FILL VOID SOLID W/SPRAYED CLOSED-CELL POLYURETHANE FOAMINSULATION - SEE WALL SECTIONS FOR THE RESPECTIVE WIDTH<EXIST 01> EXISTING CONSTRUCTION TO REMAIN. VERIFY IN FIELD THE EXACT CONDITIONS, HEIGHTS, DIMENSIONS AND MAKE UP OF CONSTRUCTION. CONTRACTOR RESPONSIBLE FOR REPAIR & REPLACEMENT OFEXISTING MALL ROOFING TO MATCH EXISTING CONDITIONS AFTER DEMO AND NEW SCOPE OF WORK IS COMPLETED<EXT WALL 03> 10" INSULATED ARCHITECTURAL PRECAST WALL PANEL<EXT WALL 14> 4" CONC BRICK, 1 3/4" AIR SPACE, CONTINUOUS 3" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION (R-18 MINIMUM) & 8" CMU W/HORIZONTAL REINFORCING @ 1'-4" O.C. VERTICALLY<FLOOR 01> REINFORCED CONCRETE SLAB-ON-GRADE FLOOR, MINIMUM 6" COMPACTED GRANULAR FILL<FND 01> REINFORCED CONCRETE FOOTING AND FOUNDATION SYSTEM<GRADE 01> FINISH GRADE<INSUL 02> 2" RIGID INSULATION DOWN TO TOP OF FOOTING, 4'-0" MINIMUM IF THERE IS NO FOOTING<LINTEL 02> 8" MASONRY LINTEL<MEMBRN RF 01> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), WRAP MEMBRANE AROUND THE SLOPED PLYWOOD & LAP JOINT BETWEEN PLYWOOD & MASONRY 1" MINIMUM - ATTACH PER MANUFACTURER'SRECOMMENDATIONS, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM) AT ROOF DRAIN, TAPERED INSULATION, VAPOR RETARDER (SEAL AGAINST VERTICAL SURFACE), ROOF DECK,ANGLE & STRUCTURAL FRAMING- SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<ROOF 01> FULLY ADHERED ROOF MEMBRANE SYSTEM, TAPERED RIGID POLYISOCYANURATE INSULATION, PRECAST CONCRETE PLANK. SEE STRUCTURAL AND ROOF PLAN.<ROOF 02> FULLY ADHERED ROOF MEMBRANE SYSTEM, TAPERED RIGID POLYISOCYANURATE INSULATION, STEEL JOIST AND DECK. SEE STRUCTURAL AND ROOF PLAN.<WINDOW 01> THERMALLY BROKEN PREFINISHED ALUMINUM STOREFRONT FRAMING SYSTEM WITH 1" INSULATED GLASS, LAP CONCRETE BRICK MASONRY RETURN 1/2" MINIMUM<WTRPRFG 02> WATERPROOFING, PROVIDE MORTAR CANT, LAP FOOTING & LAP JOINT BETWEEN SHEATHING & TOP OF FOUNDATION WALL1/2" = 1'-0"6WINDOW SYSTEM IN MASONRY CAVITY WALL10/04/2023BID DOCUMENT SET C<EXT WALL 05>1' - 2 3/4"STUD FACE6 1/4"<MEMBRN RF 02>6"1 1/2"4 1/2"<EXT WALL 01><COPING 01>DECK BRG119'-4"TOP OF STUD121'-0"3" CLOSED-CELL SPRAYED POLYURETHANE FOAM INSULATION<VNTLR 01>C1' - 2 3/4"STUD FACE6 1/4"MINIMUM8"<EXT WALL 01><BOX HDR 02><LINTEL 01><FLASH 01><WINDOW 01><SLNT 01><BLKG 02><CLG 01>3 1/8"WINDOW HEAD110'-4"<VNTLR 01><MTRNET 01>SURFACE MOUNTED SHADESC1' - 2 3/4"STUD FACE6 1/4"<EXT WALL 01>STONE SILL BELOW<BLKG 02>SOLID SURFACE STOOL BELOW<SLNT 03><WINDOW 01><SLNT 01><FLASH 04>1/2" 1/2"CFIRST FLOOR100'-0"WINDOW SILL101'-8"2' - 4"5/8"3"3 5/8"2' - 0 3/8"1"2"7 5/8"1 1/2"9 1/8"STUD FACE6 1/4"<STOOL 01>MINIMUM8"<VNTLR 01>1"8 1/8"<FLASH 06><ANGLE 03><FLASH 04><BLKG 02><EXT WALL 01>8"8"8 1/4" 6 1/2"<MTRNET 01><SILL SLR><SLNT 02><INSUL 01><FLOOR 01><FLASH 01><GRADE 01><WTRPRFG 02><GROUT 01><FND 01><INSUL 02>1' - 2 3/4"<SLNT 03><FLASH 13><SLNT 01><SILL 01>F.3TOP OF STUD134'-6"STUD FACE7 1/4"<COPING 01><EXT WALL 02><BLKG 07><BLKG 08><FLASH 10>6"1 1/2"4 1/2"F.3STUD FACE7 1/4"MINIMUM8"1' - 0"DECK BRG119'-4"4"<MEMBRN RF 02><EXT WALL 02><FLASH 12><PNLB 02>LAP AIR BARRIER OVER FLASHING LEG & SEALA5/8"2"10"1' - 0 5/8"6"1 1/2"4 1/2"<EXT WALL 05><COPING 01><EXT WALL 03>3<MEMBRN RF 02><EXT WALL 03><SLNT 02>REGLET<FLASH 03>MINIMUM1' - 0 7/8"4"HDECK BRG134'-7"DECK BRG133'-2 1/2"TOP OF PRECAST134'-7"TOP OF PRECAST BEYOND136'-0"2" ±<EXT WALL 03><MEMBRN RF 06><MEMBRN RF 06><EXT WALL 05>ADHERE ADDITIONAL MEBRANE FLASHING AROUND EDGE 4" IN EACH DIRECTIONWRAP CONTINUOUS VAPOR RETARDER AROUND PRECAST & SEAL AGAINST BLOCKING<CVR BRD><CVR BRD>4"<BLKG 04><FLASH 14>12TOP OF STUD128'-0"<MEMBRN RF 01>STUD FACE7"<FLASH 10><PNLB 01><EXT WALL 02><COPING 03>12WINDOW HEAD116'-4"STUD FACE7"<EXT WALL 02><FLASH 09><FLASH 04><WINDOW 03>MINIMUM8"<PNLB 02><BOX HDR 02><BLKG 02><SLNT 01><SLNT 03>122 1/8"STUD FACE7"<EXT WALL 02><BLKG 02><WINDOW 01><SLNT 01>SOLID SURFACE STOOL BELOW<PNLB 02><FLASH 04><SLNT 03><FLASH 11><SLNT 03>1 1/2"4 1/2"6"VARIESMIN4"MIN2"2" DRIP MINIMUMPROVIDE 4" HIGH MINIMUM X 24" WIDE MINIMUM -CONSTRUCT SCUPPER PER SMACNA RECOMMENDATIONS<CVR BRD><MEMBRN RF 06><COPING 01>(VARIES)DECK BRGVARIESTOP OF PRECAST<EXT WALL 03><THRML BR>WALL TYPES PER PLANEDGE OF EXPOSED P.C WALL PANEL AND FURRING BEYOND. V.I.F.2" WALL AND CEILING EXPANSION JOINT. 4 1/4" 2" 10"CONTINUOUS DOUBLE LAYER 3/4" P.T. PLYWOOD AND BLOCKING AS REQUIRED TO PITCH.3/4" P.T. PLYWOOD BACKER. WALL PANEL SYSTEM SIM. TO "EXT WALL 02"REFER TO STRUCTURAL FOR BENT PLATE, DECK AND FRAMING REQUIREMENTS.PREFINISHED METAL ROOF COPING WITH ALL WELDED CORNERS AND TRIM. FULLY ADHERED EPDM ROOFING SYSTEM W/ TAPERED INSULATION TO DRAIN & w/ RPS STRIP AT BASE / WALL TRANSITION. REFER TO ROOF PLAN FOR LOCATIONS AND THICKNESSES. 6"4"1' - 6 3/4" + -3 5/8" STEEL STUDS @ 16" O.C. 114 ' - 2"B/O CANOPY116 ' -5 3/8"B/O STUD115 ' - 1/2"B/O DECK10" INSULATED PRECAST CONCRETE WALL PANEL. SEE STRUCTURAL.2" CONTINUOUS COMPRESSIBLE EXPANSION JOINT. TIE INTO ROOF EXPANSION JOINT FOR A WATERTIGHT SEAL.2"10"4"EXISTING WALL CONSTRUCTION TO REMAIN. VERIFY IN FIELD EXACT CONSTRUCTION, MATERIALS, HEIGHTS LOCATIONS AND CONDITIONS. 10" INSULATED PRECAST CONCRETE WALL PANEL. SEE STRUCTURAL.2" CONTINUOUS COMPRESSIBLE EXPANSION JOINT. TIE INTO ROOF EXPANSION JOINT FOR A WATERTIGHT SEAL.EXISTING WALL CONSTRUCTION TO REMAIN. VERIFY IN FIELD EXACT CONSTRUCTION, MATERIALS, HEIGHTS LOCATIONS AND CONDITIONS. 2"10"4"NEW WALL TYPE PER PLAN AND SECTIONS.1' - 0"1' - 3"2' - 3"CANOPY/WINDOW HEAD110'-2"TOP OF STUD112'-5" (111'-10" AT SIM)DECK BRG111'-5" (111'-1" AT SIM)STUD FACE4"<COPING 02><BLKG 03><MEMBRN RF 04><FASCIA 02><FASCIA 01><FASCIA 03><SOFFIT 01><CLIP ANGLE>52 1/2"2"1"<WINDOW 02><STOOL 01><EXT WALL 03><SLNT 03>EACH SIDE9STUD FACE6" 3 1/8"CANOPY/WINDOW HEAD110'-2"<SLNT 01><BLKG 02><SOFFIT 01><WINDOW 01><FASCIA 02><BLKG 02><BOX HDR 02>3" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION, 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C. & 5/8" GYPSUM BOARD<FLASH 04><BKMTL 01><SLNT 03><CLG 02>SOFFIT116'-4"<FASCIA 02><SOFFIT 01><BOX HDR 02><EXT WALL 04>2"STUD FACE6"2" HOLLOW FASTENER SPACERWRAP AIR BARRIER AROUND FRAMING & SEALRETURN ALUMINUM PANEL AROUND PLYWOOD EDGE, ATTACH TO PLYWOOD OR STUDTOP OF STUD134'-6"STUD FACE6 5/16" ±<PNLB 01>6"4 1/2"1 1/2"<COPING 01><PNLB 01><PNLB 03>1' - 0 5/8"<EXT WALL 04><PNLB 04><FLASH 08><PNLB 01>F.9TOP OF MASONRY106'-0"MINIMUM8"2 1/2"<EXT WALL 01><EXT WALL 06>STUD FACE7 1/4"8 3/4"<PNLB 02>LAP AIR BARRIER OVER FLASHING LEG & SEAL<VNTLR 01><FLASH 07>SEAL FASTENERS THROUGH FLASHING FOR FURRING ATTACHMENT C1' - 2 3/4"STUD FACE6 1/4"<EXT WALL 01>DECK BRG119'-4"TOP OF STUD121'-0"3" CLOSED-CELL SPRAYED POLYURETHANE FOAM INSULATION<VNTLR 01>5 1/2"1 1/4"4 1/4"<COPING 03>FASCIA COVERANCHOR BARNON-CURING SEALANTSTAINLESS STEEL FASTENERConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1 1/2" = 1'-0"EXTERIOR DETAILSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A7.010/13/2023220025.00C2023-151 1/2" = 1'-0"4MASONRY CLAD WALL PARAPET1 1/2" = 1'-0"10WINDOW HEAD AT MASONRY CLAD WALL1 1/2" = 1'-0"16WINDOW JAMB AT MASONRY CLAD WALL1 1/2" = 1'-0"22WINDOW SILL AT MASONRY CLAD WALL BASE1 1/2" = 1'-0"24VERTICAL ALUMINUM PANEL SYSTEM COPINGKEYNOTES PER SHEET#<ANGLE 03> GALVANIZED STEEL ANGLE FOR MASONRY SUPPORT - (2) ANGLES PER STONE SILL<BKMTL 01> PREFINISHED ALUMINUM BREAK METAL (MATCH ALUMINUM WINDOW FINISH), ATTACH IN SHIM SPACE W/VERTICAL LEG LAP GYPSUM BOARD SHEATHING<BLKG 02> 2X BLOCKING<BLKG 03> 2X TREATED BLOCKING<BLKG 04> 2X6 TREATED BLOCKING - SHAPE TOP OF BLOCKING TO MATCH ROOF SLOPE<BLKG 07> 2X4 BLOCKING<BLKG 08> 5/8" PLYWOOD BLOCKING<BOX HDR 02> BOX HEADER<CLG 01> SUSPENDED ACT SYSTEM<CLG 02> PREFINISHED ALUMINUM WOOD-LOOK CEILING SYSTEM<CLIP ANGLE> COLD-FORMED SLOTTED STEEL CLIPS AT EACH STUD<COPING 01> PREFINISHED ALUMINUM COPING WITH CLEAT ATTACHMENT, 3/4" TREATED PLYWOOD, TREATED 2X6 SHAPED FOR 1 1/2" SLOPE & FILL VOID SOLID W/SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION -SEE WALL SECTIONS FOR THE RESPECTIVE WIDTH<COPING 02> PREFINISHED ALUMINUM GRAVEL STOP W/CLEAT ATTACHMENT, 2X TREATED BLOCKING, WRAP MEMBRANE AROUND BLOCKING ATTACH PER MANUFACTURER'S RECOMMENDATIONS<COPING 03> PREFINISHED ALUMINUM FASCIA W/ANCHOR BAR ATTACHMENT, NON-CURING SEALANT, 2X TREATED BLOCKING, WRAP MEMBRANE AROUND BLOCKING ATTACH PER MANUFACTURER'S RECOMMENDATIONS<CVR BRD> 1/2" THICK COVER BOARD<EXT WALL 01> CONCRETE BRICK (4" X 4" X 16" NOMINAL) IN RUNNING BOND W/MASONRY TIES @ 1'-4" O.C. VERTICAL SPACE, 1 1/2" AIR SPACE, CONTINUOUS 3" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION (R-18MINIMUM), 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C., 7/8" HORIZONTAL FURRING @ 1'-4" O.C. VERICALLY & 5/8" GYPSUM BOARD<EXT WALL 02> VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM, 7/8" HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONAL FURRING MAY BE REQUIRED, COORDINATE W/PANEL SYSTEM MANUFACTURER AIR BARRIER, 5/8"EXTERIOR GYPSUM BOARD SHEATHING, 3" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. (ALIGN W/STEEL STUD SPACING), 3" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION, 5/8" EXTERIOR GYPSUMBOARD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C. & 5/8" GYPSUM BOARD<EXT WALL 03> 10" INSULATED ARCHITECTURAL PRECAST WALL PANEL<EXT WALL 04> 1/8" THICK PREFINISHED PERFORATED ALUMINUM PANEL, 2" LONG STAINLESS STEEL OR ALUMINUM HOLLOW SPACER FOR PERFORATED ALUMINUM PANEL FASTENER TO FIT THROUGH - FASTENER TYPE EQUALLYSPACED HORIZONTALLY AND VERTICALLY DETERMINED BY STRUCTURAL ENGINEER, PREFINISHED ALUMINUM PANEL, AIR BARRIER, FIRE-TREATED 5/8" PLYWOOD SHEATHING, 6" STEEL STUD FRAMING @ 1'-4" O.C.,5/8" EXTERIOR GYPSUM BOARD SHEATHING, AIR BARRIER & VERTICAL FLUSH PREFINISHED ALUMINUM PANEL SYSTEM<EXT WALL 05> 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 2" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. & 2" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION<EXT WALL 06> VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM, 7/8" EXTERIOR GRADE HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONAL FURRING MIGHT BE REQUIRED, COORDINATE W/PANEL MANUFACTURER), AIR BARRIER,5/8" EXTERIOR GYPSUM BOARD SHEATHING, 3" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C., 3" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION, 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 6" STEELSTUD FRAMING @ 1'-4" O.C., & 5/8" GYPSUM BOARD<FASCIA 01> PREFINISHED ALUMINUM PANEL SYSTEM, VERTICAL 12" WIDE ON 7/8" FURRING @ 1'-4" O.C.(ADDITIONAL FURRING MAY BE REQUIRED COORDINATE W/PANEL MANUFACTURER), 6" STEEL STUD FRAMING @ 1'-4" O.C.& 5/8" EXTERIOR GYPSUM BOARD SHEATHING<FASCIA 02> PREFINISHED ALUMINUM PANEL SYSTEM J-CHANNEL BY PANEL MANUFACTURER<FASCIA 03> PREFINISHED ALUMINUM J-FLASHING W/WEEP HOLES, PREFINISHED J-CHANNEL & SEALANT - BY PANEL MANUFACTURER<FLASH 01> THROUGH-WALL FLASHING WITH STAINLESS STEEL DRIP EXTEND VERTICAL LEG 8" MINIMUM TO TERMINATION BAR SEAL ATTACHMENT<FLASH 03> PREFINISHED ALUMINUM FLASHING & COUNTERFLASHING<FLASH 04> ADHERED MEMBRANE FLASHING, LAP GYPSUM BOARD SHEATHING 3" MINIMUM & 2X BLOCKING, TERMINATE IN SHIM SPACE<FLASH 06> THROUGH-WALL FLASHING WITH DRIP, LAP OVER <FLASH 04> TERMINATE IN SHIM SPACE<FLASH 07> PREFINISHED ALUMINUM FLASHING W/HEMMED DRIP EDGE & CLEAT ATTACHMENT, EXTEND VERTICAL LEG 8" MINIMUM TO TERMINATION BAR & SEAL ATTACHMENT<FLASH 08> ADHERED MEMBRANE FLASHING, LAP AROUND TOP EDGE OF PLYWOOD 3" MINIMUM & 3" MINIMUM ONTO THE EXTERIOR GYPSUM BOARD SHEATHING/PLYWOOD EACH SIDE OF PARAPET<FLASH 09> PREFINISHED ALUMINUM FLASHING (22 GAGE MINIMUM) W/HEMMED DRIP EDGE, EXTEND VERTICAL LEG 8" MINIMUM TO TERMINATION BAR, SEAL ATTACHMENT & PROVIDE CONTINUOUS SEALANT BEAD ALONG TOPOF TERMINATION BAR - COLOR TO MATCH PANEL SYSTEM<FLASH 10> ADHERED MEMBRANE FLASHING, LAP GYPSUM BOARD SHEATHING & PLYWOOD/BLOCKING 3" MINIMUM<FLASH 11> J PROFILE BRAKE METAL W/ 3/8" RETURN, ATTACH IN SHIM SPACE, COLOR TO MATCH PANEL SYSTEM<FLASH 12> PREFINISHED ALUMINUM FLASHING & COUNTERFLASHING, EXTEND VERTICAL LEG TO TERMINATION BAR & SEAL ATTACHMENT<FLASH 13> PREFINISHED ALUMINUM FLASHING (MATCH WINDOW FINISH) W/DOWNTURNED HEMMED EDGE & UPTURNED VERTICAL HEMMED EDGE SET ONTO SEALANT BED<FLASH 14> PREFINISHED ALUMINUM FLASHING (22 GAGE) W/DRIP, CLEAT ATTACHMENT & 4" HORIZONTAL LEG - LAP & ADHERE MEMBRANE SPLICE OVER HORIZONTAL LEG & 4" MINIMUM ONTO MEMBRANE ROOF<FLOOR 01> REINFORCED CONCRETE SLAB-ON-GRADE FLOOR, MINIMUM 6" COMPACTED GRANULAR FILL<FND 01> REINFORCED CONCRETE FOOTING AND FOUNDATION SYSTEM<GRADE 01> FINISH GRADE<GROUT 01> GROUT CAVITY SOLID BELOW FLASHING<INSUL 01> 1/2" RIGID INSULATION FOR THERMAL CONTINUITY THROUGH CONCRETE FLOOR SLAB<INSUL 02> 2" RIGID INSULATION DOWN TO TOP OF FOOTING, 4'-0" MINIMUM IF THERE IS NO FOOTING<LINTEL 01> GALVANIZED BENT STEEL PLATE LINTEL (PAINT)<MEMBRN RF 01> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), WRAP MEMBRANE AROUND THE SLOPED PLYWOOD & LAP JOINT BETWEEN PLYWOOD & MASONRY 1" MINIMUM - ATTACH PER MANUFACTURER'SRECOMMENDATIONS, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM) AT ROOF DRAIN, TAPERED INSULATION, VAPOR RETARDER (SEAL AGAINST VERTICAL SURFACE), ROOF DECK, ANGLE &STRUCTURAL FRAMING- SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<MEMBRN RF 02> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), EXTEND MEMBRANE 1'-0" MINIMUM VERTICALLY TO TERMINATION BAR (SEAL PER MEMBRANE MANUFACTURER'S REQUIREMENTS), PREFINISHED ALUMINUMFLASHING & COUNTERFLASHING, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM), TAPERED INSULATION, VAPOR RETARDER (SEAL AGAINST VERTICAL SURFACE), ROOF DECK & STRUCTURALFRAMING - SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<MEMBRN RF 04> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), TAPERED POLYISOCYANURATE ROOF INSULATION (1" MINIMUM THICKNESS AT ROOF DRAIN, VAPOR RETARDER (SEAL AGAINST VERTICAL SURFACE) & ROOFSTRUCTURAL FRAMING - EXTEND MEMBRANE 1'-0" MINIMUM VERTICALLY TO TERMINATION BAR LAP MEMBRANE AROUND BLOCKING, LAP JOINT BETWEEN PLYWOOD & PANEL SYSTEM & ATTACH PERMANUFACTURER'S RECOMMENDATIONS, ROOF DECK & STRUCTURAL FRAMING<MEMBRN RF 06> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), WRAP MEMBRANE AROUND THE SLOPED PLYWOOD & LAP JOINT BETWEEN PLYWOOD & MASONRY 1" MINIMUM - ATTACH PER MANUFACTURER'SRECOMMENDATIONS, 1/2" COVER BOARD, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM), VAPOR RETARDER (SEAL AGAINST VERTICAL SURFACE), 1/2" THERMAL BARRIER, SLOPED ACOUSTICALROOF DECK & STRUCTURAL FRAMING - SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATION AT THE PERIMETER OF ROOF DRAIN LOCATIONS<MTRNET 01> MORTAR NET<PNLB 01> 6" WIDE VERTICAL PANELBOARD CLADDING SYSTEM TRADITIONAL TERMINATION SET<PNLB 02> 6" WIDE VERTICAL PANELBOARD CLADDING SYSTEM PRECISION J-TRACK<PNLB 03> OUTSIDE CORNER CRAFTSMAN TRIM BY PANELBOARD CLADDING SYSTEM MANUFACTURER<PNLB 04> 6" WIDE HORIZONTAL PANELBOARD CLADDING SYSTEM, AIR BARRIER (LAP OVER <FLASH 08> & SEAL), 5/8" EXTERIOR GYPSUM BOARD SHEATHING & 6" STEEL STUD FRAMING @ 1'-4" O.C.<SILL 01> CAST STONE SILL<SILL SLR> SILL SEALER - CONTINUOUS POLYPROPOLENE PAD SET BETWEEN STUD RUNNER & CONCRETE<SLNT 01> PERIMETER SEALANT W/BACKER ROD EACH SIDE<SLNT 02> CONTINUOUS SEALANT BEAD<SLNT 03> CONTINUOUS PERIMETER SEALANT BEAD<SOFFIT 01> SUSPENDED PREFINISHED ALUMINUM VENTED PANEL SYSTEM (12" WIDE, ALIGN JOINTS W/FASCIA JOINTS), 7/8" FURRING @ 1'-4" O.C. & 1 1/2" CHANNELS @ 4'-0" O.C. - VERIFY SPACING OF SUPPORT FRAMINGW/PANEL MANUFACTURER<STOOL 01> SOLID SURFACE STOOL W/RADIUS ON 5/8" PLYWOOD & PROVIDE CONTINUOUS SEALANT BEAD<THRML BR> 1/2" THICK THERMAL BARRIER<VNTLR 01> MASONRY VENTILATOR @ 2'-8" O.C.<WINDOW 01> THERMALLY BROKEN PREFINISHED ALUMINUM STOREFRONT FRAMING SYSTEM WITH 1" INSULATED GLASS, LAP CONCRETE BRICK MASONRY RETURN 1/2" MINIMUM<WINDOW 02> BORROWED LITE, 1/4" GLASS SET INTO HOLLOW METAL FRAME<WINDOW 03> THERMALLY BROKEN PREFINISHED ALUMINUM CURTAINWALL FRAMING SYSTEM WITH 1" INSULATED GLASS<WTRPRFG 02> WATERPROOFING, PROVIDE MORTAR CANT, LAP FOOTING & LAP JOINT BETWEEN SHEATHING & TOP OF FOUNDATION WALL1 1/2" = 1'-0"23ROOF FLASHING AT METAL PANEL BASE1 1/2" = 1'-0"28PRECAST WALL PANEL COPING1 1/2" = 1'-0"29ROOF FLASHING REGLET1 1/2" = 1'-0"30ROOF SYSTEMS AT PRECAST STEP1 1/2" = 1'-0"3VERTICAL ALUMINUM PANEL SYSTEM COPING1 1/2" = 1'-0"9VERTICAL ALUMINUM PANEL WINDOW HEAD1 1/2" = 1'-0"15VERTICAL ALUMINUM PANEL WINDOW JAMBNO SPRAY FOAM INSULATION, 5/8" EXTERIOR GYPSUM BOARD SHEATHING IN LIEU OF 5/8" GYPSUM BOARD & ADD VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM AT SIM CONDITION1 1/2" = 1'-0"21OVER FLOWSCUPPER1 1/2" = 1'-0"8EXIST. TO NEW INTERIOR EXPANSION JOINT1 1/2" = 1'-0"14PARAPET @ DUMPSTER ROOF EDGE1 1/2" = 1'-0"20EXIST. TO NEW EXPAN JOINT @ PC PANELS1 1/2" = 1'-0"1EXIST. TO NEW EXPAN JOINT @ PC PANEL1 1/2" = 1'-0"27CANOPY FASCIA1 1/2" = 1'-0"26BORROWED LITE SILL1 1/2" = 1'-0"13SOFFIT PANEL SYSTEM AT WINDOW HEAD1 1/2" = 1'-0"7SOFFIT PANEL SYSTEM AT WALL SYSTEMNO SOLID SURFACE STOOL AT SIM CONDITIONNO SOLID SURFACE STOOL/STONE SILL, WINDOW LOCATION IS DIFFERENT & 6" STUD FACE DIMENSION AT SIM CONDITIONNO SOLID SURFACE STOOL/STONE SILL & STUD FACE IS 6" AT SIM CONDITION1 1/2" = 1'-0"19COPINGNO CEILING SYSTEM AT SIM CONDITION1 1/2" = 1'-0"25VERTICAL PANEL TRANSITION AT MASONRYNO SPRAY FOAM INSULATION, 3" VERTICAL GIRTS BEHIND MASONRY & 1 1/2" AIR SPACE ON OPPOSITE SIDE OF WALL AT SIM CONDITIONNO WINDOW SYSTEM/CAST STONE SILL AT SIM CONDITION1 1/2" = 1'-0"2FASCIA AT MASONRY CLAD PARAPETSEE DETAIL 4/A7.0 FOR ADDITIONAL INFOSEE DETAIL 2/A7.0 FOR FASCIA INFO10/04/2023BID DOCUMENT SET 0' - 8"4' - 0"4' - 0"CONCRETE FOOTINGGRANULAR FILLCONCRETE WALK/DRIVEWAY8" DIA. x 8'-0" SCHEDULE 40STEEL PIPE, FILL W/ CONCRETE AND FINISH, SEE SPECS.CROWN CONCRETE AT TOPELEV VARIESFINISH GRADECONCRETE FOOTINGGRANULAR FILLCONCRETE WALK/DRIVEWAY8" DIA. x 8'-0" SCHEDULE 40STEEL PIPE, FILL W/ CONCRETE AND FINISH, SEE SPECS.CROWN CONCRETE AT TOPCLIP ANGLES-SEE STRUCTPRECAST PLANK WITH 2" CONC. TOPPING, SEE STRUCTURAL1"NOTE: VERIFY WALL HGT AND SEPARATION REQUIREMENTS FROM ROOF STRUCTURE W/ STRUCTURAL FOR DEFLECTIONCLIP ANGLES-SEE STRUCTNOTE: VERIFY WALL HGT AND SEPARATION REQUIREMENTS FROM ROOF STRUCTURE W/ STRUCTURAL FOR DEFLECTIONINSULATION, PROVIDE 1-HR RATED SAFING @ RATED WALL LOCATIONS, SEE PLANSTEEL DECKING -SEE STRUCTURALROOF TYPE, REFER TO WALL SECTIONS BEAM BEYONDCLIP ANGLES-SEE STRUCTNOTE: VERIFY WALL HGT AND SEPARATION REQUIREMENTS FROM ROOF STRUCTURE W/ STRUCTURAL FOR DEFLECTIONBEAM BEYONDCLIP ANGLES-SEE STRUCTNOTE: VERIFY WALL HGT AND SEPARATION REQUIREMENTS FROM ROOF STRUCTURE W/ STRUCTURAL FOR DEFLECTION10"INSULATED PRECAST WALL PANELBACKER ROD AND SEALANT AT BOTH SIDESCMU WALL, SEE FLOOR PLAN FOR TYPE AND LOCATIONINSULATED PRECAST WALL PANELBACKER ROD AND SEALANT AT BOTH SIDESCMU WALL, SEE FLOOR PLAN FOR TYPE AND LOCATIONBACKER ROD AND SEALANT AT BOTH SIDESINSULATED PRECAST WALL PANEL, HOLD INSULATION BACK AT CORNERS AS REQUIREDINSULATED PRECAST WALL PANEL, HOLD INSULATION BACK AT CORNERS AS REQUIREDINTERIOR10"10"BACKER ROD AND SEALANT AT BOTH SIDESINSULATED PRECAST WALL PANEL, HOLD INSULATION BACK AT CORNERS AS REQUIREDINSULATED PRECAST WALL PANEL, HOLD INSULATION BACK AT CORNERS AS REQUIREDEXTERIORGRIDBACKER ROD AND SEALANT AT BOTH SIDES BY PRECAST SUPPLIERGRIDSTEEL ANGLE AND EMBED PLATE AS REQUIRED BY PRECAST SUPPLIERINSULATED PRECAST WALL PANEL, HOLD INSULATION BACK AT CORNERS AS REQUIREDINSULATED PRECAST WALL PANEL, HOLD INSULATION BACK AT CORNERS AS REQUIRED0' - 1 1/2"0' - 1 1/2"BACKER ROD AND SEALANT AT BOTH SIDES BY PRECAST SUPPLIERINSULATED PRECAST WALL PANEL, HOLD INSULATION BACK AT CORNERS AS REQUIREDINSULATED PRECAST WALL PANEL, HOLD INSULATION BACK AT CORNERS AS REQUIREDCONCRETE-FILLED STEELBOLLARD W/ PLASTIC PROTECTIVE COVER (TYP)10 1/2" INSULATED PRECASTCONCRETE WALL PANEL -SEE STRUCTURALPERIMETER WEATHERSTRIPPING6"1' - 6"CLCLCONCRETE BOLLARD FOUNDATIONHOLD6"GRIDBACKER ROD AND SEALANT AT BOTH SIDESINSULATED PRECAST WALL PANEL, HOLD INSULATION BACK AT CORNERS AS REQUIREDINSULATED PRECAST WALL PANEL, HOLD INSULATION BACK AT CORNERS AS REQUIRED10"10"BACKER ROD AND SEALANT AT BOTH SIDESINSULATED PRECAST WALL PANEL, HOLD INSULATION BACK AT CORNERS AS REQUIREDINSULATED PRECAST WALL PANEL, HOLD INSULATION BACK AT CORNERS AS REQUIREDHOLD6"EQEQWINDOW HEAD116'-4"<BOX HDR 02><BLKG 02><CLG 02><WINDOW 01><SLNT 01>FORMED PERIMETER TRIM BY CEILING SYSTEM MANUFACTURER1"4 1/4"1 1/2"F.98 3/4"6"5 3/4"FIRST FLOOR100'-0"<EXT WALL 11>MINIMUM8"MINIMUM8"<GRADE 01>STUD FACE7 1/4"<VNTLR 01><MTRNET 01><GROUT 01><CONC STOOP><INSUL 03><WTRPRFG 02><FND 01><SILL SLR>TOP OF FND100'-8"<FLASH 01><FLASH 01>7M.47.24 A6.4M.3STUD FACE7"STUD FACE1' - 2"STUD FACE7 1/8"STUD FACE1 1/4"8"3' - 2 5/8"<EXT WALL 01> TO 6'-0" AFF THEN <EXT WALL 06> ATOP OF THIS WALL TO PARAPET HEIGHT<EXT WALL 14>9CANOPY/WINDOW HEAD110'-2"TOP OF STUD112'-5" (111'-10" AT SIM)DECK BRG111'-5" (111'-1" AT SIM)1' - 3"1' - 0"2' - 3"STUD FACE6" 3 1/8"<BOX HDR 02><BLKG 02><INSUL 04><SLNT 02><WINDOW 01><MEMBRN RF 04><SLNT 01><DOOR 04><EXT WALL 10>SCUPPER DRAIN & CONDUCTOR PIPE DASHED IN FOR CLARITY<FLASH 02><FLASH 04><SOFFIT 01><FASCIA 02><BKMTL 01><BLKG 01>LT GAGE CLIP ANGLE ATTACHED TO BLOCKING FOR SOFFIT SUPPORT ATTACHMENTF.9EQ6"EQEQEQSTUD FACE7 1/4"<EXT WALL 09><BLKG 07><BLKG 08>MASONRY/FLASHING BELOWOUTSIDE CORNER CRAFTSMAN TRIM BY PANEL MANUFACTURER12M.3STUD FACE7"STUD FACE7 1/8"STUD FACE7"<EXT WALL 13><EXT WALL 11><EXT WALL 13>MAINTAIN 1 1/2" MINIMUM AIR SPACE WIDTH7<EXT WALL 14>1' - 4" 5 3/4"<BNDBM 01>2"1"<STOOL 01><WINDOW 01><SLNT 01><INSUL 01><FLOOR 01><INSUL 02><FND 01><GRADE 01>1 1/2" 7 5/8"<WTRPRFG 03><VNTLR 01><MTRNET 01><FLASH 01><GROUT 01>8 1/8" 1"5/8"3"3 5/8"<FLASH 13><FLASH 06><ANGLE 03><FLASH 04><SILL 01>WINDOW SILL1'-8"FIRST FLOOR100'-0"71' - 4"CMU FACE5 3/4"<EXT WALL 14><WINDOW 01>3/4"ADHERED MEMBRANE FLASHING, LAP CMU 3" MINIMUM & TERMINATE IN SHIM SPACEWINDOW STOOL BELOWWINDOW STOOL BELOW<SLNT 01>7WINDOW HEAD110'-4 3/8"<EXT WALL 14><LINTEL 01><FLASH 01><VNTLR 01><MTRNET 01><LINTEL 02><CLG 01><SLNT 01><WINDOW 01>76"4 1/2"1 1/2"1' - 4"CMU FACE5 3/8"<MEMBRN RF 01><BNDBM 01><EXT WALL 05><EXT WALL 14><COPING 01>TOP OF CMU121'-8"DECK BRG119'-4"<VNTLR 01>APREFINISHES ALUMINUM COPING BY CURTAIN WALL MANUFACTURERSEALANT1" INSULATED GREEN TINTED GLASS IN PREFINISHED ALUMINUM VENEER SYSTEM MOUNTED DIRECTLY TO PRECAST. FILL SPACE BEHIND VENEER SYSTEM WITH SPRAY FOAM INSULATIONTRANSITION MEMBRANE LAP MEMBRANE 4" MINIMUM & TEMINATE IN GLAZING POCKET OF CURTAIN WALL MULLIONFILL VOID BENEATH COPING W/SPRAYED POLYURETHANE FOAM INSULATIONPRECAST WELDED TO JAMBMETAL DECK, ANGLE & JOIST -SEE STRUCTURALROOF TYPE -A LAP MEMBRANE AROUND BLOCKING & ATTACH PER MANUFACTURER'S REQUIRMENTS10"2"6' - 4 3/4"2"1/2"2"1 3/8"6"1" INSULATED GLASS IN PREFINISHED ALUMINUM CURTAINWALL SYSTEM5/8" EXTERIOR GYP BD SHEATHING ON 6" METAL STUDS @ 1' -4" O.C., FILL STUD CAVITIES SOLID W/SPRAYED POLYUREYHANE FOAM INSULATIONPROVIDE ELECTRIC MOTOR SHADE MOUNTED TO PRECASTATTACHMENT BY PRECASTER, IF POCKET, BACK HATCH WITH INSULATION PER POCKET NOTE 1<EXT WALL 05> A7.132 5/8" 2 1/2" 4 7/8"4 1/2"A4 1/2"3/8"2 1/2"2 5/8"1 3/8"6"2 5/8"MIN8"PREFINISHED ALUMINUM FLASHING TO RUN UP THE PRECAST WALL AND BACKED WITH ADHERED MEMBRANE WITH TERMINATION BAR FILL IN VENEER SYSTEM CAVITY WITH SPRAY FOAM INSULATION PERIMETER SEALANT W/BACKER ROD, PROVIDE ROPE WICKS @ 2'-0" O.C. MAX.CURTAIN WALL VENEER SYSTEM WITH SPANDREL TO MATCH JANESVILLE GREENCURTAIN WALL SYSTEM PROVIDE ELECTRIC MOTOR SHADE MOUNTED TO PRECAST -ALIGN W/HEAD OF WINDOW OPENING6"4"VERIFY IN FIELD EXISTING CONDITIONS AND ADJUST BLOCKING REQUIREMENTS AS NEEDED.PREFINISHED METAL COPING WITH WELDED CORENERS AND TRIM.8" min2"2"2"PRESSURE TREATED PLYWOOD AND BLOCKING. 1 1/2"10" INSULATED PRECAST CONCRETE WALL PANEL. 5/8" EXTERIOR GYPSUM BOARD ON 2" SPRAY FOAM INSULATION. BELLOWS TYPE EXPANSION JOINT COVER WITH DRIP AND INSULATION. PRESSURE TREATED 2x BLOCKING. TIE INTO EXISTING ROOFING PER MANUFACTURES REQUIREMENTS. 25 1/2"1 1/4"4 1/4"FASCIA COVERANCHOR BARNON-CURING SEALANTSTAINLESS STEEL FASTENERTOP OF PRECAST117'-4"<EXT WALL 05><EXT WALL 03><COPING 03>Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedEXTERIOR DETAILSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A7.110/13/2023220025.00C2023-153/4" = 1'-0"20PIPE BOLLARD -EXTERIOR (TYP)1 1/2" = 1'-0"22CMU HEAD1 1/2" = 1'-0"23CLUB ROOF EDGE DEFAULT1 1/2" = 1'-0"25PRECAST -CMU WALL T INTERSECTION1 1/2" = 1'-0"29PRECAST -PRECAST WALL T INTERSECTION1 1/2" = 1'-0"27PRECAST TYPICAL MITERED CORNER1 1/2" = 1'-0"21PIPE BOLLARD -PLAN -EXTERIOR (TYP)1 1/2" = 1'-0"26PRECAST JAMBS1 1/2" = 1'-0"28PRECAST -PRECAST WALL BUTT JOINTKEYNOTES PER SHEET#<ANGLE 03> GALVANIZED STEEL ANGLE FOR MASONRY SUPPORT - (2) ANGLES PER STONE SILL<BKMTL 01> PREFINISHED ALUMINUM BREAK METAL (MATCH ALUMINUM WINDOW FINISH), ATTACH IN SHIM SPACE W/VERTICAL LEG LAP GYPSUM BOARD SHEATHING<BLKG 01> 2X4 TREATED BLOCKING<BLKG 02> 2X BLOCKING<BLKG 07> 2X4 BLOCKING<BLKG 08> 5/8" PLYWOOD BLOCKING<BNDBM 01> 8" BOND BEAM<BOX HDR 02> BOX HEADER<CLG 01> SUSPENDED ACT SYSTEM<CLG 02> PREFINISHED ALUMINUM WOOD-LOOK CEILING SYSTEM<CONC STOOP> POURED CONCRETE SLAB-ON-GRADE (1/4" PER FOOT SLOPE )W/FOUNDATION WALLS 4'-0" DEEP MINIMUM UNLESS NOTED OTHERWISE<COPING 01> PREFINISHED ALUMINUM COPING WITH CLEAT ATTACHMENT, 3/4" TREATED PLYWOOD, TREATED 2X6 SHAPED FOR 1 1/2" SLOPE & FILL VOID SOLID W/SPRAYED CLOSED-CELL POLYURETHANEFOAM INSULATION - SEE WALL SECTIONS FOR THE RESPECTIVE WIDTH<COPING 03> PREFINISHED ALUMINUM FASCIA W/ANCHOR BAR ATTACHMENT, NON-CURING SEALANT, 2X TREATED BLOCKING, WRAP MEMBRANE AROUND BLOCKING ATTACH PER MANUFACTURER'SRECOMMENDATIONS<DOOR 04> PREFINISHED ALUMINUM MEDIUM STYLE DOOR WITH 1" INSULATED FULL GLASS<EXT WALL 03> 10" INSULATED ARCHITECTURAL PRECAST WALL PANEL<EXT WALL 05> 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 2" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. & 2" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION<EXT WALL 09> VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM, 7/8" HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONAL FURRING MAY BE REQUIRED, COORDINATE W/PANEL SYSTEM MANUFACTURER), AIRBARRIER, 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 3" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C. (ALIGN W/STEEL STUD SPACING), 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 6" STEEL STUDFRAMING @ 1'-4" O.C. 5/8" EXTERIOR GYPSUM BOARD SHEATHING, AIR BARRIER, 7/8" HORIZONTAL FURRING @ 1'-4" O.C. (ADDITIONAL FURRING MAY BE REQUIRED, COORDINATE W/PANEL SYSTEMMANUFACTURER), AIR BARRIER, & VERTICAL 6" WIDE PANELBOARD CLADDING SYSTEM<EXT WALL 10> 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 3" VERTICAL NON-METALLIC GIRTS @ 1'-4" O.C.., 3" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION, 5/8" EXTERIOR GYPSUM BOARDSHEATHING, 6" STEEL STUDS @ 1'-4" O.C. & 5/8" GYPSUM BOARD<EXT WALL 11> 4" CONC BRICK, 3 1/2" AIR SPACE, 5/8" EXTERIOR GYPSUM BOARD SHEATHING (LAP CONCRETE 1" MINIMUM), 6" STEEL STUD FRAMING @ 1'-4" O.C., 5/8" EXTERIOR GYPSUM BOARD SHEATHING(EXTEND DOWN TO TOP OF GROUT), 1 1/2" AIR SPACE & 4" CONC BRICK<EXT WALL 13> 4" CONC BRICK, 1 1/2" AIR SPACE, CONTINUOUS 3" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION (R-18 MINIMUM), 5/8" EXTERIOR GYPSUM BOARD SHEATHING, 6" STEEL STUDFRAMING @ 1'-4" O.C. & 5/8" GYPSUM BOARD<EXT WALL 14> 4" CONC BRICK, 1 3/4" AIR SPACE, CONTINUOUS 3" SPRAYED CLOSED-CELL POLYURETHANE FOAM INSULATION (R-18 MINIMUM) & 8" CMU W/HORIZONTAL REINFORCING @ 1'-4" O.C. VERTICALLY<FASCIA 02> PREFINISHED ALUMINUM PANEL SYSTEM J-CHANNEL BY PANEL MANUFACTURER<FLASH 01> THROUGH-WALL FLASHING WITH STAINLESS STEEL DRIP EXTEND VERTICAL LEG 8" MINIMUM TO TERMINATION BAR SEAL ATTACHMENT<FLASH 02> PREFINISHED ALUMINUM FLASHING W/HEMMED DRIP EDGE (MATCH WINDOW FINISH), UPTURNED VERTICAL HEMMED LEG & SLOPE HORIZONTAL LEG FOR POSITIVE DRAINAGE - FRICTION-FITFLASHING AROUND WINDOW SILL EDGE, NO FASTENERS THROUGH ROOF MEMBRANE<FLASH 04> ADHERED MEMBRANE FLASHING, LAP GYPSUM BOARD SHEATHING 3" MINIMUM & 2X BLOCKING, TERMINATE IN SHIM SPACE<FLASH 06> THROUGH-WALL FLASHING WITH DRIP, LAP OVER <FLASH 04> TERMINATE IN SHIM SPACE<FLASH 13> PREFINISHED ALUMINUM FLASHING (MATCH WINDOW FINISH) W/DOWNTURNED HEMMED EDGE & UPTURNED VERTICAL HEMMED EDGE SET ONTO SEALANT BED<FLOOR 01> REINFORCED CONCRETE SLAB-ON-GRADE FLOOR, MINIMUM 6" COMPACTED GRANULAR FILL<FND 01> REINFORCED CONCRETE FOOTING AND FOUNDATION SYSTEM<GRADE 01> FINISH GRADE<GROUT 01> GROUT CAVITY SOLID BELOW FLASHING<INSUL 01> 1/2" RIGID INSULATION FOR THERMAL CONTINUITY THROUGH CONCRETE FLOOR SLAB<INSUL 02> 2" RIGID INSULATION DOWN TO TOP OF FOOTING, 4'-0" MINIMUM IF THERE IS NO FOOTING<INSUL 03> 1/2" EXPANSION FELT<INSUL 04> SPRAY 1" THICK MINIMUM CLOSED-CELL POLYURETHANE FOAM INSULATION ON 1'-6" EXTERIOR/INTERIOR LENGTH OF THE WIDE FLANGE STEEL BEAM, PROVIDE PERIMETER 1/2" SOFT JOINT(SEALANT W/BACKER ROD) AROUND THE INTERIOR/EXTERIOR STEEL FRAMING PENETRATIONS - TYPICAL<LINTEL 01> GALVANIZED BENT STEEL PLATE LINTEL (PAINT)<LINTEL 02> 8" MASONRY LINTEL<MEMBRN RF 01> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), WRAP MEMBRANE AROUND THE SLOPED PLYWOOD & LAP JOINT BETWEEN PLYWOOD & MASONRY 1" MINIMUM - ATTACH PERMANUFACTURER'S RECOMMENDATIONS, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM) AT ROOF DRAIN, TAPERED INSULATION, VAPOR RETARDER (SEAL AGAINST VERTICALSURFACE), ROOF DECK, ANGLE & STRUCTURAL FRAMING- SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATION AT THE PERIMETER OF ROOF DRAINLOCATIONS<MEMBRN RF 04> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), TAPERED POLYISOCYANURATE ROOF INSULATION (1" MINIMUM THICKNESS AT ROOF DRAIN, VAPOR RETARDER (SEAL AGAINST VERTICALSURFACE) & ROOF STRUCTURAL FRAMING - EXTEND MEMBRANE 1'-0" MINIMUM VERTICALLY TO TERMINATION BAR LAP MEMBRANE AROUND BLOCKING, LAP JOINT BETWEEN PLYWOOD & PANELSYSTEM & ATTACH PER MANUFACTURER'S RECOMMENDATIONS, ROOF DECK & STRUCTURAL FRAMING<MTRNET 01> MORTAR NET<SILL 01> CAST STONE SILL<SILL SLR> SILL SEALER - CONTINUOUS POLYPROPOLENE PAD SET BETWEEN STUD RUNNER & CONCRETE<SLNT 01> PERIMETER SEALANT W/BACKER ROD EACH SIDE<SLNT 02> CONTINUOUS SEALANT BEAD<SOFFIT 01> SUSPENDED PREFINISHED ALUMINUM VENTED PANEL SYSTEM (12" WIDE, ALIGN JOINTS W/FASCIA JOINTS), 7/8" FURRING @ 1'-4" O.C. & 1 1/2" CHANNELS @ 4'-0" O.C. - VERIFY SPACING OFSUPPORT FRAMING W/PANEL MANUFACTURER<STOOL 01> SOLID SURFACE STOOL W/RADIUS ON 5/8" PLYWOOD & PROVIDE CONTINUOUS SEALANT BEAD<VNTLR 01> MASONRY VENTILATOR @ 2'-8" O.C.<WINDOW 01> THERMALLY BROKEN PREFINISHED ALUMINUM STOREFRONT FRAMING SYSTEM WITH 1" INSULATED GLASS, LAP CONCRETE BRICK MASONRY RETURN 1/2" MINIMUM<WTRPRFG 02> WATERPROOFING, PROVIDE MORTAR CANT, LAP FOOTING & LAP JOINT BETWEEN SHEATHING & TOP OF FOUNDATION WALL<WTRPRFG 03> WATERPROOFING, PROVIDE MORTAR CANT, LAP FOOTING & EXTEND 8" MINIMUM ABOVE FINISHED FLOOR ELEVATION1 1/2" = 1'-0"9STOREFRONT SYSTEM HEADNO CEILING OR SPRAY FOAM INSULATION & GYPSUM BOARD IS FULL HEIGHT AT SIM CONDITION1 1/2" = 1'-0"16MASONRY CLAD CAVITY WALL BASE1/2" = 1'-0"19VESTIBULE 118 PARTIAL FLOOR PLAN1 1/2" = 1'-0"13CANOPY SCUPPER DRAIN AT WINDOW SYSTEMSSTUD FACE IS 7" AT SIM CONDITION1 1/2" = 1'-0"14VERTICAL PANEL EDGE PLAN1 1/2" = 1'-0"15MASONRY CAVITY WALL PLAN1 1/2" = 1'-0"7WINDOW SILL AT MASONRY CAVITY WALL1 1/2" = 1'-0"1WINDOW JAMB AT MASONRY CAVITY WALL1 1/2" = 1'-0"8WINDOW HEAD AT MASONRY CAVITY WALL1 1/2" = 1'-0"2MASONRY CAVITY WALL PARAPET1 1/2" = 1'-0"30CONVENTION CURTAIN WALL DETAIL Copy 13" = 1'-0"3WINDOW SYSTEMS CONNECTION DETAIL1 1/2" = 1'-0"4P.C. COPING @ EXIST. ROOF -EXPAN. JOINT1 1/2" = 1'-0"10FASCIA AT PRECAST PARAPET10/04/2023BID DOCUMENT SET PRECAST PLANK - SEE STRUCTIRAL DRAWINGSMETAL SUMP PANDECK CLAMPSUMP PAN RECEIVERBODYRDMEMBRANE ROOFING SYSTEMROOF DRAIN STRAINERTAPER RIGID INSULATION TO DRAINROOF DRAIN INLETSUMP PAN2' - 0"OVERFLOW SCUPPER2"VAPOR RETARDERROOF DECK - SEE STRUCTURAL DRAWINGSMETAL SUMP PANDECK CLAMPSUMP PAN RECEIVERBODYRDMEMBRANE ROOFING SYSTEMROOF DRAIN STRAINERTAPER RIGID INSULATION TO DRAINROOF DRAIN INLETSUMP PAN2' - 0"VAPOR RETARDERM.41 1/2"4 1/2"6"STUD FACE1 5/8"TOP OF STUD128'-0"<COPING 02><MEMBRN RF 01>8" STEEL STUD FRAMING @ 1'-4" O.C <EXT WALL 04><PNLB 01><PNLB 03><FLASH 08><PNLB 04><PNLB 01>5/8" EXTERIOR GYPSUM BOARD SHEATHINGConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1 1/2" = 1'-0"EXTERIOR DETAILSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A7.210/13/2023220025.00C2023-15KEYNOTES PER SHEET#<COPING 02> PREFINISHED ALUMINUM GRAVEL STOP W/CLEAT ATTACHMENT, 2X TREATED BLOCKING, WRAP MEMBRANE AROUND BLOCKING ATTACH PER MANUFACTURER'S RECOMMENDATIONS<EXT WALL 04> 1/8" THICK PREFINISHED PERFORATED ALUMINUM PANEL, 2" LONG STAINLESS STEEL OR ALUMINUM HOLLOW SPACER FOR PERFORATED ALUMINUM PANEL FASTENER TO FIT THROUGH - FASTENERTYPE EQUALLY SPACED HORIZONTALLY AND VERTICALLY DETERMINED BY STRUCTURAL ENGINEER, PREFINISHED ALUMINUM PANEL, AIR BARRIER, FIRE-TREATED 5/8" PLYWOOD SHEATHING, 6"STEEL STUD FRAMING @ 1'-4" O.C., 5/8" EXTERIOR GYPSUM BOARD SHEATHING, AIR BARRIER & VERTICAL FLUSH PREFINISHED ALUMINUM PANEL SYSTEM<FLASH 08> ADHERED MEMBRANE FLASHING, LAP AROUND TOP EDGE OF PLYWOOD 3" MINIMUM & 3" MINIMUM ONTO THE EXTERIOR GYPSUM BOARD SHEATHING/PLYWOOD EACH SIDE OF PARAPET<MEMBRN RF 01> ADHERED MEMBRANE ROOF SYSTEM (COLOR: BLACK), WRAP MEMBRANE AROUND THE SLOPED PLYWOOD & LAP JOINT BETWEEN PLYWOOD & MASONRY 1" MINIMUM - ATTACH PERMANUFACTURER'S RECOMMENDATIONS, 7" THICK POLYISOCYANURATE ROOF INSULATION (R-38 MINIMUM) AT ROOF DRAIN, TAPERED INSULATION, VAPOR RETARDER (SEAL AGAINST VERTICALSURFACE), ROOF DECK, ANGLE & STRUCTURAL FRAMING- SEE ROOF PLAN FOR ADDITIONAL ROOF INSULATION THICKNESS FOR THE TAPERED INSULATION AT THE PERIMETER OF ROOF DRAINLOCATIONS<PNLB 01> 6" WIDE VERTICAL PANELBOARD CLADDING SYSTEM TRADITIONAL TERMINATION SET<PNLB 03> OUTSIDE CORNER CRAFTSMAN TRIM BY PANELBOARD CLADDING SYSTEM MANUFACTURER<PNLB 04> 6" WIDE HORIZONTAL PANELBOARD CLADDING SYSTEM, AIR BARRIER (LAP OVER <FLASH 08> & SEAL), 5/8" EXTERIOR GYPSUM BOARD SHEATHING & 6" STEEL STUD FRAMING @ 1'-4" O.C.1 1/2" = 1'-0"30ROOF DRAIN -PRECAST PLANK1 1/2" = 1'-0"24ROOF DRAIN -METAL DECK1 1/2" = 1'-0"18COPING10/04/2023BID DOCUMENT SET DASHER BOARDS & GLASS, SEE ICE CONSULTANT DRWGS.REFRIGERATED CONC. FLOOR SLAB, SEE REFRIGERATION DWGS.1" EXPANSION JOINT, SEE ICE CONSULTANTS DRWGS.CMU/CONCRETE WALL, SEE STRUCT.CONC. SLAB W/ THICKENED EDGE, SEE STRUCT.SUB GRADE PREPARATION, REFER TO SPECIFICATIONSSEE STRUCT.T.O. FOOTING100' - 0"ARENA FLOOR LEVEL103'-0"BLEACHER LEVELCLOSURE ANGLE, SEE ICE CONSULTANT DRWGS.1" MIN.3'-0" MIN.2" RIGID INSULATION UNDER SLAB AND AT PERIMETER, COORDINATE WITH RADIANT HEATING MFR. REQUIREMENTS V.I.F.5 1/2"POURED CONCRETE EDGEV.I.F.5 1/2"INSULATION, SEE REFRIGERATION DRAWINGS6"DASHER BOARDS & GLASS, SEE ICE CONSULTANT DRWGS.REFRIGERATED CONC. FLOOR SLAB, SEE REFRIGERATION DWGS.1" EXPANSION JOINT, SEE ICE CONSULTANTS DRWGS.CMU/CONCRETE WALL, SEE STRUCT.CONC. SLAB W/ THICKENED EDGE, SEE STRUCT.SUB GRADE PREPARATION, REFER TO SPECIFICATIONSCLOSURE ANGLE, SEE ICE CONSULTANT DRWGS.2" RIGID INSULATION UNDER SLAB AND AT PERIMETER, COORDINATE WITH RADIANT HEATING MFR. REQUIREMENTS POURED CONCRETE EDGEINSULATION, SEE REFRIGERATION DRAWINGSPRECAST STADIA RISERS,SEE STRUCTURAL/4 A7.3CIP STAIRS, SEECORE DRILL POST, SET W/ EPOXY GROUT SOLID (TYP)1-1/2" DIA. STEEL PIPE RAILING, PAINT1-1/2" DIA. STEEL PIPE, WELDED TO VERTICAL POSTS, GRIND SMOOTH, PAINTCORE DRILL POST, SET W/ EPOXY GROUT SOLID (TYP)1-1/2" DIA. STEEL PIPE RAILING, PAINT1-1/2" DIA. STEEL PIPE, WELDED TO VERTICAL POSTS, GRIND SMOOTH, PAINT3'-7 1/2"C OF STEPLC OF STEPL(22" MIN/ 36" MAX BETWEEN RAILING SECTIONS)1'-9"/4 A7.3CIP STAIRS,SEE/4 A7.3PRECAST STADIA RISERS,SEE STRUCTURALCIP STAIRS, SEECORE DRILL POST, SET W/ EPOXY GROUT SOLID (TYP)1-1/2" DIA. STEEL PIPE RAILING, PAINT1-1/2" DIA. STEEL PIPE, WELDED TO VERTICAL POSTS, GRIND SMOOTH, PAINTCORE DRILL POST, SET W/ EPOXY GROUT SOLID (TYP)1-1/2" DIA. STEEL PIPE RAILING, PAINT1-1/2" DIA. STEEL PIPE, WELDED TO VERTICAL POSTS, GRIND SMOOTH, PAINTC OF STEPLC OF STEPLCIP STAIRS,SEE0' - 11"0' - 11"0' - 11"0' - 11"0' - 11"0' - 3"0' - 3"0' - 3"0' - 3"0' - 11"0' - 11"3"x3" CHAMFER @ LOWER STEP @ EACH RISER LEVEL OF AISLE STEPS 0' - 11"0' - 11"0' - 11"0' - 11"0' - 11"0' - 7"0' - 7"0' - 7"1' - 9"PRECAST STADIA RISERS, SEE STRUCTURALSEALANT W/ BACKER ROD, BOTH SIDES(2) VERT. -#4 REBAR SET IN EPOXY PER STAIR TREAD (1) HORI. -#4 REBAR TIE(2) SEAT BRACKET ANCHORS, VERIFY W/ BLEACHER SEAT CONTRACTORC.I.P. CONCRETE STEPS, TYP.1 1/4"8 3/8"PRECAST STADIA RISERS, SEE STRUCTURALSEALANT W/ BACKER ROD, BOTH SIDES(1) HORI. -#4 REBAR TIE(2) SEAT BRACKET ANCHORS, VERIFY W/ BLEACHER SEAT CONTRACTORSTANDING RAIL, SEE DETAIL 8/A7.2 C.I.P. CONCRETE STEPS, TYP.0' - 11"1 1/4" SCHED. 40 STEEL POST; SPACED 5'-0" O.C. MAX.; PTDSTEEL REINFORCEMENT CHANNEL AT UNDERSIDE OF PAN @ PAN STAIRS OR CORE DRILL AS REQ'D; PTDVARIEST/O TREAD1 1/4" SCHED 40 STL HANDRAIL; PTD2" CONCRETE REINFORCED STEEL PANSTEEL RECEIVER SLEEVE WELDED TO BOTTOM OF PAN; KEEP TOP OF SLEEVE FLUSH WITH TOP OF TREAD;WELD POST INTO SLEEVE1 1/4" SCHED. 40 STEEL POST; SPACED 5'-0" O.C. MAX.; PTDSTEEL REINFORCEMENT CHANNEL AT UNDERSIDE OF PAN @ PAN STAIRS OR CORE DRILL AS REQ'D; PTD1 1/4" SCHED 40 STL HANDRAIL; PTD2" CONCRETE REINFORCED STEEL PANSTEEL RECEIVER SLEEVE WELDED TO BOTTOM OF PAN; KEEP TOP OF SLEEVE FLUSH WITH TOP OF TREAD;WELD POST INTO SLEEVE1 1/4" SCHED. 40 STEEL POST; SPACED 5'-0" O.C. MAX.; PTDSTEEL REINFORCEMENT CHANNEL AT UNDERSIDE OF PAN AS REQ'D; PTD1 1/4" SCHED 40 STL HANDRAIL; PTDREINFORCED STEEL TREADSTEEL RECEIVER SLEEVE WELDED TO BOTTOM OF PAN; KEEP TOP OF SLEEVE FLUSH WITH TOP OF TREAD;WELD POST INTO SLEEVE1 1/4" SCHED 40 STL MID-RAIL; PTD3' - 0"1 1/4" SCHED 40 STL HANDRAILRETURN ENDS (TYP)EQEQEQEQVARIEST/O TREAD1 1/4" SCHED. 40 STEEL POST; SPACED 5'-0" O.C. MAX.; PTDSTEEL REINFORCEMENT CHANNEL AT UNDERSIDE OF PAN AS REQ'D; PTD1 1/4" SCHED 40 STL HANDRAIL; PTDREINFORCED STEEL TREADSTEEL RECEIVER SLEEVE WELDED TO BOTTOM OF PAN; KEEP TOP OF SLEEVE FLUSH WITH TOP OF TREAD;WELD POST INTO SLEEVE1 1/4" SCHED 40 STL MID-RAIL; PTD1 1/4" SCHED 40 STL HANDRAILRETURN ENDS (TYP)COUNTERTOP FASTENED TO TOP OF WALL AS REQUIRED AND TO RETURN AS FACE OF WALL1/4" CLEAR PLEXIGLASS SET IN COUNTERTOP 1/4" DADOSEALANT ON BOTH SIDESWOOD BLOCKING AS NECESSARYSEALANT ON BOTH SIDESMETAL STUD WALL GYP. BD. FINISH AND PAINT3" STEEL TUBES PLACED 4' -0 O.C. MAXELECTRICAL BOX IN WALL, SEE ELECTRICAL FOR SPACING, BURY CONDUIT BELOW DECK FLOOR2" +-2' - 6" 3"1' - 7" 2"Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedINTERIOR DETAILSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A7.310/13/2023220025.00C2023-151 1/2" = 1'-0"1BLEACHER PLATFORM AT DASH BOARDS1 1/2" = 1'-0"2BLEACHER -TYP RAILING3/4" = 1'-0"3ARENA STEPS -CHAMFERED AT AISLES1 1/2" = 1'-0"4BLEACHER -SEATING STEP DETAIL1 1/2" = 1'-0"6INTERMEDIATE HANDRAIL @ CONC PAN STAIR1 1/2" = 1'-0"8INTERMEDIATE HANDRAIL @ STL TREAD STAIR1 1/2" = 1'-0"5PRESS BOX EDGE WALL10/04/2023BID DOCUMENT SET 2'-0"1'-6"VERIFY ALL DIMENSIONS PER MANUFACTURER10"CONCRETE SLABRESILIENT ATHLETIC FLOORING PLUG; CUT TO FIT COVER AND ADHERE FULLYRESILIENT ATHLETIC FLOORINGMETAL FLOOR SLEEVENON-SHRINK GROUTVERIFY ALL DIMENSIONS PER MANUFACTURERVOLLEYBALL STANDARDS; SIZE MAY VARY; VERIFY WITH MANUFACTURERCONCRETE SLABRESILIENT ATHLETIC FLOORINGNON-SHRINK GROUTSLEEVE FLOORPLATE TO BE FLUSH WITH CONCRETE FLOORSEE RCPB.O. MASONRY LINTELSEE STRUCTURAL FOR BOND BEAM AND LINTEL REQUIREMENTSDEEP BOND BEAMS AT SIMILAR CONDITION -SEE STRUCTURAL5/8" GB ON METAL STUDS AT 16" O.C.3/8" SEALANT JOINTSEE STRUCTURAL FOR BOND BEAM AND LINTEL REQUIREMENTSDEEP BOND BEAMS AT SIMILAR CONDITION -SEE STRUCTURAL5/8" GB ON METAL STUDS AT 16" O.C.3/8" SEALANT JOINT0' - 1 3/4"0' - 4 1/4"0' - 4 1/4"0' - 1 3/4"0' - 1 3/4"0' - 4 1/4"0' - 4 1/4"0' - 1 3/4"1' - 0"1' - 0"5/8" DIA. HOLES W/ 1/2" DIA. EXPANSION BOLTS (TYP)1/4" STEEL PLATE; GRIND ALL EDGES SMOOTH5" DIA. STEEL PIPE; PAINT(4) -1/2"x2"x2" STEEL PLATES; WELD TO PLATE AND PIPE12"x12"x1/2" STEEL PLATE5/8" DIA. HOLES W/ 1/2" DIA. EXPANSION BOLTS (TYP)1/4" STEEL PLATE; GRIND ALL EDGES SMOOTH5" DIA. STEEL PIPE; PAINT(4) -1/2"x2"x2" STEEL PLATES; WELD TO PLATE AND PIPE12"x12"x1/2" STEEL PLATEINSULATION, PROVIDE 1-HR RATED SAFING @ RATED WALL LOCATIONS, SEE PLANROOF TYPE, REFER TO WALL SECTIONS CLIP ANGLES-SEE STRUCTPRECAST PLANK, SEE STRUCTURAL1"NOTE: VERIFY WALL HGT AND SEPARATION REQUIREMENTS FROM ROOF STRUCTURE W/ STRUCTURAL FOR DEFLECTIONINSULATION, PROVIDE 1-HR RATED SAFING @ RATED WALL LOCATIONS, SEE PLANROOF TYPE, REFER TO WALL SECTIONS CLIP ANGLES-SEE STRUCTPRECAST PLANK, SEE STRUCTURALNOTE: VERIFY WALL HGT AND SEPARATION REQUIREMENTS FROM ROOF STRUCTURE W/ STRUCTURAL FOR DEFLECTIONCLIP ANGLES-SEE STRUCTPRECAST PLANK WITH 2" CONC. TOPPING OR PRECAST STADIA, SEE STRUCTURAL1"NOTE: VERIFY WALL HGT AND SEPARATION REQUIREMENTS FROM STRUCTURE W/ STRUCTURAL FOR DEFLECTIONCLIP ANGLES-SEE STRUCTPRECAST PLANK WITH 2" CONC. TOPPING OR PRECAST STADIA, SEE STRUCTURALNOTE: VERIFY WALL HGT AND SEPARATION REQUIREMENTS FROM STRUCTURE W/ STRUCTURAL FOR DEFLECTIONINSULATION, PROVIDE 1-HR RATED SAFING @ RATED WALL LOCATIONS, SEE PLANSTEEL DECKING -SEE STRUCTURALROOF TYPE, REFER TO WALL SECTIONS BEAM BEYONDCLIP ANGLES-SEE STRUCTPRECAST PLANK WITH 2" CONC. TOPPING, SEE STRUCTURAL1"NOTE: VERIFY WALL HGT AND SEPARATION REQUIREMENTS FROM ROOF STRUCTURE W/ STRUCTURAL FOR DEFLECTIONINSULATION, PROVIDE 1-HR RATED SAFING @ RATED WALL LOCATIONS, SEE PLANSTEEL DECKING -SEE STRUCTURALROOF TYPE, REFER TO WALL SECTIONS BEAM BEYONDCLIP ANGLES-SEE STRUCTPRECAST PLANK WITH 2" CONC. TOPPING, SEE STRUCTURALNOTE: VERIFY WALL HGT AND SEPARATION REQUIREMENTS FROM ROOF STRUCTURE W/ STRUCTURAL FOR DEFLECTION3/8" TEMPERED GLASS; EASEEXPOSED EDGESLINE OF STEEL GUARDRAIL POSTBEYOND; PTD1" X 1" ALUMINUM GLAZING CHANNELSETTING BLOCK AT BOTTOM RAIL CONDITION ONLYGASKET BOTH SIDES; TYP. FOR BOTTOM AND SIDES CHANNELS1 1/2" X 1 1/2" STEEL RAIL BEYOND; PTD3/8" TEMPERED GLASS; EASEEXPOSED EDGESLINE OF STEEL GUARDRAIL POSTBEYOND; PTD1" X 1" ALUMINUM GLAZING CHANNELSETTING BLOCK AT BOTTOM RAIL CONDITION ONLYGASKET BOTH SIDES; TYP. FOR BOTTOM AND SIDES CHANNELS1 1/2" X 1 1/2" STEEL RAIL BEYOND; PTD8CL1' - 7 3/8"8 3/8"STEEL STRUCTURAL BEAM110 ' -2 3/4"ANGLE CL110 ' -6"TOP OF GIRT3/4"3/4"STEEL ANGLESWRAP LEGS OF ANGLES W/ 1/4" THICK ADHESIVE BACKED NEOPRENE SHEETSALUMINUM FRONT SET STOREFRONT SYSTEMSEALANT AND BACKER RODALUMINUM TRIM BY WINDOW SUPPLIER6" CONCRETE SLAB -SEE STRUCTURALCONCENTRATED SLURRY WATER PROOFING COATMODIFIED SLURRY WATER PROOFING COATSEALING STRIP "KNOCK-OUT"1/2" EXPANSION MATERIAL W/ SEALANT3/16" STEEL CAP PLATE; RETURN CAP 1 1/2"(MIN) DOWN FACE OF WALLSLEEVES FOR GATE POST W/ 4" x 8" x 1/4" STEEL PLATE AND EXPANSION BOLTS1 1/4" DIA. STEEL PIPE3/4" DIA. STEEL PIPE1 1/4" DIA. STEEL PIPEWATER PROOFING0' - 8"0' - 1 1/2"93' -4"B/O PIT100' -0"ICE AND FIELDHOUSE LEVEL2'-0"3'-6"103' -6"T.O. GUARDRAIL2'-0"+/- (WATER LEVEL)1 1/2".0' - 6"6" CONCRETE SLAB -SEE STRUCTURALCONCENTRATED SLURRY WATER PROOFING COATMODIFIED SLURRY WATER PROOFING COATSEALING STRIP "KNOCK-OUT"1/2" EXPANSION MATERIAL W/ SEALANT3/16" STEEL CAP PLATE; RETURN CAP 1 1/2"(MIN) DOWN FACE OF WALLSLEEVES FOR GATE POST W/ 4" x 8" x 1/4" STEEL PLATE AND EXPANSION BOLTS1 1/4" DIA. STEEL PIPE3/4" DIA. STEEL PIPE1 1/4" DIA. STEEL PIPEWATER PROOFINGWALL TYPE TO BE VERIFIED BY OWNER DEPENDING ON WHAT RESURFACER IS SELECTED. COORDINATE WITH B32 AND COJ FOR DETAIL ONCE RESURFACER IS CHOSEN. 6" CONCRETE SLAB -SEE STRUCTURAL MODIFIED SLURRY WATER PROOFING COATSEALING STRIP "KNOCK-OUT"1/2" EXPANSION MATERIAL W/ SEALANT3/16" STEEL CAP PLATE; RETURN CAP 1 1/2"(MIN) DOWN FACE OF WALLWATER PROOFING96' -0"B/O PIT100' -0"ICE /MULTIPURPOSE LEVEL2'-0"+/- (WATER LEVEL)1 1/2".VARIABLE PER BRAND3'-6"8"0' - 6"103' -6"T.O. WALL6" CONCRETE SLAB -SEE STRUCTURAL CONCENTRATED SLURRY WATER PROOFING COATMODIFIED SLURRY WATER PROOFING COATSEALING STRIP "KNOCK-OUT"1/2" EXPANSION MATERIAL W/ SEALANT3/16" STEEL CAP PLATE; RETURN CAP 1 1/2"(MIN) DOWN FACE OF WALLICE REGENERATOR CHARGER WATER PROOFINGConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedINTERIOR DETAILSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A7.410/13/2023220025.00C2023-151 1/2" = 1'-0"8VOLLEYBALL SLEEVE1 1/2" = 1'-0"6CEILING AT MASONRY LINTEL1 1/2" = 1'-0"7BOLLARD -INTERIOR (TYP)1 1/2" = 1'-0"4CMU WALL TERMINATION DETAIL AT PRECAST1 1/2" = 1'-0"5CMU WALL TERMINATION DETAIL AT STADIA1 1/2" = 1'-0"3CMU WALL TERMINATION DETAIL12" = 1'-0"10GLASS ANCHORING DETAIL3" = 1'-0"9DETAIL @ STORFRONT1 1/2" = 1'-0"2ICE MELT PIT DETAIL1 1/2" = 1'-0"1ICE MELT PIT DETAILS -PLUG IN STAND10/04/2023BID DOCUMENT SET 1'-2"2X4 PLASTIC WOOD2X4 PLASTIC WOODATTACH TO CMU WALL W/ TAPCON4"3/8" METAL STUD @ 3" o.c.CL2X4 PLASTIC WOOD2X4 PLASTIC WOODATTACH TO CMU WALL W/ TAPCON3/8" METAL STUD @ 3" o.c.3 1/2"3/4" SOLID SURFACE COUNTERTOP W/ COVED BACK & SIDESPLASH1x4 WOOD STUDP-LAM BASE VALANCE PANEL STAINLESS STEEL SINK BYPLUMBING CONTRACTORSEE INTERIOR ELEVATION1 1/2"1"SEE INTERIOR ELEVATION2' - 3" MIN.MIN.8"MIN.11"MIN.9"P-LAM BASE REMOVEABLE SLOPED PANEL NOTE: SEE ELEVATION FOR UPPER CABINET TYPE AND SIZESEE PLUMBING FOR FAUCET AND SINKPOWER OUTLET REQUIRED FOR AUTOSENSOR FAUCET,SEE ELEVATION AND POWER PLAN. COORDINATE W/ REAR3/4" P-LAM COUNTERTOP W/COVED BACK & SIDESPLASH1x4 WOOD STUDP-LAM BASE CABINET W/ADJUSTABLE PLAM SHELFBASE (AS SCHED.)SEE FINISH PLANSEE INTERIOR ELEVATION1 1/2"1"2' - 0"4"3"PVC EDGE BAND PERFINISH SCHEDULENOTE: SEE ELEVATION FOR UPPER CABINET TYPE AND SIZESEE INTERIOR ELEVATION1 1/2"1"2' - 0"4"3"P-LAM BASE CABINET W/ADJUSTABLE PLAM SHELVESNOTE: SEE ELEVATION FOR UPPER CABINET TYPE AND SIZESEE INTERIOR ELEVATIONS AND ROOM FINISH SCHEDULE FOR CASEWORK CONFIGURATIONS, BACKSPLASH, COUNTER TOP, EDGE DETAIL AND MATERIAL SELECTIONS. TYP.P-LAM SHELF AND COAT ROD AS SPECIFIED. SEE FINISH SCHEDULE FOR MATERIAL AND FINISH (TYPICAL)MAXIMUM3' - 10"1' - 8"5' - 6"(MINIMUM 1'-0")SEE ELEVATIONSEE ELEVATION1' - 4"1' - 0"8"1' - 0"5mm HOLES DRILLED 32mm O.C. W/ METAL SPOON TYPE SHELF SUPPORTS.PLASTIC LAMINATE WALL CABINET W/ ADJUSTABLE PLASTIC LAMINATE SHELF & LOCKABLE DOORSINSIDE CLEAR TO BE NO LESS THAN 12" SEE INTERIOR ELEVATIONNOTE: SEE ELEVATION FOR BASE CABINET TYPE AND SIZE2' - 2".1' - 3"5mm HOLES DRILLED 32mm O.C. W/ METAL SPOON TYPE SHELF SUPPORTS.PLASTIC LAMINATE WALL CABINET W/ ADJUSTABLE PLASTIC LAMINATE SHELVES. REFER TO ELECTRICAL AND INTERIOR ELEVATIONS FOR REQUIRED DEVICES AND LOCATIONS.INSIDE CLEAR TO BE NO LESS THAN 12"1"NOTE: SEE INTERIOR ELEVATIONS FOR BASE CABINET TYPE AND SIZE2' - 0"1"CEILING AND GRID SELECTIONS PER ROOM FINISH SCHEDULE. HEIGHTS PER REFLECTED CEILING PLAN.3' - 0".1' - 2"7' - 1"UNDER CABINET LIGHTING, WHERE INDICATED. REFER TO ELEVATIONS AND ELECTRICAL DRAWINGS.2' - 0"LAMINATE PLASTIC FASCIA ASSEMBLY.8" CMU WALL W/ HORIZONTAL JT.REINFORCING @16" O.CFINISHED FLOOR AS SCHEDULEDSPORTS EQUIPMENT - HOOKS 66" A.F.F7 5/8"RECYCLED PLASTIC SEAT PLANK STEEL 90 DEGREE BRACKET. 11-3/4" X 11-1/2". (4) 3/8" HOLES FOR BENCH FASTING TO BRACKET. VERTICAL LEG (2) 9/16 X 1-1-1/2" SLOTS FOR ANCHORING ON WALLCONCRETE FILL BOTTOM 3 CMU BLOCKS WHERE BENCHES ARE MOUNTEDSPORTS EQUIPMENT - HOOKS ADA 48" A.F.FSEE FLOOR PLANS FOR LOCATIONSWOOD LOOK CEILING PANELSWOOD LOOK WALL PANELSGYPSUM BOARD CEILING GYPSUM BOARD SOFFIT 2'X2' ACT PANELS 3 5/8" MTL STUD PLACED 16" ON CENTERWOOD LOOK TRIM2' - 10" 1' - 8"1" 1' - 4" 2 1/4"GYPSUM BOARD U-TRIM (200-A)PLYWOOD & STEEL STUD FRAMING CAP IS NOT DESIGNED FOR STORAGE1/2" DRYWALL (PAINT & INSTALL PERPENDICULAR TO FRAMING) ON 8" STEEL STUD FRAMING @ 1'-4" O.C.CMU WALL SEE WALL TYPE M8 TOP OF PLYWDVARIES ON WALL TYPESTEEL STUD FRAMING TO BE VERIFIED BY ENGINEER LICENSED IN WISCONSINACOUSTICAL BATT INSULATIONNOTE: 1/2" FTP PLYWOOD TO BE INSTALLED AT SERVER ROOM - DUST CAP ONLY OVER SERVER ROOMFIRST FLOOR100' -0"ADD BLOCKING AS NEEDED BY WALL TYPE 3/8" WALL BASE AS PER FINISH SCHEDULEWOOD LOOK WALL PANELVARYING WALL TYPES BEYONDVERIFY DETAIL PER MANUFACTURERS INSTALLATION INSTRUCTIONSMETAL CHANNEL PLACED 24" O.C.6"+ - 1 1/8"L BRACKET TRIM ON EXPOSED EDGE OF TOP AND BOTTOM OF WOOD LOOK PANELSFIRST FLOOR100' -0"5.83' - 6" 3' - 3 3/4" 11 5/8"5' - 4"10"2' - 10"9' - 0"3 7/8"DECORATIVE METAL PANEL TRIM OVER WOOD LOOK WALL PANELIN- WALL SUPPORTED BACKETSROLL DOWN GATESOLID SURFACE COUNTERTOP TO CARRY OVER TO FACE OF RECEPTION6"3"SOLID SURFACE ON EXTERIOR OF WATERFALL5.85.83' - 6" 3' - 3 3/4" 11 5/8"1' - 0"ROLL DOWN GATESOLID SURFACE COUNTERTOP TO CARRY OVER TO FACE OF RECEPTIONPLAM INTERIOR WING WALL AND SOLID SURFACE CAP BEYONDWALL TO MATCH THICKNESS OF STANDING COUNTER WITH NO LIP GREATER THAN 1/2"3' - 8"3 7/8"DECORATIVE METAL PANEL TRIM OVER WOOD LOOK WALL PANEL6"3"WALL EDGE BEYONDBASE PER FINISH SCHEDULE3/4" P.LAM. BASE CABINET W/ INTERIOR FINISH (TYP.). P.LAM. ON ALL EXPOSED SURFACES (TYP.)FRT WOOD BLOCKING3"1' - 4"OPEN4" 1' - 0"3/4" PLAM BACK & TOP W/ INTERIOR FINISH (TYP.). PLAM ON ALL EXPOSED SURFACES (TYP.)OPENCOAT HOOKS 66" A.F.F6' - 3"COAT HOOKS ADA 44" A.F.FGYP WALLFRT WOOD BLOCKINGFRT WOOD BLOCKING1 1/2"1 1/8"WOOD LOOK METAL PANELCARRIER (FREE OF DRYWALL GRID) MOUNTED DIRECTLY TO STUD OR CONCRETE WALL SURFACESTAINLESS STEEL CORNER GUARDEND TRIM FOR WOOD LOOK WALL PANELConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedINTERIOR DETAILSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A7.510/13/2023220025.00C2023-151 1/2" = 1'-0"13HOCKEY STICK RACK1" = 1'-0"3BASE -SINK / REMOVABLE SLOPED PANEL1" = 1'-0"4BASE / 6" DRAWER1" = 1'-0"6BASE / OPEN WITH SHELVES1" = 1'-0"7SHELF AND COAT ROD1" = 1'-0"8UPPER CABINET -DOORS1" = 1'-0"9UPPER CABINET -OPEN SHELVES1" = 1'-0"5TEAM ROOM BENCH DETAIL1" = 1'-0"12LOBBY / LINK CEILING TRANSITIONS -TYPICAL1 1/2" = 1'-0"10DUST CAP DETAIL1 1/2" = 1'-0"1METAL PANEL @ WALL BASEGRID1/2" = 1'-0"14SKATE RENTAL DESK @ ENTRY -ADA HEIGHT1/2" = 1'-0"15SKATE RENTAL DESK @ ENTRY -STANDING HEIGHT1" = 1'-0"11SHOE CUBBY1 1/2" = 1'-0"2TYPICAL WOOD LOOK WALL PANEL CORNER10/04/2023BID DOCUMENT SET JUNCTION BOX, SEE ELEC3' - 6"8 GA PERFORATED METAL PANEL; 1/4" DIA. HOLES @ 3/8" STAGGERED PATTERN. PROVIDE IN THREE(3) PANELS, TOTAL OF 12'-0" LONG. VERIFY LENGTH WITH FINAL SCOREBOARD SELECTION. SOLID STEEL STOP @ PERIMETER, CONT.PROVIDE HOLE IN BEAM FOR POWER/ DATA FEED. COORDINATE SIZE AND LOCATION W/ ELECTRICALCONDUIT, SEE ELECTSCOREBOARD SUB-STRUCTURE BY SCOREBOARD PROVIDER/INSTALLER3 3/4"PROVIDE 8 GA BENT STEEL CLOSURE @ SCOREBOARD LOCATION(S)JUNCTION BOX, SEE ELEC8 GA PERFORATED METAL PANEL; 1/4" DIA. HOLES @ 3/8" STAGGERED PATTERN. PROVIDE IN THREE(3) PANELS, TOTAL OF 12'-0" LONG. VERIFY LENGTH WITH FINAL SCOREBOARD SELECTION. SOLID STEEL STOP @ PERIMETER, CONT.PROVIDE HOLE IN BEAM FOR POWER/ DATA FEED. COORDINATE SIZE AND LOCATION W/ ELECTRICALCONDUIT, SEE ELECTSCOREBOARD SUB-STRUCTURE BY SCOREBOARD PROVIDER/INSTALLERSCOREBOARDPROVIDE 8 GA BENT STEEL CLOSURE @ SCOREBOARD LOCATION(S)3/4" ENGINEERED QUARTZ COUNTERTOP1/4" CLEAR PLEXIGLASS SET IN CONT. 1/4" DADO8"ELECTRICAL CONNECTION TO POWER STRIP, REFER TO ELECTRICAL FOR ADDITIONAL INFORMATION1"1 1/2" x 1 1/2" STEEL TUBE RAIL, PTD1/2" LAMINATED GLASS STRUCTURAL RAILING; EASE EXPOSED EDGES; (2) STAINLESS STEEL CLIPS PER SIDE2 1/2"2"GLASS2' - 6"3 1/2"1 1/2" x 1 1/2" STEEL TUBE POST @ 4'-0" O.C., PTD112' - 6"T/O SLABSTEEL BEAM, SEE STRUCTURALCOMPOSITE DECK ASSEMBLY, SEE STRUCTURAL1-1/2"W x DEPTH OF BEAM STIFFENER @ 4'-0" O.C.; PAINT4"3' - 2"1 1/2" x 1 1/2" STEEL TUBE RAIL, PTDPROVIDE HOLES IN GLASS AS REQ. FOR EACH MOUNTING CLIP. 1 1/2" x 1 1/2" STEEL TUBE RAIL, PTD1/2" LAMINATED GLASS STRUCTURAL RAILING; EASE EXPOSED EDGES; (2) STAINLESS STEEL CLIPS PER SIDE1 1/2" x 1 1/2" STEEL TUBE POST @ 4'-0" O.C., PTDCOMPOSITE DECK ASSEMBLY, SEE STRUCTURAL1 1/2" x 1 1/2" STEEL TUBE RAIL, PTD4" KICK PLATE2"10"2"1"1 1/2" SQUARE STEEL TUBE POST; PTD1 1/2" SQUARE STEEL TUBE POST; PTDPRECAST PLANK OR STADIA1/4" X 1" STEEL SPACER PLATE, PTD; SEE DETAIL FOR MORE INFORMATION1 1/2" SQUARE STEEL TUBE POST; PTD1 1/2" x 1 1/2" STEEL TUBE RAIL, PTD1/2" LAMINATED GLASS STRUCTURAL RAILING; EASE EXPOSED EDGES; (2) STAINLESS STEEL CLIPS PER SIDE1 1/2" x 1 1/2" STEEL TUBE POST @ 4'-0" O.C., PTDPROVIDE HOLES IN GLASS AS REQ. FOR EACH MOUNTING CLIP. 1 1/2" x 1 1/2" STEEL TUBE POST @ 4'-0" O.C., PTD3' - 2"4"3 1/2"GLASS2' - 6"2"2 1/2"2" 1' - 0"6"3' - 6"3/4"2"5"1 1/2" SQUARE STEEL TUBETOP RAIL, PAINTED1 1/2" SQUARE STEEL TUBEPOST1 1/2" SQUARE STEEL TUBEBOTTOM RAIL1/4" x 4" x 13 1/2" STEEL PLATECONCOURSEBLEACHERS1 1/2" X 1 1/2" STEEL ANGLE, CONT; BOTH SIDES3/4" ENGINEERED QUARTZ COUNTERTOP1/4" CLEAR PLEXIGLASS SET IN CONT. 1/4" DADO8"ELECTRICAL CONNECTION TO POWER STRIP, REFER TO ELECTRICAL FOR ADDITIONAL INFORMATIONELECTRICAL CONDUIT, RUN TIGHT TO VERTICAL POST, PAINT TO MATCH1"CONCOURSEBLEACHERSELECTRICAL CONDUIT, RUN TIGHT TO VERTICAL POST, PAINT TO MATCH1 1/2" HSS POCKET FOR VERTICAL STEEL TUBE BOTTOM RAIL, 4" CONTINUOUS KICKPLATE1' - 0"2"2"3' - 6"6"4"1 1/2" SQUARE STEEL TUBETOP RAIL1 1/2" SQUARE STEEL TUBEPOST1 1/2" SQUARE STEEL TUBEBOTTOM RAIL1/4" x 4" x 13 1/2" STEEL PLATECONCOURSEBLEACHERS1 1/2" SQUARE STEEL TUBETOP RAIL1 1/2" SQUARE STEEL TUBEPOST1/4" x 4" x 13 1/2" STEEL PLATECONCOURSEBLEACHERS1 1/2" HSS POCKET FOR VERTICAL STEEL TUBE BOTTOM RAIL, 4" CONTINUOUS KICKPLATE100'-0"ICE LEVEL(43" MIN)3' - 7"(51" MAX)4' - 3"102'-0"FIRST ROW103'-6"T.O. DASHER100'-0"ICE LEVEL(43" MIN)3' - 7"(51" MAX)4' - 3"102'-0"FIRST ROW103'-6"T.O. DASHEREYE LEVEL (MAX)EYE LEVEL (MIN)43" AFFADA - MIN EYE LEVEL51" AFFADA - MIN EYE LEVEL2' - 11 7/8"B32 SCOPE OF WORKB32 SCOPE OF WORKEYE LEVEL (MAX)EYE LEVEL (MIN)90ELEVATIONROUTE PLUGMOLD THRU POWER STRIP SLOT PROVIDED IN FIXTUREEND CAP VIEWPOWER STRIP SLOT PROVIDED IN FIXTURE FOR ROUTING POWER STRIP THRU FIXTURE.ASSEMBLE POWER STRIP PRIOR TO INSTALLING. ROUTE POWER STRIP INSIDE FIXTURE RAIL WALL SLOT FROM END CAPS.COORDINATE WALL MOUNTED JUNCTION BOX LOCATION WITH RAIL IN THE FIELD. JUNCTION BOX SHALL LINE UP WITH DRINK RAIL TO MINIMIZE FLEXIBLE CONDUIT LENGTH. PROVIDE FINAL CONNECTIONS. INSTALL PLUGMOLD 2000 SERIES STEEL MULTIOUTLET ASSEMBLY MODEL NUMBER BK20GB509TRUSBA. (OR ACCEPTED SUBSTITUTE). INSTALL 5' LENGTHS IN BLACK FINISH WITH ALTERNATING RECEPTICLES AND USB OUTLETS ON 9" CENTERS. INSTALL ALL NECESSARY COUPLINGS, CONNECTORS AND COVER CLIPS TO BE USED FOR CONNECTING EACH 5' SECTION OF MULTIOUTLET ASSEMBLY RACEWAY.PSFIXTURE RAIL WALLCONCEAL FLEXIBLE CONDUIT INSIDE FIXTURE, AS REQUIREDROUTE CONDUIT FOR POWER FEED FROM WALL MOUNTED JUNCTION BOX SHOWN DRAWINGS TO FIXTURE RAIL WALL WIRE CHANNEL. COORDINATE EXACT POWER FEED LOCATION WITH FIXTURE CONTRACTOR ON SITE.ASSEMBLE POWER STRIP PRIOR TO INSTALLING. ROUTE POWER STRIP INSIDE FIXTURE RAIL WALL SLOT FROM END CAPS.FLOOR PLAN100'-0"ICE LEVELICE RINK DASHER BOARDS, REFER TO ICE DRAWINGSEXPANSION MATERIAL WITH SELANT AND BACKER ROD, ICE FLOOR PROFILE AND DASHER BOARD CONSTRUCTION BY OTHERS, REFER TO ICE DRAWINGSCONCRETE FLOOR W/ THICKENDED RINK EDGE, SEE STRUCTURAL1'-2"ICE RINK SLAB SECTION, REFER TO ICE DRAWINGS2" (MIN)1' - 4" +/-VAPOR BARRIER AT PERIMETER OF SLAB EDGEJUNCTION BOX, SEE ELECPROVIDE HOLE IN BEAM FOR POWER/ DATA FEED. COORDINATE SIZE AND LOCATION W/ ELECTRICALCONDUIT, SEE ELECTSCOREBOARD SUB-STRUCTURE BY SCOREBOARD PROVIDER/INSTALLERPROVIDE 8 GA BENT STEEL CLOSURE @ SCOREBOARD LOCATION(S)0' - 3 3/4"0' - 1 1/2"2' - 11 1/4"0' - 1 1/2"112' - 6"T/O SLAB3'-6"1 1/2" x 1 1/2" x 3/16" STEEL ANGLE RAIL, PTD1" x 1" STEEL TUBE PICKETS, PTD; WELD @ TOP AND BOTTOM RAIL ANGLES; SPACED 4" O.C. MAX.1 1/2" x 1 1/2" x 3/16" STEEL ANGLE RAIL, PTDCOMPOSITE DECK ASSEMBLY, SEE STRUCTURALSTEEL BEAM VARIES,SEE STRUCTURAL1 1/2" x 1 1/2" x 3/16" PAIRED STEEL ANGLE POSTS @ 4'-0" O.C., PTD; SEE DETAIL FOR POST ARRANGEMENT/----JUNCTION BOX, SEE ELECPROVIDE HOLE IN BEAM FOR POWER/ DATA FEED. COORDINATE SIZE AND LOCATION W/ ELECTRICALCONDUIT, SEE ELECTSCOREBOARD SUB-STRUCTURE BY SCOREBOARD PROVIDER/INSTALLERSCOREBOARDPROVIDE 8 GA BENT STEEL CLOSURE @ SCOREBOARD LOCATION(S)1 1/2" x 1 1/2" x 3/16" STEEL ANGLE RAIL, PTDCOMPOSITE DECK ASSEMBLY, SEE STRUCTURALSTEEL BEAM VARIES,SEE STRUCTURAL1 1/2" x 1 1/2" x 3/16" PAIRED STEEL ANGLE POSTS @ 4'-0" O.C., PTD; SEE DETAIL FOR POST ARRANGEMENT3/4" ENGINEERED QUARTZ COUNTERTOP1/4" CLEAR PLEXIGLASS SET IN CONT. 1/4" DADO8"ELECTRICAL CONNECTION TO POWER STRIP, REFER TO ELECTRICAL FOR ADDITIONAL INFORMATION1"1/2" LAMINATED GLASS STRUCTURAL RAILING; EASE EXPOSED EDGES; (2) STAINLESS STEEL CLIPS PER SIDE4"2 3/8"3"2' - 7 3/8"1 1/4"1 1/2" x 1 1/2" STEEL TUBE POST @ 4'-0" O.C., PTD112' - 6"T/O SLABSTEEL BEAM, SEE STRUCTURALCOMPOSITE DECK ASSEMBLY, SEE STRUCTURAL1-1/2"W x DEPTH OF BEAM STIFFENER @ 4'-0" O.C.; PAINT1 1/2" x 1 1/2" STEEL TUBE RAIL, PTDPROVIDE HOLES IN GLASS AS REQ. FOR EACH MOUNTING CLIP. 1/2" LAMINATED GLASS STRUCTURAL RAILING; EASE EXPOSED EDGES; (2) STAINLESS STEEL CLIPS PER SIDE1 1/2" x 1 1/2" STEEL TUBE POST @ 4'-0" O.C., PTDSTEEL BEAM, SEE STRUCTURALCOMPOSITE DECK ASSEMBLY, SEE STRUCTURALPROVIDE HOLES IN GLASS AS REQ. FOR EACH MOUNTING CLIP. 2" 1' - 0"6"2' - 4"3/4"2"4"1"1 1/2" SQUARE STEEL TUBETOP RAIL, PAINTED1 1/2" SQUARE STEEL TUBEPOST1 1/2" SQUARE STEEL TUBEBOTTOM RAIL1/4" x 4" x 13 1/2" STEEL PLATECONCOURSEBLEACHERS1 1/2" X 1 1/2" STEEL ANGLE, CONT; BOTH SIDES3/4" ENGINEERED QUARTZ COUNTERTOP1/4" CLEAR PLEXIGLASS SET IN CONT. 1/4" DADO8"ELECTRICAL CONNECTION TO POWER STRIP, REFER TO ELECTRICAL FOR ADDITIONAL INFORMATIONELECTRICAL CONDUIT, RUN TIGHT TO VERTICAL POST, PAINT TO MATCH1"1 1/2" SQUARE STEEL TUBEPOSTCONCOURSEBLEACHERS1 1/2" X 1 1/2" STEEL ANGLE, CONT; BOTH SIDESELECTRICAL CONDUIT, RUN TIGHT TO VERTICAL POST, PAINT TO MATCH1 1/2" HSS POCKET FOR VERTICAL STEEL TUBE BOTTOM RAIL, 4" CONTINUOUS KICKPLATEConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedINTERIOR DETAILSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A7.610/13/2023220025.00C2023-151 1/2" = 1'-0"2GUARDRAIL @ CONCOURSE SCOREBOARD - DRINKRAIL1 1/2" = 1'-0"3GUARDRAIL @ CONCOURSE TRACK1 1/2" = 1'-0"4RAILING @ CMU CONCOURSE TRACK1 1/2" = 1'-0"6STANDING DRINK RAIL1 1/2" = 1'-0"8STANDING RAIL1" = 1'-0"10SIGHTLINES FRONT ROW @ ICE RINK1/2" = 1'-0"9USB RAIL DETAIL1" = 1'-0"11THICKENED FLOOR SLAB @ ICE RINK1 1/2" = 1'-0"1STEEL PICKET GUARDRAIL @ CONCOURSE TRACK - DRINKRAIL1 1/2" = 1'-0"5GUARDRAIL @ STAIRS EXTENDED GLASS1 1/2" = 1'-0"7DRINK RAIL - ADA SEATING10/04/2023BID DOCUMENT SET A9.016816a1227 SFMAIN TEAMROOM1322M82M82M8M4M62M82M8M410' - 10 3/4"7 5/8"7' - 0"4' - 0" 3' - 10 3/4" 10' - 0 5/8" 5 5/8" 1' - 5 3/4"18' - 6 3/8"19' - 10 3/4"2' - 10 3/8" 1' - 0" 3' - 0" 1' - 0" 3' - 0" 1' - 0" 3' - 0" 1' - 0" 3' - 0" 1' - 0 3/8"12' - 0" A9.01453 SFUNISEX TLT1282M82M62M122M8A128.1 A10.2311 5/8"6 3/8"3' - 4"3' - 4 3/8"7 5/8"1' - 1 3/4"5 5/8" 7' - 4 3/8"7 5/8"8' - 11 3/4"T073958 SFUNISEX TLT14174 SFJ.C.142 A9.01911 5/8"7' - 10 3/4"7 5/8"8' - 4 3/8"7 5/8"7 5/8" 7' - 4 3/8"5 5/8"1' - 0 3/4"2M122M82M6 A10.23A141.1A142.19' - 6 3/8"18' - 6"42M819a A9.01718206 SFWET TEAM RR1397 5/8" 11' - 4 3/8" 7' - 9 5/8"13' - 0"7 5/8"5' - 4"3' - 4 3/4"3' - 0"7 5/8"2M82M82M6 A10.23A139.2A139.1M4M48 3/8"3 5/8"3' - 0 1/2"9 3/4"3' - 0"10 1/2"3' - 0"8' - 3 5/8"2M8468 SFMEN'S166503 SFWOMEN'S16568 SFFAMILY TLT162 A9.023 A9.025 A9.0217 5/8"5' - 0"7' - 9 1/4"2' - 4 1/4"6' - 10 1/2"5' - 0"13' - 4 7/8"5 5/8"1' - 5"5 5/8"12' - 6 1/8"2M8M62M12 A10.235' - 1"25a24M62M82M82M12ROLL DOWN METAL SECURTIY GATE3838M6T08T0811 5/8"5' - 8 1/2" 5 5/8" 9' - 4" 5 5/8" 26' - 5 1/4"7 5/8"33T0822A162.1A155.938M620205' - 1"5' - 1 7/8"5' - 1 7/8"17' - 0"20A159.10 A9.0172 SFMENS106A7' - 5 7/8"9' - 0"4' - 7 1/2" 6' - 3" 8' - 9"14' - 5"1' - 6"10' - 11"26' - 7 3/4"26' - 10"19' - 7 1/2"2M65' - 0"15' - 4"5' - 0 1/4"383' - 0"3 7/8"7 7/8" 3' - 8 1/4"38226 SFWOMENS106B32M62M6M6F2T08T08 A9.019' - 4"2' - 0"2' - 4"F2M64343F243F2 A10.2172020647 SFMEN'S121 A9.010 A9.0761' - 4"34' - 9 3/4"64' - 11"M6W1313' - 4" 16' - 0" 12' - 0"5' - 5 3/4"1"2' - 1"3' - 3 1/8" 6' - 4 3/4" 8' - 9 3/8" 18' - 1" 27' - 3"62' - 11 3/8" A9.051' - 2"F23316 A6.5 A10.2151059 SFWOMENS12243' - 6"4' - 1 3/4"3' - 6"4' - 1 3/4"3' - 6 3/4"10' - 4 5/8"7' - 6 1/2"3' - 6 3/4"5' - 7 3/8"2' - 6"2' - 6"2' - 6"11' - 0"6' - 10 3/8"5' - 8"MIN3' - 0"MIN5' - 0"TYP.2' - 11"3' - 0" MIN5' - 0" MINWELLNESSROOM119FAMILYRESTROOM120A119.1A120.19' - 1 3/4"9' - 0" 9' - 4"8' - 10" 8' - 10 3/8" 45' - 3"20383838202018' - 0"F2M6M6M8M6 A9.0152' - 1" 6' - 3 3/4"18' - 4"17' - 0"T083' - 8"TYP.3' - 0"3820T085' - 10"1' - 6"3' - 8"TYP3' - 0"MIN3' - 0"MIN5' - 0"1' - 8"1' - 8"8' - 8 7/8"STAINLESS STEEL CASE OPENING A10.215Sim A9.01113205 SFWET TEAM RR1245 5/8"11 3/4"5 5/8"6' - 8 3/8" 7 5/8" 11' - 3 3/8" 7 5/8"6' - 0"3' - 4"3' - 0"7 5/8"11' - 8 3/8"7 5/8"21' - 2"2M82M82M82M62M8M4 A10.23A124.1A124.23' - 0"1' - 3 1/8"3' - 1 1/2"1' - 3 3/4"3' - 0"6' - 8 1/4"8' - 1 3/4"5' - 0"3 1/2"3' - 6" A9.0920136 SFREFEREE RR1467 5/8"8' - 4 3/8"7 5/8"2M82M82M82M8M4A146.1 A10.237 5/8"8 3/4"7 5/8"13' - 11 3/8"3 5/8"2' - 9"7 5/8"11 3/4"7 5/8"21' - 3"1' - 0"3' - 1"1' - 0"3' - 3 3/8"52 SFFAMILY RR106381A106.12033 A10.216NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/4" = 1'-0"ENLARGED FLOOR PLANS-RESTROOMSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A8.010/13/2023220025.00C2023-151/4" = 1'-0"4ROOM 132 -MAIN TEAM ROOM -ENLARGED1/4" = 1'-0"5ROOM 128 -TLT -ENLARGED1/4" = 1'-0"8ROOMS 141 & 142 -TLT -ENLARGED1/4" = 1'-0"9ROOM 139 -WET TEAM ROOM RR -ENLARGED1/4" = 1'-0"3FIRST FLOOR PLAN -NORTH EAST RESTROOMS -ENLARGED1/4" = 1'-0"1ROOMS 106A/B - ENLARGED1/4" = 1'-0"2FIRST FLOOR PLAN -WEST RESTROOMS -ENLARGED1/4" = 1'-0"6ROOM 124 -WET TEAM ROOM RR -ELEVATION1/4" = 1'-0"7ROOM 146 -REFEREE RR -ENLARGEDKEYNOTES PER SHEET#1 ADA COMPLIANT DRINKING FOUNTAIN WITH BOTTLE FILLER4 FLOOR SINK WITH FRP PANEL TO 4'-0" A.F.F. (2) SIDES20 JUMP SEAT33 ADA PUSH BUTTON DOOR OPENER38 BABY CHANGING STATION, PROVIDE ADJ ASCENT COAT HOOK AT 48" AFF39 TRASH AND RECYCLING - FF&E43 WOOD LOOK METAL WALL PANEL, SEE INTERIORS SHEETS AND 10/A9.1T07 PAPER TOWEL DISPENSER, SURFACE MOUNTEDT08 ELECTRIC HAND DRYER1/4" = 1'-0"10ROOM 106 -FAMILY RESTROOM -ENLARGED10/04/2023BID DOCUMENT SET GCHCHCH CH CH HCSA159.4A160.1A160.210" 8' - 0" 7 5/8" 10' - 0 3/8"7 5/8"29' - 11 3/4"7 5/8"45' - 6 3/8" 11 5/8"10"17' - 10 3/8"7 5/8"8' - 8"15' - 11" 3' - 4"10 5/8" 1' - 1 1/4"3' - 4" 19' - 4 3/4" 3' - 3" 2' - 10 3/4"1' - 5 7/8"3' - 4"96' - 3 3/8"2M82M82M12 A7.125 A7.125 A7.1257 5/8" 22' - 6" 12' - 0" 12' - 0"1' - 8 3/4"2' - 0 1/4"A159.3A160.4A160.3A159.11175 SFLOADING/RECEIVING/STORAGE160797 SFWARMING ROOM159273 SFSTORAGE158143 SFELECTRIC15730128' - 0"69 SFAV CLOSET157 (A) A7.127F4A158.1A157aA157.1A159.2A157.2F426' - 5 1/2"SEE FOOD SERVICE SHEET FS101 FOR EQUIPMENT PLANFOOD SERVICE EQUIPMENT WILL BE UNDER SCOPE OF FF&E2M842 SFJ.C.163A163.17 5/8"7' - 0 3/8"7 5/8"2' - 0 1/8"414' - 4"3' - 4"10' - 4"20' - 6"6' - 8"9' - 8 1/8"2M82M82M83' - 0"1 A5.0 A9.1116' - 4" 14' - 8" 7' - 0"12' - 8"2' - 5 3/4"12' - 0"16' - 0"12' - 0"8' - 0"63' - 11 3/4"20' - 0"43' - 11 3/4"28' - 0"14' - 6" 14' - 9 3/8"12' - 8"21' - 5"6' - 5 1/8"21' - 4 1/4"5' - 6"11' - 8 1/4"3' - 4"10"5' - 6"12' - 3"3' - 4"4"A104.1A102.1A103.1A105.1W8W10W10A2D4bA2A2A235353939152 SFSTOR104171 SFFIRST AID105665 SFMEETING ROOM(B)103666 SFMEETING ROOM(A)10249' - 9 5/8"5' - 0"7' - 0 3/4"A12 A9.112A2A1A2A2A2A2A2A2A109.1A110.1A111.1A112.117' - 6" 18' - 9" 11' - 8" 16' - 9"5' - 0" 20' - 8 1/4" 4' - 0" 20' - 7 1/2" 6' - 6"64' - 8"8' - 10"7' - 0"11' - 0"26' - 10"12 A10.2 A9.1239F22' - 0" 7' - 3"2' - 0" 6' - 6"5' - 6" 4' - 5 1/8" 14' - 10 1/4" 4' - 10 7/8" 8' - 8 3/4" 2' - 0" 6' - 6"3935A2A1bA1A107.1A107.2A107.3SKATE SHARPENER3' - 6"2' - 0 1/2"1' - 3 1/4"3' - 8"15' - 4 1/4"BL2BL4BL3BL33' - 0" 5' - 2 1/4"30' - 3 1/2" 20' - 0 1/4" 2' - 10" 3' - 8" 7' - 3"2' - 0 1/2"BL1BL1BL1350 SFSKATE RENTAL108371 SFADMIN112112 SFOFFICE110158 SFOFFICE111240 SFCHECK-IN/RENTAL107101 SFCOPY AREA112 (A)4' - 8"4' - 8"4' - 8"4' - 4 7/8"A1A1b5' - 8"2' - 1 1/2"9' - 11"97399714 A7.515 A7.542" HIGH WING WALL104 A9.131' - 4"APPLY PLAM TO INTERIOR FACE OF WALLWATERFALL SOLID SURFACE ON ADA HEIGHT SIDE OF WING WALL5' - 0 1/2" 4' - 0" 20' - 0" 6' - 0" 2' - 4" 6' - 0" 13' - 6" 6' - 0" 1' - 9 1/2"43PROVIDE COAT HOOK OFFICE DOORPROVIDE COAT HOOK OFFICE DOOR A9.1131' - 5 3/8"A243184 SFBREAKROOM1091 A5.11 A5.0A115.1A114.1A116.1A115.3A115.2A2A2A2A2A229' - 4 1/4" 8' - 11"38' - 3 1/4"26' - 8" 11' - 0"8' - 10"5' - 8"2' - 3"8' - 10 1/8"4' - 10 3/8"30' - 5 1/2" A7.12944' - 0"9' - 5 1/4"59 SFJ.C.114153 SFBEER SALES116196 SFCONCESSIONS115 (B)481 SFFOOD PREP115 (A)53 SFELECTRICAL113A116.2A2A2A2 A9.1511' - 7" 7' - 1 1/2"7' - 4 3/4"1' - 8"4' - 0 3/4"1' - 8"18' - 7 1/4"6' - 0"SEE FOOD SERVICE SHEET FS101 FOR EQUIPMENT PLANFOOD SERVICE EQUIPMENT WILL BE UNDER SCOPE OF FF&EA113.143434310510577 SFLOCKERALCOVE101 (A)82.00°7' - 5"12' - 0"18' - 7 1/2"A2PROVIDE MOP SHELF ABV.NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/4" = 1'-0"ENLARGED FLOOR PLANS-ADMINISTRATION ANDCONCESSIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A8.110/13/2023220025.00C2023-151/4" = 1'-0"3FIRST FLOOR PLAN -LOADING/ RECIEVING -ENLARGED1/4" = 1'-0"4FIRST FLOOR PLAN -MEETING ROOMS-ENLARGEDKEYNOTES PER SHEET#1 ADA COMPLIANT DRINKING FOUNTAIN WITH BOTTLE FILLER4 FLOOR SINK WITH FRP PANEL TO 4'-0" A.F.F. (2) SIDES30 STEEL CONCRETE FILLED BOLLARDS (4) TYP. AT OVERHEAD DOORS U.N.O35 WALL MOUNTED TV SCREEN39 TRASH AND RECYCLING - FF&E43 WOOD LOOK METAL WALL PANEL, SEE INTERIORS SHEETS AND 10/A9.197 SKATE STORAGE RACKING - FF&E ITEM104 FF&E ITEM105 RENTABLE LOCKERS- FF&E ITEM - PLASTIC LAMINATE TO MATCH ADJACENT CUBBIES1/4" = 1'-0"2FIRST FLOOR PLAN -SKATE RENTAL/ADMIN -ENLARGED1/4" = 1'-0"1FIRST FLOOR PLAN -CONCESSIONS-ENLARGEDREFER TO FF&E MATRIX FOR ALL RESPONSIBILITIES OF FURNITURE AND EQUIPMENT 10/04/2023BID DOCUMENT SET HCHCHCHCHCHCHCHCHCHCDNCHCHCHCHCHCHCHCHCHCHCHCDNCHCHCHCHCHCHCHCHCHCHCHCDNCHCHCHCHCHCHCHCHCHCHCHCDNCHCHCHCHCHCHCHCHCHCHCHCDNCHC190' - 0"103' - 8"12' - 2"60' - 0"44' - 0"60' - 0"12' - 2"13' - 6" 30' - 0" 13' - 4" 30' - 0"30' - 0"20' - 0"30' - 0"19' - 0"30' - 0"20' - 0"30' - 0"20' - 0"14' - 9 3/4" 60' - 0"454545454545454517' - 0"36' - 0"14' - 0"36' - 0"13' - 0"36' - 0"14' - 0"36' - 0"17' - 0"52' - 0"52' - 0"10' - 6" 36' - 0" 7' - 4" 36' - 0" 13' - 10"188' - 4"8 A7.412' - 0"105' - 4"8989898989479898989847473' - 0"3' - 0"3' - 0"3' - 0"3' - 0"3' - 0"3' - 0"30' - 0"104' - 0"30' - 0"3' - 0"3' - 0"3' - 0"3' - 0"3' - 0"3' - 0"27' - 0" 30' - 0" 30' - 0" 22' - 0"SEE SHEET R101 & R503 FOR VOLLEYBALL SLEEVES WITHIN ICE SYSTEM190' - 0"103' - 8"TRENCH DRAINFLOOR DRAIN454545454545454589898989894798989898474783a837' - 2"50' - 0"12' - 0"50' - 0"12' - 0"50' - 0"7' - 2"8' - 2" 84' - 0"10' - 2" 20' - 0" 10' - 0" 20' - 0" 10' - 0" 20' - 0"10' - 2"44' - 0"18' - 0"44' - 0"18' - 0"44' - 0"10' - 2"13' - 6" 30' - 0" 13' - 4" 30' - 0"12' - 2"60' - 0"44' - 0"60' - 0"12' - 2"16' - 0" 84' - 0" 19' - 0" 84' - 0" 16' - 0"19' - 9 3/4" 50' - 0" 27' - 0"20' - 0"30' - 0"20' - 0"30' - 0"19' - 0"30' - 0"20' - 0"30' - 0"20' - 0"14' - 9 3/4" 60' - 0" 22' - 0"5' - 1 5/8" 20' - 0" 10' - 0" 20' - 0" 10' - 0"20' - 0"12' - 0"29' - 2"44' - 0"14' - 4"44' - 0"14' - 4"44' - 0"29' - 2"190' - 0"103' - 8"188' - 4"454545454545454589898989894798989898474710' - 2"44' - 0"18' - 0"44' - 0"18' - 0"44' - 0"10' - 2"10' - 2" 20' - 0" 10' - 0" 20' - 0" 10' - 0" 20' - 0"4' - 9 3/4" 20' - 0" 10' - 0" 20' - 0" 10' - 0" 20' - 0"12' - 0"29' - 2"44' - 0"14' - 4"44' - 0"14' - 4"44' - 0"29' - 2"MIN3' - 0"84' - 0"MIN3' - 0"MIN3' - 0" 50' - 0"MIN3' - 0"MIN3' - 0" 30' - 0"MIN3' - 0"MIN6' - 0"60' - 0"MIN6' - 0"3' - 0" 20' - 0" 3' - 0"VARIES6' - 10"44' - 0"VARIES6' - 10"REGULATION BASKETBALL COURT (50x84)REGULATION VOLLEYBALL COURT (29.5x59)REGULATION PICKLEBALL COURT (20x44) 2"LINE OVERLAY HIERARCHY DIAGRAM190' - 0"103' - 8"7' - 2"50' - 0"12' - 0"50' - 0"12' - 0"50' - 0"7' - 2"16' - 0"84' - 0"19' - 0"84' - 0"16' - 0"19' - 9 3/4" 50' - 0" 27' - 0"SCORER TABLEPLAYER SEATINGSCORER TABLEPLAYER SEATINGSCORER TABLEPLAYER SEATINGSCORER TABLEPLAYER SEATINGSCORER TABLEPLAYER SEATING4545454545454545188' - 4"103' - 8"8989898989479898989847474' - 8"3' - 6"8' - 2"3' - 4"5' - 8 3/4"8' - 2" 84' - 0"5' - 9 3/4"5' - 9 3/4"3' - 4"12' - 6"12' - 6"3' - 4"SEE DASHER BOARD DRAWINGS FOR DETAILS454545454545454589898989897' - 2"50' - 0"12' - 0"50' - 0"12' - 0"50' - 0"7' - 2"8' - 2" 84' - 0" NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1" = 20'-0"ENLARGED FLOOR PLANS-SPORT COURTSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A8.210/13/2023220025.00C2023-151" = 20'-0"6REGULATION VOLLEYBALL COURT DIAGRAM1" = 20'-0"5LINE OVERLAY DIAGRAM1" = 20'-0"4REGULATION PICKLBALL COURT DIAGRAM1" = 20'-0"2COURT SIZES1" = 20'-0"7REGULATION BASKETBALL COURT DIAGRAM1" = 20'-0"3INDOOR TURF (WITH DASHER BOARDS)KEYNOTES PER SHEET#45 PERMANENT SPORT COURT WALL PADDING- MOUNTED 1' - 0" AFF 6' - 0" TALL PADS. PADS LOCATED ON A CORNER SHOULD BE MOUNTED ALIGNED WITH FINISHFLOOR AND UP 7' - 0" AFF47 TWO ROWS OF PERMANENT RETRACTABLE PLASTIC BLEACHER SEATING.83 TEMPORARY RUBBER TILE FLOORING83a PERMANENT RUBBER TILE FLOORING89 SCOREBOARD BY OTHERS98 MANUALLY RETRACTABLE ACOUSTIC PARTITION WALL - FILL JOUST SPACE ABOVE WITH ACOUSTIC PANEL TO CREATE ACOUSTIC BARRIER WHEN PARTITIONWALL IS IN USE.10/04/2023BID DOCUMENT SET UPDNHCHCHCGCHCHCH CH CH CHCS1 A5.1LOBBY / LINK155STORAGE158ELECTRIC157WARMING ROOM159LOADING/RECEIVING/STORAGE160FAMILY TLT162J.C.163MEN'S166GENERALBUILDINGSTORAGE167RESURFACER/SHOPTOOLS/LAUNDRY170REFRIGERATION172Y.H. STORAGE137ELEC134MAIN COACH133WOMEN'S165F.S. STORAGE175MULTI-USECONVENTIONSPACE156MULTI-PURPOSEAREA154NE COURT YARD84' - 4 3/4"11' - 10 1/8"95' - 5 3/4"46' - 11 1/8"4 A5.03 A5.0ABEFHJKMPQCDN1232 A5.1F.3F.9GG.8LL.6M.4SE COURT YARD89' - 4"MALLCONNECTION164MECHANICAL168STORAGE135(A)MERCYHEALTHARENA136METER/RISER179MAIN TEAMROOM132WET TEAMROOM #1138ICE RINKCIRCULATION135PASSAGE144F.4F.6ELECTRICAL169TEMP STORAGE174HOCKEYSTORAGE173IT/GENSTORAGE176M.38' - 1" 56' - 10" 28' - 0" 11' - 11" 12' - 6" 12' - 0" 13' - 10" 16' - 8" 13' - 10" 26' - 10" 16' - 7 1/2" 9' - 2 1/2" 7' - 2" 21' - 3" 19' - 2 3/4" 31' - 7" 23' - 4 3/4" 10' - 2" 4' - 5" 39' - 1 1/2" 2' - 6" 18' - 10"404' - 0"83' - 1" 56' - 2 1/2" 18' - 10"28' - 0"8' - 0"58' - 8 1/2"19' - 9 1/2" A8.34VERIFY EXISTING CONSITION44' - 0"L.4L.8AV CLOSET157 (A)VESTIBULE171AV CLOSET167 (B)ICE RINKCIRCULATION135CLOSET172(A)L.7NE SESWNWBUILDING DIAGRAMNOT TO SCALE1 A5.1EFHJKCD12F.3F.9GG.8L46' - 11" 50' - 9" 40' - 0"28' - 0" 11' - 11" 12' - 6" 12' - 0" 13' - 10" 16' - 8" 13' - 10" 26' - 10" 16' - 7 1/2" 9' - 2 1/2" 7' - 2" 21' - 3" 19' - 2 3/4"12' - 0"12' - 3 3/8"50' - 11 3/4"F.4F.6120' - 0"8' - 8"A164.234' - 7"GENERAL NOTE: AFTER DEMO -FIELD VERIFY THE MALL FINISHED FLOOR ELEVATION & PROVIDED WSCC FINISHED FLOOR GRADE MATCH. NOTIFY ARCHITECT FOR INFORMATION IF NECESSARYVERIFY CONDITION OF INTERIOR WALL AND REFINISH TO MATCH EXISTING IF ANY DAMAGE OCCURS DURING CONSTRUCTION. 1 A6.52 A6.53 A6.55 A6.54 A6.512' - 9 1/2"135.00°135.00°EXISTING WALL OF MALLEXISTING WALLNEW INFILL CMU/ INTERIOR TO FINISH TO ALIGN WITH INTERIOR OF THE MALLOPENING TO ICE ARENA ENTRANCE3 A6.54 A6.517' - 2 5/8" 17' - 4 3/8"14' - 0"<CLG 01>EXISTING4 A5.01F.9F.6MATCH CERAMIC TILE FLOOR MALL FLOORING AND SHALL INSTALL TILE FULL WIDTH OF ENTRY IN LOCATION INDICATED. ALIGN JOINTS WITH JOINTS IN MALL CONCOURSE FLOOR. MALL DEVELOPER TO EXTEND CONCOURSE FLOORING TO THIS POINT AND PROVIDE OR REPAIR EXPANSION JOINT AS NEEDED. NEW CMU & GYP. WALL TO COVER SEARS OPENING. MATCH EXISTING MALL INTERIOR.PRECAST OVERHEAD1' - 1 1/2"2M8135.00°135.00°COLUMN -SEE STRUCTURALEXISTING EXTERIOR MALL2" GAP10" PRECAST WALLEXISTING MALL5' - 5" 13' - 10" 20' - 9"GENERALBUILDINGSTORAGE167MALLCONNECTION16410COLUMN -SEE STRUCTURALDISTANCE FROM OUTSIDE OF EXISTING FOUNDATION WALL TO EXIST COL 103 A6.54 A6.5NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedMALL CONNECTIONLAYOUT PLAN -NE & SEWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A8.310/13/2023220025.00C2023-151/16" = 1'-0"1FIRST FLOOR PLAN -NE & SE QUAD -COURT YARD1/8" = 1'-0"2MALL CONNECTION1/4" = 1'-0"3MALL ENTERENCE ELEVATION1/4" = 1'-0"4ENLARGED PLAN AT MALL CENNECTION TRANSITION10/04/2023BID DOCUMENT SET T e c t o n i c C o p y r i g h t 2 0 0 7 T e c t o n i c C o p y r i g h t 2 0 0 7 A7.3318 E.Q TREADS @11" MIN16' - 6"4' - 0"18 E.Q TREADS @11" MIN16' - 6"4' - 0"3 A8.4H3G.8A200.1A200.24' - 0" 1' - 0" 4' - 0"10"4' - 2"10"5' - 8"6 E.Q. TREADS @ 11" MIN6' - 5" 9' - 4"4' - 0"9 E.Q. TREADS @ 11" MIN.7' - 4"5' - 8"7' - 6"7' - 8"14 E.Q. TREADS @ 11" MIN.12' - 10"4' - 0"9' - 2 1/2"STAIR FABRICATOR TO SPECIFY STAIRS AND SUPPORT SYSTEM20' - 6"4' - 2"12' - 1" 9' - 4"3 E.Q TREADS @11" MIN2' - 9" 5' - 4"18 E.Q TREADS @11" MIN16' - 6"6' - 0"HANDRAIL RETURN TO GUARDHANDRAIL RETURN TO GUARD2M12CLEAR HEIGHT6' - 8" MIN.6' - 10 1/2" 4' - 5"2' - 3"7' - 4"14 E.Q. RISERS @ 7" MAX.12' - 6"CLCL7 EQ. RISERS @ 7" MAX.3' - 10"5' - 1" 11' - 11" 7' - 11 5/8" 6" 4 3/8"4' - 2"7 E.Q. TREADS @ 11" MIN.6' - 5" 14' - 1"11' - 6"1' - 0"STAIR FABRICATOR TO SPECIFY STAIRS AND SUPPORT SYSTEM463013' - 2"FIRST FLOOR100' -0"MEZZANINEFLOOR LEVEL112' -6" A7.346"6"6"6"902' - 9" 7' - 2" 2' - 9" 2' - 9" 2' - 9" 2' - 9" 2' - 9" 3' - 6 1/4"1' - 9"1' - 9"1' - 9"1' - 9"1' - 9"1' - 9"2' - 0"11" 11" 11"7"7"7"5' - 5 5/8"10' - 5"11" 11" 11"TYP.TYP.1 A8.4LANDING5' - 4"18 E.Q TREADS @11" MIN16' - 6"6' - 0"9' - 1 3/4" A7.333 E.Q TREADS @11" MIN2' - 9"4' - 6 5/8"R 27' - 11 3/4"12 E.Q TREADS @11" MIN11' - 0"4' - 0"6 E.Q. TREADS @ 11" MIN.5' - 6"4' - 0"6 E.Q. TREADS @ 11" MIN.5' - 6"4' - 0" A7.3318 E.Q TREADS @11" MIN16' - 6"4' - 0"A170.4 A7.476" BOLLARD DIM.TYPICAL @ D.I.DFOUNDATIONEXT.DOOR - OVERHEAD12' X 12' A7.121 A7.1201' - 6"A156.5 A7.471' - 6"6"6"EXTERIOR BOLLARDSFIRST FLOOR100' -0"HG.8MEZZANINEFLOOR LEVEL112' -6"16' - 3"7' - 2"5' - 0"425' - 4"7' - 2"HOIST BEAM12' - 10"<FLOOR 01><INSUL 03><8" CMU 02>PROVIDE STEEL WALL MOUNTED ACCESS LADDERPACK SOLID WITH 1 HOUR RATED FIRE SAFING1' - 9 7/8"95 ' -0"B/O SOFFITKL19' - 2 3/4"633 A8.4H3G.89' - 2 1/2"MATCHLINE BBA135.2STAIR FABRICATOR TO SPECIFY STAIRS AND SUPPORT SYSTEMNNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/4" = 1'-0"ENLARGED FLOOR PLANSAND SECTIONS -STAIRSAND O.H. DOORSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A8.410/13/2023220025.00C2023-151/4" = 1'-0"9NW -Seating Assembly Stairs -Lower1/4" = 1'-0"11STADIA SEATING ACCESS STAIR -FIRST FLOOR -NE1/4" = 1'-0"12MULTIPURPOSE AREA EGRESS STAIR MEZZANINE FLOOR PLAN -NE1/4" = 1'-0"5MAIN RINK STAIR FIRST FLOOR PLAN -SW1/4" = 1'-0"3MULTIPURPOSE AREA EGRESS STAIR SECTION -NE1/4" = 1'-0"1MAIN RINK STAIR SECTION -SW1/4" = 1'-0"8MAIN RINK STAIR MEZZANINE FLOOR PLAN -SW1/4" = 1'-0"14STADIA SEATING ACCESS STAIR 2 -SE1/4" = 1'-0"10STADIA SEATING ACCESS STAIR 1 -SE1/4" = 1'-0"6STADIA SEATING ACCESS STAIR 2 -NE1/4" = 1'-0"15STADIA SEATING ACCESS STAIR -NE1/4" = 1'-0"16RESURFACER ROOM -OVERHEAD DOOR1/4" = 1'-0"13MULTI-USE CONVENTION SPACE -OVERHEAD DOOR1/4" = 1'-0"4ELEVATOR PITKEYNOTES PER SHEET#30 STEEL CONCRETE FILLED BOLLARDS (4) TYP. AT OVERHEAD DOORS U.N.O42 HYDRAULIC PASSENGER ELEVATOR46 ROOF ACCESS LADDER, WALL-MOUNT GALVANIZED STEEL LADDER (PAINT)ON EACH SIDE OF THE PARAPET WALL (2ND LADDER ONLY REQUIRED ONTHE ROOF SIDE OF THE PARAPET DEPENDING UPON THE PARAPET HEIGHT)W/PLATFORM, 3'-6" HIGH HANDRAILS ABOVE PLATFORM63 RACKING PROVIDED BY YOUTH HOCKEY90 STADIA SEATING BY PRECAST<8" CMU02>8" CMU 1 HOUR RATED W/HORIZONTAL REINFORCING @ 1'-4" O.C.VERTICALLY<FLOOR01>REINFORCED CONCRETE SLAB-ON-GRADE FLOOR, MINIMUM 6" COMPACTEDGRANULAR FILL<INSUL03>1/2" EXPANSION FELT1/4" = 1'-0"2MAIN RINK STAIR SECTION -NE1/4" = 1'-0"7MULTIPURPOSE AREA EGRESS STAIR FIRST FLOOR PLAN -NE10/04/2023BID DOCUMENT SET HCHCHCHCDNDNHCHCHCDNFIRST FLOOR100' -0"PL.82' - 10 1/2"2' - 0"1' - 0"FIRST FLOOR100' -0"T.O. LOW WALL116' -6"MEZZANINEFLOOR LEVEL112' -6"EMBED BALUSTER INTO CONCRETE RAMPL.82' - 0"3' - 0"2' - 2"FIRST FLOOR100' -0"DASHER BOARDS BEYONDTRIM SPACE BETWEEN RAMP AND DASHER BOARD SO THERE IS NO GAPTYP.EMBED BALUSTER INTO CONCRETE RAMPEXTEND 1' -0" PAST RAILL.42' - 0"1SK1.4FIRST FLOOR100' -0"RAMP AND SUPPORTS BY BLEACHER MANUFACTURER10"3' - 0"2' - 10"29' - 10"FF.35' - 0"24' - 0 1/4"5' - 0"5' - 0" 10' - 0"1" / 1'-0"[No Slope]1" / 1'-0"DN2 A8.510" 12' - 0"5' - 0 3/4" 6' - 11 1/4"2M851" / 1'-0"24' - 0"R 27' -11 3/4"1' - 0"15' - 11 5/8"9' - 7 7/8" 1' - 0"4 A8.51 ' - 0 "28' - 10"1' - 0"WALL MOUNTED HANDRAIL WITH NO BALUSTERS L.425' - 1 3/4"2M8P37 A8.55 A8.51" / 1'-0"1" / 1'-0"1' - 0" 24' - 0" 1' - 0" 8' - 0" 1' - 0" 17' - 9" 6' - 3"1' - 0"7' - 2"A135.1W20BL21' - 0" 5' - 2"1' - 0"20' - 6 7/8"R 27' -11 3/4"WALL MOUNTED HANDRAIL WITH NO VERTICAL BALUSTERL.81' - 0" 17' - 7 1/2" 7' - 4 1/2" 4' - 6" 6' - 5"2M12NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/4" = 1'-0"ENLARGED FLOOR PLANSAND SECTIONS -RAMPSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A8.510/13/2023220025.00C2023-151/4" = 1'-0"7SE QUAD RAMP SECTION -EAST1/4" = 1'-0"5SE QUAD RAMP SECTION -WEST1/4" = 1'-0"4SW QUAD RAMP SECTION -EAST1/4" = 1'-0"2FIRST FLOOR PLAN -NW QUAD -RAMP SECTION1/4" = 1'-0"3FIRST FLOOR PLAN -NW QUAD -RAMP1/4" = 1'-0"1FIRST FLOOR PLAN - SW QUAD -RAMP1/4" = 1'-0"6FIRST FLOOR PLAN - SE QUAD -RAMPGENERAL RAMP NOTES1. SLOPE OF RAMPS TO BE AN ACCORDANCE WITH IBC SECTION 10122. HANDRAILS WITH A RISE GREATER THAN 6" SHALL HAVE HANDRAILS ON BOTH SIDES. 3.HANDRAILS ALONG RINK DASHER COARDS SHALL MATCH THE CURVATURE OF THE RINK AS BUILT.10/04/2023BID DOCUMENT SET F123F.3GGENERAL BUILDING STORAGE2606 SFF.6TWO SETS OF TIRES STACKED 6 HIGH PROVIDED BY YOUTH HOCKEY2479 SFGENERALBUILDINGSTORAGE167503 SFWOMEN'S165468 SFMEN'S16668 SFFAMILY TLT162224 SFHOCKEYSTORAGE17384 SFTEMP STORAGE17498 SFF.S. STORAGE17598 SFIT/GENSTORAGE1767 5/8"8' - 5 3/4"7 5/8"8' - 6"10"7' - 4 3/8"7 5/8"10" 11' - 6 5/8" 7 5/8"11 5/8" 11' - 5" 7 5/8" 30' - 4 3/8" 7 5/8"10"19' - 7 7/8"11 5/8"27' - 2"68697273716667662 A5.72 A5.58' - 10" 11' - 10 1/2" 2' - 4 1/4" 13' - 4 7/8" 12' - 1 7/8"6' - 8 1/8" 37' - 4 1/8" 51' - 7 3/8"135.00°135.00°9' - 1 3/8" 9' - 1 5/8" 8' - 2 3/8" 28' - 3 1/4" 12' - 1 7/8"135.00°BOLLARDS2 A6.53 A6.55 A6.54 A6.554 SFAV CLOSET167 (B)MALLCONNECTION16436' - 5 5/8"5' - 0"8' - 2 7/8"1' - 5"12' - 4 1/8"71' - 1 3/4"15' - 4 3/8"5' - 9 3/8"7 5/8"13' - 2 7/8"HJK31443 SFRESURFACER/SHOPTOOLS/LAUNDRY1704 INTERMEDIATE SIZE NETS BY OWNER666' - 11 1/4" 6' - 1 3/8" 9' - 1 1/4" 6' - 1 3/8"1 1/4"135.00°135.00°1 3 5 .0 0 °135.00°18' - 4" 8' - 10"13' - 0 3/8" 6' - 2" 7' - 11 5/8"A171.1A172aA171.277 SFVESTIBULE17118 SFCLOSET172(A)154 SFSTORAGE135(A)OPEN PITSLOPE TOWARDS DRAIN2" RECESS PITCH FOR DRAIN2' - 0"2' - 0"SLOPE TOWARDS DRAIN7' - 2" 21' - 3"28' - 0"6' - 7 1/2" 7 5/8" 3' - 2 1/4"1M8NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/4" = 1'-0"ENLARGED FLOOR PLANS-YOUTH HOCKEY &STORAGE ROOMSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A8.610/13/2023220025.00C2023-151/4" = 1'-0"2ENLARGED YOUTH HOCKEY EXTENDED STORAGE1/4" = 1'-0"1ENLARGED YOUTH HOCKEY NET STORAGE -MAIN ARENAKEYNOTES PER SHEET#66 4 REGULATION NETS67 TEMP BOARDS PROVIDED BY YOUTH HOCKEY - 192 LINEAR FEET68 TURF CARTS - 14 TOTAL 15' X 48" ROLLS69 PLEXI GLASS CARTS - 6 TOTAL 8' X 5' CARTS71 DASHER BOARDS 10 TOTAL 8'X8' DASHER CARTS72 HIGH DENSITY POLYPROPYLENE STACKING CHAIR - 320 CHAIRS REQ: 40 PER DOLLY73 60" ROUND FOLDING TABLE - DINING: 40 TABLESREFER TO FF&E MATRIX FOR ALL RESPONSIBILITIES OF FURNITURE AND EQUIPMENT 10/04/2023BID DOCUMENT SET JK1 A8.729' - 4 1/2" 7 3/4"7 3/4"20' - 7 1/2"2' - 3"6"2' - 9"Y.H STORAGE582 SF29' - 4 3/8"0"2' - 0" DEEP BY 5' - 0" HIGH RACKINGA137.12 A8.41175 SFLOADING/RECEIVING/STORAGE16027' - 2"10"43' - 10 1/4"727475788177781011021007 5/8"1' - 0 1/2"11 5/8"JK21' - 3"23' - 3 1/2"11"11' - 7"11"4' - 4"1' - 9"1' - 9"1' - 9"2' - 0"5' - 2"3' - 5"22' - 10 3/8"7 5/8"6' - 4"PASSAGEY.H STORAGEMEZZANINESEATINGPLEXI ON ICE RINK WALLSTRUCTURAL FRAMING GIRDER - 96LHPV ARRAYRACKING BY YOUTH HOCKEY FOAM DIVIDERS BY YOUTH HOCKEY 1 A6.512' - 5 7/8"NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/4" = 1'-0"ENLARGED SECTION ANDPLANS -YOUTH HOCKEYROOMSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A8.710/13/2023220025.00C2023-15KEYNOTES PER SHEET#72 HIGH DENSITY POLYPROPYLENE STACKING CHAIR - 320 CHAIRS REQ: 40 PER DOLLY74 RECTANGULAR FOLDING TABLE - ANCILLARY SHADE - 96" X 24"75 VOLLEYBALL EQUIPMENT77 RECTANGULAR FOLDING TABLE - 1 PER BOOTH - 96" X 24"78 STORAGE TRANSPORTATION CARTS81 SKATE ASSIST STORAGE100 20' X 48" OVERALL MOVEABLE PLATFORM STORAGE101 MOVEABLE PLATFORM STEPS STORAGE (3 TOTAL)102 MOVEABLE PLATFORM RAMP STORAGE (3 TOTAL)1/4" = 1'-0"2ENLARGED YOUTH HOCKEY ROOMS -FLOOR PLAN #11/4" = 1'-0"3ENLARGED YOUTH HOCKEY NET STORAGE -FLOOR PLAN SHIPPING/RECIEVING1/4" = 1'-0"1MEZZANINE / Y.H STORAGE / SEATING -SECTIONREFER TO FF&E MATRIX FOR ALL RESPONSIBILITIES OF FURNITURE AND EQUIPMENT 10/04/2023BID DOCUMENT SET HCHCHCHCHCHCHCHCHCHCDNGCHCHCHCHCH CHCSHCHCHCHCHCHCHCHCHCHCDNGCHCHCHCHCH CHCSHCHCHCHCHCHCHCHCHCHCDNGCHCHCHCHCH CHCSHCHCHCHCHCHCHCHCHCHCDNGCHCHCHCHCH CHCS10' - 0"WARMING ROOM15914' - 8"LOADING/RECEIVING/STORAGE16064 ROWS OF 22 CHAIRS = 1,408 TOTAL SEATS20 X 50 PLATFORM15 NET/PERSONOCC = 6774 ROWS OF 21 CHAIRS = 1,554 TOTAL SEATS20' X 48' PLATFORM15 NET/PERSONOCC = 67FIXED SEATINGOCC. = 2425' - 0"9' - 10 5/8"6' - 1 5/8"16x20 PLATFORM15 NET/PERSONOCC = 1434 ROWS OF 12 CHAIRS = 408 TOTAL SEATS12616' - 0"7' - 6"16' - 0"7' - 11 3/4"8' - 0"12272' - 0" 13' - 8"33 8'x12' BOOTHS14x20 STAGE15 NET/PERSONOCC = 1932 TABLES-256 SEATS10' - 0"WARMING ROOM15914' - 8"LOADING/RECEIVING/STORAGE160OCC. = 22134 ROWS OF 21 CHAIRS = 714 TOTAL SEATS20 X 50 PLATFORM15 NET/PERSONOCC = 67121210FIXED SEATINGOCC. = 24234 8'x12' BOOTHSOCC. = 4844' - 11 3/8"12' - 4"16' - 0"12' - 0"16' - 0"12' - 0"16' - 0"12' - 0"16' - 0"12' - 0"16' - 0"12' - 0"16' - 0"12' - 0"8' - 0" 10' - 0" 72' - 0"121212121212222TOTAL = 88 61212121212121011' - 9 3/4" 72' - 0" 13' - 0"20' - 0"16' - 0"12' - 0"16' - 0"12' - 0"16' - 0"12' - 0"16' - 0"12' - 0"16' - 0"12' - 0"16' - 0"12' - 0"16' - 0"15' - 0"10' - 0"WARMING ROOM15914' - 8"LOADING/RECEIVING/STORAGE16015 SF/PERSON NETOCC. = 727TOTAL = 82 15 SF/PERSON NETOCC. = 903FIXED SEATINGOCC. = 24210' - 0"WARMING ROOM15914' - 8"LOADING/RECEIVING/STORAGE16016x24PLATFORM15 NET/PERSONOCC. = 23 114 TABLES-912 SEATSTOTAL= 125 TABLES -1000 SEATS12x30PLATFORM15 NET/PERSONOCC. = 248' - 1 1/8"15' - 6 3/4" 82' - 2"5' - 1 3/8"177' - 8 5/8"5' - 6"FIXED SEATINGOCC. = 2428' - 0"NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1" = 20'-0"ENLARGED FLOOR PLANS-CONVENTION DIAGRAMSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A8.810/13/2023220025.00C2023-151" = 20'-0"2LARGE CONVENTION -MAX SEATING DIAGRAM1" = 20'-0"3MULTIPLE CONVENTIONS -COMBINATION DIAGRAM1" = 20'-0"1LARGE CONVENTION -BOOTH SETUP DIAGRAM1" = 20'-0"4LARGE CONVENTION -DINING TABLE DIAGRAMTOTAL OCCUPANTS: 2,188 TOTAL OCCUPANTS: 3,654TOTAL OCCUPANTS: 2,674 TOTAL OCCUPANTS: 2,51710/04/2023BID DOCUMENT SET JA202.1A202.26 A8.9M8W16W161' - 0"32' - 0"1' - 0"11' - 2" A8.942' - 5" 9' - 2"4' - 10 1/2"21' - 6"4' - 10 1/2"380 SFSPONSOR SUITE20234' - 0"43SHIM BACKER ROD AND SEAL WHERE MULLION MEETS COLUMN3 7/8"HOLD OFF SLAB EDGE 3" MIN8' - 0"PRESS BOX203A203.1A203.25 A8.9M8W16W1611' - 2"1' - 4"24' - 0" A8.9316' - 0"3 7/8"7 5/8"8' - 9"7 5/8"3 7/8"6' - 0"1' - 10" 7' - 6 1/8" 7 5/8" 2' - 4"AV CLOSET210A210.1BENCH SEATING2' - 4"3' - 0"2' - 9"3' - 0"25' - 4"11143SHIM BACKER ROD AND SEAL WHERE MULLION MEETS COLUMN3 1/2"HOLD 3" MIN OFF OF SLAB EDGE9' - 0"1"1' - 3"2' - 1" A7.35 A8.92 A8.9212' - 8"7 5/8"6' - 5"43DECORATIVE WOOD LOOK METAL PANEL TRIM9' - 0"GYP SOFFIT1' - 4"2' - 1"9' - 8" 2' - 1"11 5/8"6' - 4"9' - 0"1"1' - 3"434312' - 5"DECORATIVE WOOD LOOK METAL PANEL TRIM2' - 5"25' - 4"3' - 4"9' - 1"5' - 7 1/2" 10' - 8" 5' - 7 1/2" 1' - 8 1/2"1' - 8 1/2"43WOOD ACCENT TO MATCH ENTRY1' - 6"4"3' - 6"34' - 0"3' - 4"9' - 1"1' - 4 1/2" 4' - 10 1/2" 21' - 6" 4' - 10 1/2" 1' - 4 1/2"TV MOUNTED 5' -4" AFFENGINEERED QUARTZ COUNTER ON IN-WALL SUPPORT BRACKETS AND WATERFALL EDGEUNDERCOUNTER REFRIGERATOR PROVIDED BY OWNER434"2' - 6"TRANSPARENT BACKSPLASH ON SOLD SURFACE COUNTERTOP 3 5/8" METAL STUD5/8" MOISTURE RESISTANT GYPSUM BOARD10"X5" HSSMULLIONS BEYOND1' - 4"CLSTUD FACE7"109 ' - 0"B/O SOFFIT<CLIP ANGLE>LIGHT GAGE KICKERS AD REQUIRED5/8" MOISTURE RESISTANT GYPSUM BOARD ON 3 5/8" METAL STUD FRAMING AT 1' - 4" O.C. (TYP)110 ' - 2 1/2"T/O HSSPROVIDE METAL STUD FRAMING TO HANG ACT SYSTEMPROVIDE STENCILED NOTE ON MOISTURE RESISTANT GYPSUM BOARD CAP, NO STANDING OR STORAGEPROVIDE PREFINISHED ALUMINUM TRIM RING AROUND COLUMN PENETRATION AT MOISTURE RESISTANT GYPSUM BOARD (TYP)MOISTURE RESISTANT ACOUSTIC CEILING TILEMIN1"NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedENLARGED FLOOR PLANSAND ELEVATIONS -SPONSOR SUITE ANDPRESS BOXWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A8.910/13/2023220025.00C2023-151/4" = 1'-0"8ROOM 202 -SPONSOR SUITE-ENLARGED1/4" = 1'-0"7ROOM 203 -PRESS BOX -ENLARGED1/4" = 1'-0"5PRESS BOX SECTION1/4" = 1'-0"6SPONSOR SUITE SECTION1/4" = 1'-0"3ROOM 203 -PRESS BOX BACK WALL -ELEVATION1/4" = 1'-0"4ROOM 202 -SPONSOR SUITE -ELEVATION1/4" = 1'-0"1ROOM 203 -PRESS BOX -ELEVATION1 1/2" = 1'-0"2SOFFIT DETAIL @ PRESS BOX AND SPONSOR SUITE10/04/2023BID DOCUMENT SET T01T09T06T10T11T01T02T06T06T10T02T06T02T06T02T06T02T06T02T06T02T06T02T06T02T0638T12T20T05T07T0820T01T09T06T10T11T05T12T23T08T20T20W13T20T20T05T05T05T02T06T02T06T02T06T02T06T02T06T02T06T02T06T02T06T02T06T02T06T02T06T02T06T01T06T01T06T11T10T09T10T11T10T09T06T01T01T06T10T06T02T06T02T06T02T06T02T06T02T06T02T06T02T06T02T06T02T06T02T06T02T06T02T02T06T11T01T10T06T09T04T02T10T06T18T04T18T04T10T04T18T04T18T05T12T12T12T05T08T23T23T23T04T01T07T01T09T06T10T11T18T05T04T12T09T11T10T06T01T2386T24T11T22T04T18T06T05T12T01T09T10T11T2386T22T24T11 A7.55103aT01T09T06T10T11T05T12T23T24T116' - 11"86T12T05T01T09T06T10T11T23866' - 11"T22T24T11T20T05T20T05T20T05T2038T08T08T0820T20T05T20T20T20T20T05T05T0538T08T20T20T05T05T08T11T10T09T06T01T01T06T10T02T06T02T06T06T02T04T04T04T04T04T04T11T10T06T01T09T04T12T20T20T05T11T10T09T06T01T02T06T06T06T02T12T08T05T05T20T20T20T01T06T09T10T11T08T11T09T10T02T12T20T08T06T05BEYONDT07T12T07T05T20Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedINTERIOR ELEVATIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A9.010/13/2023220025.00C2023-151/4" = 1'-0"23ROOM 165 -WOMEN'S -ELEVATION 11/4" = 1'-0"21ROOM 162 -TLT -ELEVATION1/4" = 1'-0"14ROOM 128 -WOMEN TLT -ELEVATION1/4" = 1'-0"7ROOM 121 -MEN'S -ELEVATION 11/4" = 1'-0"6ROOM 122 -WOMEN'S -ELEVATION 21/4" = 1'-0"10ROOM 122 -WOMEN'S -ELEVATION 11/4" = 1'-0"25ROOM 166 -MEN'S -ELEVATION 11/4" = 1'-0"16ROOM 132 -MAIN TEAM ROOM -ELEVATION 21/4" = 1'-0"8ROOM 132 -MAIN TEAM ELEVATION 11/4" = 1'-0"17ROOM 139 -WET TEAM ROOM RR -ELEVATION 11/4" = 1'-0"18ROOM 139 -WET TEAM ROOM RR -ELEVATION 21/4" = 1'-0"11ROOM 124 -WET TEAM ROOM -ELEVATION 11/4" = 1'-0"13ROOM 124 -WET TEAM ROOM RR -ELEVATION 21/4" = 1'-0"9ROOM 146 -REFEREE RR -ELEVATION 11/4" = 1'-0"20ROOM 146 -REFEREE RR -ELEVATION 23/8" = 1'-0"26TYPICAL MOUNTING HEIGHTS1/4" = 1'-0"19ROOM 141 -WOMENS TLT -ELEVATIONKEYNOTES PER SHEET#20 JUMP SEAT38 BABY CHANGING STATION, PROVIDE ADJ ASCENT COAT HOOK AT 48" AFF86 PRECAST STADIA SEATING103a SPORTS EQUIPMENT HOOK ADA, 48" AFFT01 WALL MOUNTED TOILET, ADA COMPLIANTT02 WALL MOUNTED TOILET, STANDARDT04 FLOOR MOUNTED URINAL, ADA HEIGHTT05 SOAP DISPENSER, SURFACE MOUNTED.T06 TOILET TISSUE DISPENSER, DOUBLE ROLLT07 PAPER TOWEL DISPENSER, SURFACE MOUNTEDT08 ELECTRIC HAND DRYERT09 GRAB BAR - 36"T10 GRAB BAR - 42"T11 GRAB BAR - 18" VERTICALT12 FRAMELESS MIRROR WITH METAL CLIP FASTENERST18 24" DEEP WALL MOUNTED SOLID PLASTIC URINAL PARTITIONT20 THROUGH STYLE VANITY W/ ADA COMPLIANT SLOPED LOWER CABINETT22 SHOWER ADA SEATT23 WALL MOUNTED SINK W/ ADA COMPLIANT VANDAL GUARD SHROUDT24 GRAB BAR - WRAP AROUND SHOWER TRANSFER TYPE1/4" = 1'-0"16aROOM 132 -MAIN TEAM ROOM -ELEVATION 31/4" = 1'-0"25aROOM 166 -MEN'S -ELEVATION 21/4" = 1'-0"24ROOM 165 -WOMEN'S -ELEVATION 2ALL RESTROOM PARTITIONS SHALL BE CEILING MOUNTED1/4" = 1'-0"5ROOM 121 -MEN'S -ELEVATION 21/4" = 1'-0"1ROOM 106A -TOILETS -ELEVATION 11/4" = 1'-0"2ROOM 106B -TOILETS -ELEVATION 11/4" = 1'-0"3ROOM 106B -TOILETS -ELEVATION 21/4" = 1'-0"22ROOM 162 -FAMILT TLT1/4" = 1'-0"19aROOM 141 -WOMENS TLT -ELEVATION 21/4" = 1'-0"4ROOM 120 -FAMILY RM -ELEVATION 11/4" = 1'-0"15ROOM 119 -WELLNESS RM -ELEVATION 110/04/2023BID DOCUMENT SET A118.1A118.2A118.3W3A114.1A115.1A116.12' - 6"4' - 10"2' - 8"7' - 0"437' - 8"359' - 3 1/8" 8' - 0" 4' - 1 1/2" 3' - 10" 4' - 5" 3' - 4"7"A117.5A117.2W12352"12' - 4"2"39' - 10 3/4"8' - 2"10' - 0"4' - 5 1/2"4' - 10 5/8"2' - 10 1/8"A117.4A117.3A115.2A.F.F19' - 4"9' - 4"10' - 0"43A117.12' - 8"4' - 10"2' - 6"1051057' - 4 1/2" 28' - 10 1/2" 12' - 8"48' - 11"MONITORSMONITORS4' - 0"3' - 4"7' - 3"2' - 0"6' - 6"2' - 0"6' - 6"2' - 0"34' - 9"3' - 4"1' - 6 1/4"4' - 9 3/4"13' - 7 1/2"4343W15W15W15A107.11' - 11 1/2"2' - 4 7/8"2' - 4 7/8"2' - 4 7/8" 2' - 4 7/8" 1' - 6 1/4"WOOD LOOK CEILING CLOUD ABOVE15' - 0"24' - 2 1/4"1' - 0"9' - 0"10' - 0"2' - 8"7' - 2"4"2' - 10"2' - 8" 2' - 8" 16' - 0 1/4"7' - 2"4"2' - 10"16' - 1" 2' - 8" 2' - 8"2' - 8"3535A102.1A103.13939T07T05T05T076' - 5 1/8"2' - 10"10"2' - 0" 6' - 6" 2' - 0" 8' - 1 1/2"7 1/4"4' - 6"4 7/8"14' - 4 1/2"4 7/8"4' - 6"7 1/4"4' - 10 3/4"A107.1W15W153' - 8"5' - 4"9' - 0"GYP WALL2' - 8" 1' - 6" 1' - 6" 1' - 4"7' - 0" 3' - 1 3/8"2' - 8 5/8" 3' - 0" 1' - 4" 3' - 1 3/8"2' - 10"4"1' - 10"2' - 6"T05T0739104104104105 8' - 2" 3' - 0"4"6' - 2"6"1' - 4"1' - 2"24 PLAM CUBBIES W VINYL BASE4"3' - 0"2"3' - 0"6"7' - 0"9' - 6"6"4" 9" 6" TYP REPEATING PATTERN11"9" 4" 11" 6"1 A7.5U CHANNEL TRIM ON EXPOSED EDGE OF TOP AND BOTTOM OF WOOD LOOK PANELS A7.521' - 0"1' - 0"1' - 0"1' - 0"1' - 0"1' - 0" 10"6' - 3"3/4"TYP.8"3/4"PLAM SHOE CUBBY BASEPHONE LOCKERS11 A7.5113114115115a1' - 4"A105.1T05T07Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedINTERIOR ELEVATIONSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A9.110/13/2023220025.00C2023-15KEYNOTES PER SHEET#35 WALL MOUNTED TV SCREEN39 TRASH AND RECYCLING - FF&E43 WOOD LOOK METAL WALL PANEL, SEE INTERIORS SHEETS AND 10/A9.1104 FF&E ITEM105 RENTABLE LOCKERS- FF&E ITEM - PLASTIC LAMINATE TO MATCH ADJACENT CUBBIES113 DIGILOCK CURVE 2-1/8" X 3-7/8"114 8"X10" PHONE LOCKERS115 COAT STORAGE/SHOE CUBBY HOOKS @66" A.F.F115a COAT STORAGE/SHOE CUBBY ADA @48" A.F.FT05 SOAP DISPENSER, SURFACE MOUNTED.T07 PAPER TOWEL DISPENSER, SURFACE MOUNTED1/4" = 1'-0"9ROOM 117 -ICE ARENA LOBBY -SOUTH1/4" = 1'-0"7ROOM 117 -ICE ARENA LOBBY -WEST1/4" = 1'-0"8ROOM 117 - ICE ARENA LOBBY -EAST1/4" = 1'-0"4ROOM 101 - MAIN LOBBY -SOUTH1/4" = 1'-0"1ROOM 101 - MAIN LOBBY -WEST1/4" = 1'-0"11MEETING ROOM INTERIOR ELEVATION1/4" = 1'-0"2ROOM 107 -SKATE RENTAL/CHECK IN1/4" = 1'-0"6ROOM 109 -BREAK ROOM1/4" = 1'-0"5CUBBIES AND LOCKERS1/2" = 1'-0"10WOOD LOOK WALL PANEL PATTERN -TYPICAL1/4" = 1'-0"3ROOM 112 -ADMINREFER TO FF&E MATRIX FOR ALL RESPONSIBILITIES OF FURNITURE AND EQUIPMENT 1/4" = 1'-0"12ROOM 105 -FIRST AID ELEVATION1/4" = 1'-0"13ROOM 112(A) -COPY AREA ELEVATION10/04/2023BID DOCUMENT SET STRUCTURE / DECKCONTINUOUS SEALANT - EA. SIDE. 3-5/8" MTL STUD @ 16" O.C. WITH INSULATION5/8" GYP. BD. EA. SIDESEE REFLECTEDCEILING PLANSEAL ENTIRE WALL PERIMETER & AT ALL PENETRATIONS - BOTH SIDESFLOORA1DRYWALL PARTITION4 7/8"CONTINUOUS SEALANT - EA. SIDE.WITHOUT INSULATION.A1bSTRUCTURE / DECKCONTINUOUS SEALANT EACH SIDE6" MTL STUD @ 16" O.C. WITH INSULATION5/8" GYP. BD. EA. SIDE SEE REFLECTEDCEILING PLANSEAL ENTIRE WALL PERIMETER & AT ALL PENETRATIONS - BOTH SIDES.FLOORA2DRYWALL PARTITION7 1/4"CONTINUOUS SEALANT - EA. SIDE.WITHOUT INSULATION.A2bSTRUCTURE / DECK3-5/8" MTL STUDS @ 16" O.C. WITH INSULATION5/8" GYP. BD. EA. SIDECONTINUOUS SEALANT - EA. SIDESEE REFLECTEDCEILING PLANSEAL ENTIRE WALL PERIMETER & AT ALL PENETRATIONS - BOTH SIDESFLOOR6"KICKERS AS REQUIRED4 7/8"B1DRYWALL PARTITIONWITHOUT INSULATION.B1bSTRUCTURE / DECK6" MTL STUDS @ 16" O.C. WITH INSULATION5/8" GYP. BD. EA. SIDESEE REFLECTEDCEILING PLANSEAL ENTIRE WALL PERIMETER & AT ALL PENETRATIONS - BOTH SIDESFLOOR6"KICKERS AS REQUIRED7 1/4"B2DRYWALL PARTITIONCONTINUOUS SEALANT - EA. SIDEWITHOUT INSULATION.B2bSTRUCTURE / DECKCONTINUOUS SEALANT2-1/2" MTL STUD @ 16" O.C. WITH INSULATION5/8" GYP. BD.SEE REFLECTEDCEILING PLANSEAL ENTIRE WALL PERIMETER & AT ALL PENETRATIONS. FLOOR3 1/8"D4DRYWALL PARTITIONCONTINUOUS SEALANTWITHOUT INSULATION.D4bSTRUCTURE / DECKCONTINUOUS SEALANT3-5/8" MTL STUD @ 16" O.C. WITH INSULATION5/8" GYP. BD. ONE SIDESEE REFLECTEDCEILING PLANSEAL ENTIRE WALL PERIMETER & AT ALL PENETRATIONS. FLOORD5DRYWALL PARTITIONCONTINUOUS SEALANTWITHOUT INSULATIOND5bSTRUCTURE / DECKCONTINUOUS SEALANT. 6" MTL STUD @ 16" O.C. WITH INSULATION5/8" GYP. BD.SEE REFLECTEDCEILING PLANSEAL ENTIRE WALL PERIMETER & AT ALL PENETRATIONS.FLOORD6DRYWALL PARTITIONCONTINUOUS SEALANT6 5/8"WITHOUT INSULATION.D6bTypical Wall Types - Masonry (CMU)STRUCTURE / DECKCONTINUOUS JOINT SYSTEMAT FIRE RATED CONSTRUCTION(UL DESIGN # HW-D-0041)8" CMU WALL W/ HORIZONTAL JT.REINFORCING @ 16" O.C.SEE REFLECTEDCEILING PLANFLOORSTRUCTURE / DECKCONTINUOUS JOINT SYSTEMAT FIRE RATED CONSTRUCTION(UL DESIGN # HW-D-0041)10" CMU WALL W/ HORIZONTAL JT.REINFORCING @ 16" O.C.SEE REFLECTEDCEILING PLANFLOOR9 5/8"M82 HOUR FIRE RATED CMU - (UL DESIGN NO. U905)M108" MASONRY PARTITION (CMU)10" MASONRY PARTITION (CMU)7 5/8"STRUCTURE / DECKCONTINUOUS JOINT SYSTEMAT FIRE RATED CONSTRUCTION(UL DESIGN # HW-D-0041)6" CMU WALL W/ HORIZONTAL JT.REINFORCING @ 16" O.C.SEE REFLECTEDCEILING PLANFLOORM62 HOUR FIRE RATED CMU - (UL DESIGN NO. U906)6" MASONRY PARTITION (CMU)5 5/8"2M62M83 HOUR FIRE RATED CMU - (UL DESIGN NO. U904)3M82 HOUR FIRE RATED CMU - (UL DESIGN NO. U905)2M103 HOUR FIRE RATED CMU - (UL DESIGN NO. U904)3M10STRUCTURE / DECKCONTINUOUS JOINT SYSTEMAT FIRE RATED CONSTRUCTION(UL DESIGN # HW-D-0041)4" CMU WALL W/ HORIZONTAL JT.REINFORCING @ 16" O.C.SEE REFLECTEDCEILING PLANFLOORM42 HOUR FIRE RATED CMU - (UL DESIGN NO. U906)4" MASONRY PARTITION (CMU)3 5/8"2M4STRUCTURE / DECKCONTINUOUS JOINT SYSTEMAT FIRE RATED CONSTRUCTION(UL DESIGN # HW-D-0041)12" CMU WALL W/ HORIZONTAL JT.REINFORCING @ 16" O.C.SEE REFLECTEDCEILING PLANFLOORM1212" MASONRY PARTITION (CMU)2 HOUR FIRE RATED CMU - (UL DESIGN NO. U905)2M123 HOUR FIRE RATED CMU - (UL DESIGN NO. U904)3M12Typical Wall Types - Standard Walls11 5/8"Typical Wall Types - Furring Walls1 1/2" MTL. FURRING @ 16" O.C.5/8" GYP. BD.CONTINUOUS SEALANTSEE REFLECTEDCEILING PLANFLOOR6"NEW OR EXISTING WALL2 1/8"F2FURRING PARTITIONEXTEND GYP. BD. and STUDS TO DECK.F2b3 5/8" MTL. FURRING @ 16" O.C.5/8" GYP. BD.CONTINUOUS SEALANTSEE REFLECTEDCEILING PLANFLOOR6"NEW OR EXISTING WALL4 1/4"F4FURRING PARTITIONEXTEND GYP. BD. and STUDS TO DECK.F4b4 1/4"1M81 HOUR FIRE RATED CMU - (UL DESIGN NO. U905)WITH INSULATION, FRP UP TO 4' AND 6" BASEA1cConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1 1/2" = 1'-0"WALL TYPESWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A10.010/13/2023220025.00C2023-1510/04/2023BID DOCUMENT SET HARDWARE GROUPS:• SEE SPECIFICATIONS FOR HARDWARE GROUP DESCRIPTIONS• SECTION 08 71 00 PART 2.11• THE LETTER IN THE DESIGNATION REFERS TO THE TYPE OF FUNCTION• SECTION 08 71 00 PART 2.2VGFGFLUSH DOOR W/ VISION GLASSFULL GLASS DOORGFR1STANDARD FRAME GENERAL NOTE: SEE SCHEDULE FOR DOOR GLAZING TYPE1."HM" INDICATES HOLLOW METAL, "ALUM" INDICATES ALUMINUM, "SP" INDICATES SOLID PLASTIC, "FRP" INDICATES FIBERGLASS REINFORCED POLYESTER.2."G" INDICATES GLASS -PROVIDE SAFETY GLAZING WHERE REQUIRED BY CODE 3.DOOR TYPES ARE SHOWN AS SINGLE DOORS. DOUBLE DOORS (INDICATED ON THE SCHEDULE AS "PR") ARE (2) OF THE SPECIFIED DOOR TYPE, U.N.O.4.ALL HOLLOW METAL DOORS SHALL BE PRIMED AND PAINTED, U.N.O. SEE ROOM FINISH SCHEDULE.5.ALL RATED FIRE DOORS, FRAMES AND HARDWARE SHALL BE POSITIVE PRESSURE TESTED ACCORDING TO NFPA 252 OR UL10C.GENERAL NOTE: NO SCALE1.ALL HOLLOW METAL DOOR FRAMES SHALL BE PRIMED AND PAINTED, SEE ROOM FINISH SCHEDULE.2.SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS3.OPPOSITE HAND MAY APPLY -SEE PLANSFRAME TYPESDOOR TYPES6" VARIES 6"AS SCHEDULEDAS SCHEDULEDJ4OVERHEAD SECTIONAL INSULATED DOORHOLLOW METAL2" AS SCHEDULED 2"AS SCHEDULED2"AS SCHEDULED2"2"AS SCHEDULEDDGDOUBLE FULL GLASS DOORAS SCHEDULED6" VARIES6" 6"VARIES6"AS SCHEDULED1' - 0" VARIES 6"1' - 0" VARIES 6"FR2FR3FR4FFLUSH DOORAS SCHEDULEDAS SCHEDULEDAS SCHEDULEDAS SCHEDULEDG GG6" 6"3' - 10" 2' - 6" VARIESHOLLOW METAL HOLLOW METAL HOLLOW METALFRAME WITH BORROWED LITE FRAME WITH BORROWED LITE FRAME WITH BORROWED LITE2"AS SCHEDULED2"1' - 6"2"2"AS SCHEDULED2" EQ 2" EQ 2"2"AS SCHEDULED2"2' - 6"2"2"AS SCHEDULED2"EQ2"EQ2"2"AS SCHEDULED2"3' - 2"2"AS SCHEDULED2"2"EQ2"EQ2"HGFLUSH DOOR W/ HALF GLASSG6"VARIES6"AS SCHEDULEDAS SCHEDULED3' - 7" VARIES 8"AS SCHEDULED3 1/2" AS SCHEDULED 3 1/2"CDOVERHEAD COILING DOORAS SCHEDULEDAS SCHEDULEDFLUSH DOORDFAS SCHEDULEDAS SCHEDULEDSLIDING GLASSSGFR6CENTER MULLION FRAME AND DOUBLE CENTER MULLION FRAMEHOLLOW METALAS SCHEDULED2"2"AS SCHD2"AS SCHD2"AS SCHEDULEDAS SCHEDULEDSLIDING GLASS TYPE 2S2Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/4" = 1'-0"DOOR AND FRAME TYPESWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A10.110/13/2023220025.00C2023-15DOOR AND FRAME SCHEDULENUMBERDOOR FRAME FIRE RATING HARDWARECOMMENTSSIZE (Note: Door Width 1 & 2 / Door Type 2 only applicablewith double & uneven doors)MATERIAL FINISH TYPE MATERIAL FINISH FRAME TYPE LABEL SET NO.OVERALLWIDTHDOORWIDTH 1DOORWIDTH 2HEIGHTA100.1 3' - 0" 3' - 0" 10' - 0" AL FG AL W1 74A100.2 3' - 0" 3' - 0" 10' - 0" AL FG AL W1 73A100.3 12' - 4" 9' - 4" AL SG AL W1 PER MANUF.A100.4 3' - 0" 3' - 0" 10' - 0" AL FG AL W1 41A100.5 3' - 0" 3' - 0" 10' - 0" AL FG AL W1 41A100.6 3' - 0" 3' - 0" 10' - 0" AL FG AL W2 41A100.7 3' - 0" 3' - 0" 10' - 0" AL FG AL W2 41A100.8 12' - 4" 9' - 4" AL SG AL W2 PER MANUF.A100.9 3' - 0" 3' - 0" 10' - 0" AL FG AL W2 41A100.10 3' - 0" 3' - 0" 10' - 0" AL FG AL W2 41A101.1 3' - 0" 3' - 0" 8' - 0" AL FG AL W4 36A101.2 3' - 0" 3' - 0" 9' - 10" AL DG AL W14 39A101.3 3' - 0" 3' - 0" 9' - 10" AL DG AL W14 50A101.4 6' - 0" 3' - 0" 3' - 0" 7' - 2" HM DG HM FR1 36A102.1 3' - 0" 3' - 0" 7' - 2" WD VG HM FR1 43A103.1 3' - 0" 3' - 0" 7' - 2" WD VG HM FR1 43A104.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 12A105.1 3' - 0" 3' - 0" 7' - 2" HM VG HM FR1 10A106.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 06A107.1 3' - 0" 3' - 0" 7' - 2" WD F HM FR1 28A107.2 24' - 2 1/4" 9' - 0" PER MANUF. CD PER MANUF. CD PER MANUF.A107.3 3' - 0" 3' - 0" 7' - 2" HM NG HM FR1 07A109.1 3' - 0" 3' - 0" 7' - 2" WD F HM FR1 07A110.1 3' - 0" 3' - 0" 7' - 2" WD F HM FR1 07A111.1 3' - 0" 3' - 0" 7' - 2" WD F HM FR1 07A112.1 3' - 0" 3' - 0" 7' - 2" WD F HM FR1 31A113.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 26A114.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 23A115.1 3' - 6" 3' - 6" 7' - 2" HM F HM FR1 30A115.2 6' - 11" 4' - 10" PER MANUF. CD PER MANUF. CD PER MANUF.A115.3 12' - 11" 4' - 10" PER MANUF. CD PER MANUF. CD PER MANUF.A116.1 8' - 11" 4' - 10" PER MANUF. CD PER MANUF. CD PER MANUF.A116.2 3' - 6" 3' - 6" 7' - 2" HM VG HM FR1 34A117.1 12' - 4" 9' - 4 3/4" AL SG AL PER MANUF. 57A117.2 3' - 0" 3' - 0" 9' - 10" AL DG AL W12 50A117.3 3' - 0" 3' - 0" 9' - 10" AL DG AL W12 50A117.4 12' - 4" 9' - 4 3/4" AL SG AL PER MANUF. PER MANUF.A117.5 8' - 2" 9' - 6" AL S2 AL PER MANUF. PER MANUF.A118.1 3' - 0" 3' - 0" 10' - 0" AL FG AL W3A 41A118.2 3' - 0" 3' - 0" 10' - 0" AL FG AL W3A 41A118.3 3' - 0" 3' - 0" 10' - 0" AL FG AL W3A 42A118.4 3' - 0" 3' - 0" 10' - 1" AL FG AL W3 40A118.5 3' - 0" 3' - 0" 10' - 1" AL FG AL W3 40A118.6 3' - 0" 3' - 0" 10' - 1" AL FG AL W3 56A119.1 3' - 0" 3' - 0" 7' - 2" WD F HM FR1 06A120.1 3' - 0" 3' - 0" 7' - 2" WD F HM FR1 75A123.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 34A124.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 15A124.2 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 14A125.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 34A126.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 34A127.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 34A128.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 04A129.1 3' - 0" 3' - 0" 7' - 2" HM VG HM FR1 11A131.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 11A132.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 33A133.1 3' - 0" 3' - 0" 7' - 2" HM VP HM FR1 33A133.2 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 62A134.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 55A134.2 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 36A135.1 6' - 2" 3' - 1" 3' - 1" 7' - 2" HM F HM FR1 49A135.2 6' - 0" 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 37A137.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 61A138.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 34A139.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 17A139.2 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 16A140.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 34A141.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 04A142.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 23A143.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 33A144.1 6' - 0" 3' - 0" 3' - 0" 7' - 2" HM DF HM FR1 03A144.2 6' - 0" 3' - 0" 3' - 0" 7' - 2" HM DF HM FR1 03A145.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 34A146.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 05A147.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 34A148.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 34A149.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 34A150.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 30A151.1 6' - 0" 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 33A152.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 12A153.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 23A155.1 3' - 0" 3' - 0" 7' - 2" HM FG HM FR1 53A155.2 3' - 0" 3' - 0" 7' - 2" HM FG HM FR1 52A155.3 3' - 0" 3' - 0" 7' - 2" HM FG HM FR1 52A155.4 3' - 0" 3' - 0" 7' - 2" HM FG HM FR1 52A155.5 3' - 0" 3' - 0" 7' - 2" HM FG HM FR1 52A155.6 3' - 0" 3' - 0" 7' - 2" AL FG AL W18 51A155.7 3' - 0" 3' - 0" 7' - 2" AL FG AL W18 60A155.8 3' - 0" 3' - 0" 7' - 2" HM FG HM FR1 52A155.9 7' - 6" 9' - 0" PER MANUF. PER MANUF. PER MANUF. PER MANUF.A156.1 6' - 2" 3' - 1" 3' - 1" 7' - 2" FRP F AL W17 47A156.3 6' - 2" 3' - 1" 3' - 1" 7' - 2" FRP F AL W17 47A156.4 6' - 2" 3' - 1" 3' - 1" 7' - 2" FRP F AL W17 47A156.5 14' - 0" 14' - 0" PER MANUF. J4 PER MANUF. J4 58A156.6 6' - 2" 3' - 1" 3' - 1" 7' - 2" FRP F AL W17 47A157.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 23A157.2 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 22A157a 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 23A158.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 23A159.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 63A159.2 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 09A159.3 6' - 0" 3' - 0" 3' - 0" 7' - 2" HM DF HM FR1 20A159.4 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 64A159.10 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 37 VERIFY IF THRESHOLD, DOOR SWEEP, ANDGASKETING ARE NEEDEDA160.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 10A160.2 12' - 0" 12' - 0" PER MANUF. J4 PER MANUF. FR1 PER MANUF.A160.3 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 32A160.4 6' - 0" 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 20A162.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 06A163.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 23A164.1 6' - 0" 3' - 0" 3' - 0" 7' - 2" HM DF HM FR1 48A164.2 6' - 0" 3' - 0" 3' - 0" 7' - 2" HM DF HM FR1 48A164.3 5' - 9" 2' - 10 1/2" 2' - 10 1/2" 7' - 2" AL DG AL W19 44A164.4 5' - 9" 2' - 10 1/2" 2' - 10 1/2" 7' - 2" AL DG AL W19 45 electrified hardware/strike or magnetic lock placed on themost left hand lief/door.A167.1 12' - 0" 12' - 0" PER MANUF. J4 PER MANUF. J4 PER MANUF.A167.2 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 65A167.3 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 27A168.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 25A169.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 23A170.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 24A170.2 12' - 0" 12' - 0" PER MANUF. J4 PER MANUF. J4 PER MANUF.A170.4 12' - 0" 12' - 0" PER MANUF. J4 PER MANUF. J4 PER MANUF.A170.5 12' - 0" 12' - 0" PER MANUF. J4 PER MANUF. J4 PER MANUF.A171.1 3' - 6" 3' - 6" 7' - 2" HM HG HM FR1 02A171.2 3' - 6" 3' - 6" 7' - 2" HM F F HM FR1 1 HOUR 70A171.3 3' - 6" 3' - 6" 7' - 2" HM F HM FR1 29A172.1 8' - 2" 4' - 1" 4' - 1" 7' - 2" HM DF HM FR6 21A172a 3' - 6" 3' - 6" 7' - 2" HM F HM FR1 1 HOUR 66A173.1 6' - 0" 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 67A174.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 59A175.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 59A176.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 28A179.1 6' - 0" 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 69A200.1 6' - 0" 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 54A200.2 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 08A202.1 2' - 11 1/2" 2' - 11 1/2" 8' - 10" AL FG AL W16 13A202.2 2' - 7 3/4" 2' - 7 3/4" 8' - 10" AL FG AL W16 35A203.1 3' - 0" 3' - 0" 8' - 10" AL FG AL W16 13A203.2 3' - 0" 3' - 0" 8' - 10" AL FG AL W16 13A204.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 23A204.2 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 08A210.1 6' - 0" 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 68DOOR AND FRAME SCHEDULE ADD ALT 1NUMBERDOOR FRAME FIRE RATING HARDWARECOMMENTSSIZE (Note: Door Width 1 & 2 / Door Type 2 only applicablewith double & uneven doors)MATERIAL TYPE MATERIAL FRAME TYPE LABEL SET NO.OVERALLWIDTHDOORWIDTH 1DOORWIDTH 2HEIGHTA101.5 3' - 0" 3' - 0" 7' - 2" AL SG AL W4 36A186.1 3' - 0" 3' - 0" 7' - 2" HM FG HM FR2 52A186.2 3' - 0" 3' - 0" 7' - 2" HM FG HM FR2 52A186.3 6' - 2" 3' - 1" 3' - 1" 7' - 2" AL F AL W15 47A187.1 3' - 0" 3' - 0" 7' - 2" WD HG HM FR2 43A188.1 3' - 0" 3' - 0" 7' - 2" WD HG HM FR2 43A189.1 3' - 0" 3' - 0" 7' - 0" HM F HM FR1 12A190.1 3' - 0" 3' - 0" 7' - 0" HM VG HM FR1 10A191.1 3' - 0" 3' - 0" 7' - 0" HM F HM FR1 75DOOR AND FRAME SCHEDULE ADD ALT 2NUMBERDOOR FRAME FIRE RATING HARDWARECOMMENTSSIZE (Note: Door Width 1 & 2 / Door Type 2 only applicablewith double & uneven doors)MATERIAL TYPE MATERIAL FRAME TYPE LABEL SET NO.OVERALLWIDTHDOORWIDTH 1DOORWIDTH 2HEIGHTA151.1 6' - 0" 3' - 0" 3' - 0" 7' - 2" HM VP HM FR1 33A182.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 33 INCLUDES 60" HIGH KICK PLATEA183.1 3' - 0" 3' - 0" 7' - 2" HM HG HM FR1 33A184.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 33 INCLUDES 60" HIGH KICK PLATEDOOR AND FRAME SCHEDULE ADD ALT 3NUMBERDOOR FRAME FIRE RATING HARDWARECOMMENTSSIZE (Note: Door Width 1 & 2 / Door Type 2 only applicablewith double & uneven doors)MATERIAL TYPE MATERIAL FRAME TYPE LABEL SET NO.OVERALLWIDTHDOORWIDTH 1DOORWIDTH 2HEIGHTA180.1 3' - 0" 3' - 0" 7' - 2" HM HG HM FR1 33A181.1 3' - 0" 3' - 0" 7' - 2" HM F HM FR1 33 INCLUDES 60" HIGH KICK PLATEA185.1 3' - 0" 3' - 0" 7' - 2" HM HG HM FR1 3310/04/2023BID DOCUMENT SET 2"SEALANT TYP. BOTH SIDESFRAME AS SCHEDULED. (3) ANCHORS PER JAMB. TYP. DOOR AS SCHEDULED. REFER TO PLAN FOR WALL TYPES.PER WALL TYPE1/2"1/2"WALL PROTECTION WHERE NOTED ON INTERIOR ELEVATION OR ROOM FINISH SCHEDULE OR BOTH.DBL. STUDS @ JAMBS. TYP.REFER TO PLAN FOR WALL TYPES. METAL STUD BOX LINTEL FOR OPENINGS ≥ 42". METAL RUNNER TRACK ONLY FOR OPENINGS < 42".SEALANT TYP. BOTH SIDESFRAME AS SCHEDULED. DOOR AS SCHEDULED. PER WALL TYPE1/2"1/2"2"WALL PROTECTION WHERE NOTED ON INTERIOR ELEVATIONS OR ROOM FINISH SCHEDULE OR BOTH.WALL PER WALL TYPES. METAL STUD BOX LINTEL FOR OPENING ≥ 42"METAL RUNNER TRACK ONLY FOR OPENING < 42".SEALANT TYP. BOTH SIDESHOLLOW METAL WINDOW FRAME AS SCHEDULED. GLASS AS SCHEDULED. PER WALL TYPE1/2"1/2"2"WALL PROTECTION WHERE NOTED ON INTERIOR ELEVATIONS OR ROOM FINISH SCHEDULE OR BOTH.HOLLOW METAL STOPS AS REQUIRED. SEE PLAN FORCMU PARTITION TYPECMU PARTITION, SIZE VARIESRAKE BACK GROUT AND INSTALL SEALANT BOTH SIDE TYPICALDOOR AS SCEDULEDFRAME, SEE SCHEDULE-GROUT FULL AS REQDBULLNOSE BLOCK, TYP AT JAMBSSEE PLAN FORCMU PARTITION TYPECMU PARTITION, SIZE VARIESRAKE BACK GROUT AND INSTALL SEALANT BOTH SIDE TYPICALDOOR AS SCEDULEDFRAME, SEE SCHEDULE-GROUT FULL AS REQDBULLNOSE BLOCK, TYP AT JAMBSDOOR AS SCHED.MASONRY WALL -SEESTRUCT. FOR LINTELREQUIREMENTSSEALANTFRAME, SEE SCHEDULE-GROUT FULL AS REQD0' - 0 1/2"DOOR AS SCHED.MASONRY WALL -SEESTRUCT. FOR LINTELREQUIREMENTSSEALANTFRAME, SEE SCHEDULE-GROUT FULL AS REQDEXTERIORPRECAST PANELINSULATED OVERHEAD DOORTREATED 2x6 WOOD BLOCK, PAINTEDOVERHEAD DOOR TRACKH.M. FRAME, FILL W/ GROUT1'-0"EXTERIORPRECAST PANELINSULATED OVERHEAD DOORTREATED 2x6 WOOD BLOCK, PAINTEDOVERHEAD DOOR TRACKH.M. FRAME, FILL W/ GROUTSEE PLAN FORCMU PARTITION TYPECMU PARTITION, SIZE VARIESRAKE BACK GROUT AND INSTALL SEALANT BOTH SIDE TYPICALDOOR AS SCEDULEDFRAME, SEE SCHEDULE-GROUT FULL AS REQDBULLNOSE BLOCK, TYP AT JAMBSSEE PLAN FORCMU PARTITION TYPECMU PARTITION, SIZE VARIESRAKE BACK GROUT AND INSTALL SEALANT BOTH SIDE TYPICALDOOR AS SCEDULEDFRAME, SEE SCHEDULE-GROUT FULL AS REQDBULLNOSE BLOCK, TYP AT JAMBS6" EXT. BOLLARDINSULATED OVERHEAD DOOROVERHEAD DOOR TRACKH.M. FRAME FILLED WITH GROUTPRECAST PANEL1' - 0"20 A7.11'-0"6" EXT. BOLLARDINSULATED OVERHEAD DOOROVERHEAD DOOR TRACKH.M. FRAME FILLED WITH GROUTPRECAST PANELBENT STEEL PLATEWALL TYPES AND LOCATIONS AS INDICATED ON FLOOR PLAN.DOOR AS SCHEDULEDFRAME AS SCHEDULEDDBL. STUDS @ JAMBS. 4"2"PRECAST PANEL, HOLD BACK INSULATION 6" MIN.OVERHEAD COILING SHUTTER BOX, ANCHOR AS REQ'D PER MANUFACTUREROVERHEAD COILING SHUTTER OVERHEAD COILING SHUTTER GUIDEPRECAST PANEL, HOLD BACK INSULATION 6" MIN.OVERHEAD COILING SHUTTER BOX, ANCHOR AS REQ'D PER MANUFACTUREROVERHEAD COILING SHUTTER OVERHEAD COILING SHUTTER GUIDEOVERHEAD COILING SHUTTEROVERHEAD COILING SHUTTER TRACKPRECAST PANEL, HOLD BACK INSULATION 6" MIN.3"x3"x1/4"x5'-0" GALV. STEEL ANGEL, GRIND ANCHORAGE SMOOTH, PAINTOVERHEAD COILING SHUTTEROVERHEAD COILING SHUTTER TRACKPRECAST PANEL, HOLD BACK INSULATION 6" MIN.3"x3"x1/4"x5'-0" GALV. STEEL ANGEL, GRIND ANCHORAGE SMOOTH, PAINTEXPANSION ANCHOR BOLT8" CMU BLOCK WALL;SEE STRUCTURALSIM @ OPENING HEAD3/4" PLYWOOD PANELING ON 7/8" HAT CHANNELS @ 16" O.C.; STAIN & SEALDOOR AND FRAME, SEE SCHEDULESEALANT, BOTH SIDES1"SEALANT, BOTH SIDES1/2"8" CMU BLOCK WALL;SEE STRUCTURALSIM @ OPENING HEAD3/4" PLYWOOD PANELING ON 7/8" HAT CHANNELS @ 16" O.C.; STAIN & SEALDOOR AND FRAME, SEE SCHEDULESEALANT, BOTH SIDESSEALANT, BOTH SIDES2"11 3/4"RAKE BACK GROUT AND INSTALL SEALANT BOTH SIDE TYPICALSTAINLESS STEEL HOLLOW METAL FRAMEFURRING WALLCMU WALL 2"10 1/8"RAKE BACK GROUT AND INSTALL SEALANT BOTH SIDE TYPICALCMU WALLFURRING WALLWOOD LOOK METAL PANELSTAINLESS STEEL HOLLOW METAL FRAMEEND TRIM FOR WOOD LOOK WALL PANELEXTRUDED ALUMINUM THRESHOLD SET ONTO SEALANT BEDEXTEND MEMBRANE FLASHING UNDER THESHOLD AND 8" MINIMUM DOWN EXTERIOR FACE OF FOUNDATION WALLCONCRETE ENTRY STOOP - PITCH AWAY AT 1/4"/FTDOOR AS SCHEDULEDFIRST FLOOREL. 100'-0"1/2" COMPRESSIBLE FILLERBACKER ROD AND SEALANT0' - 4"10" INSULATED PRECAST CONCRETE WALL PANEL.CONTINUOUS PERIMETER SEALANT EACH SIDE.HOLLOW METAL FRAME AS SCHEDULED - GROUT SOLID. PAINTED.DRIP. EQEQHOLLOW METAL DOOR AS SCHEDULED - INSULATED. PAINTED.2"EXTERIOR10" INSULATED PRECAST CONCRETE WALL PANEL.CONTINUOUS PERIMETER SEALANT EACH SIDE.HOLLOW METAL FRAME AS SCHEDULED - GROUT SOLID. PAINTED. ATTACH WITH FLUSH FASTENERS.DRIP. HOLLOW METAL DOOR AS SCHEDULED - INSULATED. PAINTED.2"EQ.EQ.EXTERIORSTAINLESS STEEL HALLOW METAL FRAMERAKE BACK GROUT AND INSTALL SEALANT BOTH SIDE TYPICALSTUD WALL2"9 1/8"3"3"Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedDOOR AND FRAMEDETAILSWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A10.210/13/2023220025.00C2023-151 1/2" = 1'-0"7HM DOOR JAMB1 1/2" = 1'-0"6HM DOOR HEAD1 1/2" = 1'-0"9HM BORROWED LIGHT HEAD -JAMB/SILL SIM3" = 1'-0"3HM JAMB -INT CMU13" = 1'-0"1HEAD -CMU1 1/2" = 1'-0"11OVERHEAD DOOR HEAD3" = 1'-0"2JAMB -CMU1 1/2" = 1'-0"10OVERHEAD DOOR JAMB1 1/2" = 1'-0"8TYPICAL HM DOOR JAMB OFFSET1 1/2" = 1'-0"12COILING DOOR HEAD DETAIL1 1/2" = 1'-0"13COILING DOOR JAMB3" = 1'-0"14CONCESSION DOOR @ JAMB/HEAD3" = 1'-0"15WEST RESTROOMS -STAINLESS STEEL CASE OPENING -JAMB 23" = 1'-0"17ROOMS 106A/B - STAINLESS STEEL CASE OPENING -JAMB1 1/2" = 1'-0"18ENTRY DOOR -THRESHOLD1 1/2" = 1'-0"5HOLLOW METAL DOOR HEAD -PRECAST1 1/2" = 1'-0"4HOLLOW METAL DOOR JAMB -PRECAST3" = 1'-0"16FAMILY RR 106 -STAINLESS STEEL CORNER GUARD3" = 1'-0"19ADD ALT 1 -CORNER GUARD10/04/2023BID DOCUMENT SET 2"6' - 0"2"9' - 8"4"2"3' - 10 1/2"2"3' - 0"2"3' - 0"2"3' - 11"2"3' - 0 1/2"2"3' - 0 1/2"2"3' - 0 1/2"2"3' - 0 1/2"2"3' - 11"2"3' - 0"2"3' - 0"2"3' - 10 1/2"2"4' - 0 1/2"2"6' - 2"2"3' - 11"2"12' - 8"2"3' - 11"2"6' - 2"2"4' - 0 1/2"GL-1GL-1GL-1GL-1GL-341' - 11"16' - 4"GL-1GL-1GL-1GL-1GL-1GL-1GL-1GL-1GL-3GL-3GL-3GL-3GL-3GL-3GL-3GL-3GL-3GL-3GL-34"9' - 8"2"6' - 0"2" 2' - 8"2"3' - 0"2"3' - 0"2"3' - 0"2"2' - 8" 2"GL-3 GL-3 GL-3 GL-3 GL-3GL-13' - 0"2"3' - 0"2"3' - 0"15' - 4"16' - 4"2"GL-1GL-1 GL-1 GL-14"9' - 6"2"2"1' - 2"2"3' - 0"2"6' - 2"2"3' - 0"2"1' - 2"2"GL-110' - 0"GL-1GL-1GL-1GL-1GL-115' - 6"16' - 0"2" 3' - 10" 4' - 0" 4' - 0" 3' - 10" 2"GL-9GL-9GL-9GL-92"8' - 2"2"1' - 8"10' - 2"2"5' - 8 1/2"2"1 1/2"2"8' - 2"2"1' - 8"GL-32" 3' - 8"2" 4' - 0"16' - 4"GL-32"5' - 8 1/2"2"1 1/2"2"8' - 2"2"1' - 8"2"3' - 10" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 3' - 10"2"GL-7GL-7GL-8GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-852' - 0"16' - 4"2"5' - 8 1/2"2"1 1/2"2"8' - 2"2"32' - 4"GL-7GL-7GL-7GL-8GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-8GL-7GL-7GL-7GL-72" 3' - 10 1/2" 4' - 0 1/2" 4' - 0 1/2" 4' - 0 1/2" 4' - 0 1/2" 4' - 0 1/2" 4' - 0 1/2" 3' - 10 1/2" 2"1' - 8"16' - 4"2"5' - 8 1/2"2"1 1/2"2"8' - 2"2"1' - 8"GL-7GL-7GL-7GL-7GL-7GL-8GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-7GL-8GL-8GL-816' - 4"1 1/4" 3' - 8 1/8" 3' - 9 3/8" 3' - 9 3/8" 3' - 9 3/8" 3' - 9 3/8" 3' - 9 3/8" 3' - 9 3/8" 3' - 9 3/8" 3' - 6 7/8" 2"33' - 11 1/2"BUTT GLAZED CORNER MULLION8' - 6"1' - 8"2"8' - 2"2"14' - 8"2" 3' - 6" 3' - 8" 3' - 8" 3' - 6" 2"GL-7GL-7GL-7GL-71' - 8"8' - 6"2"8' - 2"2"12' - 0"2" 3' - 10" 4' - 0" 3' - 10" 2"GL-7GL-7GL-72"5' - 6 1/2"2"1 1/2"2"2' - 2"8' - 0"2" 3' - 0" 2" 4' - 3 5/8" 4' - 4 5/8" 4' - 7 1/4"16' - 7 3/8"GL-7 GL-7 GL-7GL-3GL-1 GL-7 GL-78' - 4"2"1' - 8"BUTT GLAZED CORNER MULLIONGL-3GL-17' - 4"6' - 7"2"5' - 7"2"5' - 7"2"6' - 7"2"2"3' - 0" 2" 3' - 0" 2"25' - 0"6' - 6"GL-3GL-2GL-2GL-3GL-3GL-3GL-3GL-3A.F.F3' - 10"2"3' - 2"2"3' - 6"6' - 0"2"5' - 8"2"GL-32"8' - 6"4"4 1/2" 3' - 6 1/2" 2" 3' - 6 1/2" 2" 3' - 0" 4 1/2"11' - 2"GL-19' - 0"GL-1COORDINATE WITH STRUCTURAL BEAMS AND WOOD LOOK METAL WALL PANEL2"9' - 8"2"10' - 0"GL-1GL-1GL-1GL-1GL-1GL-1GL-1GL-12"3' - 0"2"3' - 0"2"3' - 0"2"2' - 10"2"12' - 8"12' - 8"WALL10"2"5' - 8"2"2" 11' - 8" 2"12' - 0"GL-1AFF3' - 0"6' - 0"7' - 2"2"2' - 8"2"2"5' - 9"2"5' - 9"2"12' - 0"GL-3GL-36' - 0"6' - 0"GL-1GL-1GL-1GL-12"2' - 6"2"6' - 10"4"10' - 0"2" 11"2"3' - 0"2"3' - 0"2"GL-3GL-3GL-3GL-3GL-1GL-1GL-1GL-111" 5"8' - 11"2"8' - 6"4"2' - 0"9' - 0"2" 1' - 8" 2"GL-1AFF3' - 10"2"3' - 2"2"3' - 6"6' - 0"2" 5' - 8" 2"GL-3GL-17' - 4"2"4' - 0 1/2"1 1/2"A.F.F3' - 0"GL-11 1/2"2' - 9 3/4"1 1/2"2' - 9 3/4"1 1/2"6' - 0"GL-14' - 4"AFF3' - 0"2"4' - 0"2"2"3' - 8"2"4' - 0"2"3' - 10 1/2"2"3' - 0"2"3' - 0"2"3' - 11"2"3' - 0 1/2"2"3' - 0 1/2"2"3' - 0 1/2"2"3' - 0 1/2"2"3' - 11"2"3' - 0"2"3' - 0"2"3' - 10 1/2"2"3' - 10 1/2"2"6' - 2"2"3' - 11"2"12' - 8"2"3' - 11"2"6' - 2"2"4' - 0 1/2"3' - 6"2"1' - 6"1' - 0"2"9' - 8"4"GL-1GL-334SEE WALL SECTION FOR CANOPY AND WALL TYPE INFORMATION41' - 11"GL-1GL-1GL-1GL-1GL-1GL-1GL-1GL-3GL-3GL-3GL-3GL-3GL-3GL-3GL-3GL-3GL-3GL-3GL-1GL-1GL-1GL-134GL-1GL-3GL-3GL-3GL-3GL-32" 2' - 8" 3' - 2" 2" 3' - 0" 2" 3' - 0" 2" 2' - 8" 2"15' - 4"4"9' - 8"2"1' - 10"2"4' - 0"2"16' - 4"GL-1GL-1GL-1GL-1Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/4" = 1'-0"WINDOW TYPESWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A10.310/13/2023220025.00C2023-151/4" = 1'-0"23STOREFRONT -TYPE W21/4" = 1'-0"25STOREFRONT -TYPE W3A1/4" = 1'-0"7INTERIOR STOREFRONT -TYPE W141/4" = 1'-0"11STOREFRONT -TYPE W131/4" = 1'-0"21STOREFRONT -TYPE W81/4" = 1'-0"18STOREFRONT -TYPE W51/4" = 1'-0"20STOREFRONT -TYPE W71/4" = 1'-0"19STOREFRONT -TYPE W61/4" = 1'-0"12STOREFRONT -TYPE W101/4" = 1'-0"13STOREFRONT -TYPE W111/4" = 1'-0"17STOREFRONT -TYPE W41/4" = 1'-0"16CURTAIN WALL -TYPE W171/4" = 1'-0"2BORROWED LIGHT -TYPE BL21/4" = 1'-0"10INTERIOR STORFRONT -TYPE W161/4" = 1'-0"9INTERIOR STOREFRONT -TYPE W121/4" = 1'-0"5MEZZANINE BORROWED LIGHT -TYPE BL51/4" = 1'-0"14STOREFRONT -TYPE W191/4" = 1'-0"8INTERIOR STOREFRONT -TYPE W181/4" = 1'-0"1BORROWED LIGHT -TYPE BL11/4" = 1'-0"15EXTERIOR WINDOW -TYPE W20WINDOW TYPESGENERAL NOTES:1. ALL ALUMINUM STOREFRONT TO BE THERMALLY BROKEN INSULATED GLAZING SYSTEM2. ALL GLASS AND FRAMES IN RATED WALLS SHOULD BE RATED TO MATCH THE WALL3. GLAZING IN ALL FIXED AND OPERABLE DOORS (SWINGING OR SLIDING DOORS) TO BE SAFETY GLAZING (TEMPERED OR HEAT -STRENGTHENED)BORROWED LITE TYPESTHE TERM "BORROWED LITE" SHALL REFER TO ANY INTERIOR WALL OPENING IN WHICH WOOD, ALUMINUM OR HOLLOW METAL IS USED TO FRAME ANY TYPE OF GLASS OR MIRROR. BORROWED LITES SHALL NOT INCLUDE MIRRORS IN RESTROOMS.GENERAL NOTES:1. ALL HOLLOW METAL FRAMES SHALL BE PRIMED AND PAINTED U.N.O. SEE ROOM FINISH SCHEDULE2. ALL GLASS AND FRAMES IN RATED WALLS SHOULD BE RATED TO MATCH THE WALL3. PROVIDE TEMPERED GLASS AT ALL CODE REQUIRED LOCATIONSGLASS TYPE GLAZING STYLESGL-1 SAFETY GLAZING TEMPERED FLOAT GLASSGL-2 SPANDREL TO MATCH JANESVILLE GREENGL-3 1" INSULATED CLEAR TEMPERED WINDOW UNITGL-7 FRONT GLAZED STRUCTURAL SILICONE GLAZING STOREFRONT SYSTEMGL-8 FRONT GLAZED STRUCTURAL SILICONE GLAZING STOREFRONT SYSTEM - TINTED TO MATCH JANESVILLE GREENGL-9 FRONT GLAZED FSTRUCTURAL SILICONE GLAZING SYSTEM) - FROSTED GLAZING, SEE SPECIFICATIONS1/4" = 1'-0"3BORROWED LIGHT -TYPE BL31/4" = 1'-0"4BORROWED LIGHT -TYPE BL41/4" = 1'-0"22STOREFRONT -TYPE W11/4" = 1'-0"24STOREFRONT -TYPE W3KEYNOTES PER SHEET#34 CANOPY10/04/2023BID DOCUMENT SET INTERIOR REMARKS1. SEE FINISH PLAN FOR EPOXY FLOOR TO RUBBER FLOOR TRANSITION EPOXY FLOOR TO FLASH COVE UP WALL 4"H FOR INTEGRAL COVE BASE. FEATHER FLOOR TO BE FLUSH WITH RUBBER FLOOR TILE.2. COUNTER AT WINDOW EQM-1 3. SEE FINISH PLAN FOR WALL FINISH LOCATIONS4. SEE FINISH PLAN FOR FLOOR PATTERN5. AT CEILINGS PAINT ALL EXPOSED STRUCTURE, DUCTWORK, MECHANICALS, PLUMBING, ELECTRICAL, CONDUIT, ETC. P-36. AT CEILINGS PAINT ALL EXPOSED STRUCTURE, DUCTWORK, MECHANICALS, PLUMBING, ELECTRICAL, CONDUIT, ETC. P-47. CHECK-IN DESK TO BE SSM-3 SOLID SURFACE MATERIAL VERTICAL FRONT, TRANSACTION TOP AND WORKSUFACE. INTERIOR VERTICAL PANEL BELOW WORKSUFACE PL-18. RF-1 TO BE WALL TO WALL LOOSE LAY INSTALL WITHOUT DASHER BOARDS ON CONCRETE, REMOVED AND STORED.. TURF TO BE INSTALLED WITHIN DASHER BOARDS AND LOOSE LAID ON CONCRETE AND TO BE REMOVED AND STORED.9. METAL WALL PANELS MWP-2 TO CONTINUE TO THE TOP OF THE WALL ABOVE THE ACT CEILING WHERE WALLS OF THE SPONSOR SUITE AND PRESS BOX ARE VISIBLE IN THE ARENA. SEE SECTION 2/A5.010. P-4 ON GYPSUM SOFFIT ABOVE SPONSOR SUITE AND PRESS BOX ACT CEILING. SEE SECTION 2/A5.011. PT-3 AT DRINKING FOUNTAIN TO BE INSTALLED VERTICAL ASHLAR, UP TO 7'4"H, ALIGN WITH TOP OF ADJACENT DOOR FRAME. SEE FINISH PLAN12. SEE FINISH PLAN FOR PT-2 APPLICATION13. PAINT FIRST COURSE AT FLOOR P-3 OR EP-4 AS INDICATED ON ROOM FINISH SCHEDULE14. PAINT FIRST COURSE AT FLOOR P-3. REMAINDER OF WALL P-5. APPLY P-3 AT SAME HEIGHT AS ON CMU ON PRECAST WALLS.15. WHEN RF-1 IS INSTALLED, EXTENT OF MATERIAL TO PROVIDE FULL COVERAGE OF ARENA TO ABUT SEATING AND RUBBER TILE FLOORING SO COURT LAYOUTS ARE FULLY COVERED, INCLUDING OUT OF BOUND AREA16. TOILET PARTITION TP-117. TOILET PARTITION TP-218. PROVIDE TR-3 TRIM AT FLOOR TO WALL TILE TRANSITION AND TR-1 AT FLOOR TILE TRANSITION TO ADJACENT MATERIALS; TR-4 AT EXPOSED TILE EDGES19. NOT USED20. OPERABLE PARTITION TO BE FWC-121. ELEVATOR WALL PANELS TO BE STEEL, METAL PANEL CEILING WITH RECESSED CAN LIGHTS AND FLAT RAIL BARGENERAL NOTES:- INTERIOR FINISH SCHEDULE FOLLOWS PLAN NORTH WHEN REFERRING TO NORTH, EAST, SOUTH, WEST WALLS, NOT TRUE NORTH.- CAULK ALL WALL TO RFT-1 JOINTS, TYP.- PAINT METAL RAILINGS AND EXPOSED METAL BLEACHER / STAIRS P-5- HOLLOW METAL DOOR AND WINDOW FRAMES TO BE PAINTED P-5- DRINK RAIL COUNTERS TO BE EQM-1- WOOD DOORS TO BE STAINED STN-1- SUBMIT 8" X 10" COLOR FINISH SAMPLES OF ALL ITEMS FOR ARCHITECT'S APPROVAL BEFORE WORK PROCEEDS.- VERIFY ALL STOPPING AND STARTING POINTS FOR COLORS AND FINISHES WITH ARCHITECT BEFORE WORK PROCEEDS.- ALL GRILLES, FIRE EXTINGUISHER CABINETS, LOUVERS, VENTS, ETC. SHALL BE PAINTED TO MATCH WALL COLOR OR CEILING COLOR ON WHICH THEY OCCUR.- FLOORING MATERIAL TRANSITIONS. TO BE CENTERED ON DOOR UNLESS OTHERWISE NOTED.- WHEN FINISH FLOORING SEAMS / JOINTS OF DIFFERENT THICKNESS, FEATHER SUBSTRATE TO ENSURE FLUSH FINISHED FLOOR.Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/4" = 1'-0"FINISH SCHEDULEWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A11.010/13/2023220025.00C2023-15ROOM FINISH SCHEDULEROOMNUMBERROOM NAME FLOOR BASEWALLSCEILING SOFFIT CABINETS COUNTERTOP APRONWINDOWTREATMENTREMARKSROOMNUMBERNORTH EAST SOUTH WEST100 VESTIBULE CPT-1 RB-2 P-1 P-1 P-1 P-1 MCP-1 100101 MAIN LOBBY CPT-1 / RFT-1 RB-2 P-1 / MWP-1 P-1 / MWP-1 P-1 P-1 / P-2 / PT-3 MCP-1 / P-3 / AP-1 WT-1 3, 4, 5, 11 101101 (A) LOCKER ALCOVE RFT-1 RB-2 P-1 P-1 P-1 - P-1 PL-3 SSM-1101 (A)102 MEETING ROOM (A) CPT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 PL-1 SSM-1 WT-1 20 102103 MEETING ROOM (B) CPT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 PL-1 SSM-1 WT-1 20 103104 STOR SCONC RB-1 P-1 P-1 P-1 P-1 ACT-1 104105 FIRST AID RFT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 PL-1 SSM-1 105106 FAMILY RR RFT-1 RB-1 PT-3 PT-3 PT-3 PT-3 ACT-1 106106A MENS RFT-1 RB-1 EP-2 EP-2 EP-2 EP-2 / PT-2 ACT-1 SSM-2 PL-4 12, 16 106A106B WOMENS RFT-1 RB-1 EP-2 EP-2 EP-2 EP-2 / PT-2 ACT-1 SSM-2 PL-4 12, 16 106B107 CHECK-IN/RENTAL CPT-1 RB-1 P-2 P-1 P-1 P-1 ACT-1 PL-1 SSM-3 3, 7 107108 SKATE RENTAL CPT-1 RB-1 P-1 P-1 P-2 P-1 ACT-1 PL-3 3 108109 BREAKROOM LVT-1, 2 RB-1 P-1 P-1 P-1 P-5 ACT-1 PL-1 SSM-1 4109110 OFFICE CPT-2 RB-1 P-1 P-1 P-1 P-1 ACT-1 110111 OFFICE CPT-2 RB-1 P-1 P-1 P-1 P-1 ACT-1 111112 ADMIN CPT-2 RB-1 P-1 P-1 P-1 P-1 ACT-1 112112 (A) COPY AREA CPT-2 RB-1 P-1 P-1 P-1 P-1 ACT-1 PL-1 PL-2 112 (A)113 ELECTRICAL SCONC - - - - - - 113114 J.C. SCONC RB-1 EP-1 EP-1 EP-1 EP-1 ACT-2 114115 (A) FOOD PREP EPF-1 EPF-1 FRP-1 FRP-1 FRP-1 FRP-1 ACT-2115 (A)115 (B) CONCESSIONS EPF-1 EPF-1 FRP-1 FRP-1 FRP-1 FRP-1 ACT-2 EQM-1 2 115 (B)115 (C) DRY STORAGE EPF-1 EPF-1 FRP-1 FRP-1 FRP-1 FRP-1 ACT-2 115 (C)116 BEER SALES EPF-1 EPF-1 FRP-1 FRP-1 FRP-1 FRP-1 ACT-2 EQM-1 2 116117 ICE ARENA LOBBY CPT-1 / RFT-1 RB-2 P-1 / MWP-1 P-1 / P-2 / PT-1 P-1 MWP-1 P-3 / AP-1 P-1 WT-1 3, 4, 5 117118 VESTIBULE CPT-1 RB-2 P-1 P-1 - P-1 P-3 5 118119 WELLNESS ROOM RFT-1 - EP-3 EP-3 EP-3 EP-3 ACT-1 SSM-2 PL-4 13 119119 WELLNESS ROOM RFT-1 - EP-3 EP-3 EP-3 EP-3 ACT-1 SSM-2 PL-4 13 119120 FAMILY RESTROOM RFT-1 - EP-3 EP-3 EP-3 EP-3 ACT-1 SSM-2 PL-4 13 120120 FAMILY RESTROOM RFT-1 - EP-3 EP-3 EP-3 EP-3 ACT-1 SSM-2 PL-4 13 120121 MEN'S RFT-1 - EP-2, EP-4 EP-2 , EP-4 EP-2, EP-4 EP-2, EP-4 ACT-1 SSM-2 PL-4 13,16 121122 WOMENS RFT-1 - EP-2, EP-4 EP-2 , EP-4 EP-2, EP-4 EP-2, EP-4 ACT-1 SSM-2 PL-4 13,16 122123 WET TEAM ROOM 4 RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13123124 WET TEAM RR RFT-1 / EPF-2 - / EPF-2 EP-1, 4 EP-1, 4 EP-1, 4 EP-1, 4 - 1, 13 124125 WET TEAM ROOM 3 RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13125126 TEAM ROOM 5 RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13 126127 TEAM ROOM 4 RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13 127128 UNISEX TLT RFT-1 - EP-1, 4 EP-1, 4 EP-1, 4 EP-1, 4 - 13 128129 TRAINING RFT-1 - EP-1, 4 EP-1, 4 EP-1, 4 EP-1, 4 - 13 129130 PASSAGE RFT-1 - P-3, 5 P-3, 5 P-3, 5 P-3, 5 - 14 130131 LAUNDRY RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13 131132 MAIN TEAM ROOM RFT-1 / EPF-2 - / EPF-2 EP-1, 4 EP-1, 4 EP-1, 4 EP-1, 4 - 1, 13 132133 MAIN COACH RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 ACT-1 13 133133(A) CLOSET RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13 133(A)134 ELEC SCONC - - - - - 134135 ICE RINK CIRCULATION SCONC / RFT-2 - P-3, 5 P-3, 5 P-3, 5 P-3, 5 - 4, 14 135135(A) STORAGE RFT-2 - P-3, 5 P-3, 5 - P-3, 5 - 13 135(A)136 MERCYHEALTH ARENA - - - - - - P-4 136136 (A) MERCYHEALTH ARENA NORTH SEATING SCONC - P-3, 5 -P-3, 5 P-3, 5 P-4 14 136 (A)136 (B) MERCYHEALTH ARENA SOUTH SEATING SCONC - P-3, 5 P-3, 5 P-3, 5 - P-4 14 136 (B)137 Y.H. STORAGE SCONC - P-1 P-1 P-1 P-1 - 137138 WET TEAM ROOM #1 RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13 138139 WET TEAM RR RFT-1 / EPF-2 - / EPF-2 EP-1, 4 EP-1, 4 EP-1, 4 EP-1, 4 - 1, 13 139140 WET TEAM ROOM #2 RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13 140141 UNISEX TLT RFT-1 - EP-1, 4 EP-1, 4 EP-1, 4 EP-1, 4 - 13 141142 J.C. SCONC RB-1 EP-1 EP-1 EP-1 EP-1 - 142143 YH COACH RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13 143144 PASSAGE RFT-1 - P-3, 5 P-3, 5 P-3, 5 P-3, 5 - 4, 14 144145 REFEREE RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13 145146 REFEREE RR RFT-1 / EPF-2 - / EPF-2 EP-1, 4 EP-1, 4 EP-1, 4 EP-1, 4 - 1, 13 146147 TEAM ROOM 1 RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1 / P-5 - 13 147148 TEAM ROOM 2 RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13 148149 TEAM ROOM 3 RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13 149150 IT SCONC - P-1 P-1 P-1 P-1 - 150151 ICE RINK CIRCULATION SCONC / RFT-1 - P-3, 5 P-3, 5 P-3, 5 P-3, 5 - 4, 14 151152 ELEV RFT-1 - - - - - - 21 152153 GEN STORAGE SCONC - - - - - 153154 MULTI-PURPOSE AREA SCONC / RF-1 / TURF-1 - - - - - P-4 6, 8 154154 (A) MULTIPURPOSE SEATING SCONC - - P-1, 3 - P-1, 3 P-4 4, 6, 13 154 (A)154 (B) MULTIPURPOSE AREA CIRCULATION SCONC / RTF-1, 2 / RF-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 P-4 4, 6, 13, 15 154 (B)155 LOBBY / LINK CPT-1 RB-2 P-1 P-1 / MWP-1 P-1 P-1 ACT-1 / MCP-1 / P-3 P-1 3, 5 155156 MULTI-USE CONVENTION SPACE SCONC / RF-1 - P-1 P-1 P-1P-1 P-4 WT-2 6 156157 ELECTRIC SCONC - - - - - - 157157 (A) AV CLOSET SCONC - - - - - - 157 (A)158 STORAGE SCONC - - - - - - 158159 WARMING ROOM EPF-1 EPF-1 FRP-1 FRP-1 FRP-1 FRP-1 ACT-2 159160 LOADING/RECEIVING/STORAGE SCONC - - - - - - 160162 FAMILY TLT PT-1 PT-3 PT-3 PT-3 PT-3 PT-3 ACT-1 SSM-2 PL-4162163 J.C. SCONC RB-1 EP-1 EP-1 EP-1 EP-1 ACT-2 163164 MALL CONNECTION CPT-1 / PCONC-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 / P-3 4, 5 164165 WOMEN'S PT-1 PT-2, 3 PT-3 PT-2 PT-3 PT-2, 3 ACT-2 SSM-2 PL-4 3, 17, 18 165166 MEN'S PT-1 PT-2, 3 PT-3 PT-2 PT-3 PT-2, 3 ACT-2 SSM-2 PL-4 3, 17, 18 166167 GENERAL BUILDING STORAGE SCONC - - - - - - 167167 (B) AV CLOSET SCONC - - - - - - 167 (B)168 MECHANICAL SCONC - - - - - - 168169 ELECTRICAL SCONC - - - - - - 169170 RESURFACER/ SHOP TOOLS/LAUNDRY SCONC - - - - - - 170171 VESTIBULE CPT-1 RB-2 P-1 P-1 P-1 P-1 - 171172 REFRIGERATION SCONC - - - - - - 172172(A) CLOSET SCONC - - - - - - 172(A)173 HOCKEY STORAGE RFT-1 - - - - - - 173174 TEMP STORAGE SCONC - - - - - - 174175 F.S. STORAGE RFT-1 - - - - - - 175176 IT/GEN STORAGE SCONC - - - - - - 176179 METER/RISER SCONC - - - - - - 179201 MEZZANINE SCONC - P-1 P-1 P-1 P-1 P-4 6 201202 SPONSOR SUITE LVT-3 RB-1 - - - MWP-2 ACT-1 P-4 EQM-1 3 202203 PRESS BOX CPT-2 RB-1 - MWP-2 - - ACT-1 P-4 SSM-1 3 203204 ROOF ACCESS - - - - - - - 204205 CORNER SUITE SCONC - - - - - P-4 6 205206 ADA AND COMPANION SCONC - - - - - P-4 6 206207 ADA AND COMPANION SCONC - - - - - P-4 6 207208 CORNER SUITE SCONC - - - - - P-4 6 208209 ADA AND COMPANION SCONC - - - - - P-4 6 209210 AV CLOSET SCONC - - - - - ACT-1 210COLOR AND MATERIAL SCHEDULECODE MATERIAL MANUFACTURER DESCRIPTION NUMBER/COLOR SIZEREMARKSACOUSTIC CEILING TILEACT-1 ACOUSTIC CEILING TILE USG MARS HIGH NRC TILE WITH SLT SHADOWLINE TAPER EDGE WITH 15/16" WHITE GRID 88138 / WHITE 24" x 24"ACT-2 ACOUSTIC CEILING TILE USG SHEETROCK LAY-IN GYPSUM CEILING PANELS WITH 15/16" WHITE GRID 3270 / WHITE24" X 48"ACOUSTIC PANELAP-1 ACOUSTIC PANEL FRASCH BAFL CLASSIC ACOUSTIC CELING BAFFLE, WITH CABLE TO DECK MOUNTING BLACK 12"D X 72"L ONE ROW BETWEEN AND PARALLELTO OPEN BAR JOISTS,SPACED 24"APART, LOWER EDGE ALIGN WITHLOWER EDGE OF JOISTCARPETCPT-1 CARPET MATS INC DIAGONAL TILE BLACK WALNUT 20" X 20" INSTALLATION: QUARTER TURNINSTALLATIONCPT-2 CARPET INTERFACE AERIAL COLLECTION AE311 104674 SMOKE 25CM X 1M OFFICE CARPET; ASHLARINSTALLATIONCORNER GUARDSCG-1 CORNER GUARDS INPRO TYPE 304 STAINLESS STEEL CORNER GUARDS, SURFACE MOUNTED 8'H X 3-1/2" X 3-1/2"ENGINEERED QUARTZ MATERIALEQM-1 ENGINEERED QUARTZMATERIALLX HAUSYS VIATERA SOPRANO 3CM OR AS NOTED ONDRAWINGEPOXY FLOORINGEPF-1 EPOXY FLOORING SIKA DECOFLAKE, DOUBLE BROADCAST WITH UV STABLE URETHANE TOP COAT, 6" INTEGRAL COVE BASEWITH ALUMINUM TOP CAP AND WATER PROOF MEMBRAINE, LIGHT TEXTURECUSTOM COLOR BLEND (4 COLORS) TO MATCHSHERWIN WILLIAMS, RESUFLOR DECO FLAKE BC,VELVET FEATHERFOOD SERVICEEPF-2 EPOXY FLOORING SIKA DECOFLAKE, DOUBLE BROADCAST WITH UV STABLE URETHANE TOP COAT, 6" INTEGRAL COVE BASEWITH ALUMINUM TOP CAP AND WATER PROOF MEMBRAINE., TEXTURE TO MEET COF RATING (ASTMC-1028) ON HIGH SIDE OF MODERATE FOR STATIC AND DYNAMIC RATING (STATIC: 0.40-0.59; DYNAMIC0.30-0.42)CUSTOM COLOR BLEND (4 COLORS) TO MATCHSHERWIN WILLIAMS, RESUFLOR DECO FLAKE BC,VELVET FEATHERSHOWER FLOORFABIC WALLCOVERINGFWC-1 FABIC WALLCOVERING MAHARAM TEK-WALL, TRUSS 399821 005 GILL 54"w FOR OPERABLE PARTITIONFIBER REINFORCED PANELSFRP-1 FIBER REINFORCED PANELS CRANE COMPOSITES GLASBOARD WITH SURFASEAL FINISH, CLASS A SMOOTH, WHITE 0.075" THICK INSTALL FULL HEIGHT TO CEILINGINTEGRALLY COLORED POLISHED CONCRETEPCONC-1 INTEGRALLY COLOREDPOLISHED CONCRETEINTEGRALLY COLORED POLISHED CONCRETE, CLASS B AGGREGATE, LEVEL 2 SATIN APPEARANCE DARK GRAY COLOR APPROVED BY ARCHITECTLUXURY VINYL TILELVT-1 LUXURY VINYL TILE INTERFACE NATIVE FABRIC FLAX 50CM X 50CM x 4.5MM ASHLAR INSTALLATIONLVT-2 LUXURY VINYL TILE INTERFACE BRUSHED LINES MOUSSE 25CM X 1M x 4.5MM ASHLAR INSTALLATIONLVT-3 LUXURY VINYL TILE INTERFACE BRUSHED LINES SANDALWOOD 25CM X 1M x 4.5MM ASHLAR INSTALLATIONMETAL CEILING PANELMCP-1 METAL CEILING PANEL ARMSTRONG METALWORKS TORSION SPRING, M15 PERFORATION WITH TECHZONE, AXIOM 16"H TRIM OAK (FXOK) 24" x 96" TECHZONE FINISHED IN OAK (FXOK)METAL WALL PANELMWP-1 METAL WALL PANEL ARMSTRONG METALWORKS LINEAR - SYNCHRO WITH #5574 TRIM AT PERIMETER OF WALL SURFACE (HORIZONTALAND VERTICAL EDGES)OAK (FXOK) 4", 6", 9", 11"W PLANKS X 9'-6"CUSTOM LENGTHREFER TO DETAIL DRAWING FORPATTERN REPEATMWP-2 METAL WALL PANEL ARMSTRONG METALWORKS LINEAR - SYNCHRO EXTERIOR PRODUCT WITH #5574 TRIM AT PERIMETER OF WALLSURFACE (HORIZONTAL AND VERTICAL EDGES)OAK (FXOK) 4", 6", 9", 11"W PLANKS X 9'-6"CUSTOM LENGTHREFER TO DETAIL DRAWING FORPATTERN REPEATPAINTP-1 PAINT HALLMAN LINDSAY POWER LUNCH 0572 GENERAL PAINTP-2 PAINT HALLMAN LINDSAY CUSTOM COLOR - WOODMAN'S DARK GREEN ACCENT PAINTP-3 PAINT HALLMAN LINDSAY SUBWAY METRO 0536 DARK CEILING PAINT / WALL BASEP-4 PAINT SHERWIN WILLIAMS PEARLY WHITE SW7009 LIGHT CEILING PAINTP-5 PAINT SHERWIN WILLIAMS GAUNTLET GRAY SW7019 ARENA ACCENT PAINTPAINT - EPOXYEP-1 PAINT - EPOXY HALLMAN LINDSAY POWER LUNCH 0572 TEAM ROOM TOILET ROOM PAINTEP-2 PAINT - EPOXY PPG STONEHENGE GREIGE 1025-5 PUBLIC TOILET ROOM PAINTEP-3 PAINT - EPOXY PPG MOTH GRAY 1024-4 PUBLIC TOILET ROOM PAINTEP-4 PAINT - EPOXY HALLMAN LINDSAY SUBWAY METRO 0536 WALL BASE PAINTPLASTIC LAMINATEPL-1 PLASTIC LAMINATE ARBORITE HIGH PRESSURE LAMINATE RIFT NATURAL OAK W449EV,NATURAL FINISHPL-2 PLASTIC LAMINATE ARBORITE HIGH PRESSURE LAMINATE INUKSHUK TAUPE, P345-RMPL-3 PLASTIC LAMINATE ARBORITE COMPACT LAMINATE INUKSHUK TAUPE, P345-RMPL-4 PLASTIC LAMINATE WILSONART HIGH PRESSURE LAMINATEPEWTER MESH 4878-38PORCELAIN TILEPT-1 PORCELAIN TILE VIRGINIA TILE CROSSVILLE, NOTORIOUS FILM NOIR, NTR06, UPS FINISH 24" X 36" INSTALL 1/3 OFFSET RUNNINGBOND, ORIENTATION ON FINISHPLANPT-2 PORCELAIN TILE VIRGINIA TILE ISLA,SHIBUSA CREMA 12" X 24" INSTALL: VERTICAL STACK BONDPT-3 PORCELAIN TILE VIRGINIA TILE CROSSVILLE, RETRO 2.0 EMPRESS WHITE, UPS FINISH 12" X 24" INSTALL: 1/3 OFFSET, HORIZONTALRUNNING BOND; CUT TO 6"H X 24"LAT TOILET ROOMSRESILIENT FLOORRF-1 RESILIENT FLOOR GERFLOR TARAFLEX SPORT M PLUS WITH PAINT GAME LINES (SEE A8.2 FOR COURT LAYOUTS) MAPLE 6381 LOOSE LAY INSTALLATION; SEESPECIFICATION FOR GAME LINESPAINT AND SHEET A8.2 FOR COURTLAYOUTSRUBBER FLOOR TILERFT-1 RUBBER FLOOR TILE NORTHWEST RUBBERBECKER ARENASPORTS FLOOR STAMINA EARTH 190 4' X 6' X 10MM (3/8") THICKRFT-2 RUBBER FLOOR TILE NORTHWEST RUBBERBECKER ARENASPORTS FLOOR STAMINA EARTH 190 4' X 6' X 10MM (3/8") THICK INTERLOCKING LOOSE LAY TILESRUBBER WALL BASERB-1 RUBBER WALL BASE TARKETT 4"H RUBBER COVE BASE BURNT UMBER 63RB-2 RUBBER WALL BASE TARKETT 6"H RESILIENT MILLWORK WALL BASE, MANDALAY PROFILE BURNT UMBER 63 6"H X .375" THICKSEALED CONCRETESC-1 SEALED CONCRETESOLID SURFACE MATERIALSSM-1 SOLID SURFACE MATERIAL HI-MACS NOBLE CANE W011SSM-2 SOLID SURFACE MATERIAL WILSONART FLINT ROCK 9207CSSSM-3 SOLID SURFACE MATERIAL HI-MACS MERINO GT914SPORTURFTURF-1 SPORTURF FAST GRASS AT755TOILET PARTITIONTP-1 TOILET PARTITION SCRANTON HINEY HIDERS LINEN ANTI-GRAFFITI FINISHTP-2 TOILET PARTITION SCRANTON HINEY HIDERS CONCRETE ANTI-GRAFFITI FINISHTRIMTR-1 TRIM SCHLUTER SCHIENE SATIN ANODIZED ALUMINUM FLOOR TILE TRIMTR-2 TRIM TARKETT REDUCER BLACK TRANSITION: RUBBER TOCONCRETETR-3 TRIM SCHLUTER DILEX-AHK SATIN ANODIZED ALUMINUM FLOOR TILE TO WALL TILETRANSITIONTR-4 TRIM SCHLUTER JOLLY SATIN ANODIZED ALUMINUM WALL TILE TRIMWINDOW TREATMENTWT-1 WINDOW TREATMENT MECHOSHADE MECHO/5 SYSTEM MANUAL SHADES, ECOVEIL SERIES OPENNESS AND COLOR TBD BY ARCHITECT SEE FINISH PLAN, WINDOWTYPES AND SECTIONSSEE SPECIFICATION FOR MOREDETAILWT-2 WINDOW TREATMENT MECHOSHADE MECHO ELECTROSHADE MOTORIZED SHADES,ECOVEIL SERIES OPENNESS AND COLOR TBD BY ARCHITECT SEE FINISH PLAN, WINDOWTYPES AND SECTIONSSEE SPECIFICATION FOR MOREDETAILWOOD STAINSTN-1 WOOD STAIN CUSTOM STAIN TO MATCH ARCHITECTS SAMPLE10/04/2023BID DOCUMENT SET HCHCHCHCHCHCHCHCHCHCDNDNHCHCHCHCHCHCUPDNUPUPDNGCHCHCH CH CH CHCHCHCHC HCHCH CSMATCHLINE AAMATCHLINE AAMATCHLINE BBMATCHLINE BB1" / 1'-0"1" / 1'-0"SLOPESLOPESLOPERFT-1CPT-2CPT-2RFT-1RFT-1RFT-1CPT-2MWP-1MWP-1P-2P-2MWP-1MWP-1MWP-1MWP-1MWP-1MWP-1SCONCRFT-1RFT-1SCONCRFT-1SCONCSCONCRFT-1WT-1WT-1WT-1WT-1WT-1WT-1WT-1WT-1WT-1WT-1WT-1WT-1WT-2WT-2WT-2WT-2J.C.114CONCESSIONS115 (B)BEER SALES116FOOD PREP115 (A)OFFICE111SKATE RENTAL108CHECK-IN/RENTAL107VESTIBULE100MAIN LOBBY101MENS106AMEETING ROOM(A)102MEETING ROOM(B)103STOR104FIRST AID105LOBBY / LINK155STORAGE158ELECTRIC157WARMING ROOM159LOADING/RECEIVING/STORAGE160FAMILY TLT162J.C.163MEN'S166GENERALBUILDINGSTORAGE167RESURFACER/SHOPTOOLS/LAUNDRY170REFRIGERATION172Y.H. STORAGE137WET TEAMROOM #1138WET TEAMROOM #2140UNISEX TLT141YH COACH143ICE ARENALOBBY117MEN'S121ELEC134MAIN COACH133MAIN TEAMROOM132LAUNDRY131TRAINING129UNISEX TLT128TEAM ROOM 4127TEAM ROOM 5126WET TEAMROOM 3125WET TEAM RR124WET TEAMROOM 4123IT150TEAM ROOM 3149TEAM ROOM 1147WOMEN'S165F.S. STORAGE175TEAM ROOM 2148J.C.142REFEREE145REFEREE RR146WET TEAM RR139MERCYHEALTHARENA136MULTI-PURPOSEAREA154MULTI-USECONVENTIONSPACE156GEN STORAGE153ICE RINKCIRCULATION151ICE RINKCIRCULATION135PASSAGE144PASSAGE130ELEV152BREAKROOM109OFFICE110ADMIN112MECHANICAL168STORAGE135(A)MALLCONNECTION164METER/RISER179ELECTRICAL169COPY AREA112 (A)TEMP STORAGE174HOCKEYSTORAGE173IT/GENSTORAGE176ELECTRICAL113DRY STORAGE115 (C)LOCKERALCOVE101 (A)MULTIPURPOSESEATING154 (A)MULTIPURPOSEAREACIRCULATION154 (B)AV CLOSET167 (B)AV CLOSET157 (A)VESTIBULE118CLOSET133(A)VESTIBULE171CLOSET172(A)RFT-1RFT-1RFT-2SCONCRFT-2SCONCRFT-2SCONCSCONCRFT-1SCONCRFT-1SCONCSCONCRFT-1RFT-1P-2RFT-1EPF-2PT-2LVT-15 PLANKS WIDE, ARROWS INDICATE LENGTH OF PLANK, LVT-2RFT-1EPF-2RFT-1EPF-2RFT-1EPF-2RFT-2SCONCSCONCRFT-2RFT-1PCONC-1CPT-1PT-2PT-2PT-2LENGTH OF FLOOR TILELENGTH OF TILECG-1CG-1WOMENS106BPT-3WOMENS122MWP-1ABOVE OPENING TO CHECK-INFAMILY RR106ALIGNALIGNFAMILYRESTROOM120WELLNESSROOM119ALIGNNE SESWNWBUILDING DIAGRAMNOT TO SCALENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR FINISH PLAN-OVERALLWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A11.110/13/2023220025.00C2023-151/16" = 1'-0"1FIRST FLOOR PLAN -OVERALL .10/04/2023BID DOCUMENT SET HCHCHCHCHCHCHCHCHCUPCNE SESWNWBUILDING DIAGRAMNOT TO SCALEMATCHLINE AAMATCHLINE AAMATCHLINE BBMATCHLINE BB248' - 1 3/4" 8' - 0"17' - 9" 18' - 11" 63' - 1 3/4" 190' - 0" 48' - 9 1/2"64' - 0" 28' - 0" 293' - 4"MWP-2MWP-2SPONSOR SUITE202MERCYHEALTHARENA NORTHSEATING136 (A)PRESS BOX203MERCYHEALTHARENA SOUTHSEATING136 (B)ADA ANDCOMPANION209ADA ANDCOMPANION206CORNER SUITE205ADA ANDCOMPANION207CORNER SUITE20853 SFROOF ACCESS204ELEV152MEZZANINE201MEZZANINE201AV CLOSET210L.4L.8L.71SK1.4NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedMEZZANINE FLOOR FINISHPLANWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A11.210/13/2023220025.00C2023-151/16" = 1'-0"1SECOND FLOOR PLAN -OVERALL10/04/2023BID DOCUMENT SET HCHCHCHCHCHCHCHCHCHCDNDNHCHCHCHCHCHCDNGCHCHCH CH CH CHCHCHCHC HCHCH CSUPDNUPUP1" / 1'-0"1" / 1'-0"SLOPESLOPESLOPEJ.C.114CONCESSIONS115 (B)BEER SALES116FOOD PREP115 (A)OFFICE111SKATE RENTAL108CHECK-IN/RENTAL107VESTIBULE100MAIN LOBBY101MEETING ROOM(A)102MEETING ROOM(B)103STOR104FIRST AID105LOBBY / LINK155STORAGE158ELECTRIC157WARMING ROOM159LOADING/RECEIVING/STORAGE160FAMILY TLT162J.C.163MEN'S166GENERALBUILDINGSTORAGE167RESURFACER/SHOPTOOLS/LAUNDRY170REFRIGERATION172Y.H. STORAGE137WET TEAMROOM #1138WET TEAMROOM #2140UNISEX TLT141YH COACH143ICE ARENALOBBY117MEN'S121ELEC134MAIN COACH133MAIN TEAMROOM132LAUNDRY131TRAINING129UNISEX TLT128TEAM ROOM 4127TEAM ROOM 5126WET TEAMROOM 3125WET TEAM RR124WET TEAMROOM 4123IT150TEAM ROOM 3149TEAM ROOM 1147WOMEN'S165F.S. STORAGE175TEAM ROOM 2148J.C.142REFEREE145REFEREE RR146WET TEAM RR139MERCYHEALTHARENA136MULTI-PURPOSEAREA154MULTI-USECONVENTIONSPACE156GEN STORAGE153ICE RINKCIRCULATION151ICE RINKCIRCULATION135PASSAGE144PASSAGE130ELEV152BREAKROOM109OFFICE110ADMIN112MECHANICAL168STORAGE135(A)MALLCONNECTION164METER/RISER179ELECTRICAL169COPY AREA112 (A)TEMP STORAGE174HOCKEYSTORAGE173IT/GENSTORAGE176ELECTRICAL113DRY STORAGE115 (C)LOCKERALCOVE101 (A)MULTIPURPOSESEATING154 (A)MULTIPURPOSEAREACIRCULATION154 (B)AV CLOSET167 (B)AV CLOSET157 (A)VESTIBULE118CLOSET133(A)VESTIBULE171CLOSET172(A)20x6020x6020x6020x6030DIACAFE30DIACAFE30DIACAFE30DIACAFE30x7220x5430x5420x482DR36W30X6020x42120X2030x54 30x5420x4820x48BENCH20x6020x6020x6020x6020x6020x6020x6020x6020x6020x6020x6020x6020x6020x6020x6020x60BENCH BENCHBENCHBENCHStorage Seating for 3004 Table Carts(48 tables)10 Chair Dollies (300 Chairs)WOMENS106BMENS106A2 DR36W2DR30W2DR36W2DR30W5 DR42W5H36WSTORAGE BENCHSTORAGE BENCHSTORAGE BENCHSTORAGE BENCHSTORAGE BENCHSTORAGE BENCHSTORAGE BENCHSTORAGE BENCHPEDPEDPED PED PEDPEDPDPED PEDPED30X6020X422DR36W36DIALECTURELECTUREWALL MOUNTED FOLDING CHAIRNE SESWNWBUILDING DIAGRAMNOT TO SCALECOACHESOFFICE180ADD ALT TEAMROOM (A)181ADD ALT TEAMROOM (B)182COACHESOFFICE183ADD ALT TEAMROOM (C)184COACHESOFFICE18530X6020x4230X6020x4230X6020x422DR36W2DR36WMOBILE PEDPEDMOBILE PEDMOBILE PED2DR36WNNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR FURNITUREPLANWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A13.010/13/2023220025.00C2023-151/16" = 1'-0"1FIRST FLOOR FURNITURE PLAN1/16" = 1'-0"2FIRST FLOOR FURNITURE PLAN -ADD ALT 310/04/2023BID DOCUMENT SET HCHCHCHCHCHCHCHCHCCUPNE SESWNWBUILDING DIAGRAMNOT TO SCALESPONSOR SUITE202MERCYHEALTHARENA NORTHSEATING136 (A)PRESS BOX203MERCYHEALTHARENA SOUTHSEATING136 (B)ADA ANDCOMPANION209ADA ANDCOMPANION206CORNER SUITE205ADA ANDCOMPANION207CORNER SUITE20853 SFROOF ACCESS204ELEV152MEZZANINE201MEZZANINE201AV CLOSET21030DIACAFE30DIACAFE30DIACAFE30DIACAFE1SK1.4NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedMEZZANINE FLOORFURNITURE PLANWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A13.110/13/2023220025.00C2023-151/16" = 1'-0"1MEZZANINE FLOOR FURNITURE PLAN10/04/2023BID DOCUMENT SET UPHCHCHCHCHCHCHCHCHCHCDNDNDNUPUPHCHCHCHCHCHCSDSDSDDNNE SESWNWBUILDING DIAGRAMNOT TO SCALEMATCHLINE BBMATCHLINE BBMATCHLINE AAMATCHLINE AAAABBEEFFCCDD45685.87.29ADD ALT 2 SEE SHEET A2.6 - A2.81 A5.212ADD ALT 1MEETING ROOM(B)187ADD ALT 1MEETING ROOM(A)188ADD ALT 1 FIRSTAID190ADD ALT 1STORAGE1891' - 8 1/4"11' - 4 1/2"12' - 11"5' - 10"5' - 1"26' - 6"30' - 8"10 1/4"8' - 1" 56' - 10" 28' - 0" 11' - 11" 12' - 6"EXPANDEDMULTIPURPOSEROOM18641' - 8 1/4" 63' - 8" 23' - 3"31' - 4"62' - 8 3/4"FAMILYRESTROOM191103' - 8 1/4"11' - 2"NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR PLAN -ADDALT 1WOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.410/13/2023220025.00C2023-151/16" = 1'-0"1FIRST FLOOR PLAN -OVERALL -ADD ALT 110/04/2023BID DOCUMENT SET YES, 4'X4' JANITOR CLOSET PER OPS MGR.HCHCHCHCHCHCDNAAEEFF4568 A4.31MATCHLINE AAF.35.87.2963' - 8 3/4"103' - 8 1/4" 10"1 A5.2A186.2A186.3W17ABOVE10"7' - 5"40' - 0 3/4"7' - 5"7' - 0"7' - 5"A186.14758A189.140' - 10" 63' - 8" 12' - 10"21' - 4 5/8"3' - 8"31' - 4"62' - 8 3/4"6' - 0" 15' - 10" 5' - 2" 15' - 10" 6' - 0" 12' - 3 1/4"5' - 0"5' - 9 5/8"1' - 0"8' - 9"9' - 6"W12W12 A9.111SimA12A2A2A2A187.1A101.51' - 8 1/4"24' - 2 3/4"5' - 0"5"7' - 4" 12' - 0" 16' - 0" 12' - 0" 16' - 4"A188.139353539 A4.33 A4.34 A4.35 A7.1276338 SFEXPANDEDMULTIPURPOSEROOM186576 SFADD ALT 1MEETING ROOM(B)18798 SFADD ALT 1 FIRSTAID190104 SFADD ALT 1STORAGE189576 SFADD ALT 1MEETING ROOM(A)188A2DOOR AND WINDOW TO BE CENTERED IN PANEL FOR ADD ALT 111' - 4 1/2"12' - 11"5' - 10"5' - 1"26' - 6"30' - 8"5 3/4"104' - 10" 12' - 6" 12' - 0"92' - 4 1/2"A1271 SFFAMILYRESTROOM19118' - 10 5/8"1A191.1A190.1A1A2 A2.4a2F29898W6a11' - 2"2M8STAINLESS STEEL CORNER GUARD A10.219NE SESWNWBUILDING DIAGRAMNOT TO SCALE A2.4a3A2A1A2A191.138113' - 6 5/8"5' - 7 1/4"1' - 0 3/4"5' - 2 3/8" 7' - 9"71 SFFAMILYRESTROOM1912' - 6"T12T20T05T08T07T06T10T09T11T0120NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR PLAN -ADDALT 1 -NW QUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.4a10/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR PLAN -NW QUAD -ADD ALT 1KEYNOTES PER SHEET#1 ADA COMPLIANT DRINKING FOUNTAIN WITH BOTTLE FILLER20 JUMP SEAT35 WALL MOUNTED TV SCREEN38 BABY CHANGING STATION, PROVIDE ADJ ASCENT COAT HOOK AT 48" AFF39 TRASH AND RECYCLING - FF&E47 TWO ROWS OF PERMANENT RETRACTABLE PLASTIC BLEACHER SEATING.58 MOTORIZED SHADES98 MANUALLY RETRACTABLE ACOUSTIC PARTITION WALL - FILL JOUST SPACEABOVE WITH ACOUSTIC PANEL TO CREATE ACOUSTIC BARRIER WHENPARTITION WALL IS IN USE.T01 WALL MOUNTED TOILET, ADA COMPLIANTT05 SOAP DISPENSER, SURFACE MOUNTED.T06 TOILET TISSUE DISPENSER, DOUBLE ROLLT07 PAPER TOWEL DISPENSER, SURFACE MOUNTEDT08 ELECTRIC HAND DRYERT09 GRAB BAR - 36"T10 GRAB BAR - 42"T11 GRAB BAR - 18" VERTICALT12 FRAMELESS MIRROR WITH METAL CLIP FASTENERST20 THROUGH STYLE VANITY W/ ADA COMPLIANT SLOPED LOWER CABINET1/4" = 1'-0"2ROOM 191 -FAMILY RR -ENLARGED1/4" = 1'-0"3ROOM 191 -FAMILY RR -ELEVATIONREFER TO FF&E MATRIX FOR ALL RESPONSIBILITIES OF FURNITURE AND EQUIPMENT 10/04/2023BID DOCUMENT SET SDSDSDAABBEEFFHJKMPQCCDDN1234568F.3F.9GG.8LL.6M.491 A5.2MATCHLINE AAMATCHLINE BBMATCHLINE BBMATCHLINE AACANOPYRDOF1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/4" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE+7+7 +7+7+8 +8+8+8+7+7+7+7+7+7+7+7 +7+8.5+8.5+8.5 +8.5TYP4' - 0"ADD ALT 2 SEE SHEET A2.6-2.81/8" SLOPE1/8" SLOPE4141411/4" SLOPE12F.4F.6M.3414111' - 4 1/2"18' - 9"31' - 7"30' - 8"188' - 4"28' - 0"20' - 3 1/2"329' - 0"8' - 1" 56' - 10" 28' - 0" 11' - 11" 12' - 6" 12' - 0" 13' - 10" 16' - 8" 13' - 10" 26' - 10" 16' - 7 1/2" 9' - 2 1/2" 7' - 2" 21' - 3" 19' - 2 3/4" 31' - 7" 23' - 4 3/4" 10' - 2" 4' - 5" 39' - 1 1/2" 2' - 6" 18' - 10"404' - 0"8' - 1" 56' - 10" 28' - 0" 11' - 11" 12' - 6" 12' - 0"L.4L.8L.71/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE+7+7+7+71/4" SLOPENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/16" = 1'-0"ROOF PLAN -ADD ALT 1WOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.510/13/2023220025.00C2023-151/16" = 1'-0"1ROOF PLAN -OVERALL -ADD ALT 1KEYNOTES PER SHEET#41 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN- SEE DETAIL 21/A7.010/04/2023BID DOCUMENT SET AEFHJD45687F.3F.9GG.85.87.29MATCHLINE BBMATCHLINE AAMATCHLINE BBMATCHLINE AAC6C66338 SFEXPANDEDMULTIPURPOSEROOM186C3C4F.4F.6GWB11' -11" AFF13' -6" AFF12' -0" AFFSOFFIT9 -6" AFFSOFFIT9 -6" AFF13' -6" AFFSOFFIT9 -6" AFF13' -6" AFF12' -0" AFF12' -0" AFF8' -0" AFF8' -0" AFFADD ALT 1MEETING ROOM(B)187ADD ALT 1MEETING ROOM(A)188ADD ALT 1 FIRSTAID190ADD ALT 1STORAGE18957578' -0" AFFFAMILYRESTROOM1919' - 6"BULKHEADNE SESWNWBUILDING DIAGRAMNOT TO SCALECEILING PLAN LEGENDWOOD LOOK METAL PANEL INT./EXT. CEILING PANEL (SIZE VARIES) GWB CEILING2 X 2 ACT CEILING2 X 4 VCT CEILINGSTADIUM SEATING ABOVESEE STRUCTURAL FOR ROOF JOIST LOCATIONSNNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR REFLECTEDCEILING PLAN -ADD ALT 1-NW QUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A3.3a10/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR RCP -NW QUAD ADD/ALT 1KEYNOTES PER SHEET#57 MANUAL SHADESC6 CEILING MOUNTED MOTORIZED UPWARD SWINGING BASKETBALL HOOPLOCATION. HOOP TO SWING BACKWARDS IN BETWEEN JOISTS ANDMAINTAIN A 23'-0" CLEAR HEIGHT ABOVE VOLLEYBALL COURT LINES. FALLSIN THE SCOPE OF FF&E10/04/2023BID DOCUMENT SET FIRST FLOOR100' -0"T.O. PARAPET123' -4"T.O. PARAPET -ENTRY128' -0"T.O. PRECAST -132' -4"T.O. PRECAST136' -0"AEDF.3T.O. PRECAST .121' -0"1 A5.2E6E140' - 10" 7' - 4" 12' - 0" 16' - 0" 12' - 0" 16' - 4" 2' - 0" 19' - 0" 2' - 3"W6aW12W12E62828E6E4E324' - 6"11' - 11"92' - 11"129' - 4"FIRST FLOOR100' -0"T.O. PARAPET123' -4"T.O. PARAPET -ENTRY128' -0"T.O. PRECAST -132' -4"456T.O. PRECAST .121' -0"E8E131' - 4"E6E4E6283' - 2 3/4"W17W17E82' - 9" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 5' - 7 3/4" 7' - 4"99' - 6" 6' - 6"1' - 0"55' - 4 3/4"E3E23FIRST FLOOR100' -0"T.O. PRECAST -132' -4"45614' - 9" 12' - 0" 12' - 0" 12' - 0"5' - 7 3/4"6' - 6"10"33' - 3"11"15' - 8 1/8"9' - 0 1/8"14' - 0"6' - 6"14' - 0"REVEAL5 E.Q 1' - 0"REVEAL14 E.Q 10 3/4"8' - 3"6' - 8"14' - 11"FIRST FLOOR100' -0"T.O. PRECAST -132' -4"AED12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 9' - 4 1/4" 12' - 0"33' - 3"11"12' - 10"20' - 5"INTERIOR PANELSEXTERIOR PANELSFIRST FLOOR100' -0"T.O. PRECAST -132' -4"45612' - 0" 7' - 1" 12' - 0" 11' - 9 3/4" 12' - 0" 7' - 0"7' - 5"2' - 0"33' - 3"31' - 3"11"REVEAL3 E.Q 1' - 9 1/4"REVEAL8 E.Q 1' - 3 3/8"7' - 5"REVEAL3 E.Q 1' - 9"10' - 5"FIRST FLOOR100' -0"2" 3' - 6 5/8" 2" 3' - 7 5/8" 2" 3' - 7 5/8" 2" 3' - 7 5/8" 2" 3' - 6 5/8" 2"19' - 0"2"6' - 0"2"8' - 2"2"14' - 8"1' - 8"W6aFIRST FLOOR100' -0"T.O. PRECAST -132' -4"33' - 3"4' - 0"4' - 0"4' - 0"12' - 0"11"7' - 4"6' - 8"14' - 11"TYP.1' - 0"Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedEXTERIOR ELEVATIONS -ADD ALT 1WOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A4.310/13/2023220025.00C2023-15DEMOLITION KEY NOTES#28 OVERFLOW SCUPPER - SEE DETAIL 21/A7.0E1 10" THICK, INSULATED - PROVIDE R12- 3" CONCRETE +4" RIGID INSULATION + 3" CONCRETE WET CAST EXPOSEDAGGREGATE, LOAD BEARING PRECAST CONCRETE WALL. EXTERIOR FACE TO HAVE EXPOSED AGGREGATE SIZED 3/8STANDARDE3 4" X 16" RUNNING BOND PREMIUM FILLED AND POLISHED ARCHITECTURAL MASONRY UNITS. BASIS OF DESIGN -TRENDSTONE PLUS (COLOR: LIMESTONE)E4 4" X 16" RUNNING BOND PREMIUM FILLED AND POLISHED ARCHITECTURAL MASONRY UNITS. BASIS OF DESIGN -TRENDSTONE PLUS (COLOR: SHADOW GRAY)E6 COPING TO MATCH WALLE8 ROOF ACCESS DOORE23 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOM ELEVATION AT 29' - 4 1/2"1/16" = 1'-0"2WEST BUILDING ELEVATION -ADD ALT1/16" = 1'-0"1NORTH BUILDING ELEVATION -ADD ALT1/16" = 1'-0"3NORTH BUILDING PRECAST ELEVATION -ADD ALT1/16" = 1'-0"4WEST BUILDING PRECAST ELEVATION -ADD ALT1/16" = 1'-0"5SOUTH PRECAST -MULTI-USE CONVENTION SPACE -ADD ALT 11/4" = 1'-0"6STOREFRONT -TYPE W6A -ADD ALT 11/16" = 1'-0"7PRECAST PANEL 12'-0 @ 4'-0" INCREMENT TYP. PANEL -ADD ALT 110/04/2023BID DOCUMENT SET FIRST FLOOR100' -0"T.O. PRECAST -132' -4"4565.87.230' - 8" 26' - 6"5' - 1" 5' - 10"NE SESWNWBUILDING DIAGRAMNOT TO SCALEConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedBUILDING/WALL SECTIONS-ADD ALT 1WOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A5.210/13/2023220025.00C2023-151/16" = 1'-0"1BUILDING SECTION THROUGH MULTI-USE CONVENTION SPACE -ALT 1KEYNOTES PER SHEET#10/04/2023BID DOCUMENT SET HCHCHCHCHCHCHCHCHCHCDN24"X60"24"X48"18"X60"CHHCH CHCHCHCHCHCHCHCHCHCHCDN24"X60"24"X48"18"X60"CHHCH CHCHCHCHCHCHCHCHCHCHCDN24"X60"24"X48"18"X60"CHHCH CHCHCHCHCHCHCHCHCHCHCDN24"X60"24"X48"18"X60"CHHCH CHCHCHCHCHCHCHCHCHCHCDN24"X60"24"X48"18"X60"CHHCH C103' - 8"474747474747474717' - 2 7/8"36' - 0"24' - 0"36' - 0"24' - 0"36' - 0"24' - 0"36' - 0"17' - 0"8 A7.417' - 2"36' - 0"13' - 6"36' - 0"13' - 6"36' - 0"13' - 6"36' - 0"17' - 4"55' - 1"TYP.20' - 2" 20' - 0" 10' - 0" 10' - 0" 20' - 0" 23' - 6"16' - 2 3/4"30' - 0"32' - 0"30' - 0"32' - 0"30' - 0"32' - 0"30' - 0"18' - 0"14' - 9 3/4" 30' - 0" 10' - 0" 20' - 0" 22' - 0"20' - 0"30' - 0"20' - 0"30' - 0"19' - 0"30' - 0"20' - 0"30' - 0"20' - 0"98989898103' - 8"251' - 10 3/4"8' - 2" 84' - 0"7' - 0 3/4"50' - 0"12' - 0"50' - 0"12' - 0"50' - 0"12' - 0"50' - 0"7' - 2"20' - 2" 20' - 0" 10' - 0" 10' - 0" 20' - 0"16' - 2 3/4"30' - 0"32' - 0"30' - 0"32' - 0"30' - 0"32' - 0"30' - 0"18' - 0"10' - 0 3/4"44' - 0"18' - 0"44' - 0"18' - 0"44' - 0"18' - 0"44' - 0"10' - 2"10' - 2 1/4" 20' - 0" 10' - 0" 20' - 0" 10' - 0" 20' - 0"19' - 9 3/4" 50' - 0" 27' - 0"4' - 9 3/4" 20' - 0" 10' - 0" 20' - 0" 10' - 0" 20' - 0"12' - 0"14' - 9 3/4" 20' - 0" 10' - 0" 10' - 0" 20' - 0" 22' - 0"16' - 0"84' - 0"19' - 0"84' - 0"16' - 0"10' - 6 1/2"44' - 0"14' - 4"44' - 0"14' - 4"44' - 0"29' - 2"20' - 0"30' - 0"20' - 0"30' - 0"19' - 0"30' - 0"20' - 0"30' - 0"20' - 0"8383a98989898103' - 8"10' - 2" 20' - 0" 10' - 0" 20' - 0" 10' - 0" 20' - 0"4' - 9 3/4" 20' - 0" 10' - 0" 20' - 0" 10' - 0" 20' - 0"12' - 0"29' - 2"44' - 0"14' - 4"44' - 0"14' - 4"44' - 0"29' - 2"10' - 0 3/4"44' - 0"18' - 0"44' - 0"18' - 0"44' - 0"18' - 0"44' - 0"10' - 2"9898REGULATION BASKETBALL COURT (50x84)MIN3' - 0"84' - 0"MIN3' - 0"MIN3' - 0" 50' - 0"MIN3' - 0"MIN3' - 0" 30' - 0"MIN3' - 0"MIN6' - 0"60' - 0"MIN6' - 0"3' - 0" 20' - 0" 3' - 0"VARIES6' - 10"44' - 0"VARIES6' - 10"REGULATION BASKETBALL COURT (50x84)REGULATION VOLLEYBALL COURT (29.5x59)REGULATION PICKLEBALL COURT (20x44) 2"LINE OVERLAY HIERARCHY DIAGRAM103' - 8"SCORER TABLEPLAYER SEATINGSCORER TABLEPLAYER SEATINGSCORER TABLEPLAYER SEATINGSCORER TABLEPLAYER SEATINGSCORER TABLEPLAYER SEATING474747474747474747477' - 0"250' - 2 3/4"8' - 2" 84' - 0"7' - 0 3/4"50' - 0"12' - 0"50' - 0"12' - 0"50' - 0"12' - 0"50' - 0"7' - 2"96' - 9 3/4"219' - 0"989898989898454545454545458989897' - 2"50' - 0"12' - 0"50' - 0"12' - 0"50' - 0"12' - 0"50' - 0"7' - 0 3/4"8' - 2" 84' - 0"45NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1" = 20'-0"ENLARGED FLOOR PLANS-SPORT COURTS -ADDALT 1WOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A8.1010/13/2023220025.00C2023-151" = 20'-0"6REGULATION VOLLEYBALL COURT DIAGRAM -ADD ALT 11" = 20'-0"5LINE OVERLAY DIAGRAM -ADD ALT 11" = 20'-0"4REGULATION PICKLBALL COURT DIAGRAM -ADD ALT 11" = 20'-0"2COURT SIZES -ADD ALT 11" = 20'-0"7REGULATION BASKETBALL COURT DIAGRAM -ADD ALT 11" = 20'-0"3INDOOR TURF (WITH DASHER BOARDS) -ADD ALT 1KEYNOTES PER SHEET#45 PERMANENT SPORT COURT WALL PADDING- MOUNTED 1' - 0" AFF 6' - 0" TALL PADS. PADS LOCATED ON A CORNER SHOULD BE MOUNTED ALIGNED WITH FINISHFLOOR AND UP 7' - 0" AFF47 TWO ROWS OF PERMANENT RETRACTABLE PLASTIC BLEACHER SEATING.83 TEMPORARY RUBBER TILE FLOORING83a PERMANENT RUBBER TILE FLOORING89 SCOREBOARD BY OTHERS98 MANUALLY RETRACTABLE ACOUSTIC PARTITION WALL - FILL JOUST SPACE ABOVE WITH ACOUSTIC PANEL TO CREATE ACOUSTIC BARRIER WHEN PARTITIONWALL IS IN USE.10/04/2023BID DOCUMENT SET HCHCHCHCDNNE SESWNWBUILDING DIAGRAMNOT TO SCALEWT-1WT-1EXPANDEDMULTIPURPOSEROOM186ADD ALT 1MEETING ROOM(B)187ADD ALT 1MEETING ROOM(A)188ADD ALT 1 FIRSTAID190ADD ALT 1STORAGE189P-2PT-1P-2NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR FINISH PLAN-ADD ALT 1WOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A11.1.110/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR FINISH PLAN -ADD ALT 1ROOM FINISH SCHEDULE ADD ALT 1ROOMNUMBERROOM NAME FLOOR BASEWALLSCEILING SOFFIT CABINETS COUNTERTOPWINDOWTREATMENTREMARKS ROOM NUMBERNORTH EAST SOUTH WEST186 EXPANDED MULTIPURPOSE ROOM SCONC / RFT-1 - P-1 P-1 P-1 P-1 P-4 WT-2 A-3 186187 ADD ALT 1 MEETING ROOM (B) CPT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 PL-1 SSM-1 WT-1 A-3 187188 ADD ALT 1 MEETING ROOM (A) CPT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 PL-1 SSM-1 WT-1 A-3 188189 ADD ALT 1 STORAGE SCONC RB-1 P-1 P-1 P-1 P-1 ACT-1 OFFICE 189190 ADD ALT 1 FIRST AID RFT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 PL-1 SSM-1 OFFICE 190191 FAMILY RESTROOM RESTROOM 19110/04/2023BID DOCUMENT SET HCHCHCHCHCHCHCHCHCHCUPDNDNDNUPUPHCHCHCHCHCHCSDSDSDDNNE SESWNWBUILDING DIAGRAMNOT TO SCALEPQ135MATCHLINE BBMATCHLINE BBMATCHLINE AAMATCHLINE AA1' - 5"220' - 8"19' - 5 1/2"28' - 0"8' - 0"25' - 8"186' - 2"36' - 3 3/4"220' - 8"6' - 4" 33' - 2 7/8" 75' - 5 1/8" 36' - 7"11' - 11 7/8"7' - 2"83' - 10"6' - 4"24' - 4"6' - 4"84' - 2"6' - 10"83' - 1" 56' - 2 1/2" 18' - 10"12' - 0" 9' - 4" 12' - 0" 12' - 0"10 1/4"3' - 4"18' - 3 3/8"ADD ALT 1 SEE SHEET A2.41 A5.336LOCKER CORE &SHELL180A20' - 4"19' - 6"10"10"NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR PLAN -ADDALT 2WOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.610/13/2023220025.00C2023-151/16" = 1'-0"1FIRST FLOOR PLAN -OVERALL -ADD ALT 210/04/2023BID DOCUMENT SET DNHCHCHCUPDNPQ13MATCHLINE AAMATCHLINE BBMATCHLINE BBMATCHLINE AA18' - 10"7' - 9 5/8"30' - 0"18' - 0"12' - 4 3/8"22' - 10"6' - 4"8' - 10 3/8"9' - 0"5' - 6"6' - 4"20' - 6 3/8" 6' - 5" 18' - 10"1" / 1'-0"1" / 1'-0" A8.49Sim A8.49Sim1 A5.3LOCKER CORE &SHELL180A25' - 8" 7' - 2"48' - 3 1/2"10"FLOOR PLAN LEGENDDOOR PER TAG. SEE DOOR SCHEDULE SHEET A10.1##WALL TAG. SEE WALL TYPES SHEET A10.0#KEYNOTE. SEE KEYNOTES, THIS SHEET.CMU WALLPRECAST CONCRETE WALLINTERIOR METAL STUD PARTITION WALL#STRUCTURAL GRIDNOT IN SCOPENE SESWNWBUILDING DIAGRAMNOT TO SCALENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR PLAN -ADDALT 2 -SE QUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.6a10/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR PLAN -SE QUAD -ADD ALT 210/04/2023BID DOCUMENT SET DNHCHCHCUPUPPQ5 A4.44MATCHLINE AAMATCHLINE BB A8.05SimMATCHLINE AAMATCHLINE BB35' - 5 3/4"10"20' - 4"2' - 3"8' - 0"5' - 7"8' - 5 1/2"5' - 3 1/2"20' - 6"6' - 11 5/8" 20' - 7 3/8" 103' - 3 5/8" 20' - 8 3/8"7' - 8"8' - 4"18' - 0"18' - 0"18' - 0"21' - 10"6' - 4"5' - 10"9' - 0"1" / 1'-0" A7.127 A8.49Sim A8.49Sim A8.415Sim A8.415Sim1 A5.3 A7.127A151.1A184.1A183.1A182.1 A4.423351 SFLOCKER CORE &SHELL180A8"18' - 10"10"18' - 10" 10"108' - 0"NE SESWNWBUILDING DIAGRAMNOT TO SCALEFLOOR PLAN LEGENDDOOR PER TAG. SEE DOOR SCHEDULE SHEET A10.1##WALL TAG. SEE WALL TYPES SHEET A10.0#KEYNOTE. SEE KEYNOTES, THIS SHEET.CMU WALLPRECAST CONCRETE WALLINTERIOR METAL STUD PARTITION WALL#STRUCTURAL GRIDNOT IN SCOPENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR PLAN -ADDALT 2 -SW QUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.6b10/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR PLAN -SW QUAD -ADD ALT 210/04/2023BID DOCUMENT SET SDSDSDPQ12351 A5.3MATCHLINE AAMATCHLINE BB MATCHLINE BBMATCHLINE AACANOPY1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/8" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE.+7+7 +7+7+8 +8+8+8+7+7+7+7+7+7+7+7 +7+8.5+8.5+8.5 +8.5TYP4' - 0"TYP4' - 0"ADD ALT 1 SEE SHEET A2.641621/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE1/4" SLOPE41NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/16" = 1'-0"ROOF PLAN -ADD ALT 2WOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.710/13/2023220025.00C2023-151/16" = 1'-0"1ROOF PLAN -OVERALL ADD ALT 2KEYNOTES PER SHEET#41 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - SEE DETAIL 21/A7.062 ROOF CRICKET AROUND RTU10/04/2023BID DOCUMENT SET FIRST FLOOR100' -0"35E8E8212' - 8"T.O. PRECAST .121' -0"E1E19E1961E17E17E17FIRST FLOOR100' -0"PQT.O. PRECAST .121' -0"E10E16118' - 10"NE SESWNWBUILDING DIAGRAMNOT TO SCALEFIRST FLOOR100' -0"5T.O. PRECAST .121' -0"5"12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 6' - 2"21' - 11"11"REVEAL5 E.Q 1' - 0"FIRST FLOOR100' -0"PQT.O. PRECAST .121' -0"9' - 5"9' - 5"21' - 11"7' - 4"11"REVEAL13 E.Q 1' - 5"FIRST FLOOR100' -0"T.O. PRECAST -132' -4"33' - 3"4' - 0"4' - 0"4' - 0" REVEAL TYP.11 E.Q 1' - 0"12' - 0"11"7' - 4"6' - 8"14' - 11"Consultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedEXTERIOR ELEVATIONS -ADD ALT 2WOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A4.410/13/2023220025.00C2023-15DEMOLITION KEY NOTES#61 UNIT MOUNTED MECHANICAL SCREENE1 10" THICK, INSULATED - PROVIDE R12- 3" CONCRETE +4" RIGID INSULATION + 3" CONCRETE WET CAST EXPOSEDAGGREGATE, LOAD BEARING PRECAST CONCRETE WALL. EXTERIOR FACE TO HAVE EXPOSED AGGREGATE SIZED 3/8STANDARDE8 ROOF ACCESS DOORE10 HOLLOW METAL DOORE17 10" INSULATED LOAD BEARING PRECAST WALL W/ EXPOSED AGGREGATE FINISH. APPLY SEALER FULL HEIGHT ASACCENTE19 OVERFLOW SCUPPER 24"X4" - CENTERED ON ROOF DRAIN - BOTTOM ELEVATION AT 20' - 3"1/16" = 1'-0"4SOUTH BUILDING ELEVATION -ADD ALT 21/16" = 1'-0"5WEST BUILDING ELEVATION -ADD ALT 21/16" = 1'-0"1SOUTH PRECAST -ADD ALT 21/16" = 1'-0"2WEST PRECAST -ADD ALT 21/16" = 1'-0"3PRECAST PANEL 12'-0 @ 4'-0" INCREMENT TYP. PANEL -ADD ALT 210/04/2023BID DOCUMENT SET FIRST FLOOR100' -0"T.O. PRECAST136' -0"PQMEZZANINEFLOOR LEVEL112' -6"T.O. PRECAST .121' -0"2' - 6"18' - 6"18' - 10" 10"10" 18' - 0"QFIRST FLOOR100'-0"DECK BRG118'-4"TOP OF PRECAST120'-0"20' - 0"<FND 01><FLOOR 01><INSUL 03><EXT WALL 03><COPING 01>NE SESWNWBUILDING DIAGRAMNOT TO SCALEConsultant:Project:Location:Sheet:Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedBUILDING/WALL SECTIONS-ADD ALT 2WOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A5.310/13/2023220025.00C2023-151/8" = 1'-0"1BUILDING SECTION THROUGH CORE AND SHELL -SOUTH ADD ALT 21/2" = 1'-0"2INSULATED PRECAST WALL PANEL10/04/2023BID DOCUMENT SET HCHCHCHCHCHCHCHCHCHCDNDNHCHCHCHCHCHCSDSDSDUPDNUPUPDNNE SESWNWBUILDING DIAGRAMNOT TO SCALEABEFHJKMPQCDN12345687F.3F.9GG.8LL.6M.45.87.29MATCHLINE BBMATCHLINE BBMATCHLINE AAMATCHLINE AA64' - 0" 28' - 0"15' - 10"2' - 11"31' - 7"30' - 8"188' - 4"28' - 0"20' - 3 1/2"8' - 1" 56' - 10" 28' - 0" 11' - 11" 12' - 6" 109' - 0" 7' - 2" 21' - 3" 74' - 2 1/2" 53' - 8 1/2" 2' - 6" 18' - 10"1' - 5"28' - 0"190' - 0"220' - 8"104' - 10" 12' - 6" 109' - 0" 158' - 10"19' - 5 1/2"28' - 0"8' - 0"212' - 8"36' - 1 1/8"220' - 8"6' - 4" 33' - 2 7/8" 75' - 5 1/8" 36' - 7"11' - 11 7/8"7' - 2"83' - 10"6' - 4"24' - 4"6' - 4"84' - 2"6' - 10"18' - 6 1/2"11' - 4 1/2"12' - 11"2' - 11"2' - 11"5' - 1"26' - 6"30' - 8"3' - 3"75' - 0"32' - 0"61' - 0"13' - 10"31' - 3"20' - 3 1/2"83' - 1" 56' - 2 1/2" 18' - 0"10"10 1/4"3' - 4"74' - 10"32' - 0"75' - 0" A9.23Sim A9.22Sim A4.44Sim A4.45SimADD ALT 1 SEE SHEET A2.434COACHESOFFICE185ADD ALT TEAMROOM (C)184COACHESOFFICE183ADD ALT TEAMROOM (B)182ADD ALT TEAMROOM (A)181COACHESOFFICE18012F.4F.6M.319' - 8"18' - 10" 10"10"12' - 4 3/8"7 5/8"29' - 8 3/8"7 5/8"8' - 2"2' - 4 7/8"5' - 2 3/4"6' - 10"7 5/8"39' - 9 5/8"31' - 10 3/8"38' - 7 1/2"7 5/8"8' - 7 3/4"25' - 8"7' - 4"7 5/8"10' - 0 3/8"8' - 2" 7 5/8"5' - 7 3/4"L.4L.8L.7NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR PLAN -ADDALT 3WOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.810/13/2023220025.00C2023-151/16" = 1'-0"1FIRST FLOOR PLAN -OVERALL -ADD ALT 310/04/2023BID DOCUMENT SET DNHCHCHCUPDNPQ123MATCHLINE AAMATCHLINE BBMATCHLINE BBMATCHLINE AA18' - 10"7' - 9 5/8"30' - 0"18' - 0"12' - 4 3/8"22' - 10"6' - 4"8' - 10 3/8"9' - 0"5' - 6"6' - 4"18' - 10"1" / 1'-0"1" / 1'-0" A9.23Sim33' - 1 5/8"37' - 11 7/8"7 5/8"9' - 5 3/4"24' - 10"7' - 2"7' - 4"7 5/8"10' - 10 3/8"ADD ALT TEAMROOM (A)181ADD ALT TEAMROOM (B)182COACHESOFFICE1802M82M85656A180.1A181.1DEMO 7' -4" wall opening81' - 2 3/4"32' - 0"28' - 0"20' - 3 1/2"3' - 0"7 5/8"5' - 7 3/4"120' - 8 3/8" 28' - 0" 20' - 3 1/2"5635A35A1. ALL DIMENSIONS ON PLAN ARE ACTUAL UNLESS NOTED OTHERWISE. DIMENSIONS ON PLAN ARE FROM FACE OF FINISH UNLESS NOTED OTHERWISE.2. WALLS ARE TO BE PARALLEL & PERPENDICULAR TO ADJACENT WALLS UNLESS OTHERWISE NOTED. ALIGN WALLS WHERE APPARENT.3. WALL TYPES ARE LOCATED ON SHEET A10.0. 4. PROVIDE BLOCKING AS REQUIRED TO SUPPORT ALL CABINETS, SHELVES, BUILT-INS, EQUIPMENT OR ACCESSORIES. COORDINATE WITH VENDOR DOCUMENTS WHERE SUCH CONDITIONS APPLY.5. ALL FLOORS ARE TO BE LEVEL AND CLEAN PRIOR TO INSTALLATION OF NEW FLOOR COVERINGS. ALL FLOOR SURFACES AND TRANSITIONS BETWEEN SURFACE TYPES SHALL COMPLY WITH ADA GUIDELINES.6. FOR OPENING LOCATIONS AND DIMENSIONS, SEE PANEL DRAWINGS, INTERIOR ELEVATIONS, AND WINDOW ELEVATIONS.7. REFER TO SHEETS A0.2 AND A0.3 FOR LOCATIONS OF WHERE FIRE EXTINGUISHERS TO BE PROVIDED AND HOW THEY ARE TO BE MOUNTED8. SEE SHEET A10.3 FOR ALL KEYNOTES STARTING WITH "W" AND "BL"9. ALL FLOOR ELEVATIONS ARE BASED OFF OF FIRST FLOOR ELEVATION OF 100'-0". ARCHITECTURAL ELEVATION 100'-0" CORRESPONDS TO CIVIL ELEVATION OF FFE = 882.25.GENERAL CONSTRUCTION NOTESFLOOR PLAN LEGENDDOOR PER TAG. SEE DOOR SCHEDULE SHEET A10.1##WALL TAG. SEE WALL TYPES SHEET A10.0#KEYNOTE. SEE KEYNOTES, THIS SHEET.CMU WALLPRECAST CONCRETE WALLINTERIOR METAL STUD PARTITION WALL#STRUCTURAL GRIDNOT IN SCOPENE SESWNWBUILDING DIAGRAMNOT TO SCALENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR PLAN -ADDALT 3 -SE QUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.8a10/13/2023220025.00C2023-151/8" = 1'-0"1First Floor Plan -SE Quad -Add Alt 3KEYNOTES PER SHEET#35A WALL MOUNTED TV SCREEN BY OTHERS56 MODULAR LOCKERS WITH INTEGRAL (WITH ABILITY TO BE LOCKED) STORAGE SEAT AS PART OFFF&E PACKAGE. SEE SPECIFICATIONREFER TO FF&E MATRIX FOR ALL RESPONSIBILITIES OF FURNITURE AND EQUIPMENT 10/04/2023BID DOCUMENT SET DNHCHCHCUPUPPQ587MATCHLINE AAMATCHLINE BBMATCHLINE AAMATCHLINE BB35' - 5 3/4"10"12' - 4" 16' - 0" 12' - 0" 20' - 4"2' - 3"8' - 0"5' - 7"8' - 5 1/2"5' - 3 1/2"20' - 6"6' - 11 5/8" 20' - 7 3/8" 103' - 3 5/8" 20' - 8 3/8"1" / 1'-0" A9.22Sim A7.12713' - 0"30' - 4"8' - 2"1' - 11 1/4"13' - 2"39' - 2"A151.1A184.1A183.1A182.13' - 4" 4' - 0" 10' - 8"3' - 4" 4' - 0" 10' - 8"2M82M82M82M82M82M835A56565656COACHESOFFICE185ADD ALT TEAMROOM (C)184COACHESOFFICE183ADD ALT TEAMROOM (B)1823135A35AA185.187DEMO OR PROVIDE 7' -4" WALL OPENING15' - 10"18' - 10"7' - 0" 2' - 10" 8' - 2"6' - 2"7 5/8"6' - 2 3/8"35A536' - 10"6' - 4"1. ALL DIMENSIONS ON PLAN ARE ACTUAL UNLESS NOTED OTHERWISE. DIMENSIONS ON PLAN ARE FROM FACE OF FINISH UNLESS NOTED OTHERWISE.2. WALLS ARE TO BE PARALLEL & PERPENDICULAR TO ADJACENT WALLS UNLESS OTHERWISE NOTED. ALIGN WALLS WHERE APPARENT.3. WALL TYPES ARE LOCATED ON SHEET A10.0. 4. PROVIDE BLOCKING AS REQUIRED TO SUPPORT ALL CABINETS, SHELVES, BUILT-INS, EQUIPMENT OR ACCESSORIES. COORDINATE WITH VENDOR DOCUMENTS WHERE SUCH CONDITIONS APPLY.5. ALL FLOORS ARE TO BE LEVEL AND CLEAN PRIOR TO INSTALLATION OF NEW FLOOR COVERINGS. ALL FLOOR SURFACES AND TRANSITIONS BETWEEN SURFACE TYPES SHALL COMPLY WITH ADA GUIDELINES.6. FOR OPENING LOCATIONS AND DIMENSIONS, SEE PANEL DRAWINGS, INTERIOR ELEVATIONS, AND WINDOW ELEVATIONS.7. REFER TO SHEETS A0.2 AND A0.3 FOR LOCATIONS OF WHERE FIRE EXTINGUISHERS TO BE PROVIDED AND HOW THEY ARE TO BE MOUNTED8. SEE SHEET A10.3 FOR ALL KEYNOTES STARTING WITH "W" AND "BL"9. ALL FLOOR ELEVATIONS ARE BASED OFF OF FIRST FLOOR ELEVATION OF 100'-0". ARCHITECTURAL ELEVATION 100'-0" CORRESPONDS TO CIVIL ELEVATION OF FFE = 882.25.GENERAL CONSTRUCTION NOTESFLOOR PLAN LEGENDDOOR PER TAG. SEE DOOR SCHEDULE SHEET A10.1##WALL TAG. SEE WALL TYPES SHEET A10.0#KEYNOTE. SEE KEYNOTES, THIS SHEET.CMU WALLPRECAST CONCRETE WALLINTERIOR METAL STUD PARTITION WALL#STRUCTURAL GRIDNOT IN SCOPENE SESWNWBUILDING DIAGRAMNOT TO SCALENNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR PLAN -ADDALT 3 -SW QUADWOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A2.8b10/13/2023220025.00C2023-151/8" = 1'-0"1First Floor Plan -SW Quad -Add Alt 2 Copy 1KEYNOTES PER SHEET#31 LOCKER ROOM FLOOR MOUNTED PEDESTAL BENCHES BY OTHERS35A WALL MOUNTED TV SCREEN BY OTHERS53 CONCRETE STOOP 6'-10" X 4'-0", SLOPE 1/4" PER FOOT56 MODULAR LOCKERS WITH INTEGRAL (WITH ABILITY TO BE LOCKED)STORAGE SEAT AS PART OF FF&E PACKAGE. SEE SPECIFICATION87 WALL BUTT JOINT TYP.REFER TO FF&E MATRIX FOR ALL RESPONSIBILITIES OF FURNITURE AND EQUIPMENT 10/04/2023BID DOCUMENT SET NE SESWNWBUILDING DIAGRAMNOT TO SCALEPQ5MATCHLINE AAMATCHLINE BBC4C4C4COACHESOFFICE185ADD ALT TEAMROOM (C)184COACHESOFFICE183COACHESOFFICE180ADD ALT TEAMROOM (A)181ADD ALT TEAMROOM (B)1828' -0" AFF8' -0" AFF8' -0" AFFEXPOSEDEXPOSED8' -0" AFFMATCHLINE AAMATCHLINE BB13' - 0"30' - 4"8' - 2"2' - 4 7/8"12' - 8 3/8"39' - 2"33' - 1 5/8"37' - 11 7/8"10' - 1 3/8"8' - 2" 10' - 8"C4C4C4CEILING PLAN LEGENDWOOD LOOK METAL PANEL INT./EXT. CEILING PANEL (SIZE VARIES) GWB CEILING2 X 2 ACT CEILING2 X 4 VCT CEILINGSTADIUM SEATING ABOVESEE STRUCTURAL FOR ROOF JOIST LOCATIONSNNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR REFLECTEDCEILING PLAN -ADD ALT 3WOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A3.410/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR RCP -SOUTH QUAD ADD/ALT 3KEYNOTES PER SHEET#C4 EXPOSED CONCRETE PLANK10/04/2023BID DOCUMENT SET T227' - 4"11' - 2"11' - 2"T24T11T01T061' - 0"T2211' - 2"7' - 4"T24T11T2211' - 2"7' - 4"T24T11T01T01T09T05T22T06T06T10T11T1211' - 2"7' - 4"T27T08 A9.21 A9.267' - 0" 3' - 4" 7' - 8"7' - 0" 3' - 4" 3' - 10" 3' - 10"3' - 5"7 5/8"5' - 0"2' - 6"3' - 1"5' - 0"7 5/8"5' - 0"3' - 1"2' - 6"5' - 0 3/4"7 5/8"3' - 0"1' - 0"3' - 0"1' - 0"3' - 0"1' - 7 3/4"3' - 0"7 5/8"3' - 0"1' - 0"3' - 0"1' - 0"3' - 0"1' - 7"3' - 0"14' - 3 3/8" 3' - 0"8 5/8"946 SFADD ALT TEAMROOM (A)181993 SFADD ALT TEAMROOM (B)1822M8M4M4M4M4M4M42M8M4M4M4M4M4M445 A9.2792M89 3/4" 3' - 1 1/4" 5' - 10 1/2" 8' - 2 1/2"3' - 11" 1' - 5" 4' - 0" 8' - 8"8' - 9 5/8"1' - 3 5/8"M42M818' - 0"10' - 8 7/8"81' - 2"3' - 0"1' - 0"3' - 0"M4714 SFADD ALT TEAMROOM (C)184M4M4M4T04T12T12T05T05T23T23T02T11T10T09T06T06T08T11T09T06T01T02T04T18T23T23T09T12T12T05T05T06T08NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:1/4" = 1'-0"INTERIOR ELEVATIONS &ENLARGED FLOOR PLANS-ADD ALT 3WOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A9.210/13/2023220025.00C2023-151/4" = 1'-0"9ROOM 184 -ADD ALT TEAM ROOM C -E31/4" = 1'-0"7ROOM 184 -ADD ALT TEAM ROOM C -E11/4" = 1'-0"1ROOM 181 -ADD ALT TEAM ROOM C -E11/4" = 1'-0"6ROOM 182 -ADD ALT TEAM ROOM B -E11/4" = 1'-0"8ROOM 184 -ADD ALT TEAM ROOM C -E2KEYNOTES PER SHEET#T01 WALL MOUNTED TOILET, ADA COMPLIANTT02 WALL MOUNTED TOILET, STANDARDT04 FLOOR MOUNTED URINAL, ADA HEIGHTT05 SOAP DISPENSER, SURFACE MOUNTED.T06 TOILET TISSUE DISPENSER, DOUBLE ROLLT08 ELECTRIC HAND DRYERT09 GRAB BAR - 36"T10 GRAB BAR - 42"T11 GRAB BAR - 18" VERTICALT12 FRAMELESS MIRROR WITH METAL CLIP FASTENERST18 24" DEEP WALL MOUNTED SOLID PLASTIC URINAL PARTITIONT22 SHOWER ADA SEATT23 WALL MOUNTED SINK W/ ADA COMPLIANT VANDAL GUARD SHROUDT24 GRAB BAR - WRAP AROUND SHOWER TRANSFER TYPET27 ADA ACCESSIBLE WALL MOUNTED SINGLE LAVATORY WITH SHROUD1/4" = 1'-0"3ROOM 181/182 -ADD ALT TEAM ROOM A&B -ENLARGED1/4" = 1'-0"2ROOM 184 -ADD ALT TEAM ROOM C -ENLARGED1/4" = 1'-0"5ROOM 181 -ADD ALT TEAM ROOM C -E21/4" = 1'-0"4ROOM 182 -ADD ALT TEAM ROOM B -E2REFER TO FF&E MATRIX FOR ALL RESPONSIBILITIES OF FURNITURE AND EQUIPMENT 10/04/2023BID DOCUMENT SET NE SESWNWBUILDING DIAGRAMNOT TO SCALE4COACHESOFFICE180ADD ALT TEAMROOM (A)181ADD ALT TEAMROOM (B)182COACHESOFFICE183ADD ALT TEAMROOM (C)184COACHESOFFICE185RFT-1EPF-2RFT-1EPF-2EPF-2RFT-1NNConsultant:Project:Location:Sheet:Plan NorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:As indicatedFIRST FLOOR FINISH PLAN-ADD ALT 3WOODMAN'S SPORTS &CONVENTION CENTER2510 Milton AvenueJanesville, WI 53545 A11.1.210/13/2023220025.00C2023-151/8" = 1'-0"1FIRST FLOOR FINISH PLAN -ADD ALT 3ROOM FINISH SCHEDULE ADD ALT 3ROOMNUMBERROOM NAME FLOOR BASEWALLSCEILING SOFFIT CABINETS COUNTERTOPWINDOWTREATMENTREMARKS ROOM NUMBERNORTH EAST SOUTH WEST180 COACHES OFFICE RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13 180181 ADD ALT TEAM ROOM (A) RFT-1 / EPF-2 - / EPF-2 EP-1, 4 EP-1, 4 EP-1, 4 EP-1, 4 - 1, 13 181182 ADD ALT TEAM ROOM (B) RFT-1 / EPF-2 - / EPF-2 EP-1, 4 EP-1, 4 EP-1, 4 EP-1, 4 - 1, 13 182183 COACHES OFFICE RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13 183184 ADD ALT TEAM ROOM (C) RFT-1 / EPF-2 - / EPF-2 EP-1, 4 EP-1, 4 EP-1, 4 EP-1, 4 - 1, 13 184185 COACHES OFFICE RFT-1 - P-1, 3 P-1, 3 P-1, 3 P-1, 3 - 13 18510/04/2023BID DOCUMENT SET SWNW NE SE BUILDING DIAGRAM NOT TO SCALE 1 2 3 4 5 6 7 8 A B D F H J M N P QLL.5 M.4 7.2 G.8G F.9 F.9 5.8 9 ICE RINK SLAB AND BASE DESIGNED & SPECIFIED BY OTHERS ICE RINK SLAB AND BASE DESIGNED & SPECIFIED BY OTHERS ADD ALT 1 SEE S1.0 ALT ADD ALT 2 SEE S1.0 ALT L.7 L.4 L.8F.5 F.95 F.4 F.6 12 C M.3 F.3 F.3E K 3.1 L.42 4.9 - WHERE REQUIRED, REMOVE UNSUITABLE EXISTING SOILS BELOW FOOTINGS, SLABS ON GRADE, ETC. TO APPROVED BEARING SOIL. REPLACE WITH ENGINEERED FILL TO RAISE SITE TO ELEVATIONS CALLED FOR ON PLANS. SEE SECTION 1/S5.0. REVIEW SOIL REPORT AND ARCHITECTURAL SITE PLAN. FILL MATERIAL SHALL HAVE A MINIMUM 3000 PSF BEARING CAPACITY. TYPE OF FILL MATERIAL AND PLACEMENT SHALL CONFORM TO SPECIFICATIONS UNDER THE DIRECTION AND SUPERVISION OF THE SOIL ENGINEER. SOIL ENGINEER SHALL FIELD VERIFY ALL BEARING CAPACITIES BEFORE FOOTINGS ARE POURED. - PROVIDE BOND BEAM W/ 2-#5 x CONT. AT TOP COURSE OF ALL MASONRY FOUNDATION WALLS. - TOP OF FOUNDATION WALL AT DOORS AT EL. = 99' - 4'' U.N.O. - SEE SHEET S9.0, S9.1 & S9.2 FOR GENERAL NOTES, SCHEDULES AND OTHER ADDITIONAL REQUIREMENTS. - ALL DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED BY CONTRACTOR TO CONFORM WITH THOSE SHOWN ON ARCHITECTURAL PLANS. - SEE ARCHITECTURAL DRAWINGS FOR FLOOR PITCHES, DEPRESSIONS, ETC. - PROVIDE DOWELS TO MATCH ALL VERTICAL REINFORCING IN MASONRY PIERS AND WALLS. - CONTRACTOR SHALL PROVIDE FROST AND MOISTURE PROTECTION FOR FOOTINGS EXPOSED DURING CONSTRUCTION. - SEE DETAILS 10 AND 11/ S5.0 FOR LOCATIONS WHERE PLUMBING PENETRATES FOUNDATION WALLS ELECTRIC GENERATOR PAD: 8'-11' x 4'-2'' x 14'' THICK PAD w/ #4 @ 12'' o/c TOP & BOTTOM, EACH WAY. VERIFY ACTUAL SIZE w/ SUPPLIER. PAD SHOULD BE 12'' LARGER EACH DIRECTION THAN UNIT PROVIDED. T/PAD FLUSH w/ FINISH FLOOR, ISOLATE FROM SLAB ON GRADE AND SUBSOIL w/ EXP. FELT. PROVIDE 10'' LAYER OF CRUSHED STONE BELOW PAD. INSTALL ANCHOR BOLTS, SLEEVE FOR A.B'S ETC. AS REQUIRED. COORDINATE LOCATION w/ GENERATOR SUPPLIER AND MECHANICAL CONTRACTOR. PLAN NOTES KEYED NOTES - ELEVATION 100'-0" ON THIS PLAN = FFE ON CIVIL SITE PLAN. - CONTRACTOR SHALL VERIFY PIT SIZE AND DEPTH WITH ELEVATOR SUPPLIER BEFORE SHOP DRAWINGS ARE SUBMITTED. PROVIDE #5 x 4' - 0'' (LOCATED AT THE CENTER OF THE CONCRETE SLAB ON GRADE) AT ALL REENTRANT CORNERS (INCLUDING CORNERS AT EXTERIOR DOORS). - THE CONTRACTOR SHALL ALSO VERIFY ELEVATIONS OF EXISTING SLABS, FOOTINGS, WALLS ETC. THE ARCHITECT SHALL BE NOTIFIED IF ANY DISCREPANCY IS DISCOVERED - " " INDICATES PLUMBING LINE COORDINATE LOCATION OF PIPE WITH PLUMBING CONTRACTOR - SEE 16, 17, & 18/S5.0 FOR REINFORCING AT WALL CORNERS AND INTERSECTION. - SEE 12/S5.0 FOR FOOTING GROUNDING INFORMATION. - PROVIDE THICKENED SLAB PER SECTION 13/S5.0 BELOW ALL NON-BEARING MASONRY WALLS. CONTRACTOR OPTION: REPLACE THICKENED SLAB WITH SF2.0 STRIP FOOTING POURED AT SAME TIME AS OTHER FOOTINGS. FOOTING FOR STAIR SUPPORT. COORDINATE SIZE AND LOCATION WITH STAIR SUPPLIER. SEE 19/S5.0 PRECAST WALL PANEL TO BEAR ON TOP OF FOOTING. COORDINATE FOOTING STEP LOCATION AS REQUIRED TO ALIGN WITH PANEL JOINT. SLAB DEPRESSION FOR SHOWER, SEE X/SX.X - SEE 17/S5.1 FOR REINFORCING AROUND FLOOR SLAB AND WALL OPENINGS, UNLESS NOTED OTHERWISE - CONCRETE CONTRACTOR TO COORDINATE W/ PRECASTER FOR LOCATION OF ALL ANCHOR BOLTS (SEE 7/S5.0) CONTRACTOR TO ALSO COORDINATE WITH PRECASTER FOR INSTALLATION OF CLIP ANGLES, WELD PLATES, INSERTS, BEARING PLATES, DOWELS, ETC. THAT MUST BE CAST INTO CONCRETE FOR INSTALLATION OF PRECAST. STEP FOOTING AS REQUIRED TO HAVE NEW FOOTING MATCH EXISTING FOOTING. SEE 6/S5.0 FOR STEPPED WALL FOOTING DETAIL. SEE 5/S5.1 FOR NEW FOOTING ADJACENT TO EXISTING. 1 X 2 4 5 6 TRENCH DRAIN - SEE 15/S5.13 FOUNDATION LEGEND XX'-X'' COL. FOOTING MARK TOP OF COLUMN FOOTING ELEVATION COL. GRID MARK X THICKENED SLAB SEE 13/S5.0 MASONRY WALL REINFORCING CONCRETE FOUNDATION WALL STRIP FOOTING DESIGNATION W/ TOP OF FOOTING ELEVATION FOOTING STEP, SEE SEC 6/S5.0 PIER MARK & TOP OF PIER ELEVATION (BRICK LEDGE) MASONRY PIER MASONRY WALL FX X PX XX'-X"MPSFX T/L = XX'-X''TOP OF FOUNDATION LEDGE ELEVATION XX'-X'' XX'-X'' TOP OF FOOTING ELEV. TOP OF WALL ELEVATION T/W = XX'-X''BLDG EXTERIOR- SEE 14 & 15/S5.0 FOR CONDUITS IN OR BELOW SLAB ON GRADE. PROVIDE DOVETAIL RECESSES FOR P.C. PANELS IN CONTACT WITH MASONRY WALLS. SEE DETAIL 22/S5.3 7 NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated FOUNDATION PLAN - OVERALL WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S1.0 10/04/2023 220025.00 1/16" = 1'-0"1 FOUNDATION PLAN - OVERALL 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 1 2 3 H J M N P QLL.5 M.4 SF6.0 96' - 0" 10" T/W = 99' - 0"SF3.096' - 0"SF2.096' - 0" SF2.0 96' - 0" SF2.0 96' - 0"SLAB ON GRADE: 5'' CONCRETE w/6 x 6 - W1.4 x W1.4 WWF ON VAPOR BARRIER ON 6'' COMPACTED GRANULAR DRAINAGE FILL. T/SLAB ELEV. 100' - 0'' U.N.O. SF2.0 98' - 8"SF2.098' - 8" SF2.0 98' - 8"SF2.098' - 8"SF2.096' - 0"SF2.098' - 8"SF2.098' - 8"SF2.098' - 8"SF2.098' - 8" SF2.0 98' - 8" SF2.0 98' - 8" SF2.0 98' - 8"SF2.098' - 8" SF2.0 98' - 8" SF2.0 98' - 8"SF2.098' - 8"SF2.098' - 8" SF2.0 96' - 0"SF2.096' - 0"SF2.096' - 0"CJCJCJCJCJCJCJCJCJCJCJ CJCJCJCJ CJ CJ CJ CJCJCJCJCJCJCJCJCJCJCJ CJCJCJ ICE RINK FLOOR DESIGNED & SPECIFIED BY OTHERS L.4 L.8 3 S5.2 6 S5.1 7 S5.0 7 S5.0 RAMP 18 S5.1 7 S5.0 10"10"7 S5.0 1 S5.2 2 S5.2 2 S5.2 RAMP 19 S5.1SF3.093' - 0" T/PIT = 96' - 0" 3 3 6 S5.1 6 S5.1 10" T/W = 99' -0" 9 S5.0 2 STEP 1' - 0"STEP 2' - 0" STEP 1' - 0" STEP 2' - 0" F7.0 96' - 0" 6 66 4 4 SF2.0 98' - 8" 7' - 2" K 21' - 3" 19' - 2 3/4" 17' - 5" 14' - 2" 16' - 6 1/4" 6' - 10 1/2" 14' - 7"39' - 1 1/2"2' - 6" 18' - 10"20' - 7 1/2"31' - 5 1/2" 5' - 0" 10' - 4 1/2" 9' - 10" 26' - 5"28' - 0"56' - 2 1/2"18' - 10"10"7' - 2"5' - 4"5' - 0"15' - 3 3/4"7' - 2" 13 S5.0 100' -0" 100' -0" 100' -0" 102' -0" 100' -0" F5.0 F7.0 96' - 0" 96' - 0" 100' -0" 102' -0"T/W = 99' - 0" SLAB ON GRADE: 4'' CONCRETE w/6 x 6 -W1.4 x W1.4 WWF ON VAPOR BARRIER ON 6'' COMPACTED GRANULAR DRAINAGE FILL. T/SLAB ELEV. = 96' -0"CJCJCJCJCJCJCJCJCJ21 S5.0 22 S5.0 22 S5.0STEP 2' - 0"STEP 2' - 0"STEP 2' - 0" 4' - 0" 4' - 0" 100' -0" STEP 0' - 8" STEP 2' - 0" STEP 2' - 0" STEP 0' - 8" SF2.0 98' - 8" SF7.5 96' - 0"SF2.096' - 0" 3' - 3"12"F7.0 96' - 0" TYP1 TYP1 TYP1 TYP1 TYP1 TYP1 TYP1 3.1 L.42 BUILDING DIAGRAM NOT TO SCALE SWNW NE SE SEE SHEET S1.0 FOR PLAN NOTES & KEYED NOTES NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated FOUNDATION PLAN -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S1.0a 10/04/2023 220025.001/8" = 1'-0"1 FOUNDATION PLAN - SE QUAD 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 1 2 3 A B D F H JG.8GF.9 SF2.096' - 0" SF2.0 96' - 0" SF5.0 96' - 0" 10" T/W = 99' - 0" SF5.0 99' - 0" SLAB ON GRADE: 5'' CONCRETE w/6 x 6 - W1.4 x W1.4 WWF ON VAPOR BARRIER ON 6'' COMPACTED GRANULAR DRAINAGE FILL. T/SLAB ELEV. 100' - 0'' U.N.O. SF2.0 98' - 8" SF2.0 98' - 8"CJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJ CJ CJ CJCJCJCJCJCJCJCJCJCJCJCJ ICE RINK SLAB AND BASE DESIGNED & SPECIFIED BY OTHERS F.5 F.95 1 S5.2STEP 2' - 0"STEP 1' - 0" 3 C SLAB ON GRADE AT GYM FLOOR: 6'' CONCRETE W/ MACRO SYNTHETIC FIBERS PER MANUFACTURERS RECOMMENDED DOSAGE ON 6'' COMPACTED GRANULAR DRAINAGE FILL ON VAPOR BARRIER. T/SLAB ELEV. 99' - 9 1/2'' COORDINATE JOINT LOCATIONS W/ FLOOR SUPPLIER 1 S5.2 1 S5.2 6 S5.1 STEP 2' - 0"STEP 1' - 0" 10" T/W = 99' - 0"T/W = 99' - 0" 3 S5.0 4 S5.0 10" SF2.0 96' - 0" F5.0 96' - 0"99' - 0"P3BP-199' - 0"P3BP-199' - 0"P3BP-1P3BP-19 S5.0 F8.5 99' - 0"9 S5.0 F6.0 F6.0 F6.0 96' - 0"96' - 0" 96' - 0"EX SF2.096' - 0"F.V.F.V.96' - 0"98' - 0" 5 S5.1 299' - 0"6 66 4 8 S5.1 TYP 5 S5.0 STEP 2' -0"STEP 1' -0"96' - 0"98' - 0"SF5.0 99' - 0"SF2.096' - 0" 8' - 1"1' - 3" F.V.19' - 5 1/2"28' - 0"6 1/2"7' - 4"67' - 5"7' - 4"24' - 8"7' - 4"28' - 0"20' - 3 1/2"96' - 5" 41' - 7"7' - 4" 3' - 4" 7' - 4"36' - 10"12' - 8 1/4"3' - 5 3/4"10" 8' - 1"56' - 10"28' - 0" 11' - 11" 12' - 6"36' - 7 1/8"19' - 8 7/8" 12' - 4 1/8" 14' - 5 7/8" 16' - 7 1/2" 9' - 2 1/2" 7' - 2" E SF2.0 99' - 0" 13 S5.0 13 S5.0 9 S5.0 SF2.0 99' - 0"SF2.099' - 0"SF2.099' - 0" F5.0 99' - 0" 13 S5.0 9 S5.0 CJSTEP 2' - 0"STEP 2' - 0"STEP 2' - 0" 4' - 0" 4' - 0" 5 S5.2 STEP 0' - 8" STEP 2' - 0" STEP 2' - 0" STEP 0' - 8" SF7.5 96' - 0" F5.0 99' - 0" F7.0 99' - 0"12"3' - 3"12"TYP1 TYP1 7 7 7 7 3.1 BUILDING DIAGRAM NOT TO SCALE SWNW NE SE SEE SHEET S1.0 FOR PLAN NOTES & KEYED NOTES NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated FOUNDATION PLAN -NE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S1.0b 10/04/2023 220025.00 1/8" = 1'-0"1 FOUNDATION PLAN - NE QUAD 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET BUILDING DIAGRAM NOT TO SCALE SWNW NE SE 4 5 6 7 8 A B D F H J 7.2 G.8GF.9 5.8 9 F6.0 99' - 0" F6.0 99' - 0" F8.0F8.0 99' - 0"F6.0 96' - 0" F6.0 99' - 0"96' - 0" F5.0 96' - 0" F5.0 96' - 0" F8.0 F9.0 F8.0 96' - 0" F8.0 F9.0 96' - 0" 96' - 0" F9.0 96' - 0" T/W = 100' - 8"SF2.096' - 0"T/W = 100' - 8"SF2.096' - 0"T/W = 100' - 8"T/W = 100' - 0"T/W = 100' - 8"1' - 3"SF5.0 99' - 0" SF2.0 98' - 8"CJCJCJCJCJCJCJCJSF2.0 96' - 0" 1' - 3"1' - 3"1' - 3"SF2.096' - 0"SF3.099' - 0"SF3.599' - 0" CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJ CJICE RINK SLAB AND BASE DESIGNED & SPECIFIED BY OTHERS F.4 F.6 STEP 2' - 0"STEP 1' - 0" 7 S5.0 7 S5.0 T/W = 99' -0" 10" 6 S5.1 SF5.0 96' - 0"99' - 0"P1BP-18 S5.0 1' - 0" 99' - 0"BP-1BP-1BP-1BP-1BP2P199' - 0"F6.0 99' - 0" F6.0 99' - 0" 96' - 0" F4.0 96' - 0" F4.0 96' - 0" 3 S5.0 4 S5.0 3 S5.0 4 S5.0SF2.096' - 0" 16 S5.1 16 S5.1 1 S5.2 16 S5.1 1 S5.2 1 S5.2 20 S5.0 SF5.0 99' - 0" C S5.0 18 99' - 0"P1BP-199' - 0"P1BP-2BP-1P199' - 0"99' - 0"P1BP-2P1BP-199' - 0"P1BP-2BP-1P1BP-1P199' - 0"BP-2P1BP-299' - 0"6 S5.1BP-1BP-3BP-3SLAB ON GRADE AT GYM FLOOR: 6'' CONCRETE W/ MACRO SYNTHETIC FIBERS PER MANUFACTURERS RECOMMENDED DOSAGE ON 6'' COMPACTED GRANULAR DRAINAGE FILL. T/SLAB ELEV. 99' - 9 1/2'' COORDINATE JOIST LOCATIONS W/ FLOOR SUPPLIER SLAB ON GRADE: 5'' CONCRETE w/6 x 6 - W1.4 x W1.4 WWF ON VAPOR BARRIER ON 6'' COMPACTED GRANULAR DRAINAGE FILL. T/SLAB ELEV. 100' - 0'' U.N.O. BP-18 S5.0 T/PIT = 95' - 0" SF2.0 98' - 8" F.3 4 S5.1 9 S5.1 11 S5.1 10 8 S5.1 TYP 1' - 3"7' - 4"E 6 1/2"7' - 4"67' - 6"64' - 0"11' - 4 1/2"12' - 11"2' - 11"2' - 11"5' - 1" 26' - 6"30' - 8"8' - 1"56' - 10"28' - 0" 11' - 11" 12' - 6" 12' - 0" 13' - 10" 16' - 8" 13' - 10" 26' - 10"16' - 7 1/2" 9' - 2 1/2" 7' - 2"63' - 1 3/4"11' - 11" 5' - 0"2' - 0"28' - 0"36' - 7" 1' - 5 1/2" 44' - 7"1' - 5 1/2"17' - 7"17' - 7"12' - 11"2' - 11"2' - 11" 5' - 1" 26' - 6" SF5.0 99' - 0" SF2.0 99' - 0"SF2.096' - 0" S5.1 13 1' - 0"11"6' - 10 3/8"99' - 0"CJCJCJCJCJCJCJCJ1' - 5 1/2"1' - 5 1/2"99' - 0"T/W = 99' - 0"T/W = 99' - 0"11"STEP 2' - 0" STEP 0' - 8"T/W = 99' - 0" T/L = 99' - 4"T/L = 99' - 4"T/W = 100' - 8"T/L = 99' - 4"T/L = 99' - 4"T/L = 99' - 4" TYP1 TYP1 7 7 7 7 4.9 SEE SHEET S1.0 FOR PLAN NOTES & KEYED NOTES NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated FOUNDATION PLAN -NW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S1.0c 10/04/2023 220025.00 1/8" = 1'-0"1 FOUNDATION PLAN - NW QUAD 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET BUILDING DIAGRAM NOT TO SCALE SWNW NE SE5 6 7 8 H J M N P Q L L L.5 L.5 M.4 7.2 5.8 F8.0 99' - 0" F8.0 99' - 0" F5.0 99' - 0" 96' - 0" F5.0 96' - 0" F8.0 96' - 0" F8.0 96' - 0" F8.0 96' - 0" 96' - 0" F8.0 F8.0 96' - 0"96' - 0" F8.0 SF6.0 96' - 0"SF2.096' - 0"T/W = 100' - 8"1' - 3"T/W = 100' - 8"SF2.096' - 0"1' - 3"1' - 4"T/W = 100' - 8" SF2.0 96' - 0" 1' - 4" T/W = 100' - 8"SF3.599' - 0" SF2.0 98' - 8"SF2.0 98' - 8" SF2.0 98' - 8" SF2.0 98' - 8" CJ CJCJCJCJCJCJCJCJCJCJCJCJCJCJCJCJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJCJCJCJCJCJCJCJCJCJCJCJSF2.098' - 8" SF2.0 98' - 8" SF2.0 98' - 8"SF2.098' - 8"SF2.098' - 8" ICE RINK SLAB AND BASE DESIGNED & SPECIFIED BY OTHERS L.7 L.4 L.8 12 2 S5.2 3 S5.2 20 S5.0 2 S5.2 9 S5.0 9 S5.0 9 S5.0 16 S5.1 BP-1P1BP-199' - 0"BP-2BP-2BP-3BP-199' - 0"P1 BP-299' - 0"P1BP-28 S5.0 99' - 0"P1BP-299' - 0"P1BP-28 S5.0 F5.0 96' - 0"99' - 0"P1BP-299' - 0"P1BP-28 S5.0 16 S5.1 1 S5.2 9 S5.0 SF2.0 98' - 8"7 S5.0 T/W = 99' - 0" 10" 21 S5.0 F9.0 F9.0 18 S5.1 RAMP SF2.0 98' - 8" SF2.0 98' - 8" SF2.0 98' - 8"SF2.098' - 8"SF2.098' - 8"SF2.098' - 8" SF2.0 98' - 8"98' - 0"96' - 0" 19 S5.1 3 S5.0 4 S5.0 STEP 2' - 0"STEP 1' - 0" 4' - 0"3' - 11 1/2" M.3 8 S5.1 8 S5.1 S5.1 11 99' - 0"99' - 0" S5.1 9 S5.1 10 K 7' - 2" 21' - 3" 19' - 2 3/4" 17' - 5" 14' - 2" 16' - 6 1/4" 6' - 10 1/2" 14' - 7"39' - 1 1/2" 2' - 6" 18' - 10"12' - 11"2' - 11"2' - 11" 5' - 1" 26' - 6" 1' - 9 3/4" 31' - 7"15' - 8" 17' - 10 3/4" 4' - 11 7/8"1' - 10 5/8"71' - 11 3/8" 3° 43' - 11 7/8"10' - 8" 4' - 11 1/2"35' - 5 3/4"1' - 6" 7' - 0" 1' - 6 1/8" SLAB ON GRADE: 5'' CONCRETE w/6 x 6 - W1.4 x W1.4 WWF ON VAPOR BARRIER ON 6'' COMPACTED GRANULAR DRAINAGE FILL. T/SLAB ELEV. 100' - 0'' U.N.O. 21 S5.0 102' -0" 100' -0" 102' -0" 100' -0" 1 S5.1 7' - 9 1/8"9"22 S5.0 22 S5.0 100' -0" STEP 2' - 0" STEP 0' - 8" SF2.0 99' - 0" T/L = 99' - 4"T/L = 99' - 4"T/L = 99' - 4"T/L = 99' - 4" TYP1 TYP1 TYP1 TYP1 TYP1 4.9 SEE SHEET S1.0 FOR PLAN NOTES & KEYED NOTES NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated FOUNDATION PLAN -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S1.0d 10/04/2023 220025.001/8" = 1'-0"1 FOUNDATION PLAN - SW QUAD 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 1 2 3 5 6 7 8 H J M N P QLL.5 M.4 7.2 G.8 5.8 ADD ALT 2 SEE S1.1 L.7 L.4 L.8 TYPICAL CAST-IN-PLACE CONCRETE STAIRS ON PRECAST STADIA. SEE ARCHITECTURAL FOR LOCATION SHADED AREA INDICATES CAST-IN- PLACE CONCRETE OVER GEOFOAM (EPS INSULATION) OVER PRECAST STADIA 12 M.3 K 3.1 L.42 4.9 - PRECASTER SHALL CUT ALL OPENINGS 12'' OR LARGER IN ANY DIRECTION AND HEADER AS REQUIRED. COORDINATE ALL OTHER OPENINGS WITH DESIGN. OPENINGS LESS THAN 12'' IN SIZE AND NOT SHOWN ON STRUCTURAL PLANS SHALL BE INSTALLED BY RESPECTIVE TRADE. OPENINGS LESS THAN 12'' IN SIZE THAT ARE SHOWN ON STRUCTURAL DRAWINGS SHALL BE BY GENERAL OR LEAD CONTRACTOR. - ALL OPENINGS ARE SAME SIZE AS DUCT PLUS 4'' EACH WAY. COORDINATE WITH TRADE CONTRACTORS. - GROUT ALL EXPOSED ENDS OF PRECAST PLANK SOLID - COMPOSITE WALL PANELS, INCLUDING CONNECTIONS, TO BE DESIGNED BY PRECASTER TO RESIST LATERAL FORCES INDICATED ON PLAN FOR THE CORRESPONDING WALLS. PRECASTER TO ALSO DESIGN PANEL & CONNECTION FOR OUT OF PLANE WIND AND SEISMIC FORCES. XX KIPS INDICATES SHEAR FORCE,IN KIPS FOR WIND YY KIPS INDICATE SHEAR FORCE, IN KIPS FOR SEISMIC WIND SHEAR FORCES ARE SERVICE LOADS. SEISMIC FORCES SHOWN ARE ULTIMATE PRECASTER TO PERFORM INDEPENDENT LATERAL ANALYSIS AND DESIGN FOR WORST CASE LOADS. PROVIDE LATERAL LOADS FOR ENGINEER TO REVIEW. - SEE ARCHITECTURAL FOR ALL OPENINGS IN PRECAST WALL PANELS. - PRECASTER TO PERFORM LATERAL ANALYSIS AND DESIGN PRECAST FOR BOTH LATERAL AND GRAVITY LOADS. SEE S9.1 AND S9.2 FOR MORE INFORMATION - PRECASTER SHALL DEVELOP CONNECTIONS FROM DIAPHRAGM TO SHEAR WALL & COLLECTOR BEAMS AS REQUIRED 8'' PRECAST FLOOR PLANK W/ 3'' COMPOSITE TOPPING W/ W.W.F. 6 x 6 - W1.4 x W1.4 W/ 2 HOUR FIRE RATING U.N.O. PRECAST BEARING EL = 111' - 7''. HEADERS BY PRECASTER. WETCAST AS REQUIRED. SUPERIMPOSED LIVE LOAD: SUPERIMPOSED DEAD LOAD: = 80 PSF AT TYPICAL = 125 PSF AT STORAGE = 125 PSF AT MECHANICAL ROOMS = 10 PSF AT TYPICAL PLUS MASONRY PARTITIONS, AND TOPPING = 75 PSF AT MECHANICAL ROOMS PLUS MASONRY PARTITIONS AND TOPPING. PRECAST STADIA BY PRECASTER TYPICAL PRECAST WALL PANEL: 1. DESIGN WALL TO CARRY SUPERIMPOSED VERTICAL ROOF LOADS AS SHOWN ON PLAN. 2. WALL PANELS TO SPAN VERTICALLY AND RESIST BENDING DUE TO WIND LOADS, ECCENTRIC LOADING, MISCELLANEOUS ATTACHMENT (i.e LIGHT FIXTURES, OVERHEAD DOORS), ETC. 3. WALL PANELS SHALL RESIST LATERAL WIND SHEAR LOADS FOR THE BUILDING. SPECIFY SHEAR WALLS ON SHOP DRAWINGS. 4. PROVIDE DOVETAIL SLOTS WHERE CMU WALLS ABUT PRECAST PANELS, TIE IN WALLS WITH DOVETAIL ANCHORS. 5. DESIGN WALL PANELS FOR ALL OPENINGS, INCLUDING DOORS, WINDOWS, LOUVERS, ETC. DESIGN FOR FUTURE OPENINGS AS SHOWN ON PLANS. 6. PROVIDE EMBEDS AND BOX OUTS AS REQUIRED FOR OUTLETS, GRILLES, LOUVERS, DOORS, FRAMES CONDUITS, PIPES, ETC, COORDINATE WITH ALL OTHER PLANS AND TRADES TO ACCOMPLISH. 1 2 5 PRECAST KEYED NOTES: 3" CONCRETE OVER 1 1/2" x 20 GA GALVANIZED METAL FORM DECK (4 1/2" TOTAL THICKNESS) WELDED TO SUPPORTS PER MANUFACTURERS RECOMMENDATIONS W/ WWF 6 x 6 - W1.4 x W1.4 CENTERED IN UPPER 3" CONCRETE THICKNESS 3 NEW STEEL STAIR: ALL STAIR FRAMING, STAIR CONNECTIONS, HANDRAILS, AND RAILING CONNECTIONS SHALL BE DESIGNED BY STAIR SUPPLIER. DESIGN SHALL BE STAMPED BY PROFESSIONAL ENGINEER REGISTERED IN WISCONSIN. SEE SHEET S9.0 FOR DESIGN CRITERIA. 4 SWNW NE SE BUILDING DIAGRAM NOT TO SCALEN N Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated SECOND FLOOR FRAMING PLAN -OVERALL WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S2.0 10/04/2023 220025.001/16" = 1'-0"1 MEZZANINE FLOOR FRAMING PLAN - OVERALL 10/13/2023 MEZZANINE FLOORFRAMING PLAN - OVERALL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 1 2 3 H J M N P QLL.5 M.4 L2 W12 x 26MP1MP1MP1W12 x 26 W12 x 26 W12 x 26 W12 x 26 W12 x 26 W12 x 26 W12 x 26MP1MP1MP1MP1MP1MP1MP1L.4 17' - 5" L.8 30' - 8 1/4" L2 L2L2 MP1MP1MP1MP1MP1MP1MP1L2L2L2MP1MP1L2MP1MP1MP1MP1MP1MP1MP1L2L2L2 L2MP1MP1MP1MP1MP1MP1MP1MP1 W12 x 26 W12 x 26 W12 x 26 W12 x 26 W12 x 26 W12 x 26 MP1W18 x 35 W18 x 40 W18 x 35 MP1153' - 11 1/2"W10 x 12 @ 4' - 0" o/c 3 L2 18" PLANK28" PLANK18" PLANK18" PLANK18" PLANK18" PLANK18" PLANKOPEN TYPICAL CAST-IN-PLACE CONCRETE STAIRS ON PRECAST STADIA. SEE ARCHITECTURAL FOR LOCATION SHADED AREA INDICATES CAST-IN- PLACE CONCRETE OVER GEOFOAM (EPS INSULATION) OVER PRECAST STADIA SHADED AREA INDICATES CAST-IN- PLACE CONCRETE OVER GEOFOAM (EPS INSULATION) OVER PRECAST STADIA 2 2 21 3 S5.2 MP1MP11' - 4" 17 S5.4 18 S5.5 3 S5.2 L2 K W12 X 53 W12 X 53 W12 X 53 MP1MP1MP1MP1MP1MP1L2 W12 x 26 W12 x 26 W12 x 26 20 S5.4 7 S5.3 TYP51111111111111111111112' - 0"TYP52MP1 10 S5.3 - --- 5 5 L2 TYP51L22.1K 3.0K PRESS BOXCOLUMNPRESS BOXCOLUMN1' - 4" 17 S5.5 W12 x 72W12 x 7217 S5.4W18 x 35W18 x 35( 111' - 7" )( 111' - 7" )( 110' - 1 1/4" )110' - 1 1/4"( 111' - 7" ) 3.1 L.42 BUILDING DIAGRAM NOT TO SCALE SWNW NE SE SEE SHEET S2.0 FOR PLAN NOTES & KEYED NOTES Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated MEZZANINE FLOOR FRAMING PLAN -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S2.0a 10/04/2023 220025.001/8" = 1'-0"1 MEZZANINE FLOOR FRAMING PLAN - SE QUAD 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET BUILDING DIAGRAM NOT TO SCALE SWNW NE SE 5 H J M N P QLL.5 M.4G.8 W12 x 26MP1MP1 W12 x 26MP1MP1MP1MP1MP1MP1MP1MP1MP1MP1MP1MP1MP1MP1 W12 x 26 W12 x 26 W12 x 26 W12 x 26MP1 W12 x 26 L.4 L.8 W18 x 35 W18 x 40 W18 x 35 W18 x 35W18 x 35W12 x 72W12 x 72MP1L2L2L2L2L2L2 L2 MP1MP1MP1MP1MP1L2MP1MP1L2L2L2 L2MP1MP2MP1MP8MP1MP1MP1MP1MP1MP1MP1MP1MP1MP1MP1MP1MP1MP1MP1MP1L2L2 L2 W12 x 26 W12 x 26 W12 x 26 W12 x 26 W12 x 26 W12 x 26 W12 x 26 W12 x 26 18" PLANK18" PLANK18" PLANK18" PLANK18" PLANK18" PLANK18" PLANK18" PLANK18" PLANK18" PLANK18" PLANK18" PLANKL260' - 0"W10 x 12 @ 4' - 0" o/c 24' - 0"W10 x 12 @ 4' - 0" o/c 55' - 9 1/8"W10 x 12 @ 4' - 0" o/c OPEN TYPICAL CAST-IN-PLACE CONCRETE STAIRS ON PRECAST STADIA. SEE ARCHITECTURAL FOR LOCATION SHADED AREA INDICATES CAST-IN- PLACE CONCRETE OVER GEOFOAM (EPS INSULATION) OVER PRECAST STADIA 3 10"2 2 2 2 3 S5.2 17 S5.5 17 S5.4 1' - 4"1' - 3 7/8"13 S5.2 3 S5.2 K L2TYP51 15 TYP511111111111113.0K 2.1KPRESS BOXCOLUMNPRESS BOXCOLUMN4.9 SEE SHEET S2.0 FOR PLAN NOTES & KEYED NOTES H J N PK HSS10 x 5 x 1/4HSS4 x 2 x 1/4HSS4 x 2 x 1/4HSS4 x 2 x 1/4 HSS4 x 2 x 1/4 HSS4 x 2 x 1/4 HSS4 x 2 x 1/4 HSS4x2x1/4HSS4x2x1/4HSS4x2x1/4HSS4x2x1/4HSS6 x 6 x 1/4HSS6 x 6 x 1/4HSS4 x 2 x 1/4 HSS4 x 2 x 1/4 HSS4 x 2 x 1/4 HSS4 x 2 x 1/4 HSS10 x 5 x 1/4HSS4 x 2 x 1/4HSS4 x 2 x 1/4HSS4 x 2 x 1/4HSS4 x 2 x 1/4HSS4 x 2 x 1/4HSS4 x 2 x 1/4HSS6 x 6 x 1/4HSS6 x 6 x 1/41 1 1 1 1 1 T/STEEL @ 122' -8 1/2" OR 10' -2 1/2" ABOVE MEZZANINE FLOOR T/STEEL @ 122' -8 1/2" OR 10' -2 1/2" ABOVE MEZZANINE FLOOR 5 6 7 M NM.4 7.2 L.7 L.8 M.3 L7MP2MP2L2L2L2 L2 4.9 NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated MEZZANINE FLOOR FRAMING PLAN -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S2.0b 10/04/2023 220025.001/8" = 1'-0"1 MEZZANINE FLOOR FRAMING PLAN - OVERALL 1/8" = 1'-0"2 PRESS BOX ROOF FRAMING PLAN 1/8" = 1'-0"3 LINTEL PLAN 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 1 2 3 4 5 6 7 8 A B D F H J M N P QLL.5 M.4 7.2 G.8GF.9 5.8 9 198' - 1 3/4 "96DLH212219' - 0"21 EQ SP @ 10.43' = 219' - 0"DBE = 131' - 3"DBE = 134' - 7"DBE = 133' - 2 1/2"DBE = 130' - 11"DBE = 127' - 4 1/2"JBE = 127' - 4 1/2"260DLH18219' - 0"22 EQ SP @ 10.43' = 219' - 0"60DLH18188' - 4"19 EQ SP @ 9' - 11" = 188' - 4"2R.D. R.D. R.D. R.D. R.D. R.D. R.D. R.D.199' - 1 1/8"168' - 6 1/8"L.7 L.4 L.8F.5 F.95 F.4 F.6 12 C M.3 F.3 51329K (ULT)9.5K (ULT)60K (ULT)1264K (ULT)1157K (ULT)38K (ULT)5 5 5 E K 35K (ULT)3.1 L.42 4.9 121' - 6"28KSP1 @ 4' - 6" o/c W18 x 35 W24 x 55 1 1 W24 x 55W24 x 55W24 x 55W16 x 26 W16 x 3122KSP1W16 x 26 W24 x 55 W24 x 55 W30 x 90 W30 x 90 W27 x 84 75' - 0"22K4 @ 5' - 0" o/c W24 x 62W16 x 26W18 x 35 W24 x 76 W24 x 55 (22K)W24 x 55W18 x 35 W18 x 35 W21 x 44 W21 x 44 W24 x 5544' - 0" 75' - 0" 22KSP1 @ 5' - 0" o/c 1 10' - 0" 22K4 @ 6' - 0" o/c 24' - 0"22K4 @ 6' - 0" o/c 30' - 0" 22KSP1 18' - 0" 22K9 @ 6' - 0" 22KSP1 @ 4' - 0" 1 1 1 1 1 W16 x 2610 ADD ALT 1 SEE S2.1 ADD ALT 2 SEE S2.1 W16 x 26W16 x 26W16 x 26W16 x 26S2.1c 2 W24 x 104 W24 x 55 T/CANOPY STEEL = 110' - 9"W8 x 15W8 x 249' - 3 3/4" W8 x 10 18' - 1 3/4 "W24 x 5531' - 10" 33' - 7"6 EQ SP 12K3 5 EQ SP 21' - 2 5/8"20' - 1 3/4"12K3 1 T/CANOPY STEEL = 110' - 9"10101010108" ROOF PLANK FOLDING PARTITION WALL ATTACHMENT BY OTHERS 1037' - 7 1/2"43' - 5 1/2"44' - 4"36' - 5" 49K (ULT) 9.5K (ULT) 70K (ULT) W16 x 26 13 S5.5 13 S5.5 FOLDING PARTITION WALL ATTACHMENT BY OTHERS L1 (30K) (30K)(19K) (19K)(21K)(22K)W24 x 558B (19K)(19K)(36K) (36K) 8A 8A SWNW NE SE BUILDING DIAGRAM NOT TO SCALE PLAN NOTES - "(XXX'-XX'')" INDICATES TOP OF STEEL BEAM ELEVATION DBE = XXX'-XX'' INDICATES DECK BEARING ELEVATION - "( )"INDICATES BRACE FROM TOP CHORD OF JOIST AT PANEL POINT TO BOTTOM FLANGE OF BEAM OR JOIST GIRDER. SEE SEC 10/S5.4 - "(#.#K )"INDICATES ADDITIONAL LOAD FROM ROOF TOP UNITS OR DRIFT. - SEE SECTION 2, 3, & 4/S5.4 FOR FRAMING AROUND MISCELLANEOUS OPENINGS SHOWN OR NOT SHOWN. COORDINATE SIZE AND LOCATION WITH ARCH, HVAC, PLUMBING, AND ELECTRICAL DWGS. - SEE LOOSE LINTEL SCHEDULE AND GENERAL NOTES FOR ANY LINTELS NOT SPECIFICALLY CALLED OUT. - HORIZONTAL JOIST BRIDGING TOP AND BOTTOM PER SJI w/ X-BRIDGING WHERE SHOWN ON PLAN. SEE SECTION 12/S5.4 PROVIDE ADDITIONAL UPLIFT BRIDGING AT EACH END OF JOIST AND AS REQUIRED BY DESIGN. SEE JOIST GENERAL NOTES FOR ADDITIONAL REQUIREMENTS - SEE SHEET S9.0 AND S9.1 FOR GENERAL NOTES, SCHEDULES AND OTHER ADDITIONAL REQUIREMENTS. - SEE S9.2 FOR SNOW DRIFT LOADS. - STRUCTURAL STEEL CONNECTIONS SHALL BE DESIGNED BY A LICENSED ENGINEER WORKING FOR THE FABRICATOR. (#K) INDICATES A SHEAR REACTION AT A SERVICE LOAD LEVEL. USE ASD. FOR ANY SIMPLE SPAN WF FRAMING MEMBER NOT SPECIFICALLY NOTED, OR NOT SHOWN OTHERWISE ON PLANS OR DETAILS, DESIGN FOR A MINIMUM 12K END SHEAR REACTION. - TYPICAL NON-BEARING MASONRY PARTITIONS (NOT SHOWN ON PLAN): 1.8'' CONCRETE BLOCK W/ VERT. REINFORCING, #5 @ 48'' o/c (U.N.O.) GROUTED FULL HEIGHT IN CENTER OF WALL. PROVIDE DOWELS TO MATCH INTO FOOTING. 2.PROVIDE HORIZONTAL JOINT REINFORCEMENT AT 16'' o/c MAXIMUM, VERTICALLY FOR THE FULL WALL HEIGHT. 3.PROVIDE (1) - #5 AT CORNERS, ENDS AND EACH SIDE OF CONTROL AND EXPANSION JOINTS, OPENINGS, DOORS, WINDOWS, JAMBS, ETC. U.N.O. SEE PLAN FOR MASONRY PIER REQUIREMENTS. 4.REINFORCE STUB WALLS BELOW WINDOWS EXCEEDING 6'-0'' IN LENGTH W/ #5 @ 32'' o/c VERTICALLY WITH DOWELS TO MATCH INTO FOOTING, THICKENED SLAB OR TOPPING. 1.PROVIDE HORIZONTAL JOINT REINFORCEMENT AT 16'' o/c MAXIMUM VERTICALLY FOR THE FULL WALL HEIGHT. 2.PROVIDE (1) - #5 AT CORNERS, ENDS AND EACH SIDE OF CONTROL AND EXPANSION JOINTS, OPENINGS, DOORS, WINDOWS, JAMBS, ETC. FOR FULL HEIGHT TO TOP OF WALL U.N.O. SEE PLAN FOR MASONRY PIER REQUIREMENTS. 3.REINFORCE STUB WALLS BELOW WINDOWS EXCEEDING 6'-0'' IN LENGTH W/ #5 @ 32'' o/c VERTICALLY WITH DOWELS TO MATCH INTO FOOTING, THICKENED SLAB OR TOPPING. - CMU WALLS (SHOWN ON PLANS) SEE 4/S5.3: - MASONRY STAIR AND ELEVATOR WALLS: 1. GROUT COMPLETELY SOLID ALL CELLS. USE STANDARD WEIGHT BLOCK REINFORCE AS SPECIFIED ELSEWHERE - " " INDICATES REBAR GROUTED SOLID IN CMU WALL. (SHOWN FOR CONCEPT, ACTUAL PLACEMENT BY MASON) - ROOF STRUCTURE IS DESIGNED FOR AN ADHERED NON-BALLASTED ROOF - ALL DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED BY CONTRACTOR TO CONFORM WITH THOSE SHOWN ON ARCHITECTURAL PLANS - ROOF STRUCTURE IS DESIGNED FOR A MAXIMUM STANDING WATER HEIGHT OF 6". PROVIDE SCUPPERS AND/OR OVERFLOW DRAINS AS REQUIRED TO LIMIT STANDING WATER TO 6". - " R.D. " INDICATES ROOF DRAIN OR O.D. INDICATES OVERFLOW DRAIN LOCATION. SEE SECTION 2, 3 OR 4/S5.4 FOR FRAMING AROUND DRAINS, COORDINATE SIZE AND LOCATION WITH PLUMBING DRAWINGS. - PROVIDE SUPPORT AT TOP OF ALL NON-BEARING MASONRY WALLS PER 14/S5.3 - V = ##K INDICATES REACTION A = ##K INDICATES AXIAL LOAD M = ###FT-K INDICATES END MOMENT - CONNECTIONS ENGINEER TO DESIGN ALL BEAM CONNECTIONS IN LINE WITH MOMENT FRAMES FOR A MINIMUM OF 5K END AXIAL REACTION. - (A=#K) INDICATES AXIAL END REACTIONS AT SERVICE LOAD LEVEL. CONNECTIONS ENGINEER TO DESIGN MEMBER CONNECTIONS TO TRANSFER AXIAL LOAD AS A COLLECTOR MEMBER - SEE 13/S5.3 FOR MASONRY CONTROL JOINTS.. - FOR TOILET PARTITIONS HUNG FROM STRUCTURE, SEE 7, 8, & 9/S5.5 - ALL EXPOSED STEEL AT CANOPIES TO BE PAINTED W/ 3-COAT EXTERIOR PAINT SYSTEM. SEE SPEC 05 10 00 - " " INDICATES MOMENT CONNECTIONS. WHERE BEAM ENDS ARE MOMENT CONNECTED ON OPPOSING SIDES OF A MEMBER, THE BEAM SIZES ARE THE SAME UNLESS NOTED OTHERWISE. SEE 6/S5.5 - REFER TO SECTIONS 6/S5.4, 7/S5.4 AND 16/S5.4 WHERE APPLICABLE - WHERE JOISTS RUN THROUGH NON-BEARING WALLS, PROVIDE POCKET IN MASONRY FOR JOIST CLEARANCE ON ALL SIDES. FILL WITH FIRESAFING IN FIRE RATED WALLS ONLY, BATT INSULATION EVERYWHERE ELSE. SEE ARCHITECTURAL PLANS FOR DETAILS AND 18/S5.3 . PROVIDE C6 x 13 BELOW R.T.U. CURB AT 1 1/2" DECK AND REINFORCE JOIST PER DETAIL 5/S5.4. SEE SECTION 2/S5.4 FOR FRAMING AROUND DUCTS AND MISCELLANEOUS OPENINGS SHOWN OR NOT SHOWN. COORDINATE SIZE AND LOCATION WITH HVAC AND PLUMBING DRAWINGS. KEYED NOTES TYPICAL ROOF CONSTRUCTION: 1 1/2" x 22 GA WIDE RIB GALVANIZED METAL ROOF DECK, 3 SPAN MINIMUM. SEE DETAIL 1/S5.4 FOR ROOF DECK ATTACHMENT AND GENERAL NOTES FOR ADDITIONAL REQUIREMENTS. L3 x 3 x 1/4 x CONT. FOR DECK SUPPORT. SEE SECTION 11/S5.4 TYPICAL ROOF CONSTRUCTION AT GYM: 3" x 20 GA GALVANIZED ACOUSTICAL DECK, 3 SPAN MINIMUM. SEE DETAIL 3/S5.4 FOR ROOF DECK ATTACHMENT AND GENERAL NOTES FOR ADDITIONAL REQUIREMENTS PROVIDE MC8 x 21.4 BELOW R.T.U. CURB AT 3" DECK AND REINFORCE JOIST PER DETAIL 5/S5.4. SEE SECTION 4/S5.4 FOR FRAMING AROUND DUCTS AND MISCELLANEOUS OPENINGS SHOWN OR NOT SHOWN. COORDINATE SIZE AND LOCATION WITH HVAC AND PLUMBING DRAWINGS. ROOF HATCH, SEE 2/S5.4. PROVIDE 5" SEATS AT K-SERIES JOISTS TO MATCH LH JOIST SEAT DEPTH RTU WITH WEIGHT (INCLUDING CURBS) AS INDICATED ON PLANS. VERIFY DUCT PENETRATIONS WITH MECHANICAL CONTRACTOR PRIOR TO CONSTRUCTION. FRAME AROUND OPENINGS IN STEEL DECK PER 2/S5.4. PRECAST HEADERS BY PRECASTER ADDITIONAL X-BRACING BY STEEL SUPPLIER AT BASKETBALL BACKBOARD GRAVITY SUPPORT. ALIGN (4) BRACES W/ GRAVITY SUPPORTS AND (2) BRACES WITH BACKBOARD BRACE, AT MINIMUM. SEE 5/S5.5 W8 x 24 HOIST BEAM WITH 3" MINIMUM CLEARANCE ABOVE, SEE GENERAL NOTES ON S9.0. LOCATION TO BE COORDINATED WITH ELEVATOR SUPPLIER. SEE ARCH PLANS FOR RATED CEILINGS. 1 2 3 4 5 14 15 6 7 8 9 - PRECASTER SHALL CUT ALL OPENINGS 12'' OR LARGER IN ANY DIRECTION AND HEADER AS REQUIRED. COORDINATE ALL OTHER OPENINGS WITH DESIGN. OPENINGS LESS THAN 12'' IN SIZE AND NOT SHOWN ON STRUCTURAL PLANS SHALL BE INSTALLED BY RESPECTIVE TRADE. OPENINGS LESS THAN 12'' IN SIZE THAT ARE SHOWN ON STRUCTURAL DRAWINGS SHALL BE BY GENERAL OR LEAD CONTRACTOR. - ALL OPENINGS ARE SAME SIZE AS DUCT PLUS 4'' EACH WAY. COORDINATE WITH TRADE CONTRACTORS. - GROUT ALL EXPOSED ENDS OF PRECAST PLANK SOLID - COMPOSITE WALL PANELS, INCLUDING CONNECTIONS, TO BE DESIGNED BY PRECASTER TO RESIST LATERAL FORCES INDICATED ON OVERALL FRAMING. PLAN FOR THE CORRESPONDING WALLS. PRECASTER TO ALSO DESIGN PANEL & CONNECTION FOR OUT OF PLANE WIND AND SEISMIC FORCES. XX KIPS INDICATES SHEAR FORCE,IN KIPS FOR WIND WIND SHEAR FORCES SHOWN ARE ULTIMATE PRECASTER TO PERFORM INDEPENDENT LATERAL ANALYSIS AND DESIGN FOR WORST CASE LOADS. PROVIDE LATERAL LOADS FOR ENGINEER TO REVIEW. - SEE ARCHITECTURAL FOR ALL OPENINGS IN PRECAST WALL PANELS. - PRECASTER TO PERFORM LATERAL ANALYSIS AND DESIGN PRECAST FOR BOTH LATERAL AND GRAVITY LOADS. SEE S9.0 AND S9.1 FOR MORE INFORMATION - PRECASTER SHALL DEVELOP CONNECTIONS FROM DIAPHRAGM TO SHEAR WALL & COLLECTOR BEAMS AS REQUIRED 10'' PRECAST ROOF PLANK, NO TOPPING, W/ 1 HOUR FIRE RATING U.N.O. PRECAST BEARING EL. = 114' - 8". HEADERS BY PRECASTER. COORDINATE ADDITIONAL POINT LOADS WITH MEP SUPERIMPOSED LIVE LOAD SUPERIMPOSED DEAD LOAD = 125 PSF PLUS DRIFT PLUS WEIGHT OF HVAC EQUIPMENT = 20 PSF 10 96DLH JOIST, SINGLE PITCH, TOP CHORD PITCH 1/4"/FT, WITH DL = 30 PSF, LL = 30 PSF PLUS SNOW DRIFT (SEE S9.2) AND CONCENTRATED LOADS AS INDICATED ON PLAN. 11 60DLH JOIST, SINGLE PITCH, TOP CHORD PITCH 1/4"/FT, WITH DL = 30 PSF, LL = 30 PSF PLUS SNOW DRIFT (SEE S9.2) AND CONCENTRATED LOADS AS INDICATED ON PLAN. 12 DLH JOIST, SINGLE PITCH, HEIGHT AT A = 5' - 6"; HEIGHT AT F = 7' - 8" TOP CHORD PITCH 1/4"/FT, WITH DL = 30 PSF, LL = 30 PSF PLUS SNOW DRIFT (SEE S9.2) AND CONCENTRATED LOADS AS INDICATED ON PLAN. 13 IN ADDITION TO UNIFORM LOADS (DL = 25 PSF; LL = 40 PSF) ALREADY APPLIED TO THE JOISTS, JOIST SUPPLIER TO DESIGN FOR ADDITIONAL OF THE GREATER OF 8A: - 11 UNIFORMILY SPACED CONCENTRATED LOADS OF 2300 LBS - UNIFOM LOAD OF 230 LBS/LF SEE 13/S5.5 8B: - 11 UNIFORMILY SPACED CONCENTRATED LOADS OF 650 LBS - UNIFOM LOAD OF 200 LBS/LF SEE 12/S5.5 - JS-1 DESIGNATION IS FOR JOIST SUBSTITUTE, SEE 10/S5.5 NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated ROOF FRAMING PLAN - OVERALL WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S2.1 10/04/2023 220025.00 1/16" = 1'-0"1 ROOF FRAMING PLAN - OVERALL 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET BUILDING DIAGRAM NOT TO SCALE SWNW NE SE R.D. R.D.RMAX = 17K14 S5.4 1 2 3 H J M N P QLL.5 M.4 96DLH21221 EQ SP @ 10' - 5 1/4" = 219' - 0"DBE = 131' - 3"DBE = 134' - 7"DBE = 133' - 2 1/2" L.4 L.8 10 CHILLER 6000#6 9200#2000# 4 RMAX = 29KRMAX = 34K8" ROOF PLANK 1 S5.3 14 S5.4 1 S5.3 3 S5.3 11 S5.4 1 S5.3 3 S5.3 1 S5.3 1010" PLANK1010" PLANK1010" PLANK5 S5.3 L5 1 S5.3 ADD ALT 2 SEE S2.1 ALT 4 11500#500#500#500#500#500#2300#2300#2300#2300#2300#2300#K 545# 985# 6 6 1 19' - 0"W8 x 15 VERIFY LOCATION WITH MECHANICALL525000#L512" CMU3.1 L.42 SEE SHEET S2.1 FOR PLAN NOTES & KEYED NOTES NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated ROOF FRAMING PLAN -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S2.1a 10/04/2023 220025.001/8" = 1'-0"1 ROOF FRAMING PLAN - SE QUAD 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET BUILDING DIAGRAM NOT TO SCALE SWNW NE SE DBE = 130' - 11"60DLH1822 EQ SP @ 10.43' = 219' - 0"80DLH172R.D. R.D. 8 7 ROLL-UP GYM CURTAIN AND ATTACHMENT BY OTHERS R.D. 7RMAX = 25KRMAX = 22KRMAX = 17K14 S5.4 14 S5.4 14 S5.4 14 S5.427 RTU-4 7500#6 19001 2 3 A B D F H JG.8GF.9 DBE = 134' - 7"DBE = 133' - 2 1/2"DBE = 130' - 11"DBE = 130' - 11"DBE = 128' - 5 1/2"80DLH1719 EQ SP @ 9' - 11" = 188' - 4"210101010R.D.R.D. R.D.R.D.10" PLANK10" PLANK10" PLANK10" PLANKW24 x 84 W24 x 84HSS8 x 8 x 1/4HSS6 x 6 x 5/16HSS6 x 6 x 5/16HSS6 x 6 x 5/16HSS6 x 6 x 5/163 S5.3 1010" PLANK5 S5.3 HSS6 x 6 x 1/4MP1W18 x 35 W18 x 35 W18 x 35 F.5 1 S5.3 11 S5.4 LOW HIGH 3 S5.3 1 S5.3 W14 x 22 5 5 985#985#985# DHU-2 8000# 853# 666 6 6MP1F.95 4 RTU-8 4500# 6 6 7500# 9500# 6 4 4 13RMAX = 29K1010" PLANK1010" PLANK5 S5.3 1 S5.3 C E 985#1010" PLANK1010" PLANK1010" PLANK1100#7700#1100#1100#1100#1100#2100#2100#2100#2100#2100#2100#2400#2400#2400#2400#2400#2400#2400#HOOP ATTACH 500# HOOP ATTACH 500# HOOP ATTACH 500# W14 x 22 7 (80K)(80K) (80K)(80K) (24K)(24K) (24K) (24K)(24K) (24K) 9 S5.3 17 S5.4 7 S5.3 L5L512" CMUW14 x 222 S5.3 (25K) (25K) (25K) (25K)MP1MP1MP1HOOP ALT 500# HOOP ALT 500# HOOP ALT 500# HOOP ALT 500# L2 L2 15 S5.4 3.1 NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated ROOF FRAMING PLAN -NE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S2.1b 10/04/2023 220025.00 1/8" = 1'-0"1 ROOF FRAMING PLAN - NE QUAD 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET BUILDING DIAGRAM NOT TO SCALE SWNW NE SEDBE = 130' - 11"2R.D. 8 R.D.60DLH1819 EQ SP @ 9' - 11" = 188' - 4" ROLL-UP GYM CURTAIN AND ATTACHMENT BY OTHERS 14 S5.4 RMAX = 27.3K127 4500# RTU-4 7500# 14 S5.4 14 S5.4RMAX = 24.3K7 RMAX = 25K2500#RMAX = 25K14 S5.4 922 EQ SP @ 9' - 11 1/2" 6 6 6 4 480DLH1713 RMAX = 39K1650110011001900190019001900190019001100110011001100110011004 5 6 7 8 A B D F H J 7.2 G.8G F.9 F.9 5.8 9 DBE = 134' - 7"DBE = 133' - 2 1/2"DBE = 130' - 11"DBE = 130' - 11"DBE = 128' - 5 1/2"2W16 x 31W30 x 90 W27 x 84 75' - 0" 22K4 @ 5' - 0" o/c W24 x 62W16 x 26W18 x 35 W24 x 76 W24 x 55W24 x 55W24 x 55W18 x 35W18 x 35W21 x 44 W21 x 44 W24 x 5544' - 0" 77' - 5 1/2"22KSP1 @ 5' - 0" o/c 1 24' - 0" 22K4 @ 6' - 0" o/c 30' - 0" 22KSP1 @ 5' - 0" o/c 18' - 0" 22K9 @ 6' - 0" LOW 1 1 1 1 1 R.D. R.D. R.D.R.D R.D.W16 x 262 S5.3 2 S5.3 15 S5.55 5 13 S5.4 2 S5.3 11 S5.4 5 11 S5.4 LOWHSS6 x 6 x 3/8HSS6 x 6 x 3/8HSS6 x 6 x 3/8HSS6 x 6 x 3/8W10 x 60HSS12 x 6 x 3/8 GIRT ( )W16 x 26W16 x 26HSS12 x 6 x 3/8 GIRT ( )HSS12 x 6 x 3/8 GIRT ( )HSS6 x 6 x 3/8HSS6 x 6 x 3/8W10 x 6013 S5.4 1' - 0"1' - 2" 15 S5.5 W12 x 72W12 x 26 W12 x 26W12 x 26F.4 F.6 13' - 10" 16' - 8" 13' - 10" 8' - 7 3/8"8' - 7 3/8"W8 x 10W8 x 10W8 x 1012' - 11"3 EQ SP1T/CANOPY STEEL = 111' - 5"HSS6 x 6 x 5/16HSS6 x 6 x 5/16HSS6 x 6 x 5/16HSS6 x 6 x 5/16W12 x 26HSS8 x 6 x 5/16 GIRT ( )( 110' - 6" )HSS6 x 6 x 3/8( 110' - 6" )( 110' - 6" )( 110' - 6" ) 6 14 S5.4 HSS6 x 6 x 3/8C 1 S5.5 1 S5.5 1 S5.5 2 S5.5 1 S5.5 F.3 F.3 8' - 7 3/8"12' - 11"W12 x 45W12 x 45W12 x 26W24 x 104 W24 x 55 HI V = 20K A = 3K M = 107.2 KFT V = 20K A = 3K M = 107.2 KFT HSS5 x 5HSS5 x 5A = V = M =FT 4K 5K 74K A = V = M =FT 4K 5K 74K V = 26K A = 7K M = 173KFT V = 26K A = 7K M = 173KFT 10 S5.4 10 S5.4 17 S5.4 E K 8 W16 x 262400#520520520W16 x 26 HOOP ATTACH 500# HOOP ATTACH 500# HOOP ATTACH 500# 2' - 7 7/8" 2' - 5 1/2" ( 119' - 1 1/2" )( 119' - 1 1/2" ) 3' - 4 7/8" 3' - 4 7/8" 7 7 ( 119' - 1 1/2" ) 6' - 2 3/8"6' - 2 3/8" 8 S5.4 3 S5.5 22KSP13' - 9 5/8" 3' - 9 5/8" R MAX = 20K DBE = 119' - 4" ( 118' - 9" ) ( 118' - 9" ) ( 111' - 5" )LO W24 x 55 W24 x 55HI LO ( 118' - 9" ) ( 111' - 5" ) HI LO ( 118' - 9" ) ( 111' - 5" )( 118' - 6" )3' - 2 3/8"3' - 2 3/8"5' - 0 1/8"5' - 0 1/8" 4 S5.5 19 S5.5 W12 x 26W12 x 26( 118' - 6" )( 118' - 6" )(14K) (14K) 4.9 8 5.8 9 W24 x 55W24 x 55W24 x 55W24 x 55W24 x 55W24 x 55W24 x 55W24 x 5540' - 8 1/8"36LH09149' - 7"11 EQ SP49' - 7"1( 125' - 4" ) ( 125' - 4" )( 124' - 11" )( 124' - 11" )( 124' - 11" )( 124' - 11" )W24 x 55 5 11 S5.4 2 S5.3 W10 x 60W10 x 60W10 x 60W10 x 6049' - 7" 6HSS6 x 6 x 3/8HSS6 x 6 x 3/815 S5.5 15 S5.5 8100# 3 R.D. F.4 F.6 F.3 A = V = M =FT 11K 7K 71K A = V = M =FT 11K 7K 71K A = V = M =FT 8K 4K 59K A = V = M =FT 8K 4K 71K1000#1000#1000#1000#1000#1000#1000#1000#1000#1000#HSS4 x 4 x 1/4HSS4 x 4 x 1/4( 125' - 4" )HSS4x4x1/4HSS4x4x1/419 S5.5(19K)(20K) (20K)(19K)(22K)(28K)(22K)(20K)4.9 SEE SHEET S2.1 FOR PLAN NOTES & KEYED NOTES NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated ROOF FRAMING PLAN -NW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S2.1c 10/04/2023 220025.00 1/8" = 1'-0"1 ROOF FRAMING PLAN - NW QUAD 1/8" = 1'-0"2 HIGH ROOF FRAMING 1 Date 1 Revision 1 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET BUILDING DIAGRAM NOT TO SCALE SWNW NE SE96DLH21R.D. R.D.RMAX = 25K14 S5.4 9 21 EQ SP @ 10' - 5 1/4" = 219' - 0"RMAX = 39KRMAX = 39.0K5 6 7 8 H J M N P QLL.5 M.4 7.2 G.8G 5.8 96DLH21DBE = 131' - 3"DBE = 134' - 7"DBE = 133' - 2 1/2"263' - 0" 28KSP2 @ 4' - 6" o/c W18 x 35 1 1 W16 x 26 W16 x 31W16 x 26 W30 x 90 W30 x 90 W27 x 84 75' - 0" 22K4 @ 5' - 0" o/c W24 x 62W16 x 26W18 x 35 77' - 5 1/2"22KSP1 @ 5' - 0" o/c 1 10' - 0" 10K1 @ 5' - 0" o/c 1 W16 x 26L.7 W8 x 15W8 x 2413' - 11 3/4 " W8 x 10 T/CANOPY STEEL = 111' - 1" 18' - 10 1/ 4 " S2.1d 2 L.4 L.8 R.D R.D. R.D. R.D. ADD ALT 2 SEE S2.1 ALT ADD ALT 2 SEE S2.1 ALT HSS12 x 6 x 3/8 GIRT ( )HSS12 x 6 x 3/8 GIRT ( )HSS6 x 6 x 3/8HSS6 x 6 x 3/8W10 x 6013 S5.4 1' - 0"1' - 2" W8 x 24HSS6 x 6 x 3/8A =V =M =FT7K1K26KW21 x 44 W21 x 44 W27 x 84 W27 x 84 12HSS6 x 6 x 3/8W10 x 60W10 x 6015 2 S5.3 11 S5.4 13 S5.4 LOW HIGH 14 S5.4 HSS8 x 6 x 5/16 GIRT ( )( 110' - 6" )( 110' - 6" )( 110' - 6" ) 4' - 5 1/2" 6 6 244 14 S5.4 HSS6 x 6 x 3/816 S5.5 1 S5.5 111 S5.5 M.3 V = 26K A = 7K M = 173KFT V = 26K A = 7K M = 173KFT 10 S5.4 10 S5.4 17 S5.4 A = V = M =FT 20K 5K 99K A = V = M =FT 20K 5K 99K A = V = M =FT 13K 3K 67K W16 x 31A = V = M =FT 2K 1.8K 32K A = V = M =FT 2K 1.8K 32K A = V = M =FT 2K 1.8K 34K A = V = M =FT 2K 1.8K 34K HSS6 x 6 x 3/8A =V =M =FTA = V = M =FT 29K 6K 236K W16 x 3111K 5205205205202700#2400#5205205202' - 7 7/8" 2' - 5 1/2" ( 119' - 1 1/2" )( 119' - 1 1/2" ) 7 7 18 S5.4 R MAX = 20K DBE = 119' - 4"DBE = 119' - 4" R MAX = 20K 520520520520520(14K) (14K) 54' - 0" 28KSP1 @ 4' - 6" o/c DBE = 119' - 4"DBE = 119' - 4" DBE = 119' -4"DBE = 119' - 4" DBE = 119' -4" 17' - 11"JS-1 S2.0b 3 4.9 W24 x 55 W24 x 55W24 x 55W24 x 55 W24 x 55 W24 x 55W24 x 5531' - 10"33' - 7" 6 EQ SP 12K1 5 EQ SP 31' - 10"33' - 7" 12K1 1 12W10 x 60W10 x 60W10 x 60W10 x 60W10 x 60W10 x 6016 S5.5 R.D. M.3 A =V =M =FT3K4K45KA =V =M =FT3K4K45KA = V = M =FT 9K 2K 51K A = V = M =FT 9K 2K 51K A = V = M =FT 9K 2K 50K A = V = M =FT 9K 2K 50KA =V =M =FT3K2.5K17KA = V = M =FT 8K 7K 50K A = V = M =FT 9K 3K 43K A = V = M =FT 8K 7K 50K A = V = M =FT 9K 3K 43K A =V =M =FT7K4K45K18 S5.4 W8 x 24W8 x 24 1W8x24 W8x24 3' - 1 1/8" 3' - 1 1/8" DBE = 126' - 0"DBE = 126' - 0"DBE = 126' - 0"DBE = 126' - 0" DBE = 126' -0" DBE = 126' -0" SEE SHEET S2.1 FOR PLAN NOTES & KEYED NOTES NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated ROOF FRAMING PLAN -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S2.1d 10/04/2023 220025.00 1/8" = 1'-0"1 ROOF FRAMING PLAN - SW QUAD 1/8" = 1'-0"2 HIGH ROOF FRAMING PLAN 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET - THIS DETAIL SHALL APPLY TO ISOLATED AREAS WHERE GEOTECHNICAL ENGINEER DETERMINES THE EXISTING SOILS DO NOT PROVIDE THE SPECIFIED BEARING CAPACITY OR REQUIRED SETTLEMENT STRENGTH. - SEE SPECIFICATION AND SOIL REPORT FOR ADDITIONAL REQUIREMENTS. EXISTING TOP SOIL AND UNSUITABLE SOILS TO BE REMOVED PRIOR TO FILLING SEE FOUNDATION PLAN. - PROVIDE ADEQUATE SLOPES TO EXCAVATION CONFORMING TO OSHA REQUIREMENTS. TYPICAL BUILDING FOUNDATION SYSTEM INTERIOR WALL (TYP.)EXISTING GRADE BOTTOM/ENGINEERED FILL TOP/EXISTING BEARING SOIL - SEE ARCHITECTURAL GRADING PLAN & SECTIONS TOP/SLAB-ON-GRADE SEE FOUNDATION PLAN NEW GRADE EXTERIOR WALL BACKFILL EXTERIOR WALL(TYP.)6' - 0" MIN. PAST FOOTING COMPACTED ENGINEERED FILL, SEE SPECIFICATIONS N.T.S.1 1+ 9 3/32" 2"1' - 0" MIN 1' - 4 11/32 " SUITABLE SOIL BEARING STRATUM PER SOIL REPORT, FOR BIDDING PURPOSES. FIELD VERIFY EXACT ELEVATION. SEE PLAN FOR BORING LOCATIONS AND BEARING STRATUM AT BORINGS - PROVIDE FORMWORK IF CANNOT HOLD VERTICAL TRENCH FACE, OR EXTEND AS REQUIRED TO MATCH EMBANKMENT SLOPE. SEE PLAN LEAN CONCRETE SEE SPEC SECTION 31 00 00 FOR MIX 6" MIN6" MIN KEYED GALVANIZED METAL SCREED (MAY BE REMOVED AFTER ONE SIDE IS POURED) PROVIDE 2 COATS OF CURING COMPOUND. 1" DEEP SAW CUT ON 2ND POUR IF JOINTS ARE FILLED SEE SPEC. & PLANS FOR SUBGRADE REQUIREMENTS. 4" 4" VAPOR BARRIER WHERE SPECIFIED DRAINAGE FILL - FILL JOINT WITH POLYURETHANE SEALANT AT EXPOSED CONCRETE. FILL JOINT WITH EPOXY JOINT FILLER (100% SOLIDS, 50 MIN. SHORE D HARDNESS) IN MANUFACTURING AND WAREHOUSE AREAS.6" MINt/2 t/2tMIN. 1/4" WIDE SAWCUT (TYP.), USE 1/8" WIDE WHERE SEMI-RIGID JOINT FILLER IS USED. 12" MIN. 1/4" WIDE SAWCUT (TYP.), USE 1/8" WIDE WHERE SEMI-RIGID JOINT FILLER IS USED. WELDED WIRE FABRIC (W.W.F.) SEE SPECIFICATIONS & PLANS FOR SUBGRADE REQUIREMENTS VAPOR BARRIER WHERE SPECIFIED DRAINAGE FILL - SAWCUT WITHIN 4 TO 12 HOURS AFTER SLAB IS FINISHED: 1. BEFORE CONCRETE STARTS TO COOL, 2. AS SOON AS SURFACE IS FIRM ENOUGH NOT TO BE TORN OR DAMAGED, 3. BEFORE RANDOM-DRYING-SHRINKAGE CRACKS CAN FORM. - FILL JOINT WITH POLYURETHANE SEALANT AT EXPOSED CONCRETE. FILL JOINT WITH SEMI-RIGID EPOXY JOINT FILLER (100% SOLIDS, 50 MIN. SHORE D HARDNESS) IN MANUFACTURING AND WAREHOUSE AREAS.tt/2 t/2 t/4 MIN: 1" FOR 4" SLAB 1 1/2" FOR 5" SLAB NEW SLAB ON GRADE ON VAPOR BARRIER ON 6" DRAINAGE FILL. SEE PLAN FOR SLAB THICKNESS & REINFORCING. #3 x 1' - 0" @ 24" o/c, DRILL & EPOXY INTO EXISTING SLAB, GREASE OTHER END. EXISTING SLAB ON GRADE SAWCUT AS REQUIRED - SEAL NEW AND OLD VAPOR BARRIERS TOGETHER - FILL JOINT WITH POLYURETHANE SEALANT AT EXPOSED CONCRETE FILL JOINT WITH EPOXY JOINT FILLER (100% SOLIDS, 50 MIN. SHORED HARDNESS) IN MANUFACTURING AND WAREHOUSE AREAS. MIN. 1/4" WIDE SAWCUT (TYP.), USE 1/8" WIDE WHERE SEMI-RIGID JOINT FILLER IS USED. 6"SEE PLANN.T.S.- TOP OF WALL OR FOOTING STEP INDICATED ON PLAN BY 1 2 36 DIA. LAP (MIN.) T/FOOTING ELEV. SEE PLAN FOOTING REBAR BARS TO MATCH NUMBER & SIZE OF FOOTING REBAR AT CONCRETE WALL STEPS, (1) - #5 EACH FACE EXTEND 2' - 0" PAST STEP T/FOOTING ELEV. 1' - 0" (MIN.)"A"2 x "A" (MIN.) SEE PLAN T/WALL ELEV. SEE PLAN 1 21/32" 1' - 4"FOOTING STEP3 5/32" 7 1/2" (1) - #5 EACH FACE. SEE NOTE BELOW1 21/32" 2" 1 21/32" 10"WALLSTEP3"8"6"2"2"TOP BARS d SEE PLAN T/WALL SEE PLAN BY PRECASTER SEE PLAN VERTICAL PRECAST PANEL w/ (2) WELD ANCHORS PER PANEL AT BASE SHIMS AND GROUT BED BY PRECASTER (2) - #5 CONTINUOUS, LAP 2'-2" #5 DOWEL @ 48" o/c w/ STANDARD HOOK SEE PLAN AND SCHEDULE CONTINUOUS ANGLES AND WELD PLATES BY PRECASTER PRIME w/ ZRC CONTINUOUS L4 x 4 x 3/8 w/ 1/2"Ø x 4" HEADED STUDS @ 24" o/c. PRIME EXPOSED SURFACES w/ ZRC. - PRECASTER SHALL REVISE ATTACHMENT DETAILS AS REQUIRED AT SHEAR WALLS. SHEAR WALLS PANELS SHALL BE CONNECTED SO AS TO AVOID UPLIFT WITH A 1.5 SAFETY FACTOR. SLAB ON GRADE EXPANSION FELT DRAINAGE FILL BY PRECASTER 5 1/2" - SUGGESTED DETAIL; ACTUAL DETAIL & ATTACHMENT MATERIALS BY PRECASTER. VAPOR BARRIER WHERE SPECIFIED. TURN UP AND SEAL TO FOUNDATION OR PANEL PER MANUFACTURER'S REQUIREMENTS 0' - 8"0' - 8" EQEQ SEE ARCHITECTURAL FOR WALL WIDTH MATCH WALL WIDTH WITH PRECAST WALL SEE FOUNDATION PLAN EXPANSION FELT #5 @ 48" o/c W/ STANDARD HOOK FOR WALLS TO 8' - 0" HIGH; PROVIDE #5 @ 12" o/c EACH WAY FOR HIGHER WALLS W/ DOWELS TO MATCH, U.N.O. VAPOR BARRIER WHERE SPECIFIED. TURN UP AND SEAL TO FOUNDATION PER MANUFACTURER'S REQUIREMENTS EQUAL 4" MIN EQUAL 4" MIN (2) - #5 x CONT (LAP 2' - 2") SEE FOUNDATION PLAN 4 13/32"4 19/32" DRAINAGE FILL 6" GALVANIZED COLD-FORMED STEEL STUD, 54 MIL (50 KSI) MIN, 16" o/c MAX, BY COLD-FORMED STEEL DESIGNER. AT KNEE WALLS BELOW WINDOW SYSTEMS, PROVIDE SIMPSON RCKW OR EQUIVALENT AT BASE OF CANTILEVERED STUD. LOCATE AT VERTICAL WINDOW MULLIONS AND AS REQUIRED PREMOLDED JOINT FILLER. SEE PLAN CONCRETE SLAB ON GRADE W/MESH U.N.O. MASONRY WALL OR PIER REINFORCING (SEE PLAN) DOWELS TO MATCH. VAPOR BARRIER WHERE SPECIFIED. TURN UP AND SEAL TO FOUNDATION PER MANUFACTURER'S REQUIREMENTS DRAINAGE FILL SEE PLAN FOR WALL THICKNESS EQ EQ 8" CONTINUOUS STRIP FOOTING. SEE PLAN & SCHEDULE - CONTRACTOR OPTION; DRILL 8" AND EPOXY MASONRY DOWELS. SEE MASONRY REBAR CAP SCHEDULE SECTION SIDE VIEW NOTE:4"6"MIN.MIN.IF UTILITY LINE RUNNING PERPENDICULAR TO FOOTING IS MORE THAN 3' - 0" BELOW BOTTOM OF FOOTING, IT IS NOT NECESSARY TO PLACE CONCRETE FILL AROUND PIPE. PROVIDE RELIEVING ARCH ABOVE PIPE PER IPC. CONCRETE FILL TO BE PLACED BEFORE FOOTING IS POURED MAKE SAME WIDTH AS FOOTING AND FULL WIDTH OF PIPE TRENCH. PIPE SLEEVE SHALL BE TWO PIPE SIZES GREATER THAN PIPE PER IPC C.J. WITH ROUGHENED SURFACE 3' - 0"MAX2' - 0" MIN 6" MIN NO PIPES TO BE PLACED IN THIS HEIGHT - SIMILAR FOR OTHER UTILITIES SUCH AS ELECTRICAL CONDUIT. SEAL BY PLUMBING CONTRACTOR 9"5 1/2"3 15/32" 3 7/32" 1 1 NOTE: - IF UTILITY LINE RUNNING PERPENDICULAR TO FOOTING IS MORE THAN 3' - 0" BELOW BOTTOM OF FOOTING, IT IS NOT NECESSARY TO DROP FOOTING AND SLEEVE LINE THRU WALL AS SHOWN ABOVE. PROVIDE RELIEVING ARCH ABOVE PIPE PER IPC. PIPE SLEEVE SHALL BE TWO PIPE SIZES GREATER THAN PIPE PER IPC SEAL WATERTIGHT BY PLUMBING CONTRACTOR STEP FOOTING DOWN AS REQUIRED AND SLEEVE UTILITY LINE THRU FOUNDATION WALL. PIPE 45° SLOPE NO DIGGING FOR PIPE TRENCH PARALLEL TO FOOTING WITHIN THESE LINES. WALL FOOTING SHOWN, COLUMN FOOTING SIM. NO PIPES TO BE PLACED IN THIS HEIGHT SLEEVE 1' - 6" MIN. - SIMILAR FOR OTHER UTILITIES SUCH AS ELECTRICAL CONDUIT. 1' - 1 31/32" 9" - CONTRACTOR SHALL LOCATE THE BOTTOM OF FOOTING ELEVATION TO AVOID SURCHARGING PATALLEL UTILITIES. - CONTRACTOR SHALL PROVIDE SHORING, BRACING ETC AS REQUIRED TO PREVENT CAVE-INS OR DISPLACEMENT OF FOUNDATION. 20' - 0" OR MORE3" MIN12" MIN.#4 BAR COPPER GROUNDING ELECTRODE CONDUCTOR FOR EXTENSION TO BUILDING GROUND SYSTEM NONMETALLIC PROTECTIVE SLEEVE EXOTHERMIC LISTED CONNECTION CADWELD" OR EQUAL 4 AWG OR LARGER BARE COPPER CONDUCTOR OR NON-COATED STEEL REINFORCING BAR OR ROD NOT LESS THAN 1/2" DIA AT LEAST 20' - 0" LONG FOUNDATION IN DIRECT CONTACT WITH EARTH NOTES: 1 PROVIDE A CONCRETE ENCASED ELECTRODE PER N.E.C. 250.52 (3) WITHIN THE FOUNDATION OR FOOTING OR WITHIN VERTICAL FOUNDATION ON STRUCTURAL COMPONENTS THAT ARE IN DIRECT CONTACT WITH THE EARTH 2 CONCRETE INSTALLED WITH INSULATION, VAPOR BARRIERS, FILMS OR SIMILAR ITEMS SEPARATING THE CONCRETE FROM THE EARTH IS NOT CONSIDERED TO BE IN "DIRECT CONTACT" WITH THE EARTH. 3 LOCATE THE GROUNDING ELECTRODE CONDUCTOR FOR EXTENSION TO THE GROUNDING SYSTEM NEAR THE MAIN ELECTRICAL SERVICE BOARD. 4 SEE SPECIFICATION 26 05 26 GROUNDING AND BONDING FOR MORE INFORMATION. PROVIDE THICKENED SLAB AT ALL INTERIOR NON-BEARING MASONRY WALLS. SEE ARCHITECTURAL PLANS FOR SIZE AND LOCATION SEE PLANS FOR SLAB THICKNESS, REINFORCING, & ELEVATION (2) - #4 @ 8" & 12" WALLS ONLY. d = WALL THICKNESS BOND BEAM W/ (2) #5 x CONTINUOUS 4" 4"2 x d VAPOR BARRIER WHERE SPECIFIED DRAINAGE FILL - WHERE A SLAB CONSTRUCTION JOINT OCCURS BELOW A PARTITION, PROVIDE 1/2" DIA. x 18" LONG DOWEL AT 2' - 0" o/c. USING PLASTIC SLIP DOWELS.4"d(10" MIN)W.W.F. CONT. W.W.F. BENEATH CONDUIT.(MATCH SLAB ON GRADE REINF.) - CONTACT STRUCTURAL ENGINEER WHERE CONDUIT IS BUNDLED. ELECTRICAL CONDUIT VAPOR BARRIER WHERE SPECIFIED DRAINAGE FILL 6"4" TYP 4" MIN 2" CLR MIN5"CLR6"SEEPLAN5 1/2" PROVIDE SPECIFIED SLAB THICKNESS BELOW CONDUIT SLAB 6" #5 @ 10" o/c #4 @ 12" o/c REINFORCING W.W.F. ONLY #4 @ 18" o/c 8" 6" 6" W 6' - 0" < W <10' - 0" 4' - 0" < W <6' - 0" 1' - 6" < W <4' - 0" SEE SCHEDULE STD HOOK LENGTH CARRIER BARS ON CHAIRS FOR TOP BARS EACH END dW 2"COVERhFILL SPACES W/ SAND6"MIN.CONDUIT COMPACTED DRAINAGE FILL1"COVERVAPOR BARRIER WHERE SPECIFIED 1' - 0" MIN. - SEE SLAB ON GRADE JOINT DETAILS IF APPLICABLE 6 3/8" 1" 21/32" 8 7/8" 2"4 3/32"2' - 3 1/2"2' - 0 3/32" W >10' - 0" CONTACT ENGINEER 1" HIGH CARDBOARD VOID FORM ABOVE CONDUIT - COORDINATE WITH CONDUIT CONTRACTOR FOR PROPER LOCATION OF CONDUIT PER THIS DETAIL - COMPLIANCE WITH THIS DETAIL IS NOT REQUIRED IF CLEAR HORIZONTAL DISTANCE BETWEEN CONDUITS IS 4" OR GREATER W.W.F. #3 @ 12" THICKNESS, h (TOP & BOTTOM) W <1' - 6" NO VERTICAL CONSTRUCTION JOINT WITHIN 5' - 0" OF CORNER CORNER BAR SAME SIZE & NUMBER AS HORIZONTAL REINFORCING - IF NO OUTSIDE FACE HORIZONTAL BARS EXIST, PROVIDE CORNER BARS SAME SIZE & SPACING AS INSIDE FACE REINFORCING 4' - 0" x 4' - 0". PROVIDE (3) - #4 VERTICAL BARS. STANDARD HOOK 0"CLASS "B" LAPCLASS "B" LAPPLAN - AT DOORS, LOUVERS, ETC. WHEREVER WALL FACE IS EXPOSED PROVIDE HAIRPIN SAME SIZE AND SPACING AS HORIZONTAL BARS W/ TENSION LAP SPLICE 1 1/2" 90° STANDARD HOOK 2 x 4 KEY SAME SIZE & NUMBER AS HORIZONTAL REINFORCING30 BAR DIA.6"1' - 10 1/2"CONNECTION BY STAIR SUPPLIER THICKEN SLAB AS SHOWN AT STAIR BASE (COORDINATE W/ STAIR MANUFACTURER) PROVIDE (2) - #5 CONT. IN THICKENED SLAB 12"45°(2) - #5 x CONT.10"PIT DIMENSIONS. 1' - 6" 1' - 6" - COORDINATE SIZE & LOCATION OF PLUG W/ ARCHITECTURAL & ELEVATOR CONTRACTOR, PROVIDE WATERSTOP - SEE ARCHITECTURAL FOR SLAB PITCH, DRAINS, SUMPS, ETC. - (3) - #5 EACH WAY TOP & BOTTOM PLUG (3) #4 E.W. CENTERED IN SLAB38"24" 12" CONCRETE MAT w/ #5 @ 12" o/c EACH WAY TOP & BOTTOM, 2" COVER TO TOP BARS, 3" COVER TO BOTTOM BARS WATERSTOP 8" (2) #4 HORIZONTAL BARS EACH SIDE OF SUMP WALL W/ STD HOOKS #4 @ 12" o/c W/ STD HOOKS EDGE BARS T & B PER 17/S5.1 MCNICHOLS CORGRATE (1" F.GLASS GRATING) PITCH SLAB TO SUMP PIT 1" LEDGE FOR GRATING ALL AROUND 8"MINELEV. (SEE PLAN) ADJUST FOR PIT DEPTH REQUIRED BY SUPPLIER #4 @ 12" o/c ALL AROUND #4 @ 12"o/c EACH WAY x STANDARD HOOK (4 WALLS) 2" x 4" KEYS (TYP) SEE ARCHITECTURAL PLANS FOR VERIFY w/ELEVATOR SUPPLIER1'-0"3"3"4" 8"1' - 0" 1" CLEAR 1' - 0"8" L4 x 4 x 1/4 W/ 1/2" DIA. x 4" HWS @ 12" o/c AT DOOR ONLY. SILL ANGLE BY ELEV. SUPPLIER - PROVIDE PVC WATERSTOPS AT WALL CONSTRUCTION JOINTS. - WHERE A WALL SEPARATES PITS, PROVIDE SLEEVES OR BLOCKOUTS AT WALL BASE FOR DRAINAGE TO SUMP. BACKFILL W/ CLAY ALL AROUND 8"1' - 0"1' - 0"8"3' - 2" 8" 1' - 8 5/32"8" PVC WATERSTOP, 3/8" THICK x 6" LONG, BULB TYPE, NON TAPERED 4"102' -0" 100' -0"FIRST FLOOR 100' -0" 102' -0" 98' -8" 99' -4"NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S5.0 10/04/2023 220025.00 1 ENGINEERED FILL DETAIL 2 TYPICAL FILL BELOW FOOTINGS 3 SLAB ON GRADE CONSTRUCTION JOINT 4 SLAB ON GRADE CONTROL JOINT 5 NEW SLAB ON GRADE AT EXISTING 6 TYPICAL STEPPED WALL OR FOOTING 7 TYPICAL EXTERIOR FOUNDATION WALL 8 TYPICAL FOUNDATION WALL 9 INTERIOR WALL FOOTING 10 PIPE PENETRATION AT STRIP FOOTING 11 PIPE PENETRATION AT WALL 12 CONCRETE ENCASED GROUNDING ELECTRODE 13 THICKENED SLAB DETAIL 14 EMBEDDED CONDUIT IN SLAB ON GRADE 15 REINFORCING SLAB ON GRADE AT MULTIPLE CONDUITS 16 TYPICAL CORNER REINFORCING 17 END OF WALL/JAMB DETAIL 18 WALL INTERSECTION REINFORCING 19 STAIR STRINGER CONNECTION 20 ELEVATOR PIT 21 DETAIL 22 FOUNDATION DETAIL 1 Date 1 Revision 1 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET ANCHOR BOLTS w/ LEVELING NUTS BOND BREAKER ON TROWELLED SURFACE 3 TIES @ 1 1/2" o/c AT TOP - #4 U-BARS LAP 20" MIN. W/ VERT. BARS (4 TOTAL), 2" TO TOP OF PIER 2" NON-METALLIC NON-SHRINK GROUT, PLACE GROUT BEFORE PLACING ANY UPPER FLOORS NUT & WASHER @ END OF ANCHOR BOLT, TACK WELD ACI STANDARD HOOK EL. (SEE PLAN) - WHERE BASE PLATES ARE NOT LARGE ENOUGH TO PLACE ANCHOR BOLTS OUTSIDE OF COLUMN FLANGES, PLACE ANCHOR BOLTS INSIDE. STEEL SUPPLIER TO DETAILS AND SUBMIT FOR APPROVAL. - COAT ALL EXTERIOR STEEL (E.G., CANOPY COLUMNS) W/ COAL TAR BELOW GRADE T/PIER ELEV. SEE PLAN VAPOR BARRIER WHERE SPECIFIED - TURN UP AND SEAL VAPOR BARRIER AROUND COLUMNS PER MANUFACTURER'S DETAILS FOR PENETRATION.3" CLEARL. OR W. (SEE SCHEDULE FOR SIZE AND REINFORCING)SEESCHEDULE1 1/2" CLEAR COVER TO TIES SEE DETAIL FOR BARS AROUND COLUMN (2' - 0" MAX.)2" TYP.NOTES: 1. AT ELECTRICAL DUCT DEPRESSIONS (EG. WALKER DUCT): FILL DEPRESSION w/ 4000 PSI CONCRETE, 3/8" MAX. AGGREGATE AFTER ELECTRICAL DUCT IS INSTALLED. COORDINATE SIZES AND LOCATIONS WITH ELECTRICAL PLANS, ARCHITECTURAL PLANS, AND DUCT SUPPLIER WHEN D > 12": #4 @ 18" o/c W/ 1' - 0" HORIZONTAL LEGS 6" GRANULAR FILL D 2ts ts = SLABTHICKNESSD = DEPRESSIONVAPOR BARRIER WHERE SPECIFIED #4 @ 12" o/c MAX. WHEN D > 16" 6"6"7"1' - 0" 2. PROVIDE EPOXY COATED REBAR FOR EXTERIOR AND CORROSIVE INTERIOR ENVIRONMENTS (I.E. POOLS, GARAGES) SEE 17/S5.1 WHEN D > 3" #3 AT 18" o/c, ALL AROUND WITH STANDARD HOOKS. OPTION: DRILL AND EPOXY, 3 1/2" MIN. EMBED CHAMFER OR ROUNDED EDGE EQUIPMENT PADS CONCRETE FRAMED SLAB, SLAB ON GRADE, POURSTRIP, OR PRECAST FLANGE 6X6-W1.4 x W1.4 W.W.F. - PRECASTER SHALL RECESS MEMBERS TO CAST WITH POURSTRIP, OR PROVIDE CAST-IN-DOWELS. - COORDINATE W/ARCHITECTURAL, HVAC, PLUMBING & ELECTRICAL PLANS FOR LOCATION/DIMENSIONS. - PROVIDE EPOXY COATED BARS AT PARKING STRUCTURES AND EXTERIOR CONSTRUCTION.2"TYP2 - #3 CONTINUOUS ALL AROUND #3 CONTINUOUS #3 AT 12" #3 AT 12"BEND INWARD AT OPENING SEE PLANSEE PLAN6"'H'> 6"'H'6" < 6" #4 @ 12" CONTINUOUS, 2 MIN. (1' - 0" MIN. LAP). FOR 'H' > 12", #4 @ 8" o/c SIDE BARS #4 CONTINUOUS (1' - 0" MIN. LAP) PROVIDE CORNER BARS WHERE CURB CHANGES DIRECTION. FOR 'H' > 12, #4 @ 8" o/c - COORDINATE W/ ARCHITECTURAL, HVAC, PLUMBING & ELECTRICAL PLANS FOR LOCATION/DIMENSIONS. - PROVIDE EPOXY COATED BARS AT PARKING STRUCTURES AND EXTERIOR CONSTRUCTION. 1' - 0"1' - 0" NUT & WASHER @ END OF ANCHOR BOLT. TACK WELD #3 @ 18" o/c W/ STANDARD HOOK SCHEDULE ON S9.1 FOR PIER REINFORCING EXISTING FOUNDATION WALL EXTEND PIER AS NECESSARY TO ABUT EXISTING FOUNDATION WALL EXISTING STRIP FOOTING T/SLAB = SEE PLAN 20"8"1' - 9"3' - 0" AT F4.0/F6.5 1' - 6" AT F3.0 #5 DOWEL x 14" LONG @ 48" o/c. DRILL AND EPOXY 6" INTO EXISTING FOOTING OR WALL T/SLAB = SEE PLAN 6" CONC. WALL ON 3 SIDES W/ 1-#5 TOP & BOTTOM W/ CORNER BARS. DOWEL INTO BUILDING FOUNDATION. 5" THICK SLAB W/ WWF 6 x 6 W1.4 x W1.4 B/STOOP TO MATCH BUILDING B/FTG, BUT NEED NOT EXCEED 5' - 0" BELOW FINISH GRADE EPOXY COATED #4 @ 12" o/c, 2' - 0" V. X 2' - 0" H. 4 SIDES INTO STOOP SLAB, 2" COVER 12" MIN. COMPACTED FROST-RESISTANT DRAINAGE FILL SEE SPEC FOUNDATION WALL FOOTING BELOW STOOP AT CONTRACTORS OPTION. - UNLESS SHOWN OTHERWISE, PROVIDE SEALED CONTROL JOINTS PARALLEL TO THE SHORT DIRECTION OF THE STOOP AT A SPACING OF 2 TIMES THE SLAB WIDTH BUT NOT TO EXCEED 10 FEET ON CENTER. - EXTEND STOOPS A MINIMUM OF 18" PAST THE ROUGH OPENING ON THE PULL SIDE OF DOOR. PITCH PER ARCHITECTURAL 1/4" PER FOOT MIN. 4" MIN. EXPANSION FELT/THERMAL BREAK UNDER DOOR THRESHOLD DRILL & EPOXY (2) - #5 BARS x 30" LONG, 8" INTO EXISTING FOUNDATION. AT T/WALL & B/FOOTING LAP w/ HORIZONTAL REINFORCING T/FOUNDATION WALL SEE PLAN SEE PLAN NEW FOOTINGEXISTING FOOTING DRILL DOWELS TO MATCH WALL OR PIER REINFORCING 2" NON-METALLIC NON- SHRINK GROUT PLACE GROUT BEFORE PLACING ANY UPPER FLOORS. BOND BREAKER ON TROWELLED SURFACE ELEV. SEE PLAN - ADJUST ANCHOR BOLT LENGTH TO MAINTAIN 3" MIN. BOTTOM COVERAGE - WHERE BASE PLATES ARE NOT LARGE ENOUGH TO PLACE ANCHOR BOLTS OUTSIDE OF COLUMN FLANGES, PLACE ANCHOR BOLTS INSIDE. STEEL SUPPLIER TO DETAIL AND SUBMIT FOR APPROVAL. L OR W (SEE SCHEDULE FOR SIZE & REINFORCING) 3" CLEAR MIN. VAPOR BARRIER WHERE SPECIFIED - TURN UP AND SEAL VAPOR BARRIER AROUND COLUMNS PER MANUFACTURER'S DETAILS FOR PENETRATION. SEE DETAIL 13/S5.1 FOR BARS AROUND COLUMN 3" CLEAR"D" SEESCHEDULENUT & WASHER AT END OF ANCHORS BOLTS: TACK WELD (3) - #4 EACH WAY CONFINEMENT STEEL 4"2"ANCHOR BOLTS w/ 5" PROJECTION w/ LEVELING NUTS. PROVIDE PLATE WASHERS ABOVE BEARING PLATE PER SCHEDULE. 3/16 WASHER TO BASE PLATE SEE PLAN AND DETAILS FOR WALL REINFORCING HOOKED BARS TO MATCH SIZE & SPACING OF PIER TIES AT WALL INTERSECTION WITH PIER TIES, SEE CONCRETE PIER SCHEDULE VERTICAL PIER REINFORCEMENT, SEE CONCRETE PIER SCHEDULE BASE PLATE, SEE BASE PLATE SCHEDULE ANCHOR BOLT, SEE BASE PLATE SCHEDULE CONCRETE PIER RUN WALL REINFORCEMENT THRU PIER 8"1' - 3" SEE PLAN SEE PLAN AND DETAILS FOR WALL REINFORCING HOOKED BARS TO MATCH SIZE & SPACING OF PIER TIES AT WALL INTERSECTION WITH PIER, TYP. TIES, SEE CONCRETE PIER SCHEDULE VERTICAL PIER REINFORCEMENT, SEE CONCRETE PIER SCHEDULE ANCHOR BOLT, SEE BASE PLATE SCHEDULE RUN WALL REINFORCING THRU PIER BASE PLATE, SEE BASE PLATE SCHEDULE 8"SEE PLAN8" SEE PLAN CONCRETE PIER VERTICAL PIER REINFORCEMENT, SEE CONCRETE PIER SCHEDULE ANCHOR BOLT, SEE BASE PLATE SCHEDULE RUN WALL REINFORCING THRU PIER BASE PLATE, SEE BASE PLATE SCHEDULE 8" SEE PLAN TIES, SEE CONCRETE PIER SCHEDULESEE PLAN AND DETAILS FOR WALL REINFORCEMENT 0' - 7"SEEPLAN6" TYP. #5 EACH SIDE PROVIDE SIMILAR ISOLATION AT EXTERIOR WALLS - PROVIDE EPOXY COATED BARS AT EXTERIOR LOCATIONS AND IN POOLS PROVIDE 30# FELT AT COLUMN PERIMETER. PROVIDE SEALANT AT EXTERIOR CONDITIONS SLAB ON GRADE CONTROL OR CONSTRUCTION JOINT2" TYP.4' - 0" MIN. BLOCK/BRICK WALL BEYOND AT CORNERS OF SLAB, PROVIDE DIAGONAL REINFORCING PER GENERAL NOTES, SHEET S9.0 #4 @ 2' - 0" o/c 2' - 0" x 2' - 0" COMPACTED FROST RESISTANT DRAINAGE FILL. SEE SPEC. GALVANIZED L3 x 3 x 1/4", CONTINUOUS @ O/H GARAGE DOOR w/ 3/8"DIA X 4" HEADED STUDS @ 1' - 0" o/c (GALVANIZED) COORDINATE LOCATION w/ARCH. SEE DETAIL 8/S5.0 FOR FOUNDATION WALL AND FOOTING 1' - 0"1' - 6" 1' - 0"VAPOR BARRIER WHERE SPECIFIED. TURN DOWN AND SEAL TO FOUNDATION PER MANUFACTURER'S REQUIREMENTS TRENCH DRAIN CAST IN SLAB - SEE PLUMBING CONCRETE SLAB W/MESH PITCH 1/8" MIN PER FOOT TO DRAIN 2 - #5 CONTINUOUS #4 @ 18" o/c 2" COVER COMPACTED GRANULAR DRAINAGE FILL EXPANSION FELT W/ JOINT SEALANT - ALL BARS EPOXY COATED. - PROVIDE CONTROL JOINTS AT TRENCH DRAIN CONCRETE PERPENDICULAR TO DRAIN AT 8' - 0" o/c, FILL WITH SEALANT 8"8"45°1' - 0" SEE SECTION 17/S5.1 FOR BARS AROUND PERIMETER VAPOR BARRIER WHERE SPECIFIED. TURN UP AND SEAL TO FOUNDATION PER MANUFACTURER'S REQUIREMENTS PRECASTER BY VERTICAL PRECAST PANEL w/ (2) WELD ANCHORS PER PANEL AT BASE SHIMS AND GROUT BED BY PRECASTER SEE PLAN AND SCHEDULE CONTINUOUS ANGLES AND WELD PLATES BY PRECASTER PRIME w/ ZRC CONTINUOUS L4 x 4 x 3/8 w/ 1/2''∅x 4'' HEADED STUDS @ 24'' o/c. PRIME EXPOSED SURFACES w/ ZRC. - PRECASTER SHALL REVISE ATTACHMENT DETAILS AS REQUIRED AT SHEAR WALLS. SHEAR WALLS PANELS SHALL BE CONNECTED SO AS TO AVOID UPLIFT WITH A 1.5 SAFETY FACTOR. SLAB ON GRADE PRECASTER BY EXPANSION FELT DRAINAGE FILL - SUGGESTED DETAIL; ACTUAL DETAIL & ATTACHMENT MATERIALS BY PRECASTER. SEE PLAN SEE PLAN (1) - #5 BAR EACH FACE (1) - #5 x 4' - 0" EACH FACE AT EACH CORNER OPENING - SEE ARCHITECTURAL, MECHANICAL, AND PLUMBING PLANS FOR SIZES AND LOCATIONS 1' - 3 3/8" 2' - 0" EPS INSULATION MIN 15 PSI COMPRESSIVE STRENGTH T/SLAB SEE PLAN 4" CONCRETE SLAB REINFORCED WITH 6 x 6 - W1.4 x W1.4 WWF (OR MACRO-SYNTHETIC FIBERS) TYPICAL EXISTING SUBGRADE ELEV = (-0' - 4") COORDINATE WITH ARCH DRAWINGS 1 12 NEW SLAB ON GRADE T/SLAB ELEV (+0' - 0") 5' - 1 7/8" NEW SLAB ON GRADE EPS INSULATION MIN 15 PSI COMPRESSIVE STRENGTH T/SLAB ELEV +0' - 0" EXISTING SUBGRADE ELEV = (-0' - 4") 4" CONCRETE SLAB REINFORCED WITH 6 x 6 - W1.4 x W1.4 WWF (OR MACRO-SYNTHETIC FIBERS) TYPICAL T/SLAB SEE PLAN CONCRETE STAIRS SEE ARCHITECTURAL FOR TREAD DETAILS 3"#4 @ 12" o/c EACH WAY 4 3/4"6"(2) - #5 45°10"12" 2" NON-METALLIC, NON- SHRINK GROUT, PLACE GROUT BEFORE PLACING ANY UPPER FLOORS T/ PIER ELEV. SEE PLAN ACI STANDARD HOOK ELEV. (SEE PLAN) NUT & WASHER @ END OF ANCHOR BOLT, TACK WELD - COAT ALL EXTERIOR STEEL (E.G., CANOPY COLUMNS) W/ COAL TAR BELOW GRADE. VAPOR BARRIER WHERE SPECIFIED - TURN UP AND SEAL VAPOR BARRIER AROUND COLUMNS PER MANUFACTURER'S DETAILS FOR PENETRATION. 1 1/2" CLEAR COVER TO TIES 3" CLEARL. OR W. (SEE SCHEDULE FOR SIZE AND REINFORCING)"D"SEE SCHEDULE3 TIES @ 1 1/2" o/c, TOP - #4 U-BARS LAP 20" MIN. W/ VERT BARS (4 TOTAL), 2" TO TOP OF PIER SEE DETAIL 17/S5.1 FOR BARS AROUND COLUMN 0' - 2 3/8"- WHERE BASE PLATES ARE NOT LARGE ENOUGH TO PLACE ANCHOR BOLTS OUTSIDE OF COLUMN FLANGES, PLACE ANCHOR BOLTS INSIDE. STEEL SUPPLIER TO DETAIL AND SUBMIT FOR APPROVAL ALL EXTERIOR STEEL (E.G., CANOPY COLUMNS) W/ COAL TAR BELOW GRADE. CONNECTION BY PRECASTER NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S5.1 10/04/2023 220025.00 1 STEEL COLUMN ON CONCRETE PIER - MOMENT BASE OR BRACED FRAMES 2 SLAB ON GRADE DEPRESSION 3 TYPICAL EQUIPMENT PAD/ISLAND DETAIL 4 TYPICAL CURB DETAILS 5 NEW FOUNDATION AT EXISTING 6 CONCRETE STOOP DETAIL 7 NEW WALL & FOOTING AT EXISTING 8 STEEL COLUMN ON FOOTING 9 PLAN VIEW AT PIER ALONG WALL 10 PLAN VIEW AT PIER AT CORNER 11 PLAN VIEW AT PIER AT REENTRANT CORNER 13 JOINT AT COLUMN 14 EXTERIOR FOUNDATION WALL AT O.H. DOOR 15 TRENCH DRAIN 16 INTERIOR PRECAST WALL BEARING 17 TYPICAL OPENING OR DEPRESSION IN CONCRETE FLOOR SLAB OR WALL 18 LOWER STADIUM SEATING SECTION 19 STAGE SECTION 1 Date 1 Revision 1 12 STEEL COLUMN ON CONCRETE PIER 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET ICE RINK BY OTHERS DASHER BOARD BY OTHERS TO PERIMETER OF CONCRETE SEE PLAN 1' - 4"1' - 0" SLAB ON GRADE, SEE PLAN #5 DOWELS @ 2' - 0" o/c 10"3' - 0" (2) #5 x CONT, TOP & BOTTOM 100' -0" PRECAST STADIA BY PRECASTER SEE 14/S5.3 PRECAST CLOSURE BEAM BY PRECASTER 8" PRECAST SLAB BY PRECASTER BOND BEAM W/ (2) - #5 x CONT #5 VERT REINFORCING W/ DOWELS TO MATCH INTO FOOTING FOOTING, SEE PLAN CONNECTION TO PRECAST BY PRECASTER ICE RINK BY OTHERS DASHER BOARD BY OTHERS TO PERIMETER OF CONCRETE CMU WALL #5 VERT REINFORCING W/ DOWELS TO MATCH INTO FOOTING 99' -4" 2" GAP ICE RINK BY OTHERS DASHER BOARD BY OTHERS TO PERIMETER OF CONCRETE 100' -0"1' - 4"1' - 0" SLAB ON GRADE, SEE PLAN #5 DOWELS @ 2' - 0" o/c 10"3' - 0" (2) #5 x CONT, TOP & BOTTOM CONTINUOUS STRIP FOOTING. SEE PLAN & SCHEDULE BOND BEAM W/ (2) - #5 x CONT PRECAST STADIA BY PRECASTER CONNECTION TO PRECAST, BY PRECASTER #5 VERT @ 2' - 0" o/c W/ DOWELS TO MATCH INTO FOOTING SLAB ON GRADE, SEE PLAN RINK FLOOR SEE PLAN FIBERGLASS GRATING, AND DETAIL BY SUPPLIER - PIT MUST BE SIZED TO HOLD ONE SIMULTANEOUS LOAD FROM ALL MACHINES. VERIFY PIT SIZE WITH EQUIPMENT SUPPLIER. VERT #3 @ 12" o/c W/ HOOK AT TRENCH PERIMETER 2 1/2" WIDE x 1" DEEP SLOTS FOR SCREENS - SCREENS FURNISHED BY PLUMBING CONTRACTOR VERIFY REQUIREMENTS TRENCH (SLOPE 1/4"/FT MIN. TO DRAIN) WASHER ANCHOR BOLTS AS PER SUPPLIER #5 @ 12" o/c EACH WAY, TOP & BOTTOM, 3" COVER BOTTOM, 2" TOP - PROVIDE AN 8" THICK THICKENED SLAB AND #3 DOWELS x 2' - 0" @ 12" o/c, WHERE EQUIPMENT SUPPLIER REQUIRES SLAB TO BE MONOLITHIC WITH SLAB-ON-GRADE. DELETE EXPANSION JOINT. 1/2" EXPANSION JOINT ALL AROUND TO ISOLATE WASHER SLAB (VERIFY w/ SUPPLIER) THICKENED SLAB AND DOWELS, SEE NOTE BELOW SLAB ON GRADE - EQUIPMENT SUPPLIER MUST REVIEW AND APPROVE DETAILS SHOWN. - ALL BARS EPOXY COATED. 8"VERIFYVERIFY 8"4" TO 6", VERIFYWITH SUPPLIER20" MIN. AT LOW POINT,VERIFY W/ SUPPLIER(F.V.)X" TYP. (F.V.) EXISTING FOUNDATION WALL (FIELD VERIFY THICKNESS) T/EXISTING WALL XX'-X" (FIELD VERIFY) #5 DOWEL x 14" LONG @ 48" o/c DRILL & EPOXY 6" INTO EXISTING FOUNDATIONS AND WALL PRECAST WALL PANEL #3 @ 18" o/c w/ STANDARD HOOK 1' - 1 3/8"X" TYP.0' - 10 5 / 8 "8"X" SEE ARCH 4" (2) - #5 x CONTINUOUS TOP & BOTTOM 1 1/8"1"8" SEE PLAN Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S5.2 10/04/2023 220025.00 1 THICKENED SLAB AT DASHER BOARDS 2 SEAT WALL ADJACENT TO DASHER BOARDS 3 THICKENED SLAB AT DASHER BOARDS 4 CONCRETE SLAB AT SOFT MOUNT WASH MACHINES 5 NEW FOUNDATIONS AT EXISTING 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET BONDED TOPPING TYPICAL AT FLOORS, OMIT TOPPING AT ROOF PLANK, SEE PLANS PRECAST PLANK, SEE PLANS FOR THICKNESS AND LOADING WELD PLATES @ 4' - 0" o/c MAX. CONTINUOUS ANGLE DESIGNED, FURNISHED AND INSTALLED BY PRECASTER, 1/2" MIN. THICKNESS WELD PLATES SPACED AS REQUIRED. BY DESIGN BUT NOT TO EXCEED 4' - 0" o/c MAX. WITH SOLID BLOCKOUT AS REQUIRED. - IN ADDITION TO VERTICAL LOADS, CONNECTION SHALL BE DESIGNED TO TRANSFER WALL PANEL WIND LOADS PLUS SHEAR DIAPHRAGM LOADS = 300 PLF MINIMUM OR AS SPECIFIED ON PLAN. - ENTIRE CONNECTION DESIGN BY PRECASTER. FIREPROOF AND PROVIDE FIRESAFING AS REQUIRED FOR FIRE RATING. VERTICAL PRECAST PANEL - SEE ARCHITECTURAL FOR REVEALS IN EXTERIOR FACE. PRECAST WALL PANEL EMBED PLATE BY PRECASTER 1/2" x 10" x DEPTH OF BEAM + 4" MIN - SEE PLANS FOR SHEAR REACTIONS AT CONNECTION. IF NO REACTION IS PROVIDED ON PLAN, DESIGN FOR MINIMUM 12K SHEAR LOAD L3 x 3 x 1/4 x CONT. ON TOP OF BEAM FOR DECK SUPPORT ERECTION ANGLE AS REQUIRED BY STEEL ERECTOR BONDED TOPPING TYPICAL AT FLOORS, OMIT TOPPING AT ROOF PLANK, SEE PLANS SLOTTED INSERT & STRAP @ 4' - 0" o/c, TWO PER VERTICAL PANEL MIN. PRECAST PLANK, SEE PLANS FOR THICKNESS AND LOADING PLATE CAST INTO PRECAST PLANK - CONNECTION SHALL BE DESIGNED TO TRANSFER WALL PANEL WIND LOADS PLUS SHEAR DIAPHRAGM LOADS = 300 PLF MINIMUM OR AS SPECIFIED ON PLAN. - ENTIRE CONNECTION DESIGN BY PRECASTER. FIREPROOF AND PROVIDE FIRESAFING AS REQUIRED FOR FIRE RATING. VERTICAL PRECAST WALL PANEL - SEE ARCHITECTURAL FOR REVEALS IN EXTERIOR FACE. NOTES: 1. INSTALL JOINT REINFORCEMENT IN THE FIRST AND SECOND BED JOINT ABOVE LINTELS AND BELOW SILLS AT OPENINGS 2. EXTEND REINFORCEMENT IN THE SECOND BED JOINT BELOW OPENING 2' - 0" BELOW THE JAMBS 4. GROUT CELLS WITH REINFORCING SOLID. SEE 19/S5.3 1-#5 MINIMUM EXCEPT WHERE MASONRY PIERS ARE SPECIFIED AT EVERY OPENING MASONRY PIERS, SEE PLANS VERTICAL REINFORCEMENT - SEE PLANS OR SCHEDULE LINTEL: SEE PLANS AND SCHEDULE FOR SIZE, SEE MASONRY GENERAL NOTES FOR BEARING LENGTH NOTE 2 19 1/4"BAR LAP SEE SCHEDULERUN BAR TO UNDERSIDE OF STEEL BEAM BEARING, RUN BAR THRU MASONRY OR PRECAST LINTEL. EXTEND MP BARS PAST END OF LINTEL FOOTING 3. PROVIDE (1)-#5 MINIMUM AT END OF WALL AND EACH SIDE OF VERTICAL CONTROL JOINTS UNLESS MASONRY PIERS ARE SPECIFIED HORIZONTAL JOINT REINFORCING @ 16" o.c. U.N.O. SEE 8/S5.3 NOTE 1 NOTE 1 NOTE 3 NOTE 3 S5.3 11 S5.3 17 1" MAX - SEE PLAN 5" #4 DOWEL AT 4' - 0" o/c (STAGGERED ON BOTH SIDES) POUND INTO HOLE BY PRECASTER. EMBED 5" MIN. INTO BOND BEAM. PC PLANK w/ GROUTED KEYWAYS AND BUTT JOINTS BEARING STRIPS BY PRECASTER BOND BEAM w/ 2 - #5 CONTINUOUS LAP 2' - 6" CUT BLOCK AS REQUIRED SEE PLAN FOR MASONRY WALL OR PIER REINFORCEMENT SEE PLAN FOR WALL OR PIER REINFORCING BOND BEAM w/(2) - #5 CONTINUOUS LAP 2' - 6" MIN. #4 DOWEL @ 4' - 0" o.c. POUND INTO HOLE BY PRECASTER - DRYPACK GROUT BELOW PLANK BY MASONRY CONTRACTOR FOR GAP OVER 1/2 INCH. CUT BLOCK AS REQUIRED DRILL 1/2" DIA HOLE THRU PLANK AND 5" MIN INTO BOND BEAM. DRYPACK GROUT BELOW PLANK BY MASONRY CONTRACTOR FOR GAP OVER 1/2 INCH 3" 5" SEE PLAN BOND BEAM W/(2) - #5 CONTINUOUS LAP 2' - 6" MIN. SEE PLAN FOR WALL OR PIER REINFORCING #4 DOWEL @ 4' - 0" o/c POUND INTO HOLE BY PRECASTER BEARING STRIPS BY PRECASTER CUT BLOCK AS REQUIRED.P.C.PLANKSEE PLAN DRILL 1/2"Ø HOLE THRU PLANK AND 5" MIN. INTO BOND BEAM 2 1/2" MIN. - LAP 6" MIN. AT OTHER WALL SPLICES. PREFAB CORNERS AT 16" o.c. VERTICAL, U.N.O. HORIZONTAL WALL REINF. AT 16" o.c. VERTICAL, U.N.O. PREFAB TEE AT 16" o.c. VERTICAL, U.N.O. LAP 2' - 4"2' - 8" 2' - 8"0"0"3' - 0"28" 32" 32" FOR 16" DEEP LINTELS OR DEEPER, 1/4" DIA. BENT WIRE ROD @ 24" o/c FOR MASONRY TRIANGULAR TIES.MASONRY COURSING SOLID GROUT AREA AND REINFORCING PER PLAN OR MASONRY GENERAL NOTES ELEVATION - BACKPATCH SOLID AT BEAM POCKET SEE GENERAL NOTES FOR BEARING REQUIREMENTS SOFT JOINT ABOVE BRICK OR BLOCK w/ SEALANT EXTEND STEEL BEAM BOTTOM PLATE FULL LENGTH FOR 12" DEEP BEAMS OR GREATER, PROVIDE 1/4" STIFFENER PLATE EACH SIDE SLOTTED HOLES AND FINGER TIGHT NUTS 3/8" DIA. STUDS. SEE LINTEL SCHEDULE. - WHERE BEAMS FRAME INTO STEEL COLUMNS FACED BY MASONRY, CAULK ABOVE BRICK OR BLOCK BELOW BEAM AS SHOWN ABOVE - SIMILAR FOR CONCRETE WALLS. - CONTRACTOR OPTION TO ANCHOR BOLTS: PROVIDE (2) - 1/2" DIA. x 4" HEADED STUDS WELDED TO BOTTOM OF PLATE. PROVIDE (2) - 3/4" DIA. THREADED STUDS TO TOP OF PLATE WITH NUT AND WASHER. 11 1/2" 19 1/2" BEARING PLATE 5/8" x 6" x 8" U.N.O. w/ (2) - 3/4" DIA. x 1' - 4" x 3" ANCHOR BOLTS WITH NUT & WASHER ON 3/4" GROUT. PROVIDE 3" LONG SLOTTED HOLES IN BEAM, FINGER TIGHTEN NUT. EXTEND VERTICAL REINFORCING (GROUTED SOLID) TO TOP COURSE OF WALL ABOVE TOP BARS PER SCHEDULE, LAP PER GENERAL NOTES BOND BEAM BLOCK AT TOP OF LINTEL VERTICAL BARS PER MASONRY LINTEL SCHEDULE w/ STANDARD HOOK INTO U-BLOCK BELOW. U-BLOCK ONLY AT HEAD OF OPENING BOTTOM BARS PER SCHEDULE, LAP PER GENERAL NOTES NOTE: BARS TO BE CONTINUOUS WITH MOMENT LAP SPLICE FOR MULTIPLE SPANS, DO NOT INTERRUPT BARS AT INTERMEDIATE BEARING POINTS. BEAR LINTELS 16" AT END OF SPANS.DEPTH PER MASONRY LINTELSCHEDULE GROUT COMPLETELY SOLIDWALL WIDTH SEE PLAN 4"BACKER ROD CAULK 2" LADDER OR TRUSS TYPE HORIZONTAL JOINT REINFORCEMENT DOES NOT GO THRU JOINT STANDARD FLUSH END SASH BLOCK COMPLETELY CLEAR AIRSPACE OR FILL WITH EXTENDED GASKET PREFORMED 80 DUROMETER PVC OR RUBBER GASKET - BOND BEAMS SHALL BE DISCONTINUOUS AT CONTROL JOINTS - SEE ARCHITECTURAL DRAWINGS FOR BRICK EXPANSION/CMU CONTROL JOINT LOCATIONS. UNLESS SHOWN OTHERWISE: MAXIMUM JOINT TO CORNER DISTANCE SHALL NOT BE LESS THAN 2 FEET OR EXCEED 10 FEET. MAXIMUM JOINT TO JOINT SPACING SHALL NOT EXCEED THE LESSER OF 25 FEET OR 2 TIMES THE WALL HEIGHT FOR SHORT HEIGHT WALLS BELOW OR BETWEEN WINDOWS AND AT PARAPETS. JOINTS SHOULD BE LOCATED AT CRITICAL LOCATIONS SUCH AS (BUT NOT LIMITED TO) CHANGES IN BUILDING HEIGHTS, CHANGES IN FRAMING SYSTEMS, COLUMNS BUILT INTO EXTERIOR WALLS, MAJOR WALL OPENINGS, AND CHANGES IN MATERIALS. 3/8" C.I.P. OR PRECAST CONCRETE SURFACE FIRESAFING OR INSULATION AS REQUIRED BY ARCHITECT. PROVIDE SEALANT AT EXTERIOR WALLS AND FOR WALLS EXPOSED TO VIEW - SIMILAR AT STEEL SUPPORTS. WELD ANGLES TO STRUCT. w/ 3/16" x 2" FILLETS. - GROUT SOLID (1) - #5 TO TOP OF WALL AT EACH SIDE OF ALL OPENINGS (HVAC), DOORS AND WINDOWS, UNLESS NOTED OTHERWISE. - ANGLE AND SCREWS SUPPLIED BY STEEL SUPPLIER INSTALLED BY MASON. L4" x 4" x 1/4" x 8" EACH SIDE @ 4' - 0" o/c w/ (2)-1/4"Ø x 1.75" TAPCON CONCRETE SCREWS, 5" GAGE, 1 1/4" MIN. EMBEDMENT (4) TOTAL 1" GAP MIN1 1/2" MAX1/2" MIN.3"2 "2 "1" MAX.BOTTOM OF STEEL DECK #10 x 16 SELF TAPPING SCREW FIELD BEND ONE SIDE FIRESAFING OR INSULATION AS REQUIRED BY ARCHITECT - GROUT SOLID (1) - #5 TO TOP OF WALL AT EACH SIDE OF ALL OPENINGS (HVAC), DOORS AND WINDOWS, UNLESS NOTED OTHERWISE. 12 GA. SPACING @ 4' - 0" o/c PRE-DRILLED HOLES CONTINUOUS L3" x 3" x 1/4" w/ 1/2" DIA. x 5 1/2" HILTI KWIK BOLTS AT 2' - 0" o/c (OR 1/2" x 5" HUS-EZ SCREW ANCHOR ATTACHMENT GROUT COURSE SOLID FULL LENGTH FOR ANCHOR ATTACHMENT BOND BEAM w/ (2) - #5 CONTINUOUS (LAP 2' - 6") 1 1/2" METAL ROOF DECK WELDED TO ANGLE AT 6" o/c SEE PLAN FOR WALL THICKNESS AND REINFORCING - EXPANSION BOLTS MUST BE INSTALLED A MINIMUM OF 1 3/8 FROM ANY VERTICAL MORTAR JOINT. PLACE FIRST ANCHOR 12" FROM END OF WALL AT PARAPETS: BOND BEAM W/(2) - #5 CONTINUOUS LAP 2' - 6". EXTEND VERTICAL REINFORCING 4" INTO BOND BEAM - ATTACH ROOF DECK TO ANGLE IN EACH FLUTE: 6" o/c FOR 1 1/2" DECK, 8" o/c FOR 3" DECK - CONTINUOUS ANGLE SHALL BE BUTT WELDED AT JOINTS OR EQUIVALENT AREA SPLICE PLATES TO DEVELOP TENSION CAPACITY AS DECK DIAPHRAGM CHORD MEMBERS CMU WALL B/LINTEL SEE PLANS LINTEL AT STEEL LINTELS - STOP REINFORCING UNDER BEARING, ADJACENT BARS TO BE CONTINUOUS TO FLOOR OR ROOF ABOVE PROVIDE GAP ABOVE BRICK BELOW LINTEL (AND ANGLES ATTACHED TO LINTEL). FILL WITH BACKER ROD AND SEALANT AT BOND BEAM LINTELS - RUN VERTICAL REINFORCING THRU. ROOF DECK MASONRY WALL - VERIFY MINIMUM POCKET WIDTH REQUIRED WITH JOIST SUPPLIER. - FILL OPENING AS REQUIRED BY ARCHITECT WITH FIRESAFING INSULATION OR OTHER NON-BEARING MATERIAL. LOW-LIFT GROUTING HIGH-LIFT GROUTING HIGH-LIFT GROUTING HIGH-LIFT GROUTING MAX WALL HEIGHT 1ST POUR MAX WALL HEIGHT 2ND POUR 5'-0" POUR AND 5'-0" LIFTLAPLAP5'-0" POUR AND 5'-0" LIFTNEXT POUR AND LIFT- NO CLEANOUTS REQUIRED - WALL BUILT IN 3 STAGES - BARS SPLICED AT POUR HEIGHTS (10/SPLICES) - GROUT PER ASTM C476 - SLUMP 8"-11"5'-0" POUR AND 5'-0" LIFTLAP5'-0" POUR AND 5'-0" LIFT2'-8" POUR AND2'-8" LIFT- CLEANOUTS REQUIRED - WALL BUILT IN FULL HEIGHT - BARS INSTALLED FULL LENGTH (NO SPLICING) - GROUT PER ASTM C476 - THREE GROUT LIFTS REQUIRED IF: 1 SLUMP NOT 10"-11" 2 WALL NOT CURED FOR 4 HRS MAXIMUM 12'-8" POURLAP- CLEANOUTS REQUIRED - WALL BUILT IN FULL HEIGHT - BARS INSTALLED FULL LENGTH (NO SPLICING) - GROUT PER ASTM C476 - ONE GROUT LIFT IF: 1 SLUMP 10"-11" ONLY 2 WALL NOT CURE3 FOR 4 HRS MIN MAXIMUM 12'-8" POUR AND 12'-8" LIFTLAP- CLEANOUTS REQUIRED - WALL BUILT IN FULL HEIGHT - BARS INSTALLED FULL LENGTH (NO SPLICING) - ONE GROUT LIFT - SELF CONSOLIDATING GROUT (SCG)MAXIMUM 24'-0" POUR AND 24'-0" LIFT- SLUMP 21"-30" - GROUT DEMONSTATION PANEL REQUIRED31 1/4"60"31 3/4"63 5/8"36" 31 1/4" 60" 63 7/8" 35 3/4" 159 5/8"31 1/4"159 5/8" 31 1/4" 159 5/8" CONCRETE COLUMN OR WALL 3/16" DIA. GALVANIZED TRIANGULAR MASONRY TIE @ 16" o/c GROUT SOLID DOVETAIL ANCHOR SLOT L3 x 3 x 3/8 x CONT PLATE 3/8" x 5" x 8" w/ (2) - 3/8" DIA. x 4" HWS AT PARAPETS: BOND BEAM W/(2) - #5 CONTINUOUS LAP 2' - 6". EXTEND VERTICAL REINFORCING 4" INTO BOND BEAM SEE PLAN FOR WALL THICKNESS AND REINFORCING BOND BEAM w/ (2) - #5 CONTINUOUS (LAP 2' - 6") 1/2" 5" 1/8" x 1" FOR K SERIES 1/4" x 2" FOR OTHERS - ATTACH ROOF DECK TO ANGLE IN EACH FLUTE: 6" o/c FOR 1 1/2" DECK, 8" o/c FOR 3" DECK - CONTINUOUS ANGLE SHALL BE BUTT WELDED AT JOINTS OR EQUIVALENT AREA SPLICE PLATES TO DEVELOP TENSION CAPACITY AS DECK DIAPHRAGM CHORD MEMBER 3/16" - BACKPATCH JOIST POCKET SOLID - EXTEND PRECAST BEYOND EDGE AS REQUIRED FOR ARCHITECTURAL REQUIREMENTS. WELD ANCHOR AT 4' - 0" o.c. BY PRECASTER3/16 WELD ANCHOR AT 4' - 0" o.c. ± STAGGERED EACH SIDE NOTE: IN MULTIPLE BAYS, PLACE 2 ANCHORS IN ONE SLAB AND PLACE ANCHORS IN OPPOSITE ENDS OF ADJACENT SLABS GROUTED BUTT JOINT W.W.F. 1" MIN 3/16 #4 @ 12" o/c x 8' - 0", 3/4" COVER BY PRECASTER ANCHOR @ 16'' o/c BLOCK WALL CONTINUOUS DOVETAIL SLOTS REQUIRED IN CONCRETE COLUMNS FOR ALL MASONRY WALLS NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S5.3 10/04/2023 220025.00 1 PRECAST PLANK SUPPORT AT PRECAST PANELS (LOAD BEARING)2 STEEL BEAM CONNECTION AT PRECAST WALL PANEL 3 PRECAST PLANK SUPPORT AT PRECAST PANELS (NON-LOAD BEARING)4 TYPICAL CMU WALL ELEVATION 5 PRECAST PLANK BEARING 6 PRECAST PLANK SIDELAP 7 PRECAST PLANK BEARING 8 HORIZONTAL MASONRY WALL REINFORCEMENT 11 STEEL BEARING ON MASONRY 12 DEEP MASONRY LINTEL DETAIL 13 MASONRY BLOCK CONTROL JOINT 14 LATERAL SUPPORT AT TOP OF NON-BEARING MASONRY WALL 15 LATERAL SUPPORT AT TOP OF NON-BEARING WALL 16 DECK SUPPORT AT MASONRY WALL 17 PIER/WALL REINFORCING AT LINTEL BEARING 18 STEEL JOIST POCKET IN CMU WALL 19 COMPARISON OF GROUTING METHODS FOR CONCRETE MASONRY WALL 20 CMU WALL JOINT AT CONCRETE COLUMN OR WALL 21 JOIST BEARING ON MASONRY 9 PRECAST PLANK BEARING 10 PRECAST PLANK BEARING 22 TYPICAL PC PANEL/MASONRY INTERSECTION 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 6" 6"2" MIN. LAPDECK LENGTH 3 SPAN MIN.SU P P O R T PE R IM . C LC L. JO IS TC L. JO ISTC L. JO IS T36" WIDE DECK WELD END VIEW INTERMEDIATE SUPPORT - NOTE: 5 WELDS PER SHEET ARE REQUIRED IN EXACT LOCATIONS SHOWN OR ADDITIONAL WELDING WILL BE REQUIRED - CONTRACTORS OPTION: 30" WIDE ROOF DECK w/ 30/4/2 PATTERN WELD DECK AT 6" o.c.. TO JOIST AT END LAP 3 - #10 TEK SCREWS PER SPAN AT SIDE LAPS (TYPICAL) 5 - 5/8" DIA. PUDDLE WELDS TO JOISTS AT INTERMEDIATE SUPPORTS (TYPICAL) WELD DECK AT 6" o.c.. AT PERIMETER SUPPORTS TO STRUCTURE INCLUDING SIDE LAPS REQUIRED MINIMUM DECK DIAPHRAGM CAPACITY =740 PLF (ULT) ANGLE TO ANGLE CONNECTION L3 x 3 x 5/16 L6 x 4 x 5/16 SIDE FRAME ANGLE L3 x 3 x 5/16 (4 SIDES) - DIMENSIONS "A" & "B" BY TRADE CONTRACTOR OR ROOF SUMP SUPPLIER - SEE ARCHITECTURAL OR MECHANICAL/PLUMBING/ELECTRICAL FOR LOCATION, SIZE AND QUANTITY REQUIRED - DETAIL TYPICAL AT OPENINGS GREATER THAN 10", INCLUDING ROOF DRAIN/SUMPS AND HATCHES L6 x 4 x 5/16 x 0' - 6" SIDE FRAME ANGLE MAY BE OMITTED WHEN DIM. IS 6" OR LESS 3' - 8""A""B" 1' - 2" - DETAIL APPLIES TO METAL CENTERING OR ROOF DECK. .. 1/4" FIELD VERIFY CLEAR DIMENSION BETWEEN JOIST TOP CHORD OR BEAM FLANGE MINUS 1" 3/16 JOIST OR BEAM - ATTACHMENTS TO FRAMES FOR LADDERS AT ROOF HATCHES SHALL INCLUDE VERTICAL SLIP CONNECTION TO ALLOW ROOF DEFLECTIONS. NOTE: FOR OPENINGS GREATER THAN 13", FRAME OPENING w/ C6 x 8.2 5/8" DIA. PUDDLE WELDS @ 8" o.c.. TO JOISTS, AT INTERMEDIATE SUPPORTS, ALL FLUTES C L.REINFORCE OPENINGS < 13" w/ 16 GA. COVER PLATE WELDED OR SCREWED TO DECK AS SHOWN C L. JO IS TDECK LENGTH 3 SPAN MINIMUM8"(7) - #10 TEK SCREWS PER SPAN @ SIDELAPS (TYP. U.N.O.) C L. JO ISTC L.8" WELD DECK AT 8" o.c. AT END LAPS AND AT ALL PERIMETER SUPPORTS (E.G. ANGLES AND BEAMS) REQUIRED MINIMUM DECK DIAPHRAGM CAPACITY = 500 PLF (ULT) CHANNEL TO ANGLE CONNECTIONCHANNEL TO CHANNEL CONNECTION C6 x 13 BENT PLATE 7 x 7 x 5/16 x 0' - 6" C6 x 13 BENT PLATE 7 x 7 x 5/16 x 0'-6" C6 x 13 C6 x 13 SIDE FRAME SIDE FRAME C6 MAY BE OMITTED WHEN DIM IS 6" OR LESS - SEE ARCHITECTURAL, MECHANICAL/PLUMBING/ELECTRICAL FOR LOCATION, SIZE & QUANTITY REQUIRED. - DETAIL TYPICAL AT OPENINGS GREATER THAN 10", INCLUDING ROOF DRAIN/SUMPS AND HATCHES - DIMENSIONS "A" & "B" BY TRADE CONTRACTOR OR ROOF SUMP SUPPLIER."A""B" 1' - 1 1/2" CLEAR DIMENSION BETWEEN JOIST TOP CHORD OR BEAM FLANGE .. 1/4 .. 1/4 JOIST OR BEAM JOIST HANGER FOR HVAC, PLUMBING FIRE PROTECTION. ETC. @ EA. JOIST 2 - L'S L 1 1/2 x 1 1/2 x 3/16 BRACE EACH SIDE BY STRUCTURAL STEEL ERECTOR (UNLESS C6 x 13 LANDS AT TOP CHORD PANEL POINT.) - NO L BRACE REQUIRED IF LOAD OCCURS WITHIN 3" OF JOIST PANEL POINT CENTERLINE. OR IF LOAD IS LESS THAN 100 LBS. HUNG LOADS MUST BE APPLIED CONCENTRICALLY ON A JOIST CHORD SO LOAD IS APPLIED TO BOTH ANGLES EQUALLY. - DETAIL APPLIES TO LOADS ABOVE OR HUNG BELOW JOISTS. SEE GENERAL NOTES FOR HANGER SPACING FOR PIPING. FOR PIPING PLACED PARALLEL TO JOISTS USE A SPREADER ANGLE OR UNISTRUT TO DISTRIBUTE LOAD INTO MINIMUM OF TWO JOISTS. FOR ROOF FRAMING PLACEMENT OF ANY PIPING IN EXCESS OF 4" DIA OR EQUIVALENT WEIGHT IN PIPE GROUPING OF SMALLER DIAMETER IS SUBJECT TO APPROVAL OF ARCHITECT/ENGINEER - WHERE IT IS REQUIRED TO REMOVE JOIST BRIDGING FOR DUCTS, PROVIDE L 1 1/2 x 1 1/2 x 3/16 CROSS BRACING ON EACH SIDE OF DUCT. CURB BY HVAC CONTRACTOR ANY STEEL FRAMING REQUIRED ABOVE CHANNEL FOR SUPPORT OF ROOF TOP UNIT SHALL BE SUPPLIED BY HVAC CONTRACTOR C6 x 13 AT 1 1/2" WIDE RIB ROOF DECK, MC8 x 21.4 AT 3" ROOF DECK - COORDINATE EXACT LOCATION W/ HVAC CONTRACTOR - IF JOIST CHORD THICKNESS IS LESS THAN 3/16" THAN USE AN EQUIVALENT 1/8" WELD. .. 3/16 2" .. 3/16 1" - WHERE THE LONG DIRECTION OF THE RTU IS PERPENDICULAR TO SPAN OF CHANNELS, ADD ADDITIONAL CHANNELS TO LIMIT CURB SPAN TO 4 OR 5 FEET. ROOF FRAMING. STEEL JOISTS SHOWN BUT APPLIES TO ALL TYPES OF STRUCTURE INCLUDING WOOD TRUSSES BY SPRINKLER PIPE SUPPLIER 6" DIAMETER SPRINKLER PIPE W/ HANGER - ALL 6" DIA SPRINKLER PIPE MUST BE SUPPORTED EQUALLY BY TWO ROOF MEMBERS. - 4" DIA. PIPES OR SMALLER MAY BE HUNG FROM ONE ROOF MEMBER EXCEPTION: HANG 4" PIPE FROM TWO WOOD TRUSSES EQUALLY, AS SHOWN ABOVE FOR 6" PIPE. - 8" DIA. OR LARGER HORIZONTAL SPRINKLER PIPES ARE NOT ALLOWED. - SCHEDULE 10 PIPING IS REQUIRED FOR 2 1/2" DIA. PIPES OR GREATER. EQEQ 2' - 0"2' - 0" - SEE SECTION X/SX FOR ANGLE STRUTS, NOT SHOWN ECCENTRICALLY LOADED JOIST - NOT ALLOWED CONCENTRICALLY LOADED JOIST - ALLOWED HANGER RODHANGER ROD ROWS OF BOLTS BEAM W21,W24 W18 W12,W14 W16 W8,W10 SIZE 5 6 3 4 2 BEAM SIZE AS NOTED ON PLANS DOUBLE ANGLE AT COLUMNS, SINGLE ANGLE FOR PURLINS TO INTERIOR GIRDERS. STANDARD COPE AS REQUIRED - CONNECTION DESIGN BY FABRICATOR. SEE PLAN FOR LOADS AND SPEC 05 10 00 FOR ADDITIONAL REQUIREMENTS. TUBE COLUMN OF SIDE WELD STOP 1" SHORT tw BEAM WEB ST 5 CONNECTION - OFFSET SO BEAM LOADS COLUMN CONCENTRICALLY FOR BEAMS FRAMING IN AT 90°, USE ST IF FITS OTHERWISE ANGLE OR BENT PLATE. THICKNESS > tw OF BEAM -tw OF ST > tw OF BEAM -PROVIDE HORIZ. SHORT SLOTTED HOLES 3/8" MIN. PROVIDE MAX. NUMBER OF 1" DIA. A325 BOLTS POSSIBLE IN SINGLE LINE (3" SPACING) .. 3/16 .. 3/16 - CONNECTION DESIGN BY FABRICATOR. SEE PLAN FOR LOADS AND SPEC 05 10 00 FOR ADDITIONAL REQUIREMENTS. .. L3 x 3 x 1/4 x CONT - PITCH ANGLE AND EMBED PLATE WHERE REQUIRED 1/2" x 8" x 8" EMBED PLATE @ 4' - 0" o/c, 2" MIN. PER PANEL. - SIMILAR AT PRECAST BEAMS - SIMILAR AT CAST CONCRETE WALLS. PROVIDE (4) 1/2" DIA x 5" HWS PER EMBED PLATE ROOF DECK 3/16"4"TOP & BOTTOM 1' - 1 1/2"PRECASTER TO VERIFY PRECAST WALL - ATTACH ROOF DECK TO ANGLE IN EACH FLUTE: 6" o/c FOR 1 1/2" DECK, 8" o/c FOR 3" DECK - CONTINUOUS ANGLE SHALL BE BUTT WELDED AT JOINTS OR EQUIVALENT AREA SPLICE PLATES TO DEVELOP TENSION CAPACITY AS DECK DIAPHRAGM CHORD MEMBER SEE PLAN SEE PLAN PRECAST WALL CONNECT BRIDGING AT INTERSECTION W/ WELD OR BOLT X- BRIDGIN G JOIST BRG ELEV. (SEE PLAN) JOISTS (SEE PLAN) VERIFY W/ ARCH PRECAST WALL T & B WELD PLATE BY PRECASTER L6 x 4 x 1/2 x 0'-8" (LLV) BEARING SEAT WITH 3/8" STIFFENER 10" 1/4 8 3/16"3" - SUGGESTED DETAIL; ACTUAL DETAIL BY PRECASTER. IF POCKETS ARE USED OR REQUIRED BY DESIGN, BACKPATCH POCKET SOLID. CONTINUOUS L4 x 4 x 1/4 BY STEEL SUPPLIER - ATTACH ROOF DECK TO ANGLE IN EACH FLUTE: 6" o/c FOR 1 1/2" DECK, 8" o/c FOR 3" DECK - CONTINUOUS ANGLE SHALL BE BUTT WELDED AT JOINTS OR EQUIVALENT AREA SPLICE PLATES TO DEVELOP TENSION CAPACITY AS DECK DIAPHRAGM CHORD MEMBER 3/16"3"SEE PLAN - JOISTS TO BE CENTERED ON PRECAST PANEL CENTERLINE. 1'-0" LONG BLOCKOUT IN PRECAST WALL FOR JOIST BEARING (BY PRECASTER FILL SOLID WITH CONC. OR MASONRY FOR FULL HEIGHT AFTER JOIST INSTALLED CONTINUOUS L4 x 4 x 1/4 BY STEEL SUPPLIER PITCHED TOP CHORD DLH JOISTS (SEE PLAN) 1 1/2" x 8" WIDE x 10" LONG BEARING PLATE. THE BEARING PLATE CONNECTION TO PANELS BY PRECASTER. VERIFY W/ARCH'L 7 1/2" JOIST SEAT INSULATED PRECAST WALL PANELS JOIST BRG ELEV. (SEE PLAN) 8" 3/16"3" 3/16" - ATTACH ROOF DECK TO ANGLE IN EACH FLUTE: 6" o/c FOR 1 1/2" DECK, 8" o/c FOR 3" DECK - CONTINUOUS ANGLE SHALL BE BUTT WELDED AT JOINTS OR EQUIVALENT AREA SPLICE PLATES TO DEVELOP TENSION CAPACITY AS DECK DIAPHRAGM CHORD MEMBER EMBED PLATE 4' - 0" o.c. MAX. MIN. 2 PER 8' - 0" PANEL DESIGNED BY PRECASTER SEE PLAN NOT ALLOWED ALLOWED - CONTRACTOR OPTION: TO HANG FROM ROOF DECK WITHOUT ADDED SUPPORTS, PROVIDE STAMPED CALCULATIONS INCLUDING CONNECTION AND DECK ADEQUACY STEEL STUDS METAL ROOF DECK STEEL STUDS METAL ROOF DECK COLD-FORMED SUPPORT TO JOISTS OR OTHER STRUCTURE @ 4' - 0" o.c. - HANGING STUD WALLS OR BULKHEADS FROM METAL ROOF DECK IS NOT ALLOWED - SUGGESTED SUPPORT SYSTEM - SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS WHERE STUD WALLS ARE HUNG - SIMILAR RESTRICTIONS APPLY TO UNISTRUT. SEE PLAN (AS INDICATED BY ON FRAMING PLANS) tw= WEB THICKNESS 1/4" PLATE EACH SIDE. GREATER OF tw/2 OR 1/4" PLATE EACH SIDE. PROVIDE SHIM PLATE AS REQUIRED. TO MATCH THICKER BEAM WEB. 1/2" CAP PLATE w/ (4) 3/4" DIA. A325 BOLTS 2 ROWS OF BOLTS FOR 8" OR 10" WF 3 ROWS OF BOLTS FOR 12" OR 14" WF 4 ROWS OF BOLTS FOR 16" WF 5 ROWS OF BOLTS FOR 18" WF 6 ROWS OF BOLTS FOR 21" OR 24" WF - CONNECTION DESIGN BY FABRICATOR. SEE PLAN FOR LOADS AND SPEC 05 10 00 FOR ADDITIONAL REQUIREMENTS. DECK COVER PLATE WHERE DECK DOES NOT OVERLAP BY DECK SUPPLIER - STAGGER LH JOISTS AS REQUIRED FOR MINIMUM BEARING REQUIREMENTS. .. 1/8" x 1" FOR K SERIES 1/4" x 2" FOR OTHERS 1/4" - EXTEND SEAT AND BEAR ON BEAM CENTERLINE WHERE JOISTS FRAME IN FROM 1 SIDE ONLY. 1/4" 1/2" DIAMETER BOLTS AT JOIST NEAREST COLUMNS .. 3/16TYP L2 x 2 x 3/16 BRACE FROM BEAM BOTTOM FLANGE TO TOP CHORD PANEL POINT @ LOCATIONS INDICATED BY ( ) ON PLANS CONTINUOUS 1/4" ANGLE EXTEND JOIST SEAT AS REQUIRED (SEE ARCHITECTURAL DRAWINGS) SLAB THICKNESS PLUS 1" .. 3/16 ..1/8" x 1" FOR K SERIES 1/4" x 2" FOR OTHERS - EDGE ANGLES AND BENT PLATES SHALL BE FIELD INSTALLED AND STRING LINE STRAIGHT AND PLUMB FLOOR TO FLOOR. ERECTION TOLERANCE 1/4 INCH FROM PLAN DIMENSIONS. BUTT WELD EDGE ANGLES AT ALL LOCATIONS TO FORM A CONTINUOUS MEMBER. 3" MIN 1" 1/4" - DETAIL APPLIES WHEREVER DECK CHANGES DIRECTION. DECK COVER PLATE BY DECK SUPPLIER HSS 2 1/2" x 2 1/2" x 1/4" CONT. WELD TO BEAM FOR DECK SUPPORT BEAM SIZE AS NOTED ON PLAN .. 1/8" x 1" FOR K SERIES 1/4" x 2" FOR OTHERS W12 x 53 PRECAST FLOOR PLANK STIFFENER PLATE 3/8" PLATE 3/8" x 13" x 8" W/ (2) - 3/8" DIA x 4" HWS CENTERED ON WALL BOND BEAM W/ (2) - #5 x CONTINUOUS (LAP 2' - 6") 0' - 8"SEE PLAN FOR WALL THICKNESS AND REINFORCING 0' - 8" SEE PLAN FOR WALL THICKNESS AND REINFORCING STIFFENER PLATE 3/8" PLATE 3/8" x 13" x 8" W/ (2) - 3/8" DIA x 4" HWS CENTERED ON WALL BOND BEAM W/ (2) - #5 x CONTINUOUS (LAP 2' - 6") PRECAST ELEMENTS (BY OTHERS C9 x 15 TYP 3/16" 3/16" - WHERE MASONRY CONTINUES UPWARD, BACKPATCH POCKET SOLID - SAMPLE CONNECTION FOR BIDDING PURPOSES ONLY. CONNECTIONS, PLATES, STIFFENERS, AND SPLICE DESIGN IS RESPONSIBILITY OF THE CONNECTION DESIGNER. CONSIDER CONSTRUCTION LOADS AND SEQUENCING. STEEL SUPPLIER MUST SUBMIT STAMPED CALCULATIONS FROM PROFESSIONAL ENGINEER LICENSED BY STATE OF WISCONSIN W10 x 49 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S5.4 10/04/2023 220025.00 1 1.5" ROOF DECK WELD PATTERN 2 FRAMING AT DECK OPENING (1 1/2" HIGH DECK OR LESS)3 3" ROOF DECK ATTACHMENT & OPENING DETAIL 4 FRAMING AT 3" HIGH ROOF DECK OPENINGS 5 JOIST REINFORCING AT CONCENTRATED LOADS 6 SPRINKLER PIPE PARALLEL TO ROOF FRAMING 7 HUNG LOADS FROM STEEL JOISTS 8 TYPICAL FRAMING SECTION 9 BEAM TO TUBE CONNECTION 11 DECK BEARING ON PRECAST 12 JOIST BRIDGING AT PRECAST WALL 13 JOIST BEARING ON PRECAST 14 JOIST BEARING ON PRECAST 16 STEEL STUD WALL/BULKHEADS SUPPORTED AT ROOF DECK 17 TYPICAL SHEAR SPLICE DETAIL 10 ROOF JOIST BEARING ON BEAM 18 JOIST BEARING ON BEAM 19 JOIST TO BEAM 20 STEEL BEAM BEARING ON MASONRY 15 CONNECTION DETAIL 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET __" CL 6", 54 MIL MIN (50 KSI) GALVANIZED COLD-FORMED STUDS @16" o.c. MAX. DESIGNED BY COLD-FORMED STEEL SUPPLIER L3 x 3 x 3/8 x CONT. GALVANIZED METAL ROOF DECK STEEL JOIST STEEL BEAM, SEE PLAN - SEE ARCHITECTURAL FOR ALL REQUIREMENTS REGARDING INSULATION, WEEP HOLES, VAPOR BARRIERS ETC. SEAL ALL GAPS AS REQUIRED TO MAINTAIN VAPOR BARRIER - DESIGN OF LIGHTGAGE, ATTACHMENT, WELDMENT TO LIGHTGAGE ETC IS TO BE BY LIGHTGAGE CONTRACTOR SUBMIT STAMPED CALCULATIONS. - ANGLES SUPPORTING STUDS SHALL BE STRING LINE STRAIGHT AND PLUMB FLOR TO FLOOR. ERECTION TOLERANCE 1/4 INCH FROM PLAN DIMENSIONS. - BUTT WELD ROOF EDGE ANGLES AT ALL LOCATIONS TO FORM A CONTINUOUS MEMBER 1" GAP 4 1/2" 1/8" 2" 1" 3/16" COLD-FORMED CONNECTION W/ VERTICAL SLIDE CLIP __" CL 6", 54 MIL MIN (50 KSI) GALVANIZED COLD-FORMED STUDS @16" o.c. MAX. DESIGNED BY COLD-FORMED STEEL SUPPLIER GALVANIZED METAL ROOF DECK STEEL BEAM - SEE ARCHITECTURAL FOR ALL REQUIREMENTS REGARDING INSULATION, WEEP HOLES, VAPOR BARRIERS ETC. SEAL ALL GAPS AS REQUIRED TO MAINTAIN VAPOR BARRIER - DESIGN OF LIGHTGAGE, ATTACHMENT, WELDMENT TO LIGHTGAGE ETC IS TO BE BY LIGHTGAGE CONTRACTOR SUBMIT STAMPED CALCULATIONS. - ANGLES SUPPORTING STUDS SHALL BE STRING LINE STRAIGHT AND PLUMB FLOR TO FLOOR. ERECTION TOLERANCE 1/4 INCH FROM PLAN DIMENSIONS. - BUTT WELD ROOF EDGE ANGLES AT ALL LOCATIONS TO FORM A CONTINUOUS MEMBER 4 1/2" 3/16" 3"@12"o/c COLD-FORMED CONNECTION W/ VERTICAL SLIDE CLIP CONTINUOUS 3/8" BENT PLATE OR ANGLE TOP & BOTTOM. PROVIDE L3 x 3 x 1/4 BRACES FOR SPACE OR SPACES BETWEEN JOISTS FROM WHICH EQUIPMENT IS HUNG. COORDINATE LOCATION W/ EQUIPMENT SUPPLIER. DLH JOIST BACKBOARD FRAMING ATTACHMENT OF BASKETBALL HOOP SUPPORTS TO JOIST TO OCCUR AT JOIST BOTTOM CHORD PANEL POINTS OR REINFORCE SIMILAR TO SECTION 3 SIDES TC-U4 TOP & BOTTOM. FLANGE TYP. SEE PLANS FOR COLUMN SIZE (GIRDER IN OTHER DIRECTION NOT SHOWN) - STIFFENER PLATES SHALL BE SAME GRADE OF MATERIAL AS COLUMN. - DETAIL APPLIES WHERE INDICATED BY ON PLAN ALL/WELDED DOUBLE ANGLE CONNECTION w/ ERECTION ANGLE BOLTS 4 PLATES: THICKNESS & WIDTH EQUAL TO SMALLER BEAM FLANGE WHERE RIGID FRAMES INTERSECT, LOCATE PLATES PER RIGID FRAME INTO COLUMN WEB DETAIL SEE PLANS FOR BEAM SIZE TC-U4 TYPICAL ALL AROUND - CONNECTION DESIGN BY FABRICATOR. SEE PLAN FOR LOADS AND SPEC 05 10 00 FOR ADDITIONAL REQUIREMENTS. SHEAR CONNECTIONS WITH SNUG TIGHT BOLTS MY BE USED INSTEAD OF WELDS .. DOUBLER PLATE WHEN SPECIFIED SECTION4A CONNECTION TO CHANNEL BY SUPPLIER L2 X 2 x 3/16 DIAGONALS WELDED TO JOISTS & CHANNEL C4 x 5.4 SPANNING BETWEEN JOISTS TOILET PARTITION HANGER & CONNECTION TO CHANNEL BY SUPPLIER REINFORCE JOISTS AT CHANNEL BEARING PER X/SX.XX 5' - 9" MAX 9 S5.5 L3 x 3 x 3/16 x CONT., HORIZONTAL L3 x 3 x 3/16 DIAGONAL TO PARTITION STALL DOORS AT EACH HANGER HSS 4 x 4 x 3/16 w/ 1/4" CAP PLATTE EACH END PROVIDE FOR SUPPORT OF KICKERS IN BOTH DIRECTIONS ROOF DECK ROOF JOISTS L3 x 3 x 3/16 VERTICALS. LOCATE WITHIN 6" FROM PARTITION HANGER CENTERLINE L3 x 3 X 3/16 KICKER CEILING BY OTHERS SEE ARCH TYPICAL AT ALL ANGLES PARTITION HANGER & CONNECTION TO ANGLE IS BY SUPPLIER 1 1 3/16" 1" - ADD PANEL POINT REINFORCEMENT AT JOISTS PER X/SX.X ROOF JOISTS 1/4" STIFFENERS W10 x 12 HANGER RODS BY PARTITION SUPPLIER ROOF DECK L3 x 3 x 3/16 DIAGONALS WELDED TO JOISTS & BEAM (2) HSS2 x 4 x 3/16" @ EACH BEAM (2) HSS2 x 4 x 3/16" @ EACH BEAM W10 x 15 @10' - 0" o/c MATCH ELEVATION WF W/ 1/4" STIFFENERS AT BRACES. PROVIDE HOLES AS REQUIRED FOR FOLDING PARTITION SUPPORT L3 x 3 1/4 BRACE AT ; 1/3 POINTS -- SEE PLAN LOCATE AT JOIST PANEL POINT - SIMILAR WHERE BEAM IS PARALLEL TO JOISTS PROVIDE DIAGONAL ANGLE BRACES IN PLANE OF BEAM AS REQUIRED FOR LONGITUDINAL STABILITY (2 MIN.) ELEVATION SEE ARCHITECTURAL PLAN .. 3/16"TYP 10" 4" 3/8" x 6" x 6" INSERT PLATES @ 4' - 0" o/c AT TOP & BOTTOM (BY PRECASTER) GROUT PLANK END CORE SOLID L3 x 2 x 3/8 (LLH) x CONTINUOUS HSS12 x 3 x 3/16 FOR RAIL ATTACHMENT RAILING 1/4" BENT PLATE 4" 3/16 3 @ 12 3/16 3/16 3/16 3 @ 12 TYP 10" PLANK + 3" TOPPING (2) - #5 x CONT., LAP 2' - 2", AROUND PERIMETER SEE ARCH T/STEEL = SEE PLAN C6 x 13 @ 5' - 0" o/c MAX SEATED IN DECK FLUTES. SPANNING BETWEEN SUPPORTS. REINFORCE JOIST PER 3/S5.4 HSS6 x 3 x 1/4 x CONT 54 MIL MIN (50 KSI) GALVANIZED COLD-FORMED STUDS BY COLD FORMED STEEL SUPPLIER 16" o/c MAX 3/16" EACH JOIST CONTINUOUS 5/16" BENT PLATE W/ 3" VERT LEG 0' - 5" T/STUD = SEE ARCH T/STEEL = SEE PLAN SEE ARCH T/STEEL = SEE PLAN C6 x 13 @ 5' - 0" o/c MAX SEATED IN DECK FLUTES. SPANNING BETWEEN SUPPORTS. REINFORCE JOIST PER 5/S5.4 HSS6 x 3 x 1/4 x CONT 54 MIL MIN (50 KSI) GALVANIZED COLD-FORMED STUDS BY COLD FORMED STEEL SUPPLIER 16" o/c MAX 3/16" EACH JOIST CONTINUOUS 5/16" BENT PLATE W/ 3" VERT LEG 0' - 5" T/STEEL = SEE PLAN __" XXX LBS CL GALVANIZED BENT PLATE 3/8" x 6" V x CONTINUOUS. STOP HORIZONTAL LEG 1/2" BACK FROM BRICK FACE. CONTRACTOR TO COORDINATE WITH ARCHITECTURAL. ANGLE TO BE DISCONTINUOUS AT CONTROL JOINTS. DESIGNED BY COLD-FORMED STEEL SUPPLIER. 6", 54 MIL MIN (50 KSI) GALVANIZED COLD-FORMED STUDS @16" o.c. MAX. DESIGNED BY COLD-FORMED STEEL SUPPLIER L3 x 3 x 3/8 x CONT. AT EACH STUD DESIGNED BY COLD-FORMED STEEL SUPPLIER. JOIST PANEL POINT XXX LBS REACTION FROM BRACE TO JOIST STEEL JOIST, WIDE FLANGE BEAM AT "SIM" L3 x 3 x 1/4 AT EACH JOIST COLD-FORMED CLIP AT EACH STUD DESIGNED BY COLD-FORMED SUPPLIER STIFFENER CHANNEL AT EACH STUD AT PUNCHOUTS - SEE ARCHITECTURAL FOR ALL REQUIREMENTS REGARDING INSULATION, WEEP HOLES, VAPOR BARRIERS ETC. SEAL ALL GAPS AS REQUIRED TO MAINTAIN VAPOR BARRIER - DESIGN OF LIGHTGAGE, ATTACHMENT, WELDMENT TO LIGHTGAGE ETC IS TO BE BY LIGHTGAGE CONTRACTOR SUBMIT STAMPED CALCULATIONS. - ANGLES SUPPORTING STUDS SHALL BE STRING LINE STRAIGHT AND PLUMB FLOR TO FLOOR. ERECTION TOLERANCE 1/4 INCH FROM PLAN DIMENSIONS. - BUTT WELD ROOF EDGE ANGLES AT ALL LOCATIONS TO FORM A CONTINUOUS MEMBER 1" GAP 4 1/2" 1/8" 2" 1" 3/16" t FULL 3/16" 3/16" __" CL GALVANIZED BENT PLATE 3/8" x 6" V x CONTINUOUS. STOP HORIZONTAL LEG 1/2" BACK FROM BRICK FACE. CONTRACTOR TO COORDINATE WITH ARCHITECTURAL. ANGLE TO BE DISCONTINUOUS AT CONTROL JOINTS. DESIGNED BY COLD-FORMED STEEL SUPPLIER. 6", 54 MIL MIN (50 KSI) GALVANIZED COLD-FORMED STUDS @16" o.c. MAX. DESIGNED BY COLD-FORMED STEEL SUPPLIER CONTINUOUS 3/8" BENT PLATE OR ANGLE AT EACH STUD DESIGNED BY COLD-FORMED STEEL SUPPLIER. - SEE ARCHITECTURAL FOR ALL REQUIREMENTS REGARDING INSULATION, WEEP HOLES, VAPOR BARRIERS ETC. SEAL ALL GAPS AS REQUIRED TO MAINTAIN VAPOR BARRIER - DESIGN OF LIGHTGAGE, ATTACHMENT, WELDMENT TO LIGHTGAGE ETC IS TO BE BY LIGHTGAGE CONTRACTOR SUBMIT STAMPED CALCULATIONS. - ANGLES SUPPORTING STUDS SHALL BE STRING LINE STRAIGHT AND PLUMB FLOR TO FLOOR. ERECTION TOLERANCE 1/4 INCH FROM PLAN DIMENSIONS. - BUTT WELD ROOF EDGE ANGLES AT ALL LOCATIONS TO FORM A CONTINUOUS MEMBER 4 1/2" 3/16" 3"@12"o/c t FULL XXX LBS XXX LBS REACTION FROM BRACE TO JOIST L3 x 3 x 1/4 @ 4' - 0" o.c. MAX COLD-FORMED CLIP AT EACH STUD DESIGNED BY COLD-FORMED SUPPLIER STIFFENER CHANNEL AT EACH STUD AT PUNCHOUTS 3/16" 3/16" STEEL COLUMN, SEE PLAN PRECAST WALL PANEL (2) 3/4" DIA A325 SLIP CRITICAL BOLTS SPACED 9" APART PLATE 3/8" x 3" x 1/2" x 1' - 0" FIELD WELDED TO PRECAST EMBED PLATE REMOVE FLOOR DECK AS REQUIRED @ COLUMNS. PROVIDE L3 x 3 x 1/4 FIELD WELDED TO COLUMN FOR DECK SUPPORT 3/8" PARTIAL DEPTH STIFFENER EACH SIDE 5/16"3 SIDES 1/2" STIFFENER PLATE EACH SIDE TOP & BOTTOM PLATE 3/8" x 3" x 1/2" x 1' - 0" SHOP WELD TO STEEL FRAME 1/4TYP 1/4CJP CL 1' - 4" SEE PLAN STIFFENER PLATE RAILING, SEE ARCHITECTURAL 1/4 x 3 x 4 1/2 x CONT (LLV) BENT PLATE W/ 1/2" DIA H.S.A. @ 2' - 0" o/c 3" CONCRETE OVER 1 1/2" 20 GA GALVANIZED METAL DECK SHEAR TAB CONNECTION BEAM, SEE PLAN 1/4 3"@12" - SEE ARCHITECTURAL PLANS FOR PARTITION LOCATIONS T/SLAB SEE PLAN SEE PLAN FOR BEAM SIZE HSS4 x 4 x 3/16 PARTITIONS & CONNECTION TO TUBE BY SUPPLIER TYP SEE PLAN MAX TUBE SIZE = 10'-0" LC LC .. 3/16 BOTTOM OF STEEL DECK FIRESAFING OR INSULATION AS REQUIRED BY ARCHITECT. PROVIDE SEALANT AT EXTERIOR WALLS AND FOR WALLS EXPOSED TO VIEW - ANGLE AND SCREWS SUPPLIED BY ROOF STEEL SUPPLIER. - ENTIRE CONNCECTION DESIGN BY PRECASTER. FIREPROOF AND PROVIDE FIRESAFING AS REQUIRED FOR FIRE RATING L6" x 4" x 1/4" x 8" EACH SIDE @ 4' - 0" o/c w/ #10 x 16 SELF TAPPING SCREW, 5" GAGE, 1 1/4" MIN. EMBEDMENT (4) TOTAL 0' - 1"1" GAP MIN1 1/2" MAXW24 x 55 W24 x 104 W12 x 45 118' -6" W24 x 55 HSS6 x 6 x 5/16 W24 x 55 HSS6 x 6 x 5/16 W8 x 10 W24 x 55 HSS5 x 5 x 1/4 BEYOND W24 x 55 HSS4 x 4 x 1/4 W12 x 72 110' -2" - PROVIDE SAME WELDMENT & BEARING AS JOISTS2 1/2"4" MINVARIES L 2 x 2 x 1/4 C5 x 6.7 BEARING FACE 1/2" CLEAR TO .. 3/16 3"3 1/2"2 1/2"Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S5.5 10/04/2023 220025.00 3 EXTERIOR WALL SECTION (STUDS BEAR AT FOUNDATION)4 EXTERIOR WALL SECTION (STUDS BEAR AT FOUNDATION) 5 BACKBOARD SUPPORT AT GYM 6 TYPICAL DETAIL AT RIGID FRAMES 7 TOILET PARTITION SUPPORT AT JOISTS 8 SECTION AT TOILET PARTITION 13 FOLDING PARTITION SECTION - PARALLEL12NOT USED 14 RAILING ATTACHMENT 15 SECTION 16 SECTION 1 EXTERIOR WALL SECTION AT WINDOW (STUDS HUNG FROM ROOF)2 EXTERIOR WALL SECTION AT WINDOW (STUDS HUNG FROM ROOF) 17 SECTION AT FLOOR 18 SECTION AT FLOOR 9 TOILET PARTITION SUPPORT AT BEAMS 11 PRECAST WALL ATTACHMENT DETAIL 19 CANOPY DETAIL 3" = 1'-0"10 JOIST SUBSTITUTE JS-1 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET GENERAL: THE FOLLOWING NOTES SHALL APPLY TO ALL CONTRACTORS, SUBCONTRACTORS, AND SUPPLIERS ENGAGED IN EXECUTION OF THE WORK SHOWN ON THESE PLANS. ALL CONSTRUCTION SHALL BE EXECUTED IN CONFORMANCE WITH THE FOLLOWING: CONTRACTOR TO CROSS CHECK AND COORDINATE WITH CIVIL, ARCHITECTURAL, HVAC, PLUMBING, FIRE PROTECTION, AND ELECTRICAL PLANS INCLUDING OTHER BID PACKAGES, FOR OTHER DETAILS, DIMENSIONS, ELEVATIONS, OPENINGS, INSERTS, BRICK LEDGES, ETC. ARCHITECT OR ENGINEER TO BE NOTIFIED OF ANY VARIANCE BEFORE CONTRACTOR BEGINS WORK OR SHOP DRAWINGS. RESOLVE APPARENT DEFICIENCIES, CONTRADICTIONS, INCONSISTENCIES AND AMBIGUITIES IN CONTRACT DOCUMENTS WITH ARCHITECT/ENGINEER DURING THE BID PERIOD. IF ANY SUCH CONDITION CANNOT BE RESOLVED DURING THE BID PERIOD, SUBMIT BID USING THE INTERPRETATION RESULTING IN THE GREATEST COST AND RESOLVE SUCH ITEMS PRIOR TO BEGINNING THE WORK. DIMENSIONS SHOWN ON ARCHITECTURAL DRAWINGS SUPERSEDE DIMENSIONS SHOWN ON STRUCTURAL PLANS. THE USE OF A SCALE TO OBTAIN DIMENSIONS NOT SHOWN ON DRAWINGS IS NOT PERMITTED. IN NO CASE SHALL STRUCTURAL REPAIRS, CORRECTIONS, ALTERATIONS OR WORK AFFECTING A STRUCTURAL MEMBER BE MADE, UNLESS APPROVED BY ENGINEER. SUBMIT DETAILS AND CALCULATIONS PREPARED BY A PROFESSIONAL ENGINEER AND EMPLOYED BY CONTRACTOR. A/E DESIGN AND/OR REVIEW IS CONTRACTOR'S EXPENSE. THE STRUCTURE SHOWN IN THESE DRAWINGS IS STRUCTURALLY SOUND ONLY IN THE COMPLETED FORM. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE ERECTION PROCEDURE AND SEQUENCE TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING ERECTION. THIS INCLUDES BUT IS NOT LIMITED TO, THE ADDITION OF WHATEVER TEMPORARY BRACING, SHORING, GUYS OR TIE-DOWNS AS MAY BE NECESSARY. ALL CONSTRUCTION AND ERECTION TO CONFORM TO APPLICABLE SAFETY CODES AND REGULATIONS. WHERE TEMPORARY BRACING, GUYS OR TIE-DOWNS ARE ANCHORED TO STRUCTURE E.G. SLAB-ON-GRADE, CONTRACTOR SHALL HIRE A BRACING DESIGNER/ENGINEER TO VERIFY, THROUGH CALCULATION, STRUCTURAL ADEQUACY FOR APPLIED LOADS, AND SHALL PROVIDE NECESSARY DESIGN AND DETAILS IF FOUND DEFICIENT. WHERE DETAILS ARE CALLED FOR IN A CERTAIN PORTION OF THE BUILDING, THEY SHALL APPLY IN SIMILAR PORTIONS OF THE BUILDING UNLESS SHOWN OTHERWISE. PRIOR TO CONSTRUCTION AND SHOP DRAWINGS, CONTRACTOR SHALL SURVEY AND VERIFY EXISTING BUILDING DIMENSIONS, ELEVATIONS, ORIENTATION AND CONDITIONS AND REPORT ANY NON-CONFORMANCE WITH DESIGN DRAWINGS. ACTUAL SURVEY LOCATION OF EXISTING CONSTRUCTION SHALL BE COORDINATED WITH CONSTRUCTION DOCUMENTS. NOTIFY ARCHITECT OF ANY DISCREPANCIES BEFORE PROCEEDING. PROVIDE A COMPLETE SET OF CONTRACT DRAWINGS, SPECIFICATIONS, AND ADDENDA TO ALL PARTIES RESPONSIBLE FOR COMPONENT DESIGNS, E.G. WOOD TRUSSES, JOISTS, PRECAST, LIGHT GAGE, ETC. AND/OR PREPARATION OF SHOP DRAWINGS. A/E SERVICES RELATED TO SUBSTITUTIONS OR CHANGES PROPOSED BY THE CONTRACTOR OR TRADE SUBCONTRACTORS ARE THE CONTRACTOR'S EXPENSE. DO NOT RELY ON ACCEPTANCE IN PREPARING BIDS. THE A/E MAY REJECT WITHOUT CAUSE. THE ENGINEER'S REVIEW OF SHOP DRAWINGS, PRODUCT DATA, DESIGN CALCULATIONS, ETC. DOES NOT RELIEVE THE CONTRACTOR FROM COMPLYING WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL INFORM THE ENGINEER IN WRITING OF ANY SPECIFIC DEVIATIONS TO THE CONTRACT DOCUMENTS AND OBTAIN ENGINEER'S WRITTEN APPROVAL BEFORE PROCEEDING. WORK AFFECTED BY OTHERS: FRAMING, BRACING, LOADS, OPENINGS, PENETRATIONS AND STRUCTURE IN ANY WAY RELATED TO OTHER TRADES INCLUDING ELEVATORS, HVAC, PLUMBING, OR ELECTRICAL REQUIREMENTS (IF SHOWN) IS FOR BIDDING PURPOSES ONLY. RESPONSIBILITY FOR COORDINATING THE WORK OF THIS SECTION WITH THESE REQUIREMENTS IS SOLELY THAT OF THE CONTRACTOR. CONTRACTOR'S REVIEW OF SHOP DRAWINGS WILL BE TAKEN TO INDICATE THAT THIS COORDINATION HAS BEEN ACCOMPLISHED. DEMOLITION AND SHORING: DEMOLITION WORK SHALL BE PERFORMED ACCORDING TO THE SPECIFICATIONS AND SHALL BE STRICTLY LIMITED TO THE AREAS AND ITEMS CLEARLY DEFINED ON THE DRAWINGS. ALL DEMOLITION SHALL BE CONDUCTED IN A CLEAN, WORKMANLIKE MANNER AND SHALL MINIMIZE DISRUPTION TO ADJACENT BUILDING ITEMS AND FEATURES BEYOND THE CURRENT WORK. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO THE START OF WORK AND SHALL BECOME FAMILIAR WITH THE EXISTING CONDITIONS, LIMITATIONS AND ANY FEATURES WHICH MAY EFFECT THE PROPOSED DEMOLITION. THE CONTRACTOR SHALL BEAR THE FULL RESPONSIBILITY FOR THE DESIGN AND INSTALLATION OF ALL TEMPORARY SHORING TO BE USED. DIMENSIONS ON THE DRAWINGS ARE TO BE FIELD VERIFIED PRIOR TO THE START OF THE WORK. CONTACT THE ARCHITECT IMMEDIATELY IF SIGNIFICANT DEVIATIONS ARE ENCOUNTERED. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE WORK BY ALL TRADES. ALL CONCRETE TO BE REMOVED SHALL BE SAW-CUT A MINIMUM OF 1" DEEP PRIOR TO FINAL BREAK-OUT. PROVIDE A CLEAN, GRADUAL TRANSITION BETWEEN WORK WHICH IS TO REMAIN AND WORK TO BE REMOVED. WHERE CONFLICTS EXIST BETWEEN THE SPECIFICATIONS, GEOTECHNICAL REPORT AND THESE NOTES, THE MORE STRINGENT SHALL APPLY UNLESS OTHERWISE CLARIFIED IN WRITING BY STRUCTURAL ENGINEER. ALL LATERAL LOAD RESISTANCE AND STABILITY OF THE BUILDING IN THE COMPLETED STRUCTURE IS PROVIDED EXCLUSIVELY BY REINFORCED PRECAST CONCRETE SHEAR WALLS AND MOMENT FRAMES WITH WELDED BEAM TO COLUMN CONNECTIONS FRAMED IN EACH ORTHOGONAL DIRECTION. THESE WALLS PROVIDE THE LATERAL SHEAR RESISTANCE IN EACH ORTHOGONAL DIRECTION. THE ROOF DECK, COMPOSITE METAL DECK AND CONCRETE FLOORS SERVE AS HORIZONTAL DIAPHRAGMS THAT DISTRIBUTE THE LATERAL WIND AND SEISMIC FORCES HORIZONTALLY TO THE SHEAR WALLS. THE SHEAR WALLS CARRY THE APPLIED LATERAL LOADS TO THE BUILDING FOUNDATION. - DRAWINGS AND SPECIFICATIONS - ALL LOCAL BUILDING AND SAFETY CODES - STATE OF WISCONSIN BUILDING CODE AND IBC 2015 - ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE - ACI 520-13 BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES - AISC 360-10 SPECIFICATION FOR STRUCTURAL STEEL BUILDING, 14TH/ EDITION - ASCE 7-10 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES - WHEREVER CONFLICTS EXIST, THE MORE STRINGENT OR COSTLY SHALL APPLY. - AISI S100-12 NORTH AMERICAN SPECIFICATION FOR THE DESIGN OF COLD- FORMED STEEL STRUCTURAL MEMBERS ALL DEMOLITION SHALL BE CARRIED ON IN SUCH A WAY AS NOT TO DAMAGE EXISTING ELEMENTS WHICH ARE TO BE IN THE FINISHED BUILDING. ALL ELEMENTS OF THE STRUCTURE WHICH ARE TO REMAIN AND WHICH ARE DAMAGED DURING DEMOLITION WORK SHALL BE REPLACED AT NO ADDED COST. EXISTING ELEMENTS SHALL BE PROTECTED TO THE FULLEST EXTENT POSSIBLE TO REDUCE SUCH DAMAGE TO A MINIMUM. REINFORCED CONCRETE: ALL CONCRETE WORK TO CONFORM TO ACI 318 AND ACI 301. REINFORCING, DETAILING, FABRICATION, AND ERECTION TO CONFORM TO ACI 315, MANUAL OF STANDARD PRACTICE. (LATEST EDITION) CONCRETE CONTRACTOR TO PROVIDE AND COORDINATE WITH ALL OTHER TRADES FOR SIZE AND LOCATIONS OF ALL OPENINGS, SLEEVES, ETC. OCCURRING IN WALLS, FOOTINGS AND FLOORS. NO PIPES OR DUCTS SHALL BE PLACED IN STRUCTURAL CONCRETE UNLESS SPECIFICALLY DETAILED OR APPROVED BY STRUCTURAL ENGINEER. ALL OPENINGS THROUGH CONCRETE WALLS AND SLABS SHALL HAVE 2 - #5 BARS PLACED ALONG FACES AND EXTENDING 2'-0'' BEYOND CORNERS UNLESS OTHERWISE NOTED. PROVIDE 1 - #5 x 4'-0'' DIAGONAL BAR AT EACH CORNER PLACED IN EACH FACE OF WALL OR SLAB. NO PLUMBING OR MECHANICAL OPENINGS, SLEEVES, ETC. ARE ALLOWED THRU CONCRETE BEAMS OR FOOTINGS UNLESS SHOWN ON CONCRETE SHOP DRAWINGS AND APPROVED BY ENGINEER. PROVIDE ADDITIONAL BENT CORNER BARS OF SAME SIZE AND SPACING AS HORIZONTAL BARS AT ALL CORNERS AND WALL INTERSECTIONS. SLABS ON GRADE SHALL HAVE WWF 6x6 - W1.4xW1.4 REINFORCING MESH UNLESS OTHERWISE NOTED. ALL MESH TO BE LAPPED A MINIMUM OF 12''. REINFORCE WITH TWO (2) - #5, 3'-0'' LONG AT ALL RE-ENTRANT (INSIDE) CORNERS. PROVIDE 3/8'' APPROVED EXPANSION JOINT MATERIAL WHERE SLABS ON GRADE ABUT WALLS, COLUMNS, AND OTHER VERTICAL SURFACES UNLESS OTHERWISE INDICATED ON PLANS. PROVIDE ISOLATION JOINTS AROUND EQUIPMENT PADS, DRAINS, MANHOLES, SUMPS OR OTHER POINTS OF RESTRAINT. MAXIMUM LENGTH OF CONCRETE WALL POUR IS 60 FEET, WITH NO LENGTH LIMIT FOR NON-EXPOSED, NON-BASEMENT FROST WALLS. PROVIDE CONSTRUCTION JOINT KEY WITH 1/2 OF HORIZONTAL WALL REINFORCEMENT CONTINUOUS THRU JOINT. WATERSTOPS SHALL BE PROVIDED FOR RETAINING WALLS AND BASEMENT WALLS EXPOSED TO EARTH OR WEATHER. DO NOT LOCATE JOINTS WITHIN 5 FEET OF A CORNER OR PIER. CENTER PIERS AND COLUMN FOOTINGS ON COLUMN CENTERLINES, AND CENTER WALL FOOTINGS ON WALL CENTERLINES, UNLESS NOTED OTHERWISE. TEMPORARY BRACING MUST BE PROVIDED FOR ALL VERTICAL DOWELS IN RETAINING WALLS IN ORDER TO INSURE PROPER POSITION (PLUMB) AND LOCATION. PROVIDE POCKETS IN CONCRETE WALLS FOR STEEL BEAMS AND COLUMN BASE PLATES WHERE REQUIRED. BACK PATCH WITH CONCRETE. WHERE CONCRETE BACKS UP BRICK, CAST DOVETAIL SLOTS AT 2' - 0'' MAXIMUM. PROVIDE DOVETAIL ANCHORS TO BRICK AT 16'' ON CENTER. COORDINATE PRECAST ATTACHMENT REQUIREMENTS WITH PRECASTER. REFER TO ARCHITECTURAL, MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR LOCATION AND DIMENSIONS OF CURBS, CHASES, INSERTS, OPENINGS, SLEEVES, WASHES, DRIPS, REVEALS, NOTCHES, BLOCKOUTS, REGLETS, FINISHES, DEPRESSIONS, AND OTHER PROJECT REQUIREMENTS NOT SHOWN ON STRUCTURAL DRAWINGS. VERIFY ALL REQUIREMENTS WITH PERTINENT CONTRACTORS. CAST-IN ANCHORS AND PLATES SHALL NOT DISPLACE REINFORCING FROM SPECIFIED LOCATION OR REDUCE MINIMUM COVER. CONTRACTOR SHALL HIRE A SURVEYOR TO ACCURATELY LOCATE CAST-IN WELD PLATES. CONTRACTOR IS RESPONSIBLE FOR ENGINEERING COSTS ASSOCIATED WITH MISLOCATED EMBED PLATES. CONCRETE CURBS AND PADS 1'-0'' OR NARROWER SHALL BE REINFORCED WITH 1 - #5 CONTINUOUS IN CENTER UNLESS SHOWN OTHERWISE. NO CONDUITS, PIPES OR DUCTS SHALL BE PLACED IN CONCRETE JOIST, SLABS, COLUMNS OR PARALLEL AND WITHIN CONCRETE BEAMS, NOR IN SLABS ON METAL DECK SLEEVES, CONDUITS, AND PIPES EMBEDDED IN OR PASSING THROUGH SLABS AND WALLS SHALL BE LOCATED AND PLACED SO THAT: MAXIMUM SLAB ON GRADE SPACING BETWEEN CONTROL OR CONSTRUCTION JOINTS SHALL BE AS FOLLOWS: 10FT FOR 4'' SLABS, 12.5FT FOR 5'' SLABS, 15FT FOR 6'' SLABS OR GREATER. DO NOT PROVIDE CONTROL JOINTS IN SLABS ON METAL DECK, OR PRECAST COMPOSITE TOPPING, U.N.O. SPLICES IN CONTINUOUS REINFORCING: ALL BARS TO BE CLASS ''B'' LAP SPLICES PER LATEST ACI 318 UNLESS OTHERWISE NOTED. DIMENSION LENGTHS OF ALL LAP SPLICES ON SHOP DRAWING PLANS AND ELEVATIONS. COLUMN TIE SPLICES SHALL BE SUCCESSIVELY STAGGERED 90 DEGREES OR 180 DEGREES. CONCRETE COVER FOR REINFORCEMENT TO CONFORM TO SECTION 7.7 OF LATEST ACI 318 UNLESS NOTED OTHERWISE ON PLANS: DO NOT BACKFILL AGAINST WALLS UNTIL WALLS ARE TIED INTO FLOORS ABOVE. 1. THEY ARE NOT CLOSER THAN THREE DIA. OR 6'' MINIMUM ON CENTER, WITH NO MORE THAN THREE CONDUITS PER SIX-FOOT WIDTH OF SLAB. 2.THE CONCRETE COVER IS NOT LESS THAN 1-1/2 INCHES. 3.THEY RUN BETWEEN REINFORCING AND DO NOT DISPLACE IT IN ANY MANNER. 4. THEY ARE LOCATED AT MID THICKNESS OF THE SLAB OR WALL. 5.THEY SHALL NOT BE LARGER IN OUTSIDE DIAMETER AT ITS WIDEST POINT (OR FITTING) THAN 2 INCHES OR 1/4 THE THICKNESS OF THE SLAB OR WALL, WHICHEVER IS LESS. THIS RESTRICTION APPLIES TO THE TOTAL HEIGHT AT CONDUIT INTERSECTIONS/CROSSOVERS. NON-CORROSIVE ENVIRONMENTS - BEAMS, GIRDERS, COLUMNS (TO TIES AND STIRRUP) - SLABS: - FOOTINGS: TOP BOTTOM TOP BOTTOM AND SIDES 1 1/2'' 1'' 1'' 2'' 3'' THE NUMBER OF BARS REQUIRED BY NOTES AND SCHEDULES CONTROLS OVER THE NUMBER OF BARS SHOWN ON DETAILS. COORDINATE ELEVATOR PIT SIZE AND DEPTH PRIOR TO SHOP DRAWING SUBMITTAL. CONTRACTOR SHALL INCLUDE IN PROPOSAL COST TO FURNISH, DELIVER, FABRICATE, AND INSTALL 1000 LBS OF REBAR, IN ADDITION TO THAT INDICATED OR SPECIFIED, TO BE USED AS DIRECTED BY THE ARCHITECT. THE UNUSED MATERIAL SHALL BE CREDITED TO THE PROJECT AT THE CONTRACT UNIT PRICE. COORDINATE WITH ELECTRICAL CONTRACTOR FOR BUILDING GROUNDING REQUIREMENTS CONFORMING TO NEC 250.52.3 " CONCRETE ENCASED ELECTRODES". PRECAST CONCRETE: MARK STRAND LOCATIONS ON TOP OF PLANK WITH PAINT WHERE HVAC, PLUMBING, AND ELECTRICAL TRADES CORE THE PLANK FOR THEIR WORK. PROVIDE HEADERS AS REQUIRED AT OPENINGS, NOTCHES AT COLUMNS, ETC. COORDINATE SIZES AND LOCATIONS WITH HVAC, PLUMBING, ELECTRICAL AND SPECIALTY CONTRACTORS. DESIGN PLANK TO CARRY STAIR STRINGER LOADS. PROVIDE #4 DOWELS BETWEEN MASONRY WALLS AND P.C. PLANK FOR BOTH PLANK BEARING AND SIDE LAP CONDITIONS. PRECASTER SHALL DESIGN TEES, PLANK, BEAMS, COLUMNS, AND SHEAR WALLS TO RESIST VERTICAL AND LATERAL FORCES SPECIFIED ON THE DRAWINGS AND IN APPLICABLE CODES. PRECASTER SHALL DESIGN ALL CONNECTIONS BETWEEN PRECAST ELEMENTS AS WELL AS PRECAST BEARING AND CONNECTION DETAILS TO POURED CONCRETE AND STEEL. FINISH CONCRETE TOPPING ON PRECAST TO A LEVEL SURFACE WITH A MINIMUM THICKNESS AT PLANK BEARING AS CALLED FOR ON PLANS. PRECASTER SHALL DESIGN ALL PRECAST COMPONENTS AND CONNECTIONS FOR THE FIRE RESISTIVE REQUIREMENTS OF THE BUILDING. COORDINATE WITH ARCHITECT AND CONFORM TO ALL APPLICABLE CODE REQUIREMENTS AND UL ASSEMBLIES. PRECASTER SHALL DESIGN, FURNISH, AND ERECT ALL PRECAST ARCHITECTURAL AND STRUCTURAL CONCRETE MEMBERS AND CONNECTIONS AS SHOWN ON DRAWINGS AND IN CONFORMANCE WITH SPECIFIED CODES. PRECASTER SHALL BE THE ENGINEER OF RECORD FOR THE PRECAST INCLUDING DIAPHRAM DESIGN. PRECASTER SHALL VERIFY ALL LOADS, CRITERIA, ETC. PROVIDED ON THESE DOCUMENTS. ANY CHANGES TO DESIGN INTENT MUST BE APPROVED BY ARCHITECT/ENGINEER. REINFORCE THE CONCRETE TOPPING ON PRECAST PLANK WITH FLAT SHEETS OF WWF 6 x 6 W1.4 X W1.4. PRECASTER SHALL SUPPLY TO APPROPRIATE CONCRETE OR STEEL CONTRACTOR ALL ANCHOR BOLTS, CLIP ANGLES, WELD PLATES, INSERTS, AND BEARING PLATES NOT CAST INTO PRECAST UNITS, BUT REQUIRED FOR ERECTION BY PRECASTER. CONCRETE TOPPING SHALL BE CONSIDERED AS COMPOSITE UNLESS NOTED OTHERWISE. LIMIT PRECAST PLANK CAMBER TO 1 INCH FOR 2 INCH THICK TOPPING, 1 1/2'' INCHES FOR 3 INCH THICK TOPPING. USE STANDARD WEIGHT PLANK AS REQUIRED INSTEAD OF ULTRALIGHT. CONSIDER LOSS OF SPECIFIED TOPPING THICKNESS DUE TO CAMBER IN DESIGN. NO CONDUITS OR PIPES SHALL BE PLACED IN CONCRETE TOPPING. MASONRY: USE ONLY U-SHAPED LINTEL BLOCK FOR MASONRY LINTELS. CENTERLINE OF REINFORCING TO BE LOCATED 3'' MAX FROM BOTTOM OF LINTEL BLOCK. BOND BEAM LINTELS SHALL BEAR A MINIMUM OF 8'' AT EACH END. THE FIRST COURSE OF MASONRY ABOVE THE LINTEL SHALL BE LAID WITH FULL MORTAR BEDDING. AT BEARING WALLS, GROUT END CELL SOLID TO FLOOR BELOW. SEE ARCHITECTURAL AND STRUCTURAL PLANS FOR SPECIAL BOND BEAM AND LINTEL CONDITIONS. SHORE LINTELS AND DOOR FRAMES UNTIL MORTAR AND GROUT ACHIEVE REQUIRED STRENGTH. DO NOT PLACE CONTROL OR EXPANSION JOINTS AT LINTEL BEARING POINTS OR ANYWHERE WITHIN THE LINTEL. FOR STEEL BEAMS OR LINTELS BEARING PARALLEL TO MASONRY WALL, GROUT EACH CELL UNDER BEAM BEARING TO FOUNDATION AND PROVIDE 1 - #5 BAR IN THE END CELL, UNLESS NOTED OTHERWISE. PROVIDE 16'' BEARING AT EACH END FOR SPANS GREATER THAN 10'-0'', 8'' BEARING FOR SPANS LESS THAN 10'-0''. FOR STEEL BEAMS BEARING PERPENDICULAR TO MASONRY WALL, GROUT AN AREA 4 CELLS WIDE, 4 COURSES DEEP, UNLESS NOTED OTHERWISE. DO NOT BACKFILL AGAINST WALLS UNTIL WALLS ARE TIED INTO FLOORS ABOVE. CONSTRUCTION SHALL BE RUNNING BOND U.N.O. MASONRY SHALL CONFORM TO NCMA SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF LOAD BEARING CONCRETE MASONRY, MSJC TMS 402/ACI 530 AND TMS 602/ACI 530.1. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE APPLICABLE CODES AND THE IBC CODE. PILASTER LOCATIONS, BOND BEAMS, EXPANSION JOINTS, ETC. ARE TO FOLLOW THESE GUIDELINES, UNLESS NOTED OTHERWISE ON DRAWINGS. CONFORM TO MSJC CODE FOR COLD WEATHER CONSTRUCTION PROTECTION REQUIREMENTS. BOND BEAMS, WALLS, PILASTERS, AND LINTELS SHALL BE FILLED WITH CONCRETE GROUT HAVING F'c = 3000 PSI UNLESS NOTED OTHERWISE. COARSE AGGREGATE SHALL BE PEA GRAVEL. REINFORCE ALL CONTINUOUS BOND BEAMS WITH 2 - #5, U.N.O. PROVIDE CORNER BARS TO MATCH. SEE MASONRY BAR SPLICE SCHEDULE FOR REQUIRED LAPS. LINTELS: PROVIDE PRECAST OR MASONRY LINTELS OVER ALL MASONRY OPENINGS LESS THAN 6'-0'' CLEAR UNLESS NOTED OTHERWISE ON PLANS. MASON CONTRACTOR MAY USE STEEL LINTEL PER LOOSE LINTEL SCHEDULE AS AN ALTERNATE TO PRECAST OR MASONRY AT HIS EXPENSE. UNLESS SHOWN OTHERWISE, REINFORCE PRECAST AND MASONRY LINTELS AS FOLLOWS: WHERE STEEL BEAMS BEAR ON MASONRY WITH BEARING PLATES, DO NOT MORTAR TIGHT TO UNDERSIDE OF BEAM. AT EXPOSED AREAS, CAULK UNDER BEAM. SEE STEEL NOTES FOR BASE PLATE REQUIREMENTS. GROUTING & REINFORCING FOR PIERS ON UPPER FLOORS OF MULTI-STORY BUILDINGS MUST EXTEND DOWN TO FOOTINGS PROVIDE POCKETS IN MASONRY WALLS FOR STEEL BEAMS, JOISTS AND COLUMN BASE PLATES AND BACK PATCH SOLID. CONCRETE GROUT PLACEMENT IN REINFORCED MASONRY WALLS OR PIERS SHALL FOLLOW THE PROCEDURES DESCRIBED IN NCMA TEK MANUAL 23A FOR EITHER LOW-LIFT OR HIGH-LIFT GROUTING. FILLING CORES WITH MORTAR IS NOT ALLOWED. TIE BARS OR PROVIDE VERTICAL BAR POSITIONERS AT 32'' o.c. TO MAINTAIN PROPER BAR POSITION DURING GROUT PLACEMENT. CLEANOUTS SHALL BE PROVIDED IN BOTTOM COURSE OF MASONRY FOR EACH GROUT POUR WHEN THE POUR HEIGHT EXCEEDS 5 FEET REINFORCING STEEL SHALL BE SECURED IN PLACE BEFORE GROUTING. CONTINUE VERTICAL REINFORCING FLOOR TO FLOOR (OR ROOF) AND EXTEND TO THE TOP OF PARAPET, U.N.O. ONLY 2-CELL BLOCK IS ALLOWED FOR REINFORCED MASONRY CONSTRUCTION. VERTICAL CELLS THAT WILL BE GROUTED SHALL HAVE A VERTICAL ALIGNMENT TO MAINTAIN A CONTINUOUS UNOBSTRUCTED CELL AREA NOT LESS THAN 3'' x 4''. GROUTING SHALL BE STOPPED 1 1/2'' BELOW THE TOP OF A COURSE SO AS TO FORM A KEY AT THE POUR JOINT. PROVIDE HOT-DIPPED HORIZONTAL JOINT REINFORCEMENT SUCH AS DUR-O-WALL, 16 INCHES ON CENTER VERTICALLY (8'' ON CENTER FOR PARAPETS) FOR RUNNING BOND WALLS, AND 8'' AND 10'' STACK BOND WALLS. FOR 12'' STACK BOND WALLS, STANDARD HORIZONTAL JOINT REINFORCEMENT AT 8'' ON CENTER, OR EXTRA HEAVY (A = 0.056` MIN) JOINT REINFORCEMENT AT 16'' ON CENTER. CLEAR SPAN HEIGHT REINFORCEMENT UP TO 4' - 0'' 8'' 1 - #5 PER 4'' OF WALL THICKNESS BOTTOM 4' - 0'' TO 6' - 0'' 16'' 1 - #5 PER 4'' OF WALL THICKNESS, TOP & BOTTOM 6' - 0'' AND GREATER REFER TO LOOSE STEEL LINTEL SCHEDULE. THESE NOTES APPLY TO MASONRY SHOWN ON STRUCTURAL AND ARCHITECTURAL DRAWINGS. GROUT CELLS SOLID AT: REINFORCING, BOND BEAMS, INSERTS, ANCHORS, ELEVATOR GUIDE RAILS, AND STAIR CONNECTIONS. MASONRY CONTRACTOR TO GROUT ENTIRE COURSE(S) SOLID WHERE EXPANSION ANCHORS ARE SHOWN/CALLED OUT ON DRAWINGS, ALL CELLS BELOW GRADE AND BELOW SLAB-ON-GRADE. PROVIDE FULL MORTAR BEDDING (FACE SHELLS AND WEBS) FOR ALL STARTER COURSES, FOR SOLID UNITS, AT GROUTED MASONRY AND FOR ALL COURSES OF PIERS AND PILASTERS. GROUT COMPLETELY SOLID ALL CELLS AT ALL STAIR AND ELEVATOR WALLS. SEE PLANS FOR ADDITIONAL MASONRY PIERS AND REINFORCING, WALLS AT STAIRS AND ELEVATORS SHALL BE STANDARD WEIGHT BLOCK. GROUTING AND REINFORCING: ALL MASONRY, GROUTING, AND REINFORCING WORK SHALL BE PREFORMED BY MASONRY CRAFTWORKERS WHO HAVE SUCCESSFULLY COMPLETED THE INTERNATIONAL MASONRY INSTITUTE (1.800.IMI.0988) TRAINING COURSE FOR GROUTING AND REINFORCING MASONRY CONSTRUCTION, OR EQUAL. ALTERNATIVELY, INSTALLING CONTRACTOR SHALL ASSIGN SUPERVISION OF ALL GROUTING AND REINFORCING TO PERSONNEL WHO HAVE SUCCESSFULLY COMPLETED THE INTERNATIONAL MASONRY INSTITUTE (1.800.IMI.0988) TRAINING COURSE FOR GROUTING AND REINFORCED MASONRY CONSTRUCTION, OR EQUAL. THE SUPERVISOR RESPONSIBLE FOR THE PLACEMENT OF REINFORCED ASSEMBLIES WILL BE PRESENT AT THE TIME OF EACH GROUT POUR. HORIZONTAL JOINT REINFORCING SHALL BE TERMINATED AT CONTROL JOINTS. BOND BEAM REINFORCING SHALL BE CONTINUOUS. STRUCTURAL STEEL: FABRICATION AND ERECTION OF STRUCTURAL STEEL MEMBERS SHALL BE GOVERNED BY AISC CODE OF STANDARD PRACTICE (LATEST EDITION). STEEL CONTRACTOR TO PUNCH ALL HOLES FOR ARCHITECTURAL DETAILS. PROVIDE AND MAINTAIN TEMPORARY BRACING OF STEEL UNTIL SECURELY INCORPORATED INTO CONSTRUCTION SUCH AS SHEAR WALLS, X-BRACING, ETC. STEEL COLUMNS BUILT IN MASONRY SHALL HAVE ADJUSTABLE MASONRY WALL ANCHORS AT 2'-0'' ON CENTER VERTICALLY EACH SIDE, LOCATED IN COURSING. WIDE FLANGE BEAMS 12'' OR DEEPER SHALL HAVE A 1/4'' STIFFENER PLATE EACH SIDE AT ALL POINTS OF SUPPORT INCLUDING BEARING ENDS ON CONCRETE OR MASONRY. PROVIDE 5/8'' BEARING PLATES WITH (2) - 3/4'' ANCHOR BOLTS 12'' LONG WITH 3'' HOOKS. CONTRACTOR SHALL INCLUDE IN PROPOSAL COST TO FURNISH, DETAIL, FABRICATE, DELIVER, AND ERECT 3000 LBS OF STEEL, IN ADDITION TO THAT INDICATED OR SPECIFIED TO BE USED AS DIRECTED BY THE ARCHITECT. THE UNUSED MATERIAL SHALL BE CREDITED TO THE PROJECT AT THE CONTRACT UNIT PRICE. PROVIDE CLIP ANGLES AT COLUMNS FOR SUPPORT OF STEEL DECK AND PRECAST PLANK. THE THICKNESS OF FIREPROOFING SHALL CONFORM TO THE U.L. FORMULA LISTED UNDER RESTRAINED BEAM RATINGS IN THE UNDERWRITER'S LABORATORY "FIRE RESISTANCE DIRECTORY". REFER TO APPLICABLE CODE AND ARCHITECTURAL DOCUMENTS FOR REQUIRED ASSEMBLY RATINGS. EDGE ANGLES AND BENT PLATES SHALL BE FIELD INSTALLED AND STRING LINE STRAIGHT AND PLUMB FLOOR TO FLOOR. ERECTION TOLERANCE 1/4 INCH FROM PLAN DIMENSIONS. BUTT WELD EDGE ANGLES AT ALL LOCATIONS TO FORM A CONTINUOUS MEMBER. STAIRS AND HANDRAILS ALL STAIRS, LANDINGS, HANDRAILS, AND CONNECTIONS SHALL BE DESIGNED BY A REGISTERED STRUCTURAL ENGINEER LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED, AND IN CONFORMANCE TO APPLICABLE CODES AND NAAMM STANDARDS INCLUDING 510, 521 AND 555. SUBMIT STAMPED CALCULATIONS AND SHOP DRAWINGS FOR REVIEW. STAIR STRINGERS, TREADS, AND RISERS SHALL BE DESIGNED TO SUPPORT 100 PSF LIVE LOAD. INDIVIDUAL STAIR STRINGERS SHALL BE DESIGNED TO SUPPORT A MINIMUM 300 POUND CONCENTRATED LOAD PLACED IN A POSITION THAT WOULD CAUSE MAXIMUM STRESS. THE TOP RAILS OF HANDRAILS SHALL BE DESIGNED TO WITHSTAND A LOAD OF 50 PLF APPLIED IN ANY DIRECTION, OR A 200 POUND CONCENTRATED LOAD APPLIED IN ANY DIRECTION AT ANY POINT, AND HAVE ATTACHMENT DEVICES AND SUPPORTING STRUCTURE TO TRANSFER THIS LOADING TO APPROPRIATE STRUCTURAL ELEMENTS OF THE BUILDING. THESE LOADS NEED NOT BE ASSUMED TO ACT CONCURRENTLY FOR ALL COMPONENTS, MAXIMUM LIVE TOTAL DEFLECTION = L/360, EXCEPT USE L/600 LIVE LOAD DEFLECTION, L/480 TOTAL LOAD DEFLECTION AT MONUMENTAL, CURVED AND MAIN LOBBY STAIRS, AND SUCH STAIRS SHALL BE CLASSIFIED AS "ARCHITECTURAL CLASS". COORDINATE WITH ARCHITECTURAL PLANS FOR FINISHES, MINIMUM SIZES, DETAILS, AND GENERAL INTENT. UNLESS NOTED OTHERWISE FRAME AROUND ALL ROOF DECK OPENINGS LARGER THAN 10'' IN DIAMETER, INCLUDING ROOF DRAINS/SUMPS, WITH 4 - L'S 3 x 3 x 5/16 DOWNTURNED FOR 1 1/2'' DECK OR LESS. ELEVATORS: ELEVATOR FRAMING AS SHOWN AND SPECIFIED IN THE CONTRACT DOCUMENTS IS BASED ON PRELIMINARY INFORMATION PROVIDED BY THE ARCHITECT AND IS SUBJECT TO CHANGE AFTER BIDDING AND AN ELEVATOR SUPPLIER IS SELECTED. COORDINATION BETWEEN STEEL AND ELEVATOR SUPPLIERS IS REQUIRED. ANY ADDITIONAL COSTS THAT RESULT FROM CHANGES TO THE DESIGN DOCUMENTS SHALL BE BORNE BY THE ELEVATOR CONTRACT. 1. PROVIDE W8 x 24 HOIST BEAMS AT EACH ELEVATOR HOISTWAY WHERE REQUIRED FOR ELEVATOR INSTALLATION. SUBMIT SHOP DRAWING TO ENGINEER SHOWING PROPOSED LOCATION & METHOD OF ATTACHMENT FOR REVIEW. REMOVE HOIST BEAM WHERE REQUIRED FOR CLEARANCE, FIRE RATING, ETC., AND BACKPATCH. MAXIMUM LOAD 6000 LBS, MAXIMUM SPAN 12 FEET a. HOIST BEAMS SHALL SPAN SIDE-TO-SIDE OF ELEVATOR, NOT FRONT-TO-BACK. FRAME INTO SEPARATOR BEAMS AT MULTIPLE ELEVATORS. 2. COORDINATE REQUIRED WIDTH AND SPACING OF SEPARATOR BEAMS WITH ELEVATOR SUPPLIER. a. PROVIDE BEAMS AT EACH FLOOR, NOT TO EXCEED 14'-0'' o.c. VERTICALLY FROM PIT TO TOP OF ELEVATOR. IF FLOOR-TO-FLOOR ELEVATION EXCEEDS 14'-0'', PROVIDE INTERMEDIATE SEPARATOR BEAMS. b. FOR FLOOR-TO-FLOOR ELEVATIONS 14'-0'' OR LESS, IF ELEVATOR SUPPLIER REQUIRES ADDITIONAL SEPARATOR BEAMS AT A CLOSER SPACING, THEN THE ADDITIONAL COST SHALL BE INCLUDED IN THE ELEVATOR CONTRACT. c. SHOULD SEPARATOR BEAM WIDTH REQUIRED BY ELEVATOR SUPPLIER EXCEED 4'', ADDITIONAL COST SHALL BE INCLUDED IN THE ELEVATOR CONTRACT. STEEL JOIST & JOIST GIRDERS: ALL HUNG EQUIPMENT SHALL BE SUPPORTED WITHIN 3'' OF JOIST PANEL POINTS OR PROVIDE JOIST STIFFENERS AS INDICATED ON PLANS. JOIST MANUFACTURER TO DESIGN JOISTS FOR ROOFTOP UNIT LOADS AND SUSPENDED UNIT LOADS SHOWN ON DRAWINGS. COORDINATE EXACT LOCATION WITH CONTRACTOR. ALL JOISTS, JOIST BRIDGING, PLATES, HEADERS, AS WELL AS JOIST CONNECTIONS, SHALL CONFORM TO REQUIREMENTS OF THE ''STEEL JOIST INSTITUTE SPECIFICATIONS'' (LATEST EDITION). DESIGN JOIST TOP AND BOTTOM CHORDS AND BRIDGING FOR THE FOLLOWING NET WIND UPLIFT LOADS: 1. REFER TO COMPONENTS AND CLADDING FOR UPLIFT PRESSURES (W) FOR EACH ROOF ZONE. 2. DESIGN FOR THE GREATER UPLIFT RESISTED BY: CASE A: DESIGN DEAD LOAD. 25 PSF (0.6 DL - W) CASE B: MINIMUM DEAD LOAD. 14 PSF (DL - W) CASE C: 5 PSF MINIMUM NET UPLIFT STEEL DECK - ROOF: DECK, ACCESSORIES, AND ATTACHMENTS SHALL CONFORM TO ''STEEL DECK INSTITUTE SPECIFICATIONS'' (LATEST EDITION). DECK TYPE: 1-1/2'', 22 GA WIDE RIB DECK (THREE SPAN MINIMUM) AND 3", 20 GA DEEP RIB DECKS (3 SPAN (MINIMUM). DECK ATTACHMENT: SEE APPLICABLE DETAILS AND SPECIFICATIONS. ATTACH DECK 6'' ON CENTER ALONG PERIMETER WALLS AND END LAPS. WELD SPLIT OR PARTIAL PANELS IN EVERY VALLEY. SHOP DRAWINGS SHALL SPECIFY TYPE OF ATTACHMENT AND FASTENER SIZES. DO NOT USE WELD WASHERS. FOR OPENING LESS THAN 10'' IN DIAMETER, PROVIDE A 22 GA COVERPLATE, 6'' x 24'', EACH SIDE PERPENDICULAR TO DECK SPAN. THE NAME OF THE DECK FABRICATOR SHALL BE CLEARLY NOTED ON ALL SHOP DRAWING SUBMITTALS DO NOT SUSPEND POINT LOADS FROM ROOF DECK EXCEPT FOR HANGERS FOR SUSPENDED CEILINGS. SEE "WORK BY OTHERS". WORK BY OTHERS CONSTRUCTION MEANS AND METHODS ARE THE CONTRACTORS RESPONSIBILITY AND SHALL BE ENGINEERED AND PROVIDED BY THE TRADE CONTRACTOR. SUCH WORK INCLUDES BUT IS NOT LIMITED TO: ALL SUPPORTS, FRAMING, SUB-FRAMING, LIGHT GAGE FRAMING, MISCELLANEOUS STEEL FRAMING, METAL FABRICATIONS, BRACING, BRACKETS, HANGERS, CONNECTORS, EMBEDMENTS, FASTENERS AND ATTACHMENTS NOT SHOWN ON THE STRUCTURAL DRAWINGS ARE THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE ENGINEERED BY A REGISTERED P.E. AND PROVIDED BY THE TRADE CONTRACTOR WITH ITEMS BEING SUPPORTED BRACED AT THE TRADE CONTRACTOR'S EXPENSE. COMPLY WITH THE GOVERNING BUILDING CODE. SUCH ITEMS ARE NOT PART OF THE STRUCTURAL CONTRACT DOCUMENTS. THIS WORK ALSO INCLUDES: - SUPPORT FRAMING FOR EQUIPMENT INCLUDING UNISTRUT SYSTEMS, AND OTHER HUNG EQUIPMENT - CONNECTIONS OF GYMNASIUM EQUIPMENT HUNG FROM STRUCTURE SUCH AS BASKETBALL HOOPS HUNG FROM MASONRY WALLS - DESIGN OF TOWER CRANE FOUNDATIONS AND INTERMEDIATE SUPPORTS. - EVALUATION OF STRUCTURE FOR CONSTRUCTION EQUIPMENT LOADS SUCH AS FORKLIFTS, CONCRETE PLACING EQUIPMENT, ETC. - EVALUATION OF STRUCTURE AND INSTALLATION OF ANY NECESSARY SHORING FOR MOVING LOADS DURING INSTALLATION OF HEAVY EQUIPMENT. - DO NOT EXCEED THE DESIGN LIVE LOAD. SHORE AS REQUIRED. INSTALLER OF ANCHORS OR CONNECTIONS TO STRUCTURE IS RESPONSIBLE FOR ANCHOR DESIGN AND DETERMINATION OF STRUCTURAL COMPONENT ADEQUACY. DO NOT CUT REINFORCING BARS OR DAMAGE OTHER EMBEDMENTS. MECHANICAL EQUIPMENT WEIGHTS SHOWN ON THE STRUCTURAL DRAWINGS ARE THE MAXIMUM OPERATING WEIGHTS INCLUDING CURBS AND ACCESSORIES. WHERE DIMENSIONS OR WEIGHTS OF EQUIPMENT OR SYSTEMS ARE VARIABLE FROM MANUFACTURER TO MANUFACTURER, VERIFY DIMENSIONS AND WEIGHTS SHOWN ON DRAWINGS WITH SELECTED MANUFACTURER PRIOR TO ORDERING MATERIALS AND SHOP DRAWINGS SUBMITTALS. NOTIFY STRUCTURAL ENGINEER WHEN ACTUAL TOTAL WEIGHTS EXCEED THE WEIGHT SHOWN ON CONTRACT DOCUMENTS. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL EQUIPMENT OPENINGS AND CURB SUPPORTS WITH THE STEEL FABRICATOR AND THE EQUIPMENT SUPPLIER, PRIOR TO THE SUBMISSION OF SHOP DRAWINGS. DO NOT SUSPEND POINT LOADS FROM CONCRETE SLABS TOTALING MORE THAN 200 LBS WITHIN ANY 50 SQUARE FEET OF CONTIGUOUS FLOOR SLAB AREA. ENGINEER AND PROVIDE SUB-FRAMING AND BRACING TO TRANSFER SUCH LOADS TO JOISTS, BEAMS, OR GIRDERS AT EXPENSE OF TRADE CONTRACTOR SUSPENDING LOADS. DO NOT SUSPEND POINT OR LINE LOADS FROM METAL ROOF DECK. POINT LOADS INCLUDE, BUT ARE NOT LIMITED TO: PIPES, DUCTS, STEEL STUDS, EQUIPMENT, ETC. CONTRACTOR INSTALLING SUCH POINT LOADS SHALL PROVIDE SUB-FRAMING TO TRANSFER LOAD TO THE STRUCTURE SUPPORTING DECK, OR PROVIDE STAMPED CALCULATIONS THAT CONNECTIONS AND ROOF DECK HAVE SUFFICIENT CAPACITY. SUSPENDED HORIZONTAL CEILINGS EXCLUDING BULKHEADS FRAMED WITH STEEL STUDS MAY BE SUSPENDED FROM METAL ROOF DECK. SUSPENDED CEILING SYSTEMS SHALL BE LIMITED TO 4 POUNDS PER SQUARE FOOT INCLUDING THE WEIGHT OF MECHANICAL, ELECTRICAL, AND PLUMBING COMPONENTS SUPPORTED BY THE CEILING. CEILINGS SHALL BE SUPPORTED AT A MAXIMUM OF 4 FEET ON CENTER. THE DESIGN OF THE ATTACHMENT OF THE SUSPENDED CEILING TO THE ROOF DECK SHALL BE BY THE RESPECTIVE TRADE. DESIGN OF PRE-ENGINEERED SYSTEMS SPECIFIED IN THE CONTRACT DOCUMENTS WHICH ARE DESIGNED OR ENGINEERED BY OTHERS IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. SUBMITTALS OF SUCH SYSTEMS SHALL BE SEALED BY AN ENGINEER LICENSED IN THE PROJECT STATE. REVIEW OF SUBMITTALS BY THE ARCHITECT AND STRUCTURAL ENGINEER SHALL BE FOR CONFORMANCE WITH THE CONTRACT DOCUMENTS WITH REGARD TO THE ARRANGEMENT AND SIZES OF MEMBERS SHOWN ON THE STRUCTURAL CONTRACT DOCUMENTS AND THE CONTRACTORS INTERPRETATION OF THE DESIGN INFORMATION INCLUDED IN THE CONTRACT DOCUMENTS. SUCH REVIEW BY THE ARCHITECT AND STRUCTURAL ENGINEER SHALL NOT IMPLY ANY RESPONSIBILITY FOR THE ACTUAL DESIGN OF SUCH SYSTEMS. CONTRACTOR HAS FULL RESPONSIBILITY FOR DIMENSIONAL ACCURACY AND CONFORMANCE WITH THE INFORMATION CONTAINED IN THE CONTRACT DOCUMENTS. UNLESS SPECIFICALLY NOTED ON THE CONTRACT DOCUMENTS, NO SUPPORT PROVISION HAVE BEEN MADE FOR MISCELLANEOUS MECHANICAL, ELECTRICAL, PLUMBING OR SPRINKLER PIPE LOADS WHICH INDUCE A COMBINED AVERAGE LOAD GREATER THAN 3 PSF ON ANY GIVEN STRUCTURAL FRAMING MEMBER, U.N.O. THE CONTRACTOR SHALL COORDINATE ALL MISCELLANEOUS LOADS WITH ALL TRADES AND NOTIFY THE ENGINEER IF LOADS ARE EXCEEDED, PRIOR TO INSTALLATION BEFORE SUCH PIPING IS PLACED. - THERE ARE NO RESTRICTIONS FOR SINGLE WATER-FILLED 4" DIAMETER PIPING PLACED PARALLEL TO FRAMING MEMBERS (JOISTS, TRUSSES, ETC.), EXCEPT FOR FRAMING AT 2'-0" o/c OR LESS, 4" DIAMETER PIPES SHALL BE LOCATED MIDWAY BETWEEN AND HUNG FROM TWO FRAMING MEMBERS - UNLESS OTHERWISE APPROVED BY STRUCTURAL ENGINEER, SUPPORT WATER-FILLED 6'' DIAMETER (e.g. SPRINKLER PIPE MAINS) AS FOLLOWS: 1. IF PIPE RUNS PARALLEL TO FRAMING, LOCATE PIPE MIDWAY BETWEEN, AND HANG FROM, TWO FRAMING MEMBERS (JOISTS, TRUSSES, ETC.). 2. FOR PIPING PERPENDICULAR TO FRAMING ATTACH AT 8'-0'' o.c. MAXIMUM TO STRUCTURE WHERE FRAMING IS SPACED AT 8 FT o.c. OR LESS 3. ALL PIPE 3" DIAMETER OR GREATER SHALL BE SCHEDULE 10, NOTIFY ENGINEER IF SCHEDULE40 PIPE IS USED. STRUCTURE MAY NEED TO BE REVISED. 4. NOTIFY ENGINEER WHERE MULTIPLE PIPES ARE HUNG FROM FRAMING. STRUCTURE MAY NEED TO BE REVISED. 8" DIAMETER OR GREATER MAINS ARE NOT ALLOWED DESIGN STRESSES: REINFORCING STEEL STRUCTURAL STEEL HANDRAILS TUBES, RECTANGULAR HSS CONCRETE MASONRY UNIT SOIL BEARING PRESSURE CONCRETE AT 28 DAYS AND PLATES W SHAPES S, M, OR HP CHANNELS, ANGLES F'c = 4000 PSI INTERIOR SLAB ON GRADE, PRECAST KEYWAYS AND TOPPING, SUPPORTED FLOORS, WALLS, PIERS, COLUMNS. F'c = 4500 PSI EXTERIOR WALLS, PIERS, COLUMNS, TRENCH FOOTINGS. AIR ENTRAIN EXTERIOR EXPOSED CONCRETE. F'c = 3000 PSI FOOTINGS F'm = 2500 PSI (NET AREA COMPRESSIVE STRENGTH = 3750 PSI MIN.) NORMAL WEIGHT BLOCK . TYPE ''M'' MORTAR SHALL BE USED FOR FOUNDATION WALLS AND TYPE ''S'' OR ''M'' MORTAR SHALL BE USED ON WALLS ABOVE GRADE. Fy = 60,000 PSI PER ASTM A615 GRADE 60. ASTM A572 GR 50 OR ASTM A992 GR50 ASTM A572 GR 50 ASTM A36, Fy = 36000 psi, OR ASTM A572 GR50 Fy = 46,000 PSI PER ASTM A500 GRADE B. OR Fy = 50,000 PSI PER ASTM A500 GRADE C ROUND HSS Fy = 42,000 PSI PER ASTM A500 GRADE B. Fy = 42,000 PSI PER ASTM A500 GRADE B. 2,000 PSF PER SOIL REPORT NO. C22625 DATED JANUARY 25, 2023 BY CGC, INC. STEEL PIPE Fy = 35,000 PSI PER ASTM A53 GRADE B. MASONRY GROUT F'c = 3,000 PSI COMPONENTS AND CLADDING WIND DIRECTIONALITY FACTOR DESIGN LOADS & FACTORS: SYSTEM MAXIMUM DESIGN FORCE, MAIN WIND FORCE RESISTING MAXIMUM DESIGN FORCE, - - WIND: GENERAL: EXPOSURE CATEGORY - - BUILDING RISK CATEGORY - ''B'', ALL DIRECTIONS d K = 0.85 SPECTRAL RESPONSE COEFFICIENTS SEISMIC: ANALYSIS PROCEDURE DESIGN BASE SHEAR SEISMIC DESIGN CATEGORY - SITE CLASS - - - - = 0.082 = 0.107 83.7K D1 DS D S S IMPORTANCE FACTOR -E = 1.1 MAPPED SPECTRAL RESPONSE - = 5.10%g = 10.00%g 1 S S S B ASCE 7-10 DIRECTIONAL PROCEDURE VELOCITY PRESSURE COEFFICIENT -h K = TOPOGRAPHIC FACTOR -zt K = 1.0 SEE "MAIN WIND FORCE DESIGN WIND & PRESSURE DIAGRAM PRESSURES SHOWN ARE ULTIMATE SEE "COMPONENTS AND CLADDING DESIGN WIND PRESSURE DIAGRAM" PRESSURES SHOWN ARE ULTIMATE COEFFICIENTS BC 2015 CATEGORY RESPONSE MODIFICATION FACTOR - R = 4.0, ASCE, TABLE 12.2-1 SYSTEM A5 BEARING WALL SYSTEMS BASIC SEISMIC FORCE RESISTING SYSTEM - SEISMIC RESPONSE COEFFICIENT - PRECAST SHEAR WALLS EQUIVALENT LATERAL FORCE PROCEDURE ASCE 7, 12.8 INDEX FORCE ANALYSIS PROCEDURE, ASCE 7, 11.7 TYPICAL FLAT ROOF SNOW LOAD ROOF SNOW LOADS: FLOORS LIVE LOADS: GROUND SNOW LOAD Pg - - STAIRS, LOBBIES AND CORRIDORS TYPICAL FLOORS ABOVE GRADE - - = 22.0 PSF, USE 30 PSF MIN. = 0.7 x 1.0 x 1.0 x 1.1 x 25 PSF Pf = 0.7 x Ce x Ct x Is x Pg 100 PSF INCLUDING PARTITIONS 25 PSF 100 PSF AT GRADE, 80 PSF ABOVE ROOF RAIN LOADS: RAINFALL RATE (FIG. 1611.1) - RAIN LOAD AT DRAINS -R = 5.2 (ds+dh) RAIN LOAD AT SCUPPER OR OVERFLOW DRAIN -R = 5.2 (1'') = 5.2 PSF R = 5.2 (2.75'' + 1'') = 19.5 PSF i = 3 INCHES/HR RAIN LOADS CONTROL/DO NOT CONTROL PONDING CHECK -OK OR DOES NOT APPLY FLOOR SUPERIMPOSED DEAD LOAD 20 PSF ROOF DEAD LOAD 30 PSF, INCLUDING JOISTS & DECK FOR AN ADHERED ROOF AND PHOTOVOLTAIC PANELS C = 0.033S NORMAL DESIGN WIND SPEED ULTIMATE DESIGN WIND SPEED (3 SEC GUST) - -ULTV = 93 MPH ASDV = 90 MPH MAIN WIND FORCE RESISTING SYSTEM DESIGN WIND PRESSURE (ASCE 7-10 DIRECTIONAL PROCEDURE) (ULTIMATE) DESIGN PRESSURES "q", PSF PARAPET 2ND FLR 1ST FLR COMPONENT AND CLADDING DESIGN WIND PRESSURE (ASCE 7-10) (ULTIMATE) SURFACE PRESSURE (PSF)ROOF SURFACE PRESSURE (PSF)WALLS SURFACE PRESSURE (PSF)PARAPET ZONE A = 20 SF ZONE 1 ZONE 2 ZONE 3 A = 50 SF A = 100 SF -25.2 PSF -38.8 PSF -54.2 PSF -24.4 PSF -32.7 PSF -39.3 PSF -23.7 PSF -28.1 PSF -28.1 PSF 1. A IS WIND TRIBUTARY AREA OF COMPONENT OR CLADDING. ZONE A = 20 SF ZONE 4 ZONE 5 A = 50 SF A = 100 SF -24.6 PSF -29.5 PSF 1. A IS WIND TRIBUTARY AREA OF COMPONENT OR CLADDING. ZONES 4 & 5 NEGATIVE PRESSURES APPLY TO ALL HEIGHTS. "+" INDICATES POSITIVE PRESSURE AGAINST WALLS & "-" INDICATES SUCTION PRESSURE A = 10 SF CASE A: INTERIOR ZONE 4 CORNER ZONE 5 A = 100 SF A = 500 SF 59.3 PSF 81.2 PSF 40.4 PSF 40.4 PSF 38 PSF 38 PSF 1. A = WIND TRIBUTARY AREA OF PARAPET. ZONE CASE B: INTERIOR ZONE 4 CORNER ZONE 5 -41.5 PSF -47.5 PSF -34.5 PSF -37.0 PSF -29.6 PSF -29.6 PSF 2. CASE A = PRESSURE TOWARDS BUILDING CASE B = PRESSURE AWAY FROM BUILDING 5 55 5 4 4 1 3 3 3 3 2 2 2 2 a = 13' - 0'' 2 +22.7 PSF +22.7 PSF +21.3 PSF +21.3 PSF -23.2 PSF -26.7 PSF -22.2 PSF -24.6 PSF +20.2 PSF +20.2 PSF a 2a aa ALL PRESSURE SHOWN ARE ULTIMATE ФFLAT ROOF ≤10° GEOFOAM COMPRESSIVE STRENGTH 64.3 PSI 23.5 PSI Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 1/8" = 1'-0" GENERAL NOTES & SCHEDULES WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S9.0 10/04/2023 220025.00 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET BOLT TYPE AB-2 B BASE PLATE DETAILBASE PLATE DETAILA C NUT TACK WELDED TO BOLTLBOLT PROJECTIONZ DIA V/2 V/2 X X W/2 W/2Y Y SEE HOLE AND WASHER SCHEDULEYYW/2W/2XX V/2V/2 SEE HOLE AND WASHER SCHEDULE SINGLE NUT & WASHER PLATE SHORTEN HEIGHT AS REQUIRED FOR FOOTING THICKNESS - USE (4) - 3/4" DIAMETER ANCHOR BOLTS, UNLESS NOTED OTHERWISE 1. WELD BOTH SIDES WHEN MOMENT COLUMNS ARE SPECIFIED NOTE 1 5/16 (4) - SIDES5/16 - DO NOT RUN WELDS PAST TOE OF WIDE FLANGE OF CORNERS OF TUBES ANCHOR ROD DIAMETER, IN. HOLE DIAMETER, IN.. MIN. WASHER DIMENSION, IN.. MIN. WASHER THICKNESS, IN.. ANCHOR ROD HOLE AND WASHER SIZE 3/4'' 7/8'' 1'' 1 1/4'' 1 1/2'' 1 3/4'' 2'' 2 1/2'' 2''1 5/16'' 1 9/16'' 1 13/16'' 2 1/16'' 2 5/16'' 2 3/4'' 3 1/4'' 3 3/4'' 2 1/2'' 3'' 3 1/4'' 3 1/2'' 4'' 5'' 5 1/2'' 1/4'' 5/16'' 3/8'' 1/2'' 1/2'' 5/8'' 3/4'' 7/8'' HSS6 x 6 3/4" 12" 12" 4 1/2" 4 1/2" 5" 3/4"B1' - 6" W10 x 60 1 3/4" 18" 18" 7" 7" 6" 1"A1' - 6" HSS5 x 5 3/4" 11" 11" 4" 4" 5" 3/4"B1' - 4" W12 x 72 1" 20" 20" 8" 8" 6" 1"A1' - 6" REF: AISC MANUAL, 14 ED., TABLE 14 - 2 BASE PLATE SCHEDULE COLUMN THICKNESS T V W X Y DIMENSIONS BOLT LOCATIONS BOLT PROJECTIONS BOLT DIAMETER Z BASE PLATE DETAIL BOLT LENGTH L MARK BP-1 BP-2 BP-3 BP-4 TYPE ''A'' TYPE ''B''TYPE ''C'' L L L NOTE (7)WW/2WW/2NOTES: 1. W = WALL WIDTH -- SEE PLAN 2. PROVIDE DOWELS OF SAME SIZE AND NUMBER AS VERTICAL REINFORCEMENT. MINIMUM LAP PER SCHEDULE WITH STANDARD ACI HOOK INTO FOOTING, FOUNDATION WALLS, ETC. 3. RUN HORIZONTAL REINFORCEMENT THROUGH PIER WHERE PIER IS PART OF WALL. WHERE PIERS ARE ISOLATED AND NOT PART OF THE CONTINUOUS WALL e.g. BETWEEN WINDOWS, PROVIDE #2 TIES @ 8" o/c 4. FILL CELLS SOLID WITH 3000 PSI GROUT. USE ONLY 2 CELL BLOCK. SEE MASONRY GENERAL NOTES FOR GROUTING METHODS ALLOWED. 5. PROVIDE (1) - #5 AT EACH SIDE OF OPENINGS, DOORS, WINDOWS, DUCT OPENINGS ETC. U.N.O. SEE PLAN FOR MASONRY PIER REQUIREMENTS 6. USE ONLY STANDARD HOLLOW PILASTER OR COLUMN BLOCK. PROVIDE 1 1/2" CLEAR CONCRETE COVER TO TIES. FILL WITH 3000 PSI GROUT. 7. PROVIDE 1/2" CLEAR GROUT COVER BETWEEN BLOCK FACE AND BAR TYPE ''D'' L LMP1 "A" 16 (2) - #5 BARS NOTE (3) MP2 "A" 24 (3) - #5 BARS NOTE (3) MP3 "A" 32 (4) - #5 BARS NOTE (3) MP4 "B" 16 (4) - #5 BARS NOTE (3) MP5 "B" 24 (6) - #6 BARS NOTE (3) MP6 "B" 32 (8) - #6 BARS NOTE (3) MP7 "B" 48 (12) - #6 BARS NOTE (3) MP8 "C" 16 x 16 (3) - #5 BARS NOTE (3) MP9 "C" 24 x 24 (5) - #5 BARS NOTE (3) MP10 "D" 16 x 16 (4) - #5 BARS NOTE (6) #3 TIES @ 16" o/c MARK TYPE SIZE (L) IN INCHES VERTICAL REINFORCEMENT TYPE REMARKS MASONRY PIER SCHEDULE TYPE ''A'' BAR SIZE 6'' TYPE ''B'' 8'', 10'' & 12'' TYPE NOMINAL THICKNESS WALL (W) MASONRY BAR SPLICE SCHEDULE #3 1' - 0'' NOTE (3)WW/2#4 #5 #6 #3 #4 #5 1' - 9" 2' - 9" 5' - 2" - - - NOTES: 1. REQUIRED f'm = 2500 PSI 2. W = WALL WIDTH = SEE PLAN 3. PROVIDE 1/2" CLEAR GROUT COVER BETWEEN BLOCK FACE AND BAR 4. LAP LENGTHS APPLY TO BOTH VERTICAL AND HORIZONTAL BARS. 5. MECHANICAL CONNECTIONS THAT DEVELOP 125% OF BAR YIELD STRENGTH MAY BE SUBSTITUTED FOR LAP SPLICES. 6. WELDED SPLICES ARE NOT PERMITTED. 7. FOR EPOXY COATED BARS, MULTIPLY LENGTHS GIVEN IN TABLE BY 1.5 A A A A B B B 1' - 0'' 1' - 2'' 1' - 10'' 3' - 6'' 1' - 2'' 2' - 0'' 3' - 2'' ACI-530-11. TYPE ''C''TYPE ''A'' TYPE ''B''TYPE ''D'' TYPE ''E''TYPE ''F'' NOTES: 1. PROVIDE DOWELS OF SAME SIZE AND NUMBER AS VERTICAL REINFORCEMENT. MINIMUM LAP = 30 BAR DIAMETERS UNLESS NOTED OTHERWISE. SEE TYPICAL FOR DETAILS. 2. RUN HORIZONTAL WALL REINFORCING THROUGH PIER 3. LINE UP VERTICAL BARS AND TIES WITH MASONRY PIER ABOVE. 4. PROVIDE TIES PER ACI 7.10 AND 3 ADDITIONAL TIES AT TOP OF PIER. 5. COORDINATE COLUMN DOWEL LOCATIONS WITH PRECASTER 6. CENTER PIER BELOW COLUMN. 7. CHAMFER EXPOSED COLUMNS WWL L WWWL L L L MARK TYPE SIZE (W) x (L) IN INCHES VERTICAL REINFORCEMENT TIES REMARKS CONCRETE PIER SCHEDULE P1 B,D,E 24" x 24" (8) - #8 2 SETS #3 @ 16" o/c P2 A,B 30" x 30" (8) - #8 2 SETS #3 @ 16" o/c P3 B 20" x 20" (8) - #6 (3) #4 @ 12" o/c WALL THICKNESS CLEAR MASONRY OPENING WIDTH SECTION LOOSE STEEL LINTEL SCHEDULE (U.N.O.) L5 x 3 1/2 x 3/8 (LLV) (NOTE 10)TO 9'-0"4" BRICK L4 x 3 1/2 x 5/16 (LLV) (NOTE 10)TO 7'-0"4" BRICK L3 1/2 x 3 1/2 x 5/16TO 5'-0"4" BRICK ALL 4" BLOCK 6" 6" 6" 6" 8" 8" ANGLES SUPPORTING BRICK OR STONE AT FEC's & DF's 1/4" PLATE TO 5'-0" (NOTE 7)ST3 x 6.25 TO 5'-0" (NOTE 7)(2) - L3 1/2 x 2 1/2 x 1/4 LLV TO 7'-0" WT 4 x 10.5 TO 9'-0"WT 7 x 11 TO 12'-0"W8 x 10 TO 5'-0"(2) - L3 1/2 x 3 1/2 x 5/16 OR W8 x 10 w/ 5/16 PLATE TO 7'-0"(2) - L4 x 3 1/2 x 5/16 LLV OR W8 x 10 w/ 5/16 PLATE 8" TO 9'-0" WT 7 x 15 OR W8 x 15 w/ 5/16" PLATE 10" TO 7'-0" W8 x 10 w/ 5/16 PLATE W8 x 15 w/ 5/16 PLATETO 10'-0"10" (3) - L3 1/2 x 3 1/2 x 5/16 OR W8 x 10 w/ 5/16 PLATETO 5'-0"12" 12" TO 7'-0" W8 x 10 w/ 5/16 PLATE W8 x 15 w/ 5/16 PLATETO 10'-0"12" BENT PLATE 5/16" x 7"V AS REQUIRED. STOP HORIZONTAL LEG 1/2" FROM BACK FACE. FOR SPANS GREATER THAN 4' - 6" o/c EXPANSION BOLT TO BOND BEAM W/ 1/2" DIA x 5" BOLTS AT 2'-0" o/c TO 12'-5" L7 x 4 x 3/8 (LLV) (NOTE 10)4" BRICK 4" BRICK TO 11'-0" L6 x 3 1/2 x 3/8 (LLV) (NOTE 10) 1. AT EXTERIOR WALLS, POOLS AND OTHER CORROSIVE ENVIRONMENTS, BOTTOM PLATE OF LINTELS, ANGLES AND OTHER STEEL SHALL BE GALVANIZED OR PAINTED FOR EXTERIOR EXPOSURE WITH TWO COAT SYSTEM ZINC RICH EPOXY 2. MAY BE USED AS ALTERNATE TO MASONRY GENERAL NOTES FOR PRECAST OR BOND BEAM LINTELS 3. USE OVER RECESSED DRINKING FOUNTAINS (DF) FIRE EXTINGUISHER CABINETS (FEC) CONNECTORS, LOUVERS, DAMPERS, DUCTS, KNOCKOUT PANELS, WINDOWS, DOORS AND OPENINGS THROUGH MASONRY WALLS WHERE OTHER LINTELS ARE NOT DETAILED OR SCHEDULED. 4. PROVIDE MINIMUM 8" BEARING EACH END OF LINTEL 5. CENTER LINTELS IN WALL UNLESS NOTED. 6. BOTTOM PLATES UNDER WIDE FLANGE SHAPES SHALL BE EXTENDED FULL LENGTH OF LINTEL 7. WELD LINTELS INTO SINGLE UNITS 8. NO LINTEL REQUIRED FOR 4" AND 6" NON-BEARING MASONRY WALLS WHERE GROUTED HOLLOW METAL FRAMES HAVE HEADSPAN OF 4'-0" OR LESS 9. FOR BEAMS WITH PLATES, WIDTH OF PLATE = NOMINAL MASONRY WALL THICKNESS (INCLUDING BRICK) - 1 10. BOLT ANGLE TO SOLID MASONRY OR WELD TO STEEL STUD BOX HEADER AT 24" o/c LOAD = 1000 PLF (WSD) 2. SEE MASONRY GENERAL NOTES FOR BEARING REQUIREMENTS. 3. COORDINATE BOTTOM OF LINTEL ELEVATION WITH ARCHITECTURAL PLANS. 4. FOR STEEL LINTELS, PROVIDE 5/16'' BOTTOM PLATE UNLESS NOTED OTHERWISE. WIDTH OF PLATE = NOMINAL MASONRY THICKNESS (INCLUDING VENEER) -1''. 5. FOR STEEL LINTELS GREATER THAN OR EQUAL TO 10'-0'' LONG, PROVIDE 3/8'' DIAMETER x 4'' LONG HEADED WELDED STUDS AT 32'' O/C ON TOP FLANGE. LINTELS LESS THAN 10'-0'' LONG MAY BE PLACED LOOSE WITHOUT ANCHOR BOLTS OR BEARING PLATES, UNLESS NOTED OTHERWISE 6. PRECAST LINTELS: f'c = 4000 psi, MIN. (3000 PSI FOR L1) fy = 60000 psi. REINFORCEMENT FOR PRECAST BEAMS TO BE DESIGNED BY PRECASTER UNLESS SPECIFICALLY CALLED OUT. PRECAST DESIGNER SHALL DOUBLE CHECK LOADS PROVIDED AND DESIGN FOR WORST CASE. 7. FOR PRECAST OR BOND BEAM LINTELS BACKING VENEER, SEE LOOSE LINTEL SCHEDULE FOR BRICK SUPPORT ANGLE REQUIREMENTS. 8. ALL DIMENSIONS ARE NOMINAL MASONRY DIMENSIONS U.N.O. 9. LINTELS WITH L-*H INDICATES LINTELS OVER MECHANICAL OPENINGS. 10. DO NOT PLACE CONTROL OR EXPANSION JOINTS AT LINTEL BEARING POINTS OR ANYWHERE WITHIN THE LINTEL. 1. AT EXTERIOR WALLS, POOLS AND OTHER CORROSIVE ENVIRONMENTS, LINTELS AND BOTTOM PLATE ANGLES AND OTHER STEEL SHALL BE GALVANIZED OR PAINTED FOR EXTERIOR EXPOSURE WITH TWO COAT SYSTEM ZINC RICH EPOXY LINTEL SCHEDULE MARK SIZE REMARKS L1 NOT USED L2 8" HIGH BOND BEAM OR PRECAST BEAM w/ (2) #5 BOTTOM BY MASONRY CONTRACTOR L3 W8 x 18 L4 W8 x 28 L5 16" HIGH MASONRY LINTEL w/ (2) #5 TOP & BOTTOM L6 8" WIDE x 16" HIGH PRECAST LINTEL L7 24" HIGH MASONRY LINTEL w/ (2) #5 TOP & BOTTOM 1LL EDCBA 21 DL LLLL DL PPP ba c LLL L c LOAD DIAGRAMS: JOIST SCHEDULE NOTES: LL 1 L c LL 2 d LL 1 1. "DL" INDICATES DEAD LOAD. "LL" INDICATES LIVE LOAD. 2. FOR "L" SEE PLANS. COORDINATE "a", "b" AND "c" WITH MECHANICAL AND ARCHITECTURAL 3. WHERE MORE THAN ONE LOAD DIAGRAM IS SPECIFIED FOR A GIVEN LOAD CASE, LOAD DIAGRAMS. SHALL BE SUPERIMPOSED. 4. MAXIMUM DEFLECTION DUE TO LIVE LOADS AND POINT LOADS COMBINED SHALL BE L/360. 5. JOIST MANUFACTURER SHALL CHECK TOP CHORD FOR BENDING. MARK CASE NUMBER LOAD DIAGRAM PLF LBS REMARKS SCHEDULE OF SPECIAL JOISTS PLF PLF DL PLL LL1 2 22KSP1 1 B 25 400 c = 15' - 6', d = 7' - 0"240 28KSP1 1 B 25 470 c = 17' - 0", d = 4' - 0"200 22KSP2 1 B 25 525 c = 15' - 6", d = 4' - 0"300 22KSP1 2 C 25 360 c = 6' - 0" 28KSP2 1 B 100 470 c = 12' - 0", d = 4' - 0"200 6. JOIST DETAILER: JOIST SHOP DRAWINGS MUST CLEARLY INDICATE WHICH END IS DESIGNED FOR SNOW DRIFT OR CONCENTRATED LOADS. - FOOTINGS LISTED MAY NOT ALL BE USED ON THIS PROJECT. - SOIL BEARING PRESSURE PER SOIL REPORT 2,000 PSF MARK SIZE DEPTH REINFORCEMENT REMARKS FOOTING SCHEDULE F3.0 3' - 0" x 3' - 0" 12" (4) - #4 EACH WAY BOTTOM F3.5 3' - 6" x 3' - 6" 12" (5) - #4, EACH WAY, BOTTOM F4.0 4' - 0'' x 4' - 0'' 12" (4) - #5, EACH WAY, BOTTOM F4.5 4' - 6'' x 4' - 6'' 12" (4) - #5, EACH WAY, BOTTOM F5.0 5' - 0'' x 5' - 0'' 12" (5) - #5, EACH WAY, BOTTOM F5.5 5' - 6'' x 5' - 6'' 12" (5) - #5, EACH WAY, BOTTOM F6.0 6' - 0'' x 6' - 0'' 12" (6) - #5, EACH WAY, BOTTOM F6.5 6' - 6'' x 6' - 6' 13" (7) - #5, EACH WAY, BOTTOM F7.0 7' - 0'' x 7' - 0'' 14" (7) - #5, EACH WAY, BOTTOM F7.5 7' - 6'' x 7' - 6'' 15" (6) - #6, EACH WAY, BOTTOM F8.0 8' - 0'' x 8' - 0'' 16" (7) - #6, EACH WAY, BOTTOM F8.5 8' - 6'' x 8' - 6'' 17" (8) - #6, EACH WAY, BOTTOM F9.0 9' - 0'' x 9' - 0'' 18" (8) - #6, EACH WAY, BOTTOM F9.5 9' - 6'' x 9' - 6'' 19" (7) - #7, EACH WAY, BOTTOM F10.0 10' - 0'' x 10' - 0'' 20" (8) - #7, EACH WAY, BOTTOM F10.5 10' - 6'' x 10' - 6'' 21" (8) - #7, EACH WAY, BOTTOM F11.0 11' - 0'' x 11' - 0'' 21" (9) - #7, EACH WAY, BOTTOM SF2.0 2' - 0" x CONT 1' - 0" (2) - #5, BOTTOM x CONT SF2.5 2' - 6" x CONT 1' - 0" (2) - #5, BOTTOM x CONT SF3.0 3' - 0" x CONT 1' - 0" (3) - #5, BOTTOM x CONT SF4.5 4' - 6" x CONT 1' - 4" (6) - #5, BOTTOM x CONT #4 @ 16" o/c SHORT DIRECTION SF4.0 4' - 0" x CONT 1' - 4" (5) - #5, BOTTOM x CONT #4 @ 18" o/c SHORT DIRECTION SF3.5 3' - 5" x CONT 1' - 0" (3) - #5, BOTTOM x CONT #4 @ 18" o/c SHORT DIRECTION SF5.0 5' - 0" x CONT 1' - 6" (7) - #5, BOTTOM x CONT #4 @ 16" o/c SHORT DIRECTION SF7.5 7' - 6" x CONT 1' - 8" (11) - #5, BOTTOM x CONT #4 @ 7" o/c SHORT DIRECTION SF6.0 6' - 0" x CONT 1' - 6" (8) - #5, BOTTOM x CONT #4 @ 10" o/c SHORT DIRECTION Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 1/8" = 1'-0" SCHEDULES WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S9.1 10/04/2023 220025.00 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 16' - 7"30 PSF 105 PSF 11' - 6" 70 PSF 30 PSF 17' - 6" 45 PSF 115 PSF 50 PSF 30 PSF 6' - 10" 30 PSF 110 PSF 30 PSF 18' - 6"100 PSF30 PSF15' - 6"105 PSF 30 PSF 16' - 9"60 PSF 30 PSF 6' - 8"9' - 0"60 PSF 30 PSF 7' - 0" 30 PSF 50 PSF 7' - 0" 30 PSF 50 PSF 55 PSF 30 PSF 8' - 3"3' - 0"45 PSF 30 PSF 7' - 0"30 PSF 50 PSF 9' - 6" 30 PSF 75 PSF 30 PSF 70 PSF 8' - 8" 30 PSF 45 PSF3' - 3"105 PSF 30 PSF 16' - 9"70 PSF 5' - 0" Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 1/16" = 1'-0" SNOW DRIFT PLAN WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S9.2 10/04/2023 220025.00 1/16" = 1'-0"1 SNOW DRIFT PLAN 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 4 5 6 7 8 A B D F 7.2 5.8 9 B.5 C.8STEP 1' - 0"STEP 2' - 0" SF4.0 99' - 0" 96' - 0" F6.0P2 C C F9.0 96' - 0" F9.0 96' - 0" F9.0 96' - 0"99' - 0"BP-2P2BP-2P2BP-299' - 6"99' - 6"P2BP-2SF4.0 96' - 0" F.3E 99' - 6"CJ1' - 3"CJCJCJCJCJCJCJ CJ CJ CJ CJ CJ CJ CJ SLAB ON GRADE: 5'' CONCRETE w/6 x 6 - W1.4 x W1.4 WWF ON VAPOR BARRIER ON 6'' COMPACTED GRANULAR DRAINAGE FILL. T/SLAB ELEV. 100' - 0'' U.N.O. SLAB ON GRADE AT GYM FLOOR: 6'' CONCRETE W/ MACRO SYNTHETIC FIBERS PER MANUFACTURERS RECOMMENDED DOSAGE ON 6'' COMPACTED GRANULAR DRAINAGE FILL. T/SLAB ELEV. 99' - 9 1/2'' COORDINATE JOIST LOCATIONS W/ FLOOR SUPPLIER 4.9 5 N P Q SF2.0 96' - 0" SF2.0 96' - 0"SF2.096' - 0" SLAB ON GRADE: 5'' CONCRETE w/6 x 6 - W1.4 x W1.4 WWF ON VAPOR BARRIER ON 6'' COMPACTED GRANULAR DRAINAGE FILL. T/SLAB ELEV. 100' - 0'' U.N.O. CJCJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ SWNW NE SE BUILDING DIAGRAM NOT TO SCALE Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 As indicated FOUNDATION PLAN - OVERALL WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S1.0 ALT 10/04/2023 220025.00 1/8" = 1'-0"1 FOUNDATION PLAN - ALT 1 1/8" = 1'-0"2 FOUNDATION PLAN - ALT 2 KEY PLAN 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 5 8 5.8 9 W24 x 55B.5 C.8 W16 x 26 51' - 3"60DLH1761' - 6 1/8"6 EQ SPW21 x 44W24 x 62 W24 x 62 W16 x 26W27 x 84 W16 x 26W16 x 261 54' - 0"28KSP2 @ 4' - 6" 21' - 11 7/8" 20KSP1 @ 5' - 0" 11 20' - 0"20KSP2 @ 5' - 0"2C C F.3 5 E WF FOLDING PARTITION WALL ATTACHMENT BY OTHERS 8A 4.9 1 8" ROOF PLANK 1 8" ROOF PLANK Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: HEC Project No. 22-0025.00 C2023-15 1/8" = 1'-0" ROOF FRAMING PLAN AT ALTERNATE 1 & 2 WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 MILTON AVENUE JANESVILLE WI 53545 S2.1 ALT 10/04/2023 220025.00 1/8" = 1'-0"1 ROOF FRAMING PLAN - ALT 1 1/8" = 1'-0"2 ROOF FRAMING PLAN - ALT 2 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 8064 8 2 kg/cm2 11psiLEONARD 10 2010 R40050-10 0 °C°F60 30 2010LEONARD0 2010LEONARD050-10 0 °C°F60 0 -10 °C°F60 R40 0 50 30 10LEONARDR40 20 30 50-10 0 °C°F60 R4030100 100 100100 40 40 120120 40 120 40120 80 80 8080 60 60 60 60 20 20 2020 140 140 140 140 100 160 20 140 12040 60 OUTLET RETURN HOT INLET COLD INLET MEGATRON KEY TEST CONNECTION FULL PORT BALL VALVE MIXING VALVE 1 2 3 DIAL THERMOMETER4 CIRCULATOR5 PUMP SHUT-OFFS6 BALANCING VALVE7 FLAPPER CHECK8 GALVANIZED STRUT9 CORNER BRACKET11 TEE BRACKET10 1 35" 3 4 9 6 5 4 3 TO WATER HEATER 11 8 8 71 12" 410 2 60" 1. DRAWINGS OF ALL OTHER TRADES SHALL BE REVIEWED. THIS CONTRACTOR SHALL COORDINATE THE INSTALLATION AND SCHEDULING OF HIS WORK WITH OTHER TRADES TO PREVENT INTERFERENCE WITH THEIR RESPECTIVE INSTALLATIONS. 2. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL PLUMBING FIXTURES, EQUIPMENT, APPURTENANCES, STRUCTURAL DIMENSIONS, AND LAYOUT. 3. DEVIATIONS FROM THE ROUTING OF NEW PIPING SHOWN MAY BE NECESSARY IN ORDER TO CLEAR WORK OF OTHER TRADES. HOWEVER, ALL SUCH DEVIATIONS SHALL BE COORDINATED PREVIOUSLY WITH ARCHITECT, ARCHITECT REPRESENTIVE AND ENGINEER. THE INITIAL DESIGN INTENT FOR DEVIATIONS SHALL BE FOLLOWED FOR ALL NECESSARY DEVIATIONS AND MEET CODE COMPLIANCE. 4. ALL SANITARY, STORM, AND CLEAR WATER WASTE PIPING SHALL BE PITCHED AS FOLLOWS: PIPING 2" AND SMALLER AT 1/4"/FT, PIPING 3" AND LARGER AT 1/8"/FT UNLESS OTHERWISE NOTED. CORRIDNATE INVERTS WITH SITE BUILDING SEWERS BEFORE INSTALLATION OF PIPING. 5. PENETRATIONS THROUGH FLOORS AND WALLS SHALL BE SEALED WITH A U. L. LISTED SYSTEM OF MATERIAL THAT MEETS OR EXCEEDS THE FIRE RATING OF THE WALL OR FLOOR PENETRATED. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, NEW OPENINGS, EXISTING OPENINGS MADE OBSOLETE BY THE REMOVAL OR REROUTING OF PLUMBING PIPING. 6. INSTALL ALL INTERIOR HORIZONTAL STORM, WATER, WASTE, AND VENT PIPING AS HIGH AS POSSIBLE. ALL HORIZONTAL PIPING LOCATED ABOVE CEILINGS SHALL BE INSTALLED WITHIN THE JOIST SPACE UNLESS OTHERWISE INDICATED. 7. INSTALL CLEANOUT AT THE BASE OF ALL ROOF CONDUCTORS AND WASTE STACKS. ALL CLEANOUTS SHALL BE INSTALLED WHERE EASILY ACCESSIBLE. PROVIDE ACESS PANELS WHERE REQUIRED FOR C.O.’S LOCATED IN WALLS, CHASES OR CABINETRY COORDINATE ALL CLEANOUT LOCATIONS WITH ALL EQUIPMENT, CABINETS, ETC. PRIOR TO INSTALLATION. 8. ALL WORK SHALL BE PERFORMED AND INSTALLED IN COMPLIANCE WITH THE WISCONSIN PLUMBING CODE AND ALL OTHER APPLICABLE CODES AS ADOPTED BY THE LOCAL INSPECTING AUTHORITIES. ALL PLUMBING FIXTURES, EQUIPMENT AND APPURTENANCES SHALL COMPLY WITH THE WISCONSIN PLUMBING CODE SPS 384. 9. SAW CUTTING, REMOVAL, AND REPLACEMENT OF NEW (IF REQUIRED)AND EXISITING FLOOR SLAB FOR THE INSTALLATION OF NEW PLUMBING WORK IS THE RESPONSIBILITY OF THIS CONTRACTOR. NEW FLOOR CONSTRUCTION SHALL MATCH EXISTING. 10. ALL SLEEVES THROUGH CONCRETE FRAMING REQUIRED FOR THE INSTALLATION OF PLUMBING WORK SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR. 11. CORE-DRILLING OR SLEEVING THROUGH BEAMS, JOISTS, OR BRIDGING SHALL NOT BE PERMITTED UNLESS SPECIFICALLY SHOWN ON STRUCTURAL DRAWINGS. INCLUDE SUFFICIENT ALLOWANCES FOR OFFSETS OF PIPING TO CLEAR STRUCTURAL MEMBERS. 12. TRAPS AT ALL SINKS AND LAVATORIES SHALL BE INSTALLED STRAIGHT BACK TO THE WALL WITH RESPECT TO TRAP SWIVEL ADJUSTMENT . ALL PIPING OFFSETS TO TRAP WASTE OUTLET CONNECTION SHALL BE LOCATED WITHIN THE WALL. 13. LOCATE ALL VENT TERMINALS A MINIMUM OF 10'-0" FROM ANY OUTSIDE AIR INTAKES. 14. ALL VALVES, SHOCK ARRESTORS, ETC. REQUIRED IN WALLS OR ABOVE NON-ACCESSIBLE CEILINGS SHALL BE CENTRALLY LOCATED BEHIND ACCESS PANELS. ALL CODE COMPLIANT SHOCK ARRESTORS AND VALVING MAY NOT BE SHOWN ON DRAWINGS. CONTRACTOR IS TO INCLUDE ALL CODE COMPIANT SHOCK ARRESTORS AND VALVES REQUIRED FOR CODE COMPLIANCE. 15. REFER TO PIPING ISOMETRICS FOR SIZES NOT SHOWN ON PLANS. 16. REMOVAL AND REPLACEMENT OF EXISTING CEILINGS REQUIRED FOR THE INSTALLATION OF PLUMBING SHALL BE THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR. CEILING CONSTRUCTION AND FINISH SHALL MATCH EXISTING. 17. ALL BELOW GROUND PIPING SHALL BE CORRIDNATED WITH SITE INVERTS PRYOR TO INSTALATION. CONTRACTOR SHALL AJUST INTERIOR BUIDING SEWER INVERTS AND EXCAVATION WHERE REQUIRED TO MATCH SITE CONNECTIONS. INCLUDE ALL NECESSARY OFFSETS NOT SHOWN ON DRAWINGS TO MATCH SITE SEWER INVERTS AND MATERIALS TO CONNECT TO SITE SEWERS. GENERAL PLUMBING NOTES: FLOW UR URINAL CATCH BASIN EMERGENCY EYE WASH CB EEW POINT OF CONNECTION OF NEW PIPING TO EXISTING CP ELECTRIC WATER COOLER SINK SERVICE SINK SHOWER WATER CLOSET LAVATORY MOP BASIN EWC SH SS WC MB EXPANSION TANK STORAGE TANK WATER SOFTENER CIRCULATING PUMP LOCAL VENT CLEAR WATER VENT ET WS ST LV CLV IE=00.00' TRAP PRIMER VALVE INVERT ELEVATION FLOOR DRAIN ROOF DRAIN HUB DRAIN OR SITE DRAIN TPV I.E. RD FD HD PIPING DOWN BALL VALVE CHECK VALVE BALANCING VALVE FLOOR CLEANOUT CLEANOUT HOSE BIBB / WALL HYDRANT DN FCO C.O. DESCRIPTION PLUMBING LEGEND ABBR.SYMBOL CS DM W SANITARY PIPING BELOW GROUND SANITARY VENT PIPING ABOVE GROUND PIPING UP DE-MINERALIZED WATER PIPING STORM PIPING BELOW GROUND STORM PIPING ABOVE GROUND SANITARY VENT PIPING BELOW GROUND V UP DM ST ST V HOT WATER PIPING COLD WATER PIPING SANITARY PIPING ABOVE GROUND HOT WATER RETURN PIPING COLD SOFT WATER PIPING W HW CS CW FIXTURE UNIT TAGS SHOCK ARRESTOR CLV HOT WATER HEATERHWH REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTERRPPBP WASH MACHINE BOXWMB BUTTERFLY VALVE HWR CLEAR WATER WASTECLWCLW WHHB/ L-LAV / S-SINK / COLD WATER PIPING BELOW GROUNDCW CV FILL LEVEL EXCAVATION LEVEL UPONOR PEX PIPING EXCAVATION LEVEL UNDISTURBED SOIL POOR SOIL CONDITIONS. PREPARE THE TRENCH BOTTOM USING GRANULAR MATERIAL TO PROVIDE A STABLE BASE.18" MIN.• TAKE PRECAUTIONARY STEPS TO ENSURE PIPING DOES NOT COME IN CONTACT WITH SHARP OBJECTS. • DO NOT EXCEED MAXIMUM BEND RADIUS OF 6 TIMES THE O.D. OF THE PIPING. • PRESSURE TEST INSTALLED PIPING AFTER INSTALLATION TO ENSURE THE INTEGRITY OF THE PIPING HAS NOT BEEN COMPROMISED. UPONOR PEX PIPING UNDISTURBED SOIL H.D. CLEANOUT COVER, FLUSH WITH FLOOR 4" PVC FEMALE ADAPTER W/ PLUG, INSPECTION OPENING PUMPING RECESS FOR CLEANING 6" FLOOR NORMAL WATER BOTTOM OF PIT BOTTOM OF SLAB 2' 4" x 1 1/2" SAN TEE SIOUX CHIEF 4" CHECK VALVE #869-84S. PROVIDE GRADE EXTENSION SLEEVE WITH HANDLE, SLEEVE LID WITH H.D. TRAFFIC GRADE C.O. COVER OVER SLEEVE EXTENSION. H.D. C.O. COVER TO BE FASTENED TO SLAB FLOOR. 4" SAN DRAIN THRU PIT WALL W/ WATER TIGHT SEAL 10" FOR PIT DEWATERING AND CLEANING: PROVIDE SP-1 PUMP IN PIT RECESS, 1 1/2" PUMP DISCHARGE PIPE WITH 1 1/2" CHECK VALVE AND FERNCO COUPLING. CONNECT SP-1 DISCHARGE PIPE TO 1 1/2" WASTE PIPE IN PIT SIDE WALL. COORDINATE PUMP LOCATION AND PIPING WITH PIT PUMP RECESS. PROVIDE STAINLESS STEEL CABLE FASTENED TO PUMP AND A.F.F. FOR PUMP REMOVAL FOR CLEANING. 1 1/2" SAN VENT. SEE PLUMBING PLANS FOR CONTINUATION. 4" SAN TEE WITH 6" TRAP SEAL SP-1 SHALL INCLUDE A PLUGIN OUTLET POWER CORD. COORDINATE LENGTH WITH ELECTRICAL OUTLET LOCATION. SP-1 PUMP ONLY, LESS CONTROL PANEL AND FLOATS. PROVIDE STAINLESS STEEL RISER CLAMPS FASTENED WITH 3/8" S.S. ROD TO PIT WALL ABOVE AND BELOW 4" PVC PIPE. REGULATOR 2# TO 10" WC WITH VENT THRU ROOF (WHERE REQUIRED) CHECK VALVE - TYP. THERMOMETER - TYP. CIRCULATING PUMP HWR GAS WATER HEATER COLD WATER SUPPLY EXPANSION TANK BALANCE VALVE 4" CONCRETE PAD GAS COCK WATER HEATER KEY SHUT-OFF VALVE - TYP. HOT WATER SUPPLY SYSTEM HOT WATER RETURN SYSTEM SEE ISOMETRICS FOR PIPE SIZES G GCEILING 3/4" APPROVED TEMP & PRESS RELIEF VALVE - TYP. WATER HEATER INTAKE THRU ROOF - TYP. WATER HEATER EXHAUST THRU ROOF - TYP. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1512 1 10 2 6 3 111413 5 7 9 8 15 4 NOTE: CONNECT TO GAS CONNECTION BY HVAC CONTRACTOR. SEE HVAC DRAWINGS FOR LOCATION. NOTE: INSTALL PIPING FOR EASE OF REMOVAL AND REPLACEMENT OF HEATERS.G2" 4"GG 2" TEMP HW FROM RECLAIM TANKS 3/4" HWR 2" 3/4" 11 9 10 12 16 17 3 4 5 2 13 2" 14 1 1 18 4"140°140° 8 7 8 7 15 2" 6 WALL SWITCH WITH PILOT LIGHT CHECK VALVE - TYP. CIRCULATING PUMP BALL VALVE - TYP. THERMOMETER - TYP. UNION - TYP. 4" CONCRETE PAD GAS WATER HEATER BALANCING VALVE HEAT TRAP EXPANSION TANK SHOCK ARRESTOR GAS REGULATOR - TYP. GAS COCK - TYP. DIRT LEG - TYP. WATER HEATER KEY APPROVED TEMP & PRESS RELIEF VALVE - TYP. WATER HEATER INTAKE THRU ROOF WATER HEATER EXHAUST THRU ROOF 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 2 P0.2 2" HW TO RESURFACER RM. HEADER OR OTHER BRANCH PIPING STEEL STRUT WITH STRUT CLAMPS MASONRY OR OTHER WALL TYPE BALL VALVE (SEE PLANS FOR REQUIRED VALVES) UPONOR AQUAPEX PIPING FROM BELOW CLOSED-CELL PIPE INSULATION WHERE REQUIRED PVC SLEEVE FINISHED CONCRETE FLOOR CONCRETE SLAB PVC SLEEVE AT CONCRETE PENETRATION MECHANICAL CHASE STRUT CLAMPS WALL ASSEMBLY PVC BEND SUPPORT (OR PEXa TYPE ELBOW) STEEL STRUT UPONOR AQUAPEX BELOW GRADE FOR WCsFOR LAVs & URs NOTE: THE COPPER STUBS MUST BE SOLDERED TO THE SUPPORT BRACKETS AT ALL POINTS. COPPER PLATED STEEL PIPE SUPPORT BRACKETS ON FRONT AND BACK SIDE OF WALL STUDS L COPPER L COPPER COPPER PLATED STEEL PIPE SUPPORT BRACKETS ON FRONT AND WITHIN STUD SPACE OF WALL STUDS (SOLDER COP. TO BRACKETS). L COPPER STUB OUTS FOR PLUMBING FIXTURE METAL WALL STUDS L COPPER STUB OUTS FOR PLUMBING FIXTURE Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated PLUMBING DETAILS AND NOTES WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P0.1 10/04/2023 220025.00 C2023-15 PLUMBING SHEET INDEX P0.1 PLUMBING DETAILS AND NOTES P0.2 PLUMBING DETAILS AND CALCULATIONS P1.0 FOUNDATION PLUMBING PLAN - OVERALL P1.0a FOUNDATION PLUMBING PLAN - SE QUAD P1.0b FOUNDATION PLUMBING PLAN - NE QUAD P1.0c FOUNDATION PLUMBING PLAN - NW QUAD P1.0d FOUNDATION PLUMBING PLAN - SW QUAD P1.1 FIRST FLOOR PLUMBING PLAN - OVERALL P1.1a FIRST FLOOR PLUMBING PLAN - SE QUAD P1.1b FIRST FLOOR PLUMBING PLAN - NE QUAD P1.1c FIRST FLOOR PLUMBING PLAN - NW QUAD P1.1d FIRST FLOOR PLUMBING PLAN - SW QUAD P1.2 SECOND FLOOR PLUMBING PLAN - OVERALL P1.2a SECOND FLOOR PLUMBING PLAN - SE QUAD P1.2b SECOND FLOOR PLUMBING PLAN - SW QUAD P1.3 ROOF PLUMBING PLAN - OVERALL P2.0 WASTE AND VENT PIPING ISOMETRICS P2.1 WASTE AND VENT PIPING ISOMETRICS P2.2 WASTE AND VENT PIPING ISOMETRICS P3.0 WATER PIPING ISOMETRICS P3.1 WATER PIPING ISOMETRICS P3.2 WATER PIPING ISOMETRICS P4.0 STORM PIPING ISOMETRICS NTS2BELOW GROUND PEX PIPING DETAIL NTS5SNOWMELT PIT DRAIN DETAIL NTS7WATER HEATER PIPING SCHEMATIC NTS3WATER HEATER PIPING SCHEMATIC NTS6MEGATRON DETAIL NTS1 FIXTURE CONNECTION STUB OUT PIPING (PEXa OR CPVC TO COPPER TYPE L) DETAIL NTS4FIXTURE CONNECTION STUB OUT PIPING (COPPER TYPE L) DETAIL 10/13/202310/04/2023 BID DOCUMENT SET CTM CONTROLLER 2" MANUAL INLET VALVE2" MANUAL OUTLET VALVE 4" BYPASS VALVE (NORMALLY CLOSED) BRINE TANK DUPLEX INSTALLATION 4" SOFT WATER OUTLET 4" HARD WATER INLET 2" 3" 3" 1 1/2" SHOCK ARRESTOR (TYP.) (STAINLESS STEEL) 1 1/2" SHUT-OFF VALVE (TYP.) HOSE REEL THERMOMETER 2" RESURFACER FILL. TERMINATE WITH VALVE AND THREADED CONNECTION FOR PORTABLE HOSE REEL. VERIFY FINAL LOCATION, ELEVATION, AND CONNECTION REQUIREMENTS WITH OWNER. 1 1/2" THREADED HOSE CONNECTION (TYP.) 2" SHUT-OFF (LOCKING) & CHECK VALVES (STAINLESS STEEL) 2 1/2" PEX CAPPED FUTURE DE-MIN. WATER PIPING HR-1 HR-2 HR-1 2" 1" HW TO WMB-1 (RM 170) 1 1/2" AVB 2" 2" 1 1/2" 1 1/2" 3 CLEAN SAND2' -6"3' -4"3" HDPE SUBFLOOR TRANSMISSION MAINS. (TYP. OF 2 PER RINK)8" INSULATED HDPE RINK FLOOR TRANSMISSION MAINS. (TYP. OF 2 PER RINK) 3/4" SCH. 80 PVC CONDUIT FOR RINK FLOOR AND SUBFLOOR TEMP. SENSORS. (TYP. OF 2 PER RINK) A FIRST FLOOR 100' - 0" MAIN TRENCH NTS FIRST FLOOR 100' - 0" MAIN TRENCH - MULTI PURPOSE RINK NTS 2' -6"3' -4"8" INSULATED HDPE RINK FLOOR TRANSMISSION MAINS. (TYP. OF 2 PER RINK) B FIRST FLOOR 100' - 0"3' -1"3' -4"CLEAN SAND 3" HDPE SUBFLOOR TRANSMISSION MAINS. (TYP. OF 2 PER RINK) NOTE: FOR INFORMATION ONLY. RINK REFRIGERATION PIPING BY ICE RINK INSTALLER. DOMESTIC WATER PRESSURE BOOSTER SYSTEM EQUIP. NO. SERVICE LOCATION NO. OF PUMPS GPM / EA PUMP SYSTEM PRESSURE VALUES MOTOR DATA AND VALUES CONTROL PANEL DESIGN BASIS MODEL TDH (FT)SUCTION (PSI) BOOST (PSI) SET (PSI)RPM HP kWh PER YR.VOLTAGE PHASE FULL LOAD MAX. SCCR 2 80 57.75 55 25 80.00 1,750 2 4455 460 3 PHASE 8.6 100KAIC QUANTUMFLO-32980: PRODIGY DUPLEX QEB4_40-200B-2 NOTES: 1. NET BOOST PRESSURE IS CALCULATED BY SYSTEM SET PRESSURE MINUS SUCTION PRESSURE LESS SYSTEM LOSSES OF 5 PSI 2. SYSTEM SUBMITTALS SHALL INCLUDE CERTIFICATE NUMBER FOR NSF61 CERTIFICATION, UL508A AND QCZJ 3RD PARTY COMPLIANCE. 3. SYSTEM CONTROLS MUST COMPLY WITH AND PROVIDE FOR EITHER CONTROL LOGIC OR REMOTE SENSOR IN ACCORDANCE WITH ANSI/ASHRAE/IES STANDARD 90.1 ENERGY STANDARD 4. PROVIDE 5-YEAR WARRANTY ON COMPLETE SYSTEM AND INCLUDE WARRANTY CERTIFICATE WITH DETAILS IN SUBMITTALS 5. SYSTEM SHALL BE PRE-SET TO SYSTEM SITE CONDITIONS BY SIMULATING SUCTION PRESSURE. HYDROSTATIC-ONLY TESTING IS NOT ACCEPTABLE. 6. THE INDUSTRIAL CONTROLLER SHALL BE IN COMPLIANCE WITH CURRENT NEC, SECTION 409.110 HAVING A MAXIMUM 100K AVAILABLE FAULT CURRENT. 7. SCCR RATINGS MUST BE INCLUSIVE OF ALL COMPONENTS WITHIN THE ENCLOSURE WITHOUT THE NEED TO PROVIDE ADDITIONAL UPSTREAM PROTECTION. 8. EQUAL SYSTEMS MUST SHOW MATHEMATICAL ANALYSIS PROVING THAT THE ALTERNATE SUPPLIER MEETS OR EXCEEDS THE KW CAPACITY LISTED. 9. PROVIDE THE FOLLOWING OPTIONS: MONITORING PROTOCOL: MODBUS RTU, VIBRATION ISOLATION KIT, 3" 316SS NSF61 FLEX CONNECTOR, GROOVED (INCLUDES COUPLING), 3" 316SS NSF61 FLEX CONNECTOR, GROOVED (INCLUDES COUPLING), 85 GALLON SHOCK SUPPRESSOR TANK & VALVING 10. REPRESENTATIVE: HOT WATER PRODUCTS, INC.. PHONE: (414) 434-1371 11. BASED ON PROJECT: JANESVILLE SPORTS CENTER (AARON'S BP) (032980) Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated PLUMBING DETAILS AND CALCULATIONS WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P0.2 10/04/2023 220025.00 C2023-15 NTS1WATER SOFTENER PIPING SCHEMATIC NTS2ICE RESURFACER FILL DETAIL NTS3RINK REF. LINE DEPTH DETAIL 10/13/202310/04/2023 BID DOCUMENT SET HC HC HC HC HC HC HC HC HC HC DN DN HC HC HC HC HC HC DN WARMING ROOM 159 RESURFACER/ SHOP TOOLS/LAUNDRY 170 REFRIGERATION 172 MAIN COACH 133 TEAM ROOM 5 126 TEAM ROOM 4 127 WET TEAM ROOM 4 123 Y.H. STORAGE 137 WET TEAM ROOM #2 140 YH COACH 143 UNISEX TLT 141 J.C. 142 TEAM ROOM 2 148 TEAM ROOM 3 149 TEAM ROOM 1 147 ELEV 152 STORAGE 158 TEMP STORAGE 174 GEN STORAGE 153 OFFICE 111 FIRST AID 105 LOADING/RECEIVING/STORAGE 160 MULTI-USE CONVENTION SPACE 156 FOOD PREP 115 (A) J.C. 114 CHECK-IN/RENTAL 107 ADMIN 112 GENERAL BUILDING STORAGE 167 F.S. STORAGE 175 LOBBY / LINK 155 ELEC 134 WET TEAM ROOM 3 125 WET TEAM RR 124 IT 150 LAUNDRY 131 MAIN TEAM ROOM 132 HOCKEY STORAGE 173 WET TEAM ROOM #1 138 WET TEAM RR 139 REFEREE 145 REFEREE RR 146 MERCYHEALTH ARENA 136 MEETING ROOM (A) 102 MEETING ROOM (B) 103 STOR 104 VESTIBULE 100 MAIN LOBBY 101 ICE ARENA LOBBY 117 ICE RINK CIRCULATION 135 PASSAGE 130 ICE RINK CIRCULATION 151 MULTI-PURPOSE AREA 154 UNISEX TLT 128 TRAINING 129 SKATE RENTAL 108 BREAKROOM 109 OFFICE 110 BEER SALES 116 MECHANICAL 168 8" T.O.P. @ 42" DEEP MIN. SEE ICE RINK PIPING PLAN R500 FOR REFRIGERATION PIPING DEPTHS. 8" @ 1/16" 6" FCO 8" @ 1/4" (965 GPM) 8" @ 1/4" (831 GPM) 6" @ 1/16" (241 GPM) 4" @ 1/8" (81 GPM) 8" 8" @ 1/16" (492 GPM) 12" @ 1/16" (1323 GPM) 12" @ 1/8" (2081 GPM) 3" @ 1/16" (16 GPM) 3" @ 1/16" (16 GPM) 4" (102 GPM) A B E F G H J K L M P QCDN 1 2 3 4 5 6 8 7 F.3 F.9 G.8 L.6 M.3 M.4 5.8 7.2 9 1 2 1 4" 4" 4"6" @ 1/8" (299 GPM)6" @ 1/8" (316 GPM) 6" @ 1/4" (409 GPM) 10" @ 1/16" (691 GPM) 2" 2" 3" 3" 4" @ 1/8" 4" @ 1/8" (140 GPM) GTPROVIDE EXTERIOR GT VACUUM PIPE PER MANUFACTURER REQUIREMENTS. MINIMUM 24" ABOVE FINISH GRADE. PROVIDE EXTERIOR GT VACUUM PIPE PER MANUFACTURER REQUIREMENTS. MINIMUM 24" ABOVE FINISH GRADE. 3" @ 1/16" (17 GPM) 4" FCO 4" FCO FUTURE 4" SAN. CAP AT WALL. (60 DFU) FUTURE 4" SAN. CAP AT WALL. (60 DFU) COMB. D&V COMB. D&V COMB. D&V F.4 F.6 COACHES OFFICE 180 ADD ALT TEAM ROOM (A) 181 ADD ALT TEAM ROOM (B) 182 COACHES OFFICE 183 ADD ALT TEAM ROOM (B) 184 COACHES OFFICE 185ALTALTALT ALT ALTALTALTALT ALTALTERNATE BID 14" @ 1/8" (2220 GPM w/ ALT.) 4" @ 1/16" (77 GPM w/ALT) 14" @ 1/16" (1500 GPM w/ ALT.) (753 GPM w/ALT) GT MEN'S 166 WOMEN'S 165 IT/GEN STORAGE 176 CRWCRWCRWCRWCRWCRW CRW 8" @ 1/8" (670 GPM) 8" @ 1/8" (675 GPM) 4" @ 1/16" (78 GPM w/ALT) ALT 4" @ 1/4" (140 GPM) 4" @ 1/8" (93 GPM) 4" FCO ALTALT ALT ALT A LTALT 3" FCO 3" FCO ALTERNATE #1: DEDUCT (2) 3" RD'S AND STORM PIPING, SWV PIPING TO S-2, (2) S-1's & DF-1. INSTALL 4" RD, 6" RD, AND STORM PIPING. INSTALL S-2, (2)S-1's & DF-1 IN ALT LOCATION. 8" 6" @ 1/8" (245 GPM) DRY STORAGE 115 (C)ELECTRICAL 113 LOCKER ALCOVE 101 (A) FCO4" 1" 4" 2" (TYP.) 3" UP TO WCO 3" UP TO WCO 2" 1" 1" 4" 6" 8" COPY AREA 112 (A) ELECTRIC 157 AV CLOSET 157 (A) ELECTRICAL 169 STORAGE 135(A) CW 1" 4" 6" DMDM CAPPED FUTURE DE-MIN. WATER PIPING FUTURE DE-MIN. PIPING CAPPED FUTURE DE-MIN. WATER PIPING C RW CRWCRW COMB. D&V COMB. D&V COMB. D&V 4" @ 1/8" (107 GPM) CRW CRW1 1/4" 1" 3" VESTIBULE 171 1" 1" 1" 1 1/4"2 1/2" DM 1"DMDMCRWCRW2 1/2" 2 1/2" 2 1/2" 3/4" 1" 2" 3/4"2"3/4" 1" 1" 1 1/4" (2" w/ALT) 3/4" 3/4"1 1/2" 3" 3" 1" 3/4" 3"1"2 1/2" 1" 2 1/2" 3/4" 2" 3/4" 1" 3/4" 3/4" 3/4" 3/4" 3/4"3/4" IE: -4.89' 18" @ 1/32" (2533 GPM w/ALT) FCO 6" FCO 3" (8.5 GPM)3" (8.5 GPM) WOMENS 106B MEN'S 121 PASSAGE 144 METER/RISER 179 CONCESSIONS 115 (B) MULTIPURPOSE AREA CIRCULATION 154 (B) AV CLOSET 167 (B) MENS 106A FAMILY RR 106 FAMILY TLT 162 J.C. 163 3" @ 1/16" (9 GPM) 3" @ 1/4" (77 GPM) IE: -6.80' 6" YCO 3" 4" (94 GPM) 3" 4" 3" @ 1/4" (64 GPM) 3/4" 4" 3" 2" 2" 3" 2" 1" 3/4" 3/4" 2"2" 3" FCO 2" 2" MENS 119 5 P0.1 SP-1 3" CONDUCTOR TO BE IN WALL FRAME. SEE ARCH DWGS FOR CONDUCTOR PIPE SPACE. 3" CONDUCTOR TO BE IN WALL FRAME. SEE ARCH DWGS FOR CONDUCTOR PIPE SPACE. 6" FCO FCO FCO FCO 2" FCO 3" FCO 3" FCO 4" FCOFCO 4" FCO 3" FCO 3" FCO 4" FCO 8" COMBINED WATER SERVICE 3" FCO 3" 4" 3" 4" 4" 4" 8" @ 1/16" 4" 1 1/2" 4" 4"4" 4" 1 1/2"3" 4" 4"4" @ 1/4" (144 GPM) 3/4" 1 1/4" 3" 3" 4" 3" 2" 3" 4" (66 GPM)2" 3" 2" 3/4" 2" 3/4" 4" WCO 6" @ 1/16" (197 GPM) 1"2" 1" 3" 2" SP-1 1" 2" 3" 2" 3" 2" 3" 1 1/2" V-UP 3" 8" 3" FCO 3" 4" 2" 2" 3/4" FCO 3" 2" 2" 3/4" 4" 4" 4" 3"4" 3/4" 2" 3/4" 4" 2" (TYP.) 3" 1" 1 1/2" 2 1/2" 3" 3"3" 6" FCO4" 4" 4" FCO 2" 2" 12" @ 1/8" (2081 GPM) COMB. D&V BUILDING FOOT PRINT LOCATION IS INSTALLED OVER AN EXISTING BUILDING. UNDER FLOOR PLUMBING INSTALLATION MAY ENCOUNTER ABANDONED PIPING AND APPURTENANCES BELOW GROUND. REMOVAL OF ABANDONED PIPING OR APPURTENANCES BELOW GROUND TO INSTALL PIPING AND MAINTAIN INVERTS FOR GRAVITY FLOW PLUMBING SYSTEM SHALL BE BY THE P.C.. COORDINATE INVERTS AND ELEVATIONS WITH SITE PLUMBING AND REFRIGERATION SYSTEMS. NOTE: 1. PROVIDE 2" RIGID STYROFOAM INSULATION BETWEEN WATER & WASTE LINES ABOVE OR BELOW REFRIGERATION LINES. COORDINATE EXACT LOCATION OF REFRIGERATION LINES WITH REFRIGERATION CONTRACTOR. 2. PROVIDE 1" THICK FOAMCORE INSULATION ON COLD WATER LINES 3' BEYOND REFRIGERATION LINES. COORDINATE EXACT LOCATION OF REFRIGERATION LINES WITH REFRIGERATION CONTRACTOR. KEYED PLUMBING NOTES:# Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FOUNDATION PLUMBING PLAN -OVERALL WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P1.0 10/04/2023 220025.00 C2023-15 1/16" = 1'-0"1 FOUNDATION PLUMBING PLAN -OVERALL 10/13/202310/04/2023 BID DOCUMENT SET DN HC HC HC RESURFACER/ SHOP TOOLS/LAUNDRY 170 REFRIGERATION 172 MAIN COACH 133 Y.H. STORAGE 137 WET TEAM ROOM #2 140 YH COACH 143 UNISEX TLT 141 J.C. 142 ELEC 134 LAUNDRY 131 MAIN TEAM ROOM 132 WET TEAM ROOM #1 138 WET TEAM RR 139 MERCYHEALTH ARENA 136 ICE RINK CIRCULATION 135 PASSAGE 144 UNISEX TLT 128 TRAINING 129 MECHANICAL 168 METER/RISER 179FCO 8" T.O.P. @ 42" DEEP MIN. SEE ICE RINK PIPING PLAN R500 FOR REFRIGERATION PIPING DEPTHS. 4" @ 1/8" (81 GPM) 3" @ 1/16" (16 GPM) 3" @ 1/16" (16 GPM) H J K L M P QN 1 2 3 L.6 M.3 M.4 6" FCO 4" FCO 2" 3" 3" 2" 2"4" COMB. D&V COMB. D&V 3" 2" (TYP.) FUTURE 4" SAN. CAP AT WALL. (60 DFU) 4" COMB. D&V 1 2 1 COACHES OFFICE 180 ADD ALT TEAM ROOM (A) 181 ADD ALT TEAM ROOM (B) 182 ELECTRICAL 169 STORAGE 135(A) 3" 4" 3" FCO 3" 3" 3" 2" 3" FCO 1 1/2" 2" 2" 4" 4" 2" 2" 2" 3" FCO 2" 2" 1 1/2" ALT ALTA LTALTALTALTALT4" @ 1/16" (78 GPM w/ALT) DM DM DM DMDMDMDM DMDMFUTURE DE-MIN. PIPING CAPPED FUTURE DE-MIN. WATER PIPING 1"C R W CRW 8" @ 1/8" (675 GPM) 3"CRWCRWCRW1" 1" ALT 1" 2" 2" 1" 3/4" 2"3/4" 2 1/2" 4" 3" 3" UP TO WCO 3" 3" 3" UP TO WCO 2" (TYP.) 2" 4" 4" 3" 4" 1 1/2" 3" 4" 4" 4" 8" COMB. D&V 2" 3" 4" 3" 2" 4" 4" 4" 4" 2"4" 3" 3" 4" VESTIBULE 171 1" 3/4" 1 1/4" (2" w/ALT) 1" 3/4" ALT 1" 2 1/2" 2 1/2"2 1/2" CRW CRWCRW CRW CRWCRW2 1/2" 2 1/2" 3/4" 2" 3/4" 3" 3/4" 1" 1"1" 1" FCO 1" ALT 1 1/2" 3" @ 1/16" (20 GPM) 4" 8" @ 1/16" 6" IE: -5.19' 1 1/2" 1 1/2" 4" FCO 5 P0.1 SP-1 1 1/2" 1. PROVIDE 2" RIGID STYROFOAM INSULATION BETWEEN WATER & WASTE LINES ABOVE OR BELOW REFRIGERATION LINES. COORDINATE EXACT LOCATION OF REFRIGERATION LINES WITH REFRIGERATION CONTRACTOR. 2. PROVIDE 1" THICK FOAMCORE INSULATION ON COLD WATER LINES 3' BEYOND REFRIGERATION LINES. COORDINATE EXACT LOCATION OF REFRIGERATION LINES WITH REFRIGERATION CONTRACTOR. KEYED PLUMBING NOTES:# BUILDING FOOT PRINT LOCATION IS INSTALLED OVER AN EXISTING BUILDING. UNDER FLOOR PLUMBING INSTALLATION MAY ENCOUNTER ABANDONED PIPING AND APPURTENANCES BELOW GROUND. REMOVAL OF ABANDONED PIPING OR APPURTENANCES BELOW GROUND TO INSTALL PIPING AND MAINTAIN INVERTS FOR GRAVITY FLOW PLUMBING SYSTEM SHALL BE BY THE P.C.. COORDINATE INVERTS AND ELEVATIONS WITH SITE PLUMBING AND REFRIGERATION SYSTEMS. NOTE: Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FOUNDATION PLUMBING PLAN -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P1.0a 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FOUNDATION PLUMBING PLAN -SE QUAD 10/13/202310/04/2023 BID DOCUMENT SET HC HC HC HC WARMING ROOM 159 STORAGE 158 TEMP STORAGE 174 LOADING/RECEIVING/STORAGE 160 MULTI-USE CONVENTION SPACE 156 GENERAL BUILDING STORAGE 167 F.S. STORAGE 175 LOBBY / LINK 155 HOCKEY STORAGE 173 MULTI-PURPOSE AREA 154 12" @ 1/16" (1323 GPM) 8" @ 1/4" (831 GPM) 8" @ 1/16" (492 GPM) 4" @ 1/8" (107 GPM) 8" 4" @ 1/4" (144 GPM)6" @ 1/16" (241 GPM) A B E F G HCD 1 2 3 F.3 F.9 G.8 4" @ 1/8" 4" @ 1/8" (140 GPM) 4" (140 GPM) FCO GT 3" FCO 3" FCO PROVIDE EXTERIOR GT VACUUM PIPE PER MANUFACTURER REQUIREMENTS. MINIMUM 24" ABOVE FINISH GRADE. F.4 F.6 WOMEN'S 165 MEN'S 166 MULTIPURPOSE AREA CIRCULATION 154 (B) AV CLOSET 167 (B) IT/GEN STORAGE 176 ELECTRIC 157 AV CLOSET 157 (A) 3" 2" 3"DMDMDM CAPPED FUTURE DE-MIN. WATER PIPING 2 1/2"CRWCRWCRWCRW CRW CRW1 1/4" 1" 3/4" 3/4" 3/4" 4" 3"2" 3" 3" 3" 4" FCO 4" 2"2" 3" 2"3" 6" 4" 4" 4" 4" COMB. D&V COMB. D&V 1" 1" 1" 3/4" 1 1/4" 1" 1 1/4" 2" 1" 2 1/2" FAMILY TLT 162 J.C. 163 3" 3/4"3/4" 1" 1" 2" 4" FCO 2" 1 1/4" BUILDING FOOT PRINT LOCATION IS INSTALLED OVER AN EXISTING BUILDING. UNDER FLOOR PLUMBING INSTALLATION MAY ENCOUNTER ABANDONED PIPING AND APPURTENANCES BELOW GROUND. REMOVAL OF ABANDONED PIPING OR APPURTENANCES BELOW GROUND TO INSTALL PIPING AND MAINTAIN INVERTS FOR GRAVITY FLOW PLUMBING SYSTEM SHALL BE BY THE P.C.. COORDINATE INVERTS AND ELEVATIONS WITH SITE PLUMBING AND REFRIGERATION SYSTEMS. NOTE: Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FOUNDATION PLUMBING PLAN -NE QUAD WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P1.0b 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FOUNDATION PLUMBING PLAN -NE QUAD 10/13/202310/04/2023 BID DOCUMENT SET HC HC HC HC HC HC DN ELEV 152 GEN STORAGE 153 OFFICE 111 FIRST AID 105 MULTI-USE CONVENTION SPACE 156 FOOD PREP 115 (A) CHECK-IN/RENTAL 107 ADMIN 112 WOMENS 106B MEETING ROOM (A) 102 MEETING ROOM (B) 103 STOR 104 VESTIBULE 100 MAIN LOBBY 101 MULTI-PURPOSE AREA 154 SKATE RENTAL 108 BREAKROOM 109 OFFICE 110 8" @ 1/4" (965 GPM) 4" @ 1/8" (93 GPM) A B E F HCD 4 5 6 8 7 F.3 F.9 5.8 7.2 9 4" FCO 4" 3" @ 1/16" (17 GPM) 6" @ 1/8" (299 GPM) 6" @ 1/8" (316 GPM) FCO 4" FCO 4" FCO 4" 4" PROVIDE EXTERIOR GT VACUUM PIPE PER MANUFACTURER REQUIREMENTS. MINIMUM 24" ABOVE FINISH GRADE. F.4 F.6 CONCESSIONS 115 (B) LOCKER ALCOVE 101 (A) COPY AREA 112 (A) 2" CRW CRW 1" 4" (66 GPM) 3" 3" FCO ALT ALT ALT ALT ALT ALT 3" 4" 6" @ 1/8" (245 GPM) 18" @ 1/32" (2533 GPM w/ALT) 6" YCO 6" YCO ALTERNATE #1: DEDUCT (2) 3" RD'S AND STORM PIPING, SWV PIPING TO S-2, (2) S-1's & DF-1. INSTALL 4" RD, 6" RD, AND STORM PIPING. INSTALL S-2, (2)S-1's & DF-1 IN ALT LOCATION. 2" 2" 4" 2" 4" 2" 6" FCO 6" 4" 3"IE: -4.89' 3/4" 3/4" 1"3/4" 3/4" 1" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 2 1/2" 1 1/2" 3" (8.5 GPM)3" (8.5 GPM) MENS 106A FAMILY RR 106 SP-1 6" @ 1/16" (197 GPM) 2" 3" 4" 3/4" 3/4" ALT ALT3/4" 2" 4" 2" 2" 1/2" 3" @ 1/8" (38 GPM) 3" @ 1/4" (64 GPM) 2" 3" 3" 4" WCO 2" 3" CONDUCTOR TO BE IN WALL FRAME. SEE ARCH DWGS FOR CONDUCTOR PIPE SPACE. BUILDING FOOT PRINT LOCATION IS INSTALLED OVER AN EXISTING BUILDING. UNDER FLOOR PLUMBING INSTALLATION MAY ENCOUNTER ABANDONED PIPING AND APPURTENANCES BELOW GROUND. REMOVAL OF ABANDONED PIPING OR APPURTENANCES BELOW GROUND TO INSTALL PIPING AND MAINTAIN INVERTS FOR GRAVITY FLOW PLUMBING SYSTEM SHALL BE BY THE P.C.. COORDINATE INVERTS AND ELEVATIONS WITH SITE PLUMBING AND REFRIGERATION SYSTEMS. NOTE: Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FOUNDATION PLUMBING PLAN -NW QUAD WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P1.0c 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FOUNDATION PLUMBING PLAN -NW QUAD 10/13/202310/04/2023 BID DOCUMENT SET DN HC HC HC TEAM ROOM 5 126 TEAM ROOM 4 127 WET TEAM ROOM 4 123 YH COACH 143 J.C. 142 TEAM ROOM 2 148 TEAM ROOM 3 149 TEAM ROOM 1 147 ELEV 152 FOOD PREP 115 (A) J.C. 114 WET TEAM ROOM 3 125 WET TEAM RR 124 IT 150 REFEREE 145 REFEREE RR 146 MERCYHEALTH ARENA 136 ICE ARENA LOBBY 117 PASSAGE 130 PASSAGE 144 ICE RINK CIRCULATION 151 UNISEX TLT 128 BEER SALES 116 3" @ 1/4" (77 GPM) 12" @ 1/8" (2081 GPM) H J K L M P QN 5 6 8 7 L.6 M.3 M.4 5.8 7.2 9 FUTURE 4" SAN. CAP AT WALL. (60 DFU) 4" 10" @ 1/16" (691 GPM) COMB. D&V 1 1/2" 3" 3" 2" 4" 3" FCO 6" @ 1/4" (409 GPM) GT FCO FCO ADD ALT TEAM ROOM (B) 182 COACHES OFFICE 183 ADD ALT TEAM ROOM (B) 184 COACHES OFFICE 185 CONCESSIONS 115 (B) 14" @ 1/16" (1500 GPM w/ ALT.) 14" @ 1/8" (2220 GPM w/ ALT.) ELECTRICAL 113 DRY STORAGE 115 (C) 2" 3" 3" 3"3" FCO 3" 2" 2" 2" 4" 3" 3" 2" 3" FCO 1 1/2" FCO 2" 2"2" 4"ALTALT ALTALTA L T ALTALT (753 GPM w/ALT) 4" @ 1/16" (77 GPM w/ALT) 6" YCO FCO 2" 8" @ 1/8" (670 GPM)CRWCRWCRWCRWC R W CRWCRW CRW 1" 1" 1" ALT 3/4" 2"3/4" ALT 3" UP TO WCO 2" (TYP.) 3" 8" 6" 2" 3" 8" 8" 8" 2"4" 3" 4" 4" 8" 3" 1 1/2" 3/4" 3" 3" ALT 2" 3/4" 3" 3/4" 3/4" 2" 3" 1" 3/4" 1" 2 1/2"3/4" 3/4" 1" 3/4" 2 1/2" 3/4" 3/4" 2" 3/4"FCO 1 1/2" 1" A LT 3/4" MEN'S 121 3"3/4" 2" 4" @ 1/4" (140 GPM) 3" @ 1/16" (9 GPM) 4" (94 GPM) 4" MENS 119 FCO 3" CONDUCTOR TO BE IN WALL FRAME. SEE ARCH DWGS FOR CONDUCTOR PIPE SPACE. 3" 4" FCO 8" @ 1/8" (652 GPM) 1 1/2" 2" 1 1/2" 2"2" 4"2" 6" FCO 4" 6" 3" 4" FCO 3" 1 1/2"2"3" 3" 2" 1 1/2" 4" 2 1/2" 12" @ 1/8" (2081 GPM) COMB. D&V BUILDING FOOT PRINT LOCATION IS INSTALLED OVER AN EXISTING BUILDING. UNDER FLOOR PLUMBING INSTALLATION MAY ENCOUNTER ABANDONED PIPING AND APPURTENANCES BELOW GROUND. REMOVAL OF ABANDONED PIPING OR APPURTENANCES BELOW GROUND TO INSTALL PIPING AND MAINTAIN INVERTS FOR GRAVITY FLOW PLUMBING SYSTEM SHALL BE BY THE P.C.. COORDINATE INVERTS AND ELEVATIONS WITH SITE PLUMBING AND REFRIGERATION SYSTEMS. NOTE: Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FOUNDATION PLUMBING PLAN -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P1.0d 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FOUNDATION PLUMBING PLAN -SW QUAD 10/13/202310/04/2023 BID DOCUMENT SET HC HC HC HC HC HC HC HC HC HC DN DN HC HC HC HC HC HC HC HC HC HC HC HC DN WARMING ROOM 159 RESURFACER/ SHOP TOOLS/LAUNDRY 170 REFRIGERATION 172 MAIN COACH 133 TEAM ROOM 5 126 TEAM ROOM 4 127 WET TEAM ROOM 4 123 Y.H. STORAGE 137 WET TEAM ROOM #2 140 YH COACH 143 UNISEX TLT 141 J.C. 142 TEAM ROOM 2 148 TEAM ROOM 3 149 TEAM ROOM 1 147 ELEV 152 STORAGE 158 TEMP STORAGE 174 GEN STORAGE 153 OFFICE 111 FIRST AID 105 LOADING/RECEIVING/STORAGE 160 MULTI-USE CONVENTION SPACE 156 FOOD PREP 115 (A) J.C. 114 CHECK-IN/RENTAL 107 ADMIN 112 GENERAL BUILDING STORAGE 167 F.S. STORAGE 175 LOBBY / LINK 155 ELEC 134 WET TEAM ROOM 3 125 WET TEAM RR 124 IT 150 LAUNDRY 131 MAIN TEAM ROOM 132 HOCKEY STORAGE 173 WET TEAM ROOM #1 138 WET TEAM RR 139 REFEREE 145 REFEREE RR 146 MERCYHEALTH ARENA 136 MEN'S 121 MEETING ROOM (A) 102 MEETING ROOM (B) 103 STOR 104 VESTIBULE 100 MAIN LOBBY 101 ICE ARENA LOBBY 117 ICE RINK CIRCULATION 135 PASSAGE 130 PASSAGE 144 ICE RINK CIRCULATION 151 MULTI-PURPOSE AREA 154 UNISEX TLT 128 TRAINING 129 TDTD TD SKATE RENTAL 108 BREAKROOM 109 OFFICE 110 BEER SALES 116 MECHANICAL 168 METER/RISER 179 FD-1 FD-2 FD-2 HR-1 FD-2 FD-2 FD-2 WMB-1 F.P. METER WC-2 WC-1 (4)SH-1 (3)L-1 UR-2 FD-1 FD-1 HWH-2 FD-1 DF-1 LT-1 WC-2 L-1 L-1 UR-2 WC-2 SH-2 SH-1 SH-1 (12)WC-1 UR-2 (5)UR-1 (2)WC-2 L-1 MB-1HWH-1 FD-1 FD-1 FD-1 FD-1 S-3WC-2 (3)WC-1 (3)L-1 FD-1 S-1 S-1 S-2 DF-1 SH-1 SH-1 SH-2 L-1 UR-2 WC-2 FD-1 FD-1 HWH-3 MB-1 DF-1 WC-2 L-1 WC-2 SH-3 L-1 FD-1 HWH-4 (2)WMB-1 SP-1 6" RD-1 (418 GPM) 6" RD-1 (413 GPM) 6" RD-1 (414 GPM) 6" RD-1 (551 GPM) 3" RD-1 (64 GPM) 3" RD-1 (38 GPM) 3" RD-1 (71 GPM) 4" RD-1 (126 GPM) 4" RD-1 (93 GPM) 4" RD-1 (94 GPM) 4" RD-1 (81 GPM) 4" RD-1 (140 GPM) 4" RD-1 (144 GPM) 4" RD-1 (54 GPM) 3" RD-1 (53 GPM) 3" RD-1 (16 GPM) 3" @ 1/8" 4" @ 1/16" 4" @ 1/4" 4" @ 1/8" 3" @ 1/16" 4" @ 1/16" 4" @ 1/8" 3" @ 1/8" 3" @ 1/4" 8" @ 1/8" 6" @ 1/4" 6" @ 1/4" 6" @ 1/4" 4" RD-1 (78 GPM) 3" RD-1 (77 GPM) A B E F G H J K L M P QCDN 1 2 3 4 5 6 8 7 F.3 F.9 G.8 L.6 M.3M.4 5.8 7.2 9 F.4 F.6 COACHES OFFICE 180 ADD ALT TEAM ROOM (A) 181 ADD ALT TEAM ROOM (B) 182 COACHES OFFICE 183 ADD ALT TEAM ROOM (B) 184 COACHES OFFICE 185 3" (8.5 GPM) 3" @ 1/16" (9 GPM)3" @ 1/16" (53 GPM)CRWCRWCRW TMVEEWS-1 EEWS-1 3" @ 1/16" FD-1 (4)L-1 (9)WC-1 (2)WC-2 (2)UR-2 (3)UR-1 (2)WC-2WC-1 (7)L-1 FD-1 FD-1 GT SH-2 2" VTR ALTERNATE BID ALTERNATE BID 4" RD-1 (77 GPM) 4" @ 1/16" (77 GPM) w/ ALT. 2 P0.2 6 P0.1 TMV-3 (2) 4" HWH VENTS. TERMINATE THRU WALL LESS ALT. 4" VTR 2" VTR 3" RD-1 (53 GPM) 3" VTR 2" VTR 2" VTR 3" VTR H&C HR-3 TD CW THRU THERMO TANKS FOR PREHEAT FS-2 FD-2 4" RD-1 (77 GPM) SH-1 SH-2 WC-2WC-1L-1 FD-1 STORAGE 135(A) WOMEN'S 165 MEN'S 166 CONCESSIONS 115 (B) LOCKER ALCOVE 101 (A) COPY AREA 112 (A) MULTIPURPOSE AREA CIRCULATION 154 (B) AV CLOSET 167 (B) IT/GEN STORAGE 176 ELECTRIC 157 AV CLOSET 157 (A) ELECTRICAL 169 ELECTRICAL 113 DRY STORAGE 115 (C) HD-1 FD-2 HD-1 HWH-1 HEAT TRACE RD PIPING HEAT TRACE RD PIPING ALTERNATE #1: DEDUCT (2) 3" RD'S AND STORM PIPING, SWV PIPING TO S-2, (2) S-1's & DF-1. INSTALL 4" RD, 6" RD, AND STORM PIPING. INSTALL S-2, (2)S-1's & DF-1 IN ALT LOCATION. TMV-1 TMV-2 FD-1 FD-1 SH-1 SH-2 SH-1 SH-1 FD-1 SH-1 SH-1 SH-2 SH-1 L-1 L-1 UR-1 WC-2 WC-2 WC-1 UR-1 L-1 L-1 DF-1FS-1 FS-1 PROVIDE EXTERIOR GT VACUUM PIPE PER MANUFACTURER REQUIREMENTS. MINIMUM 24" ABOVE FINISH GRADE. INSTALL DEDUCT WATER METER TO PIPING FOR MECH ROOM & FINISHING EQUIP. ROOM. WATER PIPE MATERIAL AFTER METER TO BE PER 22 67 00. FD-2FD-2 2" VTR RISE UNDER STAIRS HD-1 WC-1 HD-1 8" @ 1/8" (670 GPM) 3" 3" RD-2 FD-1 FS-1 HD-1 3" UP (2) 4" HWH VENT -UP 4" 4" 2" 2" 2" VTR 4" RD-1 (66 GPM) 2" VTR 6" RD-1 (245 GPM) 6" @ 1/8" S-1S-1 S-2 DF-1 1 1/2" 1 1/2" 2" 3" RD-2 2" VTR VESTIBULE 171 HR-1 HR-2 3" WCO 3" WCO, 3" W-DN, 2" V-UP FD-1 HD-1 FCO FCO FCO HD (CLW) 3" (8.5 GPM) PROVIDE EXTERIOR GT VACUUM PIPE PER MANUFACTURER REQUIREMENTS. MINIMUM 24" ABOVE FINISH GRADE. SEE ARCH DWGS FOR PIPE SPACE. WH-1 WH-1 WH-1 WH-1 WOMENS 106B MENS 106A FAMILY RR 106 FAMILY TLT 162 J.C. 163 L-1 WC-2 FD-1 HD-1 MB-1 3" WCO, 3" DN, 1 1/2" V-UP WC-2 L-1 FD-1 L-1 WC-2 FD-1 WC-2 UR-2(2)L-1 FD-1 6" ST-DN 3" VTR L-1 DF-1 WC-2 (4)L-1 3" FD-1 3" FD-1 (12)WC-1 3" FD-1 (3)WC-1 2" VTR 1 1/2" CLV WS-1 BP-1 HD-1TMV-2 MENS 119 2" 3" 2" 3" 3" 4" WCO4" WCO 3" WCO 4" WCO 2"3"2" 1 1/2" 1 1/2"1 1/2" 3" CONDUCTOR TO BE IN WALL FRAME. SEE ARCH DWGS FOR CONDUCTOR PIPE SPACE. 3" CONDUCTOR TO BE IN WALL FRAME. SEE ARCH DWGS FOR CONDUCTOR PIPE SPACE. 4" @ 1/4" FD-1 GT 4" @ 1/16" (77 GPM) w/ ALT. 2" VENT, LESS ALT. RISE UNDER STAIRS RISE UNDER STAIRS RISE UNDER STAIRS 8" @ 1/8" (675 GPM) BP EXP. TANK FD-2 4" 3" CRW 3" RISE UNDER STAIRS 2 1/2"2"2 1/2"2" 2" 1"1 1/4" 1 1/4" 2 1/2" (2)WC-2 (2)L-1 (7)L-1 (2)WC-2 3" FD-1 1 1/2" 3" HB-4 HB-4 HB-1 HB-4 HB-4 HB-4 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/16" = 1'-0" FIRST FLOOR PLUMBING PLAN -OVERALL WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 P1.1 10/04/2023 220025.00 C2023-15 1/16" = 1'-0"1 FIRST FLOOR PLUMBING PLAN -OVERALL 10/13/202310/04/2023 BID DOCUMENT SET DN HC HC HC HC HC HC HC HC HC SD SD SD TDTD FD-2 FD-2 H&C HR-3 WMB-1 FD-2 FD-2 EEWS-1 F.P. METER FD-1 WC-2 WC-1 UR-2 SH-2(4)SH-1 L-1 L-1 L-1 FD-1 DF-1LT-1 WC-2 L-1 FD-1 HWH-2 SH-1 SH-1 SH-2 L-1 UR-2 WC-2 FD-1 HWH-3 FD-1 MB-1 DF-1 WC-2 L-1 4" RD-1 (81 GPM) 3" RD-1 (16 GPM) 4" @ 1/8" 3" @ 1/16" RESURFACER/ SHOP TOOLS/LAUNDRY 170 REFRIGERATION 172 MAIN COACH 133 Y.H. STORAGE 137 WET TEAM ROOM #2 140 YH COACH 143 UNISEX TLT 141 J.C. 142 ELEC 134 LAUNDRY 131 MAIN TEAM ROOM 132 WET TEAM ROOM #1 138 WET TEAM RR 139 MERCYHEALTH ARENA 136 ICE RINK CIRCULATION 135 UNISEX TLT 128 TRAINING 129 METER/RISER 179 STORAGE 135(A) H J K L M P QN 1 2 3 L.6 M.3 M.4 3" @ 1/16" FD-2 HD-1 HWH-1 FD-2 HD-1 WS-1 BP-1 2" VTRCRWCRWCRW TMV UP TO RH COACHES OFFICE 180 ADD ALT TEAM ROOM (A) 181 ADD ALT TEAM ROOM (B) 182 ELECTRICAL 169 PASSAGE 144 MECHANICAL 168 4" FCO HD-1 2" VTR FD-2 FS-2 2" 2" VTR CW THRU THERMO TANKS FOR PREHEAT TD ALTERNATE BID4" RD-1 (77 GPM) 4" @ 1/16" (77 GPM) w/ ALT. RISE UNDER STAIRS FD-1 (2)WMB-1 RISE UNDER STAIRS TMV-3 6 P0.1 (2) 4" HWH VENTS. TERMINATE THRU WALL LESS ALT. 4" VTR FD-1 SH-1 SH-2 SH-1 SH-1 FD-1 SH-1 SH-1 SH-2 SH-1 L-1 L-1 UR-1 WC-2 WC-2 WC-1 UR-1 L-1 L-1 3" VTR 2" 4" FD-1 HD-1 2" VENT, LESS ALT. TMV-2 4" 4" RISE UNDER STAIRS TMV-2 3" FCO 2" 2" EEWS-1 INSTALL DEDUCT WATER METER TO PIPING FOR MECH ROOM & FINISHING EQUIP. ROOM. WATER PIPE MATERIAL AFTER METER TO BE PER 22 67 00. 8" @ 1/8" (675 GPM) 1 1/4" WH-1 1" 2"2 1/2" 4" 2" BP EXP. TANK WH-1 FD-2 WC-1 3" WCO 3" W-DN, 2" V-UP 3" WCO 3" W-DN, 2" V-UP 2" 3" 2" 1 1/2" 2" 1 1/2" 3"2" 2" VTR 1 1/2" 1 1/2" RISE UNDER STAIRS 2" VESTIBULE 171 CRW 4" 3" 3" 3" 2" 2 1/2" 2" 1 1/4" 3/4" 3" RD-1 (20 GPM) HD-1 HD (CLW) Space 176 2" VTR 1 1/2" CLV HD-1 2 1/2" HB-1 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/8" = 1'-0" FIRST FLOOR PLUMBING PLAN -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P1.1a 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FIRST FLOOR PLUMBING PLAN -SE QUAD 10/13/202310/04/2023 BID DOCUMENT SET HC HC HC HC FD-2 TD TD FD-2 FD-1 HWH-4 MB-1 (4)L-1 (9)WC-1 (2)WC-2 (2)UR-2 (3)UR-1 HR-1 H&C HR-3 6" RD-1 (418 GPM) 6" RD-1 (413 GPM) 6" RD-1 (414 GPM) 4" RD-1 (140 GPM) 4" RD-1 (144 GPM) 4" RD-1 (54 GPM) 3" RD-1 (53 GPM) 3" @ 1/8" 4" @ 1/16" 4" @ 1/4" 6" @ 1/4" 6" @ 1/4" WOMEN'S 165 MEN'S 166 WARMING ROOM 159 STORAGE 158 TEMP STORAGE 174 LOADING/RECEIVING/STORAGE 160 MULTI-USE CONVENTION SPACE 156 GENERAL BUILDING STORAGE 167 F.S. STORAGE 175 LOBBY / LINK 155 HOCKEY STORAGE 173 MULTI-PURPOSE AREA 154 A B E F G HCD 1 2 3 F.3 F.9 G.8 PROVIDE EXTERIOR GT VACUUM PIPE PER MANUFACTURER REQUIREMENTS. MINIMUM 24" ABOVE FINISH GRADE.GT (2)WC-2WC-1FD-1 FD-1 FD-1 (7)L-1 F.4 F.6 MULTIPURPOSE AREA CIRCULATION 154 (B) AV CLOSET 167 (B) IT/GEN STORAGE 176 ELECTRIC 157 AV CLOSET 157 (A) 2 P0.2 4" 4" 3" VTR 2" 2" 2" VTR 8" DN 6" @ 1/4" WH-1 FS-1 FS-1 DF-1 HR-1 H-2 FAMILY TLT 162 J.C. 163 3" WCO, 3" DN, 1 1/2" V-UP HD-1 FD-1 4" @ 1/4" WC-2 L-1 2" 4" WCO4" WCO HB-4 HB-4 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/8" = 1'-0" FIRST FLOOR PLUMBING PLAN -NE QUAD WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P1.1b 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FIRST FLOOR PLUMBING PLAN -NE QUAD 10/13/202310/04/2023 BID DOCUMENT SET HC HC HC HC HC HC DN SP-1 FD-1 S-3WC-2 UR-2 WC-2(3)WC-1 (3)L-1 FD-1 S-1 S-1 S-2 DF-1 6" RD-1 (414 GPM) 8" RD-1 (551 GPM) 3" RD-1 (64 GPM) 3" RD-1 (38 GPM) 3" RD-1 (71 GPM) 4" RD-1 (126 GPM) 4" RD-1 (93 GPM) 4" @ 1/8" 3" @ 1/8" 3" @ 1/4" 8" @ 1/8" CONCESSIONS 115 (B) LOCKER ALCOVE 101 (A) COPY AREA 112 (A) CHECK-IN/RENTAL 107 ELEV 152 GEN STORAGE 153 OFFICE 111 FIRST AID 105 ADMIN 112 WOMENS 106B MEETING ROOM (A) 102 MEETING ROOM (B) 103 STOR 104 VESTIBULE 100 MAIN LOBBY 101 MULTI-PURPOSE AREA 154 SKATE RENTAL 108 BREAKROOM 109 OFFICE 110 A B E F HCD 4 5 6 8 7 F.3 F.9 5.8 7.2 9 F.4 F.6 3" (8.5 GPM) 2" VTR 1 1/2" HEAT TRACE RD PIPING 1 1/2" 3" VTR2" VTR 4" 4" 3" UP (2) 4" HWH VENT -UP 6" @ 1/4" 8" DN PROVIDE EXTERIOR GT VACUUM PIPE PER MANUFACTURER REQUIREMENTS. MINIMUM 24" ABOVE FINISH GRADE. WH-1 3" RD-23" RD-2 4" RD-1 (66 GPM) S-1S-1 S-2 DF-1 1 1/2" 1 1/2" 2" VTR 6" RD-1 (245 GPM) 6" @ 1/8" ALTERNATE #1: DEDUCT (2) 3" RD'S AND STORM PIPING, SWV PIPING TO S-2, (2) S-1's & DF-1. INSTALL 4" RD, 6" RD, AND STORM PIPING. INSTALL S-2, (2)S-1's & DF-1 IN ALT LOCATION. 2" 1 1/2" 1 1/2" 2" FD-1 HEAT TRACE RD PIPING 3" (8.5 GPM) MENS 106A FAMILY RR 106 3" @ 1/4" (2)L-1 1 1/2" FD-1 6" ST-DN L-1 WC-2 FD-1 WC-2 L-1 FD-1 1 1/2" 4" WCO 3" CONDUCTOR TO BE IN WALL FRAME. SEE ARCH DWGS FOR CONDUCTOR PIPE SPACE. 3" CONDUCTOR TO BE IN WALL FRAME. SEE ARCH DWGS FOR CONDUCTOR PIPE SPACE. HB-4 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/8" = 1'-0" FIRST FLOOR PLUMBING PLAN -NW QUAD WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P1.1c 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FIRST FLOOR PLUMBING PLAN -NW QUAD 10/13/202310/04/2023 BID DOCUMENT SET DN HC HC HC HC HC HC DF-1LT-1 WC-2 L-1 FD-1 L-1 UR-2 WC-2 SH-1 SH-2 SH-1 FD-1 (12)WC-1 WC-2 UR-2 (5)UR-1 (3)WC-1 (4)L-1 (7)L-1 HWH-3 FD-1 MB-1 DF-1 L-1 WC-2 SH-3 FD-1 MB-1 FD-1 HWH-1 FD-1 FD-1 FD-1 4" RD-1 (94 GPM) 4" RD-1 (78 GPM) 3" RD-1 (53 GPM) 3" RD-1 (77 GPM) 4" @ 1/16" TEAM ROOM 5 126 TEAM ROOM 4 127 WET TEAM ROOM 4 123 YH COACH 143 J.C. 142 TEAM ROOM 2 148 TEAM ROOM 3 149 TEAM ROOM 1 147 ELEV 152 FOOD PREP 115 (A) J.C. 114 WET TEAM ROOM 3 125 WET TEAM RR 124 IT 150 REFEREE 145 REFEREE RR 146 MERCYHEALTH ARENA 136 MEN'S 121 ICE ARENA LOBBY 117 PASSAGE 130 ICE RINK CIRCULATION 151 UNISEX TLT 128 TRAINING 129 BEER SALES 116 H J K L M P QN 5 6 8 7 L.6 M.3 M.4 5.8 7.2 9 ADD ALT TEAM ROOM (B) 182 COACHES OFFICE 183 ADD ALT TEAM ROOM (B) 184 COACHES OFFICE 185 3" @ 1/16" (53 GPM) 3" @ 1/16" (9 GPM) GT PASSAGE 144 SH-1L-1 L-1 2"FD-1 HD-1 2" VENT, LESS ALT. 4" RD-1 (77 GPM) 4" @ 1/16" (77 GPM) w/ ALT. SH-1 SH-2 WC-2WC-1L-1 3" FCO 3" VTR 3" 2" HEAT TRACE RD PIPING 3" @ 1/4" 3" VTR 1 1/2" HD-1 2" VTR 2" 4" 4" 3" UP (2) 4" HWH VENT -UP FD-1 8" @ 1/8" (670 GPM) 3" RD-2 FS-1 1 1/2" TMV-1 RISE UNDER STAIRS 2" DRY STORAGE 115 (C) FD-1 3" L-1 ELECTRICAL 113 4" @ 1/8" L-1 WC-2 DF-1 3" FD-1 3" FD-1 WC-2 WC-2 (12)WC-1 WC-2 3" FD-1 HD-1 1 1/2"MENS 119 3" 3" 2" 3" 3" WCO 2"2"3" 3" CONDUCTOR TO BE IN WALL FRAME. SEE ARCH DWGS FOR CONDUCTOR PIPE SPACE. 3" FD-1 WC-2WC-2 (2)L-1 2" HB-4 HB-4 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/8" = 1'-0" FIRST FLOOR PLUMBING PLAN -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P1.1d 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FIRST FLOOR PLUMBING PLAN -SW QUAD 10/13/202310/04/2023 BID DOCUMENT SET HC HC HC HC HC HC HC HC HC PRESS BOX 203 SPONSOR SUITE 202 Space 113 MEZZANINE 201 Space 121 A B E F G H J K L M P QCDN 1 2 3 4 5 6 8 7 F.3 F.9 G.8 L.6 M.3M.4 5.8 7.2 9 F.4 F.6 6" RD-1 (340 GPM) 6" RD-1 (335 GPM) 6" RD-1 (335 GPM) 6" RD-1 (335 GPM) 3" VTR (LESS ALT. #2) 2" VTR ADD 4" RD W/ ALT. BID #2 ACCEPTANCE 4" HWH VTR (W/ ALT. #2) 3" VTR (W/ ALT. #2) ADD 4" RD W/ ALT. BID #2 ACCEPTANCE 3" VTR (W/ ALT. #2) 2" VTR 3" VTR 2" VTR 3" VTR 2" VTR (2) 4" HWH VTR 3" SAN VTR 2" VTR 2" VTR3" VTR 2" VTR RH-1 2" VTR RD-2 RD-2RD-2 (2) 4" HWH VTR (4) 4" HWH VTR HWH V-THRU WALL (LESS ALT. #2) (2) 4" HWH VTR 2" CLVTR Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/16" = 1'-0" SECOND FLOOR PLUMBING PLAN - OVERALL WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 P1.2 10/04/2023 220025.00 C2023-15 1/16" = 1'-0"1 SECOND FLOOR PLUMBING PLAN -OVERALL 10/13/202310/04/2023 BID DOCUMENT SET HC HC HC HC HC HC 6" RD-1 (340 GPM) 6" @ 1/4" 6" RD-1 (335 GPM) 6" @ 1/8" H J K L M P QN 1 2 3 L.6 M.3 M.4 RH-1 2" VTR ADD 4" RD W/ ALT. BID #2 ACCEPTANCE 4" HWH VTR (W/ ALT. #2) 3" VTR (W/ ALT. #2) 2" VTR 2" VTR 8" DN 2" VTR (4) 4" HWH VTR HWH V-THRU WALL (LESS ALT. #2) 2" CLVTR Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/8" = 1'-0" SECOND FLOOR PLUMBING PLAN -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P1.2a 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 SECOND FLOOR PLUMBING PLAN -SE QUAD 10/13/202310/04/2023 BID DOCUMENT SET HC HC HC 6" RD-1 (335 GPM) 6" RD-1 (335 GPM) H J K L M P QN 5 6 8 7 L.6 M.3 M.4 5.8 7.2 9 3" VTR (LESS ALT. #2) ADD 4" RD W/ ALT. BID #2 ACCEPTANCE 3" VTR (W/ ALT. #2) 2" VTR 3" VTR 2" VTR (2) 4" HWH VTR 3" SAN VTR 3" 6" @ 1/8" 6" @ 1/8" 8" DN RD-2 (2) 4" HWH VTR Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/8" = 1'-0" SECOND FLOOR PLUMBING PLAN -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P1.2b 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 SECOND FLOOR PLUMBING PLAN -SW QUAD 10/13/202310/04/2023 BID DOCUMENT SET TYP 4' - 0" 41 41 41 41 41 6" RD-1 (418 GPM) 6" RD-1 (413 GPM) 6" RD-1 (414 GPM) 6" RD-1 (551 GPM) 3" RD-1 (64 GPM) 3" RD-1 (38 GPM) 3" RD-1 (71 GPM) 4" RD-1 (126 GPM) 4" RD-1 (93 GPM) 4" RD-1 (94 GPM) 4" RD-1 (78 GPM) 3" RD-1 (53 GPM) 3" RD-1 (77 GPM) 6" RD-1 (335 GPM) 6" RD-1 (340 GPM) 4" RD-1 (81 GPM) 4" RD-1 (140 GPM) 4" RD-1 (144 GPM) 4" RD-1 (54 GPM) 3" RD-1 (53 GPM) RH-1 RH-1 3" RD-1 (16 GPM) 6" RD-1 (335 GPM) 6" RD-1 (335 GPM) A B E F G H J K L M P QCDN 1 2 3 4 5 6 8 7 F.3 F.9 G.8 L.6 M.3M.4 5.8 7.2 9 3" RD-1 (20 GPM) F.4 F.6 (2) 4" HWH VTR 3" SAN VTR RD-2 RD-2RD-2 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/16" = 1'-0" ROOF PLUMBING PLAN - OVERALL WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 P1.3 10/04/2023 220025.00 C2023-15 1/16" = 1'-0"1 ROOF PLUMBING PLAN 10/13/202310/04/2023 BID DOCUMENT SET TD TD 6" FCO 4" FCO FD FD 4" FD 4" FCO FD HD HD 2" VTR TD TD FD FD FD FD FD FS 4" FCO 2" VTR 2" 3" 3" 1 1/2" 4" FD WMB 2" FS 3" 3" FCO FS SINK 2" 3" MB 3" FCO 3" FCO 2" GW 4" FCO 3" FD 4-COMP. SINK SINK 2" VTR GT PROVIDE EXTERIOR GT VACUUM PIPE PER MANUFACTURER REQUIREMENTS. MINIMUM 24" ABOVE FINISH GRADE. 3" 3"2" 2" 3" 1 1/2" 1 1/2" COMB. D&V 1 1/2" 1 1/2" 4" 23 6" 4" 6"162 4" 4" 4" 3" 4" 1 1/2" 4" 4" COMB. D&V 222 4" 8" @ 1/16" 4" PIPE 6" BELOW WATER LEVEL 4" 4" 2" VTR 1 1/2" 3"4" 4" 8" 234 COMB. D&V COMB. D&V MB HD FD 2" 3" 3" WCO DF 1 1/2" 3" FCO LAV LAVLAV LAV LAVLAV LAV 2" 2"FD 3" 4" FD FD LAV LAV LAV LAV LAV 2" 2"3" 3" 2" WC WC WC WC WC WC WC WC WC WC WC WC WC WC WC UR UR UR UR UR 3" VTR 2" 2" 2" 34 15 4" WCO 4"100 1 1/2" 1 1/2" 4" WCO 32 3" 1 1/2" 4" CV 1 1/2" SP-1 RECESSED PIT. PUMPING 11 1 1/2" Interior Interceptor Qty Length Width Depth Gallons Sink 1 1 24.00 18.00 16.00 22.44 Total Gallons from Sinks Total GPMUse this GPM w/o DW 22.44 22.44 1 P2.1 5 P0.1 NOTE: SEE HD SPECS. ALL HD RISERS TO BE ONE NOMINAL PIPE SIZE LARGER THAN TRAP SIZE. ALL COMBINATION DRAIN & VENT FD'S & HD'S TRAPS TO BE 36" MAX BELOW FINISH FLOOR. Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated WASTE AND VENT PIPING ISOMETRICS WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P2.0 10/04/2023 220025.00 C2023-15 NTS1PARTIAL WASTE AND VENT PIPING ISOMETRIC 10/13/202310/04/2023 BID DOCUMENT SET 3" FCO SINK 2" VTR SINK 2" 2" 1 1/2" 3" NOTE: SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR DESCRIPTION OF ALTERNATES. ALTERNATE #1: DEDUCT BASE BID PIPING AND ADD ALTERNATE PIPING TO PLUMBING. SINK LAV DF WC FD 1 1/2" 1 1/2" 2" 2" VTR FCO SINK SINK SINK FCO 3" FCO 3" FCO PROVIDE EXTERIOR GT VACUUM PIPE PER MANUFACTURER REQUIREMENTS. MINIMUM 24" ABOVE FINISH GRADE. GT FD SINK 2" VTR FD FD 3" FCO FD HD MB SINK 4-COMP. SINK 8" @ 1/16" SH FD WC LAV 3" VTR FCO HD FD MB DF WC FD LAV FCO SH SH SH FD WC RISE UNDER STAIRS UR LAV8"234 1 1/2" 2"1 1/2" 2" 2" 4" 4" 2" 2" 2" 2" 2" 8" 2" 2" 1 1/2" 2"2" 4" 3" 3" 1 1/2" 3" 3" 2" 3" 2"1 1/2" 2" 4" 2" 2"2" 8" 1 1/2" 2" 1 1/2" 2" 2" 1 1/2" 2" 4" 69 2" 6" FCO 2" SINK COMB. D&V 6" 2" 2" 3" GW 1 1/2" 2" 1 1/2" 6" 93 8" 282 8" 3" 3"3" 3" COMB. D&V 389 FCO FD FS 3" 3" FCO 3" 1 1/2"3" 4" 26 LAVLAV FD WC WC WC WC WC UR 3" VTR FD LAV LAV LAV 1 1/2" 4" 2" 3" 3" FCO SINK WC LAV FD DF 2" 4" 2" 1 1/2" 3" 1 1/2" 1 1/2" 1 1/2" 4" 1 1/2" 4" WCO 3" WCO 1 1/2" 1 1/2" 3" 2" 1 1/2"2" 2" 4"11 1 1/2" 2" 1 1/2" 1 1/2" FCO Interior Interceptor Qty Length Width Depth Gallons Sink 1 1 24.00 18.00 16.00 22.44 Total Gallons from Sinks Total GPMUse this GPM w/o DW 22.44 22.44 1 P2.2 1 P2.0 NOTE: SEE HD SPECS. ALL HD RISERS TO BE ONE NOMINAL PIPE SIZE LARGER THAN TRAP SIZE. ALL COMBINATION DRAIN & VENT FD'S & HD'S TRAPS TO BE 36" MAX BELOW FINISH FLOOR. Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated WASTE AND VENT PIPING ISOMETRICS WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P2.1 10/04/2023 220025.00 C2023-15 NTS1PARTIAL WASTE AND VENT PIPING ISOMETRIC 10/13/202310/04/2023 BID DOCUMENT SET FCO SH SH FD 4" 2" 2" 2" 3" LAV WC WC 3" VTR (w/ ALT) 3" VTR (w/ ALT) 2" 2" 3" FD FD SH SH SH SH SH SH SH SH 3" 2" 2" (TYP.) 3" 3" WCO 3" WCO 3" 2" 3" 2" LAV LAV UR WC WC WC WCUR LAV LAV 3" 2" 1 1/2" 1 1/2" 3" 4" 4" 2" 1 1/2" 2" 2" (w/ ALT) 2" 2" 1 1/2" NOTE: SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR DESCRIPTION OF ALTERNATES. ALTERNATE #2: DEDUCT BASE BID PIPING AND ADD ALTERNATE PIPING TO ADDITIONAL FIXTURES, ROUGH IN PLUMBING PIPING ONLY. INCLUDE FIXTURE ROUGH IN, INCLUDE PIPING LOOP FOR SHOWER VALVE MAIN SUPPLY LOOP WITH SHOWER ROOM BYPASS, BYPASS VALVES, AND SHUT OFF VALVES TO FUTURE SHOWER VALVES ONLY. ALTERNATE #3: ADD FIXTURE PIPING, FIXTURE, AND FIXTURE FINISHES COMPLETE. 3" FCO SH SH SH FD RISE UNDER STAIRS WC LAV 3" VTR (LESS ALT.) 3" 4" 2" 3" 2" 1 1/2" FUTURE 4" SAN. CAP AT WALL (60 DFU) 3" HD HD FD FD LAVWC LT DF 4" FUTURE 4" SAN. CAP AT WALL (60 DFU) (LESS ALT.)3" FCO RISE UNDER STAIRS FDWMB 3" 4" 4" FCO RISE UNDER STAIRS 2" VTR FD LAV LAV LAV FD WC WC UR SH SH SH SH SH 2" (TYP.)3" 4" 2" COMB. D&V 3" FD HD 2" COMB. D&V COMB. D&V 2" 1 1/2" 4" 2" 1 1/2" 2" 2" 1 1/2" 2" 4" 43 1 1/2" 1 1/2" 3" 1 1/2" 1 1/2" 2" 2" 1 1/2" 4" 2"1 1/2" 3" 2" 1 1/2" 4"104 4" 2" (LESS ALT.) 4"129 4"10 3" (LESS ALT.) 4"149 1 1/2" 2"3" 2" 4" @ 1/8" 164 3" FCO FD FD FCO FD FD 3" WCO WC WC WC WC WC WC WC 2" (TYP.)3" WC WC FD DF WC WC WC WC WC 3" VTR 6" FCO WC LAV LAV LAV LAV LAV LAV LAV LAV LAV LAV LAV LAV LAV 3" 3" 4" FCO 3" LAV LAV 1 1/2" 3" WC WC WC WC WC WC WC WC WC WC WC WC WC WC WC WC WC WC WC UR UR UR UR UR UR 2" (TYP.) COMB. D&V 3" 4" 3" 1 1/2" 2" 1 1/2" 2" 2" 4" 3" 3" 2" 3" 1 1/2" 1 1/2" 1 1/2" 2" 1 1/2" 1 1/2" 8" @ 1/16" 389 6" YCO 8" @ 1/16" 819 7 1 1/2" 3 24 1 1/2" (TYP.) 4"1 1/2"2" 1 1/2"2" 4" 4" 84 6" 248 4" 4" 1 P2.1 NOTE: SEE HD SPECS. ALL HD RISERS TO BE ONE NOMINAL PIPE SIZE LARGER THAN TRAP SIZE. ALL COMBINATION DRAIN & VENT FD'S & HD'S TRAPS TO BE 36" MAX BELOW FINISH FLOOR. Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated WASTE AND VENT PIPING ISOMETRICS WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P2.2 10/04/2023 220025.00 C2023-15 NTS1PARTIAL WASTE AND VENT PIPING ISOMETRIC 10/13/202310/04/2023 BID DOCUMENT SET NOTE: SEE ARCHITECTURAL DRAWINGS AND SPECIFICATION FOR DESCRIPTION OF ALTERNATES. ALTERNATE #4: ADD DEMINERALIZATION UNIT TO WATER SYSTEM COMPLETE. INCLUDE ALL EQUIPMENT AND PIPING REQUIRED FOR TANK AND UNIT. PIPE DEMINERALIZATION UNIT PIPING TO CAPPED AT PREHEAT HWH'S BASE BID PIPING. PIPE CAPPED DEMINERALIZED WATER TO HR-1 & 2 AT ROOM 170, HWH'S ROOM 168 CAPPED BASE BID CONNECTION, AND ROOM 172 REFRIGERATION ROOM PREHEAT HWH TANKS CAPPED CONNECTIONS. DISCONNECT HARD WATER CONNECTION FROM BASE BID WATER SUPPLY AT ROOM 172 PREHEAT TANKS AND REMOVE BASE BID WATER LINE LABELS/ID WATER TYPE AT VALVES IN ROOM 172 REFRIGERATION ROOM. C R W C R W AIR GAP 2" AVB (CL/2" ABOVE TANK) REFRIG. EQ. TANK 2" 1 1/2" (TYP.) 2" 2 1/2" PEX 1 1/2" (3) THERMO HEAT RECLAIM TANKS BY OTHERS 2 1/2" PEX CAPPED FUTURE DE-MIN. WATER PIPING 2" RH CRW C R W WH EEW EEW TMV 2 1/2" PEX CAPPED FUTURE DE-MIN. WATER PIPING FOR FUTURE DE-MINERALIZATION UNIT WMB SINK SINK SINK SINK 4-COMP. SINK SINK WH 2" 2 1/2" 2" 2 1/2"1" 2" DEDUCT METER 2 1/2" PEX A PROVIDE LABEL PLATE WITH WORDING ON VALVE, "SOFT WATER FOR EQ. RINK FILL & HWH'S" CV CV PROVIDE LABEL PLATE WITH WORDING ON VALVE, "RAW WATER FOR RINK FILL" A 2"149 3/4" 199 1"8 1 1/4" 2" 1" 1" 1" 2 1/2" 2"6 2 1/2" CAPPED FUTURE DE-MIN. WATER CONNECTION 2 2 1/2" 1" 2" 2 1/2" CAPPED FUTURE CRW WATER CONNECTION 2 1/2" 143 1" 2 1/2" 38 2" 1"4 1"9 14.5 1" 8 3/4" 1 1/4"10 1" 2 1/2" 143 NOTE: PIPE 1/2" RH DRAIN TO HD. D M DM DM D M D M DM DM D M D M CRW CRWCRWC R W C R W C R W CRWCRW C R W CR W CRWCRW CRW C R W C R W C R W C R W WC WC WC WC WC WC WC UR WC UR UR WC UR WC UR WC WC WC WC LAV LAV LAV LAV LAV WC LAV LAV LAV LAV LAV LAV LAV DF MB CS 1" 3/4" 1 1/2" 1 1/4" 1" 1" 16.5 11 5.5 22 3/4" 1" - TYP. (MAX 3') 1 1/4" 1 1/2"13 2" 19.5 3/4" (TYP.) 1" 3/4" 3.5 6.5 43.5 107.5 130 2" 2 1/2" 7.5 1/2" (TYP.) 3/4" FROM RECLAIM TANKS HWR HB HB HB 1 P3.1 1 P3.2 3 P0.1 2 P0.2 7 P0.1 1. EXAMINE FOOD SERVICE EQUIPMENT CONTRACTOR'S DRAWINGS AND SCHEDULES. CONFIRM ALL EXACT ROUGH-IN DIMENSIONS FOR EQUIPMENT WITH EQUIPMENT CONTRACTOR BEFORE STARTING ANY WORK. ALL ROUGH-IN LOCATIONS SHALL BE ESTABLISHED AS DIRECTED BY FOOD SERVICE EQUIPMENT CONTRACTOR AND FROM FIELD MEASUREMENTS: PLUMBING CONTRACTOR SHALL NOT SCALE THE DRAWINGS FOR EXACT DIMENSIONS. 2. ADAPTERS, TAILPIECES, ESCUTCHEONS, TRAPS, BACKFLOW PREVENTERS ETC., REQUIRED TO COMPLETE THE INSTALLATION OF FOOD SERVICE EQUIPMENT SHALL BE FURNISHED AND INSTALLED BY THE PLUMBING CONTRACTOR. INSTALL POINT OF USE MIXING VALVES AT ALL SINKS AND EQUIPMENT NOT REQUIRING 140 DEGREE WATER. 3. CONNECTION SIZES TO FOOD SERVICE EQUIPMENT ITEMS MAY VARY. VERIFY SIZES WITH EQUIPMENT MANUFACTURER. 4. PIPING, FITTINGS, AND SHUT-OFF VALVES BETWEEN PLUMBING SERVICE OUTLETS IN FLOORS AND WALLS TO BE ATTACHED TO PIECES OF EQUIPMENT, TOGETHER WITH LABOR OF CONNECTING, SHALL BE FURNISHED BY PLUMBING CONTRACTOR. 5. WATER FIXTURES, INCLUDING FAUCETS, WILL BE FURNISHED BY FOOD SERVICE EQUIPMENT CONTRACTOR UNLESS OTHERWISE NOTED. PLUMBING CONTRACTOR SHALL PROVIDE STOPS, BALANCE OF PIPING, AND MAKE FINAL CONNECTIONS, INCLUDING INSTALLATION OF TRIM. 6. ALL EXPOSED WASTE PIPE AND DRAINAGE FITTINGS IN KITCHEN AREA SHALL BE TYPE "L" HARD COPPER WITH SWEAT JOINTS. PROVIDE CODE REQUIRED SINK TRAPS. 7. PROVIDE BRACKET MOUNTED SUPPLY LINES 1 1/2" FROM WALL TO ALLOW FOR PIPE COVERING. 8. COORDINATE ALL WORK WITH FOOD SERVICE CONTRACTOR. FOOD SERVICE EQUIPMENT GENERAL NOTES: NOTE: P.C. TO PROVIDE LOOP TRANSITION RADIUS FROM BELOW FLOOR TO ABOVE FLOOR PER MANUFACTURER'S REQUIREMENTS. ADJUST PIPE LOCATIONS AND PIPE DEPTHS ACCORDINGLY TO MAINTAIN PROPER RADIUS. COORDINATE PIPE LOCATIONS WITH EQUIPMENT AND OTHER TRADES. ABOVE FLOOR TRANSITION LOCATIONS MAY BE ADJUSTED TO MAINTAIN PROPER PIPE RADIUS PROVIDED COORDINATION WITH OTHER TRADES IS DONE. PROVIDE TRANSITION SLEEVES PER MANUFACTURER'S REQUIREMENTS, PROTECT PEX PIPING FROM CONCRETE FLOOR TRANSITION, COORDINATE BELOW GROUND PIPE WITH REFRIGERATION PIPING INSTALLATION AND MAINTAIN SEPARATION FOR FROST DISTANCES. PROVIDE STRAFOAM SHEATHING IF FROST DISTANCES CAN NOT BE MAINTAINED. NOTE: PROVIDE SHOCK ARRESTORS ON ALL FV'S, FV GROUPS, AND QUICK CLOSING VALVES. PROVIDE ACCESS PANELS FOR ALL VALVES AND SHOCK ARRESTORS LOCATED WITHIN WALLS. SEE SPECIFICATIONS. COORDINATE ACCESS PANELS WITH ARCHITECTURAL MEMBERS OF BUILDING. Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated WATER PIPING ISOMETRICS WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P3.0 10/04/2023 220025.00 C2023-15 NTS1PARTIAL WATER PIPING ISOMETRIC 10/13/202310/04/2023 BID DOCUMENT SET LAV WC WC 2" 1" LAV LAV WC WC WC WC LAV LAV UR UR SH SH 1 1/2" 1 1/4" SH SH SH SH SH SH SH SH 3/4" (TYP.) 1/2" (TYP.) 3/4"1 1/4" 1 1/2" 2" 3/4" 2" 2"31 1 1/2" 15 39 2" 3/4" 0.5 2" 12 1" ALT BID ONLY ALT BID ONLY 3/4" ALT BID ONLY 3/4" 1 1/4" 1 1/2" 1 1/4" 1 1/4" 1 1/2" 1 1/4" ALT BID ONLY ALT BID ONLY 1" 7.5 ALTA L T ALT A LTALT ALT ALT ALTALT ALT ALTALTALT A LT ALT NOTE: SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR DESCRIPTION OF ALTERNATES. ALTERNATE #2: DEDUCT BASE BID PIPING AND ADD ALTERNATE PIPING TO ADDITIONAL FIXTURES, ROUGH IN PLUMBING PIPING ONLY. INCLUDE FIXTURE ROUGH IN, INCLUDE PIPING LOOP FOR SHOWER VALVE MAIN SUPPLY LOOP WITH SHOWER ROOM BYPASS, BYPASS VALVES, AND SHUT OFF VALVES TO FUTURE SHOWER VALVES ONLY. ALTERNATE #3: ADD FIXTURE PIPING AND FIXTURE FINISHES COMPLETE. LAV UR WC LAV WCSINK LAV LAV WC WC UR WH F.P. BY OTHERS SH CR W CRW 8" COMBINED WATER SERVICE BP BP EXP. TANK C R W 1" 1" 2" 2 1/2" 2" 1" 3" 449 4" 4"648 3" 4" 4" 3/4" 1" 4 199 SH SH SH SH LAV 2"54 3" 432 SH SH SH CS (TYP.) 3/4" 3/4" 4 1" 54 3/4"1 3"338 3/4" 1/2" (TYP.) 3/4" (TYP.) 1" (1 1/2" w/ALT) 1" (1 1/2" w/ALT) 1 1/2" BASE BID ONLY 2" 2" 1 1/2" 1 1/4" (2" w/ALT) BASE BID ONLY BASE BID ONLY 1"7.5 BASE BID ONLY 3/4" 1" 3"CRWCRW CRW CRWCRW CRW CRW329 WC WC WC WC WC WC WC WC WC WC WC WC WC WC LAV LAVWC WC WC WC WC WC WC UR UR UR UR UR UR WC WC WC WC WC WC WC WC WC WC WC WC LAV LAV LAV LAV LAV LAV LAV LAV LAV LAV LAV LAV LAV WC DF 1 1/4" 1 1/2" 13 2" 19.5 2"91 3/4" HB 1" (MAX. 3') TYPICAL. 1 1/2" 13 2" 19.5 136.5 HB 3/4" 2 3/4" 2 3" 144 1"8 2 1/2" 74 1 P3.0 1 P3.2 1 P0.2 6 P0.1 7 P0.1 NOTE: P.C. TO PROVIDE LOOP TRANSITION RADIUS FROM BELOW FLOOR TO ABOVE FLOOR PER MANUFACTURER'S REQUIREMENTS. ADJUST PIPE LOCATIONS AND PIPE DEPTHS ACCORDINGLY TO MAINTAIN PROPER RADIUS. COORDINATE PIPE LOCATIONS WITH EQUIPMENT AND OTHER TRADES. ABOVE FLOOR TRANSITION LOCATIONS MAY BE ADJUSTED TO MAINTAIN PROPER PIPE RADIUS PROVIDED COORDINATION WITH OTHER TRADES IS DONE. PROVIDE TRANSITION SLEEVES PER MANUFACTURER'S REQUIREMENTS, PROTECT PEX PIPING FROM CONCRETE FLOOR TRANSITION, COORDINATE BELOW GROUND PIPE WITH REFRIGERATION PIPING INSTALLATION AND MAINTAIN SEPARATION FOR FROST DISTANCES. PROVIDE STRAFOAM SHEATHING IF FROST DISTANCES CAN NOT BE MAINTAINED. NOTE: PROVIDE SHOCK ARRESTORS ON ALL FV'S, FV GROUPS, AND QUICK CLOSING VALVES. PROVIDE ACCESS PANELS FOR ALL VALVES AND SHOCK ARRESTORS LOCATED WITHIN WALLS. SEE SPECIFICATIONS. COORDINATE ACCESS PANELS WITH ARCHITECTURAL MEMBERS OF BUILDING. Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated WATER PIPING ISOMETRICS WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P3.1 10/04/2023 220025.00 C2023-15 NTS1PARTIAL WATER PIPING ISOMETRIC 10/13/202310/04/2023 BID DOCUMENT SET SINK SINK SINK WC LAV DFALTALTALT A L TALT A LT 3/4" 3/4" 3/4" 1.5 1/2"1 1/2" 1" (MAX 3') 2.5 3 5.5 1/2" 3/4" 1/2" SINK SINK SINK 4-COMP. SINK WH SINK MB SH LAV WC TMV LAV UR WC LAV WC 2 1/2" 2" 1" 3/4"2" 3/4" 1" 3/4" 1" 2 1/2" 74 1 1/4" CS CS 1 1/4"16 2 1/2" 3/4" 3 3/4" 1" RPBP 3/4" 1/2" 1 1/4" 1" 3/4" 4 3/4" 1 1/2" 3/4" 3/4" 9 MB (2)CS 26 9.5 3/4" 1" SH SH SH 1" 38 C RW CR W C R W SINK SINK SINK LAV WC DF 2" 1/2" 3/4" 3/4" 3/4" 3/4" LAV LAV LAV LAV LAV WC WC WC WC UR 8 1/2" 4.5 9.5 1" 8.5 2 1/2" 52 2 1/2" (TYP.) 2" 11 5.5 11 2.5 3 1.5 3/4" HB 1 1/4" 10 1 P3.1 1 P3.0 7 P0.1 7 P0.1 1. EXAMINE FOOD SERVICE EQUIPMENT CONTRACTOR'S DRAWINGS AND SCHEDULES. CONFIRM ALL EXACT ROUGH-IN DIMENSIONS FOR EQUIPMENT WITH EQUIPMENT CONTRACTOR BEFORE STARTING ANY WORK. ALL ROUGH-IN LOCATIONS SHALL BE ESTABLISHED AS DIRECTED BY FOOD SERVICE EQUIPMENT CONTRACTOR AND FROM FIELD MEASUREMENTS: PLUMBING CONTRACTOR SHALL NOT SCALE THE DRAWINGS FOR EXACT DIMENSIONS. 2. ADAPTERS, TAILPIECES, ESCUTCHEONS, TRAPS, BACKFLOW PREVENTERS ETC., REQUIRED TO COMPLETE THE INSTALLATION OF FOOD SERVICE EQUIPMENT SHALL BE FURNISHED AND INSTALLED BY THE PLUMBING CONTRACTOR. INSTALL POINT OF USE MIXING VALVES AT ALL SINKS AND EQUIPMENT NOT REQUIRING 140 DEGREE WATER. 3. CONNECTION SIZES TO FOOD SERVICE EQUIPMENT ITEMS MAY VARY. VERIFY SIZES WITH EQUIPMENT MANUFACTURER. 4. PIPING, FITTINGS, AND SHUT-OFF VALVES BETWEEN PLUMBING SERVICE OUTLETS IN FLOORS AND WALLS TO BE ATTACHED TO PIECES OF EQUIPMENT, TOGETHER WITH LABOR OF CONNECTING, SHALL BE FURNISHED BY PLUMBING CONTRACTOR. 5. WATER FIXTURES, INCLUDING FAUCETS, WILL BE FURNISHED BY FOOD SERVICE EQUIPMENT CONTRACTOR UNLESS OTHERWISE NOTED. PLUMBING CONTRACTOR SHALL PROVIDE STOPS, BALANCE OF PIPING, AND MAKE FINAL CONNECTIONS, INCLUDING INSTALLATION OF TRIM. 6. ALL EXPOSED WASTE PIPE AND DRAINAGE FITTINGS IN KITCHEN AREA SHALL BE TYPE "L" HARD COPPER WITH SWEAT JOINTS. PROVIDE CODE REQUIRED SINK TRAPS. 7. PROVIDE BRACKET MOUNTED SUPPLY LINES 1 1/2" FROM WALL TO ALLOW FOR PIPE COVERING. 8. COORDINATE ALL WORK WITH FOOD SERVICE CONTRACTOR. FOOD SERVICE EQUIPMENT GENERAL NOTES: NOTE: P.C. TO PROVIDE LOOP TRANSITION RADIUS FROM BELOW FLOOR TO ABOVE FLOOR PER MANUFACTURER'S REQUIREMENTS. ADJUST PIPE LOCATIONS AND PIPE DEPTHS ACCORDINGLY TO MAINTAIN PROPER RADIUS. COORDINATE PIPE LOCATIONS WITH EQUIPMENT AND OTHER TRADES. ABOVE FLOOR TRANSITION LOCATIONS MAY BE ADJUSTED TO MAINTAIN PROPER PIPE RADIUS PROVIDED COORDINATION WITH OTHER TRADES IS DONE. PROVIDE TRANSITION SLEEVES PER MANUFACTURER'S REQUIREMENTS, PROTECT PEX PIPING FROM CONCRETE FLOOR TRANSITION, COORDINATE BELOW GROUND PIPE WITH REFRIGERATION PIPING INSTALLATION AND MAINTAIN SEPARATION FOR FROST DISTANCES. PROVIDE STRAFOAM SHEATHING IF FROST DISTANCES CAN NOT BE MAINTAINED. NOTE: PROVIDE SHOCK ARRESTORS ON ALL FV'S, FV GROUPS, AND QUICK CLOSING VALVES. PROVIDE ACCESS PANELS FOR ALL VALVES AND SHOCK ARRESTORS LOCATED WITHIN WALLS. SEE SPECIFICATIONS. COORDINATE ACCESS PANELS WITH ARCHITECTURAL MEMBERS OF BUILDING. Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated WATER PIPING ISOMETRICS WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P3.2 10/04/2023 220025.00 C2023-15 NTS1PARTIAL WATER PIPING ISOMETRIC 10/13/202310/04/2023 BID DOCUMENT SET 4" RD-1 (66 GPM) 4" (66 GPM) FCO 6" RD-1 (245 GPM) 6" @ 1/8" 6" @ 1/8" (245 GPM) 4" RD-1 (77 GPM) 4" RD-1 (77 GPM) 4" @ 1/16" 4" @ 1/16" 4" @ 1/16" (78 GPM w/ALT) (753 GPM w/ALT) 4" @ 1/16" (77 GPM w/ALT) 14 @ 1/16" (1500 GPM w/ALT) (168 GPM w/ALT) (365 GPM w/ALT) (475 GPM w/ALT) (569 GPM w/ALT) 14 @ 1/8" (2220 GPM w/ALT) 18" @ 1/32" (2533 GPM w/ALT) 3" RD-1 (77 GPM) 3" @ 1/4" (77 GPM) 4" RD-1 (78 GPM) 3" RD-1 (53 GPM) 4" @ 1/16" 3" @ 1/16" 4" RD-1 (94 GPM) 4" @ 1/8" SP 4" RD-1 (93 GPM) 3" 3" @ 1/16" (17 GPM) 4" RD-1 (126 GPM) 4" @ 1/8" 3" RD-1 (71 GPM) 6" @ 1/16" (197 GPM) FCO 3" RD-1 (38 GPM) 3" @ 1/8" 3" RD-1 (64 GPM) 3" @ 1/4" 3" @ 1/4" (64 GPM) 4" @ 1/16" (102 GPM) 6" @ 1/8" (299 GPM) YCO 6" RD-1 (551 GPM) 6" RD-1 (414 GPM) 6" RD-1 (413 GPM) 6" RD-1 (418 GPM) 8" @ 1/8" 6" @ 1/4" 8" @ 1/4" (965 GPM) 6" @ 1/4" 6" @ 1/4" 8" @ 1/4" (831 GPM) 4" RD-1 (54 GPM) 4" @ 1/16" 3" @ 1/8" 3" RD-1 (53 GPM) 4" RD-1 (144 GPM) 4" @ 1/4" 4" @ 1/8" (107 GPM) 4" @ 1/4" (144 GPM) 4" RD-1 (140 GPM) 4" @ 1/4" (140 GPM) 4" @ 1/4" 3" RD-1 (20 GPM) 3" @ 1/16"4" RD-1 (81 GPM) 4" @ 1/8" (101 GPM) 4" @ 1/8" 6" RD-1 (340 GPM) 6" RD-1 (335 GPM) 6" RD-1 (335 GPM) 6" RD-1 (335 GPM) 6" @ 1/8" 6" @ 1/8" 6" @ 1/8" 6" @ 1/4" 8" @ 1/8" (675 GPM) 3" RD-1 (16 GPM) 3" @ 1/16" 3" @ 1/16" (16 GPM) 10" @ 1/16" (691 GPM) 8" @ 1/8" (670 GPM) 12" @ 1/16" (1361 GPM) HEAT TRACE HEAT TRACE 6" @ 1/4" (409 GPM) 8" @ 1/8" (503 GPM) 4" @ 1/4" (140 GPM) 3" @ 1/16" (9 GPM) 12" @ 1/8" (2081 GPM) 6" @ 1/16" (241 GPM) 8" @ 1/16" (385 GPM) 8" @ 1/16" (492 GPM) 12" @ 1/16" (1323 GPM) 18" @ 1/32" (2288 GPM) WCO (TYP.) HEAT TRACE 2" C.O. 2" 3" RD-2 3" RD-2 3" RD-2 4" SIOUX CHIEF 860 BACKWATER VALVE W/ EXT SLV TO GRADE 1 1/2" CLV 4" HD HEAT TRACE3" 3" 3" 2" CLVTR 3" @ 1/4" SEE ARCHITECTURAL DRAWINGS FOR WALL CONFIGURATION FOR 3" HORIZONTAL DRAIN PIPING LOCATIONS FOR RD-2 CANOPY ROOF DRAINS. SEE ARCHITECTURAL DRAWINGS FOR WALL CONFIGURATION FOR 3" HORIZONTAL DRAIN PIPING LOCATIONS FOR RD-2 CANOPY ROOF DRAINS. COORDINATE SP LOCATION AND FLOOR PITCH WITH ELEVATOR EQUIPMENT, EQUIPMENT RAILS, ELEVATOR PIT FLOOR, AND ACCESS FOR REMOVAL & INSTALLATION. Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: NTS STORM PIPING ISOMETRICS WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS P4.0 10/04/2023 220025.00 C2023-15 NTS1STORM PIPING ISOMETRIC 10/13/202310/04/2023 BID DOCUMENT SET HC HC HC HC HC HC HC HC HC HC DN DN HC HC HC HC HC HC HC HC HC HC HC HC HC HC HC DN SD SD SD WARMING ROOM 159 RESURFACER/ SHOP TOOLS/LAUNDRY 170 REFRIGERATION 172 MAIN COACH 133 TEAM ROOM 5 126 TEAM ROOM 4 127 WET TEAM ROOM 4 123 Y.H. STORAGE 137 WET TEAM ROOM #2 140 YH COACH 143 UNISEX TLT 141 J.C. 142 TEAM ROOM 2 148 TEAM ROOM 3 149 TEAM ROOM 1 147 ELEV 152 STORAGE 158 TEMP STORAGE 174 GEN STORAGE 153 OFFICE 111 FIRST AID 105 LOADING/RECEIVING/STORAGE 160 MULTI-USE CONVENTION SPACE 156 FOOD PREP 115 (A) J.C. 114 CHECK-IN/RENTAL 107 ADMIN 112 WOMENS 106B GENERAL BUILDING STORAGE 167 F.S. STORAGE 175 LOBBY / LINK 155 ELEC 134 WET TEAM ROOM 3 125 WET TEAM RR 124 IT 150 LAUNDRY 131 MAIN TEAM ROOM 132 HOCKEY STORAGE 173 WET TEAM ROOM #1 138 WET TEAM RR 139 REFEREE 145 REFEREE RR 146 MERCYHEALTH ARENA 136 MEN'S 121 MEETING ROOM (A) 102 MEETING ROOM (B) 103 STOR 104 VESTIBULE 100 MAIN LOBBY 101 ICE ARENA LOBBY 117 ICE RINK CIRCULATION 135 PASSAGE 130 PASSAGE 144 ICE RINK CIRCULATION 151 MULTI-PURPOSE AREA 154 UNISEX TLT 128 TRAINING 129 SKATE RENTAL 108 BREAKROOM 109 OFFICE 110 BEER SALES 116 MECHANICAL 168 METER/RISER 179 F.P. Space 188 8" COMBINED F.P. & DOMESTIC WATER SERVICE A B E F G H J K L M P QCDN 1 2 3 4 5 6 8 7 F.3 F.9 G.8 L.6 M.3M.4 5.8 7.2 9 F.4 F.6 STORAGE 135(A) WOMEN'S 165 MEN'S 166 CONCESSIONS 115 (B) LOCKER ALCOVE 101 (A) COPY AREA 112 (A) Space 176 MULTIPURPOSE AREA CIRCULATION 154 (B) AV CLOSET 167 (B) IT/GEN STORAGE 176 ELECTRIC 157 AV CLOSET 157 (A) ELECTRICAL 169 ELECTRICAL 113 DRY STORAGE 115 (C) PROVIDE DRY F.P. SYSTEM. LOCATE DRY VALVE, A.C., AND CONTROLS IN ROOM 158. PROVIDE DRY F.P. SYSTEM PROPOSED FDC ALTERNATE #2 AND #3: SEE SPECIFICATIONS FOR DESCRIPTION AND ARCHITECTURAL DRAWINGS FOR LAYOUT. PROVIDE BASE BID CAPPED FIRE PROTECTION PIPING FOR FUTURE BUILDOUT. ALTERNATE #3 BUILDOUT, DESIGN PIPING AND HEADS FOR ALTERNATE #3 BUILDOUT. PROVIDE F.P. COSTS COMPLETE WITH INSTALLATION FOR ALTERNATE #2 AND #3. ALTERNATE #2 SHALL BE THE SAME AS ALTERNATE #3. ALTERNATE #1: SEE SPECIFICATIONS FOR DESCRIPTION AND ARCHITECTURAL DRAWINGS FOR ADJUSTED LAYOUT. DEDUCT BASE BID PIPING, HEADS, AND DESIGN. PROVIDE ALTERNATE #1 PIPING AND HEADS DESIGN COST AS REQUIRED FOR ALTERNATE #1 COSTS. PROVIDE DRY F.P. SYSTEM. LOCATE DRY VALVE, A.C., AND CONTROLS IN ROOM 153. 1. THE FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR GENERAL INFORMATION ONLY AND SHALL NOT BE CONSTRUED AS FINAL DESIGN OR INSTALLATION DOCUMENTS. THE SPRINKLER DESIGN AND INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DESIGN BUILD FIRE PROTECTION CONTRACTOR. REFER TO SPECIFICATIONS FOR DESIGN CRITERIA. 2. QUANTITIES OF SPRINKLER HEADS, VALVES, FLOW AND TAMPER SWITCHES SHOWN ARE APPROXIMATE. FINAL QUANTITIES TO BE THE RESPONSIBILITY OF THE DESIGN BUILD FIRE PROTECTION CONTRACTOR. 3. THE EXACT LOCATION, ELEVATION, AND CONFIGURATION OF SPRINKLER PIPING AND SPRINKLER HEADS SHALL BE COORDINATED WITH ALL TRADES PRIOR TO COMMENCING WORK. THE FIRE PROTECTION CONTRACTOR DOES NOT HAVE PRIORITY. 4. ADD ADDITIONAL SPRINKLER HEADS AS REQUIRED BY NFPA 13 TO ACCOMMODATE OBSTRUCTIONS INCLUDING BUT NOT LIMITED TO COLUMNS, DUCTWORK, CLEARSTORY, OVERHEAD DOORS AND EQUIPMENT. TYPICAL. 5. PROVIDE ISOLATION VALVES AS REQUIRED PER NFPA 13, 14. ALL OS&Y VALVES SHALL BE SUPERVISED WITH TAMPER SWITCHES. 6. SPRINKLER PIPING MAY BE REQUIRED TO BE INSTALLED WITHIN BLOCK WALLS TO FEED ISOLATED AREAS. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR TIMELY COORDINATION WITH MASONRY CONTRACTOR. 7. INSTALL SPRINKLER HEAD GUARDS ON EXPOSED SPRINKLER HEADS IN ALL MECHANICAL ROOMS. GENERAL FIRE PROTECTION NOTES: Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FIRST FLOOR FIRE PROTECTION PLAN WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS FP1.1 10/04/2023 220025.00 C2023-15 1/16" = 1'-0"1 FIRST FLOOR FIRE PROTECTION PLAN -OVERALL FIRE PROTECTION SHEET INDEX FP1.1 FIRST FLOOR FIRE PROTECTION PLAN FP1.2 MEZZANINE FIRE PROTECTION PLAN 10/13/202310/04/2023 BID DOCUMENT SET HC HC HC HC HC HC HC HC HC PRESS BOX 203 SPONSOR SUITE 202 Space 113 MEZZANINE 201 Space 121 A B E F G H J K L M P QCDN 1 2 3 4 5 6 8 7 F.3 F.9 G.8 L.6 M.3M.4 5.8 7.2 9 F.4 F.6 AV CLOSET 210 PROVIDE DRY F.P. SYSTEM. LOCATE DRY VALVE, A.C., AND CONTROLS IN CEILING SPACE OUTSIDE ROOM AT BEST POSSIBLE ACCESS LOCATION. PROVIDE F.P. RISERS IN CHASE LOCATIONS. COORDINATE LOCATION WITH OTHER TRADES. PROVIDE F.P. RISERS IN CHASE LOCATIONS. COORDINATE LOCATION WITH OTHER TRADES. PROVIDE F.P. RISERS IN CHASE LOCATIONS. COORDINATE LOCATION WITH OTHER TRADES. PROVIDE F.P. RISERS IN CHASE LOCATIONS. COORDINATE LOCATION WITH OTHER TRADES. Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/16" = 1'-0" MEZZANINE FIRE PROTECTION PLAN WOODMAN'S SPORTS & CONVENTION CENTER 2510 Milton Avenue Janesville, WI 53545 BID SET DOCUMENTS FP1.2 10/04/2023 220025.00 C2023-15 1/16" = 1'-0"1 MEZZANINE FIRE PROTECTION PLAN -OVERALL 10/13/202310/04/2023 BID DOCUMENT SET W X D 18"Ø AIR TERMINAL (TYPE) AIR QUANTITY (CFM) F T H D - LG330 AC ACU AD ADJ AFF AHU ALT AMB AMP AP APPROX ARCH ATM AUTO AUX AVG . BAL BAR BBR BDD BHP BLDG BOD BSMT BTU BWV . CB CCF CFH CFM CHW CI CL CLG CO COMB COMP COND CONN CONST CONTIN CONTR CW . DEG DF DIA DIFF DIM DIP DISCH DS DWG . EAT EF EL ELEC ESP EWC EWH EWT EXH EXP EXT . F FFE FD FL FLEX FM FOG FOR FOS FP FPM FPS FT or ' F&T FTG FTR . GALV GC GEN GPH GPM GR GV GWH . HB HOR HP HTG HVAC HW . ID IE IN or " INSUL INT INV AIR CONDITIONING AC UNIT AREA DRAIN ADJUSTABLE ABOVE FINISHED FLOOR AIR HANDLING UNIT ALTERNATE AMBIENT AMPERES ACCESS PANEL APPROXIMATELY ARCHITECT ATMOSPHERIC AUTOMATIC AUXILLARY AVERAGE . BALANCING BAROMETRIC BASEBOARD RADIATION BACKDRAFT DAMPER BRAKE HORSEPOWER BUILDING BOTTOM OF DUCT BASEMENT BRITISH THERMAL UNIT BACKWATER VALVE . CATCH BASIN CUBIC FEET IN HUNDREDS CUBIC FEET PER HOUR CUBIC FEET PER MINUTE CIRCULATING HOT WATER CAST IRON CENTERLINE COOLING; CEILING CLEANOUT COMBUSTION COMPARTMENT; COMPRESSOR CONDENSATE CONNECTION CONSTRUCTION CONTINUOUS; CONTINUATION CONTRACTOR COLD WATER . DEGREE DRINKING FOUNTAIN DIAMETER DIFFUSER DIMENSION DUCTILE IRON PIPE DISCHARGE DOWNSPOUT DRAWING . ENTERING AIR TEMPERATURE EXHAUST FAN ELEVATION ELECTRIC EXTERNAL STATIC PRESSURE ELECTRIC WATER COOLER ELECTRIC WATER HEATER ENTERING WATER TEMPERATURE EXHAUST EXPANSION EXTERNAL; EXTERIOR FAHRENHEIT FINISHED FLOOR ELEVATION FIRE DAMPER; FLOOR DRAIN FLOOR FLEXIBLE FACTORY MUTUAL FUEL OIL GAUGE FUEL OIL RETURN FUEL OIL SUPPLY FIRE PROTECTION FEET PER MINUTE FEET PER SECOND FOOT; FEET FLOAT AND THERMOSTATIC FOOTING FINNED TUBE RADIATION . GALVANIZED GENERAL CONTRACTOR GENERAL GALLONS PER HOUR GALLONS PER MINUTE GRILLE GATE VALVE GAS WATER HEATER . HOSE BIBB HORIZONTAL HORSEPOWER HEATING HEATING, VENTILATING, & AIR CONDITIONING HOT WATER . INSIDE DIAMETER INVERT ELEVATION INCHES INSULATION INTERIOR; INTERNAL INVERT KW KWH . LAT LAV LF LOC LP LTG LWT . M MAU MAX MBH MCF MD MECH MEZZ MFR MIN MISC MTD MTG . NA NC NFPA NIC NO NTS . OA OBD OC OD . PART PD PE PLBG PROP PRV PSI PSF PSIA PSIG PVC . QTY . RA RCP RD REF REG REQ RH RO RPM RHW RTU . S SA SAT SCH SD SF SHR SIM SP SPEC SPRK SQ SS STD STR SUC SUSP SYS . TA TD TEMP THERM TONS TSP T-STAT TYP . UG UH . V VAV VCP VEL VENT VERT VTR . W W/ W/O WB WC " WC KILOWATT KILOWATT HOURS . LEAVING AIR TEMPERATURE LAVATORY LINEAR FEET LOCATION LIQUIFIED PETROLEUM LIGHTING LEAVING WATER TEMPERATURE . MOTOR MAKE-UP AIR UNIT MAXIMUM BTU PER HOUR IN THOUSANDS CUBIC FEET IN THOUSANDS MOTORIZED DAMPER MECHANICAL MEZZANINE MANUFACTURER MINIMUM MISCELLANEOUS MOUNTED MOUNTING . NOT APPLICABLE NOISE CRITERIA; NORMALLY CLOSED NATIONAL FIRE PROTECTION ASSOCIATION NOT IN CONTRACT NORMALLY OPEN NOT TO SCALE . OUTSIDE AIR OPPOSED BLADE DAMPER ON CENTER OUTSIDE DIAMETER . PARTITION PRESSURE DROP PNEUMATIC-ELECTRIC PLUMBING PROPELLER PRESSURE REDUCING VALVE POUNDS PER SQUARE INCH POUNDS PER SQUARE FOOT PSI ABSOLUTE PSI GAUGE POLYVINYL CHLORIDE . QUANTITY . RETURN AIR REINFORCED CONCRETE PIPE ROOF DRAIN REFRIGERATION; REFERENCE REGISTER REQUIRED; REQUIREMENT RELATIVE HUMIDITY ROUGH OPENING; REVERSE OSMOSIS REVOLUTIONS PER MINUTE RECIRCULATING HOT WATER ROOFTOP UNIT . SANITARY SUPPLY AIR SUPPLY AIR TEMPERATURE SCHEDULE SMOKE DAMPER; STORM DRAIN SQUARE FOOT or FEET SENSIBLE HEAT RATIO SIMILAR STATIC PRESSURE SPECIFICATION SPRINKLER SQUARE STAINLESS STEEL STANDARD STRUCTURAL SUCTION SUSPENDED SYSTEM . TRANSFER AIR TEMPERATURE DIFFERENCE TEMPERATURE THERMOMETER TONS OF AIR CONDITIONING TOTAL STATIC PRESSURE THERMOSTAT TYPICAL . UNDERGROUND UNIT HEATER . VOLT; VOLTAGE; VENT VARIABLE AIR VOLUME VITRIFIED CLAY PIPE VELOCITY VENTILATION VERTICAL VENT THRU ROOF . WASTE; WATT WITH WITHOUT WET BULB WATER CLOSET INCHES OF WATER COLUMN AIR TERMINAL SIZE AIR QUANTITY (CFM) AIR TERMINAL (TYPE) A - X XXX X XXX X DUCTWORK SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH THE LATEST ISSUES OF SMACNA STANDARDS. PLUMBING SYSTEMS SHALL BE INSTALLED ACCORDING TO LOCAL, STATE, AND NATIONAL CODES. SUPPORT EQUIPMENT, PIPING AND DUCTWORK FROM BUILDING STRUCTURE TO PROVIDE A VIBRATION FREE INSTALLATION. COORDINATE LOCATION OF EQUIPMENT SUPPORTS WITH LOCATION OF EQUIPMENT ACCESS PANELS/DOORS TO ENABLE SERVICE OF EQUIPMENT AND/OR FILTER REPLACEMENT. PROVIDE PROPER ACCESS TO MATERIALS AND EQUIPMENT THAT REQUIRE INSPECTION REPLACEMENT. REPAIR OR SERVICE SUCH AS COILS, DAMPERS, HEATERS, VALVES, ETC. IF PROPER ACCESS CANNOT BE PROVIDED. CONFER WITH THE ENGINEER AS TO THE METHOD OF APPROACH FOR MINIMIZING EFFECT OF REDUCED ACCESS WHICH MAY RESULT. MAINTAIN MAXIMUM HEADROOM AT ALL TIMES. RUN PIPES EXPOSED WHERE SHOWN AND/OR NOTED ON DRAWINGS. ALL DUCTWORK SHALL BE INSTALLED AS CLOSE AS POSSIBLE TO WALL AND UNDERSIDE OF BEAMS AND JOISTS. COORDINATE ELEVATIONS AND LOCATIONS WITH WORK OF OTHER CONTRACTORS. DIFFUSER SIZES SHOWN ARE NECK SIZES, REGISTER AND GRILLE SIZES ARE NOMINAL. KEEP ALL NEW DUCTWORK CLEAN DURING INSTALLATION, BY COVERING ENDS OF OPEN DUCT RUNS. ALL CONCEALED SUPPLY DUCTWORK INSULATION SHALL BE FIRE RATED IN ACCORDANCE w/ ASHARE 90A, 50/20 SMOKE DEVELOPMENT & FLAME SPREAD REQUIREMENTS. INSULATION SHALL NOT BE INSTALLED UNTIL AFTER ALL PIPE TESTING PROCEDURES HAVE BEEN COMPLETED, AND THE BUILDING IS COMPLETELY WATER PROOF. ANY INSULATION THAT GETS WET DURING CONTRUCTION SHALL BE REPLACED WITH NEW. SUBSTITUTE FLAT OVAL OR RECTANGULAR DUCT WHERE CLEARANCES AND OTHER BUILDING COMPONENT RESTRICT THE USE OF ROUND DUCTWORK. PROVIDE NEOPRENE FLEXIBLE CONNECTION BETWEEN DUCTWORK AND ANY RECIPROCATING OR ROTATING EQUIPMENT. STAIR, ELEVATOR SHAFT VENTS, HVAC EQUIPMENT, AND OTHER DAMPERS INTEGRAL TO THE BUILDING ENVELOPE MUST BE EQUIPPED WITH MOTORIZED DAMPERS AND 1/4" MECH SCREEN. COORDINATE ROUTING OF ALL DUCTWORK WITH LIGHTING LAYOUT AND STRUCTURAL. COORDINATE LOCATION OF ALL DIFFUSERS, REGISTERS AND GRILLES WITH ARCHITECTURAL REFLECTED CEILING PLANS AND ALL TRADES. A. SEE SPECIFICATIONS FOR SPACING OF GAS PIPE SUPPORTS. PAINT ALL GAS PIPE FITTINGS AND EXPOSED THREADS TO PREVENT CORROSION. THOROUGHLY CLEAN PIPING BEFORE PAINTING. BRANCH DUCTWORK TO DIFFUSERS TO BE THE SAME SIZE AS THE DIFFUSER NECK UNLESS NOTED OTHERWISE. MECHANICAL GENERAL NOTES A.CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH THE MECHANICAL DRAWINGS AND SPECIFICATIONS. NEITHER THE DRAWINGS NOR THE SPECIFICATIONS SHALL BE COMPLETE WITHOUT THE OTHER. B.THE DRAWINGS ARE DIAGRAMMATIC. BECAUSE OF THE SMALL SCALE OF THE DRAWING, AND COMPLEXITY OF INSTALLATION, THEY DO NOT SHOW EVERY OFFSET, BEND OR ELBOW NECESSARY FOR THE COMPLETE INSTALLATION IN THE SPACE PROVIDED. ALL DUCTWORK, AND PIPING SHALL BE CHECKED AND COORDINATED WITH THE DRAWINGS AND EXISTING CONDITIONS. VERIFY INSTALLATION REQUIREMENTS AT PRE-BID SITE INSPECTION. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXISTING CONDITIONS AND OBSTACLES. CONTRACTOR SHALL FIELD VERIFY LOCATIONS OF ALL EXISTING PIPING, CONDITIONS, TIE-INS ETC. C.PERFORM WORK, PROVIDE MATERIALS AND EQUIPMENT FOR SYSTEMS SHOWN, SPECIFIED AND DESCRIBED ON DRAWINGS. COMPLETELY COORDINATE WORK OF THIS CONTRACT WITH WORK OF OTHER CONTRACTORS AND PROVIDE COMPLETE AND FULLY FUNCTIONAL INSTALLATION. REMOVE ALL DEBRIS CAUSED BY THIS CONTRACTOR'S WORK. D.ALL MATERIALS, EQUIPMENT AND METHOD OF INSTALLATION SHALL BE IN ACCORDANCE WITH THE STANDARDS, REGULATIONS, CODES, ORDINANCES, AND LAWS OF LOCAL, STATE, AND FEDERAL GOVERNMENTS, AND OTHER AUTHORITIES THAT HAVE LAWFUL JURISDICTION. E.THE DOCUMENTS AND SPECIFICATIONS SHALL GOVERN WHERE THEY EXCEED CODE REQUIREMENTS. F.BEFORE SUBMITTING BID, VISIT AND CAREFULLY EXAMINE SITE TO IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT WORK OF THIS SECTION. NO EXTRA PAYMENT WILL BE ALLOWED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY OF THE SITE CONDITIONS THAT ARE VISIBLE OR READILY CONSTRUED BY AN EXPERIENCED OBSERVER. G.CONTRACTOR TO PROVIDE AS-BUILT DRAWINGS AT THE COMPLETION OF THE PROJECT. AS WORK PROGRESSES AND FOR DURATION OF CONTRACT, MAINTAIN COMPLETE SET OF PRINTS OF CONTRACT DRAWINGS AT JOB SITE AT ALL TIMES. RECORD WORK COMPLETED AND ALL CHANGES FROM ORIGINAL CONTRACT DRAWINGS CLEARLY AND ACCURATELY INCLUDING WORK INSTALLED AS A MODIFICATION OR ADDITION TO THE ORIGINAL DESIGN. TURN OVER TO OWNER AT CONCLUSION OF CONSTRUCTION. "AS BUILT" DRAWINGS IN ACCORDANCE WITH CONTRACT GENERAL REQUIREMENTS AND PROJECT RECORD DOCUMENTS. H.ALL ROOF PENETRATIONS, PATCHING AND FLASHING SHALL BE BY THE ROOFING CONTRACTOR. MECHANICAL CONTRACTOR SHALL CONTACT AND COORDINATE WITH THE ROOFING CONTRACTOR. I.ADDRESS QUESTIONS REGARDING DRAWINGS TO ENGINEER IN WRITING BEFORE AWARD OF CONTRACT. OTHERWISE, ENGINEER'S INTERPRETATION OF MEANING AND INTENT OF DRAWINGS SHALL BE FINAL. J.EACH CONTRACTOR SHALL GIVE NOTICES, FILE PLANS, OBTAIN PERMITS AND LICENSES, PAY FEES AND BACK CHARGES AND OBTAIN NECESSARY APPROVALS FROM AUTHORITIES THAT HAVE JURISDICTION FOR ITS WORK. K.GENERAL NOTES, SYMBOLS LIST AND DETAILS ARE APPLICABLE TO ALL DRAWINGS OF THIS SECTION. (DIVISION 20-25) L.WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER AND SHALL PRESENT NEAT, RECTILINEAR APPEARANCE WHEN COMPLETED. MAINTAIN MAXIMUM HEAD ROOM AT ALL TIMES. DO NOT RUN PIPES AND DUCTS EXPOSED UNLESS SHOWN AND NOTED TO BE EXPOSED ON DRAWINGS. MATERIALS AND EQUIPMENT SHALL BE NEW AND INSTALLED ACCORDING TO MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS, SO THAT COMPLETED INSTALLATION SHALL OPERATE SAFELY AND EFFICIENTLY. M. N. ALL EQUIPMENT, PIPING, WIRING AND INSULATION, ETC,. INSTALLED IN HVAC AIR PLENUM SPACES SHALL MEET CODE REQUIREMENTS FOR SMOKE AND COMBUSTIBILITY. O. EACH CONTRACTOR SHALL FIRE STOP ALL NEW AND EXISTING SLEEVES THROUGH CONCRETE FLOOR AND FIRE RATED WALLS OR PARTITIONS WITH UL RATED ASSEMBLIES WITH EQUAL FIRE RATING. P. EACH CONTRACTOR SHALL COORDINATE PROPER ACCESS TO EQUIPMENT THAT REQUIRES INSPECTION, REPLACEMENT OR REPAIR. ACCESS PANELS TO BE FURNISHED AND INSTALLED BY GENERAL CONTRACTOR. ALL LOCATIONS SHALL BE CONFIRMED AND COORDINATED WITH ENGINEER. Q. DO NOT SUPPORT EQUIPMENT FROM SUSPENDED CEILINGS, ABOVE FLOOR SLAB OR ROOF, ALL SUPPORT SHALL COME FROM BUILDING STRUCTURE. R. PRODUCTS SUBMITTED AND APPROVED FOR USE THAT NECESSITATE CHANGES TO THE WORK OF OTHER TRADES OF THE CONTRACT SHALL BE PROVIDED BY, COORDINATED, AND ARRANGED BY THE CONTRACTOR WITHOUT ADDITIONAL COST TO THE OWNER OR ENGINEER. S. CONTRACTOR SHALL COORDINATE ITS RESPECTIVE CEILING MOUNTED EQUIPMENT WITH OTHER CONTRACTORS PRIOR TO INSTALLATION TO AVOID CONFLICTS. T. EACH CONTRACTOR IS RESPONSIBLE FOR ITS CUTTING AND PATCHING REQUIRED FOR THE INSTALLATION OF ITS NEW WORK. CUTTING AND PATCHING SHALL BE COMPLETED IN A NEAT AND WORKMANLIKE MANNER. PATCHING MATERIALS SHALL MATCH EXISTING MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE TOUCH-UP TO MATCH EXISTING SURROUNDING AREAS OF CUTTING AND PATCHING WORK. U. PRIOR TO ACCEPTANCE OF THE FACILITY EACH RESPECTIVE CONTRACTOR SHALL ASSURE THAT ALL SYSTEMS SHALL BE TESTED, BALANCED AND ARE OPERATED IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS, AND AS A DEMONSTRATION TO THE OWNER, OR THE OWNER'S REPRESENTATIVE THAT THE INSTALLATION AND PERFORMANCE OF THESE SYSTEMS AND/OR PARTS CONFORM TO THE DESIGN INTENT. V. ENTRY AND PLACEMENT OF EQUIPMENT: MAKE ALL PROVISIONS FOR ENTRY AND PLACEMENT OF EQUIPMENT TO THE INSTALLED LOCATIONS INDICATED AND ARRANGE FOR EQUIPMENT TO BE DELIVERED IN SECTIONS SMALL ENOUGH TO PERMIT USE OF REGULAR ENTRANCES. WHEN THIS IS NOT PRACTICAL SCHEDULE DELIVERY AND COORDINATE OPENINGS AND TIMES WHEN THE BUILDING HAS ADEQUATE ACCESS OPENINGS TO LOCATE EQUIPMENT WITHIN THE BUILDING. W. EXISTING CONDITIONS WHERE TAKEN FROM ORIGINAL DRAWINGS AND SITE VISITS AND MAY NOT REFLECT EXACT "AS BUILT" CONDITIONS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. COORDINATE NEW WORK AND DEMOLITION WITH OTHER DISCIPLINES AND EXISTING CONDITIONS PRIOR TO CONSTRUCTION. CONTROL SYSTEM DEMONSTRATION: PRIOR TO TURNOVER CONTRACTOR SHALL DEMONSTRATE THE OPERATION OF THE CONTROL SYSTEM WITH THE OWNER'S REPRESENTATIVE. INCLUDE DEMONSTRATION OF CONTROL SYSTEM INTERLOCK, COOLING, HEATING AND DEHUMIDIFICATION MODES OF OPERATION AND OUTSIDE AIR DAMPER MODULATION. OBTAIN DOCUMENTATION FROM OWNER THAT DEMONSTRATION HAS BEEN COMPLETED. EQUIPMENT AND VALVES INSTALLED IN CEILING SPACE TO BE LOCATED NO HIGHER THAN 1'-0" ABOVE FINISHED CEILING. DUCT ELBOW UP FIRE DAMPER & ACCESS PANEL SMOKE DAMPER & ACCESS PANEL ROUND DUCT, SIZE SHOWN EXHAUST AIRFLOW SUPPLY AIRFLOW RETURN AIRFLOW MANUAL VOLUME, MVB CONTROL DAMPER BLANK-OFF PANEL, SHADED SIDE OF DIFFUSER DUCT ELBOW DOWN SUPPLY AIR RETURN AIR EXHAUST AIR FIRST NUMBER IS DIMENSION OF SIDE SHOWN DUCT ELBOWS w/ TURNING VANES OR RADIUS FLEXIBLE DUCT TAKE OFF w/ VOLUME DAMPER IN BRANCH DUCT SUPPLY REGISTER (SIDE WALL) GATE VALVE CAPPED LINE TEE DOWN ELBOW UP ELBOW DOWN CONNECT TO EXISTING KEY NOTES EQUIPMENT TAG SECTION CUT DETAIL REFERENCE TEE UP GAS REFRIGERATION LIQUID LINE REFRIGERATION SUCTION LINE G L S MECHANICAL ABBREVIATIONSSYMBOLS S C M COMBINATION FIRE/SMOKE DAMPER & ACCESS PANEL MOTORIZED DAMPER & ACCESS PANEL DUCTWORK PIPING CONTROL VALVE RELIEF VALVE BALL VALVE ANGLE VALVE GLOBE VALVE BUTTERFLY VALVE UNION PIPE TO BE REMOVED CHECK VALVE TEMPERATURE SENSOR HUMIDITY SENSOR DEW POINT SENSOR HVAC GENERAL NOTES ADVISE THE GENERAL CONTRACTOR OF ALL ROOF, WALL AND FLOOR PENETRATIONS. REFER TO STRUCTURAL DRAWINGS FOR DIMENSIONED LOCATIONS OF FRAMED OPENINGS FOR RTUS, PRVS, ROOF DRAINS AND OTHER FRAMED OPENINGS. ALL FRESH AIR INTAKES TO BE AT LEAST 10'-0" FROM EXHAUST OR FLUES AND 30'-0'' FROM AMMONIA REFRIGERATION ROOM EXHAUST. B. C. D. E. F. G. H. I. J. K. L. M. N. O. P. Q. R. PIPE INSULATION GALVANIZED STEEL SHIELD HIGH DENSITY INSULATION INSERT OR WOOD BLOCK SEE SPECIFICATIONS PIPE RING HANGER CLEVIS HANGER GENERAL NOTES: SUPPORT FROM TRUSS TOP CHORD PANEL POINT AT TRUSS LOCTIONS. STEEL ANGLE MAXIMUM LOAD ON A PANEL IS 100 LBS, UNLESS APPROVED BY STRUCTURAL ENGINEER. SEE STRUCTURAL FOR ADDITIONAL REQUIREMENTS. STRAP HANGER ROD HANGER STRAP HANGER ROD HANGER OR STRAP HANGER 36" MAXIMUM DUCT DIAMETER BAND SAME SIZE AS STRAP HANGER PRE-PUNCHED CHANNEL SUPPORT FASTENED TO TOP OF TRUSS OR BEAM. TYPICAL. DUCT WIDTHS 36" OR GREATER DUCT WIDTHS LESS THAN 36" A. B. C. REFER TO "SMACNA HVAC DUCT CONSTRUCTION STANDARDS" FOR HANGER REQUIREMENTS, INCLUDING SIZES OF STRAP HANGERS, ROD HANGERS, STEEL ANGLES AND FASTENERS. ROOF DECK TYPICAL SCREW STRAP TO DUCT. MINIMUM 1" STRAP LENGTH ON UNDERSIDE OF DUCT. GREATER THAN 36" DUCT DIAMETER TRUSS OR STEEL BEAM TYPICAL D. E. NOT USED. DO NOT INSTALL DUCTWORK CLOSER THAN 8" TO WATER, FIRE PROTECTION, AND GAS PIPING. 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 NOT TO SCALE MECHANICAL TITLE SHEET, SYMBOLS & ABBREVIATIONS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M1.0 10/13/2023 22-002 - M - MECHANICAL SHEET INDEX SHEET NUMBER SHEET NAME M1.0 MECHANICAL TITLE SHEET, SYMBOLS & ABBREVIATIONS M1.1 FIRST FLOOR MECHANICAL DEMOLITION PLAN - OVERALL M2.1 FIRST FLOOR MECHANICAL PLAN - OVERALL M2.1A FIRST FLOOR MECHANICAL PLAN - SE QUAD M2.1B FIRST FLOOR MECHANICAL PLAN - NE QUAD M2.1C FIRST FLOOR MECHANICAL PLAN - NW QUAD M2.1D FIRST FLOOR MECHANICAL PLAN - SW QUAD M2.2 MEZZANINE FLOOR MECHANICAL PLAN - OVERALL M2.3 MECHANICAL ROOF PLAN - OVERALL M2.4 FIRST FLOOR MECHANICAL PLAN - OVERALL - ADD ALT 1 M2.4A FIRST FLOOR MECHANICAL PLAN - ADD ALT 1 - NW QUAD M2.4B MEZZANINE FLOOR MECHANICAL PLAN - ADD ALT 1 - NW QUAD M2.5 MECHANICAL ROOF PLAN - OVERALL - ADD ALT 1 M2.6 FIRST FLOOR MECHANICAL PLAN - OVERALL - ADD ALT 2 M2.6A FIRST FLOOR MECHANICAL PLAN - ADD ALT 2 - SE QUAD M2.6B FIRST FLOOR MECHANICAL PLAN - ADD ALT 2 - SW QUAD M2.7 MECHANICAL ROOF PLAN - OVERALL - ADD ALT 2 M2.8 FIRST FLOOR MECHANICAL PLAN - OVERALL - ADD ALT 3 M2.8A FIRST FLOOR MECHANICAL PLAN - ADD ALT 3 - SE QUAD M2.8B FIRST FLOOR MECHANICAL PLAN - ADD ALT 3 - SW QUAD M5.0 MECHANICAL DETAILS M5.1 MECHANICAL GAS RISER M6.0 MECHANICAL SCHEDULES M6.1 MECHANICAL SCHEDULES NOT TO SCALEM1.0 1 INSULATED PIPE AT HANGER DETAIL NOT TO SCALEM1.0 2 DUCT HANGER DETAILS 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 55 11 22 33 4 66 88 A A B B C C D D F F H H J J K K M M N N P P Q Q L.5 L.5 M.4 G.8 G.8 G G F.9 F.9 9 77 F.3 F.3 1 GENERAL NOTES: 1. DIVISION 23 CONTRACTOR SHALL ASSIST DEMOLITION CONTRACTOR IN DISCONNECTION OF EXISTING GAS SERVICE. KEYNOTES: 1 COORDINATE WITH GAS UTILITY TO DISCONNECT, REMOVE, AND RELOCATE EXISTING GAS SERVICE. 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated FIRST FLOOR MECHANICAL DEMOLITION PLAN -OVERALL WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M1.1 10/13/2023 22-002 - 1/16" = 1'-0"M1.1 1 FIRST FLOOR MECHANICAL DEMOLITION PLAN - OVERALL 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET HC HC HC HC HC HC HC HC HC HC DN DN HC HC HC HC HC HC HC HC HC HC HC HC HC HC HC DN SD SD SD 55 11 22 33 4 66 88 A A B B C C D D F F H H J J K K M M N N P P Q Q L.5 L.5 M.4 G.8 G.8 G G F.9 F.9 9 77 F.3 F.3 MATCHLINE AAMATCHLINE AA MATCHLINE BBMATCHLINE BB1 1 1 1 1 GENERAL NOTES: 1. REFER TO M1.0 FOR GENERAL NOTES. 2. REFER TO 1/8 SCALE PLANS OF EACH QUADRANT FOR DETAILED DESIGN INFORMATION. 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated FIRST FLOOR MECHANICAL PLAN - OVERALL WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.1 10/13/2023 22-002 - 1/16" = 1'-0"M2.1 1 FIRST FLOOR MECHANICAL PLAN - OVERALL 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET DN 11 22 33 H H J J K K M M N N P P Q Q L.5 L.5 M.4 M.4 MATCHLINE AAMATCHLINE BBDS 120 6"x6" U AC 2A DS 280 6"x10" DR 280 10"x6" DR 75 6"x6" DS 75 6"x6" DR235 10"x6" DS75 6"x6"DR75 6"x6" DR75 6"x6" DS235 10"x6" DS75 6"x6" DR12"x8" DS445 12"x8"DR235 8"x6" DS235 8"x6" DR350 12"x6" DS350 12"x6" DS335 12"x6" DR335 12"x6" DR335 12"x6" DS335 12"x6" DR 12"x8"DR12"x8"14"ø20"ø12"ø22"ø LG 24" x24" LP 265 10"Ø -(3)1" -48"L LP 355 10"Ø -(3)1" -48"L LP 355 10"Ø -(3)1" -48"L LP 355 10"Ø -(3)1" -48"L LP 350 10"Ø -(3)1" -48"L LG 24" x24"18"ø22"ø1 3 4 1 1 1 1 1 1 1 1 4 ERV 4 TH 2 5 1" CD REF-L REF-S 6 M5.0 6 1" CD 5 7 8 8 10 9 4"ø 12"x8" 10"ø 10"ø 10"ø 10"ø 10"ø 6"x6"12"ø10"x6" 6"x6" 6"x6" 10"x6" 11 111111 14"ø 14"ø 16"ø16"ø20"ø 12"x6" 12"x6" 12"x6" 1 1 1 1 1 1 1 12"ø12"ø3/4" G6"x6" 10"x6"6"x6" 6"x6" 6"x6" 10"x6" 12"x8"12"ø12"x6" 8"x6" 8"x6" 12"x8" DR 500 12"x10" 12"x10"46"x20"UH 1 13 12 1" CD 14 6 1" CD 15 18 16 17 DS285 12"x6"DS285 12"x6" DS100 6"x6" DR8"x8"DR8"x8" DS100 6"x6" DR8"x8"DR8"x8" 12"x6" 6"x6" BOTH SIDES OF WALL BOTH SIDES OF WALL 19 16"ø 16"ø 3/4" G 20 21 20 22 1 1 TH ERV 022 11 M5.0 MATCHLINE AA MATCHLINE BB1 TH ERV 012 1 THERV 01 2 1 TH ERV 01 2 1 1 TH ERV 01 2 TH RTU 12 2 25 25 25 15 11 M5.0 DR 10"x6" DS130 10"x6" 11 1 1 THRTU 06 SCO S NO2 33 3333 1 1 C.O.AC 2A T 12"ø10 M5.0 9 M5.0 31 S 27 DS 100 6"x6" T S S S 28 29 32 28 DR 8"x8"DR 8"x8" ERV 4 TH2 1 LG 24" x24" DS 600 18"x8"DR 615 18"x8" 18"x8" LG 24" x24" 1 1 24 1 34M5.0 11 600 MBH BOTH SIDES OF WALL F 07 F 08 1 22.5 MBH 15M5.0 11199 MBH 3/4" G TRAINING 129 DR 12"x12" DR12"x12" DR24"x12"DR24"x12" DR24"x12"DR24"x12" EUH 08 EUH 07 BOTH SIDES OF WALL BOTH SIDES OF WALL 20"x8" 20"x8" AC 4A EUH 06 55 6 EUH 05 1" G DS600 12"x12" DS600 12"x12" 6 M5.0 ELEC 134 METER/RISER 179 REFRIGERATION 172 F 07T F 08T 35 35 30 RESURFACER/ SHOP TOOLS/LAUNDRY 170 MERCYHEALTH ARENA 136 Y.H. STORAGE 137 WET TEAM ROOM #1 138 WET TEAM ROOM #2 140 YH COACH 143 MAIN TEAM ROOM 132 36 AC 4AT 36 LAUNDRY 131 MAIN COACH 133ICE RINK CIRCULATION 135 MECHANICAL 168 ELECTRICAL 169 VESTIBULE 171 STORAGE 135 (A) KEYNOTES: PROVIDE BALANCING DAMPER AT BRANCH TAKE-OFF IN AN ACCESSIBLE LOCATION. TEMPERATURE AND HUMIDITY SENSOR, MOUNT AT 60" AFF. TERMINATE RETURN DUCTS ABOVE CEILING FOR RETURN AIR PLENUM. TRANSFER AIR GRILLE TO RETURN AIR PLENUM. MOUNT AC WALL UNIT WITH INTEGRAL CONDENSATE PUMP 8" BELOW FINISHED CEILING. ROUTE PIPING AS HIGH AS POSSIBLE. EXTEND REFRIGERANT PIPES UP TO ROOF MOUNTED CONDENSING UNIT PER DETAIL. EXTEND CONDENSATE DRAIN TO OPEN FIXTURE WASTE WITH AIR GAP PER CODE. CONDENSATE PIPE UP TO VP-3, SEE M2.2 FOR CONTINUATION. 22"ø SUPPLY AND 22"ø RETURN DUCT UP TO ERV-4 ON ROOF. 4"ø DRYER EXHAUST DOWN, CONNECT TO DRYER, VERIFY LOCATION. 4"ø DRYER EXHAUST UP THROUGH ROOF, TERMINATE WITH GOOSENECK. FOR CONTINUATION SEE SHEET M2.1D. 12"x10" EXHAUST UP TO FAN F-5 ON ROOF. PROVIDE FLEXIBLE CONNECTION AT FAN. 46"x20" EXHAUST UP TO FAN F-6 ON ROOF. PROVIDE FLEXIBLE CONNECTION AT FAN. CONDENSATE PIPE UP TO VP-2, SEE M2.2 FOR CONTINUATION. CONNECT GAS PIPING TO WATER HEATER FURNISHED BY DIVISION 22, SEE DETAIL. 20"ø SUPPLY DUCT UP TO ERV-1 ON ROOF. 16"ø RETURN DUCT UP TO ERV-1 ON ROOF. 14"ø RETURN DUCT UP TO ERV-1 ON ROOF. LOUVER BY GENERAL CONTRACTOR. 96"x44" INTAKE LOUVER WITH 80"x44" MOTORIZED DAMPER ON LEFT AND 16"X44" MOTORIZED DAMPER ON THE RIGHT. COORDINATE SIZING WITH THE ARCHITECT, PROVIDE EXPANDED METAL GRILL OVER INSIDE OPENING. 1" GAS PIPING UP. GAS METER AND SERVICE BY LOCAL UTILITY, 5.0 PSIG METER OUTLET PRESSURE, 12,145 MBH TOTAL CONNECTED LOAD. PROVIDE PLUG VALVE AND UNION AT METER DISCHARGE. 3" NG PIPING UP SIDE OF BUILDING, PAINT TO MATCH BUILDING. 20"x8" EXHAUST DUCT WITH MVD OPEN TO PLENUM, BALANCE TO 735 CFM. 20"x8" EXHAUST DUCT WITH MVD OPEN TO PLENUM, BALANCE TO 700 CFM. SEE SHEET M2-1B FOR CONTINUATION AND DIFFUSER TAGS. NOT USED. REFRIGERATION SENSOR PROVIDED BY REFRIGERATION CONTRACTOR. CONNECT TO SENSOR AND VENTILATE ROOM AS DETAILED IN CONTROL SPECIFICATIONS, COORDINATE LOCATION WITH REFRIGERATION. EMERGENCY VENTILATION SWITCH PER LOCAL CODE REQUIREMENTS, REFER TO SPECIFICATIONS. INTERLOCK CONTROLS FOR FAN F-5 WITH ROOM LIGHT SWITCH. FAN IS TO BE ON WHEN ROOM IS OCCUPIED. SMALL SECTION OF INTAKE LOUVER SHALL OPEN WHEN FAN F-5 IS ENERGIZED. INTAKE AND VENT PIPES UP THROUGH ROOF TO COMBINATION ROOF DISCHARGE, SEE DETAIL. TERMINATE EXHAUST DUCT WITH EXPANDED METAL GRILLE. SPACE SENSOR FOR TEMPERATURE CONTROL OF UNIT HEATER AND COOLING FUNCTION OF FAN F-6, SEE DIVISION CONTROL SPECIFICATIONS. TEMPERATURE, DEWPOINT, CARBON MONOXIDE, AND NO2 SENSORS, MOUNT AT 5'-0" AFF, COORDINATE FINAL LOCATION WITH OWNER. CONNECT GAS PIPING TO DRYER FURNISHED BY OTHERS, SEE SIMILAR DETAIL. THERMOSTAT FOR CONTROL OF TRANSFER FAN, MOUNT AT 5'-0" AFF, COORDINATE FINAL LOCATION WITH OWNER. TEMPERATURE SENSOR, MOUNT AT 60" AFF. COORDINATE LOCATION WITH OWNER. 1 2 GENERAL NOTES: 1. REFER TO M0.0 FOR GENERAL NOTES. 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated FIRST FLOOR MECHANICAL PLAN -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.1A 10/13/2023 22-002 -1/8" = 1'-0"M2.1A 1 FIRST FLOOR MECHANICAL PLAN - SE QUAD 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET HC HC HC HC 11 22 33 A A B B C C D D F F H H G.8 G.8 G G F.9 F.9 F.3 F.3 MATCHLINE AA MATCHLINE BBLD300 10"Ø LD250 10"Ø 14"ø VESTIBULE 163 MALL CONNECTION 164 TEMP STORAGE 174 HOCKEY STORAGE 173 MULTIPURPOSE ARENA CIRCULATION 154 (B) GENERAL BUILDING STORAGE 167 IT/GEN STORAGE 176 LOBBY / LINK 155 LOBBY / LINK 155 MULTI-USE CONVENTION SPACE 156 MULTI-PURPOSE AREA 154 LOADING/RECEIVING/STORAGE 160 STORAGE 158 WARMING ROOM 159 10"ø DS150 6"x6" DS 150 6"x6" DS90 6"x6" DR150 6"x6" DR 150 6"x6" DR 90 6"x6" LD300 10"Ø LD 325 10"Ø LD300 10"Ø LG24"x24"LG24"x24" RTU 08 DS250 10"x6"DS250 10"x6" DS250 10"x6" DR375 14"x6"DR 375 14"x6" 16"ø10"ø 16"ø 10"x6" 10"ø RTU 092 111 1 1 LD300 10"Ø 10"ø 10"ø 12"ø 12"ø 10"ø16"ø 11 1 2 16"ø M5.0 2 TYPICAL M5.0 1 TYPICAL 6"x6"THRTU 9 3 THRTU 8 3 LD150 8"Ø 1 1 1 12"ø LG 24"x12" 8"ø 8"ø 12"ø RTU 10 RTU 11 18"ø 18"ø DR12"x8" DR12"x8"DR12"x8" DS305 12"x6" DS305 12"x6" DS305 12"x6" DS305 12"x6" DS300 12"x6" DS50 6"x6" DS285 12"x6" 1 1 1 1 1 1 1 18"ø 6"x6" 18"ø THRTU 113 RTU 12 18"ø4 5 16"ø 16"ø 13 RESURFACER/ SHOP TOOLS/LAUNDRY 17018"ø14"ø LG 300 24"x24" LG425 24"x24" LG75 12"x12" LG 75 12"x12" 12"ø 6"ø F 04 LD75 6"Ø LD75 6"Ø LD75 6"Ø LD75 6"Ø LD75 6"Ø 1" CD 1 1 10"ø 6"ø 6"ø 6"ø 10"ø 12"ø 17 12 1 1 1 1 6"ø 6"ø LP190 8"Ø -(2)1" -48"L LP8"Ø -(2)1" -48"L LP190 8"Ø -(2)1" -48"L LP8"Ø -(2)1" -48"L LP190 8"Ø -(2)1" -48"L LP190 8"Ø -(2)1" -48"L LP8"Ø -(2)1" -48"L LP190 8"Ø -(2)1" -48"L LP8"Ø -(2)1" -48"L LP190 8"Ø -(2)1" -48"L 22"ø18"ø8"ø 8"ø 8"ø 1 1 1 1 1 18"ø 1 1 11 6 WOMEN'S 165 10"ø 10 10 SEE MEZZANINE PLAN FOR HVAC SYSTEMS IN THIS AREA. SEE MEZZANINE PLAN FOR HVAC SYSTEMS IN THIS AREA.22"ø18"ø 13 CO 11 M5.0 1313 6"x6" 1 THRTU 102 13 2 AC 5A14M5.0 6 AC 5A T15 10"ø F 09 6 16 C.O. 17 16"øF.S. STORAGE 175 ELECTRIC 157 AV CLOSET 157 (A) LD 200 24"x24" 8"ø 8"ø 6"ø 8"ø 8"ø 1 LP150 8"Ø -(2)1" -48"L LP150 8"Ø -(2)1" -48"L LP150 8"Ø -(2)1" -48"L LG425 24"x24" 12"ø LG 300 24"x24" 10"ø 10"ø T/A DR18"x16" 18"x16" 1 1 KEYNOTES: BALANCING DAMPER, MOUNT IN AN ACCESSIBLE LOCATION. 16"ø SUPPLY AND RETURN DUCTS UP TO RTU ON ROOF. TRANSITION TO RTU CONNECTION SIZES AND CONNECT TO UNIT WITH FLEXIBLE CONNECTION. TEMPERATURE/HUMIDITY SENSOR, MOUNT AT 5'-0" AFF. COORDINATE LOCATION WITH OWNER. 12"ø SUPPLY AND RETURN DUCTS UP TO RTU ON ROOF. TRANSITION TO RTU CONNECTION SIZES AND CONNECT TO UNIT WITH FLEXIBLE CONNECTION. 18"ø SUPPLY AND RETURN DUCTS UP TO RTU ON ROOF. TRANSITION TO RTU CONNECTION SIZES AND CONNECT TO UNIT WITH FLEXIBLE CONNECTION. 16"ø EXHAUST DUCT UP TO PRV ON ROOF. 3/4" GAS PIPING DOWN TO WATER HEATER FROM ROOF. SEE M2.3 FOR CONTINUATION. 2" GAS PIPING UP THROUGH ROOF. EXTEND GAS PIPING TO WATER HEATER. PROVIDE GAS SHUT-OFF VALVE, UNION, REGULATOR, AND DRIP TEE. REFER TO DETAIL 7/P500. CONTROL PANEL FOR RADIANT HEATING SYSTEM, MOUNT AT 5'-0" A.F.F. 1" CONDENSATE DRAIN UP TO RADIANT HEAT VACUUM PUMP. 1" CONDENSATE DRAIN DOWN TO MOP SINK, TERMINATE WITH CODE- COMPLIANT AIR GAP. INSULATE FIRST 10'-0" OF DUCTWORK FOR ACOUSTIC SOUND INSULATION. MOUNT AC WALL UNIT WITH INTEGRAL CONDENSATE PUMP 8" BELOW FINISHED CEILING. ROUTE PIPING AS HIGH AS POSSIBLE. EXTEND REFRIGERANT PIPES UP TO ROOF MOUNTED CONDENSING UNIT PER DETAIL. TEMPERATURE SENSOR, MOUNT AT 60" AFF. COORDINATE LOCATION WITH OWNER. 16"ø EXHAUST DUCT DOWN TO HOOD. 3/4" GAS PIPING DOWN TO OVENS FROM ROOF. SEE M2.3 FOR CONTINUATION. 1 2 GENERAL NOTES: 1. REFER TO M0.0 FOR GENERAL NOTES. 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated FIRST FLOOR MECHANICAL PLAN -NE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.1B 10/13/2023 22-002 - 1/8" = 1'-0"M2.1B 1 FIRST FLOOR MECHANICAL PLAN - NE QUAD 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET DN 55 4 66 88 A A B B C C D D F F H H G.8 G.8 G G F.9 F.9 9 VAV 1-13 VAV 1-12 VAV 1-11 LP200 10"Ø -(2)1" -48"L LP200 10"Ø -(2)1" -48"L LP200 10"Ø -(2)1" -48"L LP200 10"Ø -(2)1" -48"L LP200 10"Ø -(2)1" -48"L 16"ø 16"ø16"ø 12"ø18"ø32"ø16"ø RTU 01 10"ø 10"ø 10"ø 16"ø LP170 8"Ø -(2)1" -48"L LP 170 8"Ø -(2)1" -48"L 12"ø LP 250 10"Ø -(3)1" -48"L 20"ø LP 200 10"Ø -(2)1" -48"LLP200 10"Ø -(2)1" -48"L 8"ø 12"ø 12"ø 12"ø LD120 8"Ø LD100 8"Ø LD120 8"Ø LD 150 8"ØLD130 8"Ø 16"ø LD 120 8"Ø LD120 8"Ø 12"ø 12"ø LD 110 8"Ø 16"ø8"ø 8"ø 8"ø 12"ø 12"ø LD80 6"Ø LP 170 8"Ø -(2)1" -48"L 8"ø 8"ø LP170 8"Ø -(2)1" -48"L SKATE RENTAL 108 BREAKROOM 109 ADMIN 112 OFFICE 110 OFFICE 111 MAIN LOBBY 101 VESTIBULE 100 MEETING ROOM (A) 102 MEETING ROOM (B) 103 STOR 104 FIRST AID 105 COPY AREA 112 (A) CONCESSIONS 115 (B) FOOD PREP 115 (A) MULTI-PURPOSE AREA 154 ELEV EQ 153 ELEV 152 MULTI-USE CONVENTION SPACE 156 LOBBY / LINK 155 ICE ARENA LOBBY 117 DR12"x12" 10"ø 20"ø28"ø28"øTVAV 1-12 MAIN LOBBY 101 77 F.3 F.3 T VAV 1-13 TVAV 1-11 T VAV 1-10 LG24"x6" 8"ø LG8"Ø LG8"Ø LG24"x6" LG 24"x12" (TYP. OF 2) LP200 10"Ø -(2)1" -48"L 16"ø 26"ø 20"ø 20"ø20"ø 20"ø16"ø 10"ø LP170 8"Ø -(2)1" -48"L LP 170 8"Ø -(2)1" -48"LLP170 8"Ø -(2)1" -48"L LP 230 10"Ø -(3)1" -48"L LP 230 10"Ø -(3)1" -48"L LP 230 10"Ø -(3)1" -48"L LP230 10"Ø -(3)1" -48"L LP230 10"Ø -(3)1" -48"L LP230 10"Ø -(3)1" -48"L LP230 10"Ø -(3)1" -48"L 8"ø LP 150 8"Ø -(2)1" -48"LLP150 8"Ø -(2)1" -48"L LD400 10"Ø VAV 1-17 16"ø LP 150 8"Ø -(2)1" -48"L LP 150 8"Ø -(2)1" -48"L 20"ø LG940 24"x24" LD 125 8"Ø LD125 8"Ø LP 150 8"Ø -(2)1" -48"L LP 150 8"Ø -(2)1" -48"L LD400 10"ØVAV 1-16 14"ø 10"ø 10"ø 10"ø8"ø 8"ø 8"ø LG 1000 24"x24" 16"ø 8"ø 10"ø 8"ø 8"ø VAV 1-15 16"ø 8"ø 8"ø 10"ø 10"ø LG24"x6"LG24"x6" LG24"x6" LG 24"x6" 8"ø TVAV 1-17 8"ø 8"ø 8"ø 12"ø 8"ø 26"ø MATCHLINE AA MATCHLINE BBT VAV 1-14 T VAV 1-15 DR48"x24" 5 5 5 6 1 1 1 1 1 1 1 1 1 7 6"ø 7 3 TVAV 1-16 3 3 3 4 1 1 1 1 1 1 1 1 110"ø 10"ø 1 1 1 14 14 14 14 14 5 5 LD 100 8"Ø 5 1 1 1 1 1 1 1 1 1 1 3 7 7 71 1 1 20"ø LP170 8"Ø -(2)1" -48"L LP240 10"Ø -(2)1" -48"L LP240 10"Ø -(2)1" -48"L LP240 10"Ø -(2)1" -48"L LP240 10"Ø -(2)1" -48"L LP240 10"Ø -(2)1" -48"L 1 1 1 1 1 1 1 1 1 5 10"ø 10"ø 10"ø 10"ø 10"ø T VAV 1-9 6 12"ø 12 15 32"ø 1 10"ø 8 LP190 8"Ø -(2)1" -48"L LP 8"Ø -(2)1" -48"L LP8"Ø -(2)1" -48"L22"øLP200 10"Ø -(2)1" -48"L 8"ø LP200 10"Ø -(2)1" -48"L 8"ø 8"ø M5.0 1 TYPICAL M5.0 2 TYPICAL 3 3 1 1 8"ø LG 450 24"x12" LG730 24"x24" 14"ø 34"ø 9 9 9 9 9 9 9 9 9 9 9 12"ø F 01 10"ø10 12"ø 11 1111111111 11 11 11 11 VAV 1-8 16"ø 20"ø LD600 12"Ø LD600 12"Ø14"ø 5 1 1 12"ø TH RTU 1 4 (TYP. OF 2) 10"ø16"ø 1 8"ø 8"ø 34"ø 32"ø 32"ø 32"ø 8"ø 9 10"ø 10"ø 3 SG900 24"x24" 16"ø LP 180 8"Ø -(2)1" -48"L 1 DR 20"x20"VAV 1-14 VAV 1-9 VAV 1-10 DR24"x18" DR 24"x18" 13 1 1 12"ø24"øSEE MEZZANINE PLAN FOR HVAC SYSTEMS IN THIS AREA. MATCHLINE AA MATCHLINE BB20"ø 1 1 1 THRTU 044 TH RTU 02 4 1 1 1 1 EUH 03 EUH 02 24"x18" LP190 8"Ø -(2)1" -48"L 1 LG75 6"Ø 8"ø LD50 6"Ø LG150 8"Ø LG 300 10"Ø 6"ø 6"ø 9 9 10"ø 8"ø T/ADR18"x16" 18"x16"1 KEYNOTES: BALANCING DAMPER, MOUNT IN AN ACCESSIBLE LOCATION. NOT USED. TEMPERATURE SENSOR, MOUNT AT 5'-0" AFF. COORDINATE LOCATION WITH OWNER. TEMPERATURE/HUMIDITY SENSOR, MOUNT AT 5'-0" AFF. COORDINATE LOCATION WITH OWNER. MOUNT EQUIPMENT AT 1'-0" ABOVE FINISHED CEILING IN AN ACCESSIBLE LOCATION. MOUNT EQUIPMENT AS HIGH AS POSSIBLE IN AN ACCESSIBLE LOCATION. TRANSFER AIR DUCT. 24"ø SUPPLY DUCT UP. SEE SHEET M2.2 FOR CONTINUATION. INSTALL DUCTWORK AS HIGH AS POSSIBLE. 10"ø EXHAUST DUCT UP TO PRV ON ROOF. INSTALL BOTTOM OF DIFFUSER AT TOP OF WINDOW. DIRECT AIRFLOW TOWARDS BOTTOM OF WINDOW. 50"x16" RETURN DUCT DOWN. MOUNT BOTTOM OF RETURN GRILLE AT 0'-6" AFF. 42"x36" SUPPLY AND 50"x30" RETURN DUCTS UP TO RTU ON ROOF. CABLE DAMPER WITH REMOTE CABLE ADJUSTER MOUNT IN DIFFUSER NECK OR IN CEILING NEXT TO DIFFUSER. INSULATE FIRST 10'-0" OF DUCTWORK FOR ACOUSTIC NOISE REDUCTION. 1 2 GENERAL NOTES: 1. REFER TO M1.0 FOR GENERAL NOTES. 3 4 5 6 7 8 9 12 13 10 11 14 15 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated FIRST FLOOR MECHANICAL PLAN -NW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.1C 10/13/2023 22-002 - 1/8" = 1'-0"M2.1C 1 FIRST FLOOR MECHANICAL PLAN - NW QUAD 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET DN HC HC HC KEYNOTES: BALANCING DAMPER, MOUNT IN AN ACCESSIBLE LOCATION. 14"ø EXHAUST DUCT UP TO PRV ON ROOF. TEMPERATURE SENSOR, MOUNT AT 5'-0" AFF. COORDINATE LOCATION WITH OWNER. TEMPERATURE AND HUMIDITY SENSOR, MOUNT AT 5'-0" AFF. MOUNT EQUIPMENT AT 1'-0" ABOVE FINISHED CEILING IN AN ACCESSIBLE LOCATION. MOUNT EQUIPMENT AS HIGH AS POSSIBLE IN AN ACCESSIBLE LOCATION. TRANSFER AIR DUCT. 18"ø EXHAUST DUCT UP TO PRV ON ROOF. INSTALL DUCTWORK AS HIGH AS POSSIBLE. INSTALL BOTTOM OF DIFFUSER AT TOP OF WINDOW. DIRECT AIR TOWARDS BASE OF WINDOW. ROUTE SUPPLY DUCT UP TO HIGH ROOF. 3/4" NATURAL GAS DOWN TO WATER HEATER. 50"x16" RETURN DUCT DOWN. MOUNT BOTTOM OF RETURN GRILLE AT 0'-6" AFF. CABLE DAMPER WITH REMOTE CABLE ADJUSTER MOUNT IN DIFFUSER NECK OR IN CEILING NEXT TO DIFFUSER. EXTEND CONDENSATE DRAIN TO OPEN FIXTURE WASTE WITH AIR GAP PER CODE. MOUNT AC WALL UNIT IN AN ACCESSIBLE LOCATION. EXTEND REFRIGERANT PIPES UP TO ROOF MOUNTED CONDENSING UNIT PER DETAIL. 20" SUPPLY DUCT UP TO ERV ON ROOF. 16" RETURN DUCT UP TO ERV ON ROOF. 14" ROUND RETURN DUCT UP TO ERV ON ROOF. 18" ROUND RETURN DUCT UP TO ERV ON ROOF. 10" ROUND RETURN DUCT OPEN TO PLENUM. INSTALL BOTTOM OF DIFFUSER AT 14'-0" AFF. SPLIT SYSTEM FAN COIL, INSTALL PER MANUFACTURER'S INSTALLATION MANUAL. ROUTE REFRIGERATION LINES UP THROUGH ROOF INTO GOOSE NECK. COORDINATE LINE SIZING WITH MANUFACTURER. ROUTE CONDENSATE TO CONDENSATE MAIN. 1 2 GENERAL NOTES: 1. REFER TO M1.0 FOR GENERAL NOTES. 2. BRANCH DUCTWORK TO BE THE SAME SIZE AS REGISTER NECK FOR ALL "DR" AND "DS" TAG AIR TERMINALS. 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 55 66 88 H H J J K K M M N N P P Q Q L.5 L.5 M.4 G.8 G.8 VAV 1-3 VAV 1-1 VAV 1-5 20"ø 14"ø 10"ø 8"ø 12"ø 12"ø 12"ø 30"ø 18"ø 18"ø 18"ø14"ø 8"ø 8"ø 14"ø SR 75 12"x12" F 03 24"ø 6"ø 14"ø LP250 10"Ø -(3)1" -48"L LP250 10"Ø -(3)1" -48"L LP 200 10"Ø -(2)1" -48"L LP200 10"Ø -(2)1" -48"L LP200 10"Ø -(2)1" -48"LLP200 10"Ø -(2)1" -48"L LP200 10"Ø -(2)1" -48"L LP200 10"Ø -(2)1" -48"L LP250 10"Ø -(3)1" -48"L LP250 10"Ø -(3)1" -48"L LP250 10"Ø -(3)1" -48"L LP250 10"Ø -(3)1" -48"L LP250 10"Ø -(3)1" -48"L LP250 10"Ø -(3)1" -48"L LP250 10"Ø -(3)1" -48"L 20"ø 10"ø 10"ø 10"ø 10"ø 10"ø 10"ø 10"ø LP160 8"Ø -(2)1" -48"L LP160 8"Ø -(2)1" -48"L LP160 8"Ø -(2)1" -48"L LP160 8"Ø -(2)1" -48"L 8"ø 8"ø 8"ø8"ø VAV 1-4 BEER SALES 116 ELECTRICAL 113 VESTIBULE 118 ICE ARENA LOBBY 117 CONCESSIONS 115 (B) FOOD PREP 115 (A) JAN 114 MEN'S 121 WOMENS 122 TEAM ROOM 3 149 TEAM ROOM 2 148 TEAM ROOM 1 147 REFEREE RR 146 REFEREE 145 IT 150 ICE RINK CIRCULATION 151 MERCYHEALTH ARENA 136 WET TEAM ROOM 4 123 WET TEAM RR 124 WET TEAM ROOM 3 125 TEAM ROOM 5 126 TEAM ROOM 4 127 PASSAGE 130 ELEV EQ 153 ELEV 152 DR310 12"x6" DR310 12"x6" DS310 12"x6" DR310 12"x6" DS215 10"x6" DR215 10"x6" DS140 6"x6" DR140 6"x6"14"ø14"ø14"ø18"øDR 16"x16" 77 T VAV 1-1 T VAV 1-3 THVAV 1-7 T VAV 1-4 T VAV 1-5 MATCHLINE AA MATCHLINE BBDR 48" x24" LG12"Ø LP230 10"Ø -(3)1" -48"L DS310 12"x6" DS310 12"x6" LD50 6"Ø F 02 3/4" G LD70 6"Ø LD250 10"Ø 30"ø 6"ø 6"ø 10"ø LD325 24"x24" 8 LG525 24"x24" M5.0 2 TYPICAL 3 3 5 6 4 1 1 10"ø 101010 101010 1 9 9 9 9 12"ø 3 14 14 10"ø 10"ø 50"x16" 13 1111 9 9 9 9 SG24"x24" DR 16"x16"16"ø 7 LP135 8"Ø -(2)1" -48"L 10"ø 10"ø (TYP. OF 6) 10"ø 1 1 1 1 8"ø 8"ø 8"ø 1 1 8"ø 8"ø 3 1 1 1 1 T VAV 1-8 3 16"ø LD 50 6"Ø 12 VAV 1-6 VAV 1-7 16"ø 12"ø 1 11 1 T VAV 1-6 6 3 9 16"ø9 16"ø 6 1 LG150 24"x24" LG400 24"x24" 12"ø12"ø LG 24"x24" 16"ø (TYP. OF 2)14"ø2 10 10 10U 8"ø LG24"x6" LD600 12"Ø DR 24"x18" DR24"x18" DS 355 12"x6" DR 12"x6" DR 12"x6" DS 355 12"x6" DS 390 14"x6" DR 390 14"x6" DS 220 8"x6" DR 220 8"x6" DR 370 14"x6" DS 370 14"x6" 15 AC 1A16 16"ø12"ø12"ø16"ø20"ø16"ø16"ø12"ø12"ø14"x6" 8"x6" 14"x6" 12"x6" 12"x6" 1 11111 9 9 9 22 13 1 1 1 11 M5.0 300 MBH 6 M5.0 1 1 1 1 1 1 1 1 18"ø1 1 1 1 MATCHLINE AA 12"ø12"ø21 20"ø17 19 20 1 1 1 1 1 1 17 18 18 1 1 1 1 THERV 03 THERV 03 THERV 03 THERV 034 4 4 4 TH ERV 02 TH ERV 02 TH ERV 02 TH ERV 024 4 4 4 1 1/4" CD 1 AC 3A 8"ø 16 6 M5.0 EUH 04 EUH 01 AC 7A 23 6 M5.0 AC 7AT AC 1A T 3 3 24"x18" LG375 24"x24" 34"ø AC 3AT 3 LD250 10"Ø LG425 12"Ø LD250 10"Ø LG425 12"Ø LD325 12"Ø 5 5 (TYP. OF 4) 12"ø 12"ø 1 1 1 112"ø10"ø 14"ø 1 6"ø LD 50 6"Ø LD 50 6"Ø 14"ø 18"ø10"ø LG75 6"Ø 12"ø U 12"ø 12"ø 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated FIRST FLOOR MECHANICAL PLAN -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.1D 10/13/2023 22-002 - 1/8" = 1'-0"M2.1D 1 FIRST FLOOR MECHANICAL PLAN - SW QUAD 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 55 11 22 33 4 66 88 A A B B C C D D F F H H J J K K M M N N P P Q Q L.5 L.5 M.4 G.8 G.8 G G F.9 F.9 9 77 F.3 F.3 34"ø RD1125 16"Ø 16"ø 16"ø RD1125 16"Ø RD1125 16"Ø RD1125 16"Ø 16"ø RD1125 16"Ø RD1125 16"Ø 16"ø RD1125 16"Ø RD1125 16"Ø 16"ø 16"ø 34"ø RD1125 16"Ø 16"ø 16"ø RD1125 16"Ø RD1125 16"Ø RD1125 16"Ø 16"ø 16"ø RD1125 16"Ø RD1125 16"Ø 16"ø16"ø RD1125 16"Ø RD1125 16"Ø16"ø 16"ø 34"ø RD1125 16"Ø 16"ø 16"ø RD1125 16"Ø RD1125 16"Ø RD1125 16"Ø 16"ø 16"ø RD1125 16"Ø RD1125 16"Ø 16"ø16"ø RD1125 16"Ø RD1125 16"Ø16"ø 16"ø MATCHLINE AAMATCHLINE AA MATCHLINE BBMATCHLINE BB1 1 16"ø 1 1 16"ø 1 1 1 1 1 1 1 1 24"ø VP 03 VP 02 VP 01 3 3 35 26 2 35 35 8 6 20 6 935 35 14 11 10 10 1" G 13 22"ø 7 16"ø 20"ø 16"ø 14"ø 18"ø 20"ø 14"ø 16"ø 20"ø DR36"x20" (TYP. OF 3) 32"ø 15 18 24"ø 40"ø 40"ø THRTU 7 17 TH RTU 5 17 THRTU 317 1" G 19 DR48"x24" 40"ø (TYP. OF 3) DR48"x24" (TYP. OF 3) 40"ø 40"ø 40"ø DS3260 24"x36" DS3260 24"x36" DS3260 24"x36" DS3260 24"x36"40"ø40"øDS3260 24"x36" DS3260 24"x36" DS3260 24"x36" DS3260 24"x36" 1 1 1 1 1 1 1 1 32"ø 38"ø DR48"x24" (TYP. OF 3) 32"ø DS 1250 24"x14" DS 1250 24"x14" DS 1250 24"x14" DS 1250 24"x14" DS 1250 24"x14" DS 1250 24"x14" DS2000 20"x24" DS2000 20"x24" DS2000 20"x24" DS2000 20"x24" DS2000 20"x24" DS2000 20"x24" 1 1 1 1 1 1 32"ø 1 1 1 1 1 1 22"ø 21 7 IR 01 IR 02 IR 03 IR 04 IR 05 IR 06 IR 07 IR 08 IR 09 IR 10 IR 11 IR 12 IR 13 IR 14 02 ERV 01 ERV 05 ERV 04 ERV 03 ERV 02 RTU 03 RTU 04 RTU 05 RTU 06 RTU 07 RTU 3/4" G3/4" G3/4" G1" G3/4" G3/4" G3/4" G1" G 3/4" G3/4" G3/4" G22 23 24 24 24 24 24 25 25 25 25 25 25 25 24 24 24 24 25 25 25 25 25 25 25 25 25 24 25 24 25 24 25 24 25 32 (ERV-05) DUCTSOX 36"Ø x 100' L 7,425 CFM 18 14 1" G REFER TO SHEET M2.3 FOR MECHANICAL ITEMS ON LOW ROOF. REFER TO SHEET M2.3 FOR MECHANICAL ITEMS ON LOW ROOF. REFER TO SHEET M2.3 FOR MECHANICAL ITEMS ON LOW ROOF. REFER TO SHEET M2.3 FOR MECHANICAL ITEMS ON LOW ROOF. REFER TO SHEET M2.3 FOR MECHANICAL ITEMS ON LOW ROOF. 23 29 29 29 29 29 29 29 29 16 27 16 35 30 29 29 29 29 29 29 29 29 29 29 29 29 36"ø30 35 10 5 35 33 35 34 S ERV 05 12 M5.0 13 M5.0 110 MBH 16 M5.0 16 M5.0 13 M5.0 110 MBH 13 M5.0 110 MBH 13 M5.0 110 MBH 13 M5.0 110 MBH 13 M5.0 110 MBH 13 M5.0 110 MBH 13 M5.0 110 MBH 13 M5.0 110 MBH 13 M5.0 110 MBH 16 M5.0 16 M5.0 16 M5.0 16 M5.0 CO2S15 28 31 1515 12 M5.0 CO2S 28 16 M5.0 13 M5.0 110 MBH 13 M5.0 110 MBH 13 M5.0 110 MBH 13 M5.0 110 MBH 16 M5.0 16 M5.0 16 M5.0 600 MBH 31 31 16 M5.0 16 M5.0 16 M5.0 17 M5.0 36 1,040 MBH 30 35 34"ø 3 35 DR48"x24"DR48"x24" DR48"x24"DR48"x24" DR48"x24"DR48"x24" 34"ø 34"ø 30 30 30 30 DR48"x24" (TYP. OF 3) 37 AC 6A REF-S REF-L 38 6 M5.0 AC 6AT 39 KEYNOTES: BALANCING DAMPER, MOUNT IN AN ACCESSIBLE LOCATION. 24"ø SUPPLY DUCT DOWN. SEE M2.1C FOR CONTINUATION. 34"ø SUPPLY DUCT AND 50"x20" RETURN DUCTS UP TO RTU ON ROOF. TRANSITION TO UNIT DUCT SIZES AT UNIT AND PROVIDE FLEXIBLE CONNECTION. 24"ø SUPPLY DUCT AND 34"x14" RETURN DUCTS UP TO RTU ON ROOF. TRANSITION TO UNIT DUCT SIZES AT UNIT AND PROVIDE FLEXIBLE CONNECTION. 22"ø SUPPLY AND 22"ø RETURN DUCTS UP TO ERV ON ROOF. TRANSITION TO UNIT DUCT SIZES AT UNIT AND PROVIDE FLEXIBLE CONNECTION. 22"ø SUPPLY AND 22"ø RETURN DUCTS DOWN IN CHASE. SEE M2.1A FOR CONTINUATION. CONDENSATE PIPE DOWN IN CHASE. SEE M2.1A FOR CONTINUATION. REFRIGERATION LINES FOR AC UNIT DOWN IN CHASE. SEE M2.1A FOR CONTINUATION DOWN AND M2-5 FOR CONTINUATION UP TO CONDENSING UNIT ON ROOF. 20"ø SUPPLY AND (2) 16"ø RETURN DUCTS DOWN IN CHASE. SEE M2.1D FOR CONTINUATION. 20"ø SUPPLY AND 20"ø RETURN DUCTS UP TO ERV ON ROOF. TRANSITION TO UNIT DUCT SIZES AT UNIT AND PROVIDE FLEXIBLE CONNECTION. 20"ø SUPPLY, 14"ø RETURN AND 18"ø RETURN DUCTS DOWN IN CHASE. SEE M2.1D FOR CONTINUATION. NOT USED. 1" GAS PIPING UP AND DOWN IN CHASE. SEE M2.1D AND M2.3 FOR CONTINUATION. 20"ø SUPPLY, 14"ø RETURN AND 16"ø RETURN DUCTS DOWN IN CHASE. SEE M2.1A FOR CONTINUATION. DUCT PENETRATION THROUGH PRECAST WALL PANEL. COORDINATE DUCT LOCATION WITH OPENING IN PRECAST PANEL. 40"ø SUPPLY DUCT AND 42"x42" RETURN DUCTS UP TO RTU ON ROOF. TRANSITION TO UNIT DUCT SIZES AT UNIT AND PROVIDE FLEXIBLE CONNECTION. TEMPERATURE/HUMIDITY SENSOR, MOUNT AT 8'-0" AFF. COORDINATE LOCATION WITH OWNER. 1"ø GAS UP THROUGH ROOF. SEE M2.3 FOR CONTINUATION. 1"ø GAS PIPING THROUGH EXTERIOR WALL TO RTU-1 ON ROOF. 4"ø DRYER EXHAUST UP THROUGH ROOF. TERMINATE WITH GOOSE NECK. 1"ø GAS PIPING DOWN FROM ROOF. SEE M2.1A FOR CONTINUATION. TERMINATE DISCHARGE OF VACUUM PUMP OUT ROOF OF BUILDING. TERMINATE DISCHARGE OF VACUUM PUMP OUT SIDEWALL OF BUILDING. PROVIDE SIDE SHIELD ON ICE SIDE OF RADIANT SHIELD. MOUNT INFRARED SYSTEM AT 24'-0" AFF. TERMINATE RETURN DUCTS ABOVE CEILING FOR RETURN AIR PLENUM. 24"ø SUPPLY DUCT AND 24"ø RETURN DUCT UP TO RTU ON ROOF. TRANSITION TO UNIT DUCT SIZES AT UNIT AND PROVIDE FLEXIBLE CONNECTION. CO2 SENSOR LOCATED IN RETURN DUCT. SUPPLY AIR REGISTERS ARE TO BE DIRECTED TO THROW AIR ACROSS THE CEILING. DO NOT DIRECT AIRFLOW TOWARDS ICE. LOCATE DUCT HIGH IN STRUCTURE WITH REGISTERS ON TOP OF DUCT, COORDINATE WITH SIGNAGE AND OTHER OWNER-FURNISHED ITEMS. 38" ROUND SUPPLY DUCT ROUTED THROUGH STRUCTURE. 1" CONDENSATE DRAIN DOWN, SEE SHEET M2-1B. EXTEND 36" ROUND SUPPLY AIR AND EXHAUST AIR DUCTWORK UP TO ERV-5. TRANSITION TO UNIT DUCT SIZES AT UNIT AND PROVIDE FLEXIBLE CONNECTION. DISCHARGE AIR SENSOR. INSULATE FIRST 10'-0" OF DUCTWORK FOR ACOUSTIC NOISE REDUCTION. CONNECT DUCTSOX TO SHEET METAL. REFRIGERATION LINES FOR AC UNIT DOWN. SEE M2-5 FOR CONTINUATION UP TO CONDENSING UNIT ON ROOF. MOUNT AC WALL UNIT WITH INTEGRAL CONDENSATE PUMP 8" BELOW FINISHED CEILING. ROUTE PIPING AS HIGH AS POSSIBLE. EXTEND REFRIGERANT PIPES UP TO ROOF MOUNTED CONDENSING UNIT PER DETAIL. TEMPERATURE SENSOR, MOUNT AT 5'-0" AFF. COORDINATE LOCATION WITH OWNER. 1 2 GENERAL NOTES: 1. REFER TO M1.0 FOR GENERAL NOTES. 3 4 6 5 7 8 9 10 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 12 36 37 38 39 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated MEZZANINE FLOOR MECHANICAL PLAN - OVERALL WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.2 10/13/2023 22-002 - 1/16" = 1'-0"M2.2 1 MEZZANINE FLOOR MECHANICAL PLAN - OVERALL 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 55 11 22 33 4 66 88 A A B B C C D D F F H H J J K K M M N N P P Q Q L.5 L.5 M.4 G.8 G.8 G G F.9 F.9 9 REFRIGERATION SYSTEM CONDENSER, REFER TO ICE SYSTEM DOCUMENTS F 03 RTU 01 77 F.3 F.3 MATCHLINE AAMATCHLINE AA MATCHLINE BBMATCHLINE BBRTU 02 RTU 08 RTU 09 RTU 10 RTU 11 RTU 12 ERV 01 ERV 02 ERV 04 ERV 03 ERV 05 AC 1B AC 6B F 05 F 06 DHU 01 F 02 F 01 F 04 1,040 MBH (1,872.5 MBH) (2,412.5 MBH) (3,612.5 MBH) (4,152.5 MBH) (5,352.5 MBH) (5,892.5 MBH) (5,892.5 MBH) (420 MBH) (630 MBH) (1,390 MBH) (7,282.5 MBH)(7,282.5 MBH) (210 MBH) (1,274 MBH) (2,174 MBH) (2,606 MBH) (9,888.5 MBH) (270 MBH)(370 MBH)(199 MBH)(569 MBH) (60 MBH) (160 MBH)(729 MBH) (600 MBH) (700 MBH)(539 MBH)(1,000 MBH) (569 MBH)(75 MBH) (1,268 MBH)(1,968 MBH)(2,968 MBH)(3,537 MBH) (771.5 MBH) (3,537 MBH) (13,500.5 MBH)38"ø38"ø 222 DHU 02 32"ø 32"ø M5.0 3 M5.0 3 M5.0 3 (550 MBH) 2 CU 01 (210 MBH) 2 1/2" G 1 1/2" G 1 1/4" G1 1/4" G3/4" G3/4" G 1" G 3/4" G 1" G 2 1/2" G 1 1/4" G1" G3/4" G1" G3/4" G 2" G 2" G2" G2" G 2" G 1 1/2" G 1 1/4" G 1 1/4" G3/4" G 3/4" G 1 1/4" G 3/4" G 1 1/4" G 3/4" G 3/4" G1 1/2" G1 1/2" G1 1/4" G 1" G1" G3/4" G 1" G 3/4" G 3/4" G 1" G 3/4" G 3/4" G 3/4" G 3/4" G 2 1/2" G M5.0 3 1" GRTU 03 RTU 04 RTU 05 RTU 06 RTU 07 5 M5.0 8900 MBH 292.5 MBH 5 M5.0 8 7 M5.09 5 M5.08 5 M5.0 8 5 M5.0 8 5 M5.0 8 5 M5.0 8 5 M5.0 8 5 M5.0 8 5 M5.0 8 5 M5.0 8 6 M5.0 5 M5.0 8 8 M5.03 8 M5.0 3 8 M5.0 3 5 M5.0 8 5 M5.0 8 5 M5.0 8 5 M5.0 8 5 M5.0 8 5 M5.0 8 8 M5.0 3 8 M5.03 8 M5.03 5 9 M5.0 10 M5.0 10 7 292.5 MBH 540 MBH 1200 MBH 540 MBH 1200 MBH 540 MBH 100 MBH 160 MBH 60 MBH 100 MBH 539 MBH 100 MBH 210 MBH 210 MBH 210 MBH 5 M5.08 600 MBH 3" G SEE SHEET M2.7 FOR GAS PIPING IN THIS AREA TO BE INCLUDED IN ALTERNATE BIDS 2 AND 3. 8 M5.03 REF-S REF-L AC 3B 6 M5.0 REF-S REF-L REF-S REF-L (540 MBH) 1" G (1,580 MBH) 3 M5.0 1" G AC 5B 6 M5.0 AC 4B 6 M5.0 REF-S REF-L (110 MBH)3/4" G3/4" G 4 M5.0 F 09 3 M5.0 AC 7B 6 M5.0 REF-S REF-L AC 2B 6 M5.0 6 M5.0 M5.0 18 REF-S REF-L HG KEYNOTES: 1"ø GAS DOWN THROUGH ROOF. EXTERIOR DUCTS THROUGH PRECAST WALL PANEL. COORDINATE DUCT LOCATION WITH OPENING IN PRECAST PANEL. GAS PIPE DOWN THROUGH ROOF. PROVIDE GAS COCK ON ROOF. SEE DETAIL. NOT USED. UNIT HEATER VENT TERMINATION, SEE DETAIL. NOT USED. INCLUDE THIS SECTION OF GAS PIPING IN ALTERNATE BID #1. GAS CONNECTION TO ROOFTOP UNIT. GAS PIPING SHALL NOT INTERFERE WITH OPENING OF ACCESS DOORS OR LIMIT DOOR SWING NECESSARY FOR DOOR HOLD OPENS PROVIDED WITH UNIT. 4" DIAMETER GOOSENECK FOR DRYER EXHAUST. FOR CONTINUATION OF THIS GAS PIPE, SEE SHEET M2.5 ALTERNATE BID #1 ROOF PLAN. 1 2 GENERAL NOTES: 1. REFER TO M1.0 FOR GENERAL NOTES. 3 4 5 6 7 8 9 10 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated MECHANICAL ROOF PLAN - OVERALL WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.3 10/13/2023 22-002 - 1/16" = 1'-0"M2.3 1 MECHANICAL ROOF PLAN - OVERALL 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET HC HC HC HC HC HC HC HC HC HC DN DN HC HC HC HC HC HC HC HC HC HC HC HC HC HC HC DN SD SD SD 55 11 22 33 4 66 88 A A B B C C D D F F H H J J K K M M N N P P Q Q L.5 L.5 M.4 G.8 G.8 G G F.9 F.9 9 77 F.3 F.3 ADD ALT 2 SEE SHEET M2.6-M2.8 MATCHLINE AAMATCHLINE AA MATCHLINE BBMATCHLINE BB9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 1/16" = 1'-0" FIRST FLOOR MECHANICAL PLAN - OVERALL -ADD ALT 1 WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.4 10/13/2023 22-002 - 1/16" = 1'-0"M2.4 1 FIRST FLOOR MECHANICAL PLAN - OVERALL - ADD ALT 1 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET HC HC HC HC HC HC DN 55 4 66 88 A A B B C C D D F F H H G.8 G.8 G G F.9 F.9 9 77 F.3 F.3 LP150 8"Ø -(2)1" -48"L LP150 8"Ø -(2)1" -48"L LD 400 10"Ø LD 350 10"Ø LP150 8"Ø -(2)1" -48"L LP150 8"Ø -(2)1" -48"L LD130 8"Ø LD120 8"Ø LP250 10"Ø -(3)1" -48"L LP250 10"Ø -(3)1" -48"L LP250 10"Ø -(3)1" -48"L LP 200 10"Ø -(2)1" -48"L LP200 10"Ø -(2)1" -48"L VAV 1-15 VAV 1-16 VAV 1-17 8"ø 8"ø 16"ø 10"ø 6"ø10"ø 14"ø 26"ø 16"ø26"ø8"ø 12"ø 10"ø 10"ø 8"ø 8"ø 8"ø LP 200 10"Ø -(2)1" -48"L LP 200 10"Ø -(2)1" -48"L LP 200 10"Ø -(2)1" -48"L 26"ø MATCHLINE AA MATCHLINE BBLG 24"x6" LG24"x24" SG 22"x22" 20"ø 14"ø 20"ø16"ø 14"ø 8"ø 8"ø 8"ø 8"ø LG24"x6" LG 24"x6" 10"ø 10"ø 1 1 1 8"ø 8"ø 20"ø 3 3 5 LD 350 10"Ø 1 1 11 1 1 1 3 SG20"x20" LG 24"x24" 20"ø 5 5 3 1 1 M5.0 2 TYPICAL 7 1 11 1 1 6 8 8 20"ø 26"ø M5.0 1 TYPICAL 10"ø 10"ø VAV 1-14 20"x16" SG 20"x16" 16"ø 5 12"ø DS400 12"x8"DS 200 8"x6" 22"ø 12"ø 1 20"ø DS 370 12"x8" 1 T VAV 1-14 T VAV 1-15TVAV 1-172 TVAV 1-162 2 2 6 SEE M2.4B FOR MECHANICAL ITEMS IN THIS AREA SG8"x8" MAIN LOBBY 101 KEYNOTES: BALANCING DAMPER, MOUNT IN AN ACCESSIBLE LOCATION. TEMPERATURE SENSOR, MOUNT AT 5'-0" AFF. COORDINATE LOCATION WITH OWNER. MOUNT EQUIPMENT AT 1'-0" ABOVE FINISHED CEILING IN AN ACCESSIBLE LOCATION. NOT USED. TRANSFER AIR DUCT. INSTALL DUCTWORK AS HIGH AS POSSIBLE. INSTALL BOTTOM OF DIFFUSER AT TOP OF WINDOW. DIRECT AIR AT BOTTOM OF WINDOW. PROVIDE 1/4"HARWARE CLOTH OVER RETURN DUCT OPENING. 1 2 GENERAL NOTES: 1. REFER TO M1.0 FOR GENERAL NOTES. 3 4 5 6 7 8 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated FIRST FLOOR MECHANICAL PLAN -ADD ALT 1 -NW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.4A 10/13/2023 22-002 -1/8" = 1'-0"M2.4A 1 FIRST FLOOR MECHANICAL PLAN - ADD ALT 1 - NW QUAD 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 55 4 66 88 A A B B C C D D F F H H G.8 G.8 G G F.9 F.9 9 77 F.3 F.3 34"ø RD1125 16"Ø RD1125 16"Ø RD1125 16"Ø RD1125 16"Ø RD1125 16"ØRD1125 16"ØRD1125 16"ØRD1125 16"Ø 16"ø16"ø 16"ø 16"ø 16"ø16"ø16"ø16"øRTU 13 MATCHLINE AA MATCHLINE BB1 1 1 1 1 1 1 1 2 THRTU 133 34"ø 5 DR48"x24"DR48"x24" 4 KEYNOTES: BALANCING DAMPER, MOUNT IN AN ACCESSIBLE LOCATION. 34"ø SUPPLY DUCT AND 50"x20" RETURN DUCTS UP TO RTU ON ROOF. TRANSITION TO UNIT DUCT SIZES AT UNIT AND PROVIDE FLEXIBLE CONNECTION. TEMPERATURE/HUMIDITY SENSOR, MOUNT AT 8'-0" AFF. COORDINATE LOCATION WITH OWNER. INSULATE FIRST 10'-0" OF DUCTWORK FOR ACOUSTIC SOUND DAMPENING. LOCATE DUCT HIGH IN STRUCTURE WITH REGISTERS ON TOP OF DUCT, COORDINATE WITH SIGNAGE AND OTHER OWNER-FURNISHED ITEMS. 1 2 GENERAL NOTES: 1. REFER TO M1.0 FOR GENERAL NOTES. 3 4 5 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated MEZZANINE FLOOR MECHANICAL PLAN -ADD ALT 1 -NW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.4B 10/13/2023 22-002 - 1/8" = 1'-0"M2.4B 1 MEZZANINE FLOOR MECHANICAL PLAN - ADD ALT 1 - NW QUAD 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 55 11 22 33 4 66 88 A A B B C C D D F F H H J J K K M M N N P P Q Q L.5 L.5 M.4 G.8 G.8 G G F.9 F.9 9 77 F.3 F.3 ADD ALT 2 SEE SHEET M2.6-M2.8 MATCHLINE AA MATCHLINE BBMATCHLINE AAMATCHLINE BBRTU 13 540 MBH M5.0 51" GM5.0 4 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 1/16" = 1'-0" MECHANICAL ROOF PLAN - OVERALL -ADD ALT 1 WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.5 10/13/2023 22-002 - 1/16" = 1'-0"M2.5 1 MECHANICAL ROOF PLAN - OVERALL - ADD ALT 1 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET HC HC HC HC HC HC HC HC HC HC DN DN HC HC HC HC HC HC HC HC HC HC HC HC HC HC HC DN SD SD SD 55 11 22 33 4 66 88 A A B B C C D D F F H H J J K K M M N N P P Q Q L.5 L.5 M.4 G.8 G.8 G G F.9 F.9 9 77 F.3 F.3 ADD ALT 1 SEE SHEET M2.4-M2.5 MATCHLINE AA MATCHLINE BBMATCHLINE BBMATCHLINE AA ADD ALTERNATE #2 ADDS THIS SHELL SPACE TO THE PROJECT. 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 1/16" = 1'-0" FIRST FLOOR MECHANICAL PLAN - OVERALL -ADD ALT 2 WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.6 10/13/2023 22-002 -1/16" = 1'-0"M2.6 1 FIRST FLOOR MECHANICAL PLAN - OVERALL - ADD ALT 2 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET DN HC HC HC HC HC HC HC HC HC SD SD SD 11 22 33 H H J J K K M M N N P P Q Q L.5 L.5 M.4 MATCHLINE AAMATCHLINE BB22"ø1 TH ERV 6 2 3 KEYNOTES: INSTALL DUCTWORK AS HIGH AS POSSIBLE. TEMPERATURE/HUMIDITY SENSOR, MOUNT AT 5'-0" AFF. COORDINATE LOCATION WITH OWNER. LEAVE SUPPLY AIR DUCT OPEN ON THE END. SPACE IS BEING DESIGNED AS A SHELL SPACE. 1 GENERAL NOTES: 1. REFER TO M1.0 FOR GENERAL NOTES. 2 3 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated FIRST FLOOR MECHANICAL PLAN -ADD ALT 2 -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.6A 10/13/2023 22-002 - 1/8" = 1'-0"M2.6A 1 FIRST FLOOR MECHANICAL PLAN - ADD ALT 2 - SE QUAD 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET DN HC HC HC HC HC HC 55 66 88 H H J J K K M M N N P P Q Q L.5 L.5 M.4 G.8 G.8 77 MATCHLINE AA MATCHLINE BB22"ø22"øERV 06 1 1 3 4 2 32"x22" 26"x26" 50"x20" KEYNOTES: INSTALL DUCTWORK AS HIGH AS POSSIBLE. PROVIDE 1/4"HARWARE CLOTH OVER RETURN DUCT OPENING. 50"X20" RETURN AIR AND 38"X32" SUPPLY AIR DUCTS UP TO ERV-6 ON ROOF. TRANSITION TO UNIT CONNECTION SIZES AND CONNECT TO UNIT WITH FLEXIBLE CONNECTION. LEAVE SUPPLY AIR DUCT OPEN ON THE END. SPACE IS BEING DESIGNED AS A SHELL SPACE. 1 2 GENERAL NOTES: 1. REFER TO M1.0 FOR GENERAL NOTES. 3 4 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated FIRST FLOOR MECHANICAL PLAN -ADD ALT 2 -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.6B 10/13/2023 22-002 - 1/8" = 1'-0"M2.6B 1 FIRST FLOOR MECHANICAL PLAN - ADD ALT 2 - SW QUAD 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 55 11 22 33 4 66 88 A A B B C C D D F F H H J J K K M M N N P P Q Q L.5 L.5 M.4 G.8 G.8 G G F.9 F.9 9 77 F.3 F.3 ADD ALT 1 SEE SHEET M2.4-M2.5 MATCHLINE AA MATCHLINE BBMATCHLINE AAMATCHLINE BB1" G 1" G 1 ERV 06 432 MBH M5.0 5 M5.0 4 KEYNOTES: 1"ø GAS DOWN TO LOW ROOF.1 GENERAL NOTES: 1. REFER TO M1.0 FOR GENERAL NOTES. 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated MECHANICAL ROOF PLAN - OVERALL -ADD ALT 2 WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.7 10/13/2023 22-002 - 1/16" = 1'-0"M2.7 1 MECHANICAL ROOF PLAN - OVERALL - ADD ALT 2 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET HC HC HC HC HC HC HC HC HC HC DN DN HC HC HC HC HC HC HC HC HC HC HC HC HC HC HC DN SD SD SD 55 11 22 33 4 66 88 A A B B C C D D F F H H J J K K M M N N P P Q Q L.5 L.5 M.4 G.8 G.8 G G F.9 F.9 9 77 F.3 F.3 ADD ALT 1 SEE SHEET M2.4-M2.5 MATCHLINE AA MATCHLINE BBMATCHLINE BBMATCHLINE AA ADD ALTERNATE #3 ADDS THE FULLY COMPLETED DESIGN FOR THIS SPACE. 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 1/16" = 1'-0" FIRST FLOOR MECHANICAL PLAN - OVERALL -ADD ALT 3 WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.8 10/13/2023 22-002 -1/16" = 1'-0"M2.8 1 FIRST FLOOR MECHANICAL PLAN - OVERALL - ADD ALT 3 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET DN HC HC HC HC HC HC HC HC HC SD SD SD 11 22 33 H H J J K K M M N N P P Q Q L.5 L.5 M.4 MATCHLINE AAMATCHLINE BBDS450 12"x6" DS450 12"x6" DS450 12"x6" DS450 12"x6"(E)22"øLD120 8"Ø LG 120 8"Ø 8"ø 8"ø 8"ø 16"ø 1 1 1 1 1 2 2 ERV 6TH3 24"øDS465 12"x6" 1 ERV 6TH 3 DR 900 18"x12"DR 900 18"x12" DR 700 12"x12"DR 700 12"x12" 18"ø 16"ø 16"ø 1 1 11 4 KEYNOTES: BALANCING DAMPER, MOUNT IN AN ACCESSIBLE LOCATION. FOR CONTINUATION SEE SHEET M2.8B. TEMPERATURE/HUMIDITY SENSOR, MOUNT AT 5'-0" AFF. COORDINATE LOCATION WITH OWNER. CONNECT TO EXISTING, VERIFY SIZE AND LOCATION. 1 2 GENERAL NOTES: 1. REFER TO M1.0 FOR GENERAL NOTES. 3 4 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated FIRST FLOOR MECHANICAL PLAN -ADD ALT 3 -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.8A 10/13/2023 22-002 -1/8" = 1'-0"M2.8A 1 FIRST FLOOR MECHANICAL PLAN - ADD ALT 3 - SE QUAD 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET DN HC HC HC HC HC HC 55 66 88 H H J J K K M M N N P P Q Q L.5 L.5 M.4 G.8 G.8 77 MATCHLINE AA MATCHLINE BBDS470 12"x6"24"øDS465 12"x6" LD125 8"Ø LG 8"Ø DS465 12"x6" DS470 12"x6" DS465 12"x6" LD100 8"Ø LD75 6"Ø LG6"Ø LG8"Ø 1 1 1 1 1 1 1 1 (E)ERV 06 (E)32"x22" 8"ø 22"ø2 3 3 1 1 ERV 6TH 4 1 18"ø1 26"x26" 1 (E)22"ø1 1 DR700 12"x12"DR700 12"x12" 16"ø 1 1(E)22"ø5 5 5 8"ø (E)26"x26" 5 KEYNOTES: BALANCING DAMPER, MOUNT IN AN ACCESSIBLE LOCATION. EXISTING 50"X20" RETURN AIR AND 38"X32" SUPPLY AIR DUCTS UP TO ERV-6 ON ROOF. TRANSITION TO UNIT CONNECTION SIZES AND CONNECT TO UNIT WITH FLEXIBLE CONNECTION. FOR CONTINUATION SEE SHEET M2.8A. TEMPERATURE/HUMIDITY SENSOR, MOUNT AT 5'-0" AFF. COORDINATE LOCATION WITH OWNER. CONNECT TO EXISTING, VERIFY SIZE AND LOCATION. 1 2 GENERAL NOTES: 1. REFER TO M1.0 FOR GENERAL NOTES. 3 4 5 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated FIRST FLOOR MECHANICAL PLAN -ADD ALT 3 -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M2.8B 10/13/2023 22-002 -1/8" = 1'-0"M2.8B 1 FIRST FLOOR MECHANICAL PLAN - ADD ALT 3 - SW QUAD 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 12x12, 24x24 OR 24"x48" (18"x30" NECK) 6x24 OR 12x24 SEE PLANS FOR NECK SIZE SEE PLANS FOR NECK SIZE GRILLE OR REGISTER BELOW GRILLE OR REGISTER BELOW PROVIDE 1" THICK, R-6 FIBERGLASS INSULATION TO COMPLETELY COVER DIFFUSER CONE WHERE SCHEDULED OR SPECIFIED. NOTE: 1.EXTEND RIGID METAL DUCT SO THAT MAXIMUM FLEXIBLE DUCT LENGTH DOES NOT EXCEED 5'-0". PROVIDE RIGID 90° ELBOW WHERE REQUIRED TO KEEP FLEXIBLE DUCT WITHIN 5'-0" LENGTH LIMITATION. CEILING DIFFUSER WITH VOLUME DAMPER, AS SCHEDULED METALLIC OR NON-METALLIC BAND (TYPICAL) PRE-INSULATED FLEXIBLE DUCT AS REQUIRED, INSTALL PERMANENTLY SEALED AND SUPPORTED TO PREVENT KINKING AND SHARP TURNS CEILING SEE NOTE 1. FOIL TAPE AT INSULATION JOINT INSULATED DUCTHIGH EFFICIENCY TAKEOFF EXTERNALLY INSULATED, WITH VOLUME DAMPER AND DAMPER LOCK WITH EXTENSION METALLIC OR NON-METALLIC BAND OVER INSULATION (TYPICAL) FASTEN ANGLE IRON SECURELY TO DUCT AND ROOF STRUCTURE SECURE CURB TO ROOF WITH SCREWS, PINS, OR BOLTS EXTEND DUCTWORK OVER TOP OF CURB, SECURE DUCTWORK TO CURB NAILER EXHAUST DUCT UP THROUGH ROOF. SEE PLANS FOR SIZE AND LOCATION. MOTORIZED (UNLESS NOTED OTHERWISE) DAMPER, SECURE TO DUCT FROM ABOVE TO ALLOW SERVICE OR REMOVAL OF DAMPER FROM ROOF ROOF DECK REFER TO ARCHITECTURAL DRAWINGS ROOF INSULATION PREFABRICATED INSULATED CURB WITH TREATED WOOD NAILER, 24" HIGH SECURE EXHAUST FAN TO ROOF CURB EXHAUST FAN WITH BIRDSCREEN INSTALLATION: ADJUSTABLE BRACKET ROLLER SUPPORT GALVANIZED THREADED ROD COMPOSITE BASE PEEL AND STICK ADHESIVE ON BOTTOM OF BASE FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS ON PROCEDURE TO FASTEN SUPPORT TO ROOF MEMBRANE. REFER TO SPECIFICATION SECTION 20 0050 FOR PIPE SUPPORT SPACING BASED ON PIPE SIZE AND MATERIAL. PROVIDE PROPER ROLLER SUPPORT MATERIAL FOR COPPER PIPING TO AVOID CORROSION DUE TO DISSIMILAR METALS.2" MIN.PIPE SIZE SAME AS UPSTREAM OF REGULATOR. ROOFTOP EQUIPMENT NOTES: 1. INSTALL REGULATOR A MINIMUM 4'-0" FROM UNIT EXHAUST FLUE. 2. PROVIDE PIPE TRANSITION IF REGULATOR CONNECTION DIFFERS FROM GAS PIPE SIZE. GAS PIPE SUPPORT, GAS SHUTOFF VALVE GROUND JOINT UNION ROUTE PIPING TO AVOID CONFLICT WITH RTU ACCESS DOORS DIRT LEG GAS REGULATOR MOUNTED IN VERTICAL POSITION WITH RELIEF VENT FACING DOWN TOWARD ROOF. PROVIDE OVER PRESSURIZATION DEVICE ON 5 PSIG GAS PIPING SYSTEMS. REF-S EXPANSION VALVE COOLING COIL OIL TRAP SIGHT GLASS STRAINER SERVICE VALVE DRIER SOLENOID VALVE AIR COOLED CONDENSING UNIT NOTE: REFRIGERATION PIPING BY MECHANICAL CONTRACTOR. COORDINATE LINE SET SIZES W/ MANUFACTURER. REF-L SOLENOID VALVE CURB & FLASHING SOLDER DRIP LEG WATER TIGHT 12", UNLESS OTHERWISE NOTED. ACCESS PANEL (FOR DAMPER) BIRD SCREEN SECURED WITH METAL STRAP, SCREWED 6" ON CENTER, MINIMUM. COUNTER FLASHING DAMPER (NOT FOR DRYER EXH.) SLIP AND DRIVE FITTINGS, TYPICAL. SEAL JOINTS. NOTE: REFER TO SPEC. SECTION 15250 FOR INSULATION REQUIREMENTS. SEE PLAN FOR CONTINUATION AND SIZE SHUTOFF VALVE FLOW ROOF SUPPORT PER SPECIFICATIONS CONNECT BRANCH TO TOP OF MAIN, TO ALLOW FOR EXPANSION AND CONTRACTION OF MAIN PIPE RUN NOTE: PROVIDE A VERICAL OFFSET ON ALL GAS PIPES AT ROOF PENETRATIONS TO ALLOW FOR PROPER FLASHING BY OTHERS. SUPPORT PIPING OFFSETS AS REQUIRED. ROOF DECK GAS PIPE MAIN GROUND JOINT UNION COORDINATE INSTALLATION OF FLASHING AND COUNTER FLASHING WITH DIVISION 7 ROOF INSULATION CUT ROOF FOR PIPE PENETRATION. ANCHOR PIPE TO STRUCTURE THERMOSTAT FURNISHED BY DIVISION 15. REGULATOR (WHERE REQUIRED) EXTEND HANGER RODS UP TO STRUCTURE. HORIZONTAL UNIT HEATER. HANGER, TYPICAL GAS COCK CAPPED DIRT LEG UNION PITCH FLUE CONNECTOR @ 1/4" PER LIN. FT. EXTEND HANGER RODS UP TO STRUCTURE.GEXTEND DRIP TEE TO NEAREST FLOOR DRAIN IN CHIMNEY IS OVER A FINISHED CEILING. A PROVIDE OVER PRESSURIZATION DEVICE ON 5 PSIG GAS PIPING SYSTEMS. COMBUSTION AIR PIPE COMBUSTION AIR PIPE CONCENTRIC ADAPTER COMBUSTION AIR INLET FLASHING ROOF EXHAUST TERMINAL FLUE EXHAUST PIPE SEAL WITH HIGH TEMPERATURE SILICONE RUBBER SEALANT SUPPLIED WITH KIT. FLUE EXHAUST PIPE SLOPE DISCHARGE PIPE AT 1" PER 1'-0" INSTALL PUMP ON PLATFORM ATTACHED TO WALL. DISCHARGE PIPE FROM INFRA-RED HEATING SYSTEM. VACUUM PUMP FOR INFRA- RED HEATING SYSTEM. ROOF 18" FROM BUILDING, WITH BIRD SCREEN. 1" CONDENSATE DRAIN TO DRAIN, SEE PLANS. TRAP PER MANUFACTURER'S RECOMMENDATIONS. EXTERIOR WALL STORM COLLAR BY DIVISION 23. 1'-0" MIN., 2'-0" MAX. ABOVE FINISHED ROOF LINE. 10'-0" MIN. TO OUTSIDE AIR INTAKES. FLASHING FURNISHED BY DIVISION 23. BIRD SCREEN RAIN CAP4" SINGLE WALL STAINLESS STEEL (MFG BY FASTEN SEAL) PIPE PER MANUFACTURER'S RECOMMENDATIONS (SEE PLANS FOR WALL OR ROOF DISCHARGE). PROVIDE AN AIR STRAIGHTENER IF THE 3 dia. REQUIREMENT CAN NOT BE MET. HEATING COILMAIN DUCTSEE SPECS FOR BOX INSULATION. GASKETTED ACCESS PANEL LINED RECTANGULAR DUCT SAME SIZE AS VAV BOX OUTLET SEE DRAWINGS FOR DUCT SIZE. 9"x12" GASKETTED ACCESS PANEL INLET COLLAR 1/8" SMALLER THAN DUCT SIZE 5'-0" MINIMUM 3 DIAMETER SEE DRAWINGS FOR DUCT SIZE. INFRA-RED CONTROL PANEL WIRING BETWEEN PANEL AND VACUUM PUMP BY DIVISION 16. WIRING TO ELECTRIC PANEL BY DIVISION 16. LOW VOLTAGE WIRING BETWEEN PANEL AND VACUUM PUMP BY DIVISION 15. WIRING TO INFRA-RED BURNER OUTLETS BY DIVISION 16. LOW VOLTAGE WIRING TO THERMOSTAT(S) DIVISION 15. BALANCING DAMPER DUCTSOX (SEE PLANS FOR SIZE) SEE PLANS FOR DUCT SIZE SHEET METAL COLLAR (SAME SIZE AS DUCTSOX) CONNECT DUCTSOX TO SHEET METAL COLLAR WITH TIE (FURNISHED BY DUCTSOX)GG 4" MINIMUM DIRT LEG. GAS COCK UNION PROVIDE REGULATOR WITH OVER PRESSURIZATION DEVICE ON 5 PSIG GAS PIPING SYSTEMS. INTAKE AND EXHAUST VENTS. ROUTE TO ROOF VENT TERMINATION. REFER TO PLUMBING DRAWINGS FOR WATER PIPING, INTAKE VENT AND EXHAUST VENTING. WH - GAS SHUT-OFF VALVE ON ROOF 8 M5.0ROOF 2" 12" GAS NIPPLE SHUT-OFF VALVE (INCLUDED w/BURNER) 3/4" STAINLESS STEEL FLEX GAS CONNECTOR WITH PLASTISOL COVERING MAIN OR BRANCH GAS PIPING CONDUIT TO ADDITIONAL BURNERS AND CONTROLLING MEANS - 120V WIRING. PROVIDE REGULATOR WITH OVER PRESSURIZATION DEVICE ON 5 PSIG GAS PIPING SYSTEMS. TUBE NOT SHOWN RETAINER CLIP RELIEF NOTCH SIDE EXTENSION REFLECTOR No. 8x3/8 SHEET METAL SCREW TUBE AND REFLECTOR HANGER STANDARD REFLECTOR SIDE EXTENSION REFLECTOR SUPPORT BRACKET REFLECTOR SUPPORT INSTALL TOP SHIELD PARALLEL WITH CEILING. DO NOT ROTATE HEATER AT AN ANGLE. REF-S EXPANSION VALVE COOLING COIL OIL TRAP SIGHT GLASS STRAINER SERVICE VALVE DRIER SOLENOID VALVE AIR COOLED CONDENSING UNIT NOTE: REFRIGERATION PIPING BY MECHANICAL CONTRACTOR. COORDINATE LINE SET SIZES W/ MANUFACTURER. REF-L SOLENOID VALVE HG HOT GAS SOLENOID VALVE HOT GAS VALVE HOT GAS BYPASS LINE REFRIGERANT PIPING SCHEDULE SYSTEM I.D. DHU #CU #CIRCUIT 1 CIRCUIT 2 CIRCUIT 1 CIRCUIT 2 CIRCUIT 1 CIRCUIT 2 SUCTION LINE LIQUID LINE HOT GAS LINE 01 01 2-1/8"2-1/8"1-3/8"1-3/8"1-3/8"1-3/8" 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 As indicated MECHANICAL DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M5.0 10/13/2023 22-002 - NOT TO SCALEM5.0 1 GRILLE & REGISTER BOOT NOT TO SCALEM5.0 2 LAY-IN CEILING DIFFUSER DETAIL NOT TO SCALEM5.0 3 DOWNBLAST EXHAUST FAN DETAIL NOT TO SCALEM5.0 4 ROOF MOUNTED PIPE SUPPORT NOT TO SCALEM5.0 5 GAS CONNECTION FOR ROOFTOP EQUIPMENT NOT TO SCALEM5.0 6 REFRIGERANT PIPING SCHEMATIC NOT TO SCALEM5.0 7 GOOSENECK DETAIL - EXHAUST NOT TO SCALEM5.0 8 GAS PIPE ROOF PENETRATION W/O REGULATOR NOT TO SCALEM5.0 9 HORIZONTAL UNIT HEATER DETAIL (GAS) NOT TO SCALEM5.0 10 SEPARATED - COMBUSTION UNIT HEATER PIPING DETAIL NOT TO SCALEM5.0 12 VACUUM VENT DETAIL NOT TO SCALEM5.0 14 VAV BOX DETAIL NOT TO SCALEM5.0 15 GENERAL INFRA-RED WIRING DIAGRAM NOT TO SCALEM5.0 17 SHEETMETAL TO DUCTSOX CONNECTION NOT TO SCALEM5.0 11 GAS-FIRED WATER HEATER DETAIL NOT TO SCALEM5.0 13 INFRARED HEATER BURNER DETAIL NOT TO SCALEM5.0 16 INFRARED HEATER SIDE SHIELD DETAIL NOT TO SCALEM5.0 18 DHU REFRIGERANT PIPING SCHEMATIC 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 08 RTU 160 MBH 3/4" 09 RTU 100 MBH 3/4" 4 WH 199 MBH 11 RTU 100 MBH 3/4" 10 RTU 60 MBH 02 DHU R: 539 MBH 3/4" 12 RTU 100 MBH 3/4" 01 DHU R: 569 MBH H: 1,000 MBH 3/4" 1 UH 75 MBH 3/4" 1 WH (2) 300 MBH 3/4" 03 ERV 210 MBH 3/4" 1" 04 ERV 292.5 MBH 3/4" 05 ERV 900 MBH 1" 06 ERV 432 MBH 1" (ADD ALTERNATE 2) 3/4" 02 ERV 210 MBH 3/4" 01 ERV 210 MBH 3/4" 01 RTU 600 MBH 1" 1" 01 IR 110 MBH 13 RTU 540 MBH 1" (ADD ALTERNATE 1) 02 RTU 292.5 MBH 3/4" 03 RTU 540 MBH 3/4" 04 RTU 1200 MBH 1-1/4" 05 RTU 540 MBH 3/4" 06 RTU 1200 MBH 1-1/4" 07 RTU 540 MBH 3/4" G GAS METER 5.0 PSI 13,500.5 MBH GAS COCK, TYP. WALL/ROOF PENETRATION, TYP. REGULATOR, TYP. UNION, TYP. GAS COCK, TYP. 1-1/2" 3" 3" 3/4" 3/4"1" 3/4"1"1"1-1/4"1-1/4"1-1/2"1-1/2"1-1/2" 1"3/4" 1-1/2" 1-1/4"1-1/4" 3/4" 1-1/4"1" 1"1" 2"1" 1"1-1/4"1-1/4"1-1/2"2"2"2" 2" 2-1/2" 2-1/2" 110 MBH 3/4" DFG-100 DBL 3/4" 02 IR 110 MBH 03 IR 110 MBH 04 IR 110 MBH 1 WH 300 MBH 3 WH 120 MBH 3/4"3/4"3/4"3/4" 3/4" 1"1" 08 IR 110 MBH 07 IR 110 MBH 06 IR 110 MBH 05 IR 110 MBH 3/4"3/4"3/4"3/4" 09 IR 110 MBH 3/4" 12 IR 110 MBH 13 IR 110 MBH 14 IR 110 MBH 3/4" 3/4" 3/4" 11 IR 110 MBH 10 IR 110 MBH 3/4" 3/4"22.5 MBH XX WH 199 MBH 3/4" 3/4" SF-7 1"3/4" 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 1/8" = 1'-0" MECHANICAL GAS RISER WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M5.1 10/13/2023 22-002 - NOT TO SCALEM5.1 1 GAS RISER 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET FIRST LETTER: MOUNTING D F L R S DUCT FLOOR LAY-IN T-BAR ROUND STYLE, SURFACE MOUNT OR EXPOSED SURFACE LETTER KEY SECOND LETTER: TYPE D F G J K DIFFUSER FILTER RETURN RETURN/TRANSFER GRILLE HEAVY DUTY DUPPLY REGISTER HEAVY DUTY RETURN REGISTER L P R S W X LINEAR LOW PROFILE SUPPLY LINEAR RETURN / EXHAUST REGISTER SUPPLY REGISTER WIDE SLOT LOW PROFILE RETURN LINEAR LEGEND WE NF F R ES DWGS BM 21 22 23 25 26 H2O WITH EQUIPMENT NON FUSED FUSED EXISTING TO BE REMOVED EQUIPMENT SUPPLIER SEE DRAWINGS BLDG. MANAGEMENT SYSTEM DIVISION 21 DIVISION 22 DIVISION 23 DIVISION 25 DIVISION 26 WATER 1. 2" MERV 8 PRE-FILTERS AND 4" MERV 13 FILTERS. 2. PVC DRAIN TRAP. 3. GFCI FIELD WIRED. 4. SMOKE DETECTORS IN THE SUPPLY AND RETURN. 5. FULL ECONOMIZER. 6. BAROMETRIC RELIEF. 7. INSULATED ROOF CURB. 8. STAINLESS STEEL HEAT EXCHANGER. 9. PROVIDE AIRFLOW MEASURING STATIONS IN THE OUTSIDE AIR INTAKE AND RETURN AIR SECTIONS OF THE UNIT. 1. 2" MERV 8 AND 4" MERV 13 FILTERS. 2. PVC DRAIN TRAP. 3. GFCI FIELD WIRED. 4. SMOKE DETECTORS IN THE SUPPLY AND RETURN. 5. FULL ECONOMIZER. 6. INSULATED ROOF CURB. 7. RECIRCULATION OPTION, SEE SPECIFICATIONS FOR CONTROLS. 8. UCW, 3 ANGSTROM ENERGY RECOVERY WHEEL. PROVIDE BYPASS DAMPER, FOR ECONOMIZER MODE. SENSIBLE EFFICIENCY=66.2%, LATENT EFFICIENCY=60%. 9. PROVIDE UNDER ALT. 1. 10. PROVIDE UNDER ALT. 2. BALANCE TO 2,000 CFM SA AND 200 CFM OA, W/O THE USE OF HEAT RECOVERY. BALANCE AND USE AS SCHEDULED UNDER ALT. 3. 1. 2" MERV 8 AND 4" MERV 13 FILTERS. 2. PVC DRAIN TRAP. 3. GFCI FIELD WIRED. 4. SMOKE DETECTORS IN THE SUPPLY AND RETURN. 5. INSULATED ROOF CURB. 6. UCW, 3 ANGSTROM ENERGY RECOVERY WHEEL. SENSIBLE EFFICIENCY=70.3%, LATENT EFFICIENCY=66%. 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 12" = 1'-0" MECHANICAL SCHEDULES WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M6.0 10/13/2023 22-002 - AIR CONDITIONING SCHEDULE TAG TAG # LOCATION SERVES MANUFACTURER MODEL SUPPLY (CFM) COOLING (MBH) DISCONNECT STARTER CONTROLS ELECTRICAL WEIGHT COMMENTS PROV. BY TYPE LOCATION FURN. BY INST. BY TYPE FURN. BY INST. BY WIRE BY DEVICE LOCATION WIRING REQUIREMENTS VOLTAGE PHASE MCA MOCP AC 1A ELEV EQ 153 ELEV EQ 153 MITSUBISHI PKA-A12LA 320 12.0 26 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 208 1 1 -- 28 PROVIDE HIGH LIFT CONDENSATE PUMP. AC 1B ROOF AC-1A MITSUBISHI PUZ-A12NKA7-BS -- 12.0 26 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 208 1 11 28 93 PROVIDE LOW AMBIENT WIND BAFFLES. AC 2A TRAINING 129 TRAINING 129 MITSUBISHI PKA-A12LA 320 12.0 26 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 208 1 1 -- 28 PROVIDE HIGH LIFT CONDENSATE PUMP. AC 2B ROOF AC-2A MITSUBISHI PUZ-A12NKA7-BS -- 12.0 26 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 208 1 11 28 93 PROVIDE LOW AMBIENT WIND BAFFLES. AC 3A ELECTRICAL 113 ELECTRICAL 113 MITSUBISHI PKA-A12LA 320 12.0 26 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 208 1 1 -- 28 PROVIDE HIGH LIFT CONDENSATE PUMP. AC 3B ROOF AC-3A MITSUBISHI PUZ-A12NKA7-BS -- 12.0 26 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 208 1 11 28 93 PROVIDE LOW AMBIENT WIND BAFFLES. AC 4A MECHANICAL 168 MECHANICAL 168 MITSUBISHI PKA-A12LA 320 12.0 26 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 208 1 1 -- 28 PROVIDE HIGH LIFT CONDENSATE PUMP. AC 4B ROOF AC-4A MITSUBISHI PUZ-A12NKA7-BS -- 12.0 26 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 208 1 11 28 93 PROVIDE LOW AMBIENT WIND BAFFLES. AC 5A ELECTRIC 157 ELECTRIC 157 MITSUBISHI PKA-A12LA 320 12.0 26 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 208 1 1 -- 28 PROVIDE HIGH LIFT CONDENSATE PUMP. AC 5B ROOF AC-5A MITSUBISHI PUZ-A12NKA7-BS -- 12.0 26 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 208 1 11 28 93 PROVIDE LOW AMBIENT WIND BAFFLES. AC 6A AV CLOSET 210 AV CLOSET 210 MITSUBISHI PKA-A12LA 320 12.0 26 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 208 1 1 --28 PROVIDE HIGH LIFT CONDENSATE PUMP. AC 6B ROOF AC-6A MITSUBISHI PUZ-A12NKA7-BS -- 12.0 26 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 208 1 11 28 93 PROVIDE LOW AMBIENT WIND BAFFLES. AC 7A IT 150 IT 150 SAMSUNG CNH304DB 749 48.0 26 NF AT UNIT WE INT. WE WE 25 25 BAS SEE PLANS 25 208 1 1 -- 47 PROVIDE HIGH LIFT CONDENSATE PUMP. AC 7B ROOF AC-7A SAMSUNG CXH48ADB -- 48.0 26 NF AT UNIT WE INT.WE 25 25 25 BAS SEE PLANS 25 208 1 33 40 196 PROVIDE LOW AMBIENT WIND BAFFLES. AIR TERMINAL SCHEDULE TAG MANUFACTURER MODEL DIFFUSER SIZE VOLUME CONTROL MOUNTING TYPE REMARKS DR TITUS 350FL SEE PLAN AG-15-11 DUCT ALUMINUM 35° FIXED FINS DS TITUS 300FL SEE PLAN AG-15-11 DUCT ALUMINUM DOUBLE DEFLECTION LD TITUS TMS 24"x24" AG-85 LAY-IN MOUNTING SIZE IS CEILING MODULE, STEEL, ADJUSTABLE THROW, DIFFUSER SIZE IS NECK SIZE LG TITUS 50F SEE PLAN NONE LAY-IN ALUMINUM FRAME AND CORE LP TITUS ML-39 4'-0"x3" INTEGRAL DUCT PLENUM SUPPLY LINEAR DIFFUSER, WITH LOW PROFILE FACTORY PLENUM RD TITUS TMR SEE PLAN AG-85 DUCT/SURFACE -- SG TITUS 300FL SEE PLAN NONE DUCT ALUMINUM DOUBLE DEFLECTION SR TITUS 350FL SEE PLAN AG-15-11 SURFACE ALUMINUM 35° FIXED FINS DEHUMIDIFICATION UNIT SCHEDULE - MECHANICAL TAG TAG # LOCATION SERVES MANUFACTURER MODEL SUPPLY FAN EXHAUST FAN COOLING HEATING DISCONNECT STARTER CONTROLS ELECTRICAL WEIGHT (UNIT+CURB)COMMENTSCFM ESP ("WG)HP CFM ESP ("WG)HP SENSIBLE (MBH) TOTAL (MBH) ECC LCC REFRIGERANT TYPE HEATING TYPE INPUT (MBH) OUTPUT (MBH) PROV. BY TYPE LOCATION FURN. BY INST. BY TYPE FURN. BY INST. BY WIRE BY CONTROL DEVICE LOCATION WIRING REQUIREMENTS VOLTAGE PHASE MCA MOCP SCCR (kA) DB (°F) WB (°F) DB (°F) WB (°F) DHU 01 ROOF MERCY/HEALTH ARENA 136 CDI MDH-160 12,000 1.5 25 12,000 0.5 (2) 7.5 645.2 645.2 102.7 61.5 49.9 38.4 R-410A NG 1,000.0 800.0 26 NF AT UNIT WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 65 70 10 18,000 1,2,3,4,5,6 DHU 02 ROOF MULTI-PURPOSE 154 CDI CDH-148 7,500 2.0 10 - - - - - - - - - - - - - 26 NF AT UNIT WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 30 45 10 10,000 1,2,3,4,5 VARIABLE AIR VOLUME SCHEDULE TAG TAG # LOCATION SERVES MANUFACTURER MODEL INLET SIZE PRIMARY FAN HEATING DISCONNECT STARTER CONTROLS ELECTRICAL WEIGHT COMMENTS MIN (CFM) MAX (CFM)CFM HP ESP ("WG)CFM HEATING TYPE CAPACITY TOTAL (kW) # OF STAGES LAT (°F) PROV. BY TYPE LOCATION FURN. BY INST. BY TYPE FURN. BY INST. BY WIRE BY DEVICE LOCATION WIRING REQUIREMENTS VOLTAGE PHASE MCA MOCP VAV 1-1 MEN 122 MEN 122 & FAMILY RR 120 TITUS DESV-08 8" 245 700 350 ELEC 4.5 SCR 98.8 23 NF AT UNIT - - 25 25 25 BAS SEE PLANS 25 277 1 20.3 25 VAV 1-3 WOMEN 121 WOMEN 121 TITUS DESV-08 8" 210 600 300 ELEC 3.5 SCR 95.1 23 NF AT UNIT - - 25 25 25 BAS SEE PLANS 25 277 1 15.8 20 VAV 1-4 WOMEN 121 ICE ARENA LOBBY 117 TITUS DTQS-05 14" 508 1450 1450 0.25 1/3 1450 ELEC 16 SCR 96.5 23 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 480 3 28.2 30 VAV 1-5 ICE ARENA LOBBY 117 VESTIBULE 118 TITUS DESV-08 8" 175 500 250 ELEC 3 SCR 96.1 23 NF AT UNIT - - 25 25 25 BAS SEE PLANS 25 277 1 13.5 15 VAV 1-6 ICE ARENA LOBBY 117 ICE ARENA LOBBY 117 TITUS DTQS-05 14" 420 1200 1200 0.25 1/3 1200 ELEC 13 SCR 95.8 23 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 480 3 23.7 25 VAV 1-7 ICE ARENA LOBBY 117 ICE ARENA LOBBY 117 TITUS DTQS-06 16" 700 2000 2000 0.25 3/4 2000 ELEC 22 SCR 96.4 23 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 480 3 39.8 40 VAV 1-8 FOOD PREP 115 (A) FOOD PREP 115 (A) TITUS DESV-14 14" 777 2220 1110 ELEC 13 SCR 95.2 23 NF AT UNIT - - 25 25 25 BAS SEE PLANS 25 480 3 19.5 20 VAV 1-9 MAIN LOBBY 101 MAIN LOBBY 101 TITUS DTQS-06 16" 658 1880 1880 0.25 3/4 1880 ELEC 20 SCR 95.2 23 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 480 3 36.8 40 VAV 1-10 OFFICE 111 MAIN LOBBY 101 TITUS DTQS-02 8" 200 570 570 0.25 0.17 570 ELEC 6 SCR 94.9 23 NF AT UNIT WE INT. WE 25 25 25 BAS SEE PLANS 25 277 1 28.7 30 VAV 1-11 CHECK-IN / RENTAL 107 VESTIBULE 100 TITUS DESV-10 10" 350 1000 500 ELEC 6 SCR 96.1 23 NF AT UNIT - - 25 25 25 BAS SEE PLANS 25 277 1 27.1 30 VAV 1-12 SKATE RENTAL 108 OFFICES & SKATE RENTAL TITUS DESV-12 12" 415 1180 590 ELEC 7 SCR 95.7 23 NF AT UNIT - - 25 25 25 BAS SEE PLANS 25 277 1 31.6 35 VAV 1-13 TOILETS 106 TOILETS 106 TITUS DESV-06 6" 90 250 125 ELEC 1.5 SCR 96.1 23 NF AT UNIT - - 25 25 25 BAS SEE PLANS 25 277 1 6.8 15 VAV 1-14 MAIN LOBBY 101 MAIN LOBBY 101 TITUS DTQS-06 16" 745 2120 2120 0.25 3/4 2120 ELEC 23 SCR 95.9 23 NF AT UNIT WE INT.WE 25 25 25 BAS SEE PLANS 25 480 3 41.3 45 VAV 1-15 MEETING ROOM (B) 103 STORAGE 104 & FIRST AID 105 TITUS DESV-06 6" 90 250 120 ELEC 1.5 SCR 97.7 23 NF AT UNIT -- 25 25 25 BAS SEE PLANS 25 277 1 6.8 15 VAV 1-16 MEETING ROOM (B) 103 MEETING ROOM (B) 103 TITUS DESV-10 10" 245 700 350 ELEC 4.5 SCR 98.8 23 NF AT UNIT - - 25 25 25 BAS SEE PLANS 25 277 1 20.3 25 VAV 1-17 MEETING ROOM (A) 102 MEETING ROOM (A) 102 TITUS DESV-10 10" 350 1000 500 ELEC 6 SCR 96.1 23 NF AT UNIT - - 25 25 25 BAS SEE PLANS 25 277 1 27.1 30 ROOFTOP UNIT SCHEDULE TAG TAG #LOCATION SERVES MANUFACTURER MODEL SUPPLY FAN HEATING COOLING OUTSIDE AIR (CFM) DISCONNECT STARTER CONTROLS VOLTAGE ELECTRICAL WEIGHT (UNIT+CURB LB)COMMENTS SUPPLY (CFM) ESP ("WG)HP HEATING TYPE EAT DB (°F)LAT DB (°F) FUEL INPUT (MBH) FUEL OUTPUT (MBH) EAC DB (°F) EAC WB (°F) LAC DB (°F) LAC WB (°F) CAPACITY SENSIBLE (MBH) CAPACITY TOTAL (MBH) REFRIGERANT TYPE HOT GAS REHEAT (°F) PROV. BY TYPE FURN. BY INST. BY TYPE FURN. BY INST. BY WIRE BY DEVICE LOCATION WIRING REQUIREMENTS PHASE MCA MOCP SCCR (kA) RTU 01 ROOF MAIN LOBBY 101 AAON RNA-040 16,000 1.5 (2) 20 NG 52.8 80.4 600 480 78.0 65.4 55.4 55.0 384.1 490.5 R-410A 90.8 3,200 26 NF WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 134 150 10 6,800 1,2,3,4,5,6,7,8,9 RTU 02 ROOF LOBBY / LINK 155 AAON RN-011 3,500 1.5 3 NG 40.5 102.5 292.5 234 80.1 67.7 55.0 54.8 93.3 135.3 R-410A 97.2 1,200 26 NF WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 26 30 10 2,300 1,2,3,4,5,6,7,8 RTU 08 ROOF WARMING ROOM 159 AAON RQ-006 1,225 1.5 2 NG 7 104.6 160 129.6 86.0 73.5 54.9 54.6 39.8 72.6 R-410A 122.2 120 / 900 26 NF WE INT. VFD WE WE 25 BAS SEE PLANS 25 480 3 21 30 10 1,300 1,2,3,4,5,6,7,8 RTU 09 ROOF STORAGE 160 AAON RQ-004 1,140 1.5 2 NG 61.3 127.2 100 81 76.5 63.8 48.5 48.2 34.0 48.0 R-410A 95.4 115 26 NF WE INT.VFD WE 25 25 BAS SEE PLANS 25 480 3 18 25 10 1,300 1,2,3,4,5,6,7 RTU 10 ROOF MALL CONNECTION 164 AAON RQ-002 600 1.5 1 NG 61.4 136.5 60 48.6 76.5 63.7 50.6 49.8 16.5 23.2 R-410A 93.7 60 26 NF WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 12 15 10 1,200 1,2,3,4,5,6,7 RTU 11 ROOF STORAGE 167-2 AAON RQ-004 1,670 1.5 2 NG 61.3 106.2 100 81 76.5 63.8 53.5 52.8 41.1 51.7 R-410A 87.5 170 26 NF WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 18 25 10 1,300 1,2,3,4,5,6,7 RTU 12 ROOF RESURFACER ROOM 170 AAON RQ-004 1,085 1.5 2 NG 61.3 130.5 100 81 76.5 63.8 47.9 47.6 33.1 47.8 R-410A 96.7 110 26 NF WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 18 25 10 1,300 1,2,3,4,5,6,7 FAN SCHEDULE TAG TAG # DESCRIPTION LOCATION MANUFACTURER MODEL AIRFLOW (CFM) FAN ESP ("WG)TYPE FAN DRIVE DAMPER FAN RPM DISCONNECT STARTER CONTROL FAN MOTOR HP ELECTRICAL WEIGHT (LB) COMMENTS PROV. BY TYPE FURN. BY INST. BY TYPE FURN. BY INST. BY WIRE BY DEVICE LOCATION CONTROL WIRING REQUIREME NTS VOLTAGE PHASE MOCP F 01 TOILET EXHAUST ROOF GREENHECK G-090-VG 525 0.5 PRV DIRECT MOTORIZED 1,634 26 NF WE INT. WE 25 25 25 BAS SEE PLANS 25 1/10 120 1 80 (UNIT+CURB) PROVIDE SPEED CONTROLLER, INSULATED CURB F 02 CONCESSIONS EXHAUST ROOF GREENHECK CUE-120-VG 1,000 0.75 UB-PRV DIRECT MOTORIZED 1,304 26 NF WE INT. WE 25 25 25 BAS SEE PLANS 25 1/4 120 1 100 (UNIT+CURB) PROVIDE SPEED CONTROLLER, INSULATED CURB F 03 TOILET EXHAUST ROOF GREENHECK G-180-VG 3,025 0.5 PRV DIRECT MOTORIZED 939 26 NF WE INT. VFD 25 25 25 BAS SEE PLANS 25 1 480 3 100 (UNIT+CURB) PROVIDE SPEED CONTROLLER, INSULATED CURB F 04 TOILET EXHAUST ROOF GREENHECK G-120-VG 1,600 0.5 PRV DIRECT MOTORIZED 1,536 26 NF WE INT. WE 25 25 25 BAS SEE PLANS 25 1/2 120 1 100 (UNIT+CURB) PROVIDE SPEED CONTROLLER, INSULATED CURB F 05 REFRIG. RM. VENT. ROOF GREENHECK G-090-VG 500 0.5 PRV DIRECT MOTORIZED 1,601 26 NF WE INT. WE 25 25 25 BAS SEE PLANS 25 1/10 120 1 80 (UNIT+CURB) PROVIDE SPEED CONTROLLER, INSULATED CURB F 06 REFRIG. RM. EM. EXH. ROOF GREENHECK USF-22 7,215 0.5 UTIL DIRECT MOTORIZED 1,150 26 NF WE INT. VFD 25 25 25 BAS SEE PLANS 25 5 480 3 650 F 07 TRANSFER FAN ELECTRICAL 134 GREENHECK SQ-95-VG 600 0.5 INLINE DIRECT BACKDRAFT AT UNIT DIV. 26 NON-FUSED WE INTEGRAL WE WE WE 25 BMS SEE PLANS 25 1/6 120 1 50 PROVIDE SPEED CONTROLLER F 08 TRANSFER FAN METER RISER 179 GREENHECK SQ-95-VG 600 0.5 INLINE DIRECT BACKDRAFT AT UNIT DIV. 26 NON-FUSED WE INTEGRAL WE WE WE 25 BMS SEE PLANS 25 1/6 120 1 50 PROVIDE SPEED CONTROLLER F 09 HOOD FAN ROOF GREENHECK CUE-100HP-VG 900 1.0 UB-PRV DIRECT MOTORIZED 2,500 26 NF WE INT. WE 25 25 25 BAS SEE PLANS 25 1/2 480 3 80 (UNIT+CURB) PROVIDE SPEED CONTROLLER, INSULATED CURB ENERGY RECOVERY UNIT SCHEDULE TAG TAG # LOCATION SERVES MANUFACTURER MODEL SUPPLY EXHAUST FAN HEATING COOLING DISCONNECT STARTER CONTROLS ELECTRICAL WEIGHT (UNIT+C URB LB)COMMENTS SUPPLY FAN SUMMER WINTER OAT DB (°F) SUMMER WINTER POST EXCH. DB (°F) SUMMER WINTER LAT DB (°F) EXHAUST (CFM) ESP ("WG)HP HEATING TYPE FUEL INPUT (MBH) FUEL OUTPUT (MBH) CAPACITY SENSIBLE (BTUH) CAPACITY TOTAL (BTUH) REFRIGERA NT TYPE HOT GAS REHEAT (°F) PROV. BY TYPE LOCATION FURN. BY INST. BY TYPE FURN. BY INST. BY WIRE BY CONTROL DEVICE LOCATION WIRING REQUIREMENTS VOLTAGE PHASE MCA MOCP SCCR (kA) SUPPLY (CFM) ESP ("WG)HP OAT DB (°F) OAT WB (°F) POST EXCH. DB (°F) POST EXCH. WB (°F) COIL LAT DB (°) COIL LAT WB (°F) RTU 03 ROOF MULT-USE 156 AAON RN-016 9,000 3.0 20 90.0 77.0 -16.0 77.6 65.4 51.9 52.2 52.0 96.4 3,080 1.5 10 NG 540.0 432.0 345.4 467.9 R-410A 96.0 26 NF AT UNIT WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 105 125 10 4,200 1,2,3,4,5,6,7,8 RTU 04 ROOF MULTI-PURPOSE 154 AAON RN-020 13,040 3.0 20 90.0 77.0 -16.0 76.5 63.9 60.5 51.4 51.1 128.3 5,330 1.5 15 NG 1,200.0 960.0 460.2 667.0 R-410A 92.5 26 NF AT UNIT WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 129 150 10 8,500 1,2,3,4,5,6,7,8 RTU 05 ROOF MULT-USE 156 AAON RN-016 9,000 3.0 20 90.0 77.0 -16.0 77.6 65.4 51.9 52.2 52.0 96.4 3,080 1.5 10 NG 540.0 432.0 345.4 467.9 R-410A 96.0 26 NF AT UNIT WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 105 125 10 4,200 1,2,3,4,5,6,7,8 RTU 06 ROOF MULTI-PURPOSE 154 AAON RN-020 13,040 3.0 20 90.0 77.0 -16.0 76.5 63.9 60.5 51.4 51.1 128.3 5,330 1.5 15 NG 1,200.0 960.0 460.2 667.0 R-410A 92.5 26 NF AT UNIT WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 129 150 10 8,500 1,2,3,4,5,6,7,8 RTU 07 ROOF MULT-USE 156 AAON RN-016 9,000 3.0 20 90.0 77.0 -16.0 77.6 65.4 51.9 52.2 52.0 96.4 3,080 1.5 10 NG 540.0 432.0 345.4 467.9 R-410A 96.0 26 NF AT UNIT WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 105 125 10 4,200 1,2,3,4,5,6,7,8 RTU 13 ROOF EXPANDED MULTIPURPOSE 186 AAON RN-016 9,000 3.0 20 90.0 77.0 -16.0 77.6 65.4 51.9 52.2 52.0 96.4 3,080 1.5 10 NG 540.0 432.0 345.4 467.9 R-410A 96.0 26 NF AT UNIT WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 105 150 10 4,200 1,2,3,4,5,6,7,8,9 (ADD ALTERNATE #1) ERV 01 ROOF WET TEAM RMS 1,2 AAON RN-008 1,700 1.5 3 90.0 77.0 -16.0 79.7 67.6 41.3 48.2 48.1 132.9 1,700 1.5 2 NG 210.0 168.0 56.5 93.0 R-410A 110.5 26 NF AT UNIT WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 27 40 10 2,000 1,2,3,4,5,6,7,8 ERV 02 ROOF TEAM RMS 1,2,3 AAON RN-008 1,900 1.5 3 90.0 77.0 -16.0 80.1 68.0 39.0 50.6 50.4 121.0 1,900 1.5 2 NG 210.0 168.0 59.6 96.7 R-410A 108.3 26 NF AT UNIT WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 27 40 10 2,000 1,2,3,4,5,6,7,8 ERV 03 ROOF WET TEAM RMS 3,4 & TEAM RMS 4,5 AAON RN-008 2,045 1.5 3 90.0 77.0 -16.0 80.2 68.2 36.7 51.8 51.7 112.8 2,045 1.5 2 NG 210.0 168.0 61.5 98.2 R-410A 106.2 26 NF AT UNIT WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 27 40 10 2,000 1,2,3,4,5,6,7,8 ERV 04 ROOF MAIN TEAM ROOM AAON RN-013 2,500 1.5 3 90.0 77.0 -16.0 80.4 68.7 38.4 47.5 47.4 125.1 2,500 1.5 2 NG 292.5 234.0 86.9 150.6 R-410A 81.4 26 NF AT UNIT WE INT. VFD WE 25 25 BAS SEE PLANS 25 480 3 38 45 10 3,000 1,2,3,4,5,6,7,8 ERV 05 ROOF MERCY/HEALTH ARENA 136 AAON RNA-026 7,425 1.5 7.5 90.0 77.0 -16.0 60.3 55.5 34.2 40.4 40.4 123.6 7,425 1.5 3 (2) NG 900.0 720.0 162.7 271.8 R-410A 81.9 26 NF AT UNIT WE INT.VFD WE 25 25 BAS SEE PLANS 25 480 3 82 100 10 7,800 1,2,3,4,5,6,7,8 ERV 06 ROOF LOCKER CORE & SHELL/ADD ALT TEAM RMS AAON RN-020 5,025 1.5 7.5 90.0 77.0 -16.0 79.9 68.3 40.7 51.8 51.8 120.4 5,025 1.5 7.5 NG 540.0 432.0 149.2 243.5 R-410A 106.2 26 NF AT UNIT WE INT. VFD WE WE 25 BAS SEE PLANS 25 480 3 63 70 10 3,800 1,2,3,4,5,6,7,8,10 (ADD ALTERNATE #2) DEHUMIDIFICATION UNIT SCHEDULE - WHEEL AND ENERGY RECOVERY TAG TAG #SUPPLY (CFM) OA CONDITIONS (DB °F/GR PER LB) SPACE CONDITIONS (DB °F/GR PER LB) FALL PROCESS (BASIS OF DESIGN) ENERGY RECOVERY WHEEL (FALL) REACTIVATION COMMENTS 20% OA 100% OA SUMMER ENTERING CONDITIONS (DB°F/GR PER LB) SUMMER LEAVING CONDITIONS (DB°F/GR PER LB) SENSIBLE (MBH) TOTAL (MBH)CFM HEATING CAPACITY (MBH) LEAVING CONDITIONS (DB °F/GR PER LB)CFM MOISTURE REMOVAL (LBS/HR)CFM MOISTURE REMOVAL (LBS/HR) DHU 01 12,000 89.8/111.8 50/30 2,400 154.0 12,000 293.3 89.8/111.8 61.4/53.9 369.6 865.2 3,240 569.0 149.5/290.2 1,2,3,4,5,6 DHU 02 7,500 89.8/111.8 50/30 1,500 152.0 7,500 232.0 - - - - 2,025 539.0 142.8/260.7 1,2,3,4,5 1 1 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 9100 49th Avenue N. MINNEAPOLIS, MN 55428 Tel: (763) 367-7600 Fax: (763) 367-7601 MICHAEL D. WOEHRLE, P.E.wPROFES SIONA L E N GINEERE-41050-6 MICHAEL DAVID WOEHRLE MINNEAPOLIS MNISCONSIN Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: EXPIRES 07/31/2024 MECHANICAL SCHEDULES WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 M6.1 10/13/2023 22-002 - CONDENSING UNIT SCHEDULE TAG TAG #LOCATION SERVES MANUFACTURER MODEL AMBIENT (°F) COOLING DISCONNECT STARTER CONTROLS ELECTRICAL WEIGHT COMMENTS CAPACITY (MBH) REFRIGERANT TYPE SUCTION TEMPERATURE (°F) PROV. BY TYPE LOCATION FURN . BY INST. BY TYPE FURN . BY INST . BY DEVICE WIRE BY LOCATION WIRING REQUIREMENTS VOLTAGE PHASE MCA MOCP CU 01 ROOF DHU-01 DAIKIN APPLIED RCS-080D 105 645.2 R-410A 40 26 NF AT UNIT WE INT. WE WE WE BAS 25 SEE PLANS 25 480 3 133.9 150 3,600 (2) CIRCUITS WITH HOT GAS ON BOTH CIRCUITS INFRARED HEATER (GAS-FIRED) SCHEDULE TAG TAG #LOCATION MANUFACTURER MODEL SUPPLY FAN MOTOR HP HEATING MOUNTING HEIGHT FLUE DISCONNECT STARTER CONTROLS ELECTRICAL WEIGHT COMMENTSTYPE FUEL INPUT (MBH) PROV. BY TYPE AMP/PHASE LOCATION FURN . BY INST. BY TYPE FURN . BY INST . BY DEVICE WIRE BY LOCATION WIRING REQUIREMENTS VOLTAGE PHASE MCA MOCP PANEL CIRCUIT CONDUIT AND WIRE SIZE CONN. TYPE IR 01 MULTI-PURPOSE AREA SEATING ROBERTS GORDON CRV-B-12 -- NG 110 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 20/1 REC. AT UNIT WE WE -- 25 25 SENSOR 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) IR 02 MULTI-PURPOSE AREA SEATING ROBERTS GORDON CRV-B-12 -- NG 110 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 20/1 REC. AT UNIT WE WE -- 25 25 SENSOR 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) IR 03 MULTI-PURPOSE AREA SEATING ROBERTS GORDON CRV-B-12 -- NG 110 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 20/1 REC. AT UNIT WE WE -- 25 25 SENSOR 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) IR 04 MULTI-PURPOSE AREA SEATING ROBERTS GORDON CRV-B-12 -- NG 110 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 20/1 REC. AT UNIT WE WE -- 25 25 SENSOR 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) IR 05 MERCYHEALTH ARENA SEATING ROBERTS GORDON CRV-B-12 -- NG 110 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 20/1 REC. AT UNIT WE WE -- 25 25 SENSOR 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) IR 06 MERCYHEALTH ARENA SEATING ROBERTS GORDON CRV-B-12 -- NG 110 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 20/1 REC. AT UNIT WE WE -- 25 25 SENSOR 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) IR 07 MERCYHEALTH ARENA SEATING ROBERTS GORDON CRV-B-12 -- NG 110 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 20/1 REC. AT UNIT WE WE -- 25 25 SENSOR 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) IR 08 MERCYHEALTH ARENA SEATING ROBERTS GORDON CRV-B-12 -- NG 110 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 20/1 REC. AT UNIT WE WE -- 25 25 SENSOR 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) IR 09 MERCYHEALTH ARENA SEATING ROBERTS GORDON CRV-B-12 -- NG 110 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 20/1 REC. AT UNIT WE WE -- 25 25 SENSOR 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) IR 10 MERCYHEALTH ARENA SEATING ROBERTS GORDON CRV-B-12 -- NG 110 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 20/1 REC. AT UNIT WE WE -- 25 25 SENSOR 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) IR 11 MERCYHEALTH ARENA SEATING ROBERTS GORDON CRV-B-12 -- NG 110 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 20/1 REC. AT UNIT WE WE -- 25 25 SENSOR 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) IR 12 MERCYHEALTH ARENA SEATING ROBERTS GORDON CRV-B-12 -- NG 110 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 20/1 REC. AT UNIT WE WE -- 25 25 SENSOR 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) IR 13 MERCYHEALTH ARENA SEATING ROBERTS GORDON CRV-B-12 -- NG 110 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 20/1 REC. AT UNIT WE WE -- 25 25 SENSOR 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) IR 14 MERCYHEALTH ARENA SEATING ROBERTS GORDON CRV-B-12 -- NG 110 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 20/1 REC. AT UNIT WE WE -- 25 25 SENSOR 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) VP 01 MULTI-PURPOSE AREA SEATING ROBERTS GORDON VACUUM PUMP 3/4 -- -- 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 30/1 REC. AT UNIT WE WE CONTROL PANEL 23 25 CONTROL PANEL 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) PLUS BLOWER FAN MOTOR VP 02 MERCYHEALTH ARENA SEATING ROBERTS GORDON VACUUM PUMP 3/4 -- -- 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 30/1 REC. AT UNIT WE WE CONTROL PANEL 23 25 CONTROL PANEL 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) PLUS BLOWER FAN MOTOR VP 03 MERCYHEALTH ARENA SEATING ROBERTS GORDON VACUUM PUMP 3/4 -- -- 24' - 0" CATEGORY III DIV. 26 RECEPTACLE 30/1 REC. AT UNIT WE WE CONTROL PANEL 23 25 CONTROL PANEL 25 SEE PLANS 25 120 1 -- -- -- -- -- -- -- IR CONTROL PANEL (0.3A) PLUS BLOWER FAN MOTOR UNIT HEATER SCHEDULE TAG TAG # LOCATION MANUFACTURER MODEL SUPPLY FAN HEATING DISCONNECT STARTER CONTROLS ELECTRICAL WEIGHT COMMENTS SUPPLY (CFM)HP TYPE FUEL INPUT (MBH) FUEL OUTPUT (MBH) PROV. BY TYPE LOCATION FURN. BY INST. BY TYPE FURN. BY INST. BY CONTROL DEVICE WIRE BY LOCATION WIRING REQUIREMENTS VOLTAGE PHASE FLA MOCP UH 1 REFRIGERATION ROOM REZNOR UDZ-75 961 0.06 NG 75 62.3 26 NF AT UNIT WE INT. WE WE 25 BAS 25 SEE PLANS 25 120 1 3.7 15 77 SEPARATED COMBUSTION UNIT. ELECTRIC UNIT HEATER SCHEDULE TAG TAG # LOCATION MANUFACTURER MODEL HEATING DISCONNECT STARTER CONTROLS ELECTRICAL WEIGHT COMMENTSTYPE INPUT (kW) PROV. BY TYPE FURN. BY INST. BY TYPE FURN. BY INST. BY CONTROL DEVICE WIRE BY LOCATION WIRING REQUIREMENTS VOLTAGE PHASE FLA EUH 01 VESTIBULE 118 RAYWALL AFA840D-3 ELEC 4 26 NON-FUSED WE INT. WE WE WE BAS 25 SEE PLANS 25 208 3 11.11 30 EUH 02 VESTIBULE 100 RAYWALL AFA840D-3 ELEC 4 26 NON-FUSED WE INT. WE WE WE BAS 25 SEE PLANS 25 208 3 11.11 30 EUH 03 VESTIBULE 100 RAYWALL AFA840D-3 ELEC 4 26 NON-FUSED WE INT. WE WE WE BAS 25 SEE PLANS 25 208 3 11.11 30 EUH 04 WET TEAM RR 124 KING WSC-1215-T-B ELEC 1.5 26 NON-FUSED WE INT. WE WE WE BAS 25 SEE PLANS 25 120 1 12.5 10 EUH 05 WET TEAM RR 139 KING WSC-1215-T-B ELEC 1.5 26 NON-FUSED WE INT. WE WE WE BAS 25 SEE PLANS 25 120 1 12.5 10 EUH 06 VESTIBULE 171 RAYWALL AFA840D-3 ELEC 4 26 NON-FUSED WE INT. WE WE WE BAS 25 SEE PLANS 25 208 3 11.11 30 EUH 07 METER RISER 179 RAYWALL AFA840D-3 ELEC 4 26 NON-FUSED WE INT. WE WE WE BAS 25 SEE PLANS 25 208 3 11.11 30 EUH 08 ELECTRICAL 134 RAYWALL AFA840D-3 ELEC 4 26 NON-FUSED WE INT. WE WE WE BAS 25 SEE PLANS 25 208 3 11.11 30 1 08/03/2023 PERMIT REVIEW SET 10/04/2023 BID SET DOCUMENTS 1 10/13/2023 PLAN REVIEW RESUBMITTAL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET WP WEATHERPROOF HW HV AIR CONDITIONING CONTRACTOR HEAVYWALL HVAC GYP HOA GRC HP FLUOR GFI FIXT G.C. EXP ER EXR ENT EX F FLUORESCENT HEATING, VENTILATING, AND GROUND FAULT INTERRUPTING HAND-OFF-AUTO SELECTOR SWITCH GENERAL CONTRACTOR GALVANIZED RIGID CONDUIT GYPSUM BOARD HORSEPOWER ELECTRICAL NON-METALLIC TUBING EXISTING TO BE REMOVED EXISTING IN NEW LOCATION EXISTING TO REMAIN EXPOSED FIXTURE FURNISHED LTG LIGHTING MAIN LUGS ONLY MANUAL STARTER MAIN SWITCHBOARD MAGNETIC STARTER MECHANICAL CONTRACTOR MSB MTD MLO MAN MAG MC MOUNTED INSTALLED INTEGRAL TO UNIT LAY-IN GRID TRANSFORMER LOC IU KW LIG I LOCATION KILOWATT XFMR ABBREVIATIONS DNLT DISC ELEV EWC EMT E.C CLG CKT DN CS CAB CB CONC D C DISCONNECT SWITCH ELECTRICAL METALLIC TUBING DISCONNECT SWITCH ELECTRIC WATER COOLER ELECTRICAL CONTRACTOR DOWN LIGHT ELEVATION DOWN MOUNTED 6" ABOVE COUNTER CIRCUIT BREAKER COMBINATION STARTER/DISC. SWITCH CEILING CABINET CIRCUIT CONCRETE ARCH BKR BFG AR AFF AFG AF A/E B AMP FUSE ABOVE FINISHED FLOOR BELOW FINAL GRADE ABOVE FINAL GRADE AS REQUIRED ARCHITECT BREAKER JUNCTION BOX ARCHITECT/ENGINEER PNL PANEL TEMPERATURE CONTROL CONTRACTOR TIME CLOCK UNIT MANUFACTURER W VER TCC TC TYP TYPICAL WIRED VERIFY UM SWITCH STATION SUSPENDED PUSH-BUTTON RECEPTACLE SW R SS SUSP REC SURF PB SWITCH SURFACE RECESSED PLUMBING CONTRACTOR ON CENTER PHOTOCELL ON UNITOU OC PEND PENDANT PLBG PC P POLE O OTHERS NEAR UNIT NOT IN CONTRACT NU NIC OVER RIDE SWITCHORS CONTROL PANELCP AMP SWITCHAS AVAILABLE FAULT CURRENTAFC VARIABLE FREQUENCY DRIVEVFD CANDELAcd MAIN CIRCUIT BREAKERMCB COMB COMBINATION STARTER W/DISCONNECT SWITCH 1. CIRCUITS INDICATED ARE INTENDED TO DENOTE WHICH DEVICES/FIXTURES ARE TO BE WIRED TO A COMMON CIRCUIT BREAKER, AND NOT ITS POSITION IN THE PANEL. REBALANCE LOADS BETWEEN PHASES (MAX. 7.5%) UPON COMPLETION OF WIRING. 2. BRANCH CIRCUITS FOR RECEPTACLES MOUNTED ON ROOF TOP EQUIPMENT MAY BE ROUTED UP THROUGH UNIT CURB OR UNIT ITSELF IF RECOMMENDED BY ROOF TOP EQUIPMENT MANUFACTURER. 3. NEW EXIT LIGHTS SHALL BE WIRED TO THE NEAREST AVAILABLE UNSWITCHED LIGHTING CIRCUIT SERVING THE AREA THAT EXIT LIGHT IS INSTALLED. 4. ELECTRICAL RACEWAYS SHALL BE CONCEALED IN CEILING CAVITY OR IN WALLS WHERE POSSIBLE, OTHERWISE RACEWAY SHALL BE EXPOSED WIREMOLD TYPE, 200, 500 OR 700 AS NECESSARY TO ACCOMMODATE WIRES. 5. ELECTRICAL RACEWAYS SHALL BE CONCEALED IN CEILING CAVITY OR IN WALLS. EXPOSED RACEWAYS ARE NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED AND/OR APPROVED BY A/E. 6. EXACT LOCATION OF SPECIAL PURPOSE OUTLETS SHALL BE VERIFIED IN FIELD. VERIFY SPECIFIC WIRING REQUIREMENTS WITH VENDORS' DRAWINGS/INSTRUCTION, COORDINATING ELECTRICAL WORK WITH WORK OF VENDOR AND OTHER TRADES. 7. INCLUDE FISH WIRE IN ALL NON-POWER CONDUITS. 8. VERIFY EXACT LOCATION OF LIGHTING FIXTURES IN THE FIELD TO AVOID CONFLICT WITH MECHANICAL EQUIPMENT, DUCT WORK, AND PIPES. 9. PAINT ALL EXPOSED CONDUIT TO MATCH ADJACENT AREAS WHEN THE CONDUIT IS IN A FINISHED AREA. 10. FIRE AND/OR SMOKE RATINGS OF WALLS, FLOORS AND CEILINGS SHALL BE MAINTAINED. IF THE INTEGRITY IS SACRIFICED THEN THE BARRIER SHALL BE REPAIRED TO ITS ORIGINAL RATING. ALL PENETRATIONS SHALL BE PROPERLY SEALED. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING AND AIMING ALL FIXTURES TO THE OPTIMUM DISTRIBUTION AND OWNER'S SATISFACTION. 12. COORDINATE CABLE TYPES AND INSTALLATIONS FOR WORK ABOVE CEILING WITH HVAC FOR PLENUM VS. NON-PLENUM RATING OF CEILING SPACE. INSTALLATION SHALL FOLLOW GUIDELINES FOR RATINGS OF CEILING CAVITY. 13. VERIFY LOCATION OF MARKER BOARDS, TACK BOARDS, ARTWORK, SIGNS AND ANY OTHER WALL MOUNTED ITEMS PRIOR TO ROUGH-IN OF FIRE ALARM DEVICES AND ANY OTHER WALL MOUNTED DEVICE. DO NOT ROUGH IN BEHIND BOARDS. 14. ALL SPEAKERS, LIGHTS FIXTURES, FIRE ALARM DEVICES, CLOCKS AND SIMILAR DEVICES IN GYM AREA SHALL HAVE WIRE GUARDS OR SHIELDING TO PROTECT THE EQUIPMENT FROM DAMAGE. 15. WHEN THE KITCHEN HOOD FIRE SUPPRESSION SYSTEM IS ACTIVATED, ALL ELECTRICAL SOURCES SERVING COOKING APPLIANCES AND EQUIPMENT ASSOCIATED WITH THE HOODS SHALL BE AUTOMATICALLY DEACTIVATED VIA A SHUNT TRIP CIRCUIT BREAKER INTERCONNECTED TO THE HOOD FIRE SUPPRESSION SYSTEM SHUTDOWN CIRCUIT. THE HOOD EXHAUST FAN SHALL REMAIN IN OPERATION UNLESS NOTED OTHERWISE. 16. SEE MECHANICAL/ELECTRICAL SHEETS FOR ELECTRICAL INFORMATION OF HVAC EQUIPMENT INDICATED ON DRAWINGS. 17. JUNCTION BOXES INSTALLED IN EXTERIOR WALLS SHALL NOT PENETRATE THE VAPOR BARRIER. IF THE INTEGRITY IS SACRIFICED THEN THE BARRIER SHALL BE REPAIRED TO ORIGINAL RATING. 18. RECEPTACLE LOCATED IN AREAS OF CHILDREN SHALL BE TAMPER TYPE. 19. PLASTIC TIE WRAPS SHALL NOT BE USED TO SUPPORT ANY RACEWAYS OR OPEN AIR WIRING. 20. FIRE ALARM DEVICES MAY BE SHOWN OFF CENTERED SO THAT ROOM NAMES AND NUMBERS ARE VISIBLE. CONTRACTOR SHALL CENTER THESE DEVICES IN THE ROOMS ACCORDINGLY. GENERAL NEW CONSTRUCTION NOTES: ELECTRICAL DISTRIBUTION PANEL - NEW DUCT SMOKE DETECTOR. DOOR HOLD OPEN DEVICE. FIRE ALARM CONTROL PANEL (FACP). FIRE ALARM REMOTE ANNUNCIATOR. FIRE ALARM SYSTEM AUTOMATIC TRANSFER SWITCH CURRENT TRANSFORMER. AMPS, POLES. -MOUNTED 48" AFF. -MOUNTED 6" ABOVE COUNTER.LOCAL SWITCH, SINGLE POLE, WITH DUPLEX RECEPTACLE DUAL TECHNOLOGY CEILING MOUNTED OCCUPANCY SENSOR DUAL TECHNOLOGY OCCUPANCY SENSOR SWITCH - MOUNTED 48" AFF WALLBOX DIMMER - MOUNTED 48" AFF LOCAL SWITCH, SINGLE POLE, WITH DUPLEX RECEPTACLE CIRCUIT BREAKER AMPS, POLES. SMOKE DAMPER. TAMPER SWITCH. FLOW SWITCH. SMOKE DETECTOR. HEAT DETECTOR. LED POLE MOUNTED LIGHT FIXTURE - SIDE ARM LED CEILING SURFACE/PENDANT MOUNTED LIGHTING FIXTURE EXIT SIGN EMERGENCY LIGHT LED WALL MOUNTED FIXTURE LED TROFFER LIGHTING NEUTRAL AND PHASE WIRES. BRANCH CIRCUIT - SEPARATE CONTROL, INCLUDES GREEN GROUND WIRE, NEUTRAL AND PHASE WIRES. BRANCH CIRCUIT - COMMON CONTROL, INCLUDES GREEN GROUND WIRE, CIRCUIT DESIGNATIONS QUADRUPLEX RECEPTACLE - TWO DUPLEX RECEPTACLES UNDER A COMMON DUPLEX RECEPTACLE - TAMPER PROOF "CHILDSAFE" TYPE. DUPLEX RECEPTACLE - GROUND FAULT CIRCUIT INTERRUPTER TYPE. SWITCH - FUSED SWITCH - NON FUSED. DISCONNECT SWITCH - FUSIBLE. DISCONNECT SWITCH. SPECIAL PURPOSE OUTLET - SEE SCHEDULE. DUPLEX RECEPTACLE - MOUNTED IN FLOOR. (FLUSH UNLESS OTHERWISE INDICATED) AMPS, POLES. COVERPLATE. DUPLEX RECEPTACLE - MOUNTED VERTICALLY DUPLEX RECEPTACLE - MOUNTED 18" AFF. POWER & DIAGRAMS 4" ABOVE BACKSPLASH. 6" ABOVE COUNTER OR HORIZONTALLY GROUND GENERATOR. METER. INDICATES SHEET NUMBER INDICATES SHEET NUMBER INDICATES NOTE NUMBER SEE NOTE MISCELLANEOUS SYMBOLS INDICATES DETAIL NUMBER SEE DETAIL LED POLE MOUNTED LIGHT FIXTURE - POST TOP NIGHT LIGHT MONITOR MODULE CONTROL MODULE DEMAND METER. HEAT DETECTOR ELEVATOR SHUT DOWN SMOKE DETECTOR ELEVATOR RECALL. MANUAL PULL STATION WITH AUDIO/VISUAL SIGNAL DEVICE MOUNTED ABOVE. MANUAL PULL STATION - MOUNTED AT 48" AFF. 75 CANDELA UNLESS NOTED OTHERWISE UNLESS NOTED OTHERWISE OR 6" BELOW CEILING, WHICHEVER IS LOWER 75 CANDELA VISUAL SIGNAL DEVICE (STROBE) - MOUNTED AT 80" AFF COMBINATION FIRE/SMOKE DAMPER COMBINATION FIRE/SMOKE DAMPER MOTOR - SEE SCHEDULE. SEE MECHANICAL/ELECTRICAL SHEETS FOR ELECTRICAL INFORMATION OF HVAC EQUIPMENT INDICATED ON DRAWINGS. TRANSFORMER ENCLOSED CIRCUIT BREAKER ANY SYMBOLS UTILIZED ON THE FLOOR PLANS NOT OTHERWISE ON THE SYMBOLS LIST SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEERS PRIOR TO BIDDING FOR CLARIFICATION. SYMBOLS LIST NOTE: SURGE PROTECTION DEVICE DUPLEX RECEPTACLE - WEATHER PROOF. GFI WEATHER RESISTANT WITH AUDIO/VISUAL SIGNAL DEVICE (SPEAKER/STROBE) CEILING MOUNTED. 75 CANDELA UNLESS NOTED OTHERWISE AUDIO SIGNAL DEVICE (SPEAKER) CEILING MOUNTED. METAL WHILE-IN-USE. COVER AS SPECIFIED C FAANN CPFA FS TS DH H S X TP GFI C GEN M E# # E# # NL CM MM D HE SE S SD F/SD F/SD OR TOR SPD WP EX 0 D S S COMMUNICATIONS JUNCTION BOX PUSH BUTTON. FLOORBOX COMBINATION - POWER, TELEPHONE, DATA - SEE DETAIL NETWORK OUTLET - MOUNTED AT 18" AFF. (2) CAT.6 CABLES REQUIRED 3 COMBINATION POWER/TELEVISION OUTLET - SEE DETAILTV LED LINEAR RECESSED/SURFACE/SUSPENDED FIXTURE EMERGENCY BATTERY UNIT LIGHT FIXTURE - SURFACE MOUNTED LOCAL SWITCH, SINGLE POLE - 3-WAY. LOCAL SWITCH, SINGLE POLE - MOUNTED 48" AFF. 4 3 LOCAL SWITCH, SINGLE POLE - 4-WAY. LOW-VOLTAGE SWITCH - MOUNTED 48" AFF -SUBSCRIPT DESIGNATION INDICATES CONTROLLED LIGHTING ZONE# SECURITY SYSTEM - ELECTRICAL LOCK SECURITY SYSTEM - DOOR CONTACT SECURITY SYSTEMS SECURITY SYSTEM - CARD READER SECURITY SYSTEM - REQUEST TO EXIT SECURITY SYSTEM - INTERCOM SECURITY CCTV CAMERA - SINGLE CAT.6 CABLE EL DC S S CR ICS S S E NETWORK OUTLET FOR WIRELESS ACCESS POINT IN FINISHED CEILING - (2) CAT.6A CABLE REQUIRED. AUDIO/VISUAL SIGNAL DEVICE (SPEAKER/STROBE) - MOUNTED AT 80" AFF OR 6" BELOW CEILING, WHICHEVER IS LOWER 75 CANDELA UNLESS NOTED OTHERWISE SECURITY SYSTEM - KEY ENTRANCEKYS DIGITAL CLOCK - SINGLE CAT.6 CABLE LED RECESSED DOWNLIGHT SECURITY SYSTEMS INTERCOM SYSTEM - MASTER STATIONMSI INTERCOM SYSTEM - DOOR STATIONDSI SECURITY SYSTEM - DURESS BUTTONSDBS 1. ELECTRICAL DRAWINGS ARE BASED ON THE BEST INFORMATION AVAILABLE. FOR AREAS BEING REMODELED, WORK SHOWN REFLECTS INFORMATION SHOWN ON AS- BUILT PLANS AND FIELD OBSERVATION; IT IS NOT GUARANTEED 100% ACCURATE. THIS CONTRACTOR MUST FIELD VERIFY CONDITIONS AND MAKE NECESSARY ADJUSTMENTS WITHOUT EXTRA COSTS TO THE PROJECT TO SUIT ACTUAL NEEDS. 2. THE CONTRACTOR SHALL REWIRE/REROUTE/RELOCATE, AS REQUIRED DUE TO CONSTRUCTION, ALL EXISTING CIRCUITS AND EQUIPMENT WHICH ARE TO CONTINUE IN OPERATION. 3. MAINTAIN THE INTEGRITY OF ALL SYSTEMS AFFECTED BY THE REMOVAL OR ADDITION OF ELECTRICAL DEVICES AND CONTROLS IN REMODELED AREAS. 4. ALL ELECTRICAL PANELS SHALL REMAIN IN PLACE AS IS, UNLESS INDICATED OTHERWISE. 5. PROVIDE COMPLETE UPDATED DIRECTORIES FOR ALL PANELS AND SWITCHBOARD AFFECTED BY CONSTRUCTION. BREAKERS RELIVED FROM DUTY AND NOT BEING USED SHALL BE SWITCHED OFF AND LABELED "SPARE". 6. OCCUPANCY SENSOR LOCATIONS SHOWN ON DRAWINGS ARE DIAGRAMMATIC ONLY. ACTUAL LOCATION SHALL BE DETERMINED AT SITE PER MANUFACTURER'S RECOMMENDATIONS AND LAYOUT. PROVIDE MINIMUM 4'-0" OF FLEX CONDUIT/WIRES SO THAT THE SENSOR CAN BE FIELD ADJUSTED FOR PROPER COVERAGE DURING FINAL TESTING. THE TRAINED FACTORY PERSONNEL SHALL PERFORM THE FINAL TIME SETTINGS AND TESTING. 7. ALL EXISTING DEVICES WHICH ARE TO REMAIN AND ARE LOCATED ON NEW FURRED OUT WALLS SHALL BE PROVIDED WITH APPROPRIATE EXTENSION RINGS. REFER TO ARCHITECTURAL DRAWINGS FOR SPECIFIC WALLS. 8. ALL EXISTING DEVICES WHICH ARE NOT SHOWN ON THESE DRAWINGS OR DIRECTED BY A/E SHALL REMAIN IN PLACE AS IS. 9. EXISTING RECEPTACLES WHICH WOULD BE RENDERED INACCESSIBLE, DUE TO THE PLACEMENT OF NEW CASEWORK, SHALL BE RELOCATED TO THE KICK PLATE OF THE CASEWORK, OR OTHERWISE RELOCATED SUCH THAT RECEPTACLES ARE ACCESSIBLE. 10. ALL NEW DEVICES AND COVER PLATES SHALL MATCH EXISTING UNLESS OTHERWISE DIRECTED BY A/E. COVER PLATES IN KITCHEN AREAS SHALL BE STAINLESS STEEL. 11. ALL REMOVED DEVICES AND NOT REPLACED IN ANY WAY EXPOSING AN EMPTY BACK BOX, THE CONTRACTOR SHALL PROVIDE A STAINLESS STEEL COVER PLATE. 12. IN ROOMS WHICH HAVE BEEN SUBDIVIDED, UNUSED EXISTING LIGHTING SWITCHES SHALL BE REMOVED AND BLANK COVER PLATES SHALL BE PROVIDED. PROPERLY TERMINATE ALL UNUSED CONDUCTOR(S) WITH WIRE NUT(S). 13. EXISTING CEILING SPEAKERS SHALL BE REMOVED PRIOR TO DEMOLITION OF EXISTING CEILINGS. SPEAKERS SHALL BE REINSTALLED IN COMPARABLE LOCATION IN NEW CEILING. 14. WALL MOUNTED SPEAKERS, FIRE ALARM DEVICES, ETC. SHALL BE RELOCATED AS NECESSARY TO ACCOMMODATE NEW CEILING HEIGHTS. 15. WHERE EXISTING FIXTURES ARE TO BE REUSED, THE CONTRACTOR SHALL PROPERLY REMOVE, CLEAN, RELAMP, AND REINSTALL EXISTING FIXTURES AS SHOWN ON PLAN. 16. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISCONNECTING POWER AND REMOVING THE EXISTING FIXTURES FOR REUSE. ANY FIXTURE(S), ELECTRICAL DEVICES, NOT INDICATED TO BE REUSED SHALL BE PROPERLY DISPOSED OF AND/OR IN ACCORDANCE WITH THE SPECIFICATIONS. 17. IN ALL LOCATIONS WHERE RE-USE OR EXTENDING OF AN EXISTING CIRCUIT IS INDICATED ON THE PLANS, THE CONTRACTOR SHALL VERIFY THAT THE EXISTING CIRCUIT HAS ENOUGH CAPACITY TO HANDLE THE ADDITIONAL LOAD. IF REQUIRED CAPACITY DOES NOT EXIST, THE CONTRACTOR SHALL EXTEND A NEW CIRCUIT TO FEED THE NEW EQUIPMENT. NO MORE THAN 6 DUPLEX RECEPTACLES SHALL BE ON ONE CIRCUIT. 18. REMOVE AND REPLACE EXISTING CEILING TILE REQUIRED FOR INSTALLATION OF CONDUITS AND CABLES. COORDINATE ALL WORK WITH THE GENERAL CONTRACTOR. 19. THE CONTRACTOR SHALL NOTE THAT THE EXISTING BUILDING WILL REMAIN IN SERVICE DURING CONSTRUCTION. AREAS OF THE BUILDING WILL BE VACATED AS REQUIRED TO FACILITATE CONSTRUCTION. PROCEED WITH THE COMPLETION OF THE WORK IN SUCH A MANNER AS TO CAUSE THE LEAST POSSIBLE INTERFERENCE WITH OWNER'S OPERATION. ALL WORK SHALL BE DONE IN A MANNER AND TIME ACCEPTABLE TO OWNER. OUTAGES AND OTHER WORK RENDERING EXISTING EQUIPMENT INOPERATIVE SUCH AS BUT NOT LIMITED TO THE FIRE ALARM SYSTEM SHALL BE HELD TO A MINIMUM; PRIOR ARRANGEMENTS FOR EACH SHALL BE MADE WITH OWNER AND SHALL BE ACCEPTABLE AS TO TIME AND DURATION. ALL SHUTDOWNS SHALL BE COORDINATED WITH OWNER 2 WEEKS IN ADVANCE. ALL EXISTING SYSTEMS BEING MODIFIED SHALL BE OPERABLE WHEN CONTRACTOR MODIFYING THE SYSTEM IS NOT ON-SITE. 20. THE CONTRACTOR SHALL DO THE NECESSARY DEMOLITION WORK IN THE AFFECTED AREAS INCLUDING THE REMOVAL OF LIGHTING FIXTURES, LAMPS, WIRING, ACCESSIBLE CONDUIT, AND ELECTRICAL EQUIPMENT. IN ADDITION, PRECEDING DEMOLITION WORK, HE SHALL DE-ENERGIZE ALL CIRCUITS IN THE AFFECTED AREAS AND WHERE WIRING IS ROUTED THROUGH THESE AREAS SERVING AREAS OF THE BUILDING REMAINING IN SERVICE, PROVIDE TEMPORARY AND/OR PERMANENT WIRING AS REQUIRED. ALSO, WHERE NECESSARY TO MAINTAIN SERVICE IN OTHER AREAS, PROVIDE NECESSARY AND REQUIRED SOURCES OF POWER AND TEMPORARY WIRING. REMOVE ALL CONDUIT AND WIRING OF EQUIPMENT BEING REMOVED AND/OR ABANDONED BACK TO SOURCE. REMOVE ALL LOW-VOLTAGE CABLES NOT BEING REUSED. 21. SEE DEMOLITION DRAWINGS OF OTHER TRADES. THIS CONTRACTOR IS RESPONSIBLE FOR DISCONNECTION, REMOVAL AND RE-ROUTING OF EXISTING ELECTRICAL WORK. 22. ALL NEW CIRCUIT BREAKERS BEING INSTALLED IN EXISTING PANELS SHALL MATCH EXISTING BREAKERS INCLUDING AIC RATINGS. GENERAL RENOVATION/DEMOLITION NOTES: Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTES WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET EL 10/04/2023 220025.00 C2023-15 G - ELECTRICAL SHEET LIST SHEET NUMBER SHEET NAME PROGRESS PRINT DATE REVISION CURRENT DESCRIPTION DATE EL ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTES ESD1.0 ELECTRICAL SITE PLAN - DEMO ES1.0 ELECTRICAL SITE PLAN - NEW E1.1 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL E1.1a FIRST FLOOR REFLECTED CEILING PLAN A - SE QUAD E1.1b FIRST FLOOR REFLECTED CEILING PLAN B - NE QUAD E1.1c FIRST FLOOR REFLECTED CEILING PLAN C - NW QUAD E1.1d FIRST FLOOR REFLECTED CEILING PLAN D - SW QUAD E1.2 MEZZANINE REFLECTED CEILING PLAN - OVERALL E1.2a MEZZANINE REFLECTED CEILING PLAN A - SE QUAD E1.2b MEZZANINE REFLECTED CEILING PLAN B - NE QUAD E1.2c MEZZANINE REFLECTED CEILING PLAN C - NW QUAD E1.2d MEZZANINE REFLECTED CEILING PLAN D - SW QUAD E2.1 FIRST FLOOR POWER AND SYSTEMS PLAN - OVERALL E2.1a FIRST FLOOR POWER AND SYSTEMS PLAN A - SE QUAD E2.1b FIRST FLOOR POWER AND SYSTEMS PLAN B - NE QUAD E2.1c FIRST FLOOR POWER AND SYSTEMS PLAN C - NW QUAD E2.1d FIRST FLOOR POWER AND SYSTEMS PLAN D - SW QUAD E2.2a MEZZANINE POWER AND SYSTEMS PLAN A - SE QUAD E2.2b MEZZANINE POWER AND SYSTEMS PLAN B - SW QUAD E2.3 ROOF POWER AND SYSTEMS PLAN - OVERALL E2.3a ROOF POWER AND SYSTEMS PLAN A - SE QUAD E2.3b ROOF POWER AND SYSTEMS PLAN B - NE QUAD E2.3c ROOF POWER AND SYSTEMS PLAN C - NW QUAD E2.3d ROOF POWER AND SYSTEMS PLAN D - SW QUAD E2.4 FIRST FLOOR POWER AND LIGHTING - ADD ALT 1, ALT 2, ALT 3 E5.0 LIGHTING SCHEDULES E5.1 ELECTRICAL SCHEDULES E5.2 ELECTRICAL SCHEDULES E5.3 ELECTRICAL SCHEDULES E5.4 ELECTRICAL SCHEDULES E5.5 ELECTRICAL SCHEDULES E5.6 ELECTRICAL SCHEDULES E6.1 POWER DETAILS E6.2 POWER DETAILS E6.3 ELECTRICAL DETAILS E7.1 TELECOMMUNICATIONS RISER DIAGRAM E7.2 MATRIX E7.3 CARD ACCESS E7.4 CAMERA SCEDULE E7.5 SYSTEM DETAILS – ELEC. RM 134 E7.6 SYSTEM DETAILS – IT RM 150 E7.7 SYSTEM DETAILS – IT/GEN STORAGE RM 176 E7.8 SYSTEM DETAILS – STORAGE RM 104 E7.9 INTERCOM DETAILS E8.0 ELECTRICAL RISER DIAGRAM Grand total: 46 10/13/202310/04/2023 BID DOCUMENT SET SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN1 1 1 1 2 1 1 3 4 4 1 4 ESD1.0 1 1 3 ESD1.0 NTS 2 ESD1.0 NTS # 4 ESD1.0 NTS 5 ESD1.0 NTS 1 1/32" = 1'-0" ELECTRICAL SITE PLAN - DEMO ELECTRICAL SITE PLAN + DEMO ESD1.0 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET 10/04/2023 220025.00 C2023-15 10/13/202310/04/2023 BID DOCUMENT SET 4 ES1.0 NTS 2 ES1.0 NTS 3 ES1.0 NTS #SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN8 8 8 8 9 3 10 7 7 10 10 7 10 7 7 7 7 6 6 6 4 3 5 1 1/32" = 1'-0" ELECTRICAL SITE PLAN - NEW ELECTRICAL SITE PLAN - NEW ES1.0 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET 10/04/2023 220025.00 C2023-15 10/13/202310/04/2023 BID DOCUMENT SET LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LVLV LV LV LV LV LV LV LV LV LV LV LV LV MENS 119 MULTI-USE CONVENTION SPACE 156 MULTI-USE CONVENTION SPACE 156 ELECTRIC 157 STORAGE 158 WARMING ROOM 159 LOADING/RECEIVING/STORAGE 160 ? ? ? ? MEN'S 166 F.S. STORAGE 175 WOMEN'S 165 GENERAL BUILDING STORAGE 167 RESURFACER/ SHOP TOOLS/LAUNDRY 170 REFRIGERATION 172 ICE RINK CIRCULATION 135 Y.H. STORAGE 137 WET TEAM ROOM #1 138 WET TEAM RR 139 WET TEAM ROOM #2 140 UNISEX TLT 141 YH COACH 143J.C. 142 REFEREE 145 REFEREE RR 146 TEAM ROOM 1 147 TEAM ROOM 2 148 TEAM ROOM 3 149 IT 150 GEN STORAGE 153 PASSAGE 144 MAIN COACH 133 ELEC 134 MAIN TEAM ROOM 132 MAIN TEAM ROOM 132 LAUNDRY 131 TRAINING 129 UNISEX TLT 128 PASSAGE 130 TEAM ROOM 4 127 TEAM ROOM 5 126 WET TEAM ROOM 3 125 WET TEAM RR 124 WET TEAM ROOM 4 123 ? ? MEN'S 121 ? ? ICE ARENA LOBBY 117 ? ? J.C. 114 ELEV 152 MAIN LOBBY 101 VESTIBULE 100 CHECK-IN/RENTAL 107 SKATE RENTAL 108 OFFICE 111 ? ? MEETING ROOM (A) 102 MEETING ROOM (B) 103 STOR 104 FIRST AID 105 MULTI-PURPOSE AREA 154 MERCYHEALTH ARENA 136 LOBBY / LINK 155 OFFICE 110 BREAKROOM 109 MALL CONNECTION 164 A B E F G H J K M P QCDN 1 2 3 4 5 6 7 F.3 F.9 G.8 L.6 M.4 9 LD18E LD18ELD18ELD18 LD18 LD8E LD8E LD8ELD8 LD8 LCPA-1 CKT# 400W/120W EM LCPA-2 CKT# 1000W/120W EM LCPA-# CKT# #W/#W EM EA EA8 L M.3 5.8 12 AV CLOSET 157 (A) LOBBY / LINK 155 ELECTRICAL 169 MECHANICAL 168 METER/RISER 179 F.4 F.6 L.4 L.8 NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/16" = 1'-0" FIRST FLOOR REFLECTED CEILING PLAN -OVERALL WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E1.1 10/04/2023 220025.00 C2023-151/16" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLAN -OVERALL 10/13/202310/04/2023 BID DOCUMENT SET LV LV LV LV RESURFACER/ SHOP TOOLS/LAUNDRY 170 REFRIGERATION 172 ICE RINK CIRCULATION 135 Y.H. STORAGE 137 WET TEAM ROOM #1 138 WET TEAM RR 139 WET TEAM ROOM #2 140 UNISEX TLT 141 YH COACH 143 J.C. 142 MAIN COACH 133 MAIN TEAM ROOM 132 LAUNDRY 131 TRAINING 129 UNISEX TLT 128 PASSAGE 130 MERCYHEALTH ARENA 136 FE4 FE4 FE4 FE4 FE4 FE4 FE4FE4 FE4 FE4FE4 FE4 FE4 FE4 FE4 FE4 PASSAGE 144 3 BA FE4 FE4 FE4 MECHANICAL 168 METER/RISER 179 ELEC 134 3 3 BA BA BA FE4 FE4 FE4 FE4 FE4 FE4 FE4 FF4 3 FF4 FF4 FF4 FF4 FF4 FF4 FF4 FF4FF4 FF4 FF4 FE4 FE4 FE4 FF4 H J K M P QN 1 2 3 G.8 L.6 M.4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 2 E1.1a TYPICAL FF4 FF4FF4FF4FF4FF4FF4FF4FE4 FE4 FF4FF4 EE EE 3 E1.1a FF4 FF4 FF4 FF4 FF4 FF4 FF4FF4 FF4 FF4 ELECTRICAL 169 FF4 EE FF4 FF4 3 E1.1a TYPICAL 3 E1.1a TYPICAL 4 E1.1a TYPICAL FF4 EB FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FF4FF4 4 E1.1aWEF 4 E1.1aWEF WEW WEW WEW WEF 4 E1.1a 4 E1.1a 4 E1.1a 4 E1.1a 1 E6.3 L M.3 10 E1.1b EB VESTIBULE 171 4 E1.1a 3 E1.1a 10 E1.1a FF4 10 E1.1a TYPICAL SC 5 E1.1a 6 E1.1a TYPICAL FE4 CLOSET 133(A) 2 E1.1a AA AA AA 3 E1.1a L.4 L.8 1 E6.3 A21 A23 NL A22 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 1,3 E6.3 1,3 E6.3 EB EBEB EB EB 9 E1.1a 9 E1.1a 9 E1.1a EB 1 E1.1a A25 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 A34 EB 9 E1.1a 9 E1.1a CKT# HL3 -6 LCPA-1 CKT# HL3 -8 CKT# LS3 -4 CKT# LS3 -2 CKT# HL3 -3CKT# LS3 -1 CKT# HL3 -4 CKT# LS3 -3 LCPD-3 CKT# LS3 -6 1,3 E6.3 PL PL FE4 FF4 FF4FF4 FF4 FF4FF4 FF4 FF4FF4 FF4 FE4 FE4 TYPICAL EB 9 E1.1a 9 E1.1a TYP 2 E1.1a TYPICAL 9 E1.1a 9 E1.1a ## E1.1a 1. REFER TO SHEETS E1.2a AND E1.2d FOR LIGHTING IN THIS SPACE. 2. WALL MOUNT APPROXIMATELY 8'-0" AFF TO CENTER OF FIXTURES; ALL FIXTURES IN THE SAME SPACE SHALL BE MOUNTED AT THE SAME HEIGHT. 3.TOP OF FIXTURE(S) SHALL BE APPROXIMATELY 9'-0" AFF. ALL FIXTURES IN THE SAME SPACE SHALL BE MOUNTED AT THE SAME HEIGHT. 4.TOP OF FIXTURES SHALL BE APPROXIMATELY 12'-0" AFF; ALL FIXTURES IN THE SAME SPACE SHALL BE MOUNTED AT THE SAME HEIGHT. 5.WALL MOUNT APPROXIMATELY 1'-0" ABOVE TOP OF DOOR TO CENTER OF FIXTURE. 6.BOTTOM OF FIXTURES SHALL BE 9'-0" AFF. ALL FIXTURES IN THE SAME SPACE SHALL BE MOUNTED AT THE SAME HEIGHT. 7.NOT USED. 8.BOTTOM OF FIXTURES SHALL BE APPROXIMATELY 2" ABOVE THE TOP OF THE MIRRORS; ALL FIXTURES IN THE SAME SPACE SHALL BE MOUNTED AT THE SAME HEIGHT. 9.PROVIDE THIS EXIT SIGN WITH A WIREGUARD. 10.BOTTOM OF FIXTURES SHALL BE APPROXIMATELY 10'-9" AFF. ALL FIXTURES IN THE SAME SPACE SHALL BE MOUNTED AT THE SAME HEIGHT. PLAN NOTES: 1.EGRESS LIGHTING (SHADED FIXTURES ON THE PLANS) SHALL BE ACHIEVED VIA NORMAL LIGHTING FIXTURES WIRED TO INVERTERS AS REQUIRED TO EFFECTIVELY ILLUMINATE THE PATH OF EGRESS AS DESIGNATED BY THE ARCHITECT. EACH QUADRANT OF THIS PROJECT HAS AN INVERTER SERVING IT. PROVIDE UL924 TRANSFER RELAYS (BOTH DIMMING AND NON- DIMMING TYPES) AS REQUIRED TO MAINTAIN CONTROLLABILITY OF THE EGRESS FIXTURES, UNLESS SPECIFICALLY DESIGNATED AS AN "NL" 24HR NIGHTLIGHT; REFER TO DETAILS 3/E6.3 AND 5/E6.3. REFER ALSO TO THE RISER DIAGRAM AND DETAIL 5/E8.0 FOR ADDITIONAL INVERTER INFORMATION. 2.EACH QUADRANT OF THIS PROJECT INCLUDES AN INVERTER; WIRE EXIT SIGNS TO THE NEAREST INVERTER SERVING THE AREA OF INSTALLATION. 3. EGRESS LIGHTING SHALL BE CIRCUITED THROUGH EMERGENCY LIGHTING CIRCUIT DESIGNATION "LV" AND PLACED NEAR TO THE NORMAL CIRCUIT. REFER TO PLAN FOR THE CIRCUIT DESCRIPTION. GENERAL NOTES:NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FIRST FLOOR REFLECTED CEILING PLAN A -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E1.1a 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLAN A -SE QUAD 10/13/202310/04/2023 BID DOCUMENT SET LV LV LV LV MULTI-USE CONVENTION SPACE 156 MULTI-USE CONVENTION SPACE 156 ELECTRIC 157 STORAGE 158 WARMING ROOM 159 LOADING/RECEIVING/STORAGE 160 MEN'S 166 F.S. STORAGE 175 WOMEN'S 165 MULTI-PURPOSE AREA 154 FA4 3 3 3 FA4 FA4 FA4 AA AA AA AA AA AA AA AA AA 4 FA4 FA4 FA4 FA4 FA4 FA4 FA4 FA4 4 FE4FF4 FF4 FF4 FF4 FF4 FF4 FF4 FF4 FF4 FF4 FF4 FF4 FF4 FF4 FF4 LOBBY / LINK 155 A B E F G HCD 1 2 3 F.3 F.9 G.8 GENERAL BUILDING STORAGE 167 TEMP STORAGE 174 HOCKEY STORAGE 173 FE4 FE4 FF4 FF4 EE FA4 IT/GEN STORAGE 176 3 3 RC RC RBRC RBRC RC RB RB RB RB AV CLOSET 157 (A) 2 E1.1b TYPICAL 3 E1.1b TYPICAL AV CLOSET 167 (B) 3 E1.1b TYPICAL EA MALL CONNECTION 164 A4 WFW8 E1.1c RB RB WFW4 E1.1b WFW4 E1.1b 5 E1.1b WEF EA EA 1,3 E6.3 WEF WEF 5 E1.1b 5 E1.1b 5 E1.1b RC FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 WEF 5 E1.1b WEF 1 E6.3 LA8E LA8E LA8 LA8 LA8 LA8E LA8 LA8 LA8 LA8E RBRB RBRB RBRB 10 E1.1b FA4 FA4 3 33 EE FA4FA4FA4 FA4 FA4 F.4 F.6 RA RA RA NL WT2 WT2 WT2 WT2 LE8E LE8 LE8 LE8 LE8E LE8 LE8 LE8 LE8 LE8 LE8E EA LM20 1 E1.1b 1 E1.1b 1 E1.1b 2 E1.1b 2 E1.1b 2 E1.1b 2 E1.1b 2 E1.1b 2 E1.1b TYP 6 E1.1b TYP 6 E1.1b TYPICAL 1 E6.3 SB 7 E1.1b EA A5 EB 8 E1.1b 8 E1.1b EB EB EB EB EB EB 8 E1.1b 9 E1.1b 9 E1.1c 8 E1.1b 8 E1.1b TO FIXTS. ABOVE Cc TO FIXTS. ABOVE Cb A11 A12 A13 A14 A15 A16 A17 A20 Md Me Mf EB 8 E1.1b A21 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 A34 EB 8 E1.1b CKT# HL4 -4 CKT# LS4 -1 LCP-2 CKT# HL4 -2 CKT# LS4 -4 CKT# HL4 -1 CKT# LS4 -2 LCPB-1 CKT# HL4 -3 CKT# LS4 -3 LCPC-4 CKT# LS1 -6 FA4 FA42 E1.1b RB RB RA RA RA PL FE4 9 E1.1b RA RA RA RA RA RA RA RA WT2RA RARA RA RA WT2WT2 WT2 WT2 WT2 WT2 RARARARARA RARARA RARA RA RA WT2 NL NL NLNL NL SBSBSB SB SB TYPICAL LM12 LM12 LM6 LM12 LM12 LM12 NL NL NL LM12 1 E6.3 11 E1.1b ## E1.1b 1. REFER TO SHEETS 1.2b FOR LIGHTING IN THIS SPACE. 2.TOP OF FIXTURE(S) SHALL BE APPROXIMATELY 9'-0" AFF. 3.TOP OF FIXTURES SHALL LINE UP WITH TOP OF OVERHEAD GARAGE DOOR OPENING AT APPROXIMATELY 12'-0" AFF. 4.CENTER OF FIXTURE SHALL BE APPROXIMATELY 18'-4" AFF. 5.BOTTOM OF FIXTURE SHALL BE APPROXIATELY 13'-2" AFF. 6.BOTTOM OF FIXTURES SHALL BE 2" ABOVE TOP OF MIRROR. 7.BOTTOM OF FIXTURES SHALL BE APPROXIMATELY 10'-2" AFF TO LINE UP WITH ADJACENT LIG CEILING. 8.PROVIDE THIS EXIT SIGN WITH A WIREGUARD. 9.BOTTOM OF FIXTURE, WHEN AIMED STRAIGHT TOWARDS WALL, SHALL LINE UP WITH BOTTOM OF CEILING AT 12'-0" AFF. AIM FIXTURE DOWNWARDS AS REQUIRED TO EVENLY ILLUMINATE MURAL. 10.BOTTOM OF FIXTURE SHALL BE APPROXIMATELY 1'-0" ABOVE TOP OF DOOR. 11.PROVIDE LOCKABLE ENCLOSURE FOR THESE SWITCHES AND VERIFY MOUNTING LOCATION WITH OWNER PRIOR TO ROUGH IN. PLAN NOTES: 1.EGRESS LIGHTING (SHADED FIXTURES ON THE PLANS) SHALL BE ACHIEVED VIA NORMAL LIGHTING FIXTURES WIRED TO INVERTERS AS REQUIRED TO EFFECTIVELY ILLUMINATE THE PATH OF EGRESS AS DESIGNATED BY THE ARCHITECT. EACH QUADRANT OF THIS PROJECT HAS AN INVERTER SERVING IT. PROVIDE UL924 TRANSFER RELAYS (BOTH DIMMING AND NON- DIMMING TYPES) AS REQUIRED TO MAINTAIN CONTROLLABILITY OF THE EGRESS FIXTURES, UNLESS SPECIFICALLY DESIGNATED AS AN "NL" 24HR NIGHTLIGHT; REFER TO DETAILS 3/E6.3 AND 5/E6.3. REFER ALSO TO THE RISER DIAGRAM AND DETAIL 5/E8.0 FOR ADDITIONAL INVERTER INFORMATION. 2.EACH QUADRANT OF THIS PROJECT INCLUDES AN INVERTER; WIRE EXIT SIGNS TO THE NEAREST INVERTER SERVING THE AREA OF INSTALLATION. 3. EGRESS LIGHTING SHALL BE CIRCUITED THROUGH EMERGENCY LIGHTING CIRCUIT DESIGNATION "LV" AND PLACED NEAR TO THE NORMAL CIRCUIT. REFER TO PLAN FOR THE CIRCUIT DESCRIPTION. GENERAL NOTES:NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FIRST FLOOR REFLECTED CEILING PLAN B -NE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E1.1b 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLAN B -NE QUAD 10/13/202310/04/2023 BID DOCUMENT SET LV LV LV LV LV LV GEN STORAGE 153 ELEV 152 MAIN LOBBY 101 VESTIBULE 100 SKATE RENTAL 108 MENS 106A MEETING ROOM (B) 103 STOR 104 FIRST AID 105 LOBBY / LINK 155 AC MAIN LOBBY 101 MAIN LOBBY 101 AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC MEETING ROOM (A) 102 BREAKROOM 109 ADMIN 112 OFFICE 111 ACAC OFFICE 110 ACAC BC BC BC AA FA4 FEH4 FEH4 FEH4 MULTI-PURPOSE AREA 154 MULTI-USE CONVENTION SPACE 156 BC BC BC BC B E F G HCD 4 5 6 7 F.3 F.9 G.8 9 CONCESSIONS 115 (B) RB CHECK-IN/RENTAL 107 EA EA AA RC RC RC LD18E LD18 LD8LD8E EA BA BA A1 RB RB BC BC BC BC BC BC BC BC BC BC BC EA EA EA SA SA SA SA SA SA SA SASA SA SA SASA EA PA3 PA4 PA5 PA3 PA4 PA5 4 E1.1c La Lb PA5 PA4 PA3 PA5 PA4 PA3 SA SASA SA SA SA SASA SA SASA SA SASA SA SASA SA SASA EA EA RC RB RB AA AAAA AA AA SA SA EA Lc EAA3 8 E1.1c 5 E1.1c 3 E6.3 Ld Le 5 E1.1c 3 E6.3 FEH4 6 E1.1c 7 E1.1c RB RB RB RB RB WFW WFW WFW 8 E1.1c 8 E1.1c RB FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 NL 1 E6.3 8 5.8 RB LA8E LA8 3 E6.3 NL NL 3 E6.3 AC AC F.4 F.6 LD18E LD18ELD18 LD8E LD8ELD8 LE8E LE8 LE8E LE8 LE8 LE8 LE8 LA8E LA8 LA8 LA8E LM20 EB EB 9 E1.1b 9 E1.1c TO FIXTS. ABOVE Cb A8 TO FIXTS. ABOVE EB 9 E1.1c EB EB 9 E1.1c 9 E1.1c 1 E1.1c 4 E1.1c 3 E6.3 1 E1.1c A9 A10 A11 A14 A18 Ca MaMbMcA19 EB EB 9 E1.1c 9 E1.1c TO FIXTS. ABOVE EE FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 1 E6.3 MULTIPURPOSE AREA CIRCULATION 154 (B) A28 EE EA EA LOCKER ALCOVE 101 (A) LCPB-13 CKT# HL4 -8 CKT# LS4 -7 CKT# HL1 -1 CKT# LS1 -1 TO SWITCH "Lc" LCPC-3 CKT# HL1 -7 CKT# LS1 -2 TO SWITCH "Lb" LCPC-2 CKT# HL1 -6 TO SWITCH "La" LCPC-1 CKT# HL1 -4 CKT# LS1 -3 TO SWITCH "Ld" LCPC-2 CKT# HL1 -5 CKT# HL1 -13 LCPC-4 CKT# LS1 -7 CKT# HL1 -2 CKT# LS1 -5 TO SWITCH "Le" LCPC-3 CKT# HL1 -3 CKT# LS1 -4 RA RA RA RA RA RA NL CA CA CA CA NL WOMENS 106B 3 E1.1cEA RB RB LW20 RC SABABA BA AA 10 E1.1c WT8 RA RA NL WT4 NL WT2 FAMILY RR 106 11 E1.1c 12 E1.1c TYPICAL 1.EGRESS LIGHTING (SHADED FIXTURES ON THE PLANS) SHALL BE ACHIEVED VIA NORMAL LIGHTING FIXTURES WIRED TO INVERTERS AS REQUIRED TO EFFECTIVELY ILLUMINATE THE PATH OF EGRESS AS DESIGNATED BY THE ARCHITECT. EACH QUADRANT OF THIS PROJECT HAS AN INVERTER SERVING IT. PROVIDE UL924 TRANSFER RELAYS (BOTH DIMMING AND NON- DIMMING TYPES) AS REQUIRED TO MAINTAIN CONTROLLABILITY OF THE EGRESS FIXTURES, UNLESS SPECIFICALLY DESIGNATED AS AN "NL" 24HR NIGHTLIGHT; REFER TO DETAILS 3/E6.3 AND 5/E6.3. REFER ALSO TO THE RISER DIAGRAM AND DETAIL 5/E8.0 FOR ADDITIONAL INVERTER INFORMATION. 2.EACH QUADRANT OF THIS PROJECT INCLUDES AN INVERTER; WIRE EXIT SIGNS TO THE NEAREST INVERTER SERVING THE AREA OF INSTALLATION. 3. EGRESS LIGHTING SHALL BE CIRCUITED THROUGH EMERGENCY LIGHTING CIRCUIT DESIGNATION "LV" AND PLACED NEAR TO THE NORMAL CIRCUIT. REFER TO PLAN FOR THE CIRCUIT DESCRIPTION. GENERAL NOTES: ## E1.1c 1.REFER TO SHEET E1.2c FOR LIGHTING IN THIS SPACE. 2.BOTTOM OF FIXTURE SHALL BE 3" ABOVE TOP OF MIRROR. 3.PENDANT MOUNT SUCH THAT TOP OF EXIT SIGN LINES UP WITH BOTTOM OF CEILING AT 15'-0" AFF; ALL PENDANT MOUNTING HARDWARE SHALL BE PAINTED TO MATCH DECK. 4.FIXTURES SHALL BE MOUNTED AT RANDOM HEIGHTS/LOCATIONS; EXACT CONFIGURATION SHALL BE VERIFIED BY THE ARCHITECT PRIOR TO INSTALLATION. 5.BOTTOM OF FIXTURES SHALL LINE UP WITH BOTTOM OF JOISTS AT APPROXIMATELY 17'-6" AFF; ALL LIKE FIXTURES SHALL BE MOUNTED AT THE SAME HEIGHT. 6.TOP OF FIXTURE SHALL BE APPROXIMATELY 9'-0" AFF. 7.WALL MOUNT APPROXIMATELY 3'-0" ABOVE PIT FLOOR. FOR BEST LIGHTING RESULTS AND TO COMPLY WITH THE ELEVATOR CODE, EXACT MOUNTING LOCATIONS/ORIENTATIONS SHALL BE FIELD COORDINATED AND VERIFIED BY THE A/E PRIOR TO ROUGH IN. WIRE TO FIXTURES AT THE TOP OF THE ELEVATOR SHAFT. 8.CENTER OF FIXTURE SHALL BE 18'-4" AFF. 9.PROVIDE THIS EXIT SIGN WITH A WIREGUARD. 10.BOTTOM OF FIXTURE, WHEN AIMED STRAIGHT TOWARDS WALL, SHALL LINE UP WITH BOTTOM OF CEILING AT 12'-0" AFF. AIM FIXTURE DOWNWARDS AS REQUIRED TO EVENLY ILLUMINATE MURAL. 11.PROVIDE LOCKABLE ENCLOSURE FOR THESE SWITCHES AND VERIFY MOUNTING LOCATION WITH OWNER PRIOR TO ROUGH IN. 12.TOP OF FIXTURES SHALL BE 9'-6" AFF TO LINE UP WITH GLASS DIVIDER BETWEEN PLAYER'S BENCH AND PUBLIC PASSAGE WAY. PLAN NOTES:NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FIRST FLOOR REFLECTED CEILING PLAN C -NW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E1.1c 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLAN C -NW QUAD 10/13/202310/04/2023 BID DOCUMENT SET SLV LV LV LV LV LV LV LV J.C. 142 REFEREE 145 REFEREE RR 146 TEAM ROOM 1 147 TEAM ROOM 2 148 TEAM ROOM 3 149 IT 150 PASSAGE 144 TRAINING 129 UNISEX TLT 128 TEAM ROOM 4 127 TEAM ROOM 5 126 WET TEAM ROOM 3 125 WET TEAM RR 124 WET TEAM ROOM 4 123 MEN'S 121 J.C. 114 PASSAGE 144 ICE RINK CIRCULATION 151 FE4 FE4 FE4 FE4 FE4FE4 FE4 FE4 FE4 FE4FE4 FE4 FE4 FE4 FE4FE4 FE4 FE4 FE4 FE4FE4 FE4 FE4 FE4 FE4FE4 FE4 FE4FE4 FE4 FE4FE4 FE4 FE4FE4 FE4 FE4FE4 FE4 FE4FE4 FE4 FE4 FE4 AA BA FE4FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4FE4FE4FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FA4 FEH4 FEH4 FEH4 MERCYHEALTH ARENA 136 H J K M P QN 5 6 7 G.8 L.6 M.4 9 CONCESSIONS 115 (B) FE4 FE4 RB RB ELECTRICAL 113 BA AA AA AAAA AA AA AA AA AA AA BA BA BA SA SA SA SA SA SA SA SASASASASASASA SA SA SA SA SA SA SA SASASASASASASA SA SASASASASA SA SA SA SA SA SA PA3 PA4 PA5 PA2 PA3 PA5 PA3 PA4 PA4 PA2 PA5 PA3 EA EA ICE ARENA LOBBY 117 Lg Lf A2 1 E1.1d TYPICAL 2 E1.1d TYPICAL PA4 PA2 PA3 FEH4 6 E1.1c 7 E1.1c FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 NL EB EB AA FE4 RB 3 E1.1d WEF 8 L M.3 5.8 12 ICE ARENA LOBBY 117 FE4 AA FE4 AA L.4 L.8 EE 3 E6.3 3 E6.3 FE4 FE4FE4 1,3 E6.3 1,3 E6.3 EB EB EB EB 4 E1.1d AaAbAcAd TO FIXTS. ABOVEA24 5 E1.1d 5 E6.6 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 1 E6.3 A38 EE CKT# HL2 -1 CKT# LS2 -8 TO SWITCH "Lg" LCPD-2 CKT# HL2 -3 CKT# LS2 -1 CKT# HL2 -5 CKT# LS2 -2 TO SWITCH "Lf" LCPD-1 CKT# HL2 -4 / LS2- 3 CKT# HL2 -6 CKT# LS2 -4 CKT# HL2 -2 / LS2- 7 LCPB-13 CKT# HL4 -8 CKT# LS4 -7 LCPD-3 CKT# LS1 -8 3 E6.3 CA RB CA CA 6 E1.1d CACACACA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CARB RB CA CA CA CA CARB RB RB NL RB RB RB NL NLEA NL NL NL BA BA WT16 NL RB RB RB NL WT6 WT10 RB NL RB WT2 WT2 7 E1.1d 7 E1.1d AA CKT# HL2 -11 CKT# LS2 -4 RB RB 8 E1.1d 9 E1.1a 9 E1.1a 9 E1.1a 9 E1.1a 5 E1.1d EB 12 E1.1c TYPICAL A37 1.EGRESS LIGHTING (SHADED FIXTURES ON THE PLANS) SHALL BE ACHIEVED VIA NORMAL LIGHTING FIXTURES WIRED TO INVERTERS AS REQUIRED TO EFFECTIVELY ILLUMINATE THE PATH OF EGRESS AS DESIGNATED BY THE ARCHITECT. EACH QUADRANT OF THIS PROJECT HAS AN INVERTER SERVING IT. PROVIDE UL924 TRANSFER RELAYS (BOTH DIMMING AND NON- DIMMING TYPES) AS REQUIRED TO MAINTAIN CONTROLLABILITY OF THE EGRESS FIXTURES, UNLESS SPECIFICALLY DESIGNATED AS AN "NL" 24HR NIGHTLIGHT; REFER TO DETAILS 3/E6.3 AND 5/E6.3. REFER ALSO TO THE RISER DIAGRAM AND DETAIL 5/E8.0 FOR ADDITIONAL INVERTER INFORMATION. 2.EACH QUADRANT OF THIS PROJECT INCLUDES AN INVERTER; WIRE EXIT SIGNS TO THE NEAREST INVERTER SERVING THE AREA OF INSTALLATION. 3. EGRESS LIGHTING SHALL BE CIRCUITED THROUGH EMERGENCY LIGHTING CIRCUIT DESIGNATION "LV" AND PLACED NEAR TO THE NORMAL CIRCUIT. REFER TO PLAN FOR THE CIRCUIT DESCRIPTION. GENERAL NOTES: ## E1.1d 1.FIXTURES SHALL BE MOUNTED AT RANDOM HEIGHTS/LOCATIONS; EXACT CONFIGURATION SHALL BE VERIFIED BY THE ARCHITECT PRIOR TO INSTALLATION. 2.BOTTOM OF FIXTURES SHALL LINE UP WITH BOTTOM OF JOISTS AT APPROXIMATELY 17'-6" AFF; ALL LIKE FIXTURES SHALL BE MOUNTED AT THE SAME HEIGHT. 3.TOP OF FIXTURES SHALL BE APPROXIMATELY 12'-0" AFF. 4.REFER TO SHEETS 1.2a AND 1.2d FOR LIGHTING IN THIS SPACE. 5.PROVIDE THIS EXIT SIGN WITH A WIREGUARD. 6.PENDANT MOUNT SUCH THAT BOTTOM OF EXIT SIGN IS 10'-6" AFF; ALL PENDANT MOUNTING HARDWARE SHALL BE PAINTED TO MATCH DECK. 7.BOTTOM OF FIXTURE(S) SHALL BE 2" ABOVE TOP OF MIRROR. 8.PROVIDE LOCKABLE ENCLOSURE FOR THESE SWITCHES AND VERIFY MOUNTING LOCATION WITH OWNER PRIOR TO ROUGH IN. PLAN NOTES:NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FIRST FLOOR REFLECTED CEILING PLAN D -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E1.1d 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLAN D -SW QUAD 10/13/202310/04/2023 BID DOCUMENT SET HE SE SE LV LV LV LV LV LV ? ? A B E F G H J K M P QCDN 1 2 3 4 5 6 7 F.3 F.9 G.8 L.6 M.4 9 8 L M.3 5.8 12 F.4 F.6 L.4 L.8 NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/16" = 1'-0" MEZZANINE REFLECTED CEILING PLAN -OVERALL WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E1.2 10/04/2023 220025.00 C2023-15 1/16" = 1'-0"1 MEZZANINE REFLECTED CEILING PLAN -OVERALL 10/13/202310/04/2023 BID DOCUMENT SET LV LV LV LV LV LV 3 3 3 3 H J K M P QN 1 2 3 G.8 L.6 M.4 HB HB HB HB HB HB HB HB HB HB 3 E6.3 1 E1.2a 3 E6.3 1 E1.2a 3 E6.3 1 E1.2a 3 E6.3 1 E1.2a RA RA RA RA SPONSOR SUITE 202 PRESS BOX 203 AV CLOSET 210 FF4 FF4 FF4 FF4 FF4 FF4 HB HB HB HB HB HB HB HB HB HB FF4 FF4 FF4 FF4 FF4 FF4 FF4 EB2 L M.3 MERCYHEALTH ARENA NORTH SEATING 136 (A) L.4 L.8 A26 MERCYHEALTH ARENA SOUTH SEATING 136 (B) 3 E6.3 3 E6.3 A27 2 E1.2a FF4 FF4 FF4 2 E1.2a EB2 LCPA-6 CKT# HL2 -7 CKT# LS2 -5 LCPA-2 CKT# HL2 -8 CKT# LS3 -7 LCPA-3 CKT# HL2 -9 CKT# LS3 -9 LCPA-4 CKT# HL3 -9 CKT# LS3 -5 LCPA-5 CKT# HL3 -10 CKT# LS3 -10 CKT# LS3 -8 LCPA-7 CKT# HL3 -7 HB HB HB HB HB RA RA RA RA FE4 RA EB 4 E1.2a 2 E1.2a FF4 EB FF4 TO FIXTS. BELOW 3 E1.2a 3 E1.2a TO SWITCH "Aa" TO SWITCH "Ab" TO SWITCH "Ac"TO SWITCH "Ad" 1.EGRESS LIGHTING (SHADED FIXTURES ON THE PLANS) SHALL BE ACHIEVED VIA NORMAL LIGHTING FIXTURES WIRED TO INVERTERS AS REQUIRED TO EFFECTIVELY ILLUMINATE THE PATH OF EGRESS AS DESIGNATED BY THE ARCHITECT. EACH QUADRANT OF THIS PROJECT HAS AN INVERTER SERVING IT. PROVIDE UL924 TRANSFER RELAYS (BOTH DIMMING AND NON- DIMMING TYPES) AS REQUIRED TO MAINTAIN CONTROLLABILITY OF THE EGRESS FIXTURES, UNLESS SPECIFICALLY DESIGNATED AS AN "NL" 24HR NIGHTLIGHT; REFER TO DETAILS 3/E6.3 AND 5/E6.3. REFER ALSO TO THE RISER DIAGRAM AND DETAIL 5/E8.0 FOR ADDITIONAL INVERTER INFORMATION. 2.EACH QUADRANT OF THIS PROJECT INCLUDES AN INVERTER; WIRE EXIT SIGNS TO THE NEAREST INVERTER SERVING THE AREA OF INSTALLATION. 3. EGRESS LIGHTING SHALL BE CIRCUITED THROUGH EMERGENCY LIGHTING CIRCUIT DESIGNATION "LV" AND PLACED NEAR TO THE NORMAL CIRCUIT. REFER TO PLAN FOR THE CIRCUIT DESCRIPTION. GENERAL NOTES: ## E1.2a 1. TOP OF TYPE "HB" FIXTURES SHALL ALIGN WITH BOTTOM OF JOISTS -TYPICAL. 2.PROVIDE THIS EXIT SIGN WITH A WIREGUARD. 3.PROVIDE LOCKABLE ENCLOSURE FOR THESE SWITCHES AND VERIFY MOUNTING LOCATION WITH OWNER PRIOR TO ROUGH IN. 4.WALL MOUNT APPROXIMATELY 1'-0" ABOVE TOP OF DOOR TO BOTTOM OF FIXTURE. PLAN NOTES:NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated MEZZANINE REFLECTED CEILING PLAN A -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E1.2a 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 MEZZANINE REFLECTED CEILING PLAN A -SE QUAD 10/13/202310/04/2023 BID DOCUMENT SET LV LV LV LV LV A B E F G HCD 1 2 3 F.3 F.9 G.8 HB HBHB HB HB HBHB HB HB HBHB HB HB HBHB HB HB HBHB HB HB HBHB HB HA HA HA HA HA HA HA HA HA HA HA HA HA HAHA HA HA HA HA HA HA HA HA HA HA HA HA HA HA HAHA HA 3 E6.3 1 E1.2b 3 E6.3 1 E1.2b 3 E6.3 1 E1.2b 3 E6.3 1 E1.2b 3 E6.3 1 E1.2b F.4 F.6 A26 LCPB-5 CKT# HL4 -5 CKT# LS4 -5 LCPB-4 CKT# HL4 -6 CKT# LS4 -8 LCPB-12 CKT# HL1 -12 CKT# LS4 -6 LCPB-11 CKT# HL1 -17 CKT# LS4 -9 LCPB-10 CKT# HL1 -11 CKT# LS4 -10 EB 2 E1.2a FF4 TO FIXTS. BELOW 3 E1.2a TO SWITCH "Cc" TO SWITCH "Cb" TO SWITCH "Mc" TO SWITCH "Md" TO SWITCH "Me" TO SWITCH "Mf" 1.EGRESS LIGHTING (SHADED FIXTURES ON THE PLANS) SHALL BE ACHIEVED VIA NORMAL LIGHTING FIXTURES WIRED TO INVERTERS AS REQUIRED TO EFFECTIVELY ILLUMINATE THE PATH OF EGRESS AS DESIGNATED BY THE ARCHITECT. EACH QUADRANT OF THIS PROJECT HAS AN INVERTER SERVING IT. PROVIDE UL924 TRANSFER RELAYS (BOTH DIMMING AND NON- DIMMING TYPES) AS REQUIRED TO MAINTAIN CONTROLLABILITY OF THE EGRESS FIXTURES, UNLESS SPECIFICALLY DESIGNATED AS AN "NL" 24HR NIGHTLIGHT; REFER TO DETAILS 3/E6.3 AND 5/E6.3. REFER ALSO TO THE RISER DIAGRAM AND DETAIL 5/E8.0 FOR ADDITIONAL INVERTER INFORMATION. 2.EACH QUADRANT OF THIS PROJECT INCLUDES AN INVERTER; WIRE EXIT SIGNS TO THE NEAREST INVERTER SERVING THE AREA OF INSTALLATION. 3. EGRESS LIGHTING SHALL BE CIRCUITED THROUGH EMERGENCY LIGHTING CIRCUIT DESIGNATION "LV" AND PLACED NEAR TO THE NORMAL CIRCUIT. REFER TO PLAN FOR THE CIRCUIT DESCRIPTION. GENERAL NOTES: ## E1.2b 1. TOP OF TYPE "HA"/"HB" FIXTURES SHALL ALIGN WITH BOTTOM OF JOISTS -TYPICAL. PLAN NOTES:NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated MEZZANINE REFLECTED CEILING PLAN B -NE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E1.2b 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 MEZZANINE REFLECTED CEILING PLAN B -NE QUAD 10/13/202310/04/2023 BID DOCUMENT SET HE SE SE LV LV LV LV A B E F G HCD 4 5 6 7 F.3 F.9 G.8 9 FF4 FEH4 FEH4 PL FA4 FA4 1 E1.2d 3 E1.2c 4 E1.2c HB HBHB HB HB HBHB HB HB HBHB HB HB HBHB HB HB HBHB HB HB HBHB HB HA HAHA HA HA HA HA HA HA HA HA HA HA HA HA HA HA HAHA HA 3 E6.3 1 E1.2c 8 5.8 F.4 F.6 3 E6.3 1 E1.2c 3 E6.3 1 E1.2c 3 E6.3 1 E1.2c 4 E1.2d CKT# HL1 -8 LCPB-3 CKT# HL4 -7 CKT# LS4 -5 LCPB-7 CKT# HL1 -9 CKT# LS2 -6 LCPB-8 CKT# HL1 -18 CKT# LS2 -11 CKT# LS2 -12 LCPB-9 CKT# HL1 -10 FEH4 FEH4 TO SWITCH "Ca" TO SWITCH "Ma" TO SWITCH "Mb" TO SWITCH "Mc" 1.EGRESS LIGHTING (SHADED FIXTURES ON THE PLANS) SHALL BE ACHIEVED VIA NORMAL LIGHTING FIXTURES WIRED TO INVERTERS AS REQUIRED TO EFFECTIVELY ILLUMINATE THE PATH OF EGRESS AS DESIGNATED BY THE ARCHITECT. EACH QUADRANT OF THIS PROJECT HAS AN INVERTER SERVING IT. PROVIDE UL924 TRANSFER RELAYS (BOTH DIMMING AND NON- DIMMING TYPES) AS REQUIRED TO MAINTAIN CONTROLLABILITY OF THE EGRESS FIXTURES, UNLESS SPECIFICALLY DESIGNATED AS AN "NL" 24HR NIGHTLIGHT; REFER TO DETAILS 3/E6.3 AND 5/E6.3. REFER ALSO TO THE RISER DIAGRAM AND DETAIL 5/E8.0 FOR ADDITIONAL INVERTER INFORMATION. 2.EACH QUADRANT OF THIS PROJECT INCLUDES AN INVERTER; WIRE EXIT SIGNS TO THE NEAREST INVERTER SERVING THE AREA OF INSTALLATION. 3. EGRESS LIGHTING SHALL BE CIRCUITED THROUGH EMERGENCY LIGHTING CIRCUIT DESIGNATION "LV" AND PLACED NEAR TO THE NORMAL CIRCUIT. REFER TO PLAN FOR THE CIRCUIT DESCRIPTION. GENERAL NOTES: ## E1.2c 1. TOP OF TYPE "HA"/"HB" FIXTURES SHALL ALIGN WITH BOTTOM OF JOISTS -TYPICAL. 2.NOT USED. 3.WALL MOUNT APPROXIATELY 9'-0" AFF TO CENTER OF FIXTURE. 4.WALL MOUNT APPROXIMATELY 9'-0" ABOVE PLATFORM TO CENTER OF FIXTURE. PLAN NOTES:NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated MEZZANINE REFLECTED CEILING PLAN C -NW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E1.2c 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 MEZZANINE REFLECTED CEILING PLAN C -NW QUAD 10/13/202310/04/2023 BID DOCUMENT SET HE SE SE 3 3 H J K M P QN 5 6 7 G.8 L.6 M.4 9 HB HB HB HB HB HB HB HB RA RA SPONSOR SUITE 202 PRESS BOX 203 AV CLOSET 210 FF4 FF4 FF4 FF4 FF4 FF4 FF4 HB HB HB HB HB HB HB HB FF4 FF4 FF4 FF4 FF4 FF4 FF4 FEH4 FEH4 PL FA4 FA4 1 E1.2d 3 E1.2c 4 E1.2c 8 L M.3 5.8 12 L.4 L.8 MERCYHEALTH ARENA NORTH SEATING 136 (A) EB 4 E1.2d MERCYHEALTH ARENA SOUTH SEATING 136 (B) EB4 E1.2d CKT# HL1 -8 HB HB HB HB HB RA RA FE4 RA 4 E1.2a FEH4 FEH4 1.EGRESS LIGHTING (SHADED FIXTURES ON THE PLANS) SHALL BE ACHIEVED VIA NORMAL LIGHTING FIXTURES WIRED TO INVERTERS AS REQUIRED TO EFFECTIVELY ILLUMINATE THE PATH OF EGRESS AS DESIGNATED BY THE ARCHITECT. EACH QUADRANT OF THIS PROJECT HAS AN INVERTER SERVING IT. PROVIDE UL924 TRANSFER RELAYS (BOTH DIMMING AND NON- DIMMING TYPES) AS REQUIRED TO MAINTAIN CONTROLLABILITY OF THE EGRESS FIXTURES, UNLESS SPECIFICALLY DESIGNATED AS AN "NL" 24HR NIGHTLIGHT; REFER TO DETAILS 3/E6.3 AND 5/E6.3. REFER ALSO TO THE RISER DIAGRAM AND DETAIL 5/E8.0 FOR ADDITIONAL INVERTER INFORMATION. 2.EACH QUADRANT OF THIS PROJECT INCLUDES AN INVERTER; WIRE EXIT SIGNS TO THE NEAREST INVERTER SERVING THE AREA OF INSTALLATION. 3. EGRESS LIGHTING SHALL BE CIRCUITED THROUGH EMERGENCY LIGHTING CIRCUIT DESIGNATION "LV" AND PLACED NEAR TO THE NORMAL CIRCUIT. REFER TO PLAN FOR THE CIRCUIT DESCRIPTION. GENERAL NOTES: ## E1.2a 1.TOP OF FIXTURES SHALL BE APPROXIMATELY 3'-0" FROM TOP OF ELEVATOR SHAFT. FOR BEST LIGHTING RESULTS AND TO COMPLY WITH THE ELEVATOR CODE, EXACT MOUNTING LOCATIONS/ORIENTATIONS SHALL BE FIELD COORDINATED AND VERIFIED BY THE A/E PRIOR TO ROUGH IN. WIRE TO FIXTURES/SWITCH IN ELEVATOR PIT. 2.BOTTOM OF FIXTURE SHALL BE APPROXIMATELY 8'-0" ABOVE MEZZANINE FLOOR LEVEL. 3.BOTTOM OF FIXTURE SHALL BE APPROXIMATELY 8'-0" ABOVE ROOF LEVEL LANDING. 4.PROVIDE THIS EXIT SIGN WITH A WIREGUARD. PLAN NOTES:NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated MEZZANINE REFLECTED CEILING PLAN D -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E1.2d 10/04/2023 220025.00 C2023-151/8" = 1'-0"1 MEZZANINE REFLECTED CEILING PLAN D -SW QUAD 10/13/202310/04/2023 BID DOCUMENT SET DN DN DN A B E F G H J K M P QCDN 1 2 3 4 5 6 7 F.3 F.9 G.8 L.6 M.4 9 MER -ROOM # 150TR -ROOM # 104 TR -ROOM # 134TR -ROOM # 176 8 L M.3 5.8 12 DP1 DP3 T-3 LP3(L) HL3 LS3 MP1T-7 T-2 DP2 LP2(L) HL2 LS2 LP5 LS1 LP1(L) HL1 T-5 T-1 HL4 LP4(L) T-4 DP4 LS4 MSB MCC MULTI-USE CONVENTION SPACE 156 WARMING ROOM 159 ELECTRIC 157 AV CLOSET 157 (A) LOADING/RECEIVING/STORAGE 160 MEN'S 166 FAMILY TLT 162 LOBBY / LINK 155 HOCKEY STORAGE 173 GENERAL BUILDING STORAGE 167 RESURFACER/ SHOP TOOLS/LAUNDRY 170 REFRIGERATION 172 MERCYHEALTH ARENA 136 Y.H. STORAGE 137 WET TEAM ROOM #1 138 WET TEAM ROOM #2 140 WET TEAM RR 139 PASSAGE 144 YH COACH 143 J.C. 142 UNISEX TLT 141 PASSAGE 144 REFEREE 145 REFEREE RR 146 TEAM ROOM 1 147 TEAM ROOM 2 148 TEAM ROOM 3 149 IT 150 ELEV 152 MEETING ROOM (B) 103 STOR 104 FIRST AID 105 MENS 106A SKATE RENTAL 108 ADMIN 112 BREAKROOM 109 OFFICE 111 OFFICE 110 COPY AREA 112 (A)MAIN LOBBY 101 VESTIBULE 100 ICE RINK CIRCULATION 151 WET TEAM ROOM 4 123 PASSAGE 130 WET TEAM RR 124 WET TEAM ROOM 3 125 TEAM ROOM 5 126 TEAM ROOM 4 127 TRAINING 129 UNISEX TLT 128 LAUNDRY 131 MAIN TEAM ROOM 132 PASSAGE 130 MAIN COACH 133 CLOSET 133(A) METER/RISER 179 ELEC 134 ICE ARENA LOBBY 117 WOMEN'S 165 J.C. 163 TEMP STORAGE 174 F.S. STORAGE 175 IT/GEN STORAGE 176 VESTIBULE 118 CONCESSIONS 115 (B) BEER SALES 116 J.C. 114 GEN STORAGE 153 VESTIBULE 171 ELECTRICAL 169 MECHANICAL 168 AV CLOSET 167 (B) CLOSET 172(A) F.4 F.6 L.4 L.8 STORAGE 158 LP6 T-6 LP1(R) LP4(R) LP3(R) EV T-8 MEN'S 121 FOOD PREP 115 (A) CHECK-IN/RENTAL 107 MEETING ROOM (A) 102 MULTI-PURPOSE AREA 154 ICE RINK CIRCULATION 135 STORAGE 135(A) MALL CONNECTION 164 ELECTRICAL 113 DRY STORAGE 115 (C)LOCKER ALCOVE101 (A)MULTIPURPOSE SEATING 154 (A) MULTIPURPOSE AREA CIRCULATION 154 (B) WOMENS 106B FAMILY RR 106 WOMENS 122 WELLNESS ROOM 119 FAMILY RESTROOM 120 LP2(R) PMS ELEV 1. UNLESS NOTED OTHERWISE, WIRE ALL NETWORK CABLES TO THEIR RESPECTIVE ROOM AND/OR CABINET AS SHOWN PER THE DEMARCATION LINES. GENERAL NOTES:NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FIRST FLOOR POWER AND SYSTEMS PLAN -OVERALL WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E2.1 10/04/2023 220025.00 C2023-15 1/16" = 1'-0"1 FIRST FLOOR POWER AND SYSTEMS PLAN -OVERALL 10/13/202310/04/2023 BID DOCUMENT SET DN TV12 TV S S S TV S S H S S S FSFSTSTS7 H DF-3 DF-2 GWH-2 CP-2 CP-4 GWH-4 OFV-9 OFV-8 OFV-7 OFCT-7 OFCT-11 OFCT-9 60" "JT" 15cd GFCI 15cd Z1Z2 D1 W1 MCC 96" HD1 GFCI EL1 EL2 EL3 EL4 EL5 EL6 EL8EL7 CSB1 CSB2 CSB3 CSB4 HD4 HD2 HD3 ES DC E 60cd 30cd 15cd 30cd 30cd 15cd 30cd 30cd 15cd FACP EL19 EL18 EL17 MSB DP3 T-3HL3 GL1 SC1 IR-1 IR-2 IR-3 IR-4 IR-9 GFCI 60" "JT" D1 D2 GFCI W3 CR 60cd 30cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 11'-0" 60cd 60cd15cd 15cd 60" IT30A1 GB GB GB 110cd 110cd RESURFACER/ SHOP TOOLS/LAUNDRY 170 REFRIGERATION 172 Y.H. STORAGE 137 WET TEAM ROOM #2 140 UNISEX TLT 141 YH COACH 143 ELEC 134 MAIN COACH 133 MAIN TEAM ROOM 132 LAUNDRY 131 TRAINING 129 UNISEX TLT 128 J.C. 142 WET TEAM RR 139 ICE RINK CIRCULATION 135 PASSAGE 130 MECHANICAL 168 STORAGE 135(A) METER/RISER 179 UH 1 C-1 C-2 C-3 P6 P3 P2 P1 GFCI GFCI LP3(L)-6 LP3(L)-3 LP3(L)-3 LP3(L)-4 LP3(L)-4 LP3(L)-5 LP3(L)-9 LP3(L)-9 LP3(L)-23 LP3(L)-24,26 DP3-50,52,54DP3-55,57,59 LP3(L)-6 LP3(L)-9 LP3(L)-6 LP3(L)-11 LP3(L)-12 LP3(L)-11 LP3(L)-12 LP3(L)-12 LP3(L)-13 LP3(L)-14 LP3(L)-15 LP3(L)-12 LP3(L)-11 LP3(L)-12 LP3(L)-18 LP3(L)-16 LP3(L)-17 LP3(L)-18 LP3(L)-18 LP3(L)-18 LP3(L)-22 LP3(L)-56 LP3(L)-55 LP3(L)-55 LP3(L)-55 LP3(L)-57 LP3(L)-58 LP3(L)-59 LP3(L)-60 LP3(L)-56 LP3(L)-43 LP3(L)-43 LP3(L)-43 LP3(L)-45 LP3(L)-46 LP3(L)-48LP3(L)-43LP3(L)-49LP3(L)-51,53 LP3(L)-52,54 LP3(L)-50 LP3(L)-40LP3(L)-42 LP3(L)-42 LP3(L)-42LP3(L)-41LP3(L)-40LP3(L)-34 LP3(L)-40 LP3(L)-39 LP3(L)-36 LP3(L)-37 LP3(L)-36 LP3(L)-38 LP3(L)-29 LP3(L)-30LP3(L)-29LP3(L)-29 LP3(L)-34 LP3(L)-32 LP3(L)-33 LP3(L)-31 LP3(L)-31 LP3(L)-5 LP3(L)-5 LP3(L)-5 LP3(L)-5 LP3(L)-25 LP3(L)-27 LP3(L)-28 LP3(L)-28 LP3(L)-28 LP4(L)-27 LP4(L)-27 LP4(L)-30 LP4(L)-30 LP4(L)-30 LP3(L)-34 LP3(L)-34 LP2(L)-2 LP3(L)-21 H J K M P QN 1 2 3 G.8 L.6 M.4 KY KY LP3(L)-1 LP3(L)-2 MP1-18 GWH-5 GWH-6 CP-5 TMV-3 LP3(L)-19 MP1-15 LP3(L)-35 WS-1 BP-1 MP1-19 MP1-26 LP3(L)-44 DP3-20,22,24 OFCT-8 LP3(L)-47 OFV-10 LP3(L)-68 LP3(L)-61 LP3(L)-61 LP3(L)-61 W2WET TEAM ROOM #1 138 ELECTRICAL 169 AV CLOSET 167 (B) SBP-3 AV-4AV-3 LP6-20,22,24 L M.3 P4P5P7 MCC-11 MCC-10 MCC-9 MCC-7 MCC-6 MCC-5 MCC-4 MCC-1 MCC-2 MCC-3 LP3(L) LP4(L)-53LP4(L)-13 LP3(L)-20 FACP LS3 MP1-27 IR-1 MP1-1 IR-2MP1-2 IR-3 MP1-3 MP1-9 IR-9 MP1-4 IR-4 MP1T-7 L.4 L.8 "JT" "JT" "JT" "JT" "JT" "JT" "JT""JT" "JT" E7.5 1 011 012 013 014 015 019 020 018 016 017 48" +48" +48" +48" +48" WP/GFCI LP3(L)-4 WP/GFCI 110cd +48" 7 E2.1b EV LP3(L)-78 OD-1 LP3(L)-79 OD-2 LP3(L)-80 OD-7 T-8 LP3(L)-5 HT-1 LP3(L)-81,83 LP3(R)CLOSET172(A)CLOSET133(A)MERCYHEALTH ARENA 136 MULTIPURPOSE AREA CIRCULATION 154 (B) VESTIBULE 171 YH COACH 143 MULTIPURPOSE AREA CIRCULATION 154 (B) 10 E2.1A 3 E2.1A 3 E2.1A 4 E2.1A 5 E2.1A WP/GFCI 3 E2.1A 3 E2.1A 1 E2.1A 1 E2.1A 1 E2.1b 4 E2.1b 3 E2.1b LP3(L)-31 LP3(L)-31 GFCI GFCI 1 E2.1A 1 E2.1A 9 E2.1A 3 E2.1A 2 E2.1A 11 E2.1A 11 E2.1A 6 E2.1A LP3(L)-12 C C CLP3(L)-9 LP3(L)-9 IPTLP3(L)-8 LP3(L)-6 LP3(L)-6 3 E2.1DLP3(L)-3LP3(L)-3 ## E2.1a 1. PROVIDE NEW CEILING MOUNTED JUNCTION BOXES AND A DEDICATED 120-VOLT, 20A CIRCUIT FOR NEW ELECTRICALLY CONTROLLED LOCKS ON THESE DOORS. COORDINATE WITH ARCHITECT FOR FINAL ELECTRICAL REQUIREMENTS. 2. PROVIDE 120V CONNECTION TO SCOREBOARD. MOUNT JBOX ON BAR JOIST FOR SCOREBOARD SUSPENDED FROM JOIST. VERIFY CONNECTION WITH EQUIPMENT SUPPLIER AND FINAL LOCATION WITH OWNER. 3. FUTURE INFRARED HEATING SYSTEM. PROVIDE WIRING, CONDUIT, AND JUNCTION BOXES. CAP AND LABEL FOR FUTURE INSTALLATION. 4. LOCATION OF SCOREKEEPER'S BOX. VERIFY ALL CONDUIT RUNS TO THIS LOCATION WITH OWNER PRIOR TO CONSTRUCTION. FOR BIDDING PURPOSES, ASSUME (4) 2" CONDUIT RUNS FROM THIS LOCATION TO ADMINISTRATION A102 ROUTE (2) 2" CONDUITS FROM THIS LOCATION TO EACH SCOREBOARD FOR PA, MUSIC, ETC. 5. POWER AND DATA CONNECTIONS SHALL BE RECESSED INTO THE BACKER BOARDS WITH THE ACCESS ON THE NON-ICE SIDE OF THE RINK. 6. PROVIDE A 1" CONDUIT FROM THIS CENTER RINK SCOREBOARD LOCATION TO SCOREBOARD CONTROL LOCATION IN IT ROOM B115. CONFIRM ALL LOCATIONS AND ROUTING PRIOR TO ROUGH-IN. 7. FUTURE POWERED SIGNAGE. COORDINATE FINAL LOCATION WITH OWNER AND ARCHITECT. COORDINATE POWER REQUIREMENTS WITH SIGN MANUFACTURER(S). 8. WET TEAM ROOM 139. KEY LOCKS TO BE USED TO ENTER ROOM. VIA CARD ACCESS PROGRAMMING, FIRST KEY ENTRANCE TO ROOM WILL DIS-ENGAGE OPPOSITE TEAM ENTRANCE DOOR/KEY. ONCE KEY IS REMOVED AND SWITCH BACK TO NORMAL POSITION SYSTEM IS RESET. 9. PROVIDE/INSTALL (1) WALL MOUNTED NETWORK EQUIPMENT CABINET IN ROOM 133. EQUAL TO CPI PART # 11901-724. CABINET TO HOUSE LOCAL JETS NETWORK EQUIPMENT. CABINET TO BE 24"H X 18"D X 19" W. CONTRACTOR TO PROVIDE/INSTALL (1) CAT.6 CABLE FROM CABINET IN ROOM 133 TO D-MARC ROOM #134 FOR NETWORK FEED. 10. APROXIMATE LOCATION OF BDA HEAD END EQUIPMENT RACK. PROVIDE 4'X8', 3/4 INCH FIRE RATED PLYWOOD BACKING FOR WALL MOUNTED EQUIPMENT. PROVIDE CONDUIT, CABLING AND CONNECTION FROM BDA SYSTEM TO FIRE ALARM CONTROL PANEL FOR MONITORING OF (6) BDA ALARMS. COORDINATE REQUIREMENTS WITH SYSTEM INSTALLER AND APPROVED SHOP DRAWINGS. 11. PROVIDE A 480V, 3 PHASE POWER CORD REEL FOR RESURFACER CHARGING CONNECTION, HUBBELL HBL501032WM1 OR APPROVED EQUAL. FIELD LOCATE AND MOUNT CORD REEL ABOVE RESURFACER. PROVIDE ALL MOUNTING HARDWARE AND STRUT NECESSARY TO MOUNT CORD REEL.PROVIDE AND TERMINATE REQUIRED 30A PLUG AT END OF CABLE REEL, FIELD VERIFY EXACT REQUIREMENT WITH SELECTED RESURFACER MACHINE MAKE AND MODEL PRIOR TO ROUGH-IN. PLAN NOTES: 1. ALL NETWORK OUTLETS LABELED ON THIS SHEET WITH THE NOMENCLATURE "JT" TO BE WIRED FROM OUTLET TO JETS WALL MOUNTED CABINET IN ROOM 133. 2. COORDINATE LOCATION AND MOUNTING OF DEVICES WITH MILLWORK AND CASEWORK. 3. COORDINATE DEVICE LOCATIONS AND ELEVATIONS AT ALL WORKSTATIONS WITH FINAL FURNITURE PLANS AND APPROVED SHOP DRAWINGS PRIOR TO DEVICE ROUGH-IN. 4. REFER TO THE ARCHITECTURAL DETAILS AND ELEVATION DRAWINGS FOR COORDINATION OF ELECTRICAL DEVICES. 5. CONDUIT AND WIRING MAY NOT BE SHOWN GRAPHICALLY ON THE PLANS. HOWEVER IT SHALL BE PROVIDED COMPLETE AS REQUIRED BASED ON IDENTIFICATION OF CIRCUIT NUMBERS, RELAY NUMBERS, SWITCHING IDENTIFICATION, MOTOR EQUIPMENT SCHEDULE, PANEL BOUNDARIES, SPECIFIED MINIMUM CONDUIT SIZE, SPECIFIED MINIMUM CONDUCTOR SIZES, AND/OR SPECIFIED MINIMUM GROUNDING. 6. REFER TO ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION FOR FEEDERS AND ELECTRICAL EQUIPMENT. 7. PROVIDED 1-1/4" EMPTY CONDUITS WITH PULLSTRING FOR ALL TELECOMMUNICATION AND ACCESS CONTROL ROUGH-INS. 8. FOR ALL TV LOCATIONS, PROVIDE 1-1/4" EMPTY CONDUIT WITH PULLSTRING ROUGH-IN TO SUPPORT COAX AND TELECOMMUNIATION CABLING. 9. ALL DEVICES SHALL BE COORDINATED WITH FURNITURE LAYOUT AND APPROVED SHOP DRAWINGS PRIOR TO ROUGH-IN. 10. PROVIDE ACCESS CONTROL ROUGH-IN PER DETAIL 4, SHEET E6.2. PROVIDE 20A, 120V CIRCUIT FOR POWER SUPPLY AS NECESSARY. COORDINATE INSTALLATION WITH SECURITY VENDOR PRIOR TO ROUGH-IN. 11. COMBINATION FIRE SMOKE DAMPER ACTUATORS SHALL BE BY THE MC. PROVIDE A 20A, 120V CIRCUIT. REFER TO THE MECHANICAL FLOOR PLANS FOR EXACT LOCATIONS AND QUANTITIES. COORDINATE INSTALLATION WITH THE MC. 12. IT SHALL BE THE RESPONSIBILITY OF THE DIV. 26 CONTRACTOR TO PROVIDE ALL BACK BOXES, CONDUIT, AND CONDUIT SLEEVES FOR OWNER PROVIDED LOW VOLTAGE SYSTEMS SUCH AS TELECOMMUNICATIONS, CCTV, ACCESS CONTROLS, INTRUSION ALARM DETECTION, AND DISTRIBUTED ANTENNA SYSTEM (DAS) AS SYSTEMS PROVIDED BY OTHERS. COORDINATE THE REQUIRED WORK AND FINAL DEVICE LOCATIONS WITH THE TELECOMMUNICATIONS, SECURITY, ACCESS CONTROLS, AND DAS VENDORS AS NECESSARY. 13. RECEPTACLES LOCATED IN AREAS OF CHILDREN SHALL BE TAMPER RESISTANT TYPE, UNLESS NOTED OTHERWISE. 14. ALL FIRE ALARM DEVICES LOCATED IN MULTI-PURPOSE AREA SHALL HAVE WIRE GUARDS OR SHIELDING TO PROTECT THE DEVICES FROM DAMAGE. 15. PROVIDE STAINLESS STEEL FINISH DEVICE PLATES THROUGHOUT MULTI-PURPOSE AND WARMING ROOM AREA. GENERAL NOTES:NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FIRST FLOOR POWER AND SYSTEMS PLAN A -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E2.1a 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FIRST FLOOR POWER AND SYSTEMS PLAN A -SE QUAD 10/13/202310/04/2023 BID DOCUMENT SET TSFS 2HS SSSSSS3 4 5 S S S S S S S I H OFCT-1 OFCT-3 OFCT-2 OFV-1 OFV-2 GWH-1 CP-1 OFV-5 HD5 GFCI EL9 EL10 EL11 EL12 EL13 EL14 EL15 EL16 CSB5 CSB6 CSB7 CSB8 60cd 15cd 15cd EL23 EL25 T-1 HL1 DP1 DP4T-4HL4 GL4 IR-9 IR-10 IR-11 SC3 15cd 15cd 15cd 15cd 15cd 15cd 15cd 30cd 30cd 30cd30cd 15cd 110cd IT30A2 110cd110cd 110cd 110cd 110cd 110cd GB GB GB 110cd 110cd 110cd 110cd 110cd 110cd LOBBY / LINK 155 STORAGE 158 ELECTRIC 157 WARMING ROOM 159 LOADING/RECEIVING/STORAGE 160 FAMILY TLT 162 J.C. 163 MEN'S 166 GENERAL BUILDING STORAGE 167WOMEN'S 165 F.S. STORAGE 175 MULTI-PURPOSE AREA 154 MULTI-USE CONVENTION SPACE 156 MALL CONNECTION 164 LP3(L)-6 LP3(L)-6 LP3(L)-11 LP3(L)-11 LP4(L)-27 LP4(L)-27 LP4(L)-27LP4(L)-27 LP4(L)-27 LP4(L)-14 LP4(L)-27 LP4(L)-27 LP4(L)-27 LP4(L)-30 LP4(L)-32 LP4(L)-34 LP4(L)-35 LP4(L)-30 LP4(L)-29 LP4(L)-31 LP4(L)-29 LP4(L)-35 LP4(L)-35 LP4(L)-39LP4(L)-39LP4(L)-39 LP4(L)-39 LP4(L)-37 LP4(L)-41 LP4(L)-41 LP4(L)-37 LP4(L)-39 LP1(L)-1 LP1(L)-1 LP1(L)-1 LP1(L)-1 LP1(L)-1 LP1(L)-1 LP1(L)-1 LP4(L)-1 LP4(L)-1 LP4(L)-1 LP4(L)-2 LP4(L)-2 LP4(L)-2 LP4(L)-2 LP4(L)-2 LP4(L)-2 LP4(L)-2 LP4(L)-2 LP4(L)-14 LP4(L)-14 LP4(L)-14 LP4(L)-17 LP4(L)-15LP4(L)-16 LP4(L)-19 LP4(L)-24 LP4(L)-22 LP4(L)-30 LP4(L)-30 LP4(L)-30 LP4(L)-20 LP4(L)-25 LP1(L)-7 LP4(L)-42 LP4(L)-42 A B E F G HCD 1 2 3 F.3 F.9 G.8 004 003 006 30cd 30cd HOCKEY STORAGE 173 TEMP STORAGE 174 15cd CR DC EL LP4(L)-5,7,9 LP4(L)-3 LP4(L)-8,10,12 DISP-1 CO-1 REF-2 IT/GEN STORAGE 176 60" LP4(L)-6 LP4(L)-4 LP4(L)-11 LP3(L)-1 GWH-5 MP1-17 OFV-3 LP4(L)-21 LP4(L)-23 OFV-4 DF-1 OFCT-4 OFCT-5 MULTIPURPOSE AREA CIRCULATION 154 (B) GFCI LP4(L)-18 LP4(L)-18 LP4(L)-28 LP4(L)-28 LP4(L)-28 LP4(L)-29 LP1(L)-41 LP1(L)-41 LP1(L)-41 AV CLOSET 167 (B) AV CLOSET 157 (A) SC5 SC6 ST1 K K PW-2 K K PW-1 KK SBP-2 SBP-1 RSP-1 RSP-2 SBP-3 SBP-4 PRS-1 PRJ-1 PRS-2 PRJ-2 ST2 ST4 AV-2AV-1 AV-4AV-3 STG-1-1 STG-2-1 STG-4-1 LP6-26,28 LP5-4,6,8 LP1(L)-2 LP6-19,21,23LP1(L)-3 LP6-13,15,17 LP1(L)-10 LP6-8,10,12 LP5-58,60 LP1(L)-5 LP5-16,18,20 LP1(L)-8 LP6-25,27,29 LP6-20,22,24 LP4(L)-72 LP5-5,7,9 LP6-14,16,18 LP1(L)-6 LP5-13,15,17 LP5-10,12,14LP4(L)LP1(L) LP5 LP4(L)-53LP4(L)-13 LP1(L)-44LP1(L)-39 LS1 LS4 MP1-11 IR-11 MP1-10 IR-10 MP1-9 IR-9 T-5 LP4(L)-33 REF-5 LP4(L)-38 REF-6 LP4(L)-73,75 MW/OVEN-1 OVN-4 LP4(L)-40 F.4 F.6 E7.7 1 001 002 007 008 009 010 005 017 +48" +48" 6 E2.1b +48" +48"+48" +48" +48" LP1(L)-49 HD23HD24 LP1(L)-51 HD25 LP1(L)-54 LP1(L)-53 GFCIGFCILP1(L)-53 GFCI GFCI LP1(L)-53LP1(L)-53 HD29 HD30 HD31 LP1(L)-58 LP1(L)-55 LP1(L)-56 LP6 7 E2.1b 7 E2.1b 7 E2.1b 7 E2.1b MBH-3 LP5-56 LP5-52 MS2 MBH-4 LP5-57 6 E2.1b 6 E2.1b MBH-5 LP5-56 MBH-6 LP5-57 MS3 LP5-54 MS4 LP5-55 LP5-3 T-6 LP5-21 LP3(L)-79 OD-2 LP4(L)-74 OD-3 OD-4 LP4(L)-76 LP4(L)-78 OD-5 30cd HD37LP1(L)-66HD38LP1(L)-64DS LP1(R)LP4(R)MULTIPURPOSE AREA CIRCULATION 154 (B) GFCI GFCI GFCI GFCI 48" AFFLP4(L)-36 48" AFF 48" AFF 48" AFF 48" AFF MULTIPURPOSE AREA CIRCULATION 154 (B) 8 E2.1b 1 E2.1b 2 E2.1b 1 E2.1b 4 E2.1b 3 E2.1b5 E2.1b 1 E2.1b 2 E2.1b 7 E2.1b LP3(L)-6 LP3(L)-6 5 E2.1c ## E2.1b 1. FUTURE INFRARED HEATING SYSTEM. PROVIDE WIRING, CONDUIT, AND JUNCTION BOXES. CAP AND LABEL FOR FUTURE INSTALLATION. 2. PROVIDE 120V CONNECTION TO SCOREBOARD. MOUNT JBOX ON BAR JOIST FOR SCOREBOARD SUSPENDED FROM JOIST. VERIFY CONNECTION WITH EQUIPMENT SUPPLIER AND FINAL LOCATION WITH OWNER. 3. LOCATION OF SCOREKEEPER'S BOX. VERIFY ALL CONDUIT RUNS TO THIS LOCATION WITH OWNER PRIOR TO CONSTRUCTION. FOR BIDDING PURPOSES, ASSUME (4) 2" CONDUIT RUNS FROM THIS LOCATION TO ADMINISTRATION A102 ROUTE (2) 2" CONDUITS FROM THIS LOCATION TO EACH SCOREBOARD FOR PA, MUSIC, ETC. 4. POWER AND DATA CONNECTIONS SHALL BE RECESSED INTO THE BACKER BOARDS WITH THE ACCESS ON THE NON-ICE SIDE OF THE RINK. 5. PROVIDE A 1" CONDUIT FROM THIS CENTER RINK SCOREBOARD LOCATION TO SCOREBOARD CONTROL LOCATION IN IT ROOM B115. CONFIRM ALL LOCATIONS AND ROUTING PRIOR TO ROUGH-IN. 6. LOCATION OF BACKBOARD, WINDOW SHADES AND ROOM DIVIDER SWITCHES. LOCATE SWITCHES IN A RECESSED ENCLOSURE WITH A KEYED HINGED DOOR. ALL SWITCHES TO BE LABELED WITH EQUIPMENT BEING SERVED AND CIRCUIT NUMBER. PROVIDE (4) SETS OF KEYS AND TURN OVER TO OWNER. COORDINATE ROUGH-IN LOCATIONS WITH VENDORS. 7. PROVIDE A HEAVY DUTY 60A, 3PH DISCONNECT SWITCH WITH A COUPLED THREE PHASE RECEPTACLE INTERLOCKED TO HANDLE MECHANISM, EATON DH362UD5WRK OR APPROVED EQUAL. 8. APPROXIMATE LOCATION OF BI-DIRECTIONAL ANTENNA (BDA) SYSTEM ROOF PENETRATION. PROVIDE A 2" ROOF PENETRATION WITH WEATHERHEAD SEAL AND CAP. COORDINATE FINAL LOCATION WITH BDA SYSTEM INSTALLER PRIOR TO ROUGH-IN. 9. FOOD SERVICE EQUIPMENT LOCATED IN WARMING ROOM SHOWN FOR REFERENCE ONLY. REFER TO FOOD SERVICE ELECTRICAL PLANS, SPECIFICATIONS, AND APPROVED SHOP DRAWINGS FOR FINAL REQUIREMENTS. UNLESS OTHERWISE SPECIFIED, EC TO PROVIDE ALL LINE DISCONNECTS, CONDUIT, WIRING, BOXES, SWITCHES, FACEPLATES, BRACKETS, 208V CORDS, PLUGS AND RECEPTACLES AS NECESSARY FOR A COMPLETE INSTALLATION. COORDINATE EXACT LOCATIONS AND ELECTRICAL REQUIREMENTS WITH THE FOOD SERVICE CONTRACTOR PRIOR TO ROUGH-IN. PLAN NOTES: 1. COORDINATE LOCATION AND MOUNTING OF DEVICES WITH MILLWORK AND CASEWORK. 2. COORDINATE DEVICE LOCATIONS AND ELEVATIONS AT ALL WORKSTATIONS WITH FINAL FURNITURE PLANS AND APPROVED SHOP DRAWINGS PRIOR TO DEVICE ROUGH-IN. 3. REFER TO THE ARCHITECTURAL DETAILS AND ELEVATION DRAWINGS FOR COORDINATION OF ELECTRICAL DEVICES. 4. CONDUIT AND WIRING MAY NOT BE SHOWN GRAPHICALLY ON THE PLANS. HOWEVER IT SHALL BE PROVIDED COMPLETE AS REQUIRED BASED ON IDENTIFICATION OF CIRCUIT NUMBERS, RELAY NUMBERS, SWITCHING IDENTIFICATION, MOTOR EQUIPMENT SCHEDULE, PANEL BOUNDARIES, SPECIFIED MINIMUM CONDUIT SIZE, SPECIFIED MINIMUM CONDUCTOR SIZES, AND/OR SPECIFIED MINIMUM GROUNDING. 5. REFER TO ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION FOR FEEDERS AND ELECTRICAL EQUIPMENT. 6. PROVIDED 1-1/4" EMPTY CONDUITS WITH PULLSTRING FOR ALL TELECOMMUNICATION AND ACCESS CONTROL ROUGH-INS. 7. FOR ALL TV LOCATIONS, PROVIDE 1-1/4" EMPTY CONDUIT WITH PULLSTRING ROUGH-IN TO SUPPORT COAX AND TELECOMMUNIATION CABLING. 8. ALL DEVICES SHALL BE COORDINATED WITH FURNITURE LAYOUT AND APPROVED SHOP DRAWINGS PRIOR TO ROUGH-IN. 9. PROVIDE ACCESS CONTROL ROUGH-IN PER DETAIL 4, SHEET E6.2. PROVIDE 20A, 120V CIRCUIT FOR POWER SUPPLY AS NECESSARY. COORDINATE INSTALLATION WITH SECURITY VENDOR PRIOR TO ROUGH-IN. 10. COMBINATION FIRE SMOKE DAMPER ACTUATORS SHALL BE BY THE MC. PROVIDE A 20A, 120V CIRCUIT. REFER TO THE MECHANICAL FLOOR PLANS FOR EXACT LOCATIONS AND QUANTITIES. COORDINATE INSTALLATION WITH THE MC. 11. IT SHALL BE THE RESPONSIBILITY OF THE DIV. 26 CONTRACTOR TO PROVIDE ALL BACK BOXES, CONDUIT, AND CONDUIT SLEEVES FOR OWNER PROVIDED LOW VOLTAGE SYSTEMS SUCH AS TELECOMMUNICATIONS, CCTV, ACCESS CONTROLS, INTRUSION ALARM DETECTION, AND DISTRIBUTED ANTENNA SYSTEM (DAS) AS SYSTEMS PROVIDED BY OTHERS. COORDINATE THE REQUIRED WORK AND FINAL DEVICE LOCATIONS WITH THE TELECOMMUNICATIONS, SECURITY, ACCESS CONTROLS, AND DAS VENDORS AS NECESSARY. 12. RECEPTACLES LOCATED IN AREAS OF CHILDREN SHALL BE TAMPER RESISTANT TYPE, UNLESS NOTED OTHERWISE. 13. ALL FIRE ALARM DEVICES LOCATED IN MULTI-PURPOSE AREA SHALL HAVE WIRE GUARDS OR SHIELDING TO PROTECT THE DEVICES FROM DAMAGE. 14. PROVIDE STAINLESS STEEL FINISH DEVICE PLATES THROUGHOUT MULTI-PURPOSE AND WARMING ROOM AREA. GENERAL NOTES:NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FIRST FLOOR POWER AND SYSTEMS PLAN B -NE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E2.1b 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FIRST FLOOR POWER AND SYSTEMS PLAN B -NE QUAD 2 10/13/202310/04/2023 BID DOCUMENT SET DN TVSS SSSSSSSSTV TVTVS HE SE SE SE 6 S S S S S S TV TVTVTV TVI I S CHECK-IN/RENTAL 107 240 SF DF-4 REF-1 MW-1 COF-1 ELC-1 OFV-6 OFCT-6 EL15 EL16 CSB7 CSB8 HD17 EL23 EL25 EL26 EL27 EL28 GL3 IR-12 IR-13 IR-14 60cd 60cd 110cd 110cd 110cd 60cd 30cd 15cd 75cd 15cd 15cd 15cd 15cd 15cd 15cd 45cd 45cd 44" 44" 44" 60" 44" HD18 SC4 44" SD1 SD2 110cd 110cd 110cd110cd 15cd 15cd 110cd 110cd 110cd 110cd 15cd PMS15cd5 E2.1c 6 E2.1c 7 E2.1c CMMMCMCM4 E2.1c CONCESSIONS 115 (B) OFFICE 111 SKATE RENTAL 108 VESTIBULE 100 MAIN LOBBY 101 MEETING ROOM (A) 102 MEETING ROOM (B) 103 STOR 104 FIRST AID 105 LOBBY / LINK 155 GEN STORAGE 153 ELEV 152 BREAKROOM 109 OFFICE 110 ADMIN 112 CPY 1 LP4(L)-39 LP4(L)-41 LP4(L)-41 LP4(L)-39 LP4(L)-30 MULTI-USE CONVENTION SPACE 156 MULTI-PURPOSE AREA 154 MAIN LOBBY 101 LP1(L)-7 LP1(L)-7 LP1(L)-7 LP4(L)-1 LP1(L)-7 LP1(L)-11 LP1(L)-16 LP1(L)-13 LP4(L)-42 LP4(L)-42 LP4(L)-44 LP4(L)-44 LP4(L)-45 LP4(L)-46LP4(L)-30 LP4(L)-30 LP4(L)-30 LP4(L)-30 LP4(L)-44 LP1(L)-18 LP1(L)-15 LP4(L)-1 LP1(L)-17 LP1(L)-22 LP1(L)-26 LP1(L)-26 LP1(L)-26 LP1(L)-21 LP1(L)-21 LP1(L)-26 LP1(L)-26 LP1(L)-24 LP1(L)-29 LP1(L)-34 LP1(L)-31 LP1(L)-36LP1(L)-21LP1(L)-21LP1(L)-21 LP1(L)-21 LP1(L)-20 LP1(L)-43 LP1(L)-43 LP1(L)-27 LP1(L)-32 LP4(L)-1 LP1(L)-22 LP1(L)-22 LP1(L)-22 LP1(L)-22 LP1(L)-22 LP1(L)-23LP1(L)-23 LP1(L)-28 LP1(L)-23 LP1(L)-23LP1(L)-24 LP1(L)-24 LP1(L)-24LP1(L)-24 LP1(L)-24 LP1(L)-26 LP1(L)-21 LP1(L)-35 LP1(L)-35 LP1(L)-35 LP1(L)-35 LP1(L)-35 LP1(L)-38 LP1(L)-38 LP1(L)-38LP1(L)-33LP1(L)-31 LP1(L)-31 LP2(L)-2 LP2(L)-2 LP2(L)-1 LP1(L)-25 LP1(L)-30 LP1(L)-23 LP4(L)-48 LP2(L)-43 LP2(L)-66,68,70 LP2(L)-10 LP2(L)-10 LP2(L)-10 LP2(L)-46LP2(L)-57 LP2(L)-56 LP2(L)-42 A B E F G HCD 4 5 6 7 F.3 F.9 G.8 9 VAV 1-8 DP2-13,15,17 021 024DCELCR CR DC EL U/CR-1 U/CR-2 LP1(L)-40 LP1(L)-37 ELC1 ELC2 FRZ-2 POP-1 RC-1 LP2(L)-41 LP2(L)-59,61,63 CO-2 LP2(L)-65 60" LP5-37 ESP-1 LP4(L)-47 OFCT-18 LP2(L)-45 IT30A3 LP1(L)-26 ELC3 ELC4 COPY AREA 112 (A) LOCKER ALCOVE 101 (A) SC7 KK PW-3 PW-4 K K ST2 ST5 ST3PRS-3 PRJ-3 STG-3-1 LP1(L)-10 8 5.8 LP1(L)-14 LP1(L)-42 LP5-23,25,27 LP5-22,24,26 LP1(L)-9 LP5-29,31,33 LP1(L)-45,47 CPY 2 LP1(L)-46 LP1(L)-19 LP1(L)-19 LP4(L)-49 ELL-1 ELV-1 LP4(L)-50,52,54 VAV 1-9 DP1-19,21,23 VAV 1-10DP1-16 VAV 1-11DP1-18 VAV 1-12 DP1-20 VAV 1-13 DP1-8 VAV 1-14 DP1-2,4,6 VAV 1-15 DP1-1 VAV 1-16 DP1-3 VAV 1-17 DP1-5 MP1-14 IR-14 IR-13 MP1-13 IR-12 MP1-12 42" 42" LP5-30 LP5-30 LP5-30 LP5-32 LP5-32 LP5-39 LP5-39 LP2(L)-3 FRZ-3 LP2(L)-7 C/GFCI LP5-32 LP5-32 LP5-30 F.4 F.6 E7.8 1 007 008 009 010 017 022 023 025 026 6 E2.1b 8 E2.1c SBP-5 LP6-1,3,5 9 E2.1c MS-1 LP1(L)-12 MBH-1 LP1(L)-52 MBH-2 LP1(L)-52 LP5-1 GFCI GFCI LP1(L)-22 LP1(L)-21 SBP-6 LP6-7,9,11 SBP-7LP6-2,4,6 9 E2.1c 9 E2.1c LP1(L)-50 FAAP MS4 LP5-55 LP1(L)-57 OD-6 15cd WOMENS 106B MENS 106A GFCI GFCILP1(L)-22 OFCT-19 LP1(L)-59 HD36HD35 LP1(L)-61LP1(L)-62 LP1(L)-48LP1(L)-48 HT-2 LP5-59,61 HT-3 LP5-62,64 MS MS FAMILY RR 106 LP1(L)-38 44" 44" LP5-39 LP5-39 LP5-39 LP5-39 LP5-39 LP5-39 DB C/GFCI C/GFCI 15cd LP5-63 LP5-63 OFCT-20 OFV-21 4 E2.1b 3 E2.1b5 E2.1b 10 E2.1c 1 E2.1c 5 E2.1c 1 E2.1c 1 E2.1c 1 E2.1c ## E2.1c 1. FUTURE INFRARED HEATING SYSTEM. PROVIDE WIRING, CONDUIT, AND JUNCTION BOXES. CAP AND LABEL FOR FUTURE INSTALLATION. 2. PROVIDE 120V CONNECTION TO SCOREBOARD. MOUNT JBOX ON BAR JOIST FOR SCOREBOARD SUSPENDED FROM JOIST. VERIFY CONNECTION WITH EQUIPMENT SUPPLIER AND FINAL LOCATION WITH OWNER. 3. PROVIDE A 1" CONDUIT FROM THIS CENTER RINK SCOREBOARD LOCATION TO SCOREBOARD CONTROL LOCATION IN IT ROOM B115. CONFIRM ALL LOCATIONS AND ROUTING PRIOR TO ROUGH-IN. 4. ELEVATOR CONTROLLER. COORDINATE FINAL LOCATION WITH ELEVATOR INSTALLER. 5. ELEVATOR FUSIBLE SHUNT TRIP DISCONNECT; BUSSMAN POWER MODULE (PMS) OR APPROVED EQUAL. 6. PROVIDE CONTROL AND MONITOR MODULES FOR ELEVATOR RECALL AND TO SHUNT-TRIP POWER TO ELEVATOR AS NECESSARY. 7. PROVIDE MONITOR MODULE TO MONITOR ELEVATOR 120V SHUNT-TRIP POWER. 8. LOCATION OF BACKBOARD, WINDOW SHADES AND ROOM DIVIDER SWITCHES. LOCATE SWITCHES IN A RECESSED ENCLOSURE WITH A KEYED HINGED DOOR. ALL SWITCHES TO BE LABELED WITH EQUIPMENT BEING SERVED AND CIRCUIT NUMBER. PROVIDE (4) SETS OF KEYS AND TURN OVER TO OWNER. COORDINATE ROUGH-IN LOCATIONS WITH VENDORS. 9. PROVIDE A HEAVY DUTY 60A, 3PH DISCONNECT SWITCH WITH A COUPLED THREE PHASE RECEPTACLE INTERLOCKED TO HANDLE MECHANISM, EATON DH362UD5WRK OR APPROVED EQUAL. 10. PROVIDE A TWO-WAY COMMUNICATION SYSTEM AT ELEVATOR LANDING COMPLYING WITH THE INTERNATIONAL BUILDING CODE. REFER TO DETAIL 5, SHEET E6.1. PLAN NOTES: 1. COORDINATE LOCATION AND MOUNTING OF DEVICES WITH MILLWORK AND CASEWORK. 2. COORDINATE DEVICE LOCATIONS AND ELEVATIONS AT ALL WORKSTATIONS WITH FINAL FURNITURE PLANS AND APPROVED SHOP DRAWINGS PRIOR TO DEVICE ROUGH-IN. 3. REFER TO THE ARCHITECTURAL DETAILS AND ELEVATION DRAWINGS FOR COORDINATION OF ELECTRICAL DEVICES. 4. CONDUIT AND WIRING MAY NOT BE SHOWN GRAPHICALLY ON THE PLANS. HOWEVER IT SHALL BE PROVIDED COMPLETE AS REQUIRED BASED ON IDENTIFICATION OF CIRCUIT NUMBERS, RELAY NUMBERS, SWITCHING IDENTIFICATION, MOTOR EQUIPMENT SCHEDULE, PANEL BOUNDARIES, SPECIFIED MINIMUM CONDUIT SIZE, SPECIFIED MINIMUM CONDUCTOR SIZES, AND/OR SPECIFIED MINIMUM GROUNDING. 5. REFER TO ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION FOR FEEDERS AND ELECTRICAL EQUIPMENT. 6. PROVIDED 1-1/4" EMPTY CONDUITS WITH PULLSTRING FOR ALL TELECOMMUNICATION AND ACCESS CONTROL ROUGH-INS. 7. FOR ALL TV LOCATIONS, PROVIDE 1-1/4" EMPTY CONDUIT WITH PULLSTRING ROUGH-IN TO SUPPORT COAX AND TELECOMMUNIATION CABLING. 8. ALL DEVICES SHALL BE COORDINATED WITH FURNITURE LAYOUT AND APPROVED SHOP DRAWINGS PRIOR TO ROUGH-IN. 9. PROVIDE ACCESS CONTROL ROUGH-IN PER DETAIL 4, SHEET E6.2. PROVIDE 20A, 120V CIRCUIT FOR POWER SUPPLY AS NECESSARY. COORDINATE INSTALLATION WITH SECURITY VENDOR PRIOR TO ROUGH-IN. 10. COMBINATION FIRE SMOKE DAMPER ACTUATORS SHALL BE BY THE MC. PROVIDE A 20A, 120V CIRCUIT. REFER TO THE MECHANICAL FLOOR PLANS FOR EXACT LOCATIONS AND QUANTITIES. COORDINATE INSTALLATION WITH THE MC. 11. IT SHALL BE THE RESPONSIBILITY OF THE DIV. 26 CONTRACTOR TO PROVIDE ALL BACK BOXES, CONDUIT, AND CONDUIT SLEEVES FOR OWNER PROVIDED LOW VOLTAGE SYSTEMS SUCH AS TELECOMMUNICATIONS, CCTV, ACCESS CONTROLS, INTRUSION ALARM DETECTION, AND DISTRIBUTED ANTENNA SYSTEM (DAS) AS SYSTEMS PROVIDED BY OTHERS. COORDINATE THE REQUIRED WORK AND FINAL DEVICE LOCATIONS WITH THE TELECOMMUNICATIONS, SECURITY, ACCESS CONTROLS, AND DAS VENDORS AS NECESSARY. 12. RECEPTACLES LOCATED IN AREAS OF CHILDREN SHALL BE TAMPER RESISTANT TYPE, UNLESS NOTED OTHERWISE. 13. ALL FIRE ALARM DEVICES LOCATED IN MULTI-PURPOSE AREA SHALL HAVE WIRE GUARDS OR SHIELDING TO PROTECT THE DEVICES FROM DAMAGE. 14. PROVIDE STAINLESS STEEL FINISH DEVICE PLATES THROUGHOUT MULTI-PURPOSE AND WARMING ROOM AREA. GENERAL NOTES:NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FIRST FLOOR POWER AND SYSTEMS PLAN C -NW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E2.1c 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FIRST FLOOR POWER AND SYSTEMS PLAN C -NW QUAD 10/13/202310/04/2023 BID DOCUMENT SET DN TV SSS S SSS S HE SE SE SE S S S S S S SS S DF-5 DF-3 DF-2 GWH-2 CP-2 GWH-3 ELC-1 OFV-16 OFV-17 OFV-11 OFV-9 OFV-19 OFCT-17 OFCT-16 OFCT-14 OFCT-15 OFCT-13 OFCT-12 30cd 96" EL8EL7 CSB3 CSB4 HD3 CR ES E DC 15cd 15cd 30cd 30cd 30cd 30cd 30cd 30cd 15cd 15cd 15cd 15cd 75cd 75cd EL19 EL18 EL17 GFCI HD10 LP2(L) T-2 DP2 HL2 EL21EL20 EL22 GL2 IR-5 IR-6IR-8 IR-7 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd15cd15cd SC2 11'-0"11'-0" SD3 IT30A4 IT30A5 60cd 110cd 110cd 110cd GB VAV 1-3 110cd 110cd ELEV PMS15cd5 E2.1c 6 E2.1c 7 E2.1c CMMMCMCM4 E2.1c J.C. 114 CONCESSIONS 115 (B) BEER SALES 116 ICE ARENA LOBBY 117 MEN'S 121 TRAINING 129 UNISEX TLT 128 TEAM ROOM 4 127 TEAM ROOM 5 126 WET TEAM ROOM 3 125 WET TEAM RR 124 WET TEAM ROOM 4 123 IT 150 TEAM ROOM 3 149 TEAM ROOM 1 147 TEAM ROOM 2 148 J.C. 142 REFEREE 145 REFEREE RR 146 ICE RINK CIRCULATION 151 PASSAGE 144 ELEV 152 CP-3 GFCI LP3(L)-18 LP3(L)-18 LP3(L)-22 LP3(L)-56 LP3(L)-59 LP3(L)-60 LP3(L)-56 LP3(L)-43 LP3(L)-45 LP3(L)-46 LP3(L)-48LP3(L)-43 LP3(L)-34 LP4(L)-30 LP4(L)-30 LP2(L)-2 LP2(L)-2 LP2(L)-2 LP2(L)-2 GFCI GFCI DIS-1 DIS-2 LP3(L)-10LP3(L)-62LP3(L)-63 LP3(L)-10 LP3(L)-64LP3(L)-65 LP3(L)-67 LP2(L)-39 LP2(L)-39 LP2(L)-39 LP2(L)-34 LP2(L)-31 LP2(L)-36 LP2(L)-32LP2(L)-33 LP2(L)-37 LP2(L)-38 LP2(L)-35 LP2(L)-1 LP2(L)-51 LP2(L)-52 LP2(L)-55 LP2(L)-55 LP2(L)-4 LP2(L)-4 LP2(L)-5 LP2(L)-4 LP2(L)-4 LP2(L)-4 LP2(L)-26 LP2(L)-27 LP2(L)-25 LP2(L)-14 LP2(L)-19 LP2(L)-20 LP2(L)-25 LP2(L)-13 LP2(L)-6 LP2(L)-29 LP2(L)-30 LP2(L)-28 LP2(L)-6 LP2(L)-23 LP2(L)-72 LP2(L)-15 LP2(L)-17LP2(L)-16 LP2(L)-18 LP2(L)-25 LP2(L)-24 LP2(L)-6 LP2(L)-9LP2(L)-11LP2(L)-12 LP2(L)-8 LP2(L)-9 LP2(L)-9 LP2(L)-6 LP2(L)-9 LP2(L)-9 LP4(L)-48 LP2(L)-42 LP2(L)-43 LP2(L)-66,68,70 LP2(L)-10 LP2(L)-10 LP2(L)-10 LP3(L)-21 LP2(L)-54 LP2(L)-47LP2(L)-49LP2(L)-46LP2(L)-57 LP2(L)-56 LP2(L)-56 LP2(L)-42 H J K M P QN 5 6 7 G.8 L.6 M.4 9 VAV 1-1DP2-1 DP2-3 VAV 1-4 VAV 1-6 VAV 1-7 VAV 1-8 DP2-8,10,12 DP2-14,16,18 DP2-19,21,23 DP2-13,15,17 LP3(L)-66 LP3(L)-66 LP3(L)-66 029 027 030 CR E EL DC KY KY FOOD PREP 115 (A) CR DC EL LP2(L)-42 U/CR-1 U/CR-2 U/CR-3 U/CR-4 U/CR-5LP2(L)-48 LP1(L)-40 LP1(L)-37 ELC1 ELC2 FRZ-2 REF-3 POP-1 RC-1 RC-2 LP2(L)-41 LP2(L)-50 FRZ-1 GRI-1 LP2(L)-53 LP2(L)-58 LP2(L)-58 LP2(L)-59,61,63 CO-2 LP2(L)-60,62,64 LP2(L)-65 LP3(L)-19 MP1-15 LP5-37 ESP-1 LP4(L)-47 LP2(L)-67 LP2(L)-69 OFV-15 OFV-13OFV-12 OFV-18 LP2(L)-40 OFCT-10 OFCT-8 LP3(L)-47 LP2(L)-44 OFV-20 OFV-14OFCT-18 LP2(L)-45 LP2(L)-71 LP2(L)-22 ELECTRICAL 113 LP2(L)-73 MP1-16 HD19 ELC5 ELC6 LP3(L)-61 LP3(L)-61 LP3(L)-61 LOCKER ALCOVE 101 (A)HD11HD13 HD12 HD14 LP2(L)-21HD15 HD16 GFCI HD20 8 L M.3 5.8 12 LP4(L)-49 ELL-1 ELV-1 LP4(L)-50,52,54 LS2 VESTIBULE 118 VAV 1-5DP2-43 MP1-14 IR-14 MP1-8 IR-8 MP1-7 IR-7 MP1-6IR-6 IR-5 MP1-5 LP2(L)-3 FRZ-3 LP2(L)-7 LP2(L)-7C/GFCI C/GFCI HD21 LP2(L)-74 HD22 LP2(L)-76 L.4 L.8 E7.6 1 019 020 018 016 017 028 SBP-7 LP6-2,4,6 9 E2.1c LP2(L)-75LP2(L)-75 LP2(L)-75 GFCIGFCI GFCI +48" +48"+48"LP2(L)-77LP2(L)-77 GFCIGFCI +48"+48" LP1(L)-4 LP1(L)-4 LP1(L)-4 LP1(L)-4 LP1(L)-60 LP1(L)-60 LP3(L)-77 LP3(L)-77 15cd LP2(L)-78HD32 LP2(L)-79 HD33 LP2(L)-82HD39HD34 LP2(L)-80 LP1(L)-48LP1(L)-48 HT-4 LP1(L)-63,65 HT-5LP5-66,68 WELLNESS ROOM 119 FAMILY RESTROOM 120 HD40 LP2(L)-81 15cd LP2(R) MERCYHEALTH ARENA 136 HD41 LP2(L)-83 YH COACH 143 DRY STORAGE 115 (C) WOMENS 122 7 E2.1d 4 E2.1A 5 E2.1A 4 E2.1b 3 E2.1b 6 E2.1A 10 E2.1c 1 E2.1c 3 E2.1D 1 E2.1D 1 E2.1D 2 E2.1D4 E2.1D 4 E2.1D 1 E2.1D 1 E2.1D 6 E2.1D 6 E2.1D 5 E2.1D 5 E2.1D ## E2.1d 1. FUTURE INFRARED HEATING SYSTEM. PROVIDE WIRING, CONDUIT, AND JUNCTION BOXES. CAP AND LABEL FOR FUTURE INSTALLATION. 2. PROVIDE 120V CONNECTION TO SCOREBOARD. MOUNT JBOX ON BAR JOIST FOR SCOREBOARD SUSPENDED FROM JOIST. VERIFY CONNECTION WITH EQUIPMENT SUPPLIER AND FINAL LOCATION WITH OWNER. 3. PROVIDE A 1" CONDUIT FROM THIS CENTER RINK SCOREBOARD LOCATION TO SCOREBOARD CONTROL LOCATION IN IT ROOM B115. CONFIRM ALL LOCATIONS AND ROUTING PRIOR TO ROUGH-IN. 4. FUTURE POWERED SIGNAGE. COORDINATE FINAL LOCATION WITH OWNER AND ARCHITECT. COORDINATE POWER REQUIREMENTS WITH SIGN MANUFACTURER(S). 5. PROVIDE NEW CEILING MOUNTED JUNCTION BOXES AND A DEDICATED 120- VOLT, 20A CIRCUIT FOR NEW ELECTRICALLY CONTROLLED LOCKS ON THESE DOORS. COORDINATE WITH ARCHITECT FOR FINAL ELECTRICAL REQUIREMENTS. 6. WET TEAM ROOM 124. KEY LOCKS TO BE USED TO ENTER ROOM. VIA CARD ACCESS PROGRAMMING, FIRST KEY ENTRANCE TO ROOM WILL DIS-ENGAGE OPPOSITE TEAM ENTRANCE DOOR/KEY. ONCE KEY IS REMOVED AND SWITCH BACK TO NORMAL POSITION SYSTEM IS RESET. 7. IF ALTERNATE IS TAKEN, ADJUST CAMERA LOCATION(S) ACCORDINGLY PLAN NOTES: 1. COORDINATE LOCATION AND MOUNTING OF DEVICES WITH MILLWORK AND CASEWORK. 2. COORDINATE DEVICE LOCATIONS AND ELEVATIONS AT ALL WORKSTATIONS WITH FINAL FURNITURE PLANS AND APPROVED SHOP DRAWINGS PRIOR TO DEVICE ROUGH-IN. 3. REFER TO THE ARCHITECTURAL DETAILS AND ELEVATION DRAWINGS FOR COORDINATION OF ELECTRICAL DEVICES. 4. CONDUIT AND WIRING MAY NOT BE SHOWN GRAPHICALLY ON THE PLANS. HOWEVER IT SHALL BE PROVIDED COMPLETE AS REQUIRED BASED ON IDENTIFICATION OF CIRCUIT NUMBERS, RELAY NUMBERS, SWITCHING IDENTIFICATION, MOTOR EQUIPMENT SCHEDULE, PANEL BOUNDARIES, SPECIFIED MINIMUM CONDUIT SIZE, SPECIFIED MINIMUM CONDUCTOR SIZES, AND/OR SPECIFIED MINIMUM GROUNDING. 5. REFER TO ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION FOR FEEDERS AND ELECTRICAL EQUIPMENT. 6. PROVIDED 1-1/4" EMPTY CONDUITS WITH PULLSTRING FOR ALL TELECOMMUNICATION AND ACCESS CONTROL ROUGH-INS. 7. FOR ALL TV LOCATIONS, PROVIDE 1-1/4" EMPTY CONDUIT WITH PULLSTRING ROUGH-IN TO SUPPORT COAX AND TELECOMMUNIATION CABLING. 8. ALL DEVICES SHALL BE COORDINATED WITH FURNITURE LAYOUT AND APPROVED SHOP DRAWINGS PRIOR TO ROUGH-IN. 9. PROVIDE ACCESS CONTROL ROUGH-IN PER DETAIL 4, SHEET E6.2. PROVIDE 20A, 120V CIRCUIT FOR POWER SUPPLY AS NECESSARY. COORDINATE INSTALLATION WITH SECURITY VENDOR PRIOR TO ROUGH-IN. 10. COMBINATION FIRE SMOKE DAMPER ACTUATORS SHALL BE BY THE MC. PROVIDE A 20A, 120V CIRCUIT. REFER TO THE MECHANICAL FLOOR PLANS FOR EXACT LOCATIONS AND QUANTITIES. COORDINATE INSTALLATION WITH THE MC. 11. IT SHALL BE THE RESPONSIBILITY OF THE DIV. 26 CONTRACTOR TO PROVIDE ALL BACK BOXES, CONDUIT, AND CONDUIT SLEEVES FOR OWNER PROVIDED LOW VOLTAGE SYSTEMS SUCH AS TELECOMMUNICATIONS, CCTV, ACCESS CONTROLS, INTRUSION ALARM DETECTION, AND DISTRIBUTED ANTENNA SYSTEM (DAS) AS SYSTEMS PROVIDED BY OTHERS. COORDINATE THE REQUIRED WORK AND FINAL DEVICE LOCATIONS WITH THE TELECOMMUNICATIONS, SECURITY, ACCESS CONTROLS, AND DAS VENDORS AS NECESSARY. 12. RECEPTACLES LOCATED IN AREAS OF CHILDREN SHALL BE TAMPER RESISTANT TYPE, UNLESS NOTED OTHERWISE. 13. ALL FIRE ALARM DEVICES LOCATED IN MULTI-PURPOSE AREA SHALL HAVE WIRE GUARDS OR SHIELDING TO PROTECT THE DEVICES FROM DAMAGE. 14. PROVIDE STAINLESS STEEL FINISH DEVICE PLATES THROUGHOUT MULTI-PURPOSE AND WARMING ROOM AREA. GENERAL NOTES:NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated FIRST FLOOR POWER AND SYSTEMS PLAN D -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E2.1d 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 FIRST FLOOR POWER AND SYSTEMS PLAN D -SW QUAD 10/13/202310/04/2023 BID DOCUMENT SET TV## E2.2a 1. COMBINATION RECEPTACLE AND USB POWER STRIP MOUNTED TO BASE OF DRINK RAIL. EC TO FIELD VERIFY EXACT REQUIREMENTS PRIOR TO ROUGH-IN. REFER TO DETAIL 1/E6.3 FOR ADDITIONAL INFORMATION. PLAN NOTES: H J K M P QN 1 2 3 G.8 L.6 M.4LM.3L.4 L.8 SPONSOR SUITE 202 PRESS BOX 203 MEZZANINE 201 MERCYHEALTH ARENA SOUTH SEATING 136 (B) MERCYHEALTH ARENA NORTH SEATING 136 (A) CORNER SUITE 205 ADA AND COMPANION 206 ADA AND COMPANION 209 AV CLOSET 210 92" AFF. (TYP.) 1 E2.2a CKT# LP4(L) -63 LP2(R)-29 LP2(R)-30 U/C R-6 LP2(R)-29 LP2(R)-29 LP2(R)-29 LP2(R)-29 LP2(R)-29 CKT# LP4(L) -62 CKT# LP4(L) -58 CKT# LP4(L) -59 CKT# LP4(L) -60 CKT# LP4(L) -61 CKT# LP4(L) -26 CKT# LP4(L) -51 CKT# LP4(L) -55 CKT# LP4(L) -56 CKT# LP4(L) -57 CKT# LP3(L) -69 CKT# LP3(L) -70 CKT# LP3(L) -71 CKT# LP3(L) -72 CKT# LP3(L) -73 CKT# LP3(L) -74 CKT# LP3(L) -75 CKT# LP3(L) -76 CKT# LP4(L) -65 CKT# LP4(L) -66 CKT# LP4(L) -67 CKT# LP4(L) -68 LP2(R)-31 LP2(R)-31 CKT# LP3(R) -2 CKT# LP3(R) -3 CKT# LP3(R) -4 CKT# LP3(R) -5 CKT# LP3(R) -6 CKT# LP3(R) -7 CKT# LP3(R) -8 CKT# LP3(R) -9 CKT# LP3(R) -10 CKT# LP3(R) -12 CKT# LP3(R) -13CKT# LP3(R) -11 CKT# LP2(R) -22 AV-6LP2(R)-32 CKT# LP4(L) -64 CKT# LP3(R) -14 CKT# LP3(R) -1 1 E2.2a 1 E2.2a 1 E2.2a 1 E2.2a 1 E2.2a 1 E2.2a 1 E2.2a 1 E2.2a 1 E2.2a NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated MEZZANINE POWER AND SYSTEMS PLAN A -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E2.2a 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"2 MEZZANINE POWER AND SYSTEMS PLAN A -SE QUAD 10/13/202310/04/2023 BID DOCUMENT SET TV## E2.2b 1. COMBINATION RECEPTACLE AND USB POWER STRIP MOUNTED TO BASE OF DRINK RAIL. EC TO FIELD VERIFY EXACT REQUIREMENTS PRIOR TO ROUGH-IN. REFER TO DETAIL 1/E6.3 FOR ADDITIONAL INFORMATION. PLAN NOTES: H J K M P QN 5 6 7 G.8 L.6 M.4 9 8 L M.3 5.8 12 L.4 L.8 ELEV 152 ROOF ACCESS 204 ADA AND COMPANION 207 CORNER SUITE208AV CLOSET 210 CKT# LP2(R) -26 CKT# LP2(R) -25 CKT# LP2(R) -23CKT# LP2(R) -24 CKT# LP2(R) -28 CKT# LP2(R) -27 LP2(R)-29 LP2(R)-30 U/C R-6 LP2(R)-29 LP2(R)-29 LP2(R)-29 CKT# LP4(L) -66 CKT# LP4(L) -67 CKT# LP4(L) -68 LP2(R)-31 CKT# LP2(R) -20 CKT# LP2(L) -84 CKT# LP2(R) -19 CKT# LP2(R) -18 CKT# LP2(R) -17 CKT# LP2(R) -16 CKT# LP2(R) -15 CKT# LP2(R) -14 CKT# LP2(R) -13 CKT# LP2(R) -12 CKT# LP2(R) -11 CKT# LP2(R) -1 CKT# LP2(R) -2 CKT# LP2(R) -3 CKT# LP2(R) -4 CKT# LP2(R) -5 CKT# LP2(R) -6 CKT# LP2(R) -7 CKT# LP2(R) -8 CKT# LP2(R) -9 CKT# LP2(R) -10 CKT# LP2(R) -21 CKT# LP2(R) -22 AV-6 LP2(R)-32 1 E2.2a 1 E2.2b 1 E2.2b 1 E2.2b 1 E2.2b 1 E2.2b NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE As indicated MEZZANINE POWER AND SYSTEMS PLAN B -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E2.2b 10/04/2023 220025.00 C2023-151/8" = 1'-0"1 MEZZANINE POWER AND SYSTEMS PLAN B -SW QUAD 10/13/202310/04/2023 BID DOCUMENT SET A B E F G H J K M P QCDN 1 2 3 4 5 6 7 F.3 F.9 G.8 L.6 M.4 9 8 L M.3 5.8 12 F.4 F.6 L.4 L.8 NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/16" = 1'-0" ROOF POWER AND SYSTEMS PLAN -OVERALL WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E2.3 10/04/2023 220025.00 C2023-15 1/16" = 1'-0"1 ROOF POWER AND SYSTEMS PLAN -OVERALL 10/13/202310/04/2023 BID DOCUMENT SET CU 1 F-5 F-6 ERV 4 ERV 1 ERV 5 H J K M P QN 1 2 3 G.8 L.6 M.4 DP2-31,33,35 DP3-14,16,18 MP1-25 DP3-8,10,12 DP3-2,4,6 DP2-32,34,36 L M.3 MP1-28,30 AC 2B CH-1 MCC-8 RTU 12 DP3-19,21,23 MP1-33 WP/GFCI MP1-20 WP/GFCI MP1-33 WP/GFCI MP1-33 WP/GFCI WP/GFCIWP/GFCI MP1-20MP1-20 WP/GFCI MP1-20 L.4 L.8 MP1-41,43 AC 6B MP1-48,50 AC 4B DHU 1 DP3-44,46,48 ERV 6 DP2-37,39,41 NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/8" = 1'-0" ROOF POWER AND SYSTEMS PLAN A -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E2.3a 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 ROOF POWER AND SYSTEMS PLAN A -SE QUAD 10/13/202310/04/2023 BID DOCUMENT SET RTU 8 RTU 9 RTU 7 F-4 RTU 10 RTU 11 RTU 6 RTU 5 RTU 4 A B E F G HCD 1 2 3 F.3 F.9 G.8 DP1-31,33,35 DP4-1,3,5 DP4-2,4,6 DP3-38,40,42 DP3-13,15,17 MP1-24 DP3-1,3,5DP3-37,39,41 DP3-31,33,35 DHU 2 RTU 12 DP3-19,21,23 DP3-49,51,53 WP/GFCI MP1-38 MP1-38 WP/GFCI MP1-38 WP/GFCI MP1-38 WP/GFCI MP1-38 WP/GFCIMP1-38 WP/GFCI MP1-37 WP/GFCI MP1-37 WP/GFCI MP1-37 WP/GFCI MP1-37 WP/GFCI WP/GFCI MP1-20 F.4 F.6 AC 5B MP1-40,42 F-9 DP3-43,45,47 MP1-48,50 AC 4B NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/8" = 1'-0" ROOF POWER AND SYSTEMS PLAN B -NE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E2.3b 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 ROOF POWER AND SYSTEMS PLAN B -NE QUAD 10/13/202310/04/2023 BID DOCUMENT SET RTU 4 F-1 RTU 3 RTU 2 RTU 1 AC 1B A B E F G HCD 4 5 6 7 F.3 F.9 G.8 9 MP1-29,31 MP1-21 DP1-31,33,35 DP4-7,9,11 DP1-7,9,11 DP1-10,12,14 8 5.8 MP1-37 WP/GFCI MP1-37 WP/GFCI MP1-37 WP/GFCI MP1-39 WP/GFCI MP1-39 WP/GFCI MP1-39 WP/GFCI F.4 F.6 AC 3B MP1-44,46 RTU 13 DP1-34,36,38 NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/8" = 1'-0" ROOF POWER AND SYSTEMS PLAN C -NW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E2.3c 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 ROOF POWER AND SYSTEMS PLAN C -NW QUAD 10/13/202310/04/2023 BID DOCUMENT SET F-3 ERV 2 ERV 3 F-2 AC 1B H J K M P QN 5 6 7 G.8 L.6 M.4 9 MP1-29,31 DP2-25,27,29 DP2-26,28,30 MP1-22 MP1-23 8 L M.3 5.8 12 MP1-39 WP/GFCI MP1-35 WP/GFCI WP/GFCI MP1-35 MP1-35 WP/GFCI MP1-35 WP/GFCI L.4 L.8 AC 3B MP1-44,46 AC 7B MP1-45,47 ERV 6 DP2-37,39,41 NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/8" = 1'-0" ROOF POWER AND SYSTEMS PLAN D -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E2.3d 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"1 ROOF POWER AND SYSTEMS PLAN D -SW QUAD 10/13/202310/04/2023 BID DOCUMENT SET TV TV TV A B E FCD 4 5 6 7 9 ADD ALT 1 MEETING ROOM (B) 187 ADD ALT 1 FIRST AID 190 ADD ALT 1 STORAGE 189 ADD ALT 1 MEETING ROOM (A) 188 8 5.8 LP5-41 LP5-41 LP5-41 LP5-41 LP5-41 LP5-43 DF-7 LP5-36 LP5-36 60" AFF 60" AFF LP5-2 MBH-3 LP5-2 MBH-4 LP5-44,46,48 PW-5 PW-5 LP5-49,51,53 LP5-50 LP5-50 GFCI GFCI +48" +48" LP5-36 GFCI LP5-50 LP5-50 P QN 5 LOCKER CORE & SHELL 180A LP5-35 LP5-35 LP5-35 LP5-35 P QN 5 ADD ALT TEAM ROOM (C) 184 ADD ALT TEAM ROOM (B) 182 ADD ALT TEAM ROOM (A) 181 OFCT-33 OFV-30 LP5-42 LP5-19 LP5-34 LP5-34 LP5-34 LP5-34 LP5-11 LP5-11 LP5-11LP5-11 LP5-11 LP5-28 LP5-28 LP5-28 LP5-28 LP5-28 LP5-28 OFCT-31 OFV-28 OFV-29 OFCT-32 LP5-45 LP5-38 LP5-47 LP5-40 60" AFF 60" AFF 60" AFF A B E FCD 4 5 6 7 9 8 5.8 BC AC AC ACACAC AC AC AC AC AC BC ACACAC AC AC AC EA EA AA AA AA SA SA SA SA SA SA EA WEF CKT# EM/LS1-12 LCPB-1 50W EM 1 E6.3 LA8E LA8 LA8 LA8 LA8E RARARC LD8E LD8 LD8 LD8 LD8 LD8 LD8ERC RC LM20 A30 HA HA HA HA HAHAHAHA HA HA HA HA HAHAHAHA A31A32 A33 EB(w/ WIREGUARD)(w/ WIREGUARD)EB EB (w/ WIREGUARD) WFW LCPB-63 E6.3 3 E6.3 1 E6.3 P QN 5 AC ACRA TO CORR. FIXTS. WEF CKT# EMLS2-10 FE4 FE4 FE4 FE4FE4FE4 FE4 FE4 FE4 FE4 FE4FE4 AC AC FE4 FE4 FE4 FE4FE4FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4FE4FE4 FE4 FE4 FE4 FE4 FE4 FE4 AC AC TO CORR. FIXTS. RA 1,3 E6.3 25W EM A29 CKT# HL2 -10 P QN 5 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE4 FE43 3 4 4 NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: SENE NW SW BUILDING DIAGRAM NOT TO SCALE 1/16" = 1'-0" FIRST FLOOR POWER AND LIGHTING -ADD ALT 1, ALT 2, ALT 3 WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E2.4 10/04/2023 220025.00 C2023-15 1/16" = 1'-0"1 FIRST FLOOR PLAN -POWER -ADD ALT 1 1/16" = 1'-0"3 FIRST FLOOR PLAN -POWER -ADD ALT 2 1/16" = 1'-0"5 FIRST FLOOR PLAN -POWER -ADD ALT 3 1/16" = 1'-0"2 FIRST FLOOR PLAN -LIGHTING -ADD ALT 1 1/16" = 1'-0"6 FIRST FLOOR PLAN -LIGHTING -ADD ALT 3 1/16" = 1'-0"4 FIRST FLOOR PLAN -LIGHTING -ADD ALT 2 10/13/202310/04/2023 BID DOCUMENT SET LIGHTING CONTROL PANEL "A" (LCPA) SCHEDULE CONTROL CIRCUIT XXXX LCP CONTACT # CIRCUIT/CONTRACTOR CONTROLLED BY LCP CONTACT OVERRIDE SWITCH DESIGNATION PROPOSED ON/OFF SCHEDULE PROGRAM LOAD DESCRIPTION SEE NOTE 1 2 3 4 5 6 7 SEE DWG 1,2 2,3 A21,A22,A23,A37,A38 CORRIDOR 130/135/144 LTG. A24,A25,29 ARENA HIGHBAYS 1,2 SEE DWG A27 1. SWITCH SHALL BE PROGRAMMED "SWITCH ON ONLY" DURING NORMAL BUILDING HOURS. 2. THIS LIGHTING CONTROL RELAY IS SINGLE POLE. REFER TO EMERGENCY LIFE SAFETY SWITCHING/DIMMING CIRCUIT DETAIL FOR WIRING INFORMATION. THE LIFE SAFETY AND NORMAL CIRCUITS INDICATED ARE SHOWN FOR REFERENCE ONLY. THE NORMAL CIRCUIT SHALL BE CONTROLLED VIA THE LIGHTING CONTROL PANEL. THE LIFESAFETY CIRCUIT SHALL BE CONTROLLED VIA THE UL924 RELAY. LIGHTING CONTROL PANEL NOTES: TIMECLOCK ON/OFF SWITCH ON/OFF SEE DWG SEE DWG SEE DWG SEE DWG TIMECLOCK ON/OFF SWITCH ON/OFF TIMECLOCK ON/OFF SWITCH ON/OFF TIMECLOCK ON/OFF SWITCH ON/OFF TIMECLOCK ON/OFF SWITCH ON/OFF ARENA HIGHBAYS ARENA HIGHBAYS ARENA HIGHBAYS 1,2 1,2 1,2 1,2 SEE DWG A26 TIMECLOCK ON/OFF SWITCH ON/OFF ARENA NORTH SEATING LTG. A24,A25,29 A24,A25,29 A24,A25,29 1,2TIMECLOCK ON/OFF SWITCH ON/OFF ARENA SOUTH SEATING LTG. LIGHTING CONTROL PANEL "B" (LCPB) SCHEDULE CONTROL CIRCUIT XXXX LCP CONTACT # CIRCUIT/CONTRACTOR CONTROLLED BY LCP CONTACT OVERRIDE SWITCH DESIGNATION PROPOSED ON/OFF SCHEDULE PROGRAM LOAD DESCRIPTION SEE NOTE 1. SWITCH SHALL BE PROGRAMMED "SWITCH ON ONLY" DURING NORMAL BUILDING HOURS. 2. THIS LIGHTING CONTROL RELAY IS SINGLE POLE. REFER TO EMERGENCY LIFE SAFETY SWITCHING/DIMMING CIRCUIT DETAIL FOR WIRING INFORMATION. THE LIFE SAFETY AND NORMAL CIRCUITS INDICATED ARE SHOWN FOR REFERENCE ONLY. THE NORMAL CIRCUIT SHALL BE CONTROLLED VIA THE LIGHTING CONTROL PANEL. THE LIFESAFETY CIRCUIT SHALL BE CONTROLLED VIA THE UL924 RELAY. LIGHTING CONTROL PANEL NOTES: LIGHTING CONTROL PANEL "C" (LCPC) SCHEDULE CONTROL CIRCUIT XXXX LCP CONTACT # CIRCUIT/CONTRACTOR CONTROLLED BY LCP CONTACT OVERRIDE SWITCH DESIGNATION PROPOSED ON/OFF SCHEDULE PROGRAM LOAD DESCRIPTION SEE NOTE 1. SWITCH SHALL BE PROGRAMMED "SWITCH ON ONLY" DURING NORMAL BUILDING HOURS. 2. THIS LIGHTING CONTROL RELAY IS SINGLE POLE. REFER TO EMERGENCY LIFE SAFETY SWITCHING/DIMMING CIRCUIT DETAIL FOR WIRING INFORMATION. THE LIFE SAFETY AND NORMAL CIRCUITS INDICATED ARE SHOWN FOR REFERENCE ONLY. THE NORMAL CIRCUIT SHALL BE CONTROLLED VIA THE LIGHTING CONTROL PANEL. THE LIFESAFETY CIRCUIT SHALL BE CONTROLLED VIA THE UL924 RELAY. 3. LOCATE OVERRIDE SWITCH ADACENT TO LIGHTING CONTROL PANEL AND LABEL AS "EXT BLDG LTG NORTH". LIGHTING CONTROL PANEL NOTES: LIGHTING CONTROL PANEL "D" (LCPD) SCHEDULE CONTROL CIRCUIT XXXX LCP CONTACT # CIRCUIT/CONTRACTOR CONTROLLED BY LCP CONTACT OVERRIDE SWITCH DESIGNATION PROPOSED ON/OFF SCHEDULE PROGRAM LOAD DESCRIPTION SEE NOTE 1. SWITCH SHALL BE PROGRAMMED "SWITCH ON ONLY" DURING NORMAL BUILDING HOURS. 2. THIS LIGHTING CONTROL RELAY IS SINGLE POLE. REFER TO EMERGENCY LIFE SAFETY SWITCHING/DIMMING CIRCUIT DETAIL FOR WIRING INFORMATION. THE LIFE SAFETY AND NORMAL CIRCUITS INDICATED ARE SHOWN FOR REFERENCE ONLY. THE NORMAL CIRCUIT SHALL BE CONTROLLED VIA THE LIGHTING CONTROL PANEL. THE LIFESAFETY CIRCUIT SHALL BE CONTROLLED VIA THE UL924 RELAY. 3. LOCATE OVERRIDE SWITCH ADACENT TO LIGHTING CONTROL PANEL AND LABEL AS "EXT BLDG LTG SOUTH". 4. LOCATE OVERRIDE SWITCH ADJACENT TO LIGHTING CONTROL PANEL AND LABEL AS "POLE LTG". LIGHTING CONTROL PANEL NOTES: 8 9 10 11 12 13 14 15 16 SPARE SPARE SPARE SPARE SPARE SPARE SPACE SPACE SPACE 1 SEE DWG A3,A4,A30 LOBBY LINK 155 LTG. 1,2 TIMECLOCK ON/OFF SWITCH ON/OFF 2 SEE DWG A5 MALL CONNECTION 164 LTG.1,2TIMECLOCK ON/OFF SWITCH ON/OFF 3 4 5 SEE DWGS A8,A9,A10 CONVENTION 156 LTG. 1,2 SEE DWG A11,A12,A13,A14 1,2 SEE DWG A15,A16,A17 1,2 TIMECLOCK ON/OFF SWITCH ON/OFF TIMECLOCK ON/OFF SWITCH ON/OFF TIMECLOCK ON/OFF SWITCH ON/OFF CONVENTION 156 LTG. CONVENTION 156 LTG. 6 SEE DWG A31,A32,A33 CONVENTION 156 LTG. (ADD ALT.)TIMECLOCK ON/OFF SWITCH ON/OFF 1,2 7 8 9 10 11 12 SEE DWG A18,A19 SEE DWG A18,A19 SEE DWG A18,A19 A20 A20 A20 TIMECLOCK ON/OFF SWITCH ON/OFF TIMECLOCK ON/OFF SWITCH ON/OFF TIMECLOCK ON/OFF SWITCH ON/OFF 1,2 1,2 1,2 MULTIPURPOSE 154 LTG. MULTIPURPOSE 154 LTG. MULTIPURPOSE 154 LTG. SEE DWG SEE DWG SEE DWG TIMECLOCK ON/OFF SWITCH ON/OFF TIMECLOCK ON/OFF SWITCH ON/OFF TIMECLOCK ON/OFF SWITCH ON/OFF MULTIPURPOSE 154 LTG. MULTIPURPOSE 154 LTG. MULTIPURPOSE 154 LTG. 1,2 1,2 1,2 14-20 21-24 SPARE SPACE 1 SEE DWG A1 TIMECLOCK ON/OFF SWITCH ON/OFF VEST 100/LOBBY 101 LINEAR LTG 2 2 3 SEE DWG A1 LOBBY 101 PENDANTS SEE DWG A1 LOBBY 101 CYLINDER DNLTS. 2 TIMECLOCK ON/OFF SWITCH ON/OFF TIMECLOCK ON/OFF SWITCH ON/OFF 13 SEE DWG A28,A34 TIMECLOCK ON/OFF SWITCH ON/OFF MULTIPURPOSE CIRC. LTG. 1,2 5 6 7 8 9 10 11 12 13 14 15 16 SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPACE SPACE SPACE SPACE 1 2 SEE DWG A2 LOBBY 117 PENDANTS 2 SEE DWG A2 LOBBY 117 CYLINDER DNLTS. 2 TIMECLOCK ON/OFF SWITCH ON/OFF TIMECLOCK ON/OFF SWITCH ON/OFF 4 SEE DWG 6 7 8 9 10 11 12 13 14 15 16 SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPACE SPACE SPACE SPACE A6 P.C. ON / T.C. OFF SWITCH ON/OFF EXTERIOR BLDG MOUNTED LTG 2,3 3 SEE DWG A37 P.C. ON / T.C. OFF SWITCH ON/OFF EXTERIOR BLDG MOUNTED LTG 2,3 4 5 SEE DWGS A7 SIDEWALK POLE FIXTS 4 SEE DWGS A7 PARKING LOT POLE FIXTS 4 P.C. ON / T.C. OFF SWITCH ON/OFF P.C. ON / T.C. OFF SWITCH ON/OFF ABBREVIATIONS: EXP LIG GYP VER EXPOSED STRUCTURE LAY-IN GRID GYPSUM BOARD VERIFY REC SURF PEND AC RECESSED SURFACE PENDANT AIRCRAFT CABLE SUSP. WM GRD CONC BASE MTD WALL MOUNTED GROUND CONCRETE BASE MOUNTED STD SPEC AR NA STANDARD SPECIAL AS REQUIRED NOT APPLICABLE VAR LAS DRV DDRV VARIES LENGTH AS SHOWN LED DRIVER LED DIMMABLE DRIVER OPTIONS/ACCESSORIES CODE LISTING: 1. 0.125" PATTERN 12 ACRYLIC LENS 2. 0.156" PATTERN 19 ACRYLIC LENS 3. FLUSH STEEL DOOR FRAME 4. FLUSH ALUMINUM DOOR FRAME 5. SEMI-SPECULAR REFLECTOR 6. LOW IRIDESCENT REFLECTOR 7. REFLECTOR MATCHING TRIM RING 8. DAMP LOCATION LISTED 9. WET LOCATION LISTED 10. STD. FINISH TO BE SELECTED BY ARCHITECT 11. CUSTOM COLOR 12. FURNISH w / CHAIN HANGERS 13. FURNISH w / STEM/SWIVEL CANOPY 14. FURNISH w / AIRCRAFT CABLE 15. FURNISH w / NEMA HOOK, CORD & PLUG 16. FURNISH w / SAFETY CHAIN 17. FURNISH w / WIREGUARD 18. FURNISH w / AUXILIARY EMERGENCY DRIVER 19. FURNISH w / INTEGRAL PHOTOCELL 20. FURNISH WITH UNIVERSAL ARROWS AND RED STENCIL FACE 21. FURNISH w / LEAD CALCIUM BATTERY 22. FURNISH w / NICAD BATTERY 23. FURNISH w / SELF DIAGNOSTICS 24. FURNISH w / LED DRIVER, NON-DIMMED 25. FURNISH w / LED DRIVER, STEP-DIMMED 26. FURNISH w / LED DRIVER, DIMMABLE TO 10% 27. FURNISH w / LED DRIVER, DIMMABLE TO 5% 28. FURNISH w / LED DRIVER, DIMMABLE TO 1% 29. FURNISH w / LED DRIVER, DIMMABLE TO 0.1% 30. FURNISH w / PAINT AFTER FABRICATION LIGHTING FIXTURE SCHEDULE NOTES: NOTES LF1 - LF18 ARE GENERAL NOTES APPLICABLE TO ENTIRE LIGHTING FIXTURE SCHEDULE WHERE APPROPRIATE. LF1 - PROVIDE ALL PAINTED FIXTURES WITH PAINT AFTER FABRICATION. LF2 - PROVIDE ALL NECESSARY COMPONENTS AND ACCESSORIES FOR A COMPLETE OPERATING INSTALLATION PER APPLICABLE CODES AND MANUFACTURER'S RECOMMENDATIONS. LF3 - INCLUDE IN THE BASE BID THE COST FOR FURNISHING, INSTALLING, WIRING AND CONNECTING FOR A COMPLETE OPERATING INSTALLATION AN ADDITIONAL (6) EXIT FIXTURES OF EACH TYPE SPECIFIED IN THE LIGHTING FIXTURE SCHEDULE. LF4 - CONTRACTOR SHALL REVIEW THE ENTIRE LIGHTING FIXTURE SCHEDULE INCLUDING THE DESCRIPTION AND CATALOG NUMBER. CONTRACTOR SHALL NOTIFY THE A/E OF ANY DISCREPANCIES PRIOR TO BIDDING. LF5 - VERIFY ALL FINISHES/COLORS OF FIXTURES WITH A/E PRIOR TO ORDERING. LF6 - CONTRACTOR SHALL VERIFY THAT THE FIXTURE INSTALLATION TYPE IS COMPATIBLE WITH CEILING CONSTRUCTION PRIOR TO ORDERING. LF7 - FIELD VERIFY THE EXACT LOCATIONS OF THE LIGHTING FIXTURES TO AVOID CONFLICT WITH MECHANICAL EQUIPMENT, DUCTWORK, PIPES, STRUCTURAL MEMBERS, ARCHITECTURAL FEATURES, ETC. ANY CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF THE A/E PRIOR TO ROUGH IN. LF8 - IN ALL INSULATED CEILINGS, WALLS, AND WHERE RECESSED FIXTURES PENETRATE THE BUILDING ENVELOPE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING AN AIRTIGHT INSTALLATION AND PROPER CLEARANCES BETWEEN RECESSED FIXTURES AND THE INSULATION. THIS CAN BE ACCOMPLISHED BY PROPER TENTING OR BOXING-OUT AROUND RECESSED FIXTURES THAT DO NOT HAVE IC RATINGS, OR REPLACEMENT OF THOSE FIXTURES WITH EQUAL FIXTURES HAVING PROPER IC AND AIRTIGHT RATINGS. REFER TO THE ARCHITECTURAL PLANS FOR APPLICABLE AREAS. LF9 - IN ALL FIRE-RATED CEILINGS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE FIRE RATING. REFER TO ARCHITECTURAL PLANS FOR APPLICABLE AREAS. LF10 - PROVIDE OCCUPANCY SENSORS AS SHOWN ON THE PLANS. REFER TO THE SPECIFICATIONS FOR MORE INFORMATION. LF11 - PROVIDE COMPATIBLE DIMMING SWITCHES PER MANUFACTURER'S RECOMMENDATIONS. LF12 - FIELD VERIFY THE EXACT LOCATION OF ALL SURFACE MOUNTED FIXTURES TO AVOID CONFLICT WITH ARCHITECTURAL FEATURES, INCLUDING PAINT/WALL COVERING SCHEMES, DECORATIVE TRIMS, ETC. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE A/E PRIOR TO ROUGH IN. LF13 - PROVIDE (1) EXTRA LED MODULE AND LED DRIVER OF EACH TYPE INDICATED IN LIGHT FIXTURE SCHEDULE AND TURN OVER TO OWNER. PROVIDE (1) COMPLETE FIXTURE IF MODULE AND/OR DRIVER CANNOT BE SEPARATED FROM THE FIXTURE. LF14 - IN ALL PLENUM RATED CEILING CAVITIES PROVIDE PLENUM RATED TROFFERS AND OTHER TYPES OF LIGHTING FIXTURES IF REQUIRED BY LOCAL CODE(S). LF15 - IN LOCATIONS OF LIFE SAFETY EGRESS ROUTE, WHERE ONE LIGHT FIXTURE IS EMPLOYED, (2) LED MODULES AND (2) LED DRIVERS ARE REQUIRED IN THE FIXTURE TO COMPLY TO N.E.C. ARTICLE 700.16 EMERGENCY ILLUMINATION. LF16 - EXCEPT FOR HAZARDOUS RATED AND BATTERY COMPONENTS OF EMERGENCY FIXTURES, ALL LED DRIVERS SHALL HAVE A DISCONNECTING MEANS DESCRIBED IN THE NEC. THIS DISCONNECT MUST BE ACCESSIBLE WITHIN THE FIXTURE AT OR NEAR THE DRIVER. LF17 - LIGHT FIXTURES SPECIFIED ESTABLISH A LEVEL OF QUALITY WHICH SHALL BE MET BY ALL FIXTURES PROVIDED. FIXTURES SHALL BE COMPARABLE IN PERFORMANCE, CONSTRUCTION, PHYSICAL APPEARANCE, FINISH AND FEATURES IN ORDER TO BE CONSIDERED EQUIVALENT. FIXTURES NOT DEEMED "EQUIVALENT" MAY NOT BE SUBMITTED AS AN "ALTERNATE" OR "SUBSTITUTE" FIXTURE TO THAT WHICH WAS SPECIFIED. DETERMINATION OF "EQUIVALENCY" SHALL BE THE RESPONSIBILITY OF A/E. THERE SHALL BE NO ADDITIONAL COST ASSOCIATED WITH REJECTION OF A FIXTURE NOT DEEMED "EQUIVALENT" BY THE A/E. LF18 - INCLUDE IN THE BASE BID THE COST FOR FURNISHING, INSTALLING, WIRING AND CONNECTING FOR A COMPLETE OPERATING INSTALLATION AN ADDITIONAL (4) FIXTURES AS SPECIFIED IN THE LIGHTING FIXTURE SCHEDULE. LF19 - FIELD VERIFY OUTPUT WITH OWNER IN EACH SPACE THAT THIS FIXTURE IS USED. LF20 - FIXTURE TO BE MOUNTED IN ARMSTRONG METALWORKS TORSION SPRING CEILING. COORDINATE WITH CEILING VENDOR AND PROVIDE ALL NECESSARY COMPONENTS AND ACCESSORIES FOR A COMPLETE AND SOUND INSTALLATION PER MANUFACTURER'S RECOMMENDATIONS. LF21 - FOR BIDDING PURPOSES, PROVIDE A FIXTURE ALLOWANCE OF THE FOLLOWING FOR EACH FIXTURE. NOTE THAT ALLOWANCES DO NOT INCLUDE INSTALLATION/WIRING COSTS OR DISTRIBUTOR/CONTRACTOR MARKUPS. - TYPE "PA" = $1000 EACH - TYPE "WT2" = $400 EACH - TYPE "WT8" = $1200 EACH LF22 - INCLUDE IN THE BASE BID THE COST FOR FURNISHING, INSTALLING, WIRING AND CONNECTING FOR A COMPLETE OPERATING INSTALLATION AN ADDITIONAL (24) FIXTURES AS SPECIFIED IN THE LIGHTING FIXTURE SCHEDULE. Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 1/8" = 1'-0" LIGHTING SCHEDULES WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E5.0 10/04/2023 220025.00 C2023-15 E - LIGHT FIXTURE SCHEDULE DESIGNATION DESCRIPTION LED DATA VOLT RECESS DEPTH LIGHTING FIXTURE DRIVER TYPE MTG MTG SURFACE SEE NOTETYPE DELIVERED LUMENS KELVIN CRI WATTS MANUFACTURER SERIES OPTIONS/ACC ESSORIES AA 2x4 FLAT PANEL TROFFER MODULE 4000/5000/6000 3500 80 55 UNV 1.29" LITHONIA CPANL/2X4/ALO6/S WW7/M2 SERIES 26 DDRV REC LIG 19 AC 2x4 ARCHITECTURAL TROFFER MODULE 4800 3500 80 43 UNV 2.375" LITHONIA 2BLT4/48L/ADSM SERIES 28 DDRV REC LIG BA 2x2 FLAT PANEL TROFFER MODULE 2400/3300/4400 3500 80 41 UNV 1.29" LITHONIA CPANL/2X2/ALO1/S WW7/M4 SERIES 26 DDRV REC LIG 19 BC 2x2 ARCHITECTURAL TROFFER MODULE 4800 3500 80 43 UNV 2.375" LITHONIA 2BLT2/48L/ADSM SERIES 28 DDRV REC LIG CA 1x4 FLAT PANEL TROFFER MODULE 2400/3300/4400 3500 80 41 UNV 1.29" LITHONIA CPANL/1X4/ALO1/S WW7/M4 SERIES 26 DDRV REC LIG 19 EA 1-FACE EDGELIT EXIT SIGN MODULE - - - 5 UNV - LITHONIA EDG/1 SERIES 10 DRV BACK/E ND/TOP VER EB 1-FACE THERMOPLASTIC EXIT SIGN MODULE - - - 5 UNV - LITHONIA LQM/S/3 SERIES 10 DRV BACK/E ND/TOP VER EB2 2-FACE THERMOPLASTIC EXIT SIGN, WIREGUARD MODULE - - - 5 UNV - LITHONIA LQM/S/3 SERIES 10 DRV END/TO P VER EE BATTERY POWERED EMER LIGHT, DUAL ADJUST HEADS, LITHIUM BATT/SELF-DIAG MODULE (2) 3.3W HEADS - - 6.6 UNV - LITHONIA ELM4L/LTP/SDRT SERIES 10,22,23 DRV SURF WALL FA4 4'L STRIPLIGHT w/ STEMS/SWIVEL CANOPIES MODULE 3000/4000/5000 3500 80 44 UNV - LITHONIA CSS/L48/AL03/SQ SERIES 26 DDRV PEND EXP 19 FE4 4'L VAPORTIGHT, SURF. MOUNTED MODULE 4000 3500 80 24 UNV - LITHONIA FEM/L48/LPPFL/MD/ GZ10/STSL SERIES 09,26 DDRV SURF VAR FEH4 4'L VAPORTIGHT, HIGH OUTPUT MODULE 8000 4000 80 51 UNV - LITHONIA FEM/L48/LPPCL/MD /GZ10/STSL SERIES 09,26 DDRV SURF WALL 18 FF4 4'L VAPORTIGHT w/ STEMS/SWIVEL CANOPIES MODULE 3500 3500 80 24 UNV - LITHONIA FEM/L48/LPPFL/MD/ GZ10/STSL SERIES 09,26 DDRV PEND EXP 22 HA 16"Wx24"L HIGHBAY w/ WIREGUARD, STEMS/SWIVEL CANOPIES MODULE 30,000 4000 80 178 UNV - LITHONIA IBG/30000LM/SEF/A FL/GNDGZ10/WGX SERIES 10,28 DDRV PEND EXP HB 20"Wx48"L HIGHBAY w/ WIREGUARD, STEMS/SWIVEL CANOPIES MODULE 72,000 4000 80 426 UNV - LITHONIA IBG/72000LM/SEF/A FL/GNDGZ10/WGX SERIES 10,28 DDRV PEND EXP LA8 4"APERx8'L RECESSED DIRECT MODULE 375L/FT 3500 80 26 UNV 5" FOCAL POINT FSM4L/FL/375LF/L11 SERIES 28 DDRV REC LIG LA8E 4"APERx8'L RECESSED DIRECT, EMER CKT MODULE 375L/FT 3500 80 26 UNV 5" FOCAL POINT FSM4L/FL/375LF/L11 /EC SERIES 28 DDRV REC LIG LD8 4"APERx8'L RECESSED DIRECT MODULE 625L/FT 3500 80 52 UNV 5" FOCAL POINT FSM4L/PD05/625LF/ L11 SERIES 28, CUSTOM COLOR/FINISH DDRV REC VER 20 LD8E 4"APERx8'L RECESSED DIRECT, EMER CKT MODULE 625L/FT 3500 80 52 UNV 5" FOCAL POINT FSM4L/PD05/625LF/ L11/EC SERIES 28, CUSTOM COLOR/FINISH DDRV REC VER 20 LD18 4"APERx18'L RECESSED DIRECT MODULE 375L/FT 3500 80 72 UNV 5" FOCAL POINT FSM4L/PD05/375LF/ L11 SERIES 28, CUSTOM COLOR/FINISH DDRV REC VER 20 LD18E 4"APERx18'L RECESSED DIRECT, EMER CKT MODULE 375L/FT 3500 80 72 UNV 5" FOCAL POINT FSM4L/PD05/375LF/ L11/EC SERIES 28, CUSTOM COLOR/FINISH DDRV REC VER 20 LE8 4"APERx8'L RECESSED DIRECT MODULE 275L/FT 3500 80 20 UNV 5" FOCAL POINT FSM4L/PD05/275LF/ L11 SERIES 28, CUSTOM COLOR/FINISH DDRV REC VER 20 LE8E 4"APERx8'L RECESSED DIRECT, EMER CKT MODULE 275L/FT 3500 80 20 UNV 5" FOCAL POINT FSM4L/PD05/275LF/ L11/EC SERIES 28, CUSTOM COLOR/FINISH DDRV REC VER 20 LM6 6'L CLG SUSP ADJUST WALLWASHER MODULE 583L/FT 3500 80 36.6 UNV - VODE 107-WG/6'/CC/IP/A E/SO SERIES 10,28 DDRV SUSP EXP LM12 12'L CLG SUSP ADJUST WALLWASHER MODULE 583L/FT 3500 80 73.2 UNV - VODE 107-WG/12'/CC/IP/ AE/SO SERIES 10,28 DDRV SUSP EXP LM20 20'L WALL MTD ADJUST WALLWASHER MODULE 583L/FT 3500 80 122 UNV - VODE 107-WG/20'/WA/18 /IP/AE/SO SERIES 10,28 DDRV SURF WALL LW20 1.14"Wx20'L SURFACE MTD. WALLWASHER MODULE 836W/FT 3500 80 132 UNV - VODE 707-Z1/SL/20'/C/SO /A2 SERIES 28 DDRV SURF LIG PA2 2'DIA PUCK PENDANT, STRAIGHT A.C. CABLE SUSP MODULE 2700 3500 80 35 UNV - PRUDENTIAL P3920/LO/FWA/Y/D 1/CA SERIES 10,28 DDRV SUSP EXP PA3 3'DIA PUCK PENDANT, STRAIGHT A.C. CABLE SUSP MODULE 4900 3500 80 56 UNV - PRUDENTIAL P3930/LO/FWA/Y/D 1/CA SERIES 10,28 DDRV SUSP EXP PA4 4'DIA PUCK PENDANT, STRAIGHT A.C. CABLE SUSP MODULE 8100 3500 80 88 UNV - PRUDENTIAL P3940/LO/FWA/Y/D 1/CA SERIES 10,28 DDRV SUSP EXP PA5 5'DIA PUCK PENDANT, STRAIGHT A.C. CABLE SUSP MODULE 12,500 3500 80 120 UNV - PRUDENTIAL P3950/LO/FWA/Y/D 1/CA SERIES 10,28 DDRV SUSP EXP RA 4"APER RECESSED DOWNLIGHT MODULE 1500 3500 80 17.5 UNV 4" LITHONIA LDN4/15/LO4/GZ10 SERIES 10,26 DDRV REC VAR RB 4"APER RECESSED DOWNLIGHT MODULE 2000 3500 80 23 UNV 4" LITHONIA LDN4/20/LO4 SERIES 10,28 DDRV REC VAR RC 2"APER RECESSED DOWNLIGHT MODULE 750 3500 80 9.7 UNV 5.25" GOTHAM EV02/07/MWD/UGZ /NCH SERIES 10,28 DDRV REC VAR SA 4"APER CYLINDER DNLT w/ STEM/SWIVEL CANOPY MODULE 3000 3500 80 31.2 UNV - GOTHAM EVO4PC/30/MWD/ GZ1/JBXCC/PCAN4 5 SERIES 10,28 DDRV PEND EXP SB 4"APER CYLINDER DNLT w/ STEM/SWIVEL CANOPY MODULE 1500 3500 80 13.7 UNV - GOTHAM EVO4PC/15/MWD/ GZ10/JBXCC/PCAN 45 SERIES 10,28 DDRV PEND EXP SC 5"DIA SURFACE MOUNT MODULE 650 3500 80 10.2 UNV - LIGHTOLIER S5R SERIES 10 DDRV SURF WALL WEF EXTERIOR WALL MOUNT, FWD. THROW DIST.MODULE 3469 4000 80 25 UNV - LITHONIA WST LED/P2/VF SERIES 09,10,26 DDRV SURF WALL WEW EXTERIOR WALL MOUNT,WIDE DIST.MODULE 3512 4000 80 25 UNV - LITHONIA WST LED/P2/VW SERIES 09,10,26 DDRV SURF WALL WFW EXTERIOR WALL MOUNT, WIDE DIST.MODULE 6689 4000 80 50 UNV - LITHONIA WST LED/P3/VW SERIES 09,10,26 DDRV SURF WALL WT2 2'L ARCHITECTURAL WRAPAROUND MODULE 2550 3500 80 20 UNV - PRUDENTIAL S1-PRO/S0/2'/SAL/Y /SUR/ND SERIES 10 DRV SURF WALL WT4 2'L ARCHITECTURAL WRAPAROUND MODULE 2550 3500 80 20 UNV - PRUDENTIAL S1-PRO/S0/2'/SAL/Y /SUR/ND SERIES 10 DRV SURF WALL WT6 6'L ARCHITECTURAL WRAPAROUND MODULE 7650 3500 80 60 UNV - PRUDENTIAL S1-PRO/S0/6'/SAL/Y /SUR/ND SERIES 10 DRV SURF WALL WT8 8'L ARCHITECTURAL WRAPAROUND MODULE 10,200 3500 80 80 UNV - PRUDENTIAL S1-PRO/S0/8'/SAL/Y /SUR/ND SERIES 10 DRV SURF WALL WT10 10'L ARCHITECTURAL WRAPAROUND MODULE 12,750 3500 80 100 UNV - PRUDENTIAL S1-PRO/S0/10'/SAL/ Y/SUR/ND SERIES 10 DRV SURF WALL WT16 16'L ARCHITECTURAL WRAPAROUND MODULE 20,400 3500 80 160 UNV - PRUDENTIAL S1-PRO/S0/16'/SAL/ Y/SUR/ND SERIES 10 DRV SURF WALL 10/13/202310/04/2023 BID DOCUMENT SET 1. PROVIDE A DUPLEX RECEPTACLE. 2. PROVIDE A GFI CIRCUIT BREAKER. 3. MOUNT OUTLET 36" AFF. 4. PROVIDE A 3/4" CONDUIT TO MER ROOM FOR ANALOG COMMUNICATIONS LINES. 5. PROVIDE A DUPLEX RECEPTACLE FLUSH MOUNTED IN CEILING. LOCATE A DATA OUTLET ADJACENT TO POWER OUTLET. 6. PROVIDE A SINGLE POLE, SINGLE THROW TOGGLE SWITCH ABOVE COUNTER FOR CONTROL AS A DISCONNECTING MEANS. 7. PROVIDE A GROUNDED 30A, 208V TWISTLOCK (L6-30) RECEPTACLE MOUNTED TO THE ANGLE FLANGE NEAR THE BOTTOM OF THE BACK SIDE OF THE RACK. SEE DETAILS ON SHEETS E7.7, E7.8, E7.9. 8. CONTROL SWITCHES AND INTERNAL WIRING ARE FURNISHED WITH THE SHADE. E.C. SHALL WIRE TO THE SHADE CONTROLLER. PROVIDE LOW VOLTAGE WIRING FROM THE POWER SUPPLY TO THE CONTROL SWITCH(ES). LOW VOLTAGE WIRING SHALL BE SHIELDED CAT5 STRANDED CABLE. VERIFY FINAL REQUIREMENTS WITH SHADE VENDOR AND APPROVED SHOP DRAWINGS. 9. EC TO PROVIDE A 20A, 120V POWER CONNECTION AND (1) CAT 6 DATA DROP TO PAY LOCKERS. COORDINATE REQUIREMENTS AND TYPE OF CONNECTION WITH APPROVED SHOP DRAWINGS PRIOR TO ROUGH-IN. 10. PROVIDE POWER AND DATA FOR CONNECTION TO PAY LOCKERS. COORDINATE REQUIREMENTS WITH APPROVED SHOP DRAWINGS PRIOR TO ROUGH-IN. GENERAL NOTES (ALL SCHEDULES): Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" ELECTRICAL SCHEDULES WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E5.1 10/04/2023 220025.00 C2023-15 E - SPECIAL OUTLET SCHEDULE - TYPICAL HW NO. TO FEED LOC.PANEL CIRCUIT NUMBER BREAKER WIRING TERMINAL VOLT PHASE LOAD (W) SEE NOTESIZE POLE NO. SIZE COND GRD SIZE R D B AV-1 A/V OUTLET 1 AV CLOSET (157-A) LP1(L) 39 30 1 2 10 3/4" 10 X 120 1 1000 1 AV-2 A/V OUTLET 2 AV CLOSET (157-A) LP1(L) 44 30 1 2 10 3/4" 10 X 120 1 1000 1 AV-3 A/V OUTLET 3 AV CLOSET (167-B) LP4(L) 13 30 1 2 10 3/4" 10 X 120 1 1000 1 AV-4 A/V OUTLET 4 AV CLOSET (167-B) LP4(L) 53 30 1 2 10 3/4" 10 X 120 1 1000 1 AV-5 A/V OUTLET 5 AV CLOSET (210) LP4(L) 71 30 1 2 10 3/4" 10 X 120 1 1000 1 AV-6 A/V OUTLET 6 AV CLOSET (210) LP2(R) 32 30 1 2 10 3/4" 10 X 120 1 1000 1 CPY 1 COPIER 1 COPY AREA (112-A) LP1(L) 28 20 1 2 12 1/2" 12 X 120 1 300 CPY 2 COPIER 2 CHECK-IN/RENTAL (107) LP1(L) 46 20 1 2 12 1/2" 12 X 120 1 300 CSB1 CENTER SCORE BOARD 1 MERCYHEALTH ARENA (136) LP3(L) 57 20 1 2 12 1/2" 12 X 120 1 360 1 CSB2 CENTER SCORE BOARD 2 MERCYHEALTH ARENA (136) LP3(L) 58 20 1 2 12 1/2" 12 X 120 1 360 1 CSB3 CENTER SCORE BOARD 3 MERCYHEALTH ARENA (136) LP3(L) 59 20 1 2 12 1/2" 12 X 120 1 360 1 CSB4 CENTER SCORE BOARD 4 MERCYHEALTH ARENA (136) LP3(L) 60 20 1 2 12 1/2" 12 X 120 1 360 1 CSB5 CENTER SCORE BOARD 5 MULTIPURPOSE AREA (154) LP4(L) 37 20 1 2 12 1/2" 12 X 120 1 360 1 CSB6 CENTER SCORE BOARD 6 MULTIPURPOSE AREA (154) LP4(L) 37 20 1 2 12 1/2" 12 X 120 1 360 1 CSB7 CENTER SCORE BOARD 7 MULTIPURPOSE AREA (154) LP4(L) 41 20 1 2 12 1/2" 12 X 120 1 360 1 CSB8 CENTER SCORE BOARD 8 MULTIPURPOSE AREA (154) LP4(L) 41 20 1 2 12 1/2" 12 X 120 1 360 1 D1 CLOTHES DRYER RESURFACER/SHOP (170) LP3(L) 24,26 20 2 2 12 1/2" 12 X 208 1 1330 2,3 D1 CLOTHES DRYER TEAM STR/LDY (129) LP3(L) 51,53 20 2 2 12 1/2" 12 X 208 1 5000 2,3 D2 CLOTHES DRYER 2 TEAM STR/LDY (129) LP3(L) 52,54 20 2 2 12 1/2" 12 X 208 1 5000 2,3 DIS 1 DISPLAY COOLER-1 BEER SALES (116) LP2(L) 51 20 1 2 12 3/4" 12 X 120 1 1020 2 DIS 2 DISPLAY COOLER-2 BEER SALES (116) LP2(L) 52 20 1 2 12 3/4" 12 X 120 1 1020 2 EL1 EVENT LIGHTING 1 MERCYHEALTH ARENA (136) LP3(L) 28 20 1 2 12 1/2" 12 X 120 1 360 4 EL2 EVENT LIGHTING 2 MERCYHEALTH ARENA (136) LP3(L) 28 20 1 2 12 1/2" 12 X 120 1 360 4 EL3 EVENT LIGHTING 3 MERCYHEALTH ARENA (136) LP3(L) 28 20 1 2 12 1/2" 12 X 120 1 360 4 EL3 EVENT LIGHTING 21 MERCYHEALTH ARENA (136) LP3(L) 66 20 1 2 12 1/2" 12 X 120 1 360 4 EL4 EVENT LIGHTING 4 MERCYHEALTH ARENA (136) LP3(L) 55 20 1 2 12 1/2" 12 X 120 1 360 4 EL5 EVENT LIGHTING 5 MERCYHEALTH ARENA (136) LP3(L) 55 20 1 2 12 1/2" 12 X 120 1 360 4 EL6 EVENT LIGHTING 6 MERCYHEALTH ARENA (136) LP3(L) 55 20 1 2 12 1/2" 12 X 120 1 360 4 EL7 EVENT LIGHTING 7 MERCYHEALTH ARENA (136) LP3(L) 56 20 1 2 12 1/2" 12 X 120 1 360 4 EL8 EVENT LIGHTING 8 MERCYHEALTH ARENA (136) LP3(L) 56 20 1 2 12 1/2" 12 X 120 1 360 4 EL9 EVENT LIGHTING 9 MULTIPURPOSE AREA (154) LP4(L) 35 20 1 2 12 1/2" 12 X 120 1 360 4 EL10 EVENT LIGHTING 10 MULTIPURPOSE AREA (154) LP4(L) 35 20 1 2 12 1/2" 12 X 120 1 360 4 EL11 EVENT LIGHTING 11 MULTIPURPOSE AREA (154) LP4(L) 35 20 1 2 12 1/2" 12 X 120 1 360 4 EL12 EVENT LIGHTING 12 MULTIPURPOSE AREA (154) LP4(L) 39 20 1 2 12 1/2" 12 X 120 1 360 4 EL13 EVENT LIGHTING 13 MULTIPURPOSE AREA (154) LP4(L) 39 20 1 2 12 1/2" 12 X 120 1 360 4 EL14 EVENT LIGHTING 14 MULTIPURPOSE AREA (154) LP4(L) 39 20 1 2 12 1/2" 12 X 120 1 360 4 EL15 EVENT LIGHTING 15 MULTIPURPOSE AREA (154) LP4(L) 39 20 1 2 12 1/2" 12 X 120 1 360 4 EL16 EVENT LIGHTING 16 MULTIPURPOSE AREA (154) LP4(L) 39 20 1 2 12 1/2" 12 X 120 1 360 4 EL17 EVENT LIGHTING 17 MERCYHEALTH ARENA (136) LP3(L) 61 20 1 2 12 1/2" 12 X 120 1 360 4 EL18 EVENT LIGHTING 18 MERCYHEALTH ARENA (136) LP3(L) 61 20 1 2 12 1/2" 12 X 120 1 360 4 EL19 EVENT LIGHTING 19 MERCYHEALTH ARENA (136) LP3(L) 61 20 1 2 12 1/2" 12 X 120 1 360 4 EL20 EVENT LIGHTING 20 MERCYHEALTH ARENA (136) LP3(L) 66 20 1 2 12 1/2" 12 X 120 1 360 4 EL22 EVENT LIGHTING 22 MERCYHEALTH ARENA (136) LP3(L) 66 20 1 2 12 1/2" 12 X 120 1 360 4 EL23 EVENT LIGHTING 23 MULTIPURPOSE AREA (154) LP4(L) 42 20 1 2 12 1/2" 12 X 120 1 360 4 EL25 EVENT LIGHTING 25 MULTIPURPOSE AREA (154) LP4(L) 42 20 1 2 12 1/2" 12 X 120 1 360 4 EL26 EVENT LIGHTING 26 MULTIPURPOSE AREA (154) LP4(L) 44 20 1 2 12 1/2" 12 X 120 1 360 4 EL27 EVENT LIGHTING 27 MULTIPURPOSE AREA (154) LP4(L) 44 20 1 2 12 1/2" 12 X 120 1 360 4 EL28 EVENT LIGHTING 28 MULTIPURPOSE AREA (154) LP4(L) 44 20 1 2 12 1/2" 12 X 120 1 360 4 ELC1 ELECTRONIC LOCKER 1 LOCKER ALCOVE (101-A) LP1(L) 40 20 1 2 12 1/2" 12 X 120 1 300 9,10 ELC2 ELECTRONIC LOCKER 2 LOCKER ALCOVE (101-A) LP1(L) 37 20 1 2 12 1/2" 12 X 120 1 300 9,10 ELC3 ELECTRONIC LOCKER 3 ADMIN (112) LP1(L) 30 20 1 2 12 1/2" 12 X 120 1 300 9,10 ELC4 ELECTRONIC LOCKER 4 ADMIN (112) LP1(L) 25 20 1 2 12 1/2" 12 X 120 1 300 9,10 ELC5 ELECTRONIC LOCKER 5 REFEREE (145) LP3(L) 63 20 1 2 12 1/2" 12 X 120 1 500 9,10 ELC6 ELECTRONIC LOCKER 6 REFEREE (145) LP3(L) 62 20 1 2 12 1/2" 12 X 120 1 500 9,10 ELC-1 ELEVATOR CONTROL-1 ELEV (152) LP4(L) 47 20 1 2 12 1/2" 12 X 120 1 500 5 ELL-1 ELEVATOR CAB LIGHTS ELEV (152) LP4(L) 49 20 1 2 12 1/2" 12 X 120 1 500 19 EV-1 EV CHARGER 1 PARKING EV 1,3 50 2 3 6 3/4" 10 X 208 3 9600 2 EV-2 EV CHARGER 2 PARKING EV 2,4 50 2 3 6 3/4" 10 X 208 3 9600 2 EV-3 EV CHARGER 3 PARKING EV 5,7 50 2 3 6 3/4" 10 X 208 3 9600 2 EV-4 EV CHARGER 4 PARKING EV 9,11 50 2 3 6 3/4" 10 X 208 3 9600 2 FAAP FAAP VESTIBULE (100) LP1(L) 50 20 1 2 12 1/2" 12 X 120 1 1000 18 FACP FACP ELEC (134) LP3(L) 20 20 1 2 12 1/2" 12 X 120 1 1000 18 GL1 GOAL LIGHT - GL1 ICE RINK CIRC. (135) LP3(L) 25 20 1 2 12 1/2" 12 X 120 1 360 GL2 GOAL LIGHT - GL 2 ICE RINK CIRC. (151) LP2(L) 29 20 1 2 12 1/2" 12 X 120 1 360 GL3 GOAL LIGHT - GL 3 MULTIPURPOSE AREA (154) LP4(L) 45 20 1 2 12 1/2" 12 X 120 1 120 GL4 GOAL LIGHT - GL 4 MULTIPURPOSE AREANA CIRC. (154-B) LP4(L) 34 20 1 2 12 1/2" 12 X 120 1 120 HD1 ELECTRIC HAND DRYER 1 WET TEAM RR (139) LP3(L) 13 20 1 2 12 1/2" 12 X 120 1 1000 2 HD2 ELECTRIC HAND DRYER 2 WOMEN TLT (141) LP3(L) 17 20 1 2 12 1/2" 12 X 120 1 1000 2 HD3 ELECTRIC HAND DRYER 3 WOMEN TLT (128) LP3(L) 48 20 1 2 12 1/2" 12 X 120 1 1000 2 HD4 ELECTRIC HAND DRYER 4 MAIN TEAM ROOM (132) LP3(L) 39 20 1 2 12 1/2" 12 X 120 1 1000 2 HD5 ELECTRIC HAND DRYER 5 TLT (162) LP4(L) 17 20 1 2 12 1/2" 12 X 120 1 1000 2 HD10 ELECTRIC HAND DRYER 10 WET TEAM RR (124) LP2(L) 11 20 1 2 12 1/2" 12 X 120 1 1000 2 HD11 ELECTRIC HAND DRYER 11 WOMEN'S (122) LP2(L) 17 20 1 2 12 1/2" 12 X 120 1 1000 2 HD11 ELECTRIC HAND DRYER 15 MEN (121) LP2(L) 21 20 1 2 12 1/2" 12 X 120 1 1000 2 HD12 ELECTRIC HAND DRYER 12 WOMEN'S (122) LP2(L) 18 20 1 2 12 1/2" 12 X 120 1 1000 2 E - SPECIAL OUTLET SCHEDULE - TYPICAL HW NO. TO FEED LOC.PANEL CIRCUIT NUMBER BREAKER WIRING TERMINAL VOLT PHASE LOAD (W) SEE NOTESIZE POLE NO. SIZE COND GRD SIZE R D B HD13 ELECTRIC HAND DRYER 13 WOMEN'S (122) LP2(L) 16 20 1 2 12 1/2" 12 X 120 1 1000 2 HD14 ELECTRIC HAND DRYER 14 MEN (121) LP2(L) 20 20 1 2 12 1/2" 12 X 120 1 1000 2 HD16 ELECTRIC HAND DRYER 16 MEN (121) LP2(L) 19 20 1 2 12 1/2" 12 X 120 1 1000 2 HD17 ELECTRIC HAND DRYER 17 TOILETS (106B) LP1(L) 15 20 1 2 12 1/2" 12 X 120 1 180 2 HD18 ELECTRIC HAND DRYER 18 TOILETS (106B) LP1(L) 18 20 1 2 12 1/2" 12 X 120 1 180 2 HD19 ELECTRIC HAND DRYER 19 REFEREE RR (146) LP3(L) 64 20 1 2 12 1/2" 12 X 120 1 1000 2 HD20 ELECTRIC HAND DRYER 20 MEN (121) LP2(L) 27 20 1 2 12 1/2" 12 X 120 1 1000 2 HD21 ELECTRIC HAND DRYER 21 WOMEN'S (122) LP2(L) 74 20 1 2 12 1/2" 12 X 120 1 1000 2 HD22 ELECTRIC HAND DRYER 22 WOMEN'S (122) LP2(L) 76 20 1 2 12 1/2" 12 X 120 1 1000 2 HD23 ELECTRIC HAND DRYER 23 MENS (166) LP1(L) 49 20 1 2 12 1/2" 12 X 120 1 180 2 HD24 ELECTRIC HAND DRYER 24 MENS (166) LP1(L) 51 20 1 2 12 1/2" 12 X 120 1 180 2 HD25 ELECTRIC HAND DRYER 25 MENS (166) LP1(L) 54 20 1 2 12 1/2" 12 X 120 1 180 2 HD29 ELECTRIC HAND DRYER 29 WOMENS (165) LP1(L) 56 20 1 2 12 1/2" 12 X 120 1 180 2 HD30 ELECTRIC HAND DRYER 30 WOMENS (165) LP1(L) 55 20 1 2 12 1/2" 12 X 120 1 180 2 HD31 ELECTRIC HAND DRYER 31 WOMENS (165) LP1(L) 58 20 1 2 12 1/2" 12 X 120 1 180 2 HD32 ELECTRIC HAND DRYER 32 MEN (121) LP2(L) 78 20 1 2 12 1/2" 12 X 120 1 1000 2 HD33 ELECTRIC HAND DRYER 33 FAMILY RESTROOM (120) LP2(L) 79 20 1 2 12 1/2" 12 X 120 1 1000 2 HD34 ELECTRIC HAND DRYER 34 WOMEN'S (122) LP2(L) 80 20 1 2 12 1/2" 12 X 120 1 1000 2 HD35 ELECTRIC HAND DRYER 35 TOILETS (106B) LP1(L) 61 20 1 2 12 1/2" 12 X 120 1 180 2 HD36 ELECTRIC HAND DRYER 36 TOILETS (106B) LP1(L) 62 20 1 2 12 1/2" 12 X 120 1 180 2 HD37 ELECTRIC HAND DRYER 37 WOMENS (165) LP1(L) 66 20 1 2 12 1/2" 12 X 120 1 180 2 HD38 ELECTRIC HAND DRYER 38 WOMENS (165) LP1(L) 64 20 1 2 12 1/2" 12 X 120 1 180 2 HD39 ELECTRIC HAND DRYER 39 MEN (121) LP2(L) 82 20 1 2 12 1/2" 12 X 120 1 1000 2 HD40 ELECTRIC HAND DRYER 40 WOMEN'S (122) LP2(L) 81 20 1 2 12 1/2" 12 X 120 1 1000 2 HD41 ELECTRIC HAND DRYER 41 WOMEN'S (122) LP2(L) 83 20 1 2 12 1/2" 12 X 120 1 1000 2 IT30A1 TELECOM OUTLET - IT30A1 ELEC (134) LP3(L) 33 30 1 2 10 3/4" 10 X 120 1 1000 13 IT30A2 TELECOM OUTLET - IT30A2 IT/GEN STORAGE (176) LP4(L) 31 30 1 2 10 3/4" 10 X 120 1 200 7 IT30A3 TELECOM OUTLET - IT30A3 STOR (104) LP1(L) 16 30 1 2 10 3/4" 10 X 120 1 200 7 IT30A4 TELECOM OUTLET - IT30A4 IT (150) LP2(L) 38 30 1 2 10 3/4" 10 X 120 1 200 7 IT30A5 TELECOM OUTLET - IT30A5 IT (150) LP2(L) 37 30 1 2 10 3/4" 10 X 120 1 200 7 MBH-1 MOTORIZED BASKETBALL HOOP 1 EXTERIOR WINDOWS LP1(L) 52 20 1 2 12 1/2" 12 X 120 1 276 5 MBH-2 MOTORIZED BASKETBALL HOOP 2 EXTERIOR WINDOWS LP1(L) 52 20 1 2 12 1/2" 12 X 120 1 276 5 MBH-3 MOTORIZED BASKETBALL HOOP 3 EXTERIOR WINDOWS LP5 56 20 1 2 12 1/2" 12 X 120 1 276 5 MBH-4 MOTORIZED BASKETBALL HOOP 4 EXTERIOR WINDOWS LP5 57 20 1 2 12 1/2" 12 X 120 1 276 5 MBH-5 MOTORIZED BASKETBALL HOOP 5 EXTERIOR WINDOWS LP5 56 20 1 2 12 1/2" 12 X 120 1 276 5 MBH-6 MOTORIZED BASKETBALL HOOP 6 EXTERIOR WINDOWS LP5 57 20 1 2 12 1/2" 12 X 120 1 276 5 MS1 MOTORIZED SHADE 1 EXTERIOR WINDOWS LP1(L) 12 20 1 2 12 1/2" 12 X 120 1 276 5 MS2 MOTORIZED SHADE 2 EXTERIOR WINDOWS LP5 52 20 1 2 12 1/2"12 X 120 1 276 8 MS3 MOTORIZED SHADE 3 EXTERIOR WINDOWS LP5 54 20 1 2 12 1/2"12 X 120 1 276 8 MS4 MOTORIZED SHADE 4 EXTERIOR WINDOWS LP5 55 20 1 2 12 1/2"12 X 120 1 276 8 PRJ-1 PROJECTOR 1 MULTI - USE CONVENTION SPACE (156) LP6 26,28 20 2 2 12 1/2" 12 X 208 1 1540 5 PRJ-2 PROJECTOR 2 MULTI - USE CONVENTION SPACE (156) LP5 58,60 20 2 2 12 1/2" 12 X 208 1 1540 5 PRJ-3 PROJECTOR 3 MULTI - USE CONVENTION SPACE (156) LP1(L) 45,47 20 2 2 12 1/2" 12 X 208 1 540 5 PRS-1 PROJECTOR SCREEN 1 MULTI - USE CONVENTION SPACE (156) LP1(L) 2 20 1 2 12 1/2" 12 X 120 1 300 PRS-2 PROJECTOR SCREEN 2 MULTI - USE CONVENTION SPACE (156) LP1(L) 5 20 1 2 12 1/2" 12 X 120 1 300 PRS-3 PROJECTOR SCREEN 3 MULTI - USE CONVENTION SPACE (156) LP1(L) 9 20 1 2 12 1/2" 12 X 120 1 300 PW-1 PARTITION WALL 1 MULTI - USE CONVENTION SPACE (156) LP5 13,15,17 30 3 3 10 3/4" 10 X 208 3 1622 PW-2 PARTITION WALL 2 MULTI - USE CONVENTION SPACE (156) LP5 10,12,14 30 3 3 10 3/4" 10 X 208 3 1622 PW-3 PARTITION WALL 3 MULTI - USE CONVENTION SPACE (156) LP5 23,25,27 30 3 3 10 3/4" 10 X 208 3 1622 PW-4 PARTITION WALL 4 MULTI - USE CONVENTION SPACE (156) LP5 22,24,26 30 3 3 10 3/4" 10 X 208 3 1622 RSP-1 ROAD SHOW PANEL 1 MULTI PURPOSE AREA CIRCULATION (154-B) LP6 19,21,23 100 3 3 1 1-1/4" 8 X 208 3 25200 RSP-2 ROAD SHOW PANEL2 MULTI PURPOSE AREA CIRCULATION (154-B) LP6 14,16,18 100 3 3 1 1-1/4" 8 X 208 3 25200 SBP-1 SPIDER BOX-1 MULTI - USE CONVENTION SPACE (156)LP6 8,10,12 60 3 3 4 1" 10 X 208 3 13000 SBP-2 SPIDER BOX-2 MULTI - USE CONVENTION SPACE (156)LP6 13,15,17 60 3 3 4 1" 10 X 208 3 13000 SBP-3 SPIDER BOX-3 MULTI-PURPOSE AREA (154) LP6 20,22,24 60 3 3 4 1" 10 X 208 3 13000 SBP-4 SPIDER BOX-4 MULTI-PURPOSE AREA (154) LP6 25,27,29 60 3 3 4 1" 10 X 208 3 13000 SBP-5 SPIDER BOX - 5 MULTI - USE CONVENTION SPACE (156) LP6 1,3,5 60 3 3 4 1" 10 X 208 3 13000 SBP-6 SPIDER BOX - 6 MULTI - USE CONVENTION SPACE (156) LP6 7,9,11 60 3 3 4 1" 10 X 208 3 13000 SBP-7 SPIDER BOX - 7 MULTI - USE CONVENTION SPACE (156) LP6 2,4,6 60 3 3 4 1" 10 X 208 3 13000 SC1 SCORE BOARD 1 ICE RINK CIRC. (135) LP3(L) 27 20 1 2 12 1/2" 12 X 120 1 360 1 SC2 SCORE BOARD 2 ICE RINK CIRC. (151) LP2(L) 30 20 1 2 12 1/2" 12 X 120 1 360 1 SC3 SCORE BOARD 3 MULTIPURPOSE AREANA CIRC. (154-B) LP4(L) 32 20 1 2 12 1/2" 12 X 120 1 1000 1 SC4 SCORE BOARD 4 MULTIPURPOSE AREANA CIRC. (154-B) LP4(L) 46 20 1 2 12 1/2" 12 X 120 1 1000 1 SC5 SCORE BOARD 5 MULTI - USE CONVENTION SPACE (156) LP1(L) 6 20 1 2 12 1/2" 12 X 120 1 1000 1 SC6 SCORE BOARD 6 MULTI - USE CONVENTION SPACE (156) LP1(L) 8 20 1 2 12 1/2" 12 X 120 1 1000 1 SC7 SCORE BOARD 7 MULTI - USE CONVENTION SPACE (156) LP1(L) 42 20 1 2 12 1/2" 12 X 120 1 1000 1 SD1 SLIDING DOOR 1 MAIN LOBBY (101) LP1(L) 27 20 1 2 12 1/2" 12 X 120 1 500 1 SD2 SLIDING DOOR 2 VESTIBULE (100) LP1(L) 32 20 1 2 12 1/2" 12 X 120 1 500 1 SD3 SLIDING DOOR 3 ICE RINK CIRC. (151) LP2(L) 28 20 1 2 12 1/2" 12 X 120 1 500 1 ST1 SCORER TABLE 1 MULTI - USE CONVENTION SPACE (156)LP1(L) 3 20 1 2 12 1/2" 12 X 120 1 360 1 ST2 SCORER TABLE 2 MULTI - USE CONVENTION SPACE (156)LP1(L) 10 20 1 2 12 1/2" 12 X 120 1 360 1 ST3 SCORER TABLE 3 MULTI - USE CONVENTION SPACE (156)LP1(L) 14 20 1 2 12 1/2" 12 X 120 1 360 1 ST4 SCORER TABLE 4 MULTIPURPOSE AREANA CIRC. (154) LP4(L) 72 20 1 2 12 1/2" 12 X 120 1 1000 1 ST5 SCORER TABLE 5 MULTIPURPOSE AREANA CIRC. (154) LP4(L) 43 20 1 2 12 1/2" 12 X 120 1 1000 1 STG-1-1 STAGE-1 OUTLET-1 MULTI - USE CONVENTION SPACE (156) LP5 4,6,8 20 3 3 12 1/2" 12 X 208 3 2000 1 STG-2-1 STAGE-2 OUTLET-1 MULTI - USE CONVENTION SPACE (156) LP5 16,18,20 20 3 3 12 1/2" 12 X 208 3 2000 1 STG-3-1 STAGE-3 OUTLET-1 MULTI - USE CONVENTION SPACE (156) LP5 29,31,33 20 3 3 12 1/2" 12 X 208 3 2000 1 STG-4-1 STAGE-4 OUTLET-1 MULTI PURPOSE AREA CIRCULATION (154-B) LP5 5,7,9 20 3 3 12 1/2" 12 X 208 3 2000 1 U/C R-6 U/C REFRIGERATOR-6 LP2(R) 30 20 1 2 12 3/4" 12 120 1 1000 W1 CLOTHES WASHER RESURFACER/SHOP (170) LP3(L) 23 20 1 2 12 1/2" 12 X 120 1 1330 2,3 W2 CLOTHES WASHER 2 TRAINING (129) LP3(L) 49 20 1 2 12 1/2" 12 X 120 1 1500 2,3 W3 CLOTHES WASHER 3 TRAINING (129) LP3(L) 50 20 1 2 12 1/2" 12 X 120 1 1500 2,3 Z1 RESURFACE CHARGER 1 RESURFACER/SHOP (170) DP3 50,52,54 20 3 3 12 1/2" 12 X 480 1 1330 Z2 RESURFACE CHARGER 2 RESURFACER/SHOP (170) DP3 55,57,59 15 3 3 12 1/2" 12 X 480 1 1330E - SPECIAL OUTLET FOOD SERVICES SCHEDULE - TYPICAL HW NO. TO FEED LOC.PANEL CIRCUIT NUMBER BREAKER WIRING TERMINAL VOLT PHASE LOAD (W) SEE NOTESIZE POLE NO. SIZE COND GRD SIZE R D B CO-1 COFFEE MAKER 1 WARMING ROOM (159) LP4(L) 8,10,12 40 3 3 4 1" 10 X 208 3 1200 1,2,3 CO-2 COFFEE MAKER 2 FOOD PREP (115-A) LP2(L) 66,68,70 40 3 3 4 1" 10 X 208 3 1000 1,2,3 COF-1 COFFEE 1 BREAKROOM (109) LP1(L) 29 20 1 2 12 1/2" 12 X 120 1 1200 1,2,3 DISP-1 DISPOSAL WARMING ROOM (159) LP4(L) 5,7,9 20 3 3 12 1/2" 12 X 208 3 2377 2 FRZ-1 FREEZER 1 FOOD PREP (115-A) LP2(L) 50 20 1 2 12 1/2" 12 X 120 1 1152 6 FRZ-2 FREEZER 2 FOOD PREP (115-A) LP2(L) 41 20 1 2 12 1/2" 12 X 120 1 1152 6 FRZ-3 FREEZER 3 FOOD PREP (115-A) LP2(L) 3 20 1 2 12 1/2" 12 X 120 1 936 6 GRI-1 ROLLER GRILLS 2 FOOD PREP (115-A) LP2(L) 53 20 1 2 12 1/2" 12 X 120 1 1650 2 MW-1 MICROWAVE 1 BREAKROOM (109) LP1(L) 34 20 1 2 12 1/2" 12 X 120 1 1200 1,2,3 MW/OVEN-1 MICROWAVE OVEN WARMING ROOM (159) LP4(L) 73,75 20 2 2 12 1/2" 12 X 208 1 11500 1,2,3 OVN-4 MICROWAVE OVEN 4 WARMING ROOM (159) LP4(L) 40 20 1 2 12 1/2" 12 X 120 1 1200 1,2,3 POP-1 POP CORN 1 CONCESSIONS (115-B) LP2(L) 65 20 1 2 12 1/2" 12 X 120 1 1643 1,2,3 RC-1 RAPID COOK-1 FOOD PREP (115-A) LP2(L) 59,61,63 40 3 3 8 3/4" 10 X 208 3 9500 2 RC-2 RAPID COOK-2 FOOD PREP (115-A) LP2(L) 60,62,64 40 3 3 8 3/4" 10 X 208 3 9500 2 REF-1 REFRIGERATOR 1 BREAKROOM (109) LP1(L) 36 20 1 2 12 1/2" 12 X 120 1 1000 1,2,3 REF-2 REFRIGERATOR 2 WARMING ROOM (159) LP4(L) 3 20 1 2 12 1/2" 12 X 120 1 648 1,2,3 REF-3 REFRIGERATOR 3 FOOD PREP (115-A) LP2(L) 54 20 1 2 12 1/2" 12 X 120 1 648 1,2,3 REF-5 REFRIGERATOR 5 WARMING ROOM (159) LP4(L) 33 20 1 2 12 1/2" 12 X 120 1 648 1,2,3 REF-6 REFRIGERATOR 6 WARMING ROOM (159) LP4(L) 38 20 1 2 12 1/2" 12 X 120 1 648 1,2,3 U/CR-1 U/C REFRIGERATOR-1 FOOD PREP (115-A) LP2(L) 43 20 1 2 12 1/2" 12 X 120 1 480 1,2,3 U/CR-2 U/C REFRIGERATOR 2 FOOD PREP (115-A) LP2(L) 46 20 1 2 12 1/2" 12 X 120 1 480 1,2,3 U/CR-3 U/C REFRIGERATOR-3 FOOD PREP (115-A) LP2(L) 49 20 1 2 12 1/2" 12 X 120 1 480 1,2,3 U/CR-4 U/C REFRIGERATOR-4 FOOD PREP (115-A) LP2(L) 47 20 1 2 12 1/2" 12 X 120 1 480 1,2,3 U/CR-5 U/C REFRIGERATOR-5 FOOD PREP (115-A) LP2(L) 48 20 1 2 12 1/2" 12 X 120 1 480 1,2,3 R - RECEPTACLE D - DISCONNECT B - JUNCTION BOX R - RECEPTACLE D - DISCONNECT B - JUNCTION BOX R - RECEPTACLE D - DISCONNECT B - JUNCTION BOX 10/13/202310/04/2023 BID DOCUMENT SET 1. PROVIDE A DUPLEX RECEPTACLE. 2. PROVIDE A GFI DUPLEX RECEPTACLE. 3. PROVIDE A GFI CIRCUIT BREAKER. 4. PROVIDE A WALL SWITCH WITH PILOT LIGHT ON NEARBY WALL. 5. MOUNT OUTLET BELOW SINK/COUNTER FOR POWER TO INFRA-RED FAUCET CONTROL. PROVIDE (1) OUTLET PER TWO SINKS MOUNTED IN BETWEEN THE SINKS. MOUNT OUTLET AS HIGH AS POSSIBLE. 6. PROVIDE A MIN. 4"X4"X2-1/2" SQUARE JUNCTION BOX LOCATED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR OPTICAL FLUSH VALVES. PC TO PROVIDE TRANSFORMER, EC TO INSTALL. COORDINATE WITH PC PRIOR TO ROUGH-IN. 7. INDOOR UNIT PROVIDES POWER TO OUTDOOR UNIT. COORDINATE INSTALLATION WITH MC. 8. CONTROLS FURNISHED WITH EQUIPMENT INSTALLED AND WIRED BY EC. COORDINATE FINAL CONTROLS LOCATION WITH MC PRIOR TO ROUGH-IN. 9. PROVIDE A FIXED LOCKED PADLOCK ATTACHMENT TO LOCK THE BREAKER IN THE OPEN POSITION. 10. FURNISH AND INSTALL ALL WIRING, CONDUIT AND BACK BOXES NEEDED FOR PUSH-BUTTON OPERATIONS OF DOOR. INSTALL VENDOR SUPPLIED PUSH-BUTTON.COORDINATE PUSHBUTTON LOCATION WITH OWNER/ARCHITECT PRIOR TO ROUGH-IN. 11. PROVIDE A FUSE DISCONNECT SWITCH GENERAL NOTES (ALL SCHEDULES): Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" ELECTRICAL SCHEDULES WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E5.2 10/04/2023 220025.00 C2023-15 E - MECHANICAL MOTOR WIRING SCHEDULE NO. SERVING LOC. VOLT PHASE HP FLA FEED FROM OCPD BRANCH WIRING MOTOR CONTROLLER DISCONNECT SWITCH SEE NOTEPANEL CKT SIZE PO LE NO. SIZE COND GRD SIZE FURN BY INST BY WIRE BY LOC. TYPE INST BY WIRE BY LOC. OPTIONS AC 1B AC 1B ROOF 208 1 11 MP1 29,31 25 2 2 #10 3/4" #10 MC EC EC IU EC EC NU NEMA 3R 7 AC 2B AC 2B ROOF 208 1 11 MP1 28,30 25 2 2 #10 3/4" #10 MC EC EC IU EC EC NU NEMA 3R 7 AC 3B AC 3B ROOF 208 1 11 MP1 44,46 25 2 2 #10 3/4" #10 MC EC EC IU EC EC NU NEMA 3R 7 AC 4B AC 4B ROOF 208 1 11 MP1 48,50 25 2 2 #10 3/4" #10 MC EC EC IU EC EC NU NEMA 3R 7 AC 5B AC 5B ROOF 208 1 11 MP1 40,42 25 2 2 #10 3/4" #10 MC EC EC IU EC EC NU NEMA 3R 7 AC 6B AC 6B ROOF 208 1 11 MP1 41,43 25 2 2 #10 3/4" #10 MC EC EC IU EC EC NU NEMA 3R 7 AC 7B AC 7B ROOF 208 1 33 MP1 45,47 40 2 2 #8 3/4" #10 MC EC EC IU EC EC NU NEMA 3R 7 C-1 C-1 REFRIGERATION (172) 480 3 156 MCC 1 200 3 4 3/0 2" #6 MFR MFR MFR IU EC EC NU C-2 C-2 REFRIGERATION (172) 480 3 156 MCC 2 200 3 4 3/0 2" #6 MFR MFR MFR IU EC EC NU C-3 C-3 REFRIGERATION (172) 480 3 156 MCC 3 200 3 4 3/0 2" #6 MFR MFR MFR IU EC EC NU CH-1 CHILLER ROOF 480 3 14 MCC 8 20 3 4 #12 1/2" #12 MFR MFR MFR IU EC EC NU NEMA 3R CP-1 CP-1 JAN (163) 120 1 13 MP1 17 20 1 2 #12 1/2" #12 MFR MFR MFR IU EC EC NU CP-2 CP-2 JAN (142) 120 1 13 MP1 15 20 1 2 #12 1/2" #12 MFR MFR MFR IU EC EC NU CP-3 CP-3 JAN (114) 120 1 13 MP1 16 20 1 2 #12 1/2" #12 MFR MFR MFR IU EC EC NU CP-4 CP-4 TRAINING (129) 120 1 13 MP1 19 20 1 2 #12 1/2" #12 MFR MFR MFR IU EC EC NU CP-5 CP-5 MECHANICAL (168) 120 1 13 MP1 18 20 1 2 #12 1/2" #12 MFR MFR MFR IU EC EC NU CU 1 CU 1 ROOF 480 3 133.9 DP3 14,16,18 150 3 4 1/0 2" #6 MC EC EC IU EC EC NU NEMA 3R DHU 1 DHU 1 ROOF 480 3 65 DP3 44,46,48 70 3 3 #4 1" #8 MC EC EC IU EC EC NU NEMA 3R DHU 2 DHU 2 ROOF 480 3 30 DP3 49,51,53 45 3 4 #6 3/4" #10 MC EC EC IU EC EC NU NEMA 3R ELV-1 ELEVATOR MOTOR-1 ELEV (152) 208 3 25 LP4(L) 50,52,54 60 3 4 #4 1" #10 MC EC EC IU EC EC NU ERV 1 ERV 1 ROOF 480 3 24 DP2 32,34,36 40 3 4 #8 3/4" #10 MC EC EC IU EC EC NU NEMA 3R ERV 2 ERV 2 ROOF 480 3 21.6 DP2 25,27,29 40 3 4 #8 3/4" #10 MC EC EC IU EC EC NU NEMA 3R ERV 3 ERV 3 ROOF 480 3 21.6 DP2 26,28,30 40 3 4 #8 3/4" #10 MC EC EC IU EC EC NU NEMA 3R ERV 4 ERV 4 ROOF 480 3 30.4 DP3 2,4,6 45 3 4 #6 3/4" #10 MC EC EC IU EC EC NU NEMA 3R ERV 5 ERV 5 ROOF 480 3 65.6 DP2 31,33,35 100 3 4 #1 1-1/2" #8 MC EC EC IU EC EC NU NEMA 3R ERV 6 ERV 6 ROOF 480 3 63 DP2 37,39,41 70 3 3 #4 1" #8 MC EC EC IU EC EC NU NEMA 3R ESP-1 ELEVATOR SUMP PUMP-1 ELEV (152) 120 1 6.8 LP5 37 20 1 2 #12 1/2" #12 MC EC EC IU CP EC EC NU 2 F-1 F-1 ROOF 120 3 1.05 MP1 21 15 1 2 #12 1/2" #12 MC EC EC IU EC EC NU NEMA 3R F-2 F-2 ROOF 120 1 5.8 MP1 22 15 1 2 #12 1/2" #12 MC EC EC IU EC EC NU NEMA 3R F-3 F-3 ROOF 120 1 3.2 MP1 23 15 1 2 #12 1/2" #12 MC EC EC IU EC EC NU NEMA 3R F-4 F-4 ROOF 120 1 3.2 MP1 24 15 1 2 #12 1/2" #12 MC EC EC IU EC EC NU NEMA 3R F-5 F-5 ROOF 120 3 3.25 MP1 25 15 1 2 #12 1/2" #12 MC EC EC IU EC EC NU NEMA 3R F-6 F-6 ROOF 480 3 7.6 DP3 8,10,12 15 3 4 #12 1/2" #12 MC EC EC IU EC EC NU NEMA 3R F-9 F-9 ROOF 480 3 1/2 1.1 DP3 43,45,47 15 3 3 #12 1/2" #12 MC EC EC IU EC EC NU NEMA 3R P1 CENTRIFUGAL PUMP 1 REFRIGERATION (172) 480 3 34 MCC 4 50 3 4 #6 3/4" #10 MFR MFR MFR IU EC EC NU 3,4 P2 CENTRIFUGAL PUMP 2 REFRIGERATION (172) 480 3 34 MCC 5 50 3 4 #6 3/4" #10 MFR MFR MFR IU EC EC NU 3,4 P3 CENTRIFUGAL PUMP 3 REFRIGERATION (172) 480 3 27 MCC 6 40 3 4 #8 3/4" #10 MFR MFR MFR IU EC EC NU 3,4 P4 CENTRIFUGAL PUMP 4 REFRIGERATION (172) 480 3 7.6 MCC 9 20 3 4 #12 1/2" #12 MFR MFR MFR IU EC EC NU 3,4 P5 CENTRIFUGAL PUMP 5 REFRIGERATION (172) 480 3 7.6 MCC 10 20 3 4 #12 1/2" #12 MFR MFR MFR IU EC EC NU 3,4 P6 CENTRIFUGAL PUMP 6 REFRIGERATION (172) 480 3 7.6 MCC 7 20 3 4 #12 1/2" #12 MFR MFR MFR IU EC EC NU 3,4 P7 CENTRIFUGAL PUMP 7 REFRIGERATION (172) 480 3 11 MCC 11 20 3 4 #12 1/2" #12 MFR MFR MFR IU EC EC NU 3,4 RTU 1 ROOF TOP UNIT 1 ROOF 480 3 107.2 DP1 10,12,14 150 3 4 1/0 1-1/2" #6 MC EC EC IU EC EC NU NEMA 3R RTU 2 ROOF TOP UNIT 2 ROOF 480 3 20.8 DP1 7,9,11 30 3 3 #10 3/4" #10 MC EC EC IU EC EC NU NEMA 3R RTU 3 ROOF TOP UNIT 3 ROOF 480 3 84 DP4 7,9,11 125 3 3 1/0 1-1/2" #6 MC EC EC IU EC EC NU NEMA 3R RTU 4 ROOF TOP UNIT 4 ROOF 480 3 103.2 DP1 31,33,35 150 3 3 1/0 1-1/2" #6 MC EC EC IU EC EC NU NEMA 3R RTU 5 ROOF TOP UNIT 5 ROOF 480 3 84 DP4 1,3,5 125 3 3 1/0 1-1/2" #6 MC EC EC IU EC EC NU NEMA 3R RTU 6 ROOF TOP UNIT 6 ROOF 480 3 103.2 DP4 2,4,6 150 3 3 1/0 1-1/2" #6 MC EC EC IU EC EC NU NEMA 3R RTU 7 ROOF TOP UNIT 7 ROOF 480 3 84 DP3 38,40,42 125 3 3 1/0 1-1/2" #6 MC EC EC IU EC EC NU NEMA 3R RTU 8 ROOF TOP UNIT 8 ROOF 480 3 14.4 DP3 37,39,41 25 3 3 #10 3/4" #10 MC EC EC IU EC EC NU NEMA 3R RTU 9 ROOF TOP UNIT 9 ROOF 480 3 14.4 DP3 1,3,5 25 3 3 #10 3/4"#10 MC EC EC IU EC EC NU NEMA 3R RTU 10 ROOF TOP UNIT 10 ROOF 480 3 9.6 DP3 31,33,35 15 3 3 #12 1/2" #12 MC EC EC IU EC EC NU NEMA 3R RTU 11 ROOF TOP UNIT 11 ROOF 480 3 14.4 DP3 13,15,17 25 3 3 #10 3/4" #10 MC EC EC IU EC EC NU NEMA 3R RTU 12 ROOF TOP UNIT 12 ROOF 480 3 14.4 DP3 19,21,23 25 3 3 #10 3/4" #10 MC EC EC IU EC EC NU NEMA 3R RTU 13 ROOF TOP UNIT 13 ROOF 480 3 105 DP1 34,36,38 150 3 3 1/0 1-1/2" #6 MC EC EC IU EC EC NU NEMA 3R TMV-3 TMV-3 TRAINING (129) 120 1 13 MP1 26 20 1 2 #12 1/2" #12 MFR MFR MFR IU EC EC NU UH 1 UH 1 REFRIGERATION (172) 120 1 3.7 MP1 27 15 1 2 #12 1/2" #12 MFR MFR MFR IU EC EC NU VAV 1-1 VAV 1-1 MEN (122) 277 1 20.3 DP2 1 25 1 3 #10 3/4" #10 MC EC EC IU EC EC NU 8 VAV 1-3 VAV 1-3 WOMEN (121) 277 1 15.8 DP2 3 20 1 3 #12 1/2" #12 MC EC EC IU EC EC NU 8 VAV 1-4 VAV 1-4 ICE ARENA LOBBY (117) 480 3 28.2 DP2 8,10,12 30 3 3 #10 3/4" #10 MC EC EC IU EC EC NU 8 VAV 1-5 VAV 1-5 VESTIBULE (118) 277 1 13.5 DP2 43 15 1 2 #12 1/2" #12 MC EC EC IU EC EC NU 8 VAV 1-6 VAV 1-6 ICE ARENA LOBBY (117) 480 3 23.7 DP2 14,16,18 25 3 3 #10 3/4" #10 MC EC EC IU EC EC NU 8 VAV 1-7 VAV 1-7 ICE ARENA LOBBY (117) 480 3 39.8 DP2 19,21,23 40 3 3 #12 1/2" #12 MC EC EC IU EC EC NU 8 VAV 1-8 VAV 1-8 FOOD PREP (115A) 480 3 19.5 DP2 13,15,17 20 3 3 #12 1/2" #12 MC EC EC IU EC EC NU 8 VAV 1-9 VAV 1-9 MAIN LOBBY (101) 480 3 36.8 DP1 19,21,23 40 3 3 #8 3/4" #10 MC EC EC IU EC EC NU 8 VAV 1-10 VAV 1-10 MAIN LOBBY (101) 277 1 28.7 DP1 16 30 1 2 #10 3/4" #10 MC EC EC IU EC EC NU 8 VAV 1-11 VAV 1-11 VESTIBULE (100) 277 1 27.1 DP1 18 30 1 2 #10 3/4" #10 MC EC EC IU EC EC NU 8 VAV 1-12 VAV 1-12 SKATE RENTAL (108) 277 1 31.6 DP1 20 35 1 2 #10 3/4" #10 MC EC EC IU EC EC NU 8 VAV 1-13 VAV 1-13 TOILETS (106) 277 1 6.8 DP1 8 15 1 2 #12 1/2"#12 MC EC EC IU EC EC NU 8 VAV 1-14 VAV 1-14 MAIN LOBBY (101) 480 3 41.3 DP1 2,4,6 45 3 3 #6 3/4" #10 MC EC EC IU EC EC NU 8 VAV 1-15 VAV 1-15 FIRST AID (105) 277 1 6.8 DP1 1 15 1 2 #12 1/2" #12 MC EC EC IU EC EC NU 8 VAV 1-16 VAV 1-16 MEETING ROOM (A) (102) 277 1 20.3 DP1 3 25 1 2 #10 3/4" #10 MC EC EC IU EC EC NU 8 VAV 1-17 VAV 1-17 MEETING ROOM (A) (102) 277 1 21.68 DP1 5 30 1 2 #10 3/4" #10 MC EC EC IU EC EC NU 8 E - PLUMBING SPECIAL OUTLET SCHEDULE - TYPICAL HW NO. TO FEED LOC.PANEL CIRCUIT NUMBER BREAKER WIRING TERMINAL VOLT PHASE LOAD (W) SEE NOTESIZE POLE NO. SIZE COND GRD SIZE R D B BP-1 BP-1 METER/RISER (179) DP3 20,22,24 20 3 3 12 1/2" 12 X 480 3 7150 3 DF-1 DRINKING FOUNTAIN-1 LOBBY/LINK (155) LP4(L) 11 20 1 2 12 1/2" 12 X 120 1 600 1,3 DF-2 DRINKING FOUNTAIN-2 PASSAGE (130) LP3(L) 45 20 1 2 12 1/2" 12 X 120 1 600 1,3 DF-3 DRINKING FOUNTAIN-3 PASSAGE (144) LP3(L) 21 20 1 2 12 1/2" 12 X 120 1 600 1,3 DF-4 DRINKING FOUNTAIN-4 MAIN LOBBY (101) LP1(L) 13 20 1 2 12 1/2" 12 X 120 1 600 1,3 DF-5 DRINKING FOUNTAIN-5 ICE ARENA LOBBY (117) LP2(L) 5 20 1 2 12 1/2" 12 X 120 1 600 1,3 GWH-1 GAS HOT WATER HEATER-1 JAN (163) LP4(L) 25 20 1 2 12 1/2" 12 X 120 1 600 3 GWH-2 GAS HOT WATER HEATER-2 JAN (142) LP3(L) 19 20 1 2 12 1/2" 12 X 120 1 600 3 GWH-3 GAS HOT WATER HEATER-3 JAN (114) LP2(L) 73 20 1 2 12 1/2" 12 X 120 1 600 3 GWH-4 GAS HOT WATER HEATER-4 TEAM STR/LDY (129) LP3(L)44 20 1 2 12 1/2" 12 X 120 1 600 3 GWH-5 GAS HOT WATER HEATER-5 MECHANICAL (168) LP3(L) 1 20 1 2 12 1/2" 12 X 120 1 600 3 GWH-6 GAS HOT WATER HEATER-6 MECHANICAL (168) LP3(L) 2 20 1 2 12 1/2" 12 X 120 1 600 3 HT-1 HEAT TRACE - 1 RESURFACER/SHOP (170) LP3(L) 81,83 30 2 2 10 3/4" 10 X 208 1 2000 11 HT-2 HEAT TRACE - 2 VESTIBULE (100) LP5 59,61 30 2 2 10 3/4"10 X 208 1 2000 11 HT-3 HEAT TRACE - 3 VESTIBULE (100) LP5 62,64 30 2 2 10 3/4"10 X 208 1 2000 11 HT-4 HEAT TRACE - 4 VESTIBULE (100) LP1(L) 63,65 30 2 2 10 3/4" 10 X 208 1 2000 11 HT-5 HEAT TRACE - 5 VESTIBULE (100) LP5 66,68 30 2 2 10 3/4"10 X 208 1 2000 11 IPT ICE PIT DRAIN RESURFACER/SHOP (170) LP3(L) 8 20 1 2 12 1/2" 12 X 120 1200 2 OFCT-1 OPTICAL FAUCET-1 TLT (162) LP4(L) 16 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-2 OPTICAL FAUCET-2 MEN'S (166) LP4(L) 19 20 1 2 12 1/2"12 X 120 1 180 5 OFCT-3 OPTICAL FAUCET-3 WOMEN'S (165) LP4(L) 24 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-4 OPTICAL FAUCET-4 WARMING ROOM (159) LP4(L) 6 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-5 OPTICAL FAUCET-5 WARMING ROOM (159) LP4(L) 4 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-6 OPTICAL FAUCET-6 TOILETS (106B) LP1(L) 17 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-7 OPTICAL FAUCET-7 MAIN TEAM ROOM (132) LP3(L) 37 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-8 OPTICAL FAUCET-8 WOMEN TLT (128) LP3(L) 47 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-9 OPTICAL FAUCET-9 WOMEN TLT (141) LP3(L) 16 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-10 OPTICAL FAUCET-10 FOOD PREP (115-A) LP2(L) 40 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-11 OPTICAL FAUCET-11 WET TEAM RR (139) LP3(L) 14 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-12 OPTICAL FAUCET-12 REFEREE RR (146) LP3(L) 65 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-13 OPTICAL FAUCET-13 WET TEAM RR (124) LP2(L) 8 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-14 OPTICAL FAUCET-14 WOMEN'S (122) LP2(L) 15 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-15 OPTICAL FAUCET-15 WOMEN'S (122) LP2(L) 72 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-16 OPTICAL FAUCET-16 MEN (121) LP2(L) 14 20 1 2 12 1/2"12 X 120 1 180 5 OFCT-17 OPTICAL FAUCET-17 MEN (121) LP2(L) 26 20 1 2 12 1/2"12 X 120 1 180 5 OFCT-18 OPTICAL FAUCET-18 FOOD PREP (115-A) LP2(L) 45 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-19 OPTICAL FAUCET-19 TOILETS (106A) LP1(L) 59 20 1 2 12 1/2" 12 X 120 1 180 5 OFCT-20 OPTICAL FAUCET-20 FAMILY RESTROOM (120) LP1(L)67 20 1 2 12 1/2" 12 X 120 1 180 5 OFV-1 OPTICAL FLUSH VALVE-1 TLT (162) LP4(L) 15 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-2 OPTICAL FLUSH VALVE-2 MEN'S (166) LP4(L) 20 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-3 OPTICAL FLUSH VALVE-3 MEN'S (166) LP4(L) 21 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-4 OPTICAL FLUSH VALVE-4 WOMEN'S (165) LP4(L) 23 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-5 OPTICAL FLUSH VALVE-5 WOMEN'S (165) LP4(L) 22 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-6 OPTICAL FLUSH VALVE-6 TOILETS (106) LP1(L) 20 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-7 OPTICAL FLUSH VALVE-7 WET TEAM RR (139) LP3(L) 15 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-8 OPTICAL FLUSH VALVE-8 MAIN TEAM ROOM (132) LP3(L) 38 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-9 OPTICAL FLUSH VALVE-9 WOMEN TLT (128) LP3(L) 46 20 1 2 12 1/2" 12 X 120 1 100 6 OFV-10 OPTICAL FLUSH VALVE-10 WOMEN TLT (141) LP3(L) 68 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-11 OPTICAL FLUSH VALVE-11 WET TEAM RR (124) LP2(L)12 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-12 OPTICAL FLUSH VALVE-12 WOMEN'S (122) LP2(L) 24 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-13 OPTICAL FLUSH VALVE-13 WOMEN'S (122) LP2(L) 71 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-14 OPTICAL FLUSH VALVE-14 MEN (121) LP2(L) 22 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-15 OPTICAL FLUSH VALVE-15 WOMEN'S (122) LP2(L) 67 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-16 OPTICAL FLUSH VALVE-16 WOMEN'S (122) LP2(L) 23 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-17 OPTICAL FLUSH VALVE-17 MEN (121) LP2(L) 13 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-18 OPTICAL FLUSH VALVE-18 WOMEN'S (122) LP2(L) 69 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-19 OPTICAL FLUSH VALVE-19 REFEREE RR (146) LP3(L) 67 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-20 OPTICAL FLUSH VALVE-20 FAMILY RESTROOM (120) LP2(L) 44 20 1 2 12 1/2" 12 X 120 1 180 6 OFV-21 OPTICAL FLUSH VALVE-21 FAMILY RESTROOM (120) LP1(L) 68 20 1 2 12 1/2" 12 X 120 1 180 6 WS-1 WATER SOFTENER-1 METER/RISER (179) LP3(L) 35 20 1 2 12 1/2" 12 X 120 1 500 1,3 E - MOTOR WIRING SCHEDULE NO. SERVING LOC. VOLT PHASE HP FLA FEED FROM OCPD BRANCH WIRING MOTOR CONTROLLER DISCONNECT SWITCH SEE NOTEPANEL CKT SIZE POLE NO. SIZE COND GRD SIZE FURN BY INST BY WIRE BY LOC. TYPE FURN BY INST BY WIRE BY LOC. OPTIONS 1 OVERHEAD DOOR 1 RESURFACER/SHOP (170) 120 1 3/4 13.8 LP3(L) 78 20 1 2 #12 1/2" #12 UM EC EC NU MAN EC EC EC NU 10 2 OVERHEAD DOOR 2 RESURFACER/SHOP (170) 120 1 3/4 13.8 LP3(L) 79 20 1 2 #12 1/2" #12 UM EC EC NU MAN EC EC EC NU 10 3 OVERHEAD DOOR 3 GENERAL BUILDING STORAGE (167) 120 1 3/4 13.8 LP4(L) 74 20 1 2 #12 1/2" #12 UM EC EC NU MAN EC EC EC NU 10 4 OVERHEAD DOOR 4 LOADING/RECEIVING/STOR. (160) 120 1 3/4 13.8 LP4(L) 76 20 1 2 #12 1/2" #12 UM EC EC NU MAN EC EC EC NU 10 5 OVERHEAD DOOR 5 MULTI-USE CONVENTION (156) 120 1 3/4 13.8 LP4(L) 78 20 1 2 #12 1/2" #12 UM EC EC NU MAN EC EC EC NU 10 6 OVERHEAD DOOR 6 MULTI-USE CONVENTION (156) 120 1 3/4 13.8 LP1(L) 57 20 1 2 #12 1/2" #12 UM EC EC NU MAN EC EC EC NU 10 7 OVERHEAD DOOR 7 RESURFACER/SHOP (170) 120 1 3/4 13.8 LP3(L) 80 20 1 2 #12 1/2" #12 UM EC EC NU MAN EC EC EC NU 10 E - MECHANICAL SPECIAL OUTLET SCHEDULE - TYPICAL HW NO. TO FEED LOC.PANEL CIRCUIT NUMBER BREAKER WIRING TERMINAL VOLT PHASE LOAD (W) SEE NOTESIZE POLE NO. SIZE COND GRD SIZE R D B IR-1 IR 1 MERCYHEALTH ARENA (136) MP1 1 20 1 2 12 1/2" 12 X 120 1 756 8 IR-2 IR 2 MERCYHEALTH ARENA (136) MP1 2 20 1 2 12 1/2" 12 X 120 1 756 8 IR-3 IR 3 MERCYHEALTH ARENA (136) MP1 3 20 1 2 12 1/2" 12 X 120 1 756 8 IR-4 IR 4 MERCYHEALTH ARENA (136) MP1 4 20 1 2 12 1/2" 12 X 120 1 756 8 IR-5 IR 5 MERCYHEALTH ARENA (136) MP1 5 20 1 2 12 1/2" 12 X 120 1 756 8 IR-6 IR 6 MERCYHEALTH ARENA (136) MP1 6 20 1 2 12 1/2" 12 X 120 1 756 8 IR-7 IR 7 MERCYHEALTH ARENA (136) MP1 7 20 1 2 12 1/2" 12 X 120 1 756 8 IR-8 IR 8 MERCYHEALTH ARENA (136) MP1 8 20 1 2 12 1/2" 12 X 120 1 756 8 IR-9 IR 9 MERCYHEALTH ARENA (136) MP1 9 20 1 2 12 1/2" 12 X 120 1 756 8 IR-10 IR 10 MERCYHEALTH ARENA (136) MP1 10 20 1 2 12 1/2" 12 X 120 1 756 8 IR-11 IR 11 MERCYHEALTH ARENA (136) MP1 11 20 1 2 12 1/2" 12 X 120 1 756 8 IR-12 IR 12 MERCYHEALTH ARENA (136) MP1 12 20 1 2 12 1/2" 12 X 120 1 756 8 IR-13 IR 13 MERCYHEALTH ARENA (136) MP1 13 20 1 2 12 1/2" 12 X 120 1 756 8 IR-14 IR 14 MERCYHEALTH ARENA (136) MP1 14 20 1 2 12 1/2" 12 X 120 1 756 8 E - PLUMBING SPECIAL OUTLET SCHEDULE ADD ALT 3- TYPICAL HW NO. TO FEED LOC.PANEL CIRCUIT NUMBER BREAKER WIRING TERMINAL VOLT PHASE LOAD (W) SEE NOTESIZE POLE NO. SIZE COND GRD SIZE R D B OFCT-31 OPTICAL FAUCET-31 TOILETS (106) LP5 45 20 1 2 12 1/2" 12 X 120 1 180 3 OFCT-32 OPTICAL FAUCET-32 TOILETS (106) LP5 40 20 1 2 12 1/2" 12 X 120 1 180 3 OFCT-33 OPTICAL FAUCET-33 TOILETS (106) LP5 42 20 1 2 12 1/2" 12 X 120 1 180 3 OFV-28 OPTICAL FLUSH VALVE-28 TOILETS (106) LP5 38 20 1 2 12 1/2" 12 X 120 1 180 2 OFV-29 OPTICAL FLUSH VALVE-29 TOILETS (106) LP5 47 20 1 2 12 1/2" 12 X 120 1 180 2 OFV-30 OPTICAL FLUSH VALVE-30 TOILETS (106) LP5 19 20 1 2 12 1/2" 12 X 120 1 180 2 E - PLUMBING SPECIAL OUTLET SCHEDULE ADD ALT 1- TYPICAL HW NO. TO FEED LOC.PANEL CIRCUIT NUMBER BREAKER WIRING TERMINAL VOLT PHASE LOAD (W) SEE NOTESIZE POLE NO. SIZE COND GRD SIZE R D B DF-7 DRINKING FOUNTAIN-7 PASSAGE (130) LP5 43 20 1 2 12 1/2"12 X 120 1 600 1 R - RECEPTACLE D - DISCONNECT B - JUNCTION BOX R - RECEPTACLE D - DISCONNECT B - JUNCTION BOX R - RECEPTACLE D - DISCONNECT B - JUNCTION BOX R - RECEPTACLE D - DISCONNECT B - JUNCTION BOX FOR REFERENCE ONLY PROVIDED BY OTHERS. THIS DIVISION 26 CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING HE MAIN FEEDER TO THE MCC AND TERMINATING. ALL OTHER WORK RELATED TO THE MCC IS BY OTHERS. Notes: Total Est. Demand:649 A Total Conn.:610 A Total Est. Demand:539594 VA Total Conn. Load:507.2 kVA Motor 507208 VA 106.39% 539594 VA Load Classification Connected Load Demand Factor Demand Load Panel Totals 16 SPARE 1 20 A 15 SPARE 1 20 A 14 SPARE 1 20 A 13 SPARE 1 20 A 12 SPARE 1 20 A 11 P-7 3 20 A 10 P-5 3 20 A 9 P-4 3 20 A 8 C-1 3 20 A 7 P-4 3 20 A 6 P-3 3 40 A 5 P-2 3 50 A 4 P-1 3 50 A 3 C-3 3 135 A 2 C-2 3 135 A 1 C-1 3 135 A CKT Circuit Description # of Poles Trip Rating Remarks Enclosure:Type 12 LSIG 100% RATED WITH GFEP Mounting:SURFACE Wires:4 MCB Rating:800 A Supply From:UTILITY TRANSF.Phases:3 Mains Type:MCB Volts:480/277 Wye A.I.C. Rating (Fully... SWITCHBOARD: MCC Notes: EV Charger 38400 VA 125.00% 48000 VA Kitchen 18221 VA 94.47% 17213 VA Special Outlet 326543 VA 100.00% 326543 VA Power 1435 VA 100.00% 1435 VA Kitchen Receptacles 5000 VA 70.00% 3500 VA Total Est. Demand:2893 A Receptacle 140914 VA 53.55% 75457 VA Total Conn.:2897 A Other 0 VA 0.00% 0 VA Total Est. Demand:2405497 VA Motor 1786985 VA 101.81% 1819371 VA Total Conn. Load:2408.7 kVA Lighting 91183 VA 125.00% 113978 VA Load Classification Connected Load Demand Factor Demand Load Panel Totals 16 SPACE 3 -- 15 SPACE 3 -- 14 SPACE 3 -- 13 SPACE 3 -- 12 SPACE 3 -- 11 SPARE 3 400 A 10 SPARE 3 400 A 9 SPARE 3 225 A 8 SPARE 3 225 A 7 SPARE 3 225 A 6 PANEL EV VIA 75KVA XFMR T-8 3 225 A 5 DISTRIBUTUION PANEL DP4 3 600 A 4 DISTRIBUTION PANEL DP3 3 800 A 3 DISTRIBUTION PANEL DP2 3 600 A 2 DISTRIBUTION PANEL DP1 3 800 A 1 REFRIGERATION MCC 3 800 A CKT Circuit Description # of Poles Trip Rating Remarks Enclosure:NEMA 1 LSIG 100% RATED WITH GFEP Mounting:SURFACE Wires:4 MCB Rating:3000 A Supply From:UTILITY TRANSF.Phases:3 Mains Type:MCB Volts:480/277 Wye A.I.C. Rating (Fully... SWITCHBOARD: MSB 10/13/202310/04/2023 BID DOCUMENT SET 1. FAULT CURRENT INDICATED IS PROVIDED FOR BIDDING PURPOSES ONLY. ALL EQUIPMENT INCLUDING CIRCUIT BREAKERS SHALL BE FULLY RATED, SERIES RATING NOT ACCEPTABLE. THE CONTRACTOR SHALL VERIFY WITH A WRITTEN STATEMENT FROM THE UTILITY THE MAXIUM SHORT CIRCUIT CAPACITY. USING THE MAXIMUM FAULT, PREPARE A SHORT CIRCUIT ANALYSIS, COORDINATION STUDY, AND ARC FLUSH STUDY OF THE ELECTRICAL DISTRIBUTION SYSTEM. THIS STUDY WITHT THE UTILITY LETTER SHALL BE SUBMITTED WITH THE ELECTRICAL DISTRIBUTION SHOP DRAWINGS. 2. PROVIDE TERMINATION LUGS COMPATIBLE WITH FEEDER SIZE. 3. PANELS DENOTED AS XX-L AND XX-R ARE DOUBLE TUB PANELS WITH L INDICATING ONE TUB AND R INDICATING WITH THE OTHER TUB. TUBS MAY EITHER BE 42 POLE OR 54 POLE. SEE SCHDULE AND ADDITIONAL DETAILS. 4. IN ADDITION TO ALL SHOWN BREAKERS, MSB-A, MDP-B, AND MDP-C SHALL HAVE SPACES FOR FUTURE EXPANSION. REFER TO THE ONE-LINE DIAGRAMS FOR EXACT NUMBER OF SPACES REQUIRED. GENERAL NOTES: Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" ELECTRICAL SCHEDULES WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E5.3 10/04/2023 220025.00 C2023-15 NOTES: Special Outlet 49448 VA 100.00% 49448 VA Total Est. Demand Current:620 A Power 164 VA 100.00% 164 VA Total Conn. Current:594 A Other 0 VA 0.00% 0 VA Total Est. Demand:516 kVA Motor 386112 VA 105.76% 408367 VA Total Conn. Load:494 kVA Lighting 31201 VA 125.00% 39001 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...588 A 587 A 608 A Total Load:162893 VA 162719 VA 168494 VA 59 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 60 57 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 58 55 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 56 53 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 54 51 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 52 49 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 50 47 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 48 45 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 46 43 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 44 41 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 42 39 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 40 37 SPARE 20 A 1 0 VA / 29064... -- -- --38 35 ---- -- 28566 VA /... -- -- --36 33 ---- -- 28566 VA /... 3 150 A RTU-13 34 31 RTU-4 150 A 3 28566 VA /... -- -- --32 29 ---- -- 13836 VA /... -- -- --30 27 ---- -- 8016 VA / 66... 3 60 A PANEL LS1 via LTG. INVERTER 28 25 PANEL HL1 100 A 3 7514 VA /... -- -- --26 23 ---- -- 10186 VA /... -- -- --24 21 ---- -- 10186 VA /... 3 150 A PANEL HL1 VIA 75KVA XFMR T-1 22 19 VAV 1-9 40 A 3 10186 VA /... 1 35 A VAV 1-12 20 17 ---- -- 12595 VA /... 1 30 A VAV 1-11 18 15 ---- -- 12867 VA /... 1 30 A VAV 1-10 16 13 T-5 100 A 3 13833 VA /... -- -- --14 11 ---- -- 5757 VA /... -- -- --12 9 ---- -- 5757 VA /... 3 150 A RTU-1 10 7 RTU-2 30 A 3 5757 VA /... 1 15 A VAV 1-13 8 5 VAV 1-17 30 A 1 6005 VA /... -- -- --6 3 VAV 1-16 25 A 1 5623 VA /... -- -- --4 1 VAV 1-15 15 A 1 1884 VA /... 3 45 A VAV 1-14 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:35000 Mounting:Surface Wires 4 MCB Rating:800 A Supply From:MSB Phases:3 Mains Type:MLO Location:ELECTRIC (157)Volts:480/277 Wye Bussing: Panel Desgination: DP1 PANEL SCHEDULE NOTES: Special Outlet 55321 VA 100.00% 55321 VA Total Est. Demand Current:477 A Power 1271 VA 100.00% 1271 VA Total Conn. Current:475 A Other 0 VA 0.00% 0 VA Total Est. Demand:397 kVA Motor 268672 VA 105.07% 282291 VA Total Conn. Load:395 kVA Lighting 22330 VA 125.00% 27913 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...490 A 479 A 462 A Total Load:135067 VA 132093 VA 127888 VA 59 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 60 57 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 58 55 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 56 53 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 54 51 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 52 49 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 50 47 SPARE 20 A 1 0 VA / 6551... -- -- --48 45 SPARE 20 A 1 0 VA / 7807... -- -- --46 43 VAV 1-5 15 A 1 3740 VA /... 3 100 A PANEL HL2 44 41 ---- -- 17438 VA /... -- -- --42 39 ---- -- 17438 VA /... -- -- --40 37 ERV-6 70 A 3 17438 VA /... 3 100 A T-2 38 35 ---- -- 18158 VA /... -- -- --36 33 ---- -- 18158 VA /... -- -- --34 31 ERV-5 100 A 3 18158 VA /... 3 40 A ERV-1 32 29 ---- -- 5979 VA /... -- -- --30 27 ---- -- 5979 VA /... -- -- --28 25 ERV-2 40 A 3 5979 VA /... 3 40 A ERV-3 26 23 ---- -- 11017 VA /... -- -- --24 21 ---- -- 11017 VA /... -- -- --22 19 VAV 1-7 40 A 3 11017 VA /... 3 60 A PANEL LS2 via LTG. INVERTER 20 17 ---- -- 5398 VA /... -- -- --18 15 ---- -- 5398 VA /... -- -- --16 13 VAV 1-8 20 A 3 5398 VA /... 3 25 A VAV 1-6 14 11 SPARE 20 A 1 0 VA / 7806... -- -- --12 9 SPARE 20 A 1 0 VA / 7806... -- -- --10 7 SPARE 20 A 1 0 VA / 7806... 3 30 A VAV 1-4 8 5 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 6 3 VAV 1-3 20 A 1 4377 VA / 0... 1 20 A SPARE 4 1 VAV 1-1 25 A 1 5623 VA / 0... 1 20 A SPARE 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:35000 Mounting:Surface Wires 4 MCB Rating:600 A Supply From:MSB Phases:3 Mains Type:MLO Location:ELECTRICAL (113)Volts:480/277 Wye Bussing: Panel Desgination: DP2 PANEL SCHEDULE NOTES: Total Est. Demand Current:633 A Special Outlet 60274 VA 100.00% 60274 VA Total Conn. Current:614 A Other 0 VA 0.00% 0 VA Total Est. Demand:526 kVA Motor 385824 VA 107.20% 413622 VA Total Conn. Load:511 kVA Lighting 20382 VA 125.00% 25478 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...602 A 626 A 620 A Total Load:166762 VA 172723 VA 171096 VA 59 ---- -- 443 VA / 0 VA 1 20 A SPARE 60 57 ---- -- 443 VA / 0 VA 1 20 A SPARE 58 55 SPO # Z2 15 A 3 443 VA / 0 VA 1 20 A SPARE 56 53 ---- -- 8304 VA / 44... -- -- --54 51 ---- -- 8304 VA / 44... -- -- --52 49 DHU-2 45 A 3 8304 VA / 44... 3 15 A SPO # Z1 50 47 ---- -- 304 VA /... -- -- --48 45 ---- -- 304 VA /... -- -- --46 43 F-9 15 A 3 304 VA /... 3 70 A DHU-1 44 41 ---- -- 3986 VA /... -- -- --42 39 ---- -- 3986 VA /... -- -- --40 37 RTU- 8 25 A 3 3986 VA /... 3 125 A RTU- 7 38 35 ---- -- 2657 VA / 77... -- -- --36 33 ---- -- 2657 VA /... -- -- --34 31 RTU- 10 15 A 3 2657 VA /... 3 60 A PANEL LS3 via LTG. INVERTER 32 29 ---- -- 5162 VA /... -- -- --30 27 ---- -- 9928 VA /... -- -- --28 25 PANEL HL3 100 A 3 2036 VA /... 3 100 A T-3 26 23 ---- -- 3986 VA /... -- -- --24 21 ---- -- 3986 VA /... -- -- --22 19 RTU- 12 25 A 3 3986 VA /... 3 20 A BP-1 20 17 ---- -- 3986 VA /... -- -- --18 15 ---- -- 3986 VA /... -- -- --16 13 RTU- 11 25 A 3 3986 VA /... 3 150 A CU-1 14 11 ---- -- 16784 VA /... -- -- --12 9 ---- -- 15446 VA /... -- -- --10 7 T-7 100 A 3 15787 VA /... 3 15 A F-6 8 5 ---- -- 3986 VA /... -- -- --6 3 ---- -- 3986 VA /... -- -- --4 1 RTU- 9 25 A 3 3986 VA /... 3 45 A ERV-4 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:35000 Mounting:Surface Wires 4 MCB Rating:800 A Supply From:MSB Phases:3 Mains Type:MLO Location:MECHANICAL (168)Volts:480/277 Wye Bussing: Panel Desgination: DP3 PANEL SCHEDULE NOTES: Kitchen 18221 VA 94.47% 17213 VA Total Est. Demand Current:577 A Special Outlet 161500 VA 100.00% 161500 VA Total Conn. Current:557 A Other 0 VA 0.00% 0 VA Total Est. Demand:479 kVA Motor 239168 VA 108.96% 260593 VA Total Conn. Load:463 kVA Lighting 17270 VA 125.00% 21587 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...576 A 551 A 546 A Total Load:159450 VA 152570 VA 151318 VA 59 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 60 57 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 58 55 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 56 53 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 54 51 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 52 49 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 50 47 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 48 45 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 46 43 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 44 41 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 42 39 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 40 37 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 38 35 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 36 33 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 34 31 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 32 29 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 30 27 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 28 25 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 26 23 ---- -- 1494 VA /... -- -- --24 21 ---- -- 1260 VA /... -- -- --22 19 PANEL LS4 via LTG. INVERTER 60 A 3 1345 VA /... 3 100 A T-6 20 17 ---- -- 21927 VA /... -- -- --18 15 ---- -- 25863 VA /... -- -- --16 13 T-4 100 A 3 30135 VA /... 3 100 A PANEL HL4 14 11 ---- -- 23251 VA / 0... 1 20 A SPARE 12 9 ---- -- 23251 VA / 0... 1 20 A SPARE 10 7 RTU-3 125 A 3 23251 VA / 0... 1 20 A SPARE 8 5 ---- -- 23251 VA /... -- -- --6 3 ---- -- 23251 VA /... -- -- --4 1 RTU- 5 125 A 3 23251 VA /... 3 150 A RTU- 6 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:35000 Mounting:Surface Wires 4 MCB Rating:600 A Supply From:MSB Phases:3 Mains Type:MLO Location:LOADING (160)Volts:480/277 Wye Bussing: Panel Desgination: DP4 PANEL SCHEDULE NOTES: Total Est. Demand Current:30 A Total Conn. Current:25 A Power 1271 VA 100.00% 1271 VA Total Est. Demand:25 kVA Other 0 VA 0.00% 0 VA Total Conn. Load:20 kVA Lighting 19186 VA 125.00% 23983 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...22 A 28 A 24 A Total Load:6099 VA 7807 VA 6551 VA 41 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 42 39 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 40 37 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 38 35 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 36 33 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 34 31 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 32 29 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 30 27 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 28 25 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 26 23 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 24 21 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 22 19 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 20 17 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 18 15 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 16 13 LTG. SITE 20 A 1 486 VA / 0 VA 1 20 A SPARE 14 11 LTG. LEV.1 MEN'S 121 20 A 1 726 VA / 369... 1 20 A LTG. SITE 12 9 LTG. LEV.2 MULTI PURPOSE AREA 20 A 1 4260 VA /... 1 20 A LTG. ALT TEAM RM 10 7 LTG. LEV.2 MERCYHEALTH SEATING 20 A 1 390 VA / 383...1 20 A LTG. LEV.2 MULTI PURPOSE AREA 8 5 LTG. CONCESSIONS 20 A 1 817 VA / 130... 1 20 A LTG. MENS/WOMENS 6 3 LTG. ICE ARENA/HALL 20 A 1 1280 VA /... 1 20 A LTG. ICE ARENA LOBBY 4 1 LTG. REFEREE, TEAM RM. 20 A 1 717 VA / 672... 1 20 A LTG. TEAM RM. 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:18000 Mounting:Recessed Wires 4 MCB Rating:100 A Supply From:DP2 Phases:3 Mains Type:MLO Location:ELECTRICAL (113)Volts:480/277 Wye Bussing: Panel Desgination: HL2 PANEL SCHEDULE NOTES: Total Est. Demand Current:44 A Total Conn. Current:35 A Power 164 VA 100.00% 164 VA Total Est. Demand:37 kVA Other 0 VA 0.00% 0 VA Total Conn. Load:29 kVA Lighting 29202 VA 125.00% 36503 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...27 A 29 A 50 A Total Load:7514 VA 8016 VA 13836 VA 41 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 42 39 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 40 37 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 38 35 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 36 33 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 34 31 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 32 29 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 30 27 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 28 25 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 26 23 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 24 21 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 22 19 LTG. ALT 1 MEETING RM 20 A 1 2848 VA / 0... 1 20 A SPARE 20 17 LTG. LEV. 2 MULTIPURPOSE AREA 20 A 1 3408 VA /... 1 20 A LTG. LEV. 2 MULTIPURPOSE AREA 18 15 LTG. MEETING RM (A) 20 A 1 674 VA / 264... 1 20 A LTG. LOCKER SHELL 16 13 LTG. ELEVATOR 20 A 1 306 VA / 939... 1 20 A LTG. MEETING RM (A) 14 11 LTG. LEV. 2 MULTIPURPOSE AREA 20 A 1 2556 VA /... 1 20 A LTG. LEV. 2 MULTIPURPOSE AREA 12 9 LTG. LEV. 2 MULTIPURPOSE AREA 20 A 1 3408 VA /... 1 20 A LTG. LEV. 2 MULTIPURPOSE AREA 10 7 LTG. MAIN LOBBY 20 A 1 692 VA / 88... 1 20 A LTG. ELEVATOR 8 5 LTG. MAIN LOBBY 20 A 1 528 VA / 528... 1 20 A LTG. MAIN LOBBY 6 3 LTG. MAIN LOBBY 20 A 1 462 VA / 652... 1 20 A LTG. MAIN LOBBY/VEST. 4 1 LTG. MEETING, STORE, FIRST AID LTG. 20 A 1 1109 VA /... 1 20 A LTG. ADMIN/SKATE/TOILET 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:18000 Mounting:Surface Wires 4 MCB Rating:100 A Supply From:DP1 Phases:3 Mains Type:MLO Location:ELECTRIC (157)Volts:480/277 Wye Bussing: Panel Desgination: HL1 PANEL SCHEDULE 10/13/202310/04/2023 BID DOCUMENT SET 1. FAULT CURRENT INDICATED IS PROVIDED FOR BIDDING PURPOSES ONLY. ALL EQUIPMENT INCLUDING CIRCUIT BREAKERS SHALL BE FULLY RATED, SERIES RATING NOT ACCEPTABLE. THE CONTRACTOR SHALL VERIFY WITH A WRITTEN STATEMENT FROM THE UTILITY THE MAXIUM SHORT CIRCUIT CAPACITY. USING THE MAXIMUM FAULT, PREPARE A SHORT CIRCUIT ANALYSIS, COORDINATION STUDY, AND ARC FLUSH STUDY OF THE ELECTRICAL DISTRIBUTION SYSTEM. THIS STUDY WITHT THE UTILITY LETTER SHALL BE SUBMITTED WITH THE ELECTRICAL DISTRIBUTION SHOP DRAWINGS. 2. PROVIDE TERMINATION LUGS COMPATIBLE WITH FEEDER SIZE. 3. PANELS DENOTED AS XX-L AND XX-R ARE DOUBLE TUB PANELS WITH L INDICATING ONE TUB AND R INDICATING WITH THE OTHER TUB. TUBS MAY EITHER BE 42 POLE OR 54 POLE. SEE SCHDULE AND ADDITIONAL DETAILS. 4. IN ADDITION TO ALL SHOWN BREAKERS, MSB-A, MDP-B, AND MDP-C SHALL HAVE SPACES FOR FUTURE EXPANSION. REFER TO THE ONE-LINE DIAGRAMS FOR EXACT NUMBER OF SPACES REQUIRED. GENERAL NOTES: Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" ELECTRICAL SCHEDULES WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E5.4 10/04/2023 220025.00 C2023-15 NOTES: Total Est. Demand Current:26 A Total Conn. Current:21 A Total Est. Demand:21 kVA Other 0 VA 0.00% 0 VA Total Conn. Load:17 kVA Lighting 17126 VA 125.00% 21408 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...7 A 38 A 20 A Total Load:2036 VA 9928 VA 5162 VA 41 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 42 39 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 40 37 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 38 35 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 36 33 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 34 31 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 32 29 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 30 27 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 28 25 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 26 23 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 24 21 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 22 19 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 20 17 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 18 15 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 16 13 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 14 11 LTG. EXTERIOR POLES 20 A 1 486 VA / 369... 1 20 A LTG. EXTERIOR POLES 12 9 LTG. LEV.2 MULTI PURPOSE AREA 20 A 1 4260 VA /... 1 20 A LTG. LEV.2 MULTI PURPOSE AREA 10 7 LTG. LEV.2 MERCYHEALTH SEATING 20 A 1 414 VA / 151...1 20 A LTG. PASSAGE 8 5 SPARE 20 A 1 0 VA / 977 VA 1 20 A LTG. MAIN TEAM ROM 6 3 LTG. BUILDING STORAGE 20 A 1 1066 VA / 76... 1 20 A LTG. STORAGE, WET TEAM RM. 4 1 0 VA / 110 VA 1 20 A LTG. METER /ELEC. 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:18000 Mounting:Surface Wires 4 MCB Rating:100 A Supply From:DP3 Phases:3 Mains Type:MLO Location:MECHANICAL (168)Volts:480/277 Wye Bussing: Panel Desgination: HL3 PANEL SCHEDULE NOTES: Total Est. Demand Current:20 A Total Conn. Current:16 A Total Est. Demand:16 kVA Other 0 VA 0.00% 0 VA Total Conn. Load:13 kVA Lighting 13171 VA 125.00% 16464 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...19 A 9 A 22 A Total Load:4999 VA 2476 VA 5696 VA 41 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 42 39 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 40 37 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 38 35 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 36 33 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 34 31 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 32 29 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 30 27 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 28 25 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 26 23 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 24 21 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 22 19 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 20 17 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 18 15 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 16 13 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 14 11 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 12 9 SPARE 20 A 1 0 VA / 0 VA 1 -- SPACE 10 7 LTG. LEV.2 MULTIPURPOSE AREA 20 A 1 2848 VA / 43... 1 20 A LTG .MULTI PURPOSE ARENA 8 5 LTG. LEV.2 MULTI PURPOSE AREA 20 A 1 2848 VA /... 1 20 A LTG. LEV.2 MULTIPURPOSE AREA 6 3 LTG. LOBBY LINK 20 A 1 1270 VA /... 1 20 A LTG. ELEC.,WARMING, LOADING 4 1 LTG. MENS/WOMENS 20 A 1 1062 VA / 65... 1 20 A LTG. MALL CONNECTION 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:18000 Mounting:Surface Wires 4 MCB Rating:100 A Supply From:DP4 Phases:3 Mains Type:MLO Location:LOADING (160)Volts:480/277 Wye Bussing: Panel Desgination: HL4 PANEL SCHEDULE NOTES: Total Est. Demand Current:3 A Total Conn. Current:2 A Total Est. Demand:2 kVA Other 0 VA 0.00% 0 VA Total Conn. Load:2 kVA Lighting 1999 VA 125.00% 2499 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...2 A 2 A 3 A Total Load:664 VA 534 VA 801 VA 11 Lighting 20 A 1 0 VA / 116 VA 1 20 A LTG. EXTERIOR 12 9 LTG. MEETING RM (A) 20 A 1 0 VA / 0 VA 1 20 A LTG. MEETING RM (A) 10 7 LTG. EXTERIOR 20 A 1 173 VA / 127... 1 20 A LTG. EXTERIOR 8 5 LTG. ADMIN/SKATE/TOILET 20 A 1 163 VA / 522... 1 20 A LTG. EXTERIOR 6 3 LTG. MAIN LOBBY/VEST. 20 A 1 312 VA / 222... 1 20 A LTG. MAIN LOBBY 4 1 LTG.MEETING, STORE, FIRST AID LTG. 20 A 1 172 VA / 192... 1 20 A LTG. MAIN LOBBY 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:18000 Mounting:Surface Wires 4 MCB Rating:60 A Supply From:DP1 Phases:3 Mains Type:MLO Location:ELECTRIC (157)Volts:480/277 Wye Bussing: Panel Desgination: LS1 PANEL SCHEDULE NOTES: Total Est. Demand Current:5 A Total Conn. Current:4 A Total Est. Demand:4 kVA Total Conn. Load:3 kVA Lighting 3144 VA 125.00% 3930 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...3 A 3 A 5 A Total Load:829 VA 845 VA 1470 VA 11 LTG. LEV. 2 MULTIPURPOSE AREA 20 A 1 426 VA / 426...1 20 A LTG. LEV. 2 MULTIPURPOSE AREA 12 9 LTG. ALT TEAM RM 20 A 1 228 VA / 58... 1 20 A LTG. ALT TEAM RM (C) 10 7 LTG. TEAM RM. 20 A 1 144 VA / 175... 1 20 A LTG. REFEREE, TEAM RM. 8 5 LTG. LEV.2 MERCYHEALTH SEATING 20 A 1 192 VA / 426...1 20 A LTG. LEV.2 MULTI PURPOSE AREA 6 3 LTG. ICE ARENA LOBBY 20 A 1 203 VA / 356... 1 20 A LTG. MENS/WOMENS 4 1 LTG. ICE ARENA LOBBY 20 A 1 421 VA / 89... 1 20 A LTG. CONCESSIONS 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:18000 Mounting:Recessed Wires 4 MCB Rating:60 A Supply From:DP2 Phases:3 Mains Type:MLO Location:ELECTRICAL (113)Volts:480/277 Wye Bussing: Panel Desgination: LS2 PANEL SCHEDULE NOTES: Total Est. Demand Current:5 A Total Conn. Current:4 A Total Est. Demand:4 kVA Total Conn. Load:3 kVA Lighting 3256 VA 125.00% 4070 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...5 A 4 A 3 A Total Load:1438 VA 1044 VA 774 VA 11 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 12 9 LTG. LEV.2 MULTI PURPOSE AREA 20 A 1 426 VA / 426... 1 20 A LTG. LEV.2 MULTI PURPOSE AREA 10 7 LTG. LEV.2 MULTI PURPOSE AREA 20 A 1 426 VA / 192... 1 20 A LTG. LEV.2 MERCYHEALTH SEATING 8 5 LTG. LEV.2 MULTIPURPOSE AREA 20 A 1 426 VA / 348... 1 20 A LTG. EXTERIOR 6 3 LTG.WET TEAM RM. 20 A 1 96 VA / 96 VA 1 20 A LTG. MAIN TEAM ROM 4 1 LTG. BUILDING STORAGE 20 A 1 82 VA / 738... 1 20 A LTG. ICE CIRCULATION 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:18000 Mounting:Recessed Wires 4 MCB Rating:60 A Supply From:DP3 Phases:3 Mains Type:MLO Location:MECHANICAL (168)Volts:480/277 Wye Bussing: Panel Desgination: LS3 PANEL SCHEDULE NOTES: Total Est. Demand Current:6 A Total Conn. Current:5 A Total Est. Demand:5 kVA Other 0 VA 0.00% 0 VA Total Conn. Load:4 kVA Lighting 4099 VA 125.00% 5123 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...5 A 5 A 5 A Total Load:1345 VA 1260 VA 1494 VA 11 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 12 9 LTG. LEV. 2 MULTIPURPOSE AREA 20 A 1 426 VA / 426... 1 20 A LTG. LEV. 2 MULTIPURPOSE AREA 10 7 LTG. MULTI PURPOSE ARENA 20 A 1 422 VA / 356... 1 20 A LTG. LEV.2 MULTIPURPOSE AREA 8 5 LTG. LEV. 2 MULTIPURPOSE AREA 20 A 1 1068 VA / 42... 1 20 A LTG. LEV.2 MULTI PURPOSE AREA 6 3 LTG. LOBBY LINK 20 A 1 330 VA / 78... 1 20 A LTG. MALL CONNECTION 4 1 LTG. WARMING RM 20 A 1 293 VA / 274... 1 20 A LTG. MENS/WOMENS 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:18000 Mounting:Surface Wires 4 MCB Rating:60 A Supply From:DP4 Phases:3 Mains Type:MLO Location:LOADING (160)Volts:480/277 Wye Bussing: Panel Desgination: LS4 PANEL SCHEDULE NOTES: Total Est. Demand Current:102 A Total Conn. Current:110 A Total Est. Demand:37 kVA Special Outlet 21408 VA 100.00% 21408 VA Total Conn. Load:40 kVA Motor 1656 VA 125.00% 2070 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...108 A 112 A 113 A Total Load:12920 VA 13338 VA 13546 VA 89 ---- -- 0 VA / 0 VA 90 87 ---- -- 0 VA / 0 VA 88 85 LP1(R)225 A 3 0 VA / 0 VA 86 83 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 84 81 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 82 79 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 80 77 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 78 75 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 76 73 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 74 71 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 72 69 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 70 67 SPO # OFCT-20 20 A 1 180 VA / 180... 1 20 A SPO # OFV-21 68 65 ---- -- 1000 VA / 18... 1 20 A SPO # HD-37 66 63 SPO#HT-4 - VEST 100 30 A 2 1000 VA / 18... 1 20 A SPO # HD-38 64 61 SPO # HD-35 20 A 1 180 VA / 180... 1 20 A SPO # HD-36 62 59 SPO # OFCT-19 20 A 1 180 VA / 540... 1 20 A RECPT ICE ARENA LOBBY 114 60 57 OVERHEAD DOOR-7 20 A 1 1656 VA / 18... 1 20 A SPO # HD-31 58 55 SPO # HD-30 20 A 1 180 VA / 180... 1 20 A SPO # HD-29 56 53 RECEPT. RM 165, 166 20 A 1 720 VA / 180... 1 20 A SPO # HD-25 54 51 SPO # HD-24 20 A 1 180 VA / 552... 1 20 A SPO#MBH-1 52 49 SPO # HD-23 20 A 1 180 VA / 100... 1 20 A FAAP-2 VESTIBULE 100 50 47 ---- -- 270 VA / 360... 1 20 A RECEPT. 204 48 45 SPO # PRJ-3 20 A 2 270 VA / 300... 1 20 A SPO # CPY-2 46 43 RECEPT. RM 101 20 A 1 360 VA / 100... 1 20 A SPO # AV-2 44 41 RECEPT. RM 157, 158, 157(A) 20 A 1 540 VA / 100... 1 20 A SPO # SC-7 42 39 SPO # AV-1 20 A 1 1000 VA / 30... 1 20 A SPO # ELC-1 40 37 SPO # ELC-2 20 A 1 300 VA / 900... 1 20 A RECEPT. RM 110 38 35 RECEPT. RM 111 20 A 1 1080 VA /... 1 20 A SPO # REF-1 36 33 RECEPT. RM 109 20 A 1 360 VA / 120... 1 20 A SPO # M-1 34 31 RECEPT. RM 109 20 A 1 540 VA / 500... 1 20 A SPO # SD-2 32 29 SPO # COF-1 20 A 1 1200 VA / 30... 1 20 A SPO # ELC-3 30 27 SPO # SD-1 20 A 1 500 VA / 300... 1 20 A SPO # CPY-1 28 25 SPO # ELC-4 20 A 1 300 VA / 198... 1 20 A RECEPT. RM 107 26 23 RECEPT. RM 112 20 A 1 1080 VA /... 1 20 A RECEPT. RM 112 24 21 RECEPT. RM 108 20 A 1 1440 VA /... 1 20 A RECEPT. RM 101 22 19 RECEPT. RM 101 20 A 1 360 VA / 180... 1 20 A OPTICAL FLUSH VALVE- 4 20 17 OPTICAL FAUCET- 6 20 A 1 180 VA / 180... 1 20 A SPO # HD-18 18 15 SPO # HD-17 20 A 1 180 VA / 200... 1 20 A SPO # IT30A3 16 13 SPO # DF-4 20 A 1 600 VA / 360... 1 20 A SPO # ST=3 14 11 RECEPT. RM 104 20 A 1 360 VA / 276... 1 20 A SPO#MS1 12 9 SPO # PRS-3 20 A 1 300 VA / 360... 1 20 A SPO # ST-2 10 7 RECEPT. RM 156 20 A 1 720 VA / 100... 1 20 A SPO # SC-6 8 5 SPO # PRS-2 20 A 1 300 VA / 100... 1 20 A SPO # SC-5 6 3 SPO # ST-1 20 A 1 360 VA / 108... 1 20 A RECPT ICE ARENA LOBBY 114 4 1 RECEPT. RM 156 20 A 1 1260 VA / 30... 1 20 A SPO # PRS-1 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:18000 Mounting:Surface Wires 4 MCB Rating:225 A Supply From:T-1 Phases:3 Mains Type:MCB Location:ELECTRIC (157)Volts:120/208 Wye Bussing: Panel Desgination: LP1(L) PANEL SCHEDULE NOTES: Total Est. Demand Current:0 A Total Conn. Current:0 A Total Est. Demand:0 kVA Total Conn. Load:0 kVA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...0 A 0 A 0 A Total Load:0 VA 0 VA 0 VA 83 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 84 81 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 82 79 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 80 77 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 78 75 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 76 73 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 74 71 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 72 69 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 70 67 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 68 65 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 66 63 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 64 61 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 62 59 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 60 57 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 58 55 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 56 53 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 54 51 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 52 49 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 50 47 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 48 45 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 46 43 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 44 41 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 42 39 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 40 37 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 38 35 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 36 33 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 34 31 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 32 29 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 30 27 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 28 25 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 26 23 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 24 21 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 22 19 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 20 17 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 18 15 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 16 13 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 14 11 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 12 9 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 10 7 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 8 5 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 6 3 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 4 1 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:18000 Mounting:Surface Wires 4 MCB Rating:225 A Supply From:LP1(L)Phases:3 Mains Type:MCB Location:ELECTRIC (157)Volts:120/208 Wye Bussing: Panel Desgination: LP1(R) PANEL SCHEDULE 10/13/202310/04/2023 BID DOCUMENT SET 1. FAULT CURRENT INDICATED IS PROVIDED FOR BIDDING PURPOSES ONLY. ALL EQUIPMENT INCLUDING CIRCUIT BREAKERS SHALL BE FULLY RATED, SERIES RATING NOT ACCEPTABLE. THE CONTRACTOR SHALL VERIFY WITH A WRITTEN STATEMENT FROM THE UTILITY THE MAXIUM SHORT CIRCUIT CAPACITY. USING THE MAXIMUM FAULT, PREPARE A SHORT CIRCUIT ANALYSIS, COORDINATION STUDY, AND ARC FLUSH STUDY OF THE ELECTRICAL DISTRIBUTION SYSTEM. THIS STUDY WITHT THE UTILITY LETTER SHALL BE SUBMITTED WITH THE ELECTRICAL DISTRIBUTION SHOP DRAWINGS. 2. PROVIDE TERMINATION LUGS COMPATIBLE WITH FEEDER SIZE. 3. PANELS DENOTED AS XX-L AND XX-R ARE DOUBLE TUB PANELS WITH L INDICATING ONE TUB AND R INDICATING WITH THE OTHER TUB. TUBS MAY EITHER BE 42 POLE OR 54 POLE. SEE SCHDULE AND ADDITIONAL DETAILS. 4. IN ADDITION TO ALL SHOWN BREAKERS, MSB-A, MDP-B, AND MDP-C SHALL HAVE SPACES FOR FUTURE EXPANSION. REFER TO THE ONE-LINE DIAGRAMS FOR EXACT NUMBER OF SPACES REQUIRED. GENERAL NOTES: Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" ELECTRICAL SCHEDULES WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E5.5 10/04/2023 220025.00 C2023-15 NOTES: Total Est. Demand Current:236 A Total Conn. Current:285 A Total Est. Demand:85 kVA Total Conn. Load:103 kVA Special Outlet 55321 VA 100.00% 55321 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...282 A 284 A 291 A Total Load:33799 VA 34087 VA 34890 VA 89 ---- -- 11440 VA / 0...90 87 ---- -- 9424 VA / 0...88 85 LP2(R)225 A 3 13060 VA / 0...86 83 SPO # HD-41 20 A 1 1000 VA /... 1 20 A DRINK RAILS-18 84 81 SPO # HD-40 20 A 1 1000 VA /... 1 20 A SPO # HD-39 82 79 SPO # HD-33 20 A 1 1000 VA /... 1 20 A SPO # HD-33 80 77 RECPT MEN 122 20 A 1 360 VA / 100... 1 20 A SPO # HD-32 78 75 RECPT WOMEN 118 20 A 1 540 VA / 100... 1 20 A SPO # HD-22 76 73 SPO # GWH-3 20 A 1 600 VA / 100... 1 20 A SPO # HD-21 74 71 OPTICAL FAUCET-13 20 A 1 180 VA / 180... 1 20 A OPTICAL FAUCET-15 72 69 OPTICAL FAUCET-18 20 A 1 180 VA / 333... -- -- --70 67 OPTICAL FAUCET-15 20 A 1 180 VA / 333... -- -- --68 65 SPO # POP-1 20 A 1 1643 VA / 33... 3 40 A SPO # CO-2 66 63 ---- -- 3167 VA /... -- -- --64 61 ---- -- 3167 VA /... -- -- --62 59 SPO # RC-1 40 A 3 3167 VA /... 3 40 A SPO # RC-2 60 57 RECEPT. RM 115 (A) 20 A 1 1000 VA /... 1 20 A RECEPT. RM 116 58 55 RECEPT. RM 116 20 A 1 360 VA / 200... 1 20 A RECEPT. RM 115 (A) 56 53 SPO # GRI-1 20 A 1 1650 VA / 64... 1 20 A SPO # REF-3 54 51 SPO # DIS-1 20 A 1 1020 VA /... 1 20 A SPO # DIS-2 52 49 SPO # U/CR-3 20 A 1 480 VA / 115... 1 20 A SPO # FRZ-1 50 47 SPO # U/CR-4 20 A 1 480 VA / 480... 1 20 A SPO # U/CR-5 48 45 OPTICAL FAUCET-18 20 A 1 180 VA / 480... 1 20 A SPO # U/CR-2 46 43 SPO # U/RC-1 20 A 1 480 VA / 180... 1 20 A OPTICAL FLUSH VALVE-20 44 41 SPO # FRZ-2 20 A 1 1152 VA / 54... 1 20 A RECEPT. RM 115 (A) 42 39 RECEPT. RM 147,148,149 20 A 1 540 VA / 180... 1 20 A OPTICAL FAUCET- 10 40 37 SPO # IT30A5 20 A 1 200 VA / 200... 1 20 A SPO # IT30A4 38 35 RECEPT. RM 150 20 A 1 360 VA / 360... 1 20 A RECEPT. RM 150 36 33 RECEPT. RM 150 20 A 1 360 VA / 360... 1 20 A RECEPT. RM 150. 34 31 RECEPT. RM 150 20 A 1 360 VA / 360... 1 20 A RECEPT. RM 150 32 29 SPO # GL-2 20 A 1 360 VA / 360... 1 20 A SPO # SC-2 30 27 SPO # HD-20 20 A 1 1000 VA / 50... 1 20 A SPO # SD-3 28 25 RECEPT. RM 120, 121 20 A 1 540 VA / 180... 1 20 A OPTICAL FAUCET-17 26 23 OPTICAL FLUSH-16 20 A 1 180 VA / 180... 1 20 A OPTICAL FLUSH-12 24 21 SPO # HD-15 20 A 1 1000 VA / 18... 1 20 A OPTICAL FAUCET-14 22 19 SPO # HD-16 20 A 1 1000 VA /... 1 20 A SPO # HD-14 20 17 SPO # HD-11 20 A 1 1000 VA /... 1 20 A SPO # HD-12 18 15 OPTICAL FAUCET-14 20 A 1 180 VA / 100... 1 20 A SPO # HD-13 16 13 OPTICAL FAUCET-17 20 A 1 180 VA / 180... 1 20 A OPTICAL FAUCET-16 14 11 SPO # HD-10 20 A 1 1000 VA / 18... 1 20 A OPTICAL FLUSH VALVE-11 12 9 RECEPT. RM 123,124,125,126,127 20 A 1 900 VA / 540...1 20 A RECEPT. RM 153 10 7 RECEPT. RM 115 (A) 20 A 1 360 VA / 180... 1 20 A OPTICAL FAUCET-13 8 5 SPO # DF-5 20 A 1 600 VA / 720... 1 20 A RECEPT. RM 151 6 3 SPO # FRZ-3 20 A 1 936 VA / 900... 1 20 A RECEPT. RM 117, 119 4 1 RECEPT. RM 113 20 A 1 180 VA / 720... 1 20 A RECEPT. RM 144 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:14000 Mounting:Recessed Wires 4 MCB Rating:225 A Supply From:T-2 Phases:3 Mains Type:225 A Location:ELECTRICAL (113)Volts:120/208 Wye Bussing: Panel Desgination: LP2(L) PANEL SCHEDULE NOTES: Total Est. Demand Current:194 A Total Conn. Current:234 A Total Est. Demand:70 kVA Special Outlet 39880 VA 100.00% 39880 VA Total Conn. Load:84 kVA Motor 4968 VA 108.33% 5382 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...237 A 225 A 244 A Total Load:28197 VA 27000 VA 29071 VA 89 ---- -- 0 VA / 4680... -- -- --90 87 ---- -- 0 VA / 4680... -- -- --88 85 ---- 3 0 VA / 7020... 3 300 A LP3(R)86 83 ---- -- 1000 VA / 0... 1 20 A SPARE 84 81 SPO # HT-1 - SHOP 170 30 A 2 1000 VA / 0... 1 20 A SPARE 82 79 OVERHEAD DOOR-2 20 A 1 1656 VA /... 1 20 A OVERHEAD DOOR-8 80 77 RECPT ICE ARENA LOBBY 114 20 A 1 360 VA / 165... 1 20 A OVERHEAD DOOR-1 78 75 DRINK RAILS-35 20 A 1 1170 VA /... 1 20 A DRINK RAILS-36 76 73 DRINK RAILS-33 20 A 1 1170 VA /... 1 20 A DRINK RAILS-34 74 71 DRINK RAILS-31 20 A 1 1170 VA /... 1 20 A DRINK RAILS-32 72 69 DRINK RAILS-29 20 A 1 1170 VA /... 1 20 A DRINK RAILS-30 70 67 OPTICAL FLUSH VALVE-19 20 A 1 180 VA / 180... 1 20 A OPTICAL FLUSH VALVE-10 68 65 OPTICAL FAUCET-12 20 A 1 180 VA / 108... 1 20 A SPO # EL20, EL21, EL22 66 63 SPO # ELC-5 20 A 1 500 VA / 100... 1 20 A SPO # HD-19 64 61 SPO # EL17, EL18, EL19 20 A 1 1080 VA / 50... 1 20 A SPO # ELC-6 62 59 SPO # CSB-3 20 A 1 360 VA / 360... 1 20 A SPO # CSB-4 60 57 SPO # CSB-1 20 A 1 360 VA / 360... 1 20 A SPO # CSB-2 58 55 SPO # EL4, EL5, EL6 20 A 1 1080 VA / 72... 1 20 A SPO # EL7, EL8 56 53 ---- -- 2500 VA /... -- -- --54 51 SPO # D-1 20 A 2 2500 VA /... 2 20 A SPO # D-2 52 49 SPO # W-2 20 A 1 1500 VA /... 1 20 A SPO # W-3 50 47 OPTICAL FAUCET- 8 20 A 1 180 VA / 100... 1 20 A SPO # HD-3 48 45 SPO # DF-2 20 A 1 600 VA / 100... 1 20 A OPTICAL FLUSH-9 46 43 RECEPT. RM 128/129 20 A 1 720 VA / 600... 1 20 A SPO # GWH-4 44 41 RECEPT. RM 126 20 A 1 180 VA / 900... 1 20 A RECEPT. RM 131 42 39 SPO # HD-4 20 A 1 1000 VA / 72... 1 20 A RECEPT. RM 132 40 37 OPTICAL FAUCET-7 20 A 1 180 VA / 180... 1 20 A OPTICAL FLUSH-8 38 35 SPO # WS-2 20 A 1 500 VA / 360... 1 20 A RECEPT. RM 126 36 33 RECEPT. RM 124 20 A 1 1000 VA / 72... 1 20 A RECEPT.RM 144/179 34 31 RECEPT. RM 134 20 A 1 540 VA / 360... 1 20 A RECEPT. RM 134 32 29 RECEPT. RM 125 20 A 1 720 VA / 180... 1 20 A RECEPT. RM 125 30 27 SPO # SC-1 20 A 1 360 VA / 108... 1 20 A SPO # EL1, EL2, EL3 28 25 SPO # GL-1 20 A 1 360 VA / 665... -- -- --26 23 SPO # W-1 20 A 1 1330 VA / 66... 2 20 A SPO # D-1 24 21 SPO # DF-3 20 A 1 600 VA / 360... 1 20 A RECEPT. RM 144 22 19 SPO # GWH-2 20 A 1 600 VA / 100... 1 20 A FACP 20 17 SPO # HD-2 20 A 1 1000 VA /... 1 20 A RECEPT. RM 143 18 15 OPTICAL FLUSH VALVE-7 20 A 1 180 VA / 180... 1 20 A OPTICAL FAUCET-9 16 13 SPO # HD-1 20 A 1 1000 VA / 18... 1 20 A OPTICAL FAUCET-11 14 11 RECEPT. PASSAGE 135 20 A 1 540 VA / 108... 1 20 A RECEPT. RM 137, 138, 139, 140 12 9 REC. RM. 152 20 A 1 900 VA / 360... 1 20 A RECEPT. RM 145 10 7 SPARE 20 A 1 0 VA / 1200... 1 20 A SPO - ICE PIT DRAIN - RM170 8 G 5 RECEPT. 135 20 A 1 1080 VA /... 1 20 A RECEPT. RM 170 6 3 RECEPT. RM 168 20 A 1 720 VA / 540... 1 20 A RECEPT. RM 169 4 1 SPO # GWH-5 20 A 1 600 VA / 600... 1 20 A SPO # GWH-6 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:14000 Mounting:Surface Wires 4 MCB Rating:300 A Supply From:T-3 Phases:3 Mains Type:MCB Location:MECHANICAL (168)Volts:120/208 Wye Bussing: Panel Desgination: LP3(L) PANEL SCHEDULE NOTES: Total Est. Demand Current:109 A Total Conn. Current:109 A Total Est. Demand:39 kVA Special Outlet 28040 VA 100.00% 28040 VA Total Conn. Load:39 kVA Motor 816 VA 125.00% 1020 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...116 A 108 A 105 A Total Load:13833 VA 12867 VA 12595 VA 83 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 84 81 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 82 79 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 80 77 SPACE -- 1 0 VA / 0 VA 1 20 A SPARE 78 75 SPACE -- 1 0 VA / 0 VA 1 20 A SPARE 76 73 SPACE -- 1 0 VA / 0 VA 1 20 A SPARE 74 71 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 72 69 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 70 67 SPARE 20 A 1 0 VA / 1000... -- -- --68 65 SPARE 20 A 1 0 VA / 1000... 2 30 A SPO#HT-3 - J.C. 114 66 63 REC. - FAMILY RR 106 20 A 1 360 VA / 100... -- -- --64 61 ---- -- 1000 VA /... 2 30 A SPO#HT-3 - VEST 100 62 59 SPO#HT-2 - VEST 100 30 A 2 1000 VA / 77... -- -- --60 57 SPO#MBH-6 20 A 1 552 VA / 770... 2 20 A SPO # PRJ-2 58 55 SPO#MS4 20 A 1 276 VA / 552... 1 20 A SPO#MBH-5 56 53 ---- -- 200 VA / 276... 1 20 A SPO#MS3 54 51 ---- -- 200 VA / 276... 1 20 A SPO#MS2 52 49 SPO # PW-5 RM 188 20 A 3 200 VA / 720... 1 20 A Receptacle 50 47 OPTICAL FLUSH VALVE-29 20 A 1 180 VA / 200... -- -- --48 45 OPTICAL FAUCET-31 20 A 1 180 VA / 200... -- -- --46 43 SPO # DF-7 20 A 1 600 VA / 200... 3 20 A SPO # PW-5 RM 188 44 41 RECEPT. RM 187 20 A 1 900 VA / 180... 1 20 A OPTICAL FAUCET-33 42 39 RECEPT. RM 104 , 105 20 A 1 1440 VA / 18... 1 20 A OPTICAL FAUCET-32 40 37 SPO # ESP-1 20 A 1 816 VA / 180... 1 20 A OPTICAL FLUSH VALVE-28 38 35 RECEPT. RM 180A 20 A 1 720 VA / 540... 1 20 A RECEPT. RM 189 36 33 ---- -- 667 VA / 900... 1 20 A RECEPT. RM 184(C) 34 31 ---- -- 667 VA / 720... 1 20 A RECEPT. RM 103 32 29 SPO # STG-3-1 20 A 3 667 VA / 720... 1 20 A RECEPT. RM 102 30 27 ---- -- 541 VA / 126... 1 20 A RECEPT. RM 181(A) 28 25 ---- -- 541 VA / 541... -- -- --26 23 SPO # PW-3 RM 156 20 A 3 541 VA / 541... -- -- --24 21 RECEPT. STAGE 2 20 A 1 360 VA / 541... 3 20 A SPO # PW-4 RM 156 22 19 OPTICAL FLUSH VALVE-30 20 A 1 180 VA / 667... -- -- --20 17 ---- -- 541 VA / 667... -- -- --18 15 ---- -- 541 VA / 667... 3 20 A SPO # STG-2-1 16 13 SPO # PW-1 RM 156 20 A 3 541 VA / 541... -- -- --14 11 RECEPT. RM 182(B) 20 A 1 1080 VA / 54... -- -- --12 9 ---- -- 667 VA / 541... 3 20 A SPO # PW-2 RM 156 10 7 ---- -- 667 VA / 667... -- -- --8 5 SPO # STG-4-1 20 A 3 667 VA / 667... -- -- --6 3 RECEPT. STAGE 1 20 A 1 360 VA / 667... 3 20 A SPO # STG-1-1 4 1 RECPT STG-3 20 A 1 360 VA / 120... 1 20 A SPO#MBH-3&4 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:14000 Mounting:Surface Wires 4 MCB Rating:225 A Supply From:T-5 Phases:3 Mains Type:MCB Location:ELECTRIC (157)Volts:120/208 Wye Bussing: Panel Desgination: LP5 PANEL SCHEDULE NOTES: Total Est. Demand Current:37 A Total Conn. Current:45 A Total Est. Demand:13 kVA Total Conn. Load:16 kVA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...59 A 39 A 39 A Total Load:7020 VA 4680 VA 4680 VA 83 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 84 81 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 82 79 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 80 77 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 78 75 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 76 73 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 74 71 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 72 69 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 70 67 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 68 65 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 66 63 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 64 61 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 62 59 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 60 57 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 58 55 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 56 53 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 54 51 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 52 49 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 50 47 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 48 45 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 46 43 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 44 41 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 42 39 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 40 37 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 38 35 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 36 33 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 34 31 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 32 29 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 30 27 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 28 25 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 26 23 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 24 21 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 22 19 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 20 17 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 18 15 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 16 13 DRINK RAILS-55 20 A 1 1170 VA /... 1 20 A DRINK RAILS-68 14 11 DRINK RAILS-53 20 A 1 1170 VA /... 1 20 A DRINK RAILS-54 12 9 DRINK RAILS-51 20 A 1 1170 VA /... 1 20 A DRINK RAILS-52 10 7 DRINK RAILS-49 20 A 1 1170 VA /... 1 20 A DRINK RAILS-50 8 5 DRINK RAILS-47 20 A 1 1170 VA /... 1 20 A DRINK RAILS-48 6 3 DRINK RAILS-45 20 A 1 1170 VA /... 1 20 A DRINK RAILS-46 4 1 DRINK RAILS-70 20 A 1 1170 VA /... 1 20 A DRINK RAILS-44 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:14000 Mounting:Surface Wires 4 MCB Rating:300 A Supply From:LP3(L)Phases:3 Mains Type:MCB Location:MECHANICAL (168)Volts:120/208 Wye Bussing: Panel Desgination: LP3(R) PANEL SCHEDULE NOTES: Total Est. Demand Current:64 A Total Conn. Current:94 A Total Est. Demand:23 kVA Total Conn. Load:34 kVA Special Outlet 2000 VA 100.00% 2000 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...111 A 79 A 98 A Total Load:13060 VA 9424 VA 11440 VA 83 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 84 81 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 82 79 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 80 77 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 78 75 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 76 73 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 74 71 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 72 69 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 70 67 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 68 65 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 66 63 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 64 61 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 62 59 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 60 57 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 58 55 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 56 53 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 54 51 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 52 49 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 50 47 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 48 45 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 46 43 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 44 41 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 42 39 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 40 37 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 38 35 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 36 33 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 34 31 RECEPT. RM 203 20 A 1 360 VA / 100... 1 20 A SPO # AV-6 32 29 RECEPT. RM 202 20 A 1 1080 VA /... 1 20 A SPO U/C REFRIGERATOR-6 30 27 DRINK RAILS-12 20 A 1 32 VA / 32 VA 1 20 A DRINK RAILS-11 28 25 DRINK RAILS-17 20 A 1 1170 VA /... 1 20 A DRINK RAILS-15 26 23 DRINK RAILS-14 20 A 1 1170 VA /... 1 20 A DRINK RAILS-13 24 21 DRINK RAILS-66 20 A 1 1170 VA /... 1 20 A DRINK RAILS-67 22 19 DRINK RAILS-19 20 A 1 1170 VA /... 1 20 A DRINK RAILS-43 20 17 DRINK RAILS-21 20 A 1 1170 VA /... 1 20 A DRINK RAILS-20 18 15 DRINK RAILS-23 20 A 1 1170 VA /... 1 20 A DRINK RAILS-22 16 13 DRINK RAILS-25 20 A 1 1170 VA /... 1 20 A DRINK RAILS-24 14 11 DRINK RAILS-28 20 A 1 1170 VA /... 1 20 A DRINK RAILS-26 12 9 DRINK RAILS-64 20 A 1 1170 VA /... 1 20 A DRINK RAILS-65 10 7 DRINK RAILS-62 20 A 1 1170 VA /... 1 20 A DRINK RAILS-63 8 5 DRINK RAILS-60 20 A 1 1170 VA /... 1 20 A DRINK RAILS-61 6 3 DRINK RAILS-58 20 A 1 1170 VA /... 1 20 A DRINK RAILS-59 4 1 DRINK RAILS-56 20 A 1 1170 VA /... 1 20 A DRINK RAILS-57 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:14000 Mounting:Recessed Wires 4 MCB Rating:225 A Supply From:LP2(L)Phases:3 Mains Type:225 A Location:ELECTRICAL (113)Volts:120/208 Wye Bussing: Panel Desgination: LP2(R) PANEL SCHEDULE NOTES: Total Est. Demand Current:138 A Total Conn. Current:133 A Total Est. Demand:50 kVA Special Outlet 10584 VA 100.00% 10584 VA Total Conn. Load:48 kVA Motor 32753 VA 105.24% 34469 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...132 A 129 A 140 A Total Load:15787 VA 15446 VA 16784 VA 59 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 60 57 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 58 55 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 56 53 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 54 51 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 52 49 SPARE 20 A 1 0 VA / 1144... -- -- --50 47 ---- -- 3432 VA /... 2 25 A AC-4B 48 45 AC-7B 40 A 2 3432 VA /... -- -- --46 43 ---- -- 1144 VA /... 2 25 A AC-3B 44 41 AC-6B 25 A 2 1144 VA /... -- -- --42 39 RECEPT. ROOF 20 A 1 540 VA / 114... 2 25 A AC-5B 40 37 RECEPT. ROOF 20 A 1 1080 VA /... 1 20 A RECEPT. ROOF 38 35 RECEPT. ROOF 20 A 1 720 VA / 0 VA 36 33 RECEPT. ROOF 20 A 1 540 VA / 0 VA 34 31 ---- -- 1144 VA / 0...32 29 AC-1B 25 A 2 1144 VA /... -- -- --30 27 UH-1 15 A 1 444 VA / 114... 2 25 A AC-2B 28 25 F-05 15 A 1 675 VA / 156... 1 20 A SPO # TMV-3 26 23 F-03 15 A 1 384 VA / 384... 1 15 A F-04 24 21 F-01 15 A 1 218 VA / 696... 1 15 A F-02 22 19 SPO # CP-4 20 A 1 1560 VA / 72... 1 20 A RECEPT. ROOF 20 17 SPO # CP-1 20 A 1 1560 VA /... 1 20 A SPO # CP-5 18 15 SPO # CP-2 20 A 1 1560 VA /... 1 20 A SPO # CP-3 16 13 IR-13 20 A 1 756 VA / 756... 1 20 A IR-14 14 11 IR-11 20 A 1 756 VA / 756... 1 20 A IR-12 12 9 IR-9 20 A 1 756 VA / 756... 1 20 A IR-10 10 7 IR-7 20 A 1 756 VA / 756... 1 20 A IR-8 8 5 IR-5 20 A 1 756 VA / 756... 1 20 A IR-6 6 3 IR-3 20 A 1 756 VA / 756... 1 20 A IR-4 4 1 IR-1 20 A 1 756 VA / 756... 1 20 A IR-2 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating: Mounting:Surface Wires 4 MCB Rating:225 A Supply From:T-7 Phases:3 Mains Type:MCB Location:MECHANICAL (168)Volts:120/208 Wye Bussing: Panel Desgination: MP1 PANEL SCHEDULE 10/13/202310/04/2023 BID DOCUMENT SET 1. FAULT CURRENT INDICATED IS PROVIDED FOR BIDDING PURPOSES ONLY. ALL EQUIPMENT INCLUDING CIRCUIT BREAKERS SHALL BE FULLY RATED, SERIES RATING NOT ACCEPTABLE. THE CONTRACTOR SHALL VERIFY WITH A WRITTEN STATEMENT FROM THE UTILITY THE MAXIUM SHORT CIRCUIT CAPACITY. USING THE MAXIMUM FAULT, PREPARE A SHORT CIRCUIT ANALYSIS, COORDINATION STUDY, AND ARC FLUSH STUDY OF THE ELECTRICAL DISTRIBUTION SYSTEM. THIS STUDY WITHT THE UTILITY LETTER SHALL BE SUBMITTED WITH THE ELECTRICAL DISTRIBUTION SHOP DRAWINGS. 2. PROVIDE TERMINATION LUGS COMPATIBLE WITH FEEDER SIZE. 3. PANELS DENOTED AS XX-L AND XX-R ARE DOUBLE TUB PANELS WITH L INDICATING ONE TUB AND R INDICATING WITH THE OTHER TUB. TUBS MAY EITHER BE 42 POLE OR 54 POLE. SEE SCHDULE AND ADDITIONAL DETAILS. 4. IN ADDITION TO ALL SHOWN BREAKERS, MSB-A, MDP-B, AND MDP-C SHALL HAVE SPACES FOR FUTURE EXPANSION. REFER TO THE ONE-LINE DIAGRAMS FOR EXACT NUMBER OF SPACES REQUIRED. GENERAL NOTES: Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" ELECTRICAL SCHEDULES WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E5.6 10/04/2023 220025.00 C2023-15 NOTES: Total Est. Demand Current:0 A Total Conn. Current:0 A Total Est. Demand:0 kVA Total Conn. Load:0 kVA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...0 A 0 A 0 A Total Load:0 VA 0 VA 0 VA 83 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 84 81 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 82 79 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 80 77 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 78 75 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 76 73 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 74 71 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 72 69 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 70 67 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 68 65 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 66 63 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 64 61 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 62 59 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 60 57 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 58 55 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 56 53 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 54 51 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 52 49 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 50 47 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 48 45 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 46 43 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 44 41 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 42 39 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 40 37 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 38 35 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 36 33 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 34 31 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 32 29 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 30 27 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 28 25 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 26 23 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 24 21 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 22 19 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 20 17 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 18 15 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 16 13 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 14 11 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 12 9 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 10 7 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 8 5 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 6 3 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 4 1 SPACE -- 1 0 VA / 0 VA 1 -- SPACE 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:14000 Mounting:Surface Wires 4 MCB Rating:300 A Supply From:LP4(L)Phases:3 Mains Type:MCB Location:LOADING (160)Volts:120/208 Wye Bussing: Panel Desgination: LP4(R) PANEL SCHEDULE NOTES: Total Est. Demand Current:196 A Total Conn. Current:216 A Kitchen 18221 VA 94.47% 17213 VA Total Est. Demand:71 kVA Special Outlet 18560 VA 100.00% 18560 VA Total Conn. Load:78 kVA Motor 13964 VA 116.11% 16213 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...256 A 221 A 183 A Total Load:30135 VA 25863 VA 21927 VA 89 ---- -- 0 VA / 0 VA 90 87 ---- -- 0 VA / 0 VA 88 85 LP4(R)300 A 3 0 VA / 0 VA 86 83 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 84 81 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 82 79 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 80 77 0 VA / 1656... 1 20 A OVERHEAD DOOR-6 78 75 ---- -- 5750 VA /... 1 20 A OVERHEAD DOOR-4 76 73 SPO # OVEN-3 20 A 2 5750 VA /... 1 20 A OVERHEAD DOOR-3 74 71 SPO # AV-5 20 A 1 1000 VA /... 1 20 A SPO # ST-4 72 69 70 67 DRINK RAILS-41 20 A 1 1170 VA /... 1 20 A DRINK RAILS-42 68 65 DRINK RAILS-39 20 A 1 1170 VA /... 1 20 A DRINK RAILS-40 66 63 DRINK RAILS-37 20 A 1 1170 VA /... 1 20 A DRINK RAILS-38 64 61 DRINK RAILS-9 20 A 1 1170 VA /... 1 20 A DRINK RAILS-10 62 59 DRINK RAILS-7 20 A 1 1170 VA /... 1 20 A DRINK RAILS-8 60 57 DRINK RAILS-5 20 A 1 1170 VA /... 1 20 A DRINK RAILS-6 58 55 DRINK RAILS-3 20 A 1 1170 VA /... 1 20 A DRINK RAILS-4 56 53 SPO # AV-4 20 A 1 1000 VA /... -- -- --54 51 DRINK RAILS-2 20 A 1 1170 VA /... -- -- --52 49 SPO # ELL-1 20 A 1 500 VA / 299... 3 60 A SPO # ELV-1 50 47 SPO # EA-1 20 A 1 500 VA / 180... 1 20 A RECEPT. RM 152 48 45 SPO # GL-3 20 A 1 120 VA / 100... 1 20 A SPO # SC-4 46 43 SPO # ST-5 20 A 1 1000 VA /... 1 20 A SPO # EL26, EL27, EL28 44 41 SPO # CSB7, CSB8 20 A 1 720 VA / 720... 1 20 A SPO # EL23,EL24,EL25 42 39 SPO # EL12, EL13, EL14, EL15, EL16 20 A 1 1800 VA /... 1 20 A SPO # OVEN-4 40 37 SPO # CSB5, CSB6 20 A 1 720 VA / 648... 1 20 A SPO # REF-6 38 35 SPO # EL9, EL10, EL11 20 A 1 1080 VA / 18... 1 20 A RECEPT. RM 160 36 33 SPO # REF-5 20 A 1 648 VA / 120... 1 20 A SPO # GL-4 34 31 SPO # IT30A2 20 A 1 200 VA / 100... 1 20 A SPO # SC-3 32 29 RECEPT. RM 175 20 A 1 720 VA / 180... 1 20 A RECEPT. RM 154B 30 27 RECEPT. RM 167 20 A 1 1440 VA / 54... 1 20 A RECEPT. RM 173,174 28 25 SPO # GWH-1 20 A 1 600 VA / 117... 1 20 A DRINK RAILS-1 26 23 OPTICAL FLUSH VALVE- 4 20 A 1 180 VA / 180... 1 20 A OPTICAL FAUCET- 3 24 21 OPTICAL FLUSH VALVE- 3 20 A 1 180 VA / 180... 1 20 A OPTICAL FLUSH VALVE- 5 22 19 OPTICAL FAUCET- 2 20 A 1 180 VA / 180... 1 20 A OPTICAL FLUSH VALVE- 2 20 17 SPO # HD-5 20 A 1 1000 VA / 36... 1 20 A RECEPT. RM 162,163 18 15 OPTICAL FLUSH VALVE- 1 20 A 1 180 VA / 180... 1 20 A OPTICAL FAUCET- 1 16 13 SPO # AV-3 20 A 1 1000 VA / 72... 1 20 A RECEPT. RM 164 14 11 SPO # DF-1 20 A 1 600 VA / 400... -- -- --12 9 ---- -- 792 VA / 400... -- -- --10 7 ---- -- 792 VA / 400... 3 40 A SPO # CO-1 8 5 SPO # DISP-1 20 A 3 792 VA / 180... 1 20 A OPTICAL FAUCET- 4 6 3 SPO # REF-2 20 A 1 648 VA / 180... 1 20 A OPTICAL FAUCET- 5 4 1 RECEPT. RM 101 20 A 1 1080 VA /... 1 20 A RECEPT. RM 159 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:14000 Mounting:Surface Wires 4 MCB Rating:300 A Supply From:T-4 Phases:3 Mains Type:MCB Location:LOADING (160)Volts:120/208 Wye Bussing: Panel Desgination: LP4(L) PANEL SCHEDULE NOTES: Total Est. Demand Current:397 A Total Conn. Current:397 A Total Est. Demand:143 kVA Total Conn. Load:143 kVA Special Outlet 142940 VA 100.00% 142940 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...400 A 400 A 393 A Total Load:47903 VA 47903 VA 47133 VA 83 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 84 81 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 82 79 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 80 77 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 78 75 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 76 73 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 74 71 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 72 69 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 70 67 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 68 65 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 66 63 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 64 61 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 62 59 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 60 57 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 58 55 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 56 53 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 54 51 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 52 49 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 50 47 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 48 45 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 46 43 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 44 41 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 42 39 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 40 37 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 38 35 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 36 33 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 34 31 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 32 29 ---- -- 4333 VA / 0... 1 20 A SPARE 30 27 ---- -- 4333 VA / 77... -- -- --28 25 SPO # SPB-4 60 A 3 4333 VA / 77... 2 20 A SPO # PRJ-1 26 23 ---- -- 8400 VA /... -- -- --24 21 ---- -- 8400 VA /... -- -- --22 19 SPO # RSP-1 100 A 3 8400 VA /... 3 60 A SPO # SPB-3 20 17 ---- -- 4333 VA /... -- -- --18 15 ---- -- 4333 VA /... -- -- --16 13 SPO # SPB-2 60 A 3 4333 VA /... 3 100 A SPO # RSP-2 14 11 ---- -- 4333 VA /... -- -- --12 9 ---- -- 4333 VA /... -- -- --10 7 SPO#SBP-6 60 A 3 4333 VA /... 3 60 A SPO # SPB-1 8 5 ---- -- 4333 VA /... -- -- --6 3 ---- -- 4333 VA /... -- -- --4 1 SPO#SBP-5 60 A 3 4333 VA /... 3 60 A SPO#SBP-8 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating: Mounting:Surface Wires 4 MCB Rating:300 A Supply From:75 kVA, 277 V/480 V,...Phases:3 Mains Type:MCB Location:Volts:120/208 Wye Bussing: Panel Desgination: LP6 PANEL SCHEDULE NOTES: Total Est. Demand Current:133 A Total Conn. Current:107 A Total Est. Demand:48 kVA Total Conn. Load:38 kVA EV Charger 38400 VA 125.00% 48000 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals S = SHUNT TRIP CKT = CIRCUIT G = GROUND FAULT SENSING CB = CIRCUIT BREAKER E = EXISTING SPARE CIRCUIT BREAKER TO BE REUSED MCB = MAIN CIRCUIT BREAKER N = PROVIDE CIRCUIT BREAKER, SIZE AS INDICATED MLO = MAIN LUGS ONLY CIRCUIT BREAKER INFORMATION LEGEND:ABBREVIATIONS: Total...126 A 126 A 80 A Total Load:14400 VA 14400 VA 9600 VA 23 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 24 21 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 22 19 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 20 17 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 18 15 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 16 13 SPARE 20 A 1 0 VA / 0 VA 1 20 A SPARE 14 11 ---- -- 4800 VA / 0... -- -- --12 9 EV CHARGER-4 50 A 2 4800 VA / 0... 2 50 A SPARE 10 7 ---- -- 4800 VA / 0... -- -- --8 5 EV CHARGER-3 50 A 2 4800 VA / 0... 2 50 A SPARE 6 3 ---- -- 4800 VA /... -- -- --4 1 EV CHARGER-1 50 A 2 4800 VA /... 2 50 A EV CHARGER-2 2 CB INFO CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT CB INFO Number of Tubs:1 A.I.C. Rating:18000 Mounting:Surface Wires 4 MCB Rating:225 A Supply From:T-8 Phases:3 Mains Type:MCB Location:ELEC 134 Volts:120/208 Wye Bussing: Panel Desgination: EV PANEL SCHEDULE 10/13/202310/04/2023 BID DOCUMENT SET TV #2 WALKERDUCT PRO SERIES, OR EQUAL. ONE FOR POWER, ONE FOR COMMUNICATIONS. NOTES: 1. PROVIDE DUCT SUPPORTS FOR SLAB ON GRADE INSTALLATION (AS SHOWN ON DETAIL). WHEN DUCT IS MOUNTED ON STEEL METAL DECK, THEN SECURE DUCT TO METAL DECK BY WELDING. 2. PROVIDE 1/4" OF CONCRETE TOPPING OVER PRESET. 3. PROVIDE FLUSH COVER CARPET PLATE OR BRASS DOUBLE TRIM PLATE AS REQUIRED, WITH 3/4" CONDUIT FITTING. PROVIDE CARPET FOR PLAT AS REQUIRED. X 2" PRESET SEE NOTE 1 2'-0" ON CENTER SEE NOTE 3 90° ELBOW SEE NOTE 2 CONNECTION SEALTIGHT FLEX COMMUNICATION WIRING. INTERNAL POWER AND SECTION FOR DIVIDED RACEWAY MODULAR FURNITURE WALL. WIREMOLD RFB4 SERIES OR EQUAL RECESSED FLOOR BOX NOTES: 1. PROVIDE FLOOR PORT "FP" SERIES OR EQUAL BRASS FURNITURE FEED ASSEMBLY, TILE CARPIT FLANGE, WITH A 1" PLUG FOR POWER AND 2" PLUG FOR TELECOM. 2. INSTALL A (2) 1" CONDUIT FROM COMMUNICATION/DATA FLOOR BOX TO AN ACCESSIBLE CEILING SPACE. 3. IN BOTH POWER AND COMMUNICATION/DATA FLOOR BOXES, LEAVE 6" OF EXTRA WIRE OR CABLE TO ALLOW FOR REMOVAL OF COVER PLATE. 4. FOR ELECTRICAL SERVICE PROVIDE (1) 20AMP 3-POLE AND (1) 1-POLE BREAKERS. 5. THE FURNITURE WILL BE PRE-WIRED, USING AN 8-WIRE, FOUR CIRCUIT SYSTEM. SEALTITE FLEXFURNISHED WITH FURNITURE WIRED TO BUILDING BY E.C. 6. SEE FURNITURE PLANS FOR EXACT LOCATION OF ALL FURNITURE CONNECTIONS. 21 SEE NOTE 1 90° ELBOW CONNECTION 1" SEALTIGHT FLEX COMMUNICATION WIRING.INTERNAL POWER AND SECTION FOR DIVIDED RACEWAY MODULAR FURNITUREWALL.(TELECOM). 2" SEALTITE FLEX. (POWER) 120/208V, 3PH, 4W PANEL 1/A FED FROM MSB, BKR. 4 NAMEPLATE COLOR: NORMAL = BLACK LETTER (FILL) COLOR: NORMAL = WHITE EQUIPMENT DESIGNATION INDICATE VOLTAGE, NO. OF PHASES, NO. OF WIRES ATTACH NAMEPLATE WITH 2 SCREWS INDICATE WHERE THIS EQUIPMENT IS FED FROM LETTERING SHALL BE 1/4" HIGH 65 KAIC AIC RATING PER SHORT CIRCUIT STUDY1. VERIFY CHALK AND TACK LOCATIONS PRIOR TO ROUGH-IN. DO NOT ROUGH-IN BEHIND BOARDS. 2. COORDINATE MOUNTING HEIGHT WITH ARCHITECT. 3. TV WALL BOX SHALL BE ARLINGTON INDUSTRIES. DVFR4W POWER OUTLET SHALL BE SURGE PROTECTIVE AND HOSPITAL GRADE. HUBBELL HBL8262 OR EQUAL. NOTES: QUADPLEX RECEPTACLE CAT 6A OUTLET (RJ-45) 3/4" CONDUIT INTO CEILING SPACE FOR EACH TO PANEL COAX OUTLET (RG-6 QUAD SHIELD) TO CATV DISTRIBUTION SEE NOTE 3 CAT6A 1" CONDUIT STUBBED INTO NEAREST ACCESSIBLE CEILING CAVITY SINGLE GANG TRIM RING 4" SQUARE, 2 1/8" DEEP BOX WITH AND BUSHINGS AT BOTH ENDS INSTALL PULL STRING IN CONDUIT 1. IF THE CONTRACTOR IS NOT PROVIDING TERMINATION JACKS, PROVIDE A BLANK COVERPLATE. COVERPLATE SHALL MATCH COLOR OF RECEPTACLE COVERPLATE. NOTES: PROVIDE 120-VOLT, 20-AMP GFI OUTLET IN WALL BEHIND VENDING MACHINE 1.PROVIDE PRODUCT BY USA TECHNOLOGIES. (888) 561-4748 WWW.USATECH.COM 2.PROVIDE A "VEND MISER" CONTROLLER IF THE MACHINE IS REFRIGERATED AND A "SNACK MISER" CONTROLLER IF THE MACHINE IS NOT REFRIGERATED. 3.INSTALL ALL COMPONENTS AND CABLE AS DIRECTED IN MANUFACTURER'S INSTALLATION INSTRUCTIONS. NOTES: INFRA-RED MOTION SENSOR MOUNTED ABOVE VENDING MACHINE PLUG-IN ENERGY CONTROLLER CORD & PLUG FROM VENDING MACHINE LOW VOLT CABLE NOTES: 1. USE CHANNEL THAT IS AT LEAST 1 5/8" SLOTTED. UNISTRUT OR ACCEPTED EQUAL. 2. BOTTOM OF MOUNTING RACK SHALL BE AT 7'-0" MINIMUM. 3. MOUNT TRANSFORMER 6" MINIMUM FROM WALL. 4. EMBED PLATES IN PRECAST CEILING ABOVE ON 4' CENTERS. CONTRACTOR SHALL WELD UNI-STRUT TO PLATES. SEE STRUCTURAL DRAWINGS FOR MORE INFORMATION (TYPICAL). 5. ALL STRUT AND HARDWARE BELOW 8' AFF SHALL BE TAPED YELLOW AND BLACK. ALSO COVER ROD AND STRUT ENDS WITH SOLID FOAM. LOCATION AS DIRECTED BY LOCAL FIRE DEPARTMENT. COORDINATE PRIOR TO ROUGH-IN. NOTE: PROVIDE ALL CABLING AND CONNECTIONS AS REQUIRED PER MANUFACTURER'S PUBLISHED INSTALLATION INSTRUCTIONS. PROVIDE HOMERUN FOR EACH AREA STATION. AT EACH AREA STATION SEE PLANS FOR QUANTITY 120VOLT - SEE FLOOR PLANS PROVIDE TELEPHONE CONNECTION AS REQUIRED TWO WAY COMMUNCATION RISER DIAGRAM DIAGRAMMATIC AS ARI MS ARI RCC VPD BCC DEVICE LEGEND MS RCC BCC AS ARI VPD MASTER STATION , HOUSING DEVICES INC #HDI-ADAMS-XX SERIES OR APPROVED EQUAL. PROVIDE WITH QUANTITY OF ZONES AS REQUIRED. RELAY CARD CABINET , HOUSING DEVICES INC #HDI-ADARCC-XX SERIES OR APPROVED EQUAL. PROVIDE WITH CONTROL BOARD AND QUANTITY OF RELAY CARDS AS REQUIRED. BATTERY BACKUP CABINET , HOUSING DEVICES INC #HDI-ADA-BBU SERIES OR APPROVED EQUAL. BATTERY BACKUP SYSTEM SHALL PROVIDE 2 HOUR SUPPORT FOR FULL ALARM CAPABILITY. PROVIDE WITH INTEGRAL AUDIO AMPLIFIER SYSTEM. PROVIDE WITH TRANSFORMER AS REQUIRED. AREA STATION , HOUSING DEVICES INC #HDI-ADA-100A SERIES OR APPROVED EQUAL. TWO WAY COMMUNICATION INSTRUCTION SIGN , HOUSING DEVICES HDI-ADA-BS PROVIDE DIRECTIONAL SIGNAGE AND INSTRUCTIONS AT 2ND FLOOR ELEVATOR AND WHERE REQUIRED BY THE BUILDING CODE. COORDINATE EXACT REQUIREMENTS WITH THE LOCAL AHJ. AUTO VOICE PHONE DIALER , PROVIDE TIMED-AUTOMATIC TELEPHONE DIAL OUT ACCESSORY FOR CONNECTION TO REMOTE MONITORING LOCATION OR 911. ALL MASTER AND AREA STATIONS ARE TO BE FLUSH MOUNTED WITH BACKBOXES PER MANUFACTURER'S REQUIREMENTS. NOTES 1. WIRE ALL DEVICES PER MANUFACTURER'S RECOMMENDATIONS. 2. COORDINATE ALL DEVICES PER REQUIREMENTS OF THE LOCAL AUTHORITY HAVING JURISDICTION. 3. PROVIDE ALL REQUIRED BACK BOXES AND SURFACE MOUNTED COLLARS FOR AREA STATIONS AND MASTER STATIONS. SIZE PER MANUFACTURER'S RECOMMENDATIONS. 4. VERIFY LOCATIONS OF RELAY CARD CABINET AND BATTERY BACKUP WITH INSTALLER, PRIOR TO ROUGH-IN. 5. CORNELL, TALKAPHONE, AND JERRON ARE APPROVED EQUIVALENTS. OTHER EQUIVALENTS WILL BE CONSIDERED BUT MUST BE SUBMITTED 10 DAYS PRIOR TO BID. 6. WHEN PROVIDING AN TWO-WAY COMMUNICATION SYSTEM (CALL-BOXES), PER INTERNATIONAL BUILDING CODE 1007.8 IT IS THE RESPONSIBILITY OF THE ELECTRICAL/LOW VOLTAGE CONTRACTOR TO INCLUDE IN THEIR BID ALL COST ASSOCIATED TO HAVE AN AUTHORITY HAVING JURISDICTION APPROVED LICENSED DESIGN PROFESSIONAL (ELECTRICAL ENGINEER) TO EVALUATE THE TWO-WAY COMMUNICATION SYSTEM (CALL-BOXES) AND DETERMINE COMPLIANCE WITH THIRD PARTY LISTING STANDARDS, SUCH AS UNDERWRITERS LABORATORY (UL) OR AN APPROVED EQUIVALENT BY THE AUTHORITY HAVING JURISDICTION. 7. ALL WIRING TO BE IN CONDUIT. Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: NTS POWER DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E6.1 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"3 MODULAR FURNITURE WALL CONNECTION DETAIL 1/8" = 1'-0"4 MODULAR FURNITURE FLOOR BOX CONNECTION DETAILS 1 1/8" = 1'-0"7 PANELBOARD NAMEPLATE DETAIL 1/8" = 1'-0"6 RECEPTACLE TV OUTLET DETAIL 1 1/8" = 1'-0"2 TYPICAL DATA TELEPHONE OUTLET 1/8" = 1'-0"1 VENDING MACHINE ENERGY CONTROL NTS8TYPICAL WALL OR COLUMN-MOUNTED TRANSFORMER NTS5TWO WAY COMMUNICATION DETAIL 10/13/202310/04/2023 BID DOCUMENT SET S S H S S H 6'' 12'' CL ROOF CONDUIT SLEEVE OTHERWISE SPLIT CLAMP NEOPRENE FLASHING OVER SLEEVE FOLDED DOWN BETWEEN SLEEVE AND PIPE 1/4" SQ. PLATE 4" LARGER THAN SLEEVE DIAMETER CONTINUOUSLY WELDED TO PIPE SLEEVE CLAMP COUNTERFLASHING TO PIPE WITH NEOPRENE SEAL BETWEEN PIPING AND FLASHING WEATHERPROOF SEAL AT END OF CONDUIT. PROVIDE UNISTRUT STRUCTURE AND CLAMP FOR LATERAL BRACING. UNLESS INDICATED 1" CONDUIT PROVIDE 180° END WHEN CONDUIT DOES NOT TERMINATE INTO WEATHERPROOF ENCLOSURE. DUCT DUCT SMOKE DETECTOR NOTES: POWER AND SIGNAL WIRING TO FIRE ALARM SYSTEM. FIRE ALARM CONTROL RELAY AT ASSOCIATED AHU/RTU STARTER. FORM "C". TO DDC FOR SMOKE DAMPER STATUS-OPEN/CLOSE BY TEMP CONTROL CONTRACTOR. 24V DC POWER LIMITED FIRE ALARM CIRCUIT. BY ELECTRICAL CONTRACTOR. SMOKE DAMPER BY M.C. SMOKE DAMPER ACTUATOR BY M.C. 24V DC POWER LIMITED FIRE ALARM CIRCUIT. BY ELECTRICAL CONTRACTOR. N.C. CONTACT TO HAVE 30 SEC. T.D. OPENS ON ALARM BY E.C. 1. PROVIDE CONTACTS AS SHOWN. 2. SEE SPECIFICATIONS FOR COORDINATION OF WORK WITH THE HVAC CONTRACTOR. 3. POWER SOURCE FOR DUCT SMOKE DETECTOR SHALL BE 24V DC. 4. ALL DEVICES SHALL BE ACCESSIBLE FOR NORMAL MAINTENANCE. 5. RELAY CONTACT FOR RTU/AHU CONTROL SHALL CHANGE STATE IMMEDIATELY UPON SMOKE DETECTION. 6. DETECTOR SHALL BE COORDINATE WITH MECHANICAL CONTRACTOR. SEE MECHANICAL DRAWINGS FOR EXACT LOCATION. E.C. PROVIDES, M.C. INSTALLS, E.C. WIRES TO FINAL FIRE ALARM CONTROLS SYSTEM. 7. FIRE ALARM RELAY AT STARTER SHALL BE RATED FOR COIL/CONTROL VOLTAGE OF THE STARTER. 8. DAMPER CONTROL SHALL BE RESETTABLE FROM THE FIRE ALARM CONTROL PANEL. MAINTENANCE STAFF SHALL NOT NEED TO BE AT THE DETECTOR OR THE DAMPER TO RESET TO NORMAL CONDITION. 9. PROVIDE REMOTE RESET AND TESTING DEVICE ON THE BUILDING SERVICES AND ROOM ___ WALL IN A VISIBLE PLACE. COORDINATE FINAL LOCATION WITH MECH. CONTRACTOR. 10. COORDINATE WITH HVAC DETAIL _ ON SHEET _. S R 1. ALL WIRING AND CABLES SHALL BE STRAPPED AS FAR UP AND BACK AS POSSIBLE SO THEY ARE NOT VISIBLE. 2. PLUMBING CONTRACTOR SHALL PROVIDE LOW VOLT CABLING AS DIRECTED BY MANUFACTURER. 3. LOW VOLT CABLE TO ENTER FAUCET FROM BELOW COUNTER. 4. DETAIL TYPICAL FOR MEN'S AND WOMEN'S TOILET ROOMS. NOTES: SINGLE GFI RECEPTACLE BELOW SINK COUNTER AS HIGH AS POSSIBLE. BY ELECTRICAL CONTRACTOR. CONNECT TO EXISTING RECEPTACLE CIRCUIT. POWER SUPPLY PROVIDED BY PLUMBING CONTRACTOR. LOW VOLT CABLE TO FAUCET. (TYP.) 39 CONNECT TO EXISTING RECEPTACLE CIRCUIT. E.C SHALL PROVIDE 4" BACK BOX ABOVE CEILING. LOW VOLT WIRING BY P.C IN 1/2" CONDUIT. BY E.C. TOILETS/URINALS MAY BE WIRED ON SAME 24VAC CIRCUIT. SENSOR PLATE MOUNTED ON FLUSH 2-GANG BACK BOX. 1. PLUMBING CONTRACTOR SHALL PROVIDE LOW VOLT CABLING AS DIRECTED BY MANUFACTURER. 2. DETAIL TYPICAL FOR MEN'S AND WOMEN'S TOILET ROOMS. 3. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL BACK BOXES FOR SENSOR PLATES. COORDINATE SENSOR LOCATIONS WITH PLUMBING FIXTURE INSTALLATION. NOTES: 24VAC TRANSFORMER ON 4" SQUARE PLATE FURNISHED WITH PLUMBING FIXTURES. INSTALLED AND PRIMARY WIRING BY E.C. 40 R R FIRE ALARM VENDOR SHALL VERIFY CIRCUIT BREAKER SHUNT COIL LOAD. FURNISH & INSTALL INTERPOSING RELAY IF REQ'D. 1 E5 DETECTOR NEXT TO EACH SPRINKLER HEAD IN THE AREAS SHOWN (ELEVATOR PIT, TOP OF SHAFT 2. HEAT DETECTORS SHALL BE INSTALLED WITHIN 2 FEET OF SPRINKLER HEADS. INSTALL ONE HEAT 480VOLT, 100/3 ENCLOSED SHUNT TRIP CIRCUIT BREAKER FOR ELEVATOR POWER. PROVIDE 120VOLT FOR CONTROL BY HEAT DETECTORS. AND MACHINE ROOM). 1. ALL HEAT DETECTORS SHOWN SHALL BE 135° FIXED. GENERAL NOTES: KEY NOTES: SMOKE AND HEAT DETECTORS IN MACHINE ROOM. LOBBY SMOKE DETECTORS. SEE FLOOR PLANS. SMOKE AND HEAT DETECTORS AT TOP OF SHAFT.3 E5 4 E5 1 E5 2 E5 2 E5 3 E5 2 E5 SHAFTELEVATOR 4 E5 3. HEAT DETECTORS SHALL HAVE 120VOLT AUX CONTACTS. THESE CONTACTS SHALL BE WIRED IN SERIES FOR CONTROL OF THE SHUNT TRIP BREAKER. SHALL BE RUN IN CONDUIT FROM EACH DETECTOR TO THE ELEVATOR CONTROLLER. 4. SMOKE DETECTORS SHALL HAVE AUX CONTACTS. 2 #14 WIRES IN CONDUIT MAIN RECALL RELAY MODULE ALTERNATE RECALL RELAY MODULE DETECTOR NEXT TO EACH SPRINKLER HEAD IN THE AREAS SHOWN (ELEVATOR PIT, TOP OF SHAFT NOTES: 1. EC SHALL VERIFY WHERE USE OF THIS IS APPROPRIATE WITH STRUCTURAL DRAWINGS PRIOR TO ROUGH-IN. 2. TYPICAL OF WIREMOLD RFB11 (OR EQUAL BY HUBBELL). PROVIDE COVER APPROPRIATE TO FINISH AND FUNCTION OF FEED (CARPET, TILE, FURNITURE FEED, ETC). ALL COVERS SHALL BE BRUSHED ALUMINUM. 3. FLUSH FINISH COVER SHALL BE IN-USE STYLE (TERMINATIONS ARE RECESSED). 4. SEPARATE CONDUIT AND COMPARTMENTS FOR POWER AND LOW VOLTAGE (CATV, LAN, VIDEO, USB, VGA, ETC.) PROVISIONS. USE 3/4" MINIMUM FOR POWER. 1" MINIMUM FOR CATV OR LAN WIRING. SHALL ACCOMMODATE AT LEAST (2) DUPLEX 120 VOLT, 20 AMP RECEPTACLES (WITH AT LEAST ONE BEING P&S 5362 OR EQUAL) AND ALL LOW VOLTAGE REQUIREMENTS BASED ON SPACE INSTALLED. PROVIDE COMPLETE DEVICE ACCOUTREMENTS, WIRE/CABLE, AND FITTINGS FOR A COMPLETE AND FUNCTIONAL INSTALLATION. 10 11/16"12 1/2" 12 5/8" 14 3/4" 6 1/8" (317MM)(272MM) (156MM) (375MM) (322MM) 1.INSTALL 4-PAIR UTP COPPER CABLES ABOVE HVAC, PLUMBING AND ELECTRICAL WHERE POSSIBLE. 2.WHERE TRAY OR CONDUIT DOES NOT EXIST, ADDITIONAL SUPPORTS FROM DECK MAY BE REQUIRED TO SUPPORT THE CABLE ROUTE. 3.ROUTES SHALL EXTEND TO CONDUIT STUBS. 1.ADDITIONAL RIGID SUPPORT FASTENED TO THE DECK MAY BE REQUIRED IN SOME AREAS WHERE THE INTERIOR WALLS DO NOT EXTEND TO THE DECK. THIS EXAMPLE SHOWS 1/2" TYPE THREADED ROD FROM DECK TO J-HOOK. 2.SUPPORTS NEED TO ADHERE TO THE 4' MAX SPACING REQUIREMENT FROM TR TO CONDUIT STUB UP. 3.J-HOOKS MAY NOT BE MOUNTED TO OTHER MEP SUPPORT STRUCTURES WHERE CABLING SPANS FROM THE BASKET TRAY IN THE MAIN COORIDOR TO THE CONDUIT STUB UP.6"4-PAIR CATEGORY CABLES J-HOOK 4'-0" O.C. MAX DETAIL NOTE: CABLE SAG NOT TO EXCEED 6" J-HOOK J-HOOK CLIP NOTES: DECK OR TRUSS ROUTE PLUGMOLD THRU POWER STRIP SLOT PROVIDED IN FIXTURE END CAP VIEW POWER STRIP SLOT PROVIDED IN FIXTURE FOR ROUTIN POWER STRIP THRI FIXTURE. ASSEMBLE POWER STRIP PIOR TO INSTALLING. ROUTE POWER STRIP INSIDE FIXTURE RAIL WALL SLOT FROM END CAPS COORDINATE WALL MOUNTED JUNCTION BOX LOCATION WITH BENCH IN THE FIELD. JUNCTION BOX SHALL LINE UP WITH BENCH RAIL TO MINIMIZE FLEXIBLE CONDUIT LENGTH. PROVIDE FINAL CONNECTIONS. CONCEAL FLEXIBLE CONDUIT INSIDE FIXTURE, AS REQUIRED ROUTE CONDUIT FOR POWER FEED FROM WALL MOUNTED JUNCTION BOX SHOWN DRAWINGS TO FIXTURE RAIL WALL WIRE CHANNEL. COORDINATE EXACT POWER FEED LOCATION WITH FIXTURE CONTRACTOR ON SITE. INSTALL PLUGMOLD 2000 SERIES STEEL MULTIOUTLET ASSEMBLY MODEL NUMBER BK20GB509TRUSBA.(OR ACCEPTED SUBSTITUTE). INSTALL 5' LENGTHS IN BLACK FINISH WITH ALTERNATING RECEPTACLES AND USB OUTLETS ON 9" CENTERS. INSTALL ALL NECESSARY COUPLINGS, CONNECTORS AND COVER CLIPS TO BE USED FOR CONNECTING EACH 5' SECTION OF MULTIOULET ASSEMBLY RACEWAY. FLOOR FIXTURE RAIL WALL ELEVATION PS ASSEMBLE POWER STRIP PIOR TO INSTALLING. ROUTE POWER STRIP INSIDE FIXTURE RAIL WALL SLOT FROM END CAPS. FLOOR PLAN Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: NTS POWER DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E6.2 10/04/2023 220025.00 C2023-15 1/8" = 1'-0"3 CONDUIT THROUGH ROOF FLASHING DETAILS 1 1/8" = 1'-0"5 DUCT SMOKE DETECTOR WITH SMOKE DAMER DETAIL 1/8" = 1'-0"1 ELECTRONIC FAUCET WIRING DETAILS 1/8" = 1'-0"2 ELECTRONIC TOILET AND URINAL WIRING DETAIL 1/8" = 1'-0"6 ELEVATOR RECALL FIRE ALARM INTERLOCK DETAIL 1/8" = 1'-0"4 FLOOR BOXES (NON POKE-THROUGH) 1/8" = 1'-0"7 J-HOOK INSTALLATION DETAIL NTS8USB RAIL DETAIL 10/13/202310/04/2023 BID DOCUMENT SET 6 5 2 7 1 VIOLET (+)HOTNEUTRAL4 3 X1 X2 98 10 BLACK WHITE VIOLET GREY +GREY (-)VIOLETGREYSWITCHED HOTNEUTRALNEUTRALBLACK WHITE VIOLET GREY 0-10V DIMMING BALLAST + MAIN BUSS NEUTRAL NORMAL POWER MAIN BUSS HOT NORMAL POWER 20 AMP BREAKER DIMMER CONTROLSWITCHED HOTREGULAR DIMMED BALLASTS 20 AMP CIRCUIT EMERGENCY PANEL EMERGENCY HOT CUT & CAP X1 & X2 JUMPER FOR 4 WIRE LOADS EMERGENCY NEUTRAL LVS EPC-D-F UL 924 TRANSFER RELAY 0-10V DIMMING BALLAST EMERGENCY DIMMED BALLASTS NOTES: 1. PROVIDE (1) RELAY PER SWITCHED LEG. PC 0 0 SWITCH INPUTS PHOTOCELL CONTROL POWER LIGHT FIXTURES (TYPICAL) LIGHT FIXTURES (TYPICAL) PANEL LIGHT FIXTURES (TYPICAL) OCCUPANCY SENSOR NOTES: 1. UNLESS NOTED OTHERWISE, OCCUPANCY SENSORS USED IN CONJUNCTION WITH LOCAL LINE VOLTAGE SWITCHING SHALL BE ELECTRICALLY LOCATED ON THE PANEL SIDE OF THE SWITCH, AS INDICATED IN THE ABOVE DIAGRAM. 2. IN ROOMS SHOWN WITH TWO OR MORE OCCUPANCY SENSORS, IT IS INTENDED THAT BOTH SENSORS CONTROL THE SAME LIGHT FIXTURES VIA A COMMON "POWER PACK" UNLESS NOTED OTHERWISE. 3. POWER PACKS SHALL BE LOCATED IN THE CEILING SPACE DIRECTLY ABOVE THE LOCAL WALL SWITCHES WHENEVER FEASIBLE. 4. USE OF THE OCCUPANCY SENSOR SYMBOL IN A ROOM INDICATES THE TYPE OF SENSOR TO BE USED TO CONTROL ALL LIGHTS IN THAT SPACE INCLUDING UNDER CABINET LIGHT FIXTURE. EXACT LOCATION, MOUNTING, AND CONFIGURATION OF SENSOR SHALL BE DETERMINED IN THE FIELD, BASED UPON MANUFACTURERS RECOMMENDATIONS AND GUIDELINES. 5. SPECIFIC MODEL OF OCCUPANCY SENSOR SHALL BE COORDINATED WITH ROOM SIZE, LAYOUT, CEILING HEIGHT AND MOUNTING REQUIREMENTS, SENSOR MANUFACTURER, AND CONTRACTOR. VERIFY DEVICE COLOR WITH ARCHITECT PRIOR TO ORDERING. 6. OCCUPANCY SENSOR MANUFACTURER SHALL PROVIDE HARD COPIES AND ELECTRONIC AUTOCAD DRAWINGS FILES OF THE LOCATION AND MODEL NUMBERS OF ALL ASSOCIATED EQUIPMENT. 7. CONTRACTOR SHALL PROVIDE A COIL OF WIRING 4'-5' IN LENGTH IN A J-BOX AT EACH OCCUPANCY SENSOR LOCATION FOR FUTURE RELOCATION IF DESIRED BY OWNER. 8. MOTION SENSORS SHALL BE LINKABLE OR HAVE AUXILARY CONTACTS TO CONTROL MULTIPLE LOADS SUCH AS BUT NOT LIMITED TO HVAC LOADS. DUAL-TECHNOLOGY WALL BOX DUAL- TECHNOLOGY WALL BOX DUAL- TECHNOLOGY DLS. DIMMABLE OCCUPANCY SWITCH LOCAL SWITCHING (TYPICAL) (MAY BE DLS, 3-WAY, OR OTHER COMBINATIONS) MICROPROCESSOR CONTROLLER MICROPROCESSOR- CONTROLLED CONTACT (TYPICAL) OCCUPANCY SENSOR (OR "POWER PACK" FOR MULTIPLE SENSORS) WALL BOX OCCUPANCY SENSOR 0 0 OCCUPANCY SENSOR NOTES: 1. IN ROOMS SHOWN WITH TWO OR MORE OCCUPANCY SENSORS, IT IS INTENDED THAT BOTH SENSORS CONTROL THE SAME LIGHT FIXTURES VIA A COMMON "POWER PACK" UNLESS NOTED OTHERWISE. 2. POWER PACKS SHALL BE LOCATED IN THE CEILING SPACE DIRECTLY ABOVE THE LOCAL WALL SWITCHES WHENEVER FEASIBLE. 3. USE OF THE OCCUPANCY SENSOR SYMBOL IN A ROOM INDICATES THE TYPE OF SENSOR TO BE USED TO CONTROL ALL LIGHTS IN THAT SPACE. EXACT LOCATION, MOUNTING, AND CONFIGURATION OF SENSOR SHALL BE DETERMINED IN THE FIELD, BASED UPON MANUFACTURERS RECOMMENDATIONS AND GUIDELINES. 4. SPECIFIC MODEL OF OCCUPANCY SENSOR SHALL BE COORDINATED WITH ROOM SIZE, LAYOUT, CEILING HEIGHT AND MOUNTING REQUIREMENTS, SENSOR MANUFACTURER, AND CONTRACTOR. VERIFY DEVICE COLOR WITH ARCHITECT PRIOR TO ORDERING. 5. CONTRACTOR SHALL PROVIDE A COIL OF WIRING 4'-5' IN LENGTH IN A J-BOX AT EACH OCCUPANCY SENSOR LOCATION FOR FUTURE RELOCATION IF DESIRED BY OWNER. 6. OCCUPANCY SENSOR MANUFACTURER SHALL PROVIDE HARD COPIES AND ELECTRONIC AUTOCAD DRAWINGS FILES OF THE LOCATION AND MODEL NUMBERS OF ALL ASSOCIATED EQUIPMENT. 7. MOTION SENSORS / POWER PACK SHALL BE LINKABLE OR HAVE AUXILARY CONTACTS TO CONTROL MULTIPLE LOADS SUCH AS BUT NOT LIMITED TO HVAC LOADS. a d o L CEILING MOUNTED OCCUPANCY SENSOR WALL MOUNTED SWITCH OCCUPANCY SENSOR LOCAL SWITCHING WALL BOX OCCUPANCY SENSOR (WITH 0-10VDC DIMMING WHERE INDICATED) LIGHT FIXTURES VIO (0-10VDC DIM OUT) GRY (0-10VDC DIM COMMON) PANEL WALLBOX - DUAL TECH WALLBOX - DUAL TECH DIMMABLE Red Red Power Pack CAT 6 OR AS REQUIRED BY MFG.ANY CEILING/WALL SENSOR ANY LOW VOLTAGE WALL CONTROL CAT 6 OR AS REQUIRED BY MFG. WhtNeutral Hot Blk CONTROL SWITCH (MAYBE DLS, OCCUPANCY SENSOR OR RELAY).TRANSFER CONTROL RELAY UL 924 LISTED LVS-MODEL "EPC-1". EMERGENCY LIFE SAFETY SWITCHABLE LIGHT FIXTURE. NORMAL NEUTRAL NORMAL SWITCHABLE LIGHT FIXTURE. NOTES: 1. PROVIDE (1) RELAY PER SWITCHED LEG. EMERGENCY LIFE SAFETY CIRCUIT EMERGENCY LIFE SAFETY NEUTRAL NORMAL CIRCUIT Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: NTS ELECTRICAL DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E6.3 10/04/2023 220025.00 C2023-15 NTS3EMERGENCY LIFE SAFETY DIMMING CIRCUIT NTS2LIGHTING CONTROL DETAIL NTS4OCCUPANCY SENSOR DETAIL NTS1EMERGENCY LIFE SAFETY SWITCHING CIRCUIT 10/13/202310/04/2023 BID DOCUMENT SET 1 2 3 4 5 SIZE GROUND WIRE PER GROUNDING CHART - BY E.C. (CFCI) PROVIDER FIBER/COPPER DIRECT TO MER ROOM 150 (NFNI) 12-STRAND SINGLE MODE FIBER - ARMORED PLENUM (CFCI WALL FIELD TERMINATION RACK TERMINATION GENERAL NOTES: 1. OWNER RESONSIBLE FOR CUTOVER OF ALL NETWORK CONNECTIONS THAT WILL BE REQUIRED POST CONSTRUCTION. 2. OWNER TO PROVIDE/INSTALL ALL NETWORK SWITCHES FOR THE PROJECT. 3. MER = MAIN TELECOMMUNICATIONS EQUIPMENT ROOM = 150 NOTES: C = CONTRACTOR O = OWNER N = NETWORK PROVIDER F = FURNISHED I = INSTALLED ELECTRICAL SERVICE ENTRANCE TEF TMGB TBC TBB BUILDING STEEL PANELBOARD TRAY OTHER EBC TGB ICC ICC TYPICAL (TR) (ER) or (MER) TO OTHER (TR) TELECOM ROOM GROUNDING DETAIL - TYPICAL NOTES: 1. TMGB, TGB, TBC, TBB & GE BY E.C. QUANTITY OF TELECOMMUNICATION ROOMS PER PLANS. 2. TELECOMMUNICATIONS CONTRACTOR SHALL BOND ALL METAL RACKS, LADDER, BASKET TRAY, CABINETS AND ALL EQUIPMENT IN ALL TELECOMMUNICATIONS ROOMS TO THE TGB WITH #6 OR AS LISTED PER THE CONDUCTOR SIZE MATRIX TBB = TELECOMMUNICATIONS BONDING BACKBONE GE = GROUNDING EQUALIZER TBC = TELECOMMUNICATIONS BONDING CONDUCTOR EBC = EQUIPMENT BONDING CONDUCTOR ICC = IRREVERSIBLE CRIMP CONNECTOR NOTE: 1. SIZE OF TBC & GE SHOULD MATCH SIZE OF TBB. 2. TBB SHOULD NOT BE SPLICED. TIA-607-B (TBB), (GE), (TBC) & (EBC) BONDING CONDUCTOR SIZE TBB/GE LINEAR LENGTH IN FEET TBB/GE SIZE - AWG LESS THAN 13 FEET 6 14' - 20' 4 21' - 26' 3 27' - 33' 2 34' - 41' 1 42' - 52' 1/0 53' - 66' 2/0 67' - 84' 3/0 85' - 105' 4/0 106' - 125' 250 kcmil 126' - 150' 300 kcmil 151' - 175' 350 kcmil 176' - 250' 500 kcmil 251' - 300' 600 kcmil GREATER THAN 301' 750 kcmil TMGB = TELECOMMUNICATIONS MAIN GROUNDING BUSBAR TGB = TELECOMMUNICATIONS GROUNDING BUSBAR ER = EQUIPMENT ROOM TR = TELECOMMUNICATIONS ROOM MER = MAIN EQUIPMENT ROOM TEF = TELECOMMUNICATIONS ENTRANCE FACILITY TMGB AND TGB MUST BE PRE DRILLED COPPER BUSBAR WITH HOLES FOR USE WITH STANDARD SIZED LUGS. BARS MUST BE NRTL RATED. BARS TO ACCOMODATE BONDING CONDUCTORS THAT ORIGINATE AT VARIOUS EQUIPMENT AND METALLIC SURFACES AND ALLOW FOR FUTURE GROWTH. TIA-607-B (TGB) & (TMGB) SIZING ROOM BAR TYPE THICKNESS WIDTH LENGTH ER TGB 0.25" 2.00" MIN 12.00" TR TGB 0.25" 2.00" MIN 12.00" MER TGB 0.25" 2.00" MIN 12.00" TEF TMGB 0.25" 4.00" MIN 20.00" COPPER BUS BAR SIZE PER MATRIX SET SCREW GROUNDING BLOCK BOLTED TO GROUND BUS FOR USE WITH #6 AND SMALLER GROUNDING CONDUCTORS INSULATOR PLYWOOD 5/16" DIA. HOLE FOR EQUIPMENT GROUNDING CONDUCTOR LUGS OF #8 AND LARGER TWO-HOLE COPPER COMPRESSION LUG BOLTED TO GROUND BUS #3/0 BARE COPPER TO INTERSYSTEM GROUND BAR 5 2 MAIN EQUIPMENT ROOM - # 150 TELECOM GROUND BAR MAIN ELECTRICAL ROOM - # 134 STORAGE ROOM #104 STORAGE ROOM #164 NEW FIBER / COPPER SERVICE FIRST FLOOR NEW FIBER / COPPER SERVICE 3 5 5 6 6 655 5 6 7 4 1 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 1/8" = 1'-0" TELECOMMUNICATIONS RISER DIAGRAM WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E7.1 10/04/2023 220025.00 C2023-15 NTS:1 TELECOMMUNICATIONS GROUNDING DETAILS 1/8" = 1'-0"2 TELECOMMUNICATIONS BACKBONE & GROUNDING REQUIREMENTS 10/13/202310/04/2023 BID DOCUMENT SET SINGLE GANG FACEPLATE STAINLESS STEEL FINISH CAT 6 1A-122 LOW VOLTAGE MOUNTING BRACKET MOUNTING LUG COMPUTER LABEL DATA JACK RECESSED W 4 - PORT FACEPLATE CAT 6 BLANK XXXX 1A-122 CAT 6 TV RF BULKHEAD COMPUTER GENERATED LABEL 1" CONDUIT TO ACCESSIBLE CEILING SPACECOUNT (2) CAT.6 CABLES & (1) COAXIAL CABLE TERMINATED IN MER. NOTES: 1. MOUNTED 18" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED. 2. REFER TO LABELING DETAIL FOR LABELING SPECIFICATIONS. 3. QUANTITY= (2) CAT.6 NETWORK JACKs & (1) COAXIAL OUTLETS ARE DEPICTED ABOVE. 4-PORT FACEPLATE MINIMUM. FILL UN-USED PORTS WITH BLANKS. 4. REFER TO DIVISION 27 05 53 FOR LABELING REQUIREMENTS. 5. SEE ADDITIONAL DETAILS FOR POWER REQUIREMENTS NOTES: 1. CONTRACTOR TO PROVIDE BLANK COVERPLATE AT LOCATION WHERE JACKS ARE NOT INSTALLED. 2. COVERPLATE TO MATCH COLOR OF RECEPTACLE COVERPLATE. 4" SQUARE BOX WITH SINGLE GANG TRIM RING 1" CONDUIT STUBBED INTO NEAREST ACCESSIBLE CEILING CAVITY INSTALL PULL STRING IN CONDUIT, BUSHINGS AT BOTH ENDS SINGLEGANG BLANK COVERPLATE FOR REFERENCE CAT.6A DATA JACK IN-CEILING BRACKET PLENUM CAT.6A STRANDED PATCH CORD TO NETWORK DEVICE PLENUM SURFACE BOX XXXX Notes: 1. USED IN A PLENUM APPLICATION PLENUM RATED CAT.6A SOLID CABLE COUNT (2) CAT CABLES TERMINATED IN APPLICABLE TR CEILING BRACKET CLIP DROP WIRE/ROD PLENUM CAT.6A STRANDED PATCH CORD TO NETWORK DEVICE NOTES: 1. TWO CAT.6A NETWORK JACK DEPICTED ABOVE. 2. FOLLOW OWNER LABELING SCHEME. WIRLESS ACCESS POINT - MOUNTED BELOW CEILING HARD OR DROP CEILING NOTES: 1. MOUNTED 18" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED. 2. REFER TO LABELING DETAIL FOR LABELING SPECIFICATIONS. 3. ONE CAT.6 NETWORK JACK DEPICTED ABOVE. 4-PORT FACEPLATE MINIMUM. FILL UN-USED PORTS WITH BLANKS. 4. FOLLOW OWNER LABELING SCHEME. COMPUTER GENERATED LABEL COMPUTER GENERATED LABEL 4 - PORT FACEPLATE CAT 6 BLANK BLANKBLANK XXXX 1A-122 NOTES: 1. MOUNTED 18" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED. 2. REFER TO LABELING DETAIL FOR LABELING SPECIFICATIONS. 3. QUANTITY= SYMBOL COUNT OF CAT.6 NETWORK JACK ARE DEPICTED ABOVE. 4-PORT FACEPLATE MINIMUM. FILL UN-USED PORTS WITH BLANKS. 4. REFER TO DIVISION 27 05 53 FOR LABELING REQUIREMENTS. "X" COMPUTER GENERATED LABEL COMPUTER GENERATED LABEL4 - PORT FACEPLATE FILLED WITH QUANTITY SHOWN 1" CONDUIT TO ACCESSIBLE CEILING SPACECOUNT (X) CAT.6 CABLES TERMINATED IN MER. CAT 6 BLANK BLANKBLANK XXXX 1A-122 Notes: 1. ALL DEVICES ARE TO BE FASTENED TO BOX - NO LOOSE EQUIPMENT IS ALLOWED IN BOX 2. THIS DETAIL IS FOR ALL EXTERIOR CAMERAS 3. DEVICE EQUAL TO DITEK # DTK-MRJPOE CAT.6 BACK TO TELECOM ROOM (2) 1" NIPPLES / CAT.6 OPENINGS FOR LOW VOLTAGE. CAT.6 CABLE SHALL NOT EXCEED 4-TIMES OUTSIDE DIAMETER OF THE CABLE FOR BENDING RADIUS. SEAL PUNCH-OUT AFTER CABLE IS INSTALLED CAT. 6 TO BISCUIT #12 COPPER GROUND WIRE WITH SELF TAPPING GROUND SCREW GROUNDING TERMINAL BUILDING STEEL #12 COPPER GROUND .5" CONDUIT .5" CONDUIT TO EXTERIOR CAMERA 10' CABLING SERVICE COIL CAT.6 OUT TO CAMERA 6" X 6" X 6" STEEL ENCLOSURE WITH HINGED COVER AND LATCH. PLENUM RATED. WIRING PAIR COLORS - EIA/TIA 568B PAIR # ID PIN # BRAND MARKED CODE T1 5 WHITE/BLUE R1 4 BLUE/WHITE 1 T2 1 WHITE/ORANGE R2 2 ORANGE/WHITE 2 T3 3 WHITE/GREEN R3 6 GREEN/WHITE 3 T4 7 WHITE/BROWN R4 8 BROWN/WHITE 3 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 2 1 4 3 T568B PAIR # T568B T568B 12345678 RESPONSIBILITY SCOPE MATRIX NOTES SUGGESTED RESPONSIBILITY SCOPE MATRIX ITEM:SHOWN ON: FURNISHED BY: INSTALLED BY:NOTES:QTY: TECHNOLOGY ROUGH-IN (INCLUDES ALL LOW VOLTAGE SYSTEMS LISTED)E-SERIES E.C.E.C. 1 , 2 INFORMATION OUTLET FACEPLATES, JACKS AND TERMINATIONS E-SERIES T.C. T.C. CONDUIT SLEEVES - WHEN SHOWN E-SERIES E.C. E.C. CONDUIT SLEEVES - NOT SHOWN BUT REQUIRED FOR PROPER INSTALLATION N/A T.C. T.C. 4 TELECOMMUNICATION SYSTEMS ROUGH-IN E.C. E.C.E-SERIES 1 , 2 TELECOMMUNICATION EQUIPMENT, CABLING & TERMINATIONS E-SERIES T.C. T.C. LADDER RACK E-SERIES T.C. T.C. GROUNDING LUGS ON TECHNOLOGY EQUIPMENT (NOT SHOWN)T.C. T.C.N/A BONDING SYSTEM FOR TECHNOLOGY SYSTEM E-SERIES E.C. E.C. 3 CONNECTION OF TECHNOLOGY BONDING SYSTEM TO THE GROUND SYSTEM E-SERIES E.C. E.C. 3 LINE VOLTAGE POWER (+120V OR GREATER)E-SERIES E.C. E.C. 1 , 2 LINE VOLTAGE POWER FOR DOOR HARDWARE POWER SUPPLIES E-SERIES E.C. E.C. LOW VOLTAGE CABLING FOR TECHNOLOGY SYSTEMS & SECURITY E-SERIES T.C. T.C. J-HOOKS AND SUPPORTS OR OTHER ROUTING METHODS (OTHER THAN CONDUIT)T.C. T.C.N/A 4 FLOOR BOX (ROUGH-IN) E-SERIES E.C. E.C. SECURITY CAMERAS AND LICENSING FOR EACH CAMERA - INDOOR & OUTDOOR E-SERIES S.C. S.C. CAMERA RECORDING HARDWARE / SOFTWARE S.C. S.C.N/A CAMERA NETWORK WIRING & OUTDOOR CAMERA SURGE DEVICE - PART # DTK-MRJPOE N/A T.C. T.C. DOOR CONTROL SECURITY DEVICES N/A S.C. S.C. N/A S.C. S.C. N/A S.C. S.C. N/A S.C. S.C. DOOR CONTROL SOFTWARE SYSTEM DOOR CONTROL COMPUTER WORKSTATION HARDWARE REQUIREMENT DOOR CONTROL CABLING DOOR CONTROL CABLING E-SERIES T.C. T.C. INTERCOM SYSTEM DEVICES E-SERIES T.C. T.C. INTERCOM CABLING E-SERIES T.C. T.C. AV - EQUIPMENT CABINETS AV-SERIES S.C. S.C. AV - DEVICES AV-SERIES S.C. S.C. AV - NETWORK RELATED EQUIPMENT AND SOFTWARE AV-SERIES S.C. S.C. AV - CABLING FROM EQUIPMENT CABINETS TO DEVICES AV-SERIES S.C. S.C. AV - NETWORK CABLING FROM MER OR TR ROOM TO EQUIPMENT CABINETS AV-SERIES T.C. T.C. LIVE BARN - DEVICES, HEAD END SYSTEM AND WIRING NA DIGITAL SIGNAGE - MOUNTING HARDWARE AND MONITORS E-SERIES E.V. T.C. T.C. E.V. DIGITAL SIGNAGE - NETWORK CABLING E-SERIES T.C. T.C. NETWORK HARDWARE - SWITCHES, ROUTERS, CONTROLLERS, PC'S, PHONES, SERVERS, POS SYSTEM NA O.W. O.W. WIRELESS ACCESS POINTS NA O.W. T.C. 1. 2. 3. 4. 5. 6. LOCATIONS OF TECHNOLOGY ROUGH-INS SHALL BE INDICATED BY THE INFORMATION OUTLET SYMBOLS. INCLUDE BACKBOXES AND CONDUIT REQUIRED FOR THE TECHNOLOGY SYSTEM INSTALLATION. THE E.C. SHALL BASE THE BID ON BASIS OF CONTRACT DOCUMENTS. INCLUDES ALL CONDUCTORS , GROUND BARS, AND TERMINATIONS FOR THE COMPLETE BONDING SYSTEM REQUIRED BY THE SPECIFICATIONS. SIZE APPROPRIATELY FOR 40% FILL RATIO'S NOT USED VERIFY SIZES PRIOR TO PURCHASE WITH OWNER Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: NTS: MATRIX WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E7.2 10/04/2023 220025.00 C2023-15 NTS:1 WALL MOUNTED VOICE OUTLET NTS:2 TV OUTLET NTS:3 TYPICAL TELECOM BOX/CONDUIT ROUGH-IN NTS:4 WIRELESS OUTLET DETAIL NTS:6 DATA ONLY TELECOM OUTLET NTS:5 DATA "QTY" TELECOM OUTLET NTS:7 OUTDOOR CAMERA SURGE DEVICE NTS:8 568B WIRING CONFIGURATION NTS:9 SCOPE MATRIX 10/13/202310/04/2023 BID DOCUMENT SET 12 Volt VDC Lock Output (Optional 24VDC) Door Contact & REX Input In & Out Wiegand Reader Ports (READER 1) NETWORK PORT Green LEDRed LED Cable Pass Through "External Status LEDs" POWER SUPPLY HIRSCH - BATTERY CABINET BATTERY 1313 BATTERY 12 HIRSCH - CONTROLLER POE SWITCH DOOR STRIKE CARDSWIPE READER DOOR POSITION SWITCH NETWORK ROUTER 1 NETWORK ROUTER - APAI 2 3 4 5 6 7 8 DOOR POSITION SWITCH - CPCI 10 11 APAI = OWNER PROVIDED, OWNER INSTALLED HIRSCH - CABINET10 11 2 1 3 4 7 REQUEST TO EXIT 9 NETWORK SWITCH - APAI CENTRAL PROCESSOR - CPCI APCI = OWNER PROVIDED, CONTRACTOR INSTALLED SERVER SOFTWARE LICENSE - CPCI 5 CPCI = CONTRACTOR PROVIDED, CONTRACTOR INSTALLED ALL CABLING - CPCI READER / KEYPAD - CPCI DOOR STRIKE - 8P8I 8P8I = DIVISION 8 CONTRACTOR PROVIDED, DIVISION 8 CONTRACTOR INSTALLED HIRSCH CONTROLLER CABINET - CPCI HIRSCH CONTROLLER - CPCI BATTERY CABINET - CPCI BATTERIES - CPCI 9 REQUEST TO EXIT - CPCI 12 13 6 8 Manufacurer Power SupliesRequest To ExitAces Control BoardReadersDoor StrikesDoor SwitchesCableAltronix DSAL600ULACMCB Bosch DS160 HID Multiclass Wall Reader HES Surface Mount 951WG ALPHA Reader Cable (22 AWG) 5-conductor - Stranded with overall shield 1295 REX Cable (22 AWG) 4-conductor - Stranded with overall shield ALPHA Door Switch (22 AWG) 2-conductor - Stranded with overall shield 1292 HID Multiclass Mullion Reader HID Keypad Reader HES Flush Mount Honeywell Ademco 8000C 9600 Hirsch MX-8-N3 SE-RP40 SE-RP15 5355AGK00 Notes: 1. VIEW IS FROM NON-SECURE SIDE OF DOOR 2. PROVIDE PULL STRINGS IN ALL EMPTY CONDUITS 3. E.C. TO FURNISH AND INSTALL DOOR ACCESS WIRING TO CRASHBAR FOR ELECTRIC LATCH TO COMPRESS AND AUTODOOR SHALL OPERATE OPEN/CLOSE UPON ACTIVATION OF THE CARD READER 4. E.C. TO INSTALL ALL WIRING REQUIRED FOR AUTO-DOOR SYSTEM 5. COORDINATE ALL DEVICE LOCATIONS WITH G.C. PRIOR TO ROUGH-IN Notes: 1. VIEW IS FROM NON-SECURE SIDE OF DOOR 2. PROVIDE PULL STRINGS IN ALL EMPTY CONDUITS 3. E.C. TO FURNISH AND INSTALL DOOR ACCESS WIRING TO CRASHBAR FOR ELECTRIC LATCH TO COMPRESS AND AUTODOOR SHALL OPERATE OPEN/CLOSE UPON ACTIVATION OF THE CARD READER 4. E.C. TO INSTALL ALL WIRING REQUIRED FOR AUTO-DOOR SYSTEM 5. COORDINATE ALL DEVICE LOCATIONS WITH G.C. PRIOR TO ROUGH-IN Notes: 1. VIEW IS FROM NON-SECURE SIDE OF DOOR 2. PROVIDE PULL STRINGS IN ALL EMPTY CONDUITS 3. DOOR HANDLE ON SECURE SIDE IS TO RELEASE THE ELECTRIC STRIKE UPON ACTIVATION 4. 5. COORDINATE ALL DEVICE LOCATIONS WITH G.C. PRIOR TO ROUGH-IN Notes: 1. VIEW IS FROM NON-SECURE SIDE OF DOOR 2. PROVIDE PULL STRINGS IN ALL EMPTY CONDUITS 3. DOOR HANDLE ON SECURE SIDE IS TO RELEASE THE ELECTRIC STRIKE UPON ACTIVATION 4. 5. COORDINATE ALL DEVICE LOCATIONS WITH G.C. PRIOR TO ROUGH-IN Notes: 1. VIEW IS FROM NON-SECURE SIDE OF DOOR 2. PROVIDE PULL STRINGS IN ALL EMPTY CONDUITS 3. DOOR HANDLE ON SECURE SIDE IS TO RELEASE THE ELECTRIC STRIKE UPON ACTIVATION 4. 5. COORDINATE ALL DEVICE LOCATIONS WITH G.C. PRIOR TO ROUGH-IN SINGLE MULTI-CONDUCTOR CABLE - AKA SMART CABLE OR CAT.6 CABLE 8" X 8" BREAKOUT JUNCTION BOX 1/2" CONDUIT AUTO OPENER POWER SUPPLY 1/2" CONDUIT AUTO DOOR PUSH BUTTON SECURED DOUBLE DOOR DETAIL AUTOMATIC / HANDICAPPED CONTROL 1/2" CONDUIT 8" X 8" BREAKOUT JUNCTION BOX 1/2" CONDUIT CRASH BAR WITH ELECTRIC OPERATOR LATCH SHALL RECESS ON OPERATION OF CARD READER PROVIDED WITH SHUNT SWITCH FOR NO ALARM ON EGRESS AUTO OPENER POWER SUPPLY AUTO DOOR PUSH BUTTON SECURED DOOR DETAIL AUTOMATIC / HANDICAPPED CONTROL 1/2" CONDUIT ELECTRIC HINGE FURNISHED WITH DOOR HARDWARE ELECTRIC HINGE FURNISHED WITH DOOR HARDWARE CARD READER IN 4" SQUARE OUTLET BOX WITH SINGLE GANG TRIM RING 3 PAIR SHIELDED CONDUCTORS 8" X 8" BREAKOUT JUNCTION BOX 1/2" CONDUIT AUTO OPENER POWER SUPPLY 2 CONDUCTOR 22 GAUGE DOOR POSITION SWITCH SECURED DOOR DETAIL DOOR HANDLE CONTROL 1/2" CONDUIT WIRE PASS THROUGH HINGE FURNISHED WITH DOOR HARDWARE CARD READER IN 4" SQUARE OUTLET BOX WITH SINGLE GANG TRIM RING 3 PAIR SHIELDED CONDUCTORS CRASH BAR WITH ELECTRIC OPERATOR LATCH SHALL RECESS ON OPERATION OF CARD READER PROVIDED WITH SHUNT SWITCH FOR NO ALARM ON EGRESS CRASH BAR WITH ELECTRIC OPERATOR LATCH SHALL RECESS ON OPERATION OF CARD READER PROVIDED WITH SHUNT SWITCH FOR NO ALARM ON EGRESS FRAME WILL BE GROUTED. COORDINATE CABLE ROUTING WITH G.C. FRAME WILL BE GROUTED. COORDINATE CABLE ROUTING WITH G.C. ONE 16/2 FROM HINGE TO J-BOX ONE 16/2 FROM HINGE TO J-BOX ONE 16/2 FROM HINGE TO J-BOX HANDLE WITH SHUNT SWITCH FOR NO ALARM ON EGRESS AND TO DEACTIVATE ELECTRIC STRIKE FOR FREE PASSTHRU MORTAR BOX FOR ELECTRIC STRIKE FURNISHED WITH DOOR FRAME SINGLE MULTI-CONDUCTOR CABLE - AKA SMART CABLE OR CAT.6 CABLE SINGLE MULTI-CONDUCTOR CABLE - AKA SMART CABLE OR CAT.6 CABLE CARD ACCESS CONTROLLER IF NEEDED CARD ACCESS CONTROLLER IF NEEDED CARD ACCESS CONTROLLER IF NEEDED 8" X 8" BREAKOUT JUNCTION BOX 1/2" CONDUIT AUTO OPENER POWER SUPPLY 2 CONDUCTOR 22 GAUGE DOOR POSITION SWITCH SECURED DOOR DETAIL WITH CRASH BAR 1/2" CONDUIT CARD READER IN 4" SQUARE OUTLET BOX WITH SINGLE GANG TRIM RING 3 PAIR SHIELDED CONDUCTORS ONE 16/2 FROM HINGE TO J-BOX MORTAR BOX FOR ELECTRIC STRIKE FURNISHED WITH DOOR FRAME SINGLE MULTI-CONDUCTOR CABLE - AKA SMART CABLE OR CAT.6 CABLE CARD ACCESS CONTROLLER IF NEEDED CRASH BAR WITH SHUNT SWITCH FOR NO ALARM ON EGRESS ELECTRIC HINGE FURNISHED WITH DOOR HARDWARE 8" X 8" BREAKOUT JUNCTION BOX 1/2" CONDUIT AUTO OPENER POWER SUPPLY 2 CONDUCTOR 22 GAUGE DOOR POSITION SWITCH SECURED DOOR DETAIL DOOR HANDLE CONTROL 1/2" CONDUIT CARD READER IN 4" SQUARE OUTLET BOX WITH SINGLE GANG TRIM RING 3 PAIR SHIELDED CONDUCTORS ONE 16/2 FROM HINGE TO J-BOX MORTAR BOX FOR ELECTRIC STRIKE FURNISHED WITH DOOR FRAME SINGLE MULTI-CONDUCTOR CABLE - AKA SMART CABLE OR CAT.6 CABLE CARD ACCESS CONTROLLER IF NEEDED CRASH BAR WITH ELECTRIC OPERATOR LATCH SHALL RECESS ON OPERATION OF CARD READER PROVIDED WITH SHUNT SWITCH FOR NO ALARM ON EGRESS ELECTRIC HINGE FURNISHED WITH DOOR HARDWARE AUTO DOOR PUSH BUTTON SECURE SIDE CARD READER IN 4" SQUARE OUTLET BOX WITH SINGLE GANG TRIM RING 3 PAIR SHIELDED CONDUCTORS AUTO DOOR PUSH BUTTON SECURE SIDE CARD READER ALSO ON SECURED SIDE Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated CARD ACCESS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E7.3 10/04/2023 220025.00 C2023-15 NTS:1 CARD ACCESS DETAILS NTS:2 CARD ACCESS PRODUCT NTS3DOOR ROUGH-IN DETAILS 10/13/202310/04/2023 BID DOCUMENT SET ROUTE CONDUIT IN NEW WALL AND EXPOSED TO TO NEAREST ACCESSIBLE CEILING WALL MOUNT BRACKET VICON PART # V1001-WM2X4 BACKBOX AND GROMMET FOR CABLE OPENING 4X4 BACKBOX AND GROMMET FOR CABLE OPENING BEAM DRYWALL OR CONCRETE 4X4 BACKBOX AND GROMMET FOR CABLE OPENING GRID CEILING TILE TO CUT FOR RECESSED BOX. PROVIDE SUPPORT WIRES TO STRUCTURE. MOUNT PER MANUFACTURERS RECOMMENDATIONS. SUPPORT WIRES, PROVIDE CONNECTION TO STEEL 4X4 BACKBOX AND GROMMET FOR CABLE OPENING Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: NTS CAMERA SCEDULE WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E7.4 10/04/2023 220025.00 C2023-15 NTS2CAMERA OUTDOOR WALL MOUNT DETAIL NTS3CAMERA BEAM MOUNT DETAIL NTS4CAMERA WALL MOUNT DETAIL NTS5CAMERA SUSPENDED CEILING MOUNT DETAIL NTS1CAMERA SCHEDULE 10/13/202310/04/2023 BID DOCUMENT SET S ELEC 134E7.5 2 3 4 52 7 4 8 8 6 9 5 18' - 0" 17 2 1 6 8 11' - 8"18' - 0 1/2" 2 1 9 11' - 8" 5 1 42 7 6 10 11 12 13 15 1. 3/4" PAINTED PLYWOOD - HORIZONTAL AT 24" AFF (CFCI) 2. WALL MOUNTED WALL CABINET (CFCI) 3. VERTICAL MANAGER - DOUBLE SIDED WITH DOORS (CFCI) 4. WALL MOUNTED GROUND BAR (CFCI) 5. 4" UL 1479 RATED THROUGH-PENETRATION FIRE STOP (CFCI) 6. 18" WIDE CABLE RUNWAY (CFCI) 7. GROUNDED 30A, 208V TWISTLOCK (L6-30) RECEPTACLE MOUNTED ADJACENT TO WALL MOUNT RACK. (CFCI) 8. PROVIDER D-MARK TERMINATION LOCATION. 9. DOOR ACCESS AND OTHER SYSTEMS TERMINATION AREA 10. 1RU FIBER ENCLOSURE (CFCI) 11. 2RU HORIZONTAL WIRE MANAGER (CFCI) 12. 2RU 48 PORT MODULAR PATCH PANEL (CFCI) 13. 2RU 48 PORT NETWORK SWITCH (OPOI) 14. VERTICAL PDU - EQUAL TO TRIPLITE PART # PDUV30HV (CFCI) 15. HORIZONTAL PDU - EQUAL TO TRIPLITE PART # DRS-1215 (CFCI) 16. SPACE ALLOCATED FOR OWNER EQUIPMENT (OFOI) 17. SITE CONDUITS ENTRANCE POINT (CFCI) PLAN NOTES:## 1. 48 PORT PATCH PANELS ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR TO PROVIDE AND INSTALL QUANTITIES AS REQUIRED TO TERMINATE ALL UTP CABLES 2. CONTRACTOR TO COORDINATE AND VERIFY ROOM BUILDOUT REQUIREMENT WITH OWNER PRIOR TO CONSTRUCTION START OF ROOM. 3. C = CONTRACTOR 4. O = OWNER 5. F = FURNIISHED 6. I = INSTALLED GENERAL NOTES: Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated SYSTEM DETAILS –ELEC. RM 134 WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E7.5 10/04/2023 220025.00 C2023-15 3/8" = 1'-0"1 ELEC. RM 134 -ROOM DETAIL 3/8" = 1'-0"2 Elevation 1 -a 3/8" = 1'-0"3 Elevation 1 -b 3/8" = 1'-0"4 Elevation 1 -c 3/8" = 1'-0"5 Elevation 1 -d 3/4" = 1'-0"6 WALL CABINET LAYOUT 10/13/202310/04/2023 BID DOCUMENT SET IT 150 E7.6 2 3 4 5 17 7 2 3 2 3 7 5 4 6 6 3 3 5 5 19' - 11 3/4" 77 4 9 1 2 2 1 6 9 7' - 7" 3 2 3 19' - 11 3/4" 9 11 8 17 17 5 7' - 7 3/4" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 NOTE: PDU AND UPS POWER OUTLETS GET MOUNTED FACING THE BACK OF THE RACKS 2 14 7 33 10 11 12 11 11 13 15 TYPICAL 2- POST RACK LAYOUT 1. 48 PORT PATCH PANELS ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR TO PROVIDE AND INSTALL QUANTITIES AS REQUIRED TO TERMINATE ALL UTP CABLES 2. CONTRACTOR TO COORDINATE AND VERIFY ROOM BUILDOUT REQUIREMENT WITH OWNER PRIOR TO CONSTRUCTION START OF ROOM. 3. C = CONTRACTOR 4. O = OWNER 5. F = FURNIISHED 6. I = INSTALLED GENERAL NOTES: 1. 3/4" PAINTED PLYWOOD - HORIZONTAL AT 24" AFF (CFCI) 2. 2-POST FLOOR RACK (CFCI) 3. VERTICAL MANAGER - (10") - DOUBLE SIDED WITH DOORS (CFCI) 4. WALL MOUNTED GROUND BAR (CFCI) 5. 4" UL 1479 RATED THROUGH-PENETRATION FIRE STOP (CFCI) 6. 18" WIDE CABLE RUNWAY (CFCI) 7. GROUNDED 30A, 208V TWISTLOCK (L6-30) RECEPTACLE MOUNTED ADJACENT TO WALL MOUNT RACK. (CFCI) 8. PROVIDER D-MARK TERMINATION LOCATION. 9. DOOR ACCESS AND OTHER SYSTEMS TERMINATION AREA 10. 2RU FIBER ENCLOSURE (CFCI) 11. 2RU HORIZONTAL WIRE MANAGER (CFCI) 12. 2RU 48 PORT MODULAR PATCH PANEL (CFCI) 13. 2RU 48 PORT NETWORK SWITCH (OPOI) 1RU FIBER ENCLOSURE (CFCI) PLAN NOTES:## 14. VERTICAL PDU - EQUAL TO TRIPLITE PART # PDUV30HV (CFCI) 15. HORIZONTAL PDU - EQUAL TO TRIPLITE PART # DRS-1215 (CFCI) 16. SPACE ALLOCATED FOR OWNER EQUIPMENT (OFOI) 17. SITE CONDUITS ENTRANCE POINT (CFCI) Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated SYSTEM DETAILS –IT RM 150 WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E7.6 10/04/2023 220025.00 C2023-15 3/8" = 1'-0"1 IT RM 150 -ROOM DETAIL 3/8" = 1'-0"2 Elevation 2 -a 3/8" = 1'-0"3 Elevation 2 -b 3/8" = 1'-0"4 Elevation 2 -c 3/8" = 1'-0"5 Elevation 2 -d NTS6IT RM 150 -ROOM DETAIL 10/13/202310/04/2023 BID DOCUMENT SET IT/GEN STORAGE 176 E7.7 2 3 4 5 4 1 7 26 5 8' - 5 3/4" 1 24 7 6 2 8' - 5 3/4" 5 10 11 12 13 15 1. 3/4" PAINTED PLYWOOD - HORIZONTAL AT 24" AFF (CFCI) 2. WALL MOUNTED WALL CABINET (CFCI) 3. VERTICAL MANAGER - DOUBLE SIDED WITH DOORS (CFCI) 4. WALL MOUNTED GROUND BAR (CFCI) 5. 4" UL 1479 RATED THROUGH-PENETRATION FIRE STOP (CFCI) 6. 18" WIDE CABLE RUNWAY (CFCI) 7. GROUNDED 30A, 208V TWISTLOCK (L6-30) RECEPTACLE MOUNTED ADJACENT TO WALL MOUNT RACK. (CFCI) 8. PROVIDER D-MARK TERMINATION LOCATION. 9. DOOR ACCESS AND OTHER SYSTEMS TERMINATION AREA 10. 1RU FIBER ENCLOSURE (CFCI) 11. 2RU HORIZONTAL WIRE MANAGER (CFCI) 12. 2RU 48 PORT MODULAR PATCH PANEL (CFCI) 13. 2RU 48 PORT NETWORK SWITCH (OPOI) PLAN NOTES: ## 14. VERTICAL PDU - EQUAL TO TRIPLITE PART # PDUV30HV (CFCI) 15. HORIZONTAL PDU - EQUAL TO TRIPLITE PART # DRS-1215 (CFCI) 16. SPACE ALLOCATED FOR OWNER EQUIPMENT (OFOI) 1. 48 PORT PATCH PANELS ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR TO PROVIDE AND INSTALL QUANTITIES AS REQUIRED TO TERMINATE ALL UTP CABLES 2. CONTRACTOR TO COORDINATE AND VERIFY ROOM BUILDOUT REQUIREMENT WITH OWNER PRIOR TO CONSTRUCTION START OF ROOM. 3. C = CONTRACTOR 4. O = OWNER 5. F = FURNIISHED 6. I = INSTALLED GENERAL NOTES: Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated SYSTEM DETAILS –IT/GEN STORAGE RM 176 WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E7.7 10/04/2023 220025.00 C2023-15 3/8" = 1'-0"1 IT/GEN STORAGE RM 176 -ROOM DETAIL 3/8" = 1'-0"2 Elevation 3 -a 3/8" = 1'-0"3 Elevation 3 -b 3/8" = 1'-0"4 Elevation 3 -c 3/8" = 1'-0"5 Elevation 3 -d 3/4" = 1'-0"6 WALL CABINET LAYOUT RM 176 10/13/202310/04/2023 BID DOCUMENT SET SSTOR 104 E7.8 3 2 5 4 1 4 7 6 2 5 12' - 7 1/2" 6 4 1 2 7 12' - 0 3/4" 2 5 12' - 7 1/2"12' - 0 3/4" 1. 48 PORT PATCH PANELS ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR TO PROVIDE AND INSTALL QUANTITIES AS REQUIRED TO TERMINATE ALL UTP CABLES 2. CONTRACTOR TO COORDINATE AND VERIFY ROOM BUILDOUT REQUIREMENT WITH OWNER PRIOR TO CONSTRUCTION START OF ROOM. 3. C = CONTRACTOR 4. O = OWNER 5. F = FURNIISHED 6. I = INSTALLED GENERAL NOTES: 1. 3/4" PAINTED PLYWOOD - HORIZONTAL AT 24" AFF (CFCI) 2. WALL MOUNTED WALL CABINET (CFCI) 3. VERTICAL MANAGER - DOUBLE SIDED WITH DOORS (CFCI) 4. WALL MOUNTED GROUND BAR (CFCI) 5. 4" UL 1479 RATED THROUGH-PENETRATION FIRE STOP (CFCI) 6. 18" WIDE CABLE RUNWAY (CFCI) 7. GROUNDED 30A, 208V TWISTLOCK (L6-30) RECEPTACLE MOUNTED ADJACENT TO WALL MOUNT RACK. (CFCI) 8. PROVIDER D-MARK TERMINATION LOCATION. 9. DOOR ACCESS AND OTHER SYSTEMS TERMINATION AREA 10. 1RU FIBER ENCLOSURE (CFCI) 11. 2RU HORIZONTAL WIRE MANAGER (CFCI) 12. 2RU 48 PORT MODULAR PATCH PANEL (CFCI) 13. 2RU 48 PORT NETWORK SWITCH (OPOI) PLAN NOTES: ## 14. VERTICAL PDU - EQUAL TO TRIPLITE PART # PDUV30HV (CFCI) 15. HORIZONTAL PDU - EQUAL TO TRIPLITE PART # DRS-1215 (CFCI) 16. SPACE ALLOCATED FOR OWNER EQUIPMENT (OFOI) 10 11 12 13 15 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated SYSTEM DETAILS – STORAGE RM 104 WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E7.8 10/04/2023 220025.00 C2023-15 3/8" = 1'-0"1 IT/GEN STORAGE RM 176 -ROOM DETAIL 3/8" = 1'-0"2 Elevation 4 -d 3/8" = 1'-0"3 Elevation 4 -a 3/8" = 1'-0"4 Elevation 4 -b 3/8" = 1'-0"5 Elevation 4 -c 3/4" = 1'-0"6 WALL CABINET LAYOUT RM 104 10/13/202310/04/2023 BID DOCUMENT SET O I ■PRODUCT DRAWING IP65 IK08265(10-7/16")150(5-7/8")235(9-1/4")LAN FIG. NAME FIG.NO. UNIT REVISION 1/8 PAGE DATE mm 1 ■PRODUCT DRAWING 220(8-11/16")172(6-3/4")PRODUCT DRAWING/SPECIFICATIONS APPROVAL CONFIRMATION MAKING 60.5(2-3/8")UNIT CENTER CAMERA COMMUNICATION CALL INDICATOR STATUS INDICATOR (ORANGE/BLUE) CAMERA MICROPHONE DOOR RELEASE INDICATOR (GREEN) LED FOR NIGHT ILLUMINATION SPEAKER CALL BUTTON FRONT PANEL PACKING BOX ■SPECIFICATIONS POWER SOURCE CURRENT CONSUMPTION TYPE OF COMMUNICATION CAMERA MINIMUM ILLUMINATION LAN AUDIO CODEC VIDEO CODEC PROTOCOL ENCRYPTION METHOD PACKET DELIVERY NUMBER OF CALLED STATIONS AMBIENT TEMPERATURE MOUNTING MATERIAL UNIT COLOR WEIGHT IP RATING IK RATING REMARKS DESCRIPTION VIDEO DOOR STATION MODEL NO.FIG.NO. PRODUCT DRAWING/SPECIFICATIONS FIG. NAME PAGE 1/5 REVISION 1 UNIT mm DATE ONVIF PROFILE S SUPPORT UNIT: APPROX.1.2kg (2.7 lbs) / BOX: APPROX.690g (1.53 lbs) FRONT PANEL: SILVER / MAIN UNIT: BLACK / BOX: BLACK(ELECTRODEPOSITION COATING) FRONT PANEL: STAINLESS STEEL, VERTICAL ALIGNMENT FINISHED / MAIN UNIT: SELF-EXTINGUISHING ABS RESIN / BOX: SPCC 1.2 FLUSH WALL-MOUNT -40~+60℃(-40~+140°F) 20 STATIONS UNICAST, MULTICAST TLS1.0, TLS1.1, TLS1.2 IPv4, IPv6, TCP, UDP, SIP, HTTP, HTTPS, RTSP, RTP, RTCP, IGMP, MLD, SMTP, SFTP, DHCP, NTP, DNS H.264/AVC, MOTION JPEG G.711(µ-LAW, А-LAW)、G.722 ETHERNET(10BASE-T, 100BASE-TX) AUTO MDI/MDI-X-COMPATIBLE 5 LUX 1/3-TYPE COLOR CMOS, SXVGA 1280 X 960(APPROX. 1.2 MILLION PIXELS) HANDS-FREE: AUTOMATIC VOICE SWITCHING POWER-OVER-ETHERNET STANDBY: 55mA/STANDBY WITH CONTINUOUS RECORDING: 77mA MAXIMUM: 155mA 24V DC EXTERNAL POWER SUPPLY STANDBY: 94mA/STANDBY WITH CONTINUOUS RECORDING: 140mA MAXIMUM: 300mA POWER-OVER-ETHERNET(IEEE 802.3AF/AT CLASS 0)/ 24V DC EXTERNAL POWER SUPPLY APPROVAL CONFIRMATION MAKING POWER SOURCE CURRENT CONSUMPTION TYPE OF COMMUNICATION CAMERA ■SPECIFICATIONS MONITOR AUDIO CODEC VIDEO CODEC PROTOCOL ENCRYPTION METHOD PACKET DELIVERY NUMBER OF STATIONS IN ADDRESS BOOK AMBIENT TEMPERATURE MOUNTING ELECTRICAL BOX MATERIAL UNIT COLOR WEIGHT REMARKS DESCRIPTION MASTER STATION MODEL NO. POWER-OVER-ETHERNET(IEEE 802.3AF CLASS 0) STANDBY 66mA, MAXIMUM 155mA HANDS-FREE: AUTOMATIC VOICE SWITCHING/TOUCH-TO-TALK 7" TFT LCD DISPLAY, WVGA 800 X 480 (APPROX. 1.15 MILLION PIXELS) 1/4-TYPE CMOS, VGA 640 X 480 (APPROX. 300,000 PIXELS) ETHERNET(10BASE-T, 100BASE-TX) AUTO MDI/MDI-X-COMPATIBLE G.711(µ-LAW, А-LAW)、G.722 H.264/AVC, MOTION JPEG IPv4, IPv6, TCP, UDP, SIP, HTTP, HTTPS, RTSP, RTP, RTCP, IGMP, MLD, SMTP, SFTP, DHCP, NTP, DNS TLS1.0, TLS1.1, TLS1.2 UNICAST, MULTICAST 500 STATIONS 0~40℃(32~104°F) DESKTOP USE (WITH DESKTOP STAND) OR WALL-MOUNT 3-GANG BOX SELF-EXTINGUISHING ABS RESIN FLAT BLACK (N2 MUNSELL APPROXIMATION) 680g (APPROX.)(1.5 lbs) (WHEN USED WITH DESK STAND: 870g (APPROX.)(1.92 lbs)) ONVIF PROFILE S SUPPORT UNIT CENTER CAMERA POSITION 75.5(3")SPEAKER HOME BUTTON MICROPHONE 3.5mm 4-CONDUCTOR MINI JACK MICRO-SD CARD SLOT RESET BUTTON LIQUID CRYSTAL DISPLAY (TOUCH SCREEN) STATUS INDICATOR LIGHT (ORANGE/BLUE) PRIVACY MASK LEVER (ON TOP) CAMERA MOUNTING BRACKET 31.7 (1-1/4") OWNER PROVIDED NETWORK POE SWITCH CAT.6 PLENUM (MINIMUM) CAT.6 PLENUM (MINIMUM) AIPHONE A/V MASTER STATION PART # IX-MV7 AIPHONE A/V FLUSH DOOR STATION - PART # IX-DVF INTERCOM DOOR STRIKE BY DIV.8 (2) COND. 16 GAUGE (MINIMUM) RELAY OUTPUT BACK PANEL RECEPTION ENTRANCE DOOR AIPHONE A/V MASTER STATION PART # IX-MV7 SKATE RENTAL - 108 ADMINISTRATION - 112 (GREEN) INDICATOR (ORANGE) CENTER 50(1-15/16") 60(2-3/8") 60(2-3/8") 10(3/8") IX-DVF 2.5(1/8") POWER Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: NTS INTERCOM DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E7.9 10/04/2023 220025.00 C2023-15 NTS1INTERCOM 10/13/202310/04/2023 BID DOCUMENT SET MAIN SWITCHBOARD "MSB" 3000AMP. 480/277V, 3∅, 4W, MIN. 65,000 AIC SPD 60A 3P 800A 3P 800A 3P 600A 3P 800A 3P M UTILITY APPROVED TRANSOCKET 3000A, 480Y/277V, 3PH, 4W ALLIANT ENERGY TRANSFORMER NEAR SOUTHEAST CORNER OF BUILDING SPARE 3000A 3P LSIG INCOMING UNDERGROUND ELECTRICAL UTILITY SERVICE BY WE ENERGIES 6 E8.0 M REFRIGERATION MCC T-1 75 KVA, 480:208Y/120V, 3PH, 4W T-2 112.5 KVA, 480:208Y/120V, 3PH, 4W T-7 75 KVA, 480:208Y/120V, 3PH, 4W 600A 3P T-4 75 KVA, 480:208Y/120V, 3PH, 4W ELECTRIC RM 157 ELECTRIC RM 113 ELECTRIC RM 169 RECEIVING RM 160 2 E8.0 1 E8.0 3 E8.0 60A, 3P NF 60AS/60AF PMS SWITCH ELEVATOR-1 LP1 (L) LP1 (R) LP2 (L) LP2 (R) LP3 (L) LP3 (R) LP4 (L) LP4 (R) HL3 LTG. INV. HL2 DP2DP1 DP3 DP4 71 71 8 63 63 61 63 61 12121212 48 48 54 54 5454 10 10 10 MP1 48 T-3 75 KVA, 480:208Y/120V, 3PH, 4W 12 54 T-5 75 KVA, 480:208Y/120V, 3PH, 4W LP5 12 51 HL1 48 LTG. INV. 9 999 4 E8.0 5 E8.0 5 E8.0 8 E8.0 T-7 75 KVA, 480:208Y/120V, 3PH, 4W LP6 12 51 T-8 75 KVA, 480:208Y/120V, 3PH, 4W EV 12 54 LCPC 7 E8.0 LS1 LS2 LCPB LCPA LTG. INV. 5 E8.0 LS3 7 E8.0 7 E8.0 HL4 LCPB LTG. INV. 5 E8.0 LS4 7 E8.0 150A 3P ELECTRIC RM 157 ELECTRIC RM 157 ELECTRIC RM 157 ELECTRIC RM 157 ELECTRIC RM 157 ELECTRIC RM 157 ELECTRIC RM 113 ELECTRIC RM 113 ELECTRIC RM 113 ELECTRIC RM 113 ELECTRIC RM 113 ELECTRIC RM 169 ELECTRIC RM 169 ELECTRIC RM 169 ELECTRIC RM 169 ELECTRIC RM 169 ELECTRIC RM 169 RECEIVING RM 160 RECEIVING RM 160 ELECTRIC RM 134 RECEIVING RM 160 RECEIVING RM 160 RECEIVING RM 160 RECEIVING RM 160 3/4" PLYWOOD INSULATOR TWO-HOLE COPPER COMPRESSION LUG BOLTED TO GROUND BUS 3/0 BARE COPPER TO BUILDING MAIN SERVICE GROUND BAR NOTES: 1.TELECOMMUNICATIONS CONTRACTOR SHALL BOND ALL RACKS AND ENCLOSURES TO THE GROUND BUS BAR WITH WIRING SIZE TBB SCHEDULE. 2.LENGTH OF BUS BAR SHALL BE ADEQUATE TO GROUND ALL EQUIPMENT AND HAVE ROOM FOR 20% GROWTH. 3.ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL TMGB AND TMG AS INDICATED BY DRAWINGS. EC TO COORDINATE WITH TELECOMMUNICATIONS CONTRACTOR THE SIZE OF GROUND BUS BAR TO BE INSTALLED. 4.NEW GROUNDING BACKBONE TO INCLUDE NEW GROUNDING BUSBAR AND GROUNDING CONDUCTOR AT APPLICABLE LOCATIONS, INCLUDING SOURCE OF TELECOMMUNICATIONS GROUND. 20"x4"x1/4" COPPER PLATE #4 AWG.#6 AWG. BUILDING STEEL GROUND RODS EXTERIOR DRIVEN WATER PIPE GROUND BUS GROUND TO STREET SIDE OF SERVICE ENTRANCE WATER METER IN ACCORDANCE WITH ARTICLE 250 OF THE CURRENT NEC. NFPA 70. SIZE GROUNDING ELECTRODE CONDUCTOR FOR SERVICE AND TRANSFORMER IN ACCORDANCE WITH THE CURRENT NEC. AND LOCAL REQUIREMENTS. CONCRETE ENCASED ELECTRODE IN FOOTING. SEE SPECIFICATION 26 05 26 GROUNDING AND BONDING FOR MORE INFORMATION. COORDINATE LOCATION WITH STRUCTURAL CONTRACTOR. GROUNDING ELECTRODE CONDUCTOR G N EQUIPMENT GROUNDING CONDUCTOR. SEE FEEDER SCHEDULE FOR SIZE.A B C 480V SEE FEEDER SCHEDULE FOR SIZE. DRY-TYPE TRANSFORMER 208Y/120V SEE FEEDER SCHEDULE FOR SIZE. ISOLATED NEUTRAL TERMINAL BAR. SYSTEM BONDING JUMPER. SEE GROUND/BONDING TABLE FOR SIZE. GROUNDING ELECTRODE CONDUCTOR. SEE GROUND/BONDING TABLE FOR SIZE. N NEAREST GROUNDING ELECTRODE. SUPPLY SIDE BONDING JUMPERS. SEE GROUND/BUILDING TABLE FOR SIZE. GROUND/BONDING TABLE COPPER EQUIPMENT BONDING JUMPER SYSTEM BONDING JUMPER GROUNDING ELECTRODE CONDUCTOR 15 #8 30 #6 45 #6 75 #2 112.5 #1/0 150 #2/0 200 #3/0 225 #3/0 TRANSFORMER KVA 1. ELECTRICAL CONTRACTOR TO COORDINATE ALL WORK FOR SERVICES WITH LOCAL UTILITY. OBTAIN ALL NECESARY APPROVIALS, PERMITS AND INSPECTIONS, COORDINATE AND SCHEDULE ALL WORK WITH THE SERVING UTILITY CO. 2. PROVIDE A 4" REINFORCED CONCTRETE HOUSEKEEPING PAD UNDER ALL FLOOR MOUNTED ELECTRICAL EQUIPMENT. 3. REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR ADDITIONAL EQUIPMENT LOCATIONS AND SIZES. 4. VERIFY WITH LOCAL UTILITY THAT THIS CONTRACTOR NEED ONLY PROVIDE EMPTY CONDUITS TO UTILITY PAD MOUNTED TRANSFORMER SECONDARY AND THAT THE UTILITY SHALL PROVIDE AND INSTALL SERVICE ENTRANCE CONDUCTORS. 5. FAULT CURRENT INDICATED IS PROVIDED FOR BIDDING PURPOSES ONLY. ALL EQUIPMENT INCLUDING CIRCUIT BREAKERS SHALL BE FULLY RATED, SERIES RATING NOT ACCEPTABLE. THE CONTRACTOR SHALL VERIFY WITH A WRITTEN STATEMENT FROM THE UTILITY THE MAXIUM SHORT CIRCUIT CAPACITY. USING THE MAXIMUM FAULT, PREPARE A SHORT CIRCUIT ANALYSIS, COORDINATION STUDY, AND ARC FLUSH STUDY OF THE ELECTRICAL DISTRIBUTION SYSTEM. THIS STUDY WITHT THE UTILITY LETTER SHALL BE SUBMITTED WITH THE ELECTRICAL DISTRIBUTION SHOP DRAWINGS. 6. PANELS DENOTED AS XX-L AND XX-R ARE DOUBLE TUB PANELS; (L) LEFT & (R) RIGHT AND SHOULD BE PROVIDED WITH FEED-THRU LUGS. PROVIDE TERMINATION LUGS COMPATIBLE WITH FEEDER SIZE. 7. TYPICAL 75KVA AND BELOW BRANCH PANELBOARD TRANSFORMERS TO BE WALL MOUNTED. FIELD LOCATE ABOVE PANELS AT A MINIMUM OF 8'-0" A.F.F. REFER TO DETAIL 8, SHEET E6.1 FOR ADDITIONAL INFORMATION. GENERAL NOTES: ## E8.0 1. PROVIDE BUSSMANN POWER MODULE OR APPROVED EQUAL WITH 100A ASSEMBLY, SHUNT-TRIP MODULE, AND DOOR INTERLOCK CONTACTS FOR ELEVATOR CAB LOWERING CIRCUIT. COORDINATE EXACT FUSE SIZE WITH ELEVATOR SHOP DRAWINGS. 2. ELEVATOR CONTROLLER. COORDINATE EXACT LOCATION AND CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS PRIOR TO ROUGH-IN. 3. EC IS RESPONSIBLE FOR PROVIDING FEEDER TO REFRIGERATION MCC AND TERMINATING. INSTALLATION OF MCC AND WIRING OF ALL MCC BRANCH CIRCUITS TO REFRIGERATION EQUIPMENT BY REFRIGERATION CONTRACTOR. MCC EQUIPMENT LOADS SCHEDULED ARE FOR REFERENCE ONLY. 4. INTERCONNECT TO THE FIRE ALARM CONTROL PANEL ELEVATOR SHUT DOWN CIRCUIT. 5. PROVIDE A 8KW, SINGLE PHASE EMERGENCY LIGHTING INVERTER, EQUIPPED WITH A DISTRIBUTION CIRCUIT BREAKER TO FEED PANEL 'EM/LS- X', MIN. 90 MINUTE BATTERY, AND 10 YEAR WARRANTY. PROVIDE MEYERS ILLUMINATOR IE 480V INPUT -480/277V OUTPUT OR APPROVED EQUAL. 6. REMOTE SPD MOUNTED ADJACENT TO SWITCHBOARD PER SPECIFICATION 26 43 00. 7. PROVIDE A PROGRAMMABLE RELAY CONTROL PANEL TO CONTROL LIGHTING AS INDICATED ON SHEET E5.0. PANEL SHALL INCLUDE TIME CLOCK FUNCTION AND TIME OF DAY CONTROL PROGRAMMING CAPABILITY. 8. PROVIDE A 600V, 3-PHASE, 4 WIRE UTILITY APPROVED PAD MOUNTED CT/METERING CABINET. SHEET NOTES: Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated ELECTRICAL RISER DIAGRAM WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2510 Milton Avenue Janesville, WI 53545 BID SET E8.0 10/04/2023 220025.00 C2023-15 NTS:1 ELECTRICAL POWER ONE-LINE DIAGRAM NTS:2 GROUND BAR DETAIL NTS:3 GROUND DETAIL NTS:4 TRANSFORMER GROUNDING/BONDING DETAIL E - FEEDER SCHEDULE WIRE NUMBER FEEDER RATEING (AMPS) # OF SETS FEEDER SIZE (QTY) FEEDER SIZE EQUIPMENT GROUND (QTY) EQUIPMENT GROUND SIZE CONDUIT (QTY) CONDUIT SIZE 8 60 A 3 #4 #10 1" 9 30 A 3 #10 #10 3/4" 10 60 A 4 #4 #10 1-1/4" 12 150 A 3 1/0 #6 1-1/2" 48 100 A 4 #1 #8 1-1/2" 51 150 A 4 1/0 #6 2" 54 225 A 4 4/0 #4 2-1/2" 61 600 A 2 4 350kcmil #1 2 3" 63 800 A 2 4 600kcmil #1/0 2 4" 71 3000 A 8 4 500kcmil 400kcmil 8 3-1/2" 10/13/202310/04/2023 BID DOCUMENT SET MICROHHHHHICECOFFEE RFU/C R24"X60"24"X60"24"X48"24"X60"24"X48"W.H.18"X60" 18"X36"18"X48"GLASSDOORRGLASSDOORRPOSFU/C RPOSRAPIDCOOK 18"X60"18"X60"SAFEHRAPIDCOOKFULL HEIGHTPASS THRUFULL HEIGHTU/C RU/C RU/C RMENU BOARDPOP-CORNCUPS POSPOS 75"54"FUTURETYPE 2POS54321109FUTURESTACKEDCONV.OVENSRRRCOFFEE 221115161721212121212122222222232323313029282730x7230x7230x7230x72 434240444444454140406048484950415455494056656667636363646250614478787140797140414443407174717340444483847172UPHCHCHCHCHCHCHCHCHCHCDNDNDNUPUPHCHCHCHCHCHCDNJ.C.114CONCESSIONS115 (B)BEER SALES116FOOD PREP115 (A)SKATE RENTAL108CHECK-IN/RENTAL107VESTIBULE100MAIN LOBBY101MENS106AMEETING ROOM(A)102MEETING ROOM(B)103STOR104FIRST AID105LOBBY / LINK155STORAGE158ELECTRIC157WARMING ROOM159LOADING/RECEIVING/STORAGE160FAMILY TLT162J.C.163MEN'S166GENERALBUILDINGSTORAGE167REFRIGERATION172Y.H. STORAGE137WET TEAMROOM #1138WET TEAMROOM #2140UNISEX TLT141YH COACH143ICE ARENALOBBY117MEN'S121ELEC134MAIN COACH133MAIN TEAMROOM132LAUNDRY131TRAINING129UNISEX TLT128TEAM ROOM 4127TEAM ROOM 5126WET TEAMROOM 3125WET TEAM RR124WET TEAMROOM 4123IT150TEAM ROOM 3149TEAM ROOM 1147WOMEN'S165F.S. STORAGE175TEAM ROOM 2148REFEREE145REFEREE RR146WET TEAM RR139MERCYHEALTHARENA136MULTI-PURPOSEAREA154MULTI-USECONVENTIONSPACE156ICE RINKCIRCULATION151PASSAGE130ICE RINKCIRCULATION135PASSAGE1441" / 1'-0"1" / 1'-0"SLOPESLOPESLOPEADD ALT 2SEE SHEETA2.6 -2.8ADD ALT 1SEE SHEET A2.4TRASH/RECYCLESIM TRASH/RECYCLERESURFACER/SHOPTOOLS/LAUNDRY170MECHANICAL168ELECTRICAL169MALLCONNECTION164IT/GENSTORAGE176TEMP STORAGE174HOCKEYSTORAGE173METER/RISER179ELECTRICAL113BREAKROOM109ADMIN112OFFICE110OFFICE111COPY AREA112 (A)GEN STORAGE153LOCKERALCOVE101 (A)J.C.1421" / 1'-0"AV CLOSET157 (A)AV CLOSET167 (B)STORAGE135(A)CLOSET133(A)VESTIBULE171CLOSET172(A)MULTIPURPOSESEATING154 (A)VESTIBULE118EXISTING MALL1" / 1'-0"1" / 1'-0"ELEV152BOLLARD SPACING 6'-0" LOCATED 3'-0" OFF BACK OF CURB.(INCLUDE CURB TAPER SECTIONS) - SEE CIVIL DRAWINGS FORLOCATION FOR COORDINATION WITH UTILITES. (V.I.F.)WOMENS106BFAMILY RR106WOMENS12270 SFFAMILYRESTROOM12059 SFWELLNESSROOM119NNConsultant:Project:Location:Sheet:PlanNorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: 1/16" = 1'-0"Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:FOODSERVICEOVERALL PLANWOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2500 Milton AvenueJanesville, WI 53545Bid Set DocumentsFS10010-4-23220025.00-10/13/2023Location:2510 Milton AvenueJanesville, WI 5354510/04/2023BID DOCUMENT SET MICROHHHHHICECOFFEE75"54"FUTURETYPE 254321109FUTURESTACKEDCONV.OVENSRRR221115161721212121212122222222232323313029282730x7230x7230x7230x72STORAGE158ELECTRIC157WARMING ROOM159LOADING/RECEIVING/STORAGEAV CLOSET157 (A)RFU/C R24"X60"24"X60"24"X48"24"X60"24"X48"W.H.18"X60"18"X36"18"X48"GLASSDOORRGLASSDOORRPOSFU/C RPOSRAPIDCOOK18"X60"18"X60"SAFEHRAPIDCOOKFULL HEIGHTPASS THRUFULL HEIGHTU/C RU/C RU/C RMENU BOARDPOP-CORNCUPS POSPOS POSCOFFEE 434240444444454140406048484950415455494056656667636363646250614478787140797140414443407174717340444483847172J.C.114CONCESSIONS115 (B)BEER SALES116FOOD PREP115 (A)150ELECTRICAL113GEN STORAGE153LOCKERALCOVE101 (A)ITEMDESCRIPTIONHAND SINKMICROWAVESPARE NUMBER12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061EQUIPMENT LISTQTYBY PCCOMMENTS21-WALL SHELFWORKTABLE W/ SINK11TRASH CONTAINER 4EXHAUST HOOD (TYPE 2)MOP SINK11SPARE NUMBERSTACKED CONVECTION OVENS-1SPARE NUMBER-WALL SHELF4-COMPARTMENT SINK11SPARE NUMBERSPARE NUMBER--SPARE NUMBER-SPARE NUMBERHOT HOLDING CABINET-5SPARE NUMBERSPARE NUMBER--DISPOSER W/ PRE-RINSE ASSEMBLY1SPARE NUMBERSPARE NUMBER--REACH-IN REFRIGERATORSPARE NUMBER3-MOBILE WORKTABLE4ICE TRANSPORT CARTWORKTABLE11COFFEE MAKERWORKTABLE W/ SINK11COFFEE GRINDER1SPARE NUMBERSPARE NUMBER--SPARE NUMBERSPARE NUMBER--SPARE NUMBER-TRASH CONTAINER HAND SINK83SPARE NUMBERSPARE NUMBER--SPARE NUMBER-SAFESPARE NUMBER1-WALL SHELFSTORAGE SHELVING1LOT4-COMPARTMENT SINK1UNDERCOUNTER REFRIGERATORSPARE NUMBER2-REACH-IN FREEZERRAPID COOK OVEN22SPARE NUMBER-WORKTABLE W/ SINKWALL SHELF11SPARE NUMBERHOT HOLDING CABINET-1SPARE NUMBER-REACH-IN REFRIGERATORROLLER GRILL W/ BUN WARMER11SPARE NUMBERSPARE NUMBER--SPARE NUMBER-62636465666768697071727374757677787980818283848586878889CUP/LID DISPENSERCOFFEE MAKER11UNDERCOUNTER REFRIGERATORMENU BOARD31COUNTER W/ PASS-THRU1SPARE NUMBERP.O.S. SYSTEM-5SPARE NUMBERSPARE NUMBER--COFFEE GRINDER1SPARE NUMBERSPARE NUMBER--COUNTERTOP POPCORN MAKER11P.O.S. COUNTER1SPARE NUMBERSPARE NUMBER--GLASS DOOR MERCHANDISER21SPARE NUMBER-SPARE NUMBERSPARE NUMBER--WATER HEATERMOP SINK11SPARE NUMBER-SPARE NUMBERSPARE NUMBER--SPARE NUMBER-BY OWNERBY OWNERBY OWNERBY OWNERBY OWNERBY MILLWORKP.O.S. COUNTERBY MILLWORKP.O.S. COUNTERBY MILLWORKBY OWNERBY PCBY OWNERFUTUREFUTURE(1 NEW - 2 FUTURE)BY OWNERNNConsultant:Project:Location:Sheet:PlanNorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: 1/4" = 1'-0"Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:FOODSERVICEEQUIPMENT PLANWOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2500 Milton AvenueJanesville, WI 53545Bid Set DocumentsFS10110-4-23220025.00-10/13/2023Location:2510 Milton AvenueJanesville, WI 5354510/04/2023BID DOCUMENT SET 77"33"104"36"27COCO53"57"57"23B23A23B6"45"36"CO1CO117117"27"27"27"27"81"2121212121105"60"128"75" 75"132"CO2CO2CO2CO2CO5CO24"84"28S48"45"27"91057"57"COCO21"CO160"51"9"12"5049CO4821"CO151"71186"CO115"30"12"78"9"15"6"9"36"48"6427"57"CO148"27"717154" 48"57"78785449COCO604848"12"50616363CO63666712"51"42"737171836"CO12"CO30"CO54"CO60"33"CO151"CO133"63"CO1CO175"CO145"45"33"45"CO1CO1CO1CO118"CO154"CO1CO130"CO145"CO175"CO130"CO136"CO1E10.E9.E8.E7.E6.E2.E4.E5.E3.E1.E11.E12.THIS PLAN SHOWS ONLY THE REQUIREMENTS FOR FOODSERVICEEQUIPMENT TO BE FURNISHED BY THE FOODSERVICE EQUIPMENTCONTRACTOR. FOR ALL OTHER REQUIREMENTS, REFER TO ARCHITECTSPLANS, CONSULTANT OR OWNER.UNLESS OTHERWISE SPECIFIED, THE ELECTRICIAN IS TO FURNISH ALL 208VOLT CORDS, PLUGS AND RECEPTACLES WHERE NECESSARY.ELECTRICAL CONTRACTOR TO FURNISH ALL LIGHT BULBS REQUIRED FOREXHAUST HOOD(S) AND/OR WALK-IN COOLERS AND FREEZERS UNLESSOTHERWISE SPECIFIED.ALL ELECTRICAL WORK PERFORMED IS TO BE DONE IN ACCORDANCE WITHALL STATE AND LOCAL CODES.EQUIPMENT MANUFACTURERS SPECIFICATION SHEETS FOR EACH PIECEOF EQUIPMENT TO BE SUPPLIED BY FOODSERVICE EQUIPMENTCONTRACTOR WILL BE MADE AVAILABLE TO EACH CONTRACTOR UPONREQUEST.DIMENSIONS ON THIS PLAN ARE GIVEN TO THE CENTERLINES OF THEROUGH-INS.ELECTRICAL CONTRACTOR TO FURNISH AND INSTALL DISCONNECTSWITCHES AS REQUIRED BY LOCAL CODE.ELECTRICAL CONTRACTOR TO SEAL INSIDE OF CONDUIT W/ SILICONE OREXPANDABLE FOAM WHERE CONDUIT PENETRATES WALK-INCOOLER/FREEZER WALLS. TYPICAL.THE FOODSERVICE EQUIPMENT CONTRACTOR WILL NOT BE RESPONSIBLEFOR FURNISHING ELECTRICAL APPURTENANCES SUCH AS LINE ORDISCONNECT SWITCHES, SAFETY CUTOUTS, CONTROL PANELS, FUSEBOXES, FITTINGS AND INTERWIRING REQUIRED BETWEEN EQUIPMENT ANDCONTROL PANELS UNLESS SPECIFIED IN FOODSERVICE EQUIPMENTCONTRACT.ALL ELECTRICAL CONDUIT IS TO BE RUN WITHIN WALL SURFACES ANDBOXES AND RECEPTACLES ARE TO BE INSET FLUSH WITH WALL SURFACE.SURFACE MOUNTED ELECTRICAL WORK IS NOT TO BE USED UNLESSOTHERWISE SPECIFIED ON FOODSERVICE EQUIPMENT ROUGH-IN PLAN.ELECTRICAL CONTRACTOR IS TO SUPPLY AND INSTALL ALL CONDUIT,WIRING, BOXES, SWITCHES, FACEPLATES, BRACKETS, ETC. TO COMPLETEINSTALLATION. ELECTRICAL CONTRACTOR SHALL ALSO MAKE ALL FINALCONNECTIONS TO FOODSERVICE EQUIPMENT INCLUDING ALLINTERWIRING REQUIRED FOR WALK-IN COOLERS AND FREEZERS ANDTHEIR COMPRESSORS, BLOWER FANS, TIMERS, HEATERS AND LIGHTING.ELECTRICIAN IS TO DO ALL INTERWIRING FOR EXHAUST HOOD LIGHTING,BLOWERS, DAMPERS, AND FIRE SUPPRESSION SYSTEM, INCLUDING THESUPPLY AND INSTALLATION OF A SHUNT/TRIP BREAKERS FOR EQUIPMENTAND FAN INTERLOCK MECHANISMS AS NEEDED.ELECTRICALCONTRACTORS NOTESELECTRICAL CONTRACTOR IS TO VERIFY ALL REQUIREMENTS FOREXISTING EQUIPMENT TO BE REUSED OR ITEMS LABELED "BY OTHERS".ELECTRICAL CONTRACTOR TO COMPLY WITH ALL LOCAL ANDSTATE ELECTRICAL CODES.ELECTRICAL CONTRACTOR TO READ AND REVIEW 11 40 00SPECIFICATIONS.ELECTRICAL NOTESWIRED FROM ABOVEWFAABOVE FINISHED FLOORAFFHORSEPOWERHPVOLTVKILOWATTSKWTELEPHONETELSWITCHSWJUNCTION BOXJBELECTRICAL CONDUIT STUB UPECSDIRECT WIRED CONNECTIONDIRSPECIAL PURPOSE OUTLETSPOCONVENIENCE OUTLETCODEDICATED DUPLEX GROUNDED RECEPTACLEDDGRDUPLEX GROUNDED RECEPTACLEDGRSINGLE GROUNDED RECEPTACLESGRGROUND FAULT CIRCUIT INTERRUPTGFCIELECTRICAL SYMBOLS & ABBREVIATIONSELECTRICAL CONTRACTORECCONNECTION(S)ELECTRICAL ROUGH-INSITEMQTYELECTRICAL CONTRACTOR TO INSTALL CORD AND PLUGSPROVIDED BY FOODSERVICE EQUIPMENT CONTRACTOR.ELECTRICAL NOTESCORD GRIPSUSPENDEDCEILINGBRACED 4"OCTAGON BOXCEILING CANOPYWITH CENTER HOLES.O.- CORDREINFORCEDWOODHEAD PORTABLEPOWER OUTLET BOX#3080-1 FOR DUPLEXRECEPTACLE (VERIFYNEMA #'S WITHEQUIPMENT SUPPLIER).SEE ROUGH-IN PLANFOR INDIVIDUALMOUNTING HEIGHTS.CEILING MOUNTED OUTLETDETAIL23CO1120V./1 DGR 18" AFF. FOR A CONVENIENCE OUTLET. 20.0 AMP CIRCUIT.14CO120V./1 DGR 48" AFF. FOR A CONVENIENCE OUTLET. 20.0 AMP CIRCUIT.4CO2120V./1 SUSPENDED DGR FROM ABOVE DOWN TO 66" AFF. FOR A CONVENIENCE OUTLET. 20.0 AMP CIRCUIT.* ALSO REFER TO SUSPENDED OUTLET DETAIL THIS SHEET.15120V./1 DGR 66" AFF. FOR MICROWAVE. 1.5 KW. 13.0 AMPS. NEMA 5-15P.120V./1 DGR. 18" AND 48" AFF. FOR STACKED CONVECTION OVENS. 3/4 HP EACH. 8.0 AMPS EACH. NEMA 5-15P EACH.FUTURE - E.C. TO CAP AND COVER ROUGH-INS FOR FUTURE USE.19SWITCH FOR EXHAUST HOOD (TYPE 2) FAN(S) 48" AFF. FAN(S) BY HVAC. SWITCH(ES) BY E.C.E.C. TO WIRE TO HOOD LIGHT. SWITCH(ES) TO CONTROL LIGHT AND FAN(S).E.C. TO VERIFY LOCATION(S) AND REQUIREMENTS.FUTURE - E.C. TO CAP AND COVER ROUGH-IN(S) FOR FUTURE USE.208V./3 J-BOX 18" AFF. FOR DISPOSER. 2.0 HP. 6.6 AMPS. E.C. TO FURNISH AND INSTALL DISCONNECT PER LOCAL CODE(S).E.C. TO CONNECT DISPOSER, SOLENOID VALVE AND SWITCH.521120V./1 SUSPENDED DGR FROM ABOVE DOWN TO 66" AFF. FOR HOT HOLDING CABINET. 1.9 KW. 16.0 AMPS. NEMA 5-20P.BY OWNER - EC TO VERIFY ROUGH-IN LOCATION AND REQUIREMENTS.* ALSO REFER TO SUSPENDED OUTLET DETAIL THIS SHEET.117110120V./1 DGR. 90" AFF. FOR REACH-IN REFRIGERATOR. 1/2 HP. 5.9 AMPS. NEMA 5-15P.123A120V./1 DGR. 48" AFF. FOR COFFEE GRINDER. 9.4 AMPS. NEMA 5-15P.127120/240V./1 J-BOX 48" AFF. FOR COFFEE MAKER. 6.6 KW. 27.5 AMPS.E.C. TO FURNISH AND INSTALL A DISCONNECT PER LOCAL CODES.128120V./1 DGR. 48" AFF. FOR REACH-IN FREEZER. 3/4 HP. 8.7 AMPS. NEMA 5-15P.248208V./1 DGR. 48" AFF. FOR RAPID COOK OVEN. 8.32 KW. 50.0 AMPS. NEMA 6-50P.249120V./1 DGR. 48" AFF. FOR HOT HOLDING CABINET. 1.9 KW. 16.0 AMPS. NEMA 5-20P.154120V./1 DGR. 18" AFF. FOR UNDERCOUNTER REFRIGERATOR. 1/4 HP. 4.0 AMPS. NEMA 5-15P.250120V./1 DGR. 48" AFF. FOR REACH-IN REFRIGERATOR. 1/2 HP. 5.9 AMPS. NEMA 5-15P.160120V./1 DGR. 18" AFF. FOR UNDERCOUNTER REFRIGERATOR. 1/5 HP. 3.0 AMPS. NEMA 5-15P.363MENU BOARD BY OWNER.BY OWNER - E.C. TO VERIFY ROUGH-IN LOCATION(S) AND REQUIREMENTS.164120/240V./1 J-BOX 48" AFF. FOR COFFEE MAKER. 4.0 KW. 16.6 AMPS.E.C. TO FURNISH AND INSTALL A DISCONNECT PER LOCAL CODES.166120V./1 DGR. 48" AFF. FOR COFFEE GRINDER. 9.4 AMPS. NEMA 5-15P.167120V./1 DGR. 48" AFF. FOR ROLLER GRILL W/ BUN WARMER. 12.8 AMPS. NEMA 5-15P.161183WATER HEATER BY OWNER.BY OWNER - E.C. TO VERIFY ROUGH-IN LOCATION(S) AND REQUIREMENTS WITH OWNER.120V./1 DDGR. 48" AFF. FOR P.O.S. SYSTEM. 20.0 AMP DEDICATED CIRCUIT.E.C. TO PROVIDE DATA CABLE CORD REEL FOR RUNNING OF P.O.S. AND DATA LINES; ROUTE PER OWNER'S SPECIFICATIONS.BY OWNER - E.C. TO VERIFY ROUGH-IN LOCATION(S) AND REQUIREMENTS WITH OWNER.571120V./1 DGR. 48" AFF. FOR COUNTERTOP POPCORN MAKER. 13.5 AMPS. NEMA 5-15P.173120V./1 DGR. 18" AFF. FOR GLASS DOOR MERCHANDISER. 16.0 AMPS.BY OWNER - E.C. TO VERIFY ROUGH-IN LOCATION AND REQUIREMENTS WITH OWNER.278120V./1 DGR. 90" AFF. FOR FUTURE REACH-IN REFRIGERATOR. 1/2 HP. 5.9 AMPS. NEMA 5-15P.FUTURE - E.C. TO CAP AND COVER ROUGH-IN FOR FUTURE USE.223BNNConsultant:Project:Location:Sheet:PlanNorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: 1/4" = 1'-0"Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:FOODSERVICEELECTRICAL PLANWOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2500 Milton AvenueJanesville, WI 53545Bid Set DocumentsFS10210-4-23220025.00-10/13/2023Location:2510 Milton AvenueJanesville, WI 5354510/04/2023BID DOCUMENT SET 8"444464"4412" 15"99"49"60"44 48"22"8"6"20"6"8"6"115"31"442815"29C29A29B1C1B1A17C17A17B16C16C16A16B16C94A4C4B1A1C1B11A11C11B194"44 4415"114"6"8"6"20"6"8"6"45"44104"55C55B55A41C41B41A42C42B42A42C42C42A42B42C44 41C41A41B41C41B41A18"168"668"44 12"84C84A84B83HWHOT WATER LINE STUBCWCOLD WATER LINE STUBDWDIRECT WASTE CONNECTIONFDFLUSH FLOOR DRAIN AND GRATEINDINDIRECT WASTE DRAIN FS12" SQUARE FLOOR SINKGASGAS SUPPLY LINE STUBAFFABOVE FINISHED FLOORDFADOWN FROM ABOVEDFSSSTEAM SUPPLYCRCONDENSATE RETURNPLUMBING SYMBOLS & ABBREVIATIONSPCPLUMBING CONTRACTORPLUMBING CONTRACTOR TO COMPLY WITH ALL LOCAL ANDSTATE PLUMBING CODES.PLUMBING CONTRACTOR TO READ AND REVIEW 11 40 00SPECIFICATIONS.PLUMBING NOTEEXACT LOCATION OF ALL FLOOR DRAINS TO BE LOCATED BYPLUMBING CONTRACTOR.FLOOR DRAIN NOTEPLUMBING CONTRACTOR TO FURNISH AND INSTALL ANY ANDALL CODE COMPLYING BACKFLOW PREVENTERS PER LOCALCODES.BACKFLOW PREVENTER NOTEP10.P3.P9.P8.P7.P6.P5.P4.P1.P2.P11.P12.THE FOODSERVICE EQUIPMENT CONTRACTOR WILL NOT BE RESPONSIBLEFOR PROVIDING APPURTENANCES SUCH AS TEES, ELBOWS, MIXINGVALVES, R.P. VALVES, GREASE TRAPS OR INTERCEPTORS, BACKFLOWDEVICES, COUPLINGS AND FITTINGS OTHER THAN THOSE FURNISHED ASSTANDARD WITH EQUIPMENT TO BE FURNISHED BY THE FOODSERVICEEQUIPMENT CONTRACTOR, EXCEPT WHERE SPECIFIED TO DO SO UNDERTHE ARCHITECTS OR CONSULTANTS GENERAL KITCHEN EQUIPMENTSPECIFICATIONS.PLUMBER/FITTERS NOTESTHIS PLAN SHOWS ONLY THE REQUIREMENTS FOR FOODSERVICEEQUIPMENT TO BE FURNISHED BY THE FOODSERVICE EQUIPMENTCONTRACTOR. FOR ALL OTHER REQUIREMENTS, REFER TO ARCHITECT'SPLANS, CONSULTANT, OR OWNER.UNLESS OTHERWISE SPECIFIED, THE PLUMBER IS TO FURNISH ANDINSTALL ALL NECESSARY P.V.C. PIPING (6" MIN.) THROUGH AND BELOWFLOOR TO ACT AS A CHASE FOR BEVERAGE AND/OR REFRIGERATION LINERUNS. BENDS IN P.V.C. CHASE ARE NOT TO EXCEED 45 DEGREES AT ANYSINGLE POINT.PLUMBER/FITTER TO MAKE ALL FINAL PLUMBING AND GAS CONNECTIONSTO EQUIPMENT, INCLUDING MOUNTING FAUCETS AND DRAINS. EXTENDWASTE LINES FROM ALL APPLICABLE EQUIPMENT TO NEAREST INDIRECTDRAIN AS SHOWN ON PLAN.ALL MECHANICAL WORK PERFORMED IS TO BE DONE IN ACCORDANCEWITH ALL STATE AND LOCAL CODES.PLUMBER/FITTER CONTRACTOR IS TO VERIFY ALL REQUIREMENTS FOREXISTING EQUIPMENT TO BE REUSED OR ITEMS LABELED "BY OTHERS".ALL PLUMBING, GAS AND STEAM LINES TO BE RUN WITHIN WALL CAVITIESSO AS TO HAVE ONLY SUPPLY AND RETURN STUBS PROTRUDINGTHROUGH WALL SURFACE. WALL PENETRATIONS ARE TO BE SEALED ANDTRIM RINGS APPLIED. SURFACE MOUNTED PLUMBING, GAS AND STEAMLINES ARE NOT TO BE USED UNLESS OTHERWISE SPECIFIED ONFOODSERVICE EQUIPMENT ROUGH-IN PLANS.EQUIPMENT MANUFACTURER'S SPECIFICATION SHEETS FOR EACH PIECEOF EQUIPMENT TO BE SUPPLIED BY THE FOODSERVICE EQUIPMENTCONTRACTOR WILL BE MADE AVAILABLE TO EACH CONTRACTOR UPONREQUEST.DIMENSIONS ON THIS PLAN ARE GIVEN TO THE CENTERLINES OF THEROUGH-INS.PLUMBING CONTRACTOR TO FURNISH AND INSTALL GAS PRESSUREREDUCING VALVE TO PROVIDE MAXIMUM OPERATING PRESSURE OF 14"W.C. TO FOODSERVICE EQUIPMENT. GAS SHUT OFF VALVE MUST BEINSTALLED TO BE ACCESSIBLE FOR INSPECTIONS.PLUMBING CONTRACTOR TO FURNISH AND INSTALL WATER PRESSUREREDUCING VALVE(S) WHERE REQUIRED FOR FOODSERVICE EQUIPMENT.PLUMBING CONTRACTOR TO FURNISH AND INSTALL HOT WATERRECIRCULATION SYSTEM THAT SHALL PROVIDE HOT WATER SUPPLYWITHIN 20 SECONDS AT EACH SINK AND DISHMACHINE.QTYITEMCONNECTION(S)PLUMBING ROUGH-INS293/4" GAS SUPPLY 24" AND 42" AFF. FOR FUTURE STACKED CONVECTION OVENS. 55,000 BTU EACH (110,000 TOTAL BTU).FUTURE - P.C. TO CAP AND COVER ROUGH-INS FOR FUTURE USE.CONNECTIONS FOR HAND SINK: A - 1/2" HW. 22" AFF. B - 1/2" CW. 22" AFF. C - 1-1/2" DW. 20" AFF.21CONNECTIONS FOR HAND SINK: A - 1/2" HW. 22" AFF. B - 1/2" CW. 22" AFF. C - 1-1/2" DW. 20" AFF.341CONNECTIONS FOR WORKTABLE W/ SINK: A - 1/2" HW 14" AFF. B - 1/2" CW 14" AFF. C - 2" DRAIN TO FLOOR SINK.14CONNECTIONS FOR MOP SINK: A - 1/2" HW. 36" AFF. B - 1/2" CW. 36" AFF. C - 3" DW. FLUSH W/ FINISHED FLOOR.BY OTHERS - P.C. TO VERIFY ROUGH-IN LOCATIONS AND REQUIREMENTS.111CONNECTIONS FOR MOP SINK: A - 1/2" HW. 36" AFF. B - 1/2" CW. 36" AFF. C - 3" DW. FLUSH W/ FINISHED FLOOR.BY OTHERS - P.C. TO VERIFY ROUGH-IN LOCATIONS AND REQUIREMENTS.184CONNECTIONS FOR WORKTABLE W/ SINK: A - 1/2" HW 14" AFF. B - 1/2" CW 14" AFF. C - 2" DRAIN TO FLOOR SINK.155CONNECTIONS FOR WORKTABLE W/ SINK: A - 1/2" HW 14" AFF. B - 1/2" CW 14" AFF. C - 2" DRAIN TO FLOOR SINK.129CONNECTIONS FOR 4-COMPARTMENT SINK: A - 3/4" HW. 14" AFF. P.C. TO PROVIDE 1/2" HW. "T" WITH BALL VALVE SHUT OFF FOR CHEMICAL/SOAP DISPENSER UNITINSTALLED BY CHEMICAL SUPPLIER. B - 3/4" CW. 14" AFF. C - (3) 2" DW. 12" AFF.P.C. TO DRAIN TO GREASE TRAP PER LOCAL CODE(S).116CONNECTIONS FOR DISPOSER W/ PRE-RINSE SPRAY: A - 1/2" HW. 14" AFF. B - 3/4" CW. 14" AFF. P.C. TO BRANCH 1/2" TO DISPOSER. C - 2" DW. 8" AFF.P.C. TO CONNECT DISPOSER, SOLENOID VALVE, FLOW CONTROL VALVE AND VACUUM BREAKER.117128CONNECTION FOR COFFEE MAKER: 3/8" CW. 48" AFF. P.C. TO BRANCH THRU WATER FILTER (BY F.S.E.C.) TO COFFEE MAKER WATER INLET.CONNECTIONS FOR 4-COMPARTMENT SINK: A - (2)3/4" HW. 14" AFF. P.C. TO PROVIDE 1/2" HW. "T" WITH BALL VALVE SHUT OFF FOR CHEMICAL/SOAP DISPENSER UNITINSTALLED BY CHEMICAL SUPPLIER. B - (2)3/4" CW. 14" AFF. C - (4) 2" DW. 12" AFF.P.C. TO DRAIN TO GREASE TRAP PER LOCAL CODE(S).142166CONNECTION FOR COFFEE MAKER: 3/8" CW. 48" AFF. P.C. TO BRANCH THRU WATER FILTER (BY F.S.E.C.) TO COFFEE MAKER WATER INLET.183WATER HEATER BY OWNER.BY OWNER - P.C. TO VERIFY ROUGH-IN LOCATION(S) AND REQUIREMENTS WITH OWNER.NNConsultant:Project:Location:Sheet:PlanNorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: 1/4" = 1'-0"Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:FOODSERVICEPLUMBING PLANWOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2500 Milton AvenueJanesville, WI 53545Bid Set DocumentsFS10310-4-23220025.00-10/13/2023Location:2510 Milton AvenueJanesville, WI 5354510/04/2023BID DOCUMENT SET 75"1054"60"FUTURE TYPE 2EXHAUST HOODITEMDESCRIPTIONHAND SINKMICROWAVESPARE NUMBER12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061EQUIPMENT LISTQTYBY PCCOMMENTS21-WALL SHELFWORKTABLE W/ SINK11TRASH CONTAINER 4EXHAUST HOOD (TYPE 2)MOP SINK11SPARE NUMBERSTACKED CONVECTION OVENS-1SPARE NUMBER-WALL SHELF4-COMPARTMENT SINK11SPARE NUMBERSPARE NUMBER--SPARE NUMBER-SPARE NUMBERHOT HOLDING CABINET-5SPARE NUMBERSPARE NUMBER--DISPOSER W/ PRE-RINSE ASSEMBLY1SPARE NUMBERSPARE NUMBER--REACH-IN REFRIGERATORSPARE NUMBER3-MOBILE WORKTABLE4ICE TRANSPORT CARTWORKTABLE11COFFEE MAKERWORKTABLE W/ SINK11COFFEE GRINDER1SPARE NUMBERSPARE NUMBER--SPARE NUMBERSPARE NUMBER--SPARE NUMBER-TRASH CONTAINER HAND SINK83SPARE NUMBERSPARE NUMBER--SPARE NUMBER-SAFESPARE NUMBER1-WALL SHELFSTORAGE SHELVING1LOT4-COMPARTMENT SINK1UNDERCOUNTER REFRIGERATORSPARE NUMBER2-REACH-IN FREEZERRAPID COOK OVEN22SPARE NUMBER-WORKTABLE W/ SINKWALL SHELF11SPARE NUMBERHOT HOLDING CABINET-1SPARE NUMBER-REACH-IN REFRIGERATORROLLER GRILL W/ BUN WARMER11SPARE NUMBERSPARE NUMBER--SPARE NUMBER-62636465666768697071727374757677787980818283848586878889CUP/LID DISPENSERCOFFEE MAKER11UNDERCOUNTER REFRIGERATORMENU BOARD31COUNTER W/ PASS-THRU1SPARE NUMBERP.O.S. SYSTEM-5SPARE NUMBERSPARE NUMBER--COFFEE GRINDER1SPARE NUMBERSPARE NUMBER--COUNTERTOP POPCORN MAKER11P.O.S. COUNTER1SPARE NUMBERSPARE NUMBER--GLASS DOOR MERCHANDISER21SPARE NUMBER-SPARE NUMBERSPARE NUMBER--WATER HEATERMOP SINK11SPARE NUMBER-SPARE NUMBERSPARE NUMBER--SPARE NUMBER-BY OWNERBY OWNERBY OWNERBY OWNERBY OWNERBY MILLWORKP.O.S. COUNTERBY MILLWORKP.O.S. COUNTERBY MILLWORKBY OWNERBY PCBY OWNERFUTUREFUTURE(1 NEW - 2 FUTURE)BY OWNERGC NOTE:GC TO PRIME WALLS WHERE ST/ST WALL FLASHING IS TO BE INSTALLED.WALLS TO BE BUILT CMU. IF ANY WALLS ARE BUILT WITH METAL STUD AND DRYWALLGC TO COORDINATE ANY WALL BLOCKING WITH FSEC FOR KITCHEN EQUIPMENT.EXHAUST HOOD INFORMATIONHOOD ITEMDUCT SIZECFMSPHOOD PROVIDED BY FSEC.FANS, CURBS, ETC. PROVIDED BY OTHERSPLENUM10EXHAUSTFUTUREFUTUREFUTURETYPETYPE 2NNConsultant:Project:Location:Sheet:PlanNorthTrueNorthKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: 1/4" = 1'-0"Date:Project No.:Sheet No.:Revisions:(Owner) Project No.:No:Date:Description:FOODSERVICECONDITIONS PLANWOODMAN'S SPORTS &CONVENTION CENTER(WSCC)2500 Milton AvenueJanesville, WI 53545Bid Set DocumentsFS10410-4-23220025.00-10/13/2023Location:2510 Milton AvenueJanesville, WI 5354510/04/2023BID DOCUMENT SET Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: INDEX SHEET WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV0.0 10/13/2023 220025.00 AUDIOVISUAL SERIES SHEET INDEX SHEET SHEET NAME AV0.0 INDEX SHEET AV0.1 LEGENDS, SYMBOLS, ABBREVIATIONS AV0.2 GENERAL AUDIOVISUAL INFORMATION AV2.1 FIRST FLOOR PLAN - OVERALL AV2.1a FIRST FLOOR PLAN - SE QUAD AV2.1b FIRST FLOOR PLAN - NE QUAD AV2.1c FIRST FLOOR PLAN - NW QUAD AV2.1d FIRST FLOOR PLAN - SW QUAD AV2.2a MEZZANINE FLOOR PLAN - SE QUAD AV2.2d MEZZANINE FLOOR PLAN - SW QUAD AV3.1a FIRST FLOOR PLAN RCP - SE QUAD AV3.1b FIRST FLOOR PLAN RCP - NE QUAD AV3.1c FIRST FLOOR PLAN RCP - NW QUAD AV3.1d FIRST FLOOR PLAN RCP SW QUAD AV4.1 LOBBY & BREAKROOM SECTIONS & ELEVATIONS AV4.2 MERCY HEALTH ARENA SECTIONS & ELEVATIONS AV4.3 MULTI-PURPOSE ARENA SECTIONS & ELEVATIONS AV4.4 MULTI-PURPOSE ARENA SECTIONS & ELEVATIONS AV4.5 MULTI-USE CONVENTION SECTIONS & ELEVATIONS AV4.9a STANDARD AV DETAILS AV4.9b ADA DETAILS AV5.1 EQUIPMENT RACK ELEVATIONS AV5.2 EQUIPMENT RACK ELEVATIONS AV6.1 PANEL ELEVATIONS & DETAILS AV6.2 PANEL ELEVATIONS & DETAILS AV6.3 PANEL ELEVATIONS & DETAILS AV7.0 AUDIO TERMINATIONS WIRING AV7.1a LOBBY / BREAKROOM SCHEMATICS AV7.1b LOBBY / BREAKROOM SCHEMATICS AV7.1c LOBBY / BREAKROOM SCHEMATICS AV7.2a MERCYHEALTH ARENA SCHEMATICS AV7.2b MERCYHEALTH ARENA SCHEMATICS AV7.2c MERCYHEALTH ARENA SCHEMATICS AV7.2d MERCYHEALTH ARENA SCHEMATICS AV7.2e MERCYHEALTH ARENA SCHEMATICS AV7.3a MULTI-PURPOSE ARENA SCHEMATICS AV7.3b MULTI-PURPOSE ARENA SCHEMATICS AV7.3c MULTI-PURPOSE ARENA SCHEMATICS AV7.3d MULTI-PURPOSE ARENA SCHEMATICS AV7.3e MULTI-PURPOSE ARENA SCHEMATICS AV7.3f MULTI-PURPOSE ARENA SCHEMATICS AV7.4a MULTI-USE CONVENTION SCHEMATICS AV7.4b MULTI-USE CONVENTION SCHEMATICS AV7.4c MULTI-USE CONVENTION SCHEMATICS AV7.4d MULTI-USE CONVENTION SCHEMATICS AV7.4e MULTI-USE CONVENTION SCHEMATICS AV7.4f MULTI-USE CONVENTION SCHEMATICS AV9.1 AV POWER, DATA, & BOX SCHEDULES AV9.2 AV CONDUIT SPECIFICATIONS & DETAILS AV9.3 LOBBY AV CONDUIT RISER AV9.4 MERCYHEALTH ARENA AV CONDUIT RISER AV9.5 MULTI-PURPOSE ARENA AV CONDUIT RISER AV9.6 MULTI-USE CONVENSTION SPACE AV CONDUIT RISER WOODMAN'S SPORT & CONVENTION CENTER BID DOCUMENT SET Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET xW SPK/ MFR / MODEL MFR / MODEL SPK/xW MFR / MODEL SPK/xW 21 3 NEUTRIK 12 3 NEUTRIK PUSH SCDP-x (COLOR) 12 3 NEUTRIK PUSH 12 3 NEUTRIK PUSH 8" 8" FLUSH MOUNT PANEL SIZE PANEL COLOR BOX SIZE BOX MOUNT LOCATION QUANTITY XX XX XX PANEL ID XX XX XX PANEL ID 8"W x 8"H PANEL 6"W x 6"H x 6"D BACKBOX XXXXX 1 LOCATION SCDP-x (COLOR) SCDP-x (COLOR) SCHEMATIC DRAWINGS SYMBOL LEGEND DEVICE AV701 DEVICE DEVICE DEVICE P NUMBERTYPE SHEET NUMBER CROSS REFERENCE, SAME SHEET CROSS REFERENCE, DIFFERENT SHEET WIRE CONTINUATION POWER CONNECTION WIRE TYPE & NUMBER INDICATOR TYPE WIRE TYPE INDICATOR WIRENUM WIRE NUMBER INDICATOR FLUSH MOUNT 70V LOUDSPEAKER GENERIC LOUDSPEAKER MIC 1 MIC 1 PART OF [NAME] PART OF [NAME] PANEL, TEXT INDICATES CONNECTOR LABELOR WIRE INTERSECTION, NO CONNECTION WIRE INTERSECTION, CONNECTED MULTIPLE WIRES GROUPED TOGETHER, NO CONNECTIONS BREAK LINE PENDANT MOUNT 70V LOUDSPEAKER SURFACE MOUNT 70V LOUDSPEAKER WIRE LANDS AT TERMINATED PANEL CONNECTION SPK/ MFR / MODEL PANEL & PLATE SYMBOLS LEGEND FEMALE 4-PIN XLR PANEL CONNECTOR NEUTRIK NC3MD FEMALE 5-PIN XLR PANEL CONNECTOR FEMALE 6-PIN XLR PANEL CONNECTOR NEUTRIK NC6FD NEUTRIK NC4FD FEMALE 3-PIN XLR PANEL CONNECTOR MALE 3-PIN XLR PANEL CONNECTOR MALE SPEAKON STX (4-PIN) PANEL CONNECTOR PANEL AND PLATE CONNECTOR NOTES: 1.) GASKETS FOR CONNECTORS ON PANELS SHALL ADHERE TO THE FOLLOWING COLOR SCHEME: AUDIO NETWORK, PRIMARY : GREEN (SCDP-5); AUDIO NETWORK, SECONDARY : YELLOW (SCDP-4); VIDEO NETWORK : BLUE (SCDP-6); CONTROL NETWORK : RED (SCDP-2); ADDITIONAL / PROJECT SPECIFIC NETWORK : WHITE (SCDP-9) HDMI & UNDESIGNATED CAT6/6A: BLACK (SCDP-0); 2.) MAINTAIN ELECTRICAL ISOLATION FROM RACK PANEL OR WALL PANEL/PLATE FOR ALL ETHERCON CONNECTORS. ALL ETHERCONS SHALL HAVE ENLARGED CONNECTOR HOLES AND A COLORED GASKET AS NOTED ABOVE. PLASTIC SCREWS (NEUTRIK E-SCREW1-12 B) SHALL BE USED TO FASTEN CONNECTOR TO PANEL. NEUTRIK NC3FD NEUTRIK NC5FD NEUTRIK NLT4MPXX NEUTRIK NE8FDX NEUTRIK NBB75DFIB NEUTRIK NAHDMI NEUTRIK NAUSB3 NEUTRIK DBA-BL NEUTRIK SCDP-x CAT6A ETHERCON PANEL CONNECTOR 75-OHM BNC PANEL CONNECTOR HDMI PASS-THRU PANEL CONNECTOR USB A/B REVERSIBLE PASS- THRU PANEL CONNECTOR D-STYLE BLANK PANEL INSERT D-STYLE COLORED GASKET / BUSHING, COLOR PER NOTES BELOW. 50-OHM BNC PANEL CONNECTOR PAMONA 3846 SINGLE POLE, DOUBLE THROW SWITCH ALCOSWITCH MTA106D MULTI-PIN PANEL CONNECTOR SIZE AS CALLED OUT ON SCHEMATICS WHIRLWIND MASS SERIES MALE SPEAKON (4-PIN) PANEL CONNECTOR NEUTRIK NL4MPXX MALE SPEAKON STX (8-PIN) PANEL CONNECTOR NEUTRIK NLT8MP NEUTRIK N02-4FDW W/ SCDX COVER FIBER LC DUPLEX WITH DUST COVER MALE SPEAKON (2-PIN) PANEL CONNECTOR NEUTRIK NL2MPXX FEMALE SPEAKON (4-PIN) PANEL CONNECTOR NEUTRIK NL4FPXX PROJECTOR / SCREEN ELEVATION VIEW IDEAL VIEWING AREA -PLAN VIEW CLEARANCE ZONE SCREEN CASE PROJECTION SCREEN PROJECTOR PROJECTION BEAM VENTILATION CLEARANCE ZONE CLEARANCE ZONE PROJECTION SCREEN SCREEN CASE FARTHEST VIEWER FOR GENERAL PRESENTATIONS NEAREST VIEWER FARTHEST VIEWER FOR HIGH-RES IMAGERY FARTHEST VIEWER FOR SPREADSHEETS / DATA AV PLAN / RCP / DETAILS LEGEND BOX MNT AV/XXX-X HT P ▼ AV/XXX-X SYMBOL DEFINITION ATTRIBUTES AV : DEVICE TYPE REFER TO AV DEVICE TYPE KEY ON AV002 /XXX-X : UNIQUE ID FOR DEVICE TYPE BOX : ASSOCIATED BOX TYPE REFER TO AV900 SERIES SHEETS FOR BOX TYPES USED IN PROJECT MNT: ASSOCIATED BOX MOUNTING TYPE REFER TO THE FOLLOWING TABLE: FM = FLUSH MOUNT SM = SURFACE MOUNT RM = RECESSED MOUNT FS = FREE STANDING HT: ASSOCIATED BOX MOUNTING HEIGHT REFER TO THE FOLLOWING TABLE: CLG = CEILING FLR = FLOOR RHT = PROJECT RECEPTACLE HEIGHT SHT = PROJECT SWITCH HEIGHT XX"-T = INCHES TO TOP XX"-C = INCHES TO CENTER XX"-B = INCHES TO BOTTOM STRC = MOUNT TO STRUCTURE MPE = MOUNT PER ELEVATION OR DETAIL NOTE = REFER TO NOTE P: WHEN PRESENT, INDICATES ELECTRICAL REQUIREMENTS AT LOCATION. REFER TO AV POWER REQUIREMENTS SCHEDULES ON AV900 SERIES SHEETS. ▼: WHEN PRESENT, INDICATES TELECOM DATA DROP REQUIREMENTS AT LOCATION. REFER TO AV DATA DROP REQUIREMENTS SCHEDULES ON AV900 SERIES SHEETS. AV DEVICE TAG NO ASSOCIATED BACK BOX OR INFRASTRUCTURE REQUIREMENTS AV DEVICE TAG WITH ASSOCIATED BACK BOX Room name 101 A101 1 SIM A101/1 ? 1 SPK/XXX-X 70V: xxW HOME TO: ER/XXX 70V ZONE: TBD 70V SPEAKER TAG SPK/XXX-X : SPEAKER UNIQUE ID 70V ZONE TAG 70V ZONE : INDICATES SPEAKER ZONE HOME TO : INDICATES HOME FOR ZONE ROOM TAG DETAIL CALLOUT ELEVATION CALLOUT KEYNOTE SEE KEYNOTES ON SAME SHEET AT CALLOUT REVISION TAG SIM : INDICATES SIMILAR CONDITION OUTLINE OF BACKBOX PROVIDED & INSTALLED BY DIVISION 26 CONTRACTOR CUSTOM PANEL PROVIDED, INSTALLED, & TERMINATED BY THE AV CONTRACTOR CONNECTOR LABELS SHALL BE MINIMUM 1/8" HIGH REFER TO CONNECTOR LEGEND FOR CONNECTOR TYPES PROVIDE PANEL ID IN BOTTOM RIGHT CORNER FOR ALL CUSTOM PLATES WITH UNIQUE I/O INDICATES FLUSH MOUNT OR SURFACE MOUNT CONDITION OF ASSOCIATED BACKBOX. AV CONTRACTOR SHALL VERIFY ALL BOX SIZES AND MOOUNTING PRIOR TO FABRICATION OF PANELS. Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated LEGENDS, SYMBOLS, ABBREVIATIONS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV0.1 10/13/2023 220025.00 ABBREVIATIONS AC ALTERNATING CURRENT ACT ACOUSTICAL CEILING TILE AFF ABOVE FINISHED FLOOR ALS ASSISTED LISTENING SYSTEM ALT ALTERNATE AMP AMPLIFIER ANT RF ANTENNA ARCH ARCHITECTURAL AUTO AUTOMATIC AV AUDIO-VISUAL AWG AMERICAN WIRE GAUGE BLDG BUILDING C CENTER CCT CIRCUIT CCTV CLOSED CIRCUIT TELEVISION CCU CAMERA CONTROL UNIT CFCI CONTRACTOR FURNISHED, CONTRACTOR INSTALLED CLG CEILING CMU CONCRETE MASONRY UNIT CTRL CONTROL DC DIRECT CURRENT DIA DIAMETER DL DOWNSTAGE LEFT DR DOWNSTAGE RIGHT DSP DIGITAL SIGNAL PROCESSOR DVR DIGITAL VIDEO RECORDER EC ELECTRICAL CONTRACTOR EMI ELECTROMAGNETIC INTERFERENCE EMT ELECTRICAL METALLIC TUBING ER EQUIPMENT RACK EXST EXISTING FB FLOOR BOX FLR FLOOR GC GENERAL CONTRACTOR GND GROUND GPC GENERAL PRIME CONTRACTOR GWB GYPSUM WALL BOARD HD HIGH DEFINITION HDBT HD BASE T HL HOUSE LEFT HR HOUSE RIGHT I/O INPUT / OUTPUT IC INTERCOM ICOM INTERCOM IR INFRARED JB JUNCTION BOX KO KNOCK-OUT KV KILOVOLT KW KILOWATT LAN LOCAL AREA NETWORK LCR LOGIC CONTROLLED RELAY LVC LOW VOLTAGE CONTROL / CONTROLLER MFR MANUFACTURER MIC MICROPHONE MIN MINIMUM MISC MISCELLANEOUS MTX MATRIX N/A NOT APPLICABLE NIC NOT IN CONTRACT NTS NOT TO SCALE O.C. ON CENTER OFCI OWNER FURNISHED, CONTRACTOR INSTALLED OFE OWNER FURNISHED EQUIPMENT OFOI OWNER FURNISHED, OWNER INSTALLED ORCH ORCHESTRA / ORCHESTRAL PB PULL BOX PC PERSONAL COMPUTER POE POWER OVER ETHERNET PSU POWER SUPPLY PWR POWER RCP REFLECTED CEILING PLAN REQ'D REQUIRED RF RADIO FREQUENCY RU RACK UNIT SCN SCREEN SEQ SEQUENCE SIM SIMILAR SPEC SPECIFICATION SPK SPEAKER STP SHIELDED TWISTED PAIR TV TELEVISION TYP TYPICAL UL UPSTAGE LEFT UNO UNLESS NOTED OTHERWISE UPS UNINTERRUPTIBLE POWER SUPPLY UR UPSTAGE RIGHT UTP UNSHIELDED TWISTED PAIR V VOLTAGE / VOLTS VC VOLUME CONTROL / CONTROLLER VoIP VOICE OVER INTERNET PROTOCOL W/ WITH NOTE: NOT ALL ABBREVIATIONS LISTED MAY BE USED IN THE PROJECT. LIST MAY NOT BE COMPREHENSIVE OF ALL ABBREVIATIONS USED IN PROJECT. 1 AV PANEL LEGEND Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET SUGGESTED SCOPE OF WORK DEMARCATION TABLE SCOPE OF WORK GENERAL PRIME CONTRACTOR DIVISION 26 INSTALLER AV INSTALLER OWNER FURNISHES INSTALLS WIRES FURNISHES INSTALLS WIRES FURNISHES INSTALLS WIRES FURNISHES INSTALLS WIRES POWER DISTRIBUTION SYSTEMS MAIN POWER SERVICE, CIRCUIT BREAKERS X X X STANDARD PANELBOARDS, CIRCUIT BREAKERS X X X STANDARD LOAD CENTERS, CIRCUIT BREAKERS X X X COMPANY SWITCH, CIRCUIT BREAKERS X X X CUSTOM SEQUENCING PANELBOARD, BREAKERS X†X X ISOLATION TRANSFORMERS X X X AC ELECTRICAL WIRING INFRASTRUCTURE WIRING X X X CONDUIT X X X TERMINATIONS X X TERMINATIONS OF AC ELECTRICAL TO WHIPS FOR EQUIPMENT RACKS X†X AC ELECTRICAL DISTRIBUTION WITHIN EQUIPMENT RACKS X X X WALL RECEPTACLES X X X AUDIO-VIDEO SYSTEMS WIRING INFRASTRUCTURE WIRING X X X CONDUIT X X CONDUIT RISER DRAWING X PULL LINES IN ALL EMPTY CONDUITS X X TERMINATIONS X X WALL PLATES X X X PULL BOXES X X† BUILDING DATA WIRING FROM BUILDING DATA TO CONNECTION IN PROXIMITY TO AUDIO-VIDEO EQUIPMENT X†∆X TERMINATION OF BUILDING DATA CONNECTION AT AUDIO-VIDEO EQUIPMENT X†∆X BUILDING FIRE ALARM WIRING FROM BUILDING FIRE ALARM TO AUDIO-VIDEO EQUIPMENT X† TERMINATION OF BUILDING FIRE ALARM CONNECTION TO AUDIO-VIDEO EQUIPMENT X AUDIO-VIDEO SYSTEMS EQUIPMENT, DEVICES AUDIO-VIDEO EQUIPMENT X X X EQUIPMENT RACKS X X X STANDARD ELECTRICAL BACK BOXES X X X SPECIALTY FLOOR, WALL, CEILING BOXES X X X OWNER FURNISHED, CONTRACTOR INSTALLED EQUIPMENT X X X OWNER FURNISHED, OWNER INSTALLED EQUIPMENT X X X † INSTALLATION PER DIRECTION OF AUDIO-VIDEO CONTRACTOR. ∆ OR BY RELEVANT CONTRACTOR. Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" GENERAL AUDIOVISUAL INFORMATION WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV0.2 10/13/2023 220025.00 NOTE: THIS TABLE IS FOR REFERENCE ONLY AND PROVIDES ONE EXAMPLE OF HOW ELECTRICAL CONTRACTOR MAY APPORTION WORK. AV CABLE SCHEDULE SIGNAL GROUP CABLE TYPE MANUFACTURER PART NUMBER PLENUM PART NUMBER DESCRIPTION OUTSIDE DIAMETER (in) MINIMUM BEND RADIUS (in) MINIMUM CONDUIT SIZE*COMMENTS A MIC WINDY CITY WIRE 22-1PREZ-BLK 22-1PREZP-BLK 22 AWG TWISTED PAIR TINNED COPPER, SHIELDED 0.134 1.5 3/4" B ICOM WINDY CITY WIRE 1802S-GRY 1802SP-GRY 18 AWG 2-CONDUCTOR, BARE COPPER, SHIELDED 0.158 2.5 3/4" B LINE WINDY CITY WIRE 22-1PREZ-BLK 22-1PREZP-BLK 22 AWG TWISTED PAIR TINNED COPPER, SHIELDED 0.134 1.5 3/4" B LINE-AES WINDY CITY WIRE 22-1PS-BRD-BLK 22-1PSP-BRD-BLK 22 AWG TWISTED PAIR, TINNED COPPER 0.235 2.5 3/4" C SPK10 WINDY CITY WIRE 10-02-BLK 10-02P-BLK 10 AWG TWISTED PAIR, NON-SHIELDED 0.34 4.5 1" C SPK10-NJ WINDY CITY WIRE NJ10-02 10 AWG TWISTED PAIR STRANDED THHN, NO JACKET 0.326 4.5 1" C SPK12 WINDY CITY WIRE 12-02-BLK 12-02P-BLK 12 AWG 2-CONDUCTOR BARE COPPER, NON-SHIELDED, JACKET 0.266 3.5 3/4" C SPK14 WINDY CITY WIRE 14-02-BLK 14-02P-BLK 14 AWG 2-CONDUCTOR OXYGEN FREE COPPER, NON-SHIELDED 0.21 2.7 3/4" C SPK16 WINDY CITY WIRE 16-02-BLK 16-02P-BLK 16 AWG 2-CONDUCTOR COPPER, NON-SHIELDED 0.184 1.64 3/4" C SPK16-4 WINDY CITY WIRE 16-04-GRY 16-04P-WHT 16 AWG 4-CONDUCTOR COPPER, NON-SHIELDED 0.215 1.95 3/4" D 8G WINDY CITY WIRE CAT6AS-BLK CAT6ASP-BLK ANSI/TIA 568-C.2 CATEGORY 6A, 4-TWISTED PAIR CABLE, SHIELDED 0.29 2.75 1" CABLE LENGTH SHALL NOT EXCEED 295' D CTRL WINDY CITY WIRE 22-1PREZ-BLK 22-1PREZP-BLK 22 AWG TWISTED PAIR TINNED COPPER, SHIELDED 0.134 1.5 3/4" D IR WINDY CITY WIRE 22-1PREZ-BLK 22-1PREZP-BLK 22 AWG TWISTED PAIR TINNED COPPER, SHIELDED 0.134 1.5 3/4" D NET WINDY CITY WIRE CRESCOM CRESCOMP 18 AWG, 1 PAIR BARE COPPER, NON-SHIELDED WITH 22 AWG 1 PAIR BARE COPPER SHIELDED 0.228 2.5 1" D STP WINDY CITY WIRE CAT6AS-BLK CAT6ASP-BLK ANSI/TIA 568-C.2 CATEGORY 6A, 4-TWISTED PAIR CABLE, SHIELDED 0.29 2.75 1" CABLE LENGTH SHALL NOT EXCEED 295' D USB C2G VARIES USB 3.0 CABLE 0.3 1.4 1" D UTP WINDY CITY WIRE CAT6A-BLU CAT6AP-BLU ANSI/TIA 568-C.2 CATEGORY 6A, 4-TWISTED PAIR CABLE, NON-SHIELDED 0.315 2.75 1" CABLE LENGTH SHALL NOT EXCEED 295' E DPORT C2G 554402 DISPLAYPORT CABLE 0.236 2.8 1" CABLE ORDERED BY LENGTH AS NEEDED E HDMI C2G VARIES HIGH SPEED HDMI CABLE 0.39 4.1 1" NOTE: CABLE DIAMETER = 0.39", CONNECTOR DIAMETER = 0.82" E SDI WINDY CITY WIRE RG6HD-BLK RG6HDP-BLK RG-6/U 75-OHM COAX CABLE, 18 AWG, SHIELDED, JACKET 0.274 5.36 1" E VGA EXTRON VGA M-M MD/xx MALE-MALE VGA CABLE WITH MOLDED CONNECTORS 0.36 2.25 1" VGA 100' OR UNDER. 1-1/2" MINIMUM CONDUIT SIZE REQUIRED TO PASS MOLDED VGA CONNECTOR F MMF-02 BELDEN FI4B002RB FI4B002PB OM4 MULTIMODE FIBER, 2 STRAND, 50/125μm, 2mm SUB-UNIT 0.26 3.9 1" F MMF-04 BELDEN FI4B004RB FI4B004PB OM4 MULTIMODE FIBER, 4 STRAND, 50/125μm, 2mm SUB-UNIT 0.32 4.8 1" F MMF-06 BELDEN FI4B006RB FI4B006PB OM4 MULTIMODE FIBER, 6 STRAND, 50/125μm, 2mm SUB-UNIT 0.36 5.4 1-1/4" F MMF-12 BELDEN FI4B012RB FI4B012PB OM4 MULTIMODE FIBER, 12 STRAND, 50/125μm, 2mm SUB-UNIT 0.51 7.65 2" F SMF-02 BELDEN FISB002RB FISB002PB OS2 SINGLEMODE FIBER, 2 STRAND, 9/125 μm, 2mm SUB-UNIT 0.26 3.9 1" F SMF-04 BELDEN FISB004RB FISB004PB OS2 SINGLEMODE FIBER, 4 STRAND, 9/125 μm, 2mm SUB-UNIT 0.32 4.8 1" F SMF-06 BELDEN FISB006RB FISB006PB OS2 SINGLEMODE FIBER, 6 STRAND, 9/125 μm, 2mm SUB-UNIT 0.36 5.4 1-1/4" F SMF-12 BELDEN FISB012RB FISB012PB OS2 SINGLEMODE FIBER, 12 STRAND, 9/125 μm, 2mm SUB-UNIT 0.51 7.65 2" G HLOOP WILLIAMS PLW F500 INDUCTION LOOP ALS CABLE - FLAT COPPER 0.87 3/4" R ANT WINDY CITY WIRE RG8X-BLK RG8P-BLK RG-8X MINI COAXIAL CABLE, 17 AWG, 50-OHM, JACKET 0.242 2.42 1" USE FOR ANTENNA RUNS OF 50' OR LESS. USE AMP-112533 CRIMP BNC CONNECTORS. R ANT-50 WEST PENN 98G8 2598G8 RG8/U COAXIAL CABLE, 10 AWG, 50-OHM, JACKET 0.405 4.05 1" USE FOR ANTENNA RUNS OF MORE THAN 50'. USE CN-BM98G8 CRIMP BNC CONNECTORS. AV DEVICE TYPE KEY DEVICE TYPE DESCRIPTION ALS ALS ANTENNA ANT MIC ANTENNA AV AV I/O BOX BP BUTTON PANEL BT BLUETOOTH INPUT ER EQUIPMENT RACK HDMI HDMI INPUT PRJ PROJECTOR SCN 178" X 284" SCREEN SPK LOUDSPEAKER SW SCREEN SWITCH VD VIDEO DISPLAY * MINIMUM CONDUIT SIZE BASED ON OUTER DIAMETER OF CABLE AND CONNECTORS AND/OR MINIMUM BEND RADIUS Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET HC HC HC HC HC HC HC HC HC HC DN DN HC HC HC HC HC HC DN FRONTFRONTSD SD SD FRONTAV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NE SE SWNW BUILDING DIAGRAM NOT TO SCALE A B E F H J K M P QCDN 1 2 3 4 5 6 8 7 F.3 F.9 G G.8 L L.6 M.4 5.8 7.2 9 GENERAL BUILDING STORAGE 167 MULTI-PURPOSE AREA 154 MERCYHEALTH ARENA 136 MALL CONNECTION 164 LOADING/RECEIVING/STORAGE 160 WARMING ROOM 159 STORAGE 158 MULTI-USE CONVENTION SPACE 156 ICE ARENA LOBBY 117 MAIN LOBBY 101 MEETING ROOM (A) 102 MEETING ROOM (B) 103 WET TEAM ROOM 4 123 WET TEAM ROOM 3 125 TEAM ROOM 5 126 TEAM ROOM 4 127 MAIN TEAM ROOM 132 REFRIGERATION 172 RESURFACER/ SHOP TOOLS/LAUNDRY 170 ? ? SKATE RENTAL 108 CHECK-IN/RENTAL 107 BREAKROOM 109 ADMIN 112 OFFICE 110 OFFICE 111 COPY AREA 112 (A) GEN STORAGE 153 ELEV 152 IT 150 J.C. 114ELECTRICAL 113 FOOD PREP 115 (A) BEER SALES 116 TEAM ROOM 3 149 TEAM ROOM 2 148 TEAM ROOM 1 147 REFEREE RR 146 REFEREE 145 J.C. 142 YH COACH 143 UNISEX TLT 141 WET TEAM ROOM #2 140 WET TEAM RR 139 WET TEAM ROOM #1 138 Y.H. STORAGE 137 ELECTRICAL 169 MECHANICAL 168 MULTIPURPOSE AREA CIRCULATION 154 (B) ICE RINK CIRCULATION 135 MAIN COACH 133 MAIN TEAM ROOM 132 METER/RISER 179 ELEC 134 TRAINING 129 PASSAGE 130 LAUNDRY 131 WOMEN'S 165 MEN'S 166 J.C. 163 TEMP STORAGE 174 F.S. STORAGE 175 IT/GEN STORAGE 176 HOCKEY STORAGE 173 MULTIPURPOSE SEATING 154 (A) STOR 104 FIRST AID 105 ELECTRIC 157 AV CLOSET 157 (A) WOMENS 122 MEN'S 121 VESTIBULE 118 NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated FIRST FLOOR PLAN - OVERALL WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV2.1 10/13/2023 220025.00 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. 1/16" = 1'-0" FIRST FLOOR1 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET DN HC HC HC NE SE SWNW BUILDING DIAGRAM NOT TO SCALE AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) H J K M P QN 1 2 3 L L.6 M.4 MERCYHEALTH ARENA 136 REFRIGERATION 172 RESURFACER/ SHOP TOOLS/LAUNDRY 170 MECHANICAL 168 ELECTRICAL 169 STORAGE 135(A) MAIN TEAM ROOM 132 METER/RISER 179 ELEC 134 MAIN COACH 133 TRAINING 129 PASSAGE 130 LAUNDRY 131 WET TEAM ROOM #2 140 WET TEAM RR 139 WET TEAM ROOM #1 138 Y.H. STORAGE 137 YH COACH 143 UNISEX TLT 141 J.C. 142 ICE RINK CIRCULATION 135 WB-2 FM ANT/MPA-A 22'-C WB-6B FM ALS/MPA 22'-C WB-2 FM ANT/MPA-B 22'-C 1 AV4.2 WB-61 FM BT/MHA-1 NOTE /1 AV2.1c /1 AV2.1b /1 AV2.1d WB-6 FM AV/MHA-1 18"-C UNISEX TLT 128 PASSAGE 130 VESTIBULE 171 PASSAGE 144 CLOSET 133(A) MULTIPURPOSE AREA CIRCULATION 154 (B) B1 /1 AV3.1aRCP:NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated FIRST FLOOR PLAN -SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV2.1a 10/13/2023 220025.00 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. 1/8" = 1'-0" FIRST FLOOR PLAN - SE QUAD1 KEYNOTE LEGEND B1 BOX MOUNTED SO THAT THE DEVICE AND COVERPLATE MAY BE INSTALLED ABOVE THE COUNTERTOP. Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET HC HC HC HC FRONTFRONTFRONTNE SE SWNW BUILDING DIAGRAM NOT TO SCALE AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) A B E F H C D 1 2 3 F.3 F.9 G G.8WARMING ROOM 159 STORAGE 158 ELECTRIC 157 MULTI-USE CONVENTION SPACE 156 LOBBY / LINK 155 MULTI-PURPOSE AREA 154 GENERAL BUILDING STORAGE 167 HOCKEY STORAGE 173 IT/GEN STORAGE 176 F.S. STORAGE 175 TEMP STORAGE 174 J.C. 163 WOMEN'S 165 MEN'S 166 FAMILY TLT 162 MALL CONNECTION 164 LOADING/RECEIVING/STORAGE 160 P ▼FS ER/MPA FLR P ▼FS ER/MUC-1 FLR AV4.5/4AV4.5/2 6 AV4.5 WB-6B FM ANT/MUC-A1 22'-C WB-6B FM ALS/MUC-1 22'-C WB-6B FM ANT/MUC-B1 22'-C WB-2 FM ANT/MPA-A 22'-C WB-6B FM ALS/MPA 22'-C WB-2 FM ANT/MPA-B 22'-C AV4.3/1WB-1 FM BT/MPA NOTE FS ER/MUC-2 FLR P ▼ WB-X3 FM AV/MUC-E RHT P ▼ WB-X3 FM AV/MUC-S1 18"-C P ▼ WB-X3 FM AV/MUC-S2 30"-C P ▼ WB-X3 FM AV/MUC-N 28"-C /1 AV2.1a /1 AV2.1d/1 AV2.1c WB-1 FM SW/MUC-E SHT P ▼ WB-X3 FM AV/MPA-S 18"-C P ▼ WB-X3 FM AV/MPA-E RHT 3 AV4.3 4 AV4.3 1 AV4.4 AV4.4/2 3 AV4.5 WB-6B FM ANT/MUC-B2 22'-C WB-6B FM ALS/MUC-2 22'-C PROJECTION SCREEN SHOWN ON PLAN FOR REFERENCE, SEE RCP FOR ADDITIONAL INFORMATION PROJECTION SCREEN SHOWN ON PLAN FOR REFERENCE, SEE RCP FOR ADDITIONAL INFORMATION PROJECTION SCREEN SHOWN ON PLAN FOR REFERENCE, SEE RCP FOR ADDITIONAL INFORMATION PROJECTION SCREEN SHOWN ON PLAN FOR REFERENCE, SEE RCP FOR ADDITIONAL INFORMATION PROJECTION SCREEN AND SWITCH DEVICES ARE INCLUDED AS PART OF MULT-PURPOSE ARENA VIDEO ADD ALTERNATE. FURNISH AND INSTALL I/O BOX AV/MPA-E AND SW/MPA-E BOX AS PART BASE BID. PROJECTION SCREEN AND SWITCH INCLUDED AS PART OF MULT-PURPOSE ARENA VIDEO ADD ALT, I/O BOX AV/MPA-N IS INCLUDED IN BASE BID. WB-1 FM SW/MPA-E SHT AV CLOSET 157 (A) AV CLOSET 167 (B)AV4.5/5PASSAGE 144 MULTIPURPOSE AREA CIRCULATION 154 (B) MULTIPURPOSE AREA CIRCULATION 154 (B) MULTIPURPOSE SEATING 154 (A)AV4.3/2B1 RCP:/1 AV3.1b WB-3 FM SW/MUC-N SHT HATCHING INDICATES EQUIPMENT REQUIRED FOR THE MULTI-PURPOSE ARENA VIDEO ADD ALTERNATE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated FIRST FLOOR PLAN -NE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV2.1b 10/13/2023 220025.00 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. 1/8" = 1'-0" FIRST FLOOR PLAN - NE QUAD1 KEYNOTE LEGEND B1 BOX MOUNTED SO THAT THE DEVICE AND COVERPLATE MAY BE INSTALLED ABOVE THE COUNTERTOP. Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET HC HC HC HC HC HC DN NE SE SWNW BUILDING DIAGRAM NOT TO SCALE AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) A B E FCD 4 5 6 8 7 F.3 F.9 5.8 7.2 9 MEETING ROOM (B) 103 MULTI-USE CONVENTION SPACE 156 MEETING ROOM (A) 102 FIRST AID 105 STOR 104 MULTI-PURPOSE AREA 154 MENS 106A MAIN LOBBY 101 VESTIBULE 100 SKATE RENTAL 108 ADMIN 112 BREAKROOM 109 OFFICE 110 OFFICE 111 GEN STORAGE 153 CONCESSIONS 115 (B) COPY AREA 112 (A) P ▼ WB-526 FM VD/LOB-1 MPE P ▼ WB-526 FM VD/LOB-2 MPE P ▼ WB-526 FM VD/LOB-3 MPE P ▼ WB-526 FM VD/LOB-4 MPE P ▼ WB-526 FM VD/LOB-5 MPE P ▼ WB-526 FM VD/LOB-6 MPE P ▼ WB-526 FM VD/BR MPE AV4.5/1 AV4.1/1 AV4.1/3P ▼ WB-526 FM VD/RENT MPE P ▼ WB-X3 FM AV/MUC-S3 18"-C P ▼ WB-X3 FM AV/MUC-W 28"-C /1 AV2.1b /1 AV2.1a /1 AV2.1d WB-1 FM SW/MUC-W SHT CHECK-IN/RENTAL 107 WB-63 FM BP/BR SHT PWB-61 FM HDMI/BR RHT 1 AV4.4 3 AV4.5 P ▼SM ER/LOB 27"-B WB-6B FM ALS/MUC-3 22'-C WB-6B FM ANT/MUC-B3 22'-C WB-6B FM ANT/MUC-A3 22'-C WB-2 FM ANT/MUC-A2 22'-C PROJECTION SCREEN SHOWN ON PLAN FOR REFERENCE, SEE RCP FOR ADDITIONAL INFORMATION WB-1 FM SW/MPA-N SHT P ▼ WB-X3 FM AV/MPA-N 18"-C FOOD PREP 115 (A) ELECTRICAL 113 PASSAGE 144 LOCKER ALCOVE 101 (A) ELEV 152 MULTIPURPOSE AREA CIRCULATION 154 (B) MULTIPURPOSE SEATING 154 (A) MULTIPURPOSE AREA CIRCULATION 154 (B) AV4.1/2 G1 G1 G1 G1 PROJECTION SCREENS AND SWITCH DEVICES ARE INCLUDED AS PART OF MULT-PURPOSE ARENA VIDEO ADD ALTERNATE. FURNISH AND INSTALL I/O BOX AV/MPA-E AND SW/MPA-E BOX AS PART BASE BID. 5 AV4.3 RCP:/1 AV3.1c P ▼ WB-X3 FM AV/MPA-W 18"-C WOMENS 106B HATCHING INDICATES EQUIPMENT REQUIRED FOR THE MULTI-PURPOSE ARENA VIDEO ADD ALTERNATE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated FIRST FLOOR PLAN -NW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV2.1c 10/13/2023 220025.00 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. 1/8" = 1'-0" FIRST FLOOR PLAN - NW QUAD1 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET DN HC HC HC NE SE SWNW BUILDING DIAGRAM NOT TO SCALE AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) H J K M PN 5 6 8 7 L L.6 M.4 5.8 7.2 9 TRAINING 129 YH COACH 143 J.C. 142 GEN STORAGE 153 CONCESSIONS 115 (B) TEAM ROOM 1 147 MERCYHEALTH ARENA 136 TEAM ROOM 4 127 TEAM ROOM 5 126 WET TEAM ROOM 3 125 WET TEAM RR 124 WET TEAM ROOM 4 123 ICE RINK CIRCULATION 151 TEAM ROOM 3 149 TEAM ROOM 2 148 IT 150 J.C. 114 BEER SALES 116 ICE ARENA LOBBY 117 MEN'S 121 /1 AV2.1c /1 AV2.1b /1 AV2.1a VESTIBULE 118 ? ? FOOD PREP 115 (A) ELECTRICAL 113 REFEREE RR 146 REFEREE 145 UNISEX TLT 128 PASSAGE 144 PASSAGE 130 LOCKER ALCOVE 101 (A) ELEV 152 RCP:/1 AV3.1d WOMENS 122 FAMILY RESTROOM 120 WELLNESS ROOM 119 NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated FIRST FLOOR PLAN -SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV2.1d 10/13/2023 220025.00 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. 1/8" = 1'-0" FIRST FLOOR PLAN - SW QUAD1 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET HC HC HC HC HC HC HC HC HC H J K M P QN 1 2 3 G.8 L L.6 M.4 MEZZANINE 201 SPONSOR SUITE 202 PRESS BOX 203 MEZZANINE 201 P ▼SM ER/MHA FLR 1 AV4.2 WB-6B FM ANT/MHA-A 9'6"-C WB-6B FM ALS/MHA 9'6"-C WB-2 FM BT/MHA-2 SHT AV4.1/4P ▼ WB-526 FM VD/SS MPE /1 AV2.2d WB-8A FM AV/MHA-2 RHT ARENA OPEN TO BELOW ? ?COORDINATE GROMMETS OR PASSTHRU'S IN THE COUNTERTOP WITH THE COUNTERTOP INSTALLER. PROVIDE A MINIMUM OF TWO (2) 2" GROMMETS IN THE COUNTER TO ALLOW CABLES TO ROUTE FROM AV/MHA-2 TO ABOVE COUNTER. G1 WB-1 FM BP/SS 54"-C RCP:/1 AV3.1a MERCYHEALTH ARENA 136 MERCYHEALTH ARENA 136 AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated MEZZANINE FLOOR PLAN - SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV2.2a 10/13/2023 220025.00 1/8" = 1'-0" MEZZANINE FLOOR PLAN - SE QUAD1 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. KEYNOTE LEGEND G1 BLOCKING REQUIRED TO SUPPORT WEIGHT OF DISPLAY WITH A 5x SAFETY FACTOR. GC COORDINATE DISPLAY WEIGHT WITH AV CONTRACTOR FOR EACH DISPLAY FURNISHED. Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET HC HC HC HC HC HC AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) NE SE SWNW BUILDING DIAGRAM NOT TO SCALE H J K M P QN 5 6 8 7 L L.6 M.4 5.8 7.2 9 PRESS BOX 203 ROOF ACCESS 204 ELEV 152 WB-6B FM ANT/MHA-B 9'6"-C /1 AV2.2a ARENA OPEN TO BELOW WESTERN MEZZANINE PLAN SHOWN FOR REFERENCE ONLY SEE FIRST FLOOR RCP FOR AV DEVICE LOCATIONS RCP:/1 AV3.1d MERCYHEALTH ARENA 136 NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated MEZZANINE FLOOR PLAN - SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV2.2d 10/13/2023 220025.00 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. 1/8" = 1'-0" MEZZANINE FLOOR PLAN - SW QUAD1 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET H J K M P QN 1 2 3 L L.6 M.4 ELEC 134 METER/RISER 179 REFRIGERATION 172 RESURFACER/ SHOP TOOLS/LAUNDRY 170 STORAGE 135(A) WB-6A SM SPK/MHA-27 STRC WB-6A SM SPK/MHA-28 STRC WB-6A SM SPK/MHA-29 STRC WB-6A SM SPK/MHA-30 STRC WB-6A SM SPK/MHA-22 STRC WB-6A SM SPK/MHA-21 STRC WB-6A SM SPK/MHA-20 STRC WB-6A SM SPK/MHA-19 STRC 26'-0"26'-0" WB-6A SM SPK/MHA-7 STRC WB-6A SM SPK/MHA-8 STRC WB-6A SM SPK/MHA-9 STRC WB-6A SM SPK/MHA-3 STRC WB-6A SM SPK/MHA-2 STRC WB-6A SM SPK/MHA-1 STRC EQ EQ /1 AV3.1d /1 AV3.1b ARENA CENTERLINES /1 AV3.1c 22'-0"22'-0"25'-6"29'-0"46'-0"66'-0"46'-0"EQS1 S1 S1 S1 S1 S1 S2 S2 S2 S2 S2 S2 S2 S2 WB-6A SM SPK/MHA-4 STRC WB-6A SM SPK/MHA-5 STRC WB-6A SM SPK/MHA-6 STRCEQEQ EQEQEQEQFLOOR PLAN:/1 AV2.1a MERCY HEALTH ARENA 136 AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated FIRST FLOOR PLAN RCP - SE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV3.1a 10/13/2023 220025.00 1/8" = 1'-0" FIRST FLOOR RCP - SE QUAD1 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. KEYNOTE LEGEND S1 REFER TO DETAIL 9/AV4.9a FOR DOWN-FIRING SPEAKER MOUNTING & INFRASTRUCTURE REQUIREMENTS S2 REFER TO DETAIL 2/AV4.2 FOR MERCY HEALTH ARENA SEATING SPEAKER MOUNTING & INFRASTRUCTURE REQUIREMENTS Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) A B E F H C D 1 2 3 F.3 F.9 G G.8 MULTI-USE CONVENTION SPACE 156 LOBBY / LINK 155 STORAGE 158 ELECTRIC 157 WARMING ROOM 159 LOADING/RECEIVING/STORAGE 160 ? ? ? ? MEN'S 166 WOMEN'S 165 GENERAL BUILDING STORAGE 167 WB-6A SM SPK/MPA-22 STRC WB-6A SM SPK/MPA-23 STRC WB-6A SM SPK/MPA-24 STRC WB-6A SM SPK/MPA-25 STRC 26'-0"26'-0" WB-6A SM SPK/MPA-12 STRC WB-6A SM SPK/MPA-11 STRC WB-6A SM SPK/MPA-10 STRC WB-6A SM SPK/MPA-6 STRC WB-6A SM SPK/MPA-5 STRC WB-6A SM SPK/MPA-4 STRC WB-6A SM SPK/MPA-1 STRC WB-6A SM SPK/MPA-2 STRCWB-6A SM SPK/MPA-3 STRC 20'-0"20'-0"20'-0"20'-0"30'-8"WB-6A SM SPK/MUC-11 STRC WB-6A SM SPK/MUC-13 STRC WB-6A SM SPK/MUC-14 STRC WB-6A SM SPK/MUC-17 STRC WB-6A SM SPK/MUC-16 STRCWB-6A SM SPK/MUC-12 STRC WB-6A SM SPK/MUC-15 STRC WB-6A SM SPK/MUC-19 STRC WB-6A SM SPK/MUC-20 STRC WB-6A SM SPK/MUC-18 STRC 11'-10"20'-0"20'-7"19'-5"20'-0"13'-0"30'-0"WB-6A SM SPK/MUC-1 STRC WB-6A SM SPK/MUC-3 STRC WB-6A SM SPK/MUC-4 STRC WB-6A SM SPK/MUC-7 STRCWB-6A SM SPK/MUC-6 STRCWB-6A SM SPK/MUC-2 STRC WB-6A SM SPK/MUC-5 STRC WB-6A SM SPK/MUC-9 STRC WB-6A SM SPK/MUC-10 STRC WB-6A SM SPK/MUC-8 STRC P ▼ WB-6B SM PRJ/MUC-E STRC P ▼ WB-6B SM PRJ/MUC-N STRCPNA SM SCN/MUC-N MPE PNA SM SCN/MUC-E MPE EQ EQEQROOM CENTERLINES 30'-8"31'-0"30'-0"16'-5"/1 AV3.1c /1 AV3.1a /1 AV3.1d P ▼ WB-6B SM PRJ/MPA-E STRC P ▼ WB-6B SM PRJ/MPA-N STRC PNA SM SCN/MPA-E MPE PNA SM SCN/MPA-N MPE 32'-6"22'-0"22'-0"21'-0"S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S3 S3 S3 S3 20'-6" PROJECTION SCREEN AND PROJECTOR DEVICES ARE INCLUDED AS PART OF MULT-PURPOSE ARENA VIDEO ADD ALTERNATE. FURNISH AND INSTALL BOXES, POWER, AND CONDUIT AS PART BASE BID. PROJECTION SCREEN AND PROJECTOR DEVICES ARE INCLUDED AS PART OF MULT-PURPOSE ARENA VIDEO ADD ALTERNATE. FURNISH AND INSTALL BOXES, POWER, AND CONDUIT AS PART BASE BID. B2 B2 B2 B2 FLOOR PLAN:/1 AV2.1b MULTI-PURPOSE ARENA 154 PROVIDE PROTECTIVE CAGE PROVIDE PROTECTIVE CAGE S1 S1 WB-6A SM SPK/MPA-9 STRC WB-6A SM SPK/MPA-7 STRC WB-6A SM SPK/MPA-8 STRC NE SE SWNW BUILDING DIAGRAM NOT TO SCALE HATCHING INDICATES EQUIPMENT REQUIRED FOR THE MULTI-PURPOSE ARENA VIDEO ADD ALTERNATE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated FIRST FLOOR PLAN RCP - NE QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV3.1b 10/13/2023 220025.00 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. 1/8" = 1'-0" FIRST FLOOR RCP - NE QUAD1 KEYNOTE LEGEND B2 REFER TO DETAIL 10/AV4.9a FOR PROJECTION SCREEN POWER AND CONDUIT INFRASTRUCTURE REQUIREMENTS. S1 REFER TO DETAIL 9/AV4.9a FOR DOWN-FIRING SPEAKER MOUNTING & INFRASTRUCTURE REQUIREMENTS S3 REFER TO DETAIL 6/AV4.3 FOR MULTI-PURPOSE ARENA SEATING SPEAKER MOUNTING & INFRASTRUCTURE REQUIREMENTS Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET A B E F HCD 4 5 6 8 7 F.3 F.9 G G.8 5.8 7.2 9 SKATE RENTAL 108 CHECK-IN/RENTAL 107 OFFICE 111 CONCESSIONS 115 (B) MAIN LOBBY 101 MAIN LOBBY 101 VESTIBULE 100 MENS 106A MEETING ROOM (A) 102 MEETING ROOM (B) 103 FIRST AID 105 STOR 104 MULTI-USE CONVENTION SPACE 156 FOOD PREP 115 (A) WB-6A SM SPK/MPA-26 STRC WB-6A SM SPK/MPA-27 STRC WB-6A SM SPK/MPA-28 STRC WB-6A SM SPK/MPA-29 STRC WB-6A SM SPK/MPA-18 STRC WB-6A SM SPK/MPA-17 STRC WB-6A SM SPK/MPA-16 STRC WB-6A SM SPK/MPA-13 STRC WB-6A SM SPK/MPA-14 STRC WB-6A SM SPK/MPA-15 STRC 20'-0"20'-0"20'-0"20'-0"13'-0" WB-6A SM SPK/MUC-21 STRC WB-6A SM SPK/MUC-23 STRC WB-6A SM SPK/MUC-24 STRC WB-6A SM SPK/MUC-27 STRC WB-6A SM SPK/MUC-26 STRC WB-6A SM SPK/MUC-22 STRC WB-6A SM SPK/MUC-25 STRC WB-6A SM SPK/MUC-29 STRC WB-6A SM SPK/MUC-30 STRC WB-6A SM SPK/MUC-28 STRC P ▼ WB-6B SM PRJ/MUC-W STRC PNA SM SCN/MUC-W MPE16'-5"32'-0"/1 AV3.1a /1 AV3.1d /1 AV3.1b 21'-0"22'-0"22'-0"32'-6"28'-6"26'-0"26'-0"28'-6" S3 S3 S3 S3 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 20'-6" B2 B2 FLOOR PLAN:/1 AV2.1c MULTI-PURPOSE ARENA 154 WB-6A SM SPK/MPA-21 STRC WB-6A SM SPK/MPA-20 STRC WB-6A SM SPK/MPA-19 STRC S1 S1 S1 ELEV 152 AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated FIRST FLOOR PLAN RCP - NW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV3.1c 10/13/2023 220025.00 1/8" = 1'-0" FIRST FLOOR RCP - NW QUAD1 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. KEYNOTE LEGEND B2 REFER TO DETAIL 10/AV4.9a FOR PROJECTION SCREEN POWER AND CONDUIT INFRASTRUCTURE REQUIREMENTS. S1 REFER TO DETAIL 9/AV4.9a FOR DOWN-FIRING SPEAKER MOUNTING & INFRASTRUCTURE REQUIREMENTS S3 REFER TO DETAIL 6/AV4.3 FOR MULTI-PURPOSE ARENA SEATING SPEAKER MOUNTING & INFRASTRUCTURE REQUIREMENTS Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET HC HC HC AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) H J K M P QN 5 6 8 7 L L.6 M.4 5.8 7.2 9 CONCESSIONS 115 (B) ICE ARENA LOBBY 117 BEER SALES 116 FOOD PREP 115 (A) J.C. 114 MEN'S 121 WB-6A SM SPK/MHA-31 STRC WB-6A SM SPK/MHA-32 STRC WB-6A SM SPK/MHA-33 STRC WB-6A SM SPK/MHA-34 STRC WB-6A SM SPK/MHA-26 STRC WB-6A SM SPK/MHA-25 STRC WB-6A SM SPK/MHA-24 STRC WB-6A SM SPK/MHA-23 STRC WB-6A SM SPK/MHA-16 STRC WB-6A SM SPK/MHA-17 STRC WB-6A SM SPK/MHA-18 STRC WB-6A SM SPK/MHA-15 STRC WB-6A SM SPK/MHA-14 STRCWB-6A SM SPK/MHA-13 STRC ARENA CENTERLINES /1 AV3.1a/1 AV3.1b /1 AV3.1c 29'-0"25'-6"22'-0"22'-0"EQS1 S1 S1 S1 S1 S1 S1 S1 S1 S2 S2 S2 S2 S2 S2 S2 S2 EQEQFLOOR PLAN:/1 AV2.1d WB-6A SM SPK/MHA-10 STRC WB-6A SM SPK/MHA-11 STRC WB-6A SM SPK/MHA-12 STRC EQEQEQEQMERCY HEALTH ARENA 136 FAMILY RESTROOM 120 ELEV 152 NE SE SWNW BUILDING DIAGRAM NOT TO SCALE NN Consultant: Project: Location: Sheet: Plan North True North Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated FIRST FLOOR PLAN RCP SW QUAD WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV3.1d 10/13/2023 220025.00 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. 1/8" = 1'-0" FIRST FLOOR RCP - SW QUAD1 KEYNOTE LEGEND S1 REFER TO DETAIL 9/AV4.9a FOR DOWN-FIRING SPEAKER MOUNTING & INFRASTRUCTURE REQUIREMENTS S2 REFER TO DETAIL 2/AV4.2 FOR MERCY HEALTH ARENA SEATING SPEAKER MOUNTING & INFRASTRUCTURE REQUIREMENTS Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET E F D F.3 F.9 G 4'-2"6'-2"P ▼ WB-526 FM VD/LOB-1 MPE P ▼ WB-526 FM VD/LOB-2 MPE P ▼ WB-526 FM VD/LOB-3 MPE P ▼ WB-526 FM VD/LOB-4 MPE P ▼ WB-526 FM VD/LOB-5 MPE P ▼ WB-526 FM VD/LOB-6 MPE4'-2"6'-2"(3) 55" DISPLAYS (3) 55" DISPLAYS 3'-9"2'-3"2'-3"35'-9" LOCATE BOXES TO AVOID COLUMN IN THE WALL 2'-2"2'-3"2'-3"2'-2" LOCATE BOXES TO AVOID COLUMN IN THE WALL 5 4'-2"6'-0"4'-0"5'-3"P ▼ WB-526 FM VD/BR MPE 55" DISPLAY 1'-6"PWB-61 FM HDMI/BR RHT WB-63 FM BP/BR SHT EQ EQ 5'-6"6'-6"P ▼ WB-526 FM VD/SS MPE 55" DISPLAY 4'-6"WB-1 FM BP/SS 54"-C AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) P ▼ WB-526 FM VD/RENT MPE 7'-0"5'-0"85" DISPLAY 12'-2"3'-4" Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated LOBBY & BREAKROOM SECTIONS & ELEVATIONS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV4.1 10/13/2023 220025.00 1/4" = 1'-0" MAIN LOBBY 101 EAST ELEVATION1 1/4" = 1'-0" BREAK ROOM 109 SOUTH ELEVATION3 1/4" = 1'-0" SPONSOR SUITE NORTH ELEVATION4 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. 1/4" = 1'-0" CHECK-IN/RENTAL 107 EAST ELEVATION2 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET AV4.2 2 WB-6A SM SPK/MHA-22 STRC WB-6A SM SPK/MHA-30 STRC 1'-6"1'-6"MOUNT PER LOUDSPEAKER MOUNTING DETAIL AV4.9A/5, TYPICAL WB-8A FM AV/MHA-2 RHT P ▼SM ER/MHA FLR WB-6 FM AV/MHA-1 18"-C P ▼ WB-526 FM VD/SS MPE WB-61 FM BT/MHA-1 NOTE WB-1 FM BP/SS 54"-C B1 WB-6A SM SPK/MHA-7 STRC WB-6A SM SPK/MHA-8 STRC WB-6A SM SPK/MHA-9 STRC DANLEY SH-50 APE RIGGING ASSEMBLY P1000 UNISTRUT SPANS STRUCTURE ARENA STRUCTURE LOUDSPEAKER BOX, REFER TO RCP FOR BOX SIZE/TYPE ALIGN SPEAKER WITH BOTTOM OF TRUSS TILT LOUDSPEAKER DOWN TO AIM AT THE VERTICAL CENTER OF THE SEATING AREA. ALLOW FOR +/-15-DEGREES TILT FOR FIELD ADJUSTMENTS. AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated MERCY HEALTH ARENA SECTIONS & ELEVATIONS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV4.2 10/13/2023 220025.00 1/4" = 1'-0" MERCY HEALTH ARENA SECTION1 1 1/2" = 1'-0" DANLEY LOUDSPEAKER RIGGING DETAIL2 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. KEYNOTE LEGEND B1 BOX MOUNTED SO THAT THE DEVICE AND COVERPLATE MAY BE INSTALLED ABOVE THE COUNTERTOP. DETAIL APPLIES TO LOUDSPEAKERS SPK/MHA-16 THROUGH SPK/MHA-21 AND SPK/MHA-24 THROUGH SPK/MHA-31 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET AV4.3 6 1 AV4.4 WB-6A SM SPK/MPA-24 STRC EAW MK5394 LOUDSPEAKER ARENA STRUCTURE EAW MK2(5)000 U-BRAKET THEADED ROD ATTACHMENT TO UNISTRUT ABOVE ALIGN SPEAKER WITH BOTTOM OF TRUSS TILT LOUDSPEAKER DOWN TO AIM AT THE VERTICAL CENTER OF THE SEATING AREA. ALLOW FOR +/-15-DEGREES TILT FOR FIELD ADJUSTMENTS. AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) 1 AV4.4 P ▼ WB-6B SM PRJ/MPA-N STRC PNA SM SCN/MPA-N MPE WB-1 FM BT/MPA NOTE P ▼ WB-X3 FM AV/MPA-S 18"-C B1 353 AV4.3 4 AV4.3 P ▼ WB-X3 FM AV/MPA-N 18"-C PNA SM SCN/MPA-N MPE EQ EQ WB-1 FM SW/MPA-N SHT 1'-6"5 AV4.3 12'-0"21'-4"13'-4"HATCHING INDICATES EQUIPMENT REQUIRED FOR THE MULTI-PURPOSE ARENA VIDEO ADD ALTERNATE 3 53 AV4.3 4 AV4.3 WB-2 FM ANT/MPA-A 22'-C WB-6B FM ALS/MPA 22'-C WB-2 FM ANT/MPA-B 22'-C 1'-6"4'-5"4'-5"1'-6" WB-1 FM SW/MPA-N SHT P ▼ WB-X3 FM AV/MPA-N 18"-C 1'-6"Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated MULTI-PURPOSE ARENA SECTIONS & ELEVATIONS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV4.3 10/13/2023 220025.00 1/8" = 1'-0" MULTI-PURPOSE ARENA CROSS SECTION LOUDSPEAKERS3 1 1/2" = 1'-0" EAW LOUDSPEAKER RIGGING DETAIL6 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. 1/8" = 1'-0" MULTI-PURPOSE ARENA CROSS SECTION VIDEO4 1/8" = 1'-0" MULTI-PURPOSE ARENA NORTH ELEVATION1 1/8" = 1'-0" MULTI-PURPOSE ARENA SOUTH ELEVATION2 KEYNOTE LEGEND B1 BOX MOUNTED SO THAT THE DEVICE AND COVERPLATE MAY BE INSTALLED ABOVE THE COUNTERTOP. DETAIL APPLIES TO LOUDSPEAKERS SPK/MPA-16 THROUGH SPK/MPA-23 1/8" = 1'-0" MULTI-PURPOSE ARENA CROSS SCETION AT AV/MPA-N5 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 3 AV4.3 4 AV4.3 P ▼ WB-6B SM PRJ/MPA-E STRC PNA SM SCN/MPA-E MPE WB-1 FM SW/MPA-E SHT P ▼ WB-X3 FM AV/MPA-E RHT F HF.3 F.9 G G.8 1 AV4.4 PNA SM SCN/MPA-E MPE P ▼ WB-X3 FM AV/MPA-E RHT 36'-0"73'-0" WB-1 FM SW/MPA-E SHT12'-0"13'-4"21'-4"1'-9"AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) HATCHING INDICATES EQUIPMENT REQUIRED FOR THE MULTI-PURPOSE ARENA VIDEO ADD ALTERNATE Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated MULTI-PURPOSE ARENA SECTIONS & ELEVATIONS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV4.4 10/13/2023 220025.00 1/8" = 1'-0" MULTI-PURPOSE ARENA LONGITUDINAL SECTION1 1/8" = 1'-0" MULTI-PURPOSE ARENA EAST ELEVATION2 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 346 AV4.5 8'-0"PNA SM SCN/MUC-N MPE EQ EQ 13'-4"21'-4" P ▼ WB-X3 FM AV/MUC-N 28"-C WB-6B FM ANT/MUC-B2 22'-C WB-6B FM ALS/MUC-2 22'-C WB-2 FM ANT/MUC-A2 22'-C 2'-4"1'-6"PORTABLE STAGE PLATFORM HEIGHT WB-6B FM ALS/MUC-3 22'-C WB-6B FM ANT/MUC-A3 22'-C WB-3 FM SW/MUC-N SHT PNA SM SCN/MUC-N MPE WB-6A SM SPK/MUC-11 STRC P ▼ WB-6B SM PRJ/MUC-N STRC WB-6A SM SPK/MUC-13 STRC WB-6A SM SPK/MUC-14 STRC WB-6A SM SPK/MUC-15 STRC WB-6A SM SPK/MUC-19 STRC AV4.5 7 AV TAG LEGEND BOX MNT AV/XXX-X HT P ▼ DEVICE LOCATION ID ASSOCIATED BOX MOUNTING TYPE (SEE AV0.1) ASSOCIATED BOX TYPE (REFER TO AV9.x SERIES SHEETS FOR BOX TYPES USED IN PROJECT) ASSOCIATED BOX MOUNTING HEIGHT (SEE AV0.1) WHEN PRESENT, INDICATES POWER & DATA REQUIREMENTS (SEE AV9.x SERIES SHEETS) HATCHING INDICATES EQUIPMENT REQUIRED FOR THE MULTI-PURPOSE ARENA VIDEO ADD ALTERNATE 3 46 AV4.5 P ▼ WB-X3 FM AV/MUC-S2 30"-C MOUNTED SO COVER/DOOR CAN OPEN WITHOUT HITTING BLEACHER 2'-6"P ▼ WB-6B SM PRJ/MUC-E STRC P ▼ WB-6B SM PRJ/MUC-W STRC PNA SM SCN/MUC-W MPE PNA SM SCN/MUC-E MPE ABECD EQ EQ PNA SM SCN/MUC-W MPE 8'-0"13'-4"21'-4" P ▼ WB-X3 FM AV/MUC-W 28"-C WB-1 FM SW/MUC-W SHT 3 AV4.5 WB-6B FM ANT/MUC-B3 22'-C 2'-4"1'-6"PORTABLE STAGE PLATFORM HEIGHT A B ECD PNA SM SCN/MUC-E MPE 8'-0"EQEQ 13'-4"21'-4"WB-6B FM ANT/MUC-A1 22'-C WB-6B FM ALS/MUC-1 22'-C WB-6B FM ANT/MUC-B1 22'-C 22'-0"P ▼ WB-X3 FM AV/MUC-E RHT WB-1 FM SW/MUC-E SHT 3 AV4.5 2'-4"Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated MULTI-USE CONVENTION SECTIONS & ELEVATIONS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV4.5 10/13/2023 220025.00 1/8" = 1'-0" MULTI-USE CONVENTION SPACE NORTH ELEVATION4 1/8" = 1'-0" MULTI-USE CONVENTION SPACE NS SECTION6 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. 1/8" = 1'-0" MULTI-USE CONVENTION SPACE SOUTH ELEVATION5 1/8" = 1'-0" MULTI-USE CONVENTION SPACE LONGITUDINAL SECTION3 1/8" = 1'-0" MULTI-USE CONVENTION SPACE WEST ELEVATION1 1/8" = 1'-0" MULTI-USE CONVENTION SPACE EAST ELEVATION2 3/8" = 1'-0" PROJECTOR LIFT ENLARGED VIEW7 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET FRONT FRONTFRONTINSTALL SWITCH BOX FOR DATA, POWER, & AV. POWER INSTALLED HERE DATA INSTALLED HERE CONDUIT ABOVE CEILING STUBBED AT 45 DEGREES IF FREE -AIR CABLE APPLICABLE RESERVED FOR AV CABLE OR CONNECTIONS. DISPLAY BACK BOX SHOULD BE MOUNTED WITHIN TWO STUD CAVITIES, PROVIDING CLEARANCE FOR CUT-IN BOXES AS SHOWN ON DRAWING. GENERAL NOTE: PROJECT STANDARD FOR ALL DISPLAY BACK BOXES TV/XXX-X SHALL INCLUDE, AT LEAST, A SINGLE AV CONDUIT STUBBED ABOVE CEILING. CERTAIN DISPLAY BACK BOXES MAY CALL FOR MORE THAN A SINGLE AV CONDUIT CONNECTION TO ACCOMODATE MULTIPLE SIGNAL TYPES. POWER INSTALLED HERE DATA INSTALLED HERE RESERVED FOR AV CABLES OR CONNECTIONS INSTALL SWITCH BOX FOR DATA, POWER, & AV DISPLAY BACK BOX SHOULD BE SECURED TO HEADER AN ADDITIONAL VERTICAL BRACE MAY BE REQUIRED TO STABILIZE DISPLAY BACK BOX GENERAL NOTE: PROJECT STANDARD FOR ALL DISPLAY BACK BOXES TV/XXX-X SHALL INCLUDE, AT LEAST, A SINGLE AV CONDUIT INSTALLED BELOW FLOOR. CERTAIN DISPLAY BACK BOXES MAY CALL FOR MORE THAN A SINGLE AV CONDUIT CONNECTION TO ACCOMODATE MULTIPLE SIGNAL TYPES.INSTALL 6" HIGH BLOCKING SPANNING 4 STUD CAVITIES ON TOP AND BOTTOM OF DISPLAY BACK BOX.BLOCKING SHALL FRAME DISPLAY BACK BOX GENERAL NOTE: DISPLAY BACK BOXES ARE SHOWN AT THE CENTER OF DISPLAYS ON AV SHEETS. BOXES MAY MOVE LEFT OR RIGHT 8" BASED ON STUD LAYOUT. BLOCKING MATERIAL SHOULD BE CONSISTENT WITH PROJECT STANDARDS.AV4.9a/78'x8' PLYWOOD ON WALL (PROVIDED BY GC), CENTERED ON EQUIPMENT RACK 8'-0" PLYWOOD - CENTERED ON RACKAV EQUIPMENT RACK. REFER TO PLANS FOR SPECIFIC LAYOUT. CONDUIT CLEARANCE AREA WITHIN CABLE CHASES. CLEARANCE AREAS SHALL MAINTAIN 1/2" CLEARANCE FROM FRONT OF CABLE CHASES & 2" CLEARANCE FROM SIDES OF CABLE CHASES. (SEE EQUIPMENT RACK CONDUIT CLEARANCE DETAIL -THIS SHEET) DETAIL SHOWS GENERIC CONFIGURATION FOR CABLE MANAGEMENT AND CONDUIT ROUTING AT EQUIPMENT RACK LOCATION. AV CONTRACTOR SHALL COORDINATE PROJECT SPECIFIC LAYOUTS AND REQUIREMENTS WITH ELECTRICAL CONTRACTOR. 4" x 31" CABLE CHASE ATTACHED TO PLYWOOD AT BACK OF RACK 8'-0" EQ EQ 8'-0"8' x 8' PLYWOOD ON WALL (BY GC) CENTERED ON RACK AV EQUIPMENT RACK 4" x 31" CABLE CHASE MOUNTED TO PLYWOOD CONDUIT CLEARANCE AREA WITHIN CABLE CHASES. CLEARANCE AREAS SHALL MAINTAIN 1/2" CLEARANCE FROM FRONT OF CABLE CHASES & 2" CLEARANCE FROM SIDES OF CABLE CHASES.29"1/2" 4" x 31" CABLE CHASE PLYWOOD BY GC A MINIMUM CLEARANCE OF 36" SURROUNDING THREE SIDES OF THE EQUIPMENT RACK IS RECOMMENDED FOR OPERATIONAL AND MAINTENANCE ACCESSIBILITY. A MINIMUM CEILING HEIGHT OF 108" IS RECOMMENDED FOR EQUIPMENT RACK INSTALLATION & MAINTENANCE. EQUIPMENT RACK SHALL HAVE A MINIMUM CLEARANCE OF 36" FROM ELECTRIC EQUIPMENT PER ELECTRICAL CODES. DO NOT LOCATE CEILING SPRINKLERS, SMOKE DETECTORS, OR DRAINAGE EQUIPMENT DIRECTLY ABOVE EQUIPMENT RACK. FRONT OF EQUIPMENT RACK SHALL HAVE A MINIMUM CLEARANCE OF 36" TO WALL IN ORDER TO MEET ADA REQUIREMENTS CABLE CHASES MAY BE REQUIRED IN FRONT OF AND/OR BEHIND RACK. SEE AV491 DETAIL 10 FOR MORE DETAILS. TYPICAL RACK DIMENSIONS: 24" WIDE X 32" DEEPMINIMUM5'-4"MINIMUM 8'-9" CONDUIT FROM EQUIPMENT RACK RUNS TO SPEAKER JUNCTION BOX. ADDITIONAL CONDUIT MAY RUN TO OTHER SPEAKER LOCATIONS. 6X6X4 JUNCTION BOX MOUNTED TO DECK OR TRUSS. ACTUAL LOCATION TBD BY EC BASED ON CONDUIT ROUTING LOCATIONS. EC SHALL PROVIDE FLEX CONDUIT FROM JUNCTION BOX. EC SHALL VERIFY NECESSARY LENGTH WITH AV CONTRACTOR. LOUDSPEAKER MOUNTED FLUSH WITH BOTTOM OF TRUSS LOUDSPEAKER MOUNTED TO UNISTRUT (2) 1-5/8" UNISTRUT SPANNING BETWEEN TRUSSES AND SECURED TO BOTTOM CHORDS OF TRUSSES. STRUCTURAL TRUSS AV CONTRACTOR SHALL SECURE FLEX CONDUIT TO TRUSS WEBBING. COORDINATE LOUDSPEAKER LOCATIONS WITH PLANS. ADDITIONAL COORDINATION MAY BE REQUIRED WITH MECHANICAL, ELECTRICAL, OR OTHER EQUIPMENT. 6" X 6" X 3-1/2" BOX (6350-BLNK) NO KNOCKOUTS. DRILL HOLES AS NEEDED FOR REQUIRED CONDUIT TERMINATIONS ORIENT BOX SUCH THAT SCREW TABS FOR DEVICE RINGS ARE ON THE TOP AND BOTTOM OF THE BOX ONE GANG DEVICE RING VERTICAL ORIENTATION ONE GANG DEVICE RING HORIZONTAL ORIENTATION TWO GANG DEVICE RING VERTICAL ORIENTATION TWO GANG DEVICE RING HORIZONTAL ORIENTATION THREE GANG DEVICE RING VERTICAL ORIENTATION ONLY THREE GANG ADJUSTABLE DEVICE RING ADJUSTABLE FROM 3/4" TO 1-1/2" MOUNTING SLOTS ON TOP AND BOTTOM ONLY SET 6X6 BOX DEEPER IN WALL FOR WALL SURFACES LESS THAN 3/4" SELECT DEPTH OF DEVICE RING BASED ON THICKNESS OF WALL MATERIAL RAISED PORTIONS AVAILABLE IN SIZES FROM 1/2" TO 2" ONE AND TWO GANG DEVICE RINGS HAVE MOUNTING SLOTS ON ALL FOUR SIDES ALLOWING RING TO BE ROTATED TO DETERMINE DEVICE ORIENTATION. INSTALL PER PROJECT REQUIREMENTS 12" MIN. 4-SQUARE BOX WITH TOGGLE SWITCH BY ELECTRICAL INSTALLER. PROJECTION SCREEN POWER WIRED THROUGH SWITCH TO SERVE AS LOCAL DISCONNECT. MOUNT BOX ADJACENT TO SCREEN CASE. ELECTRICAL INSTALLER SHALL COORDINATE LOCATION WITH AV INSTALLER. PROJECTION SCREEN BY AV INSTALLER. CEILING- RECESSED SCREEN SHOWN. DETAIL IS APPLICABLE FOR WALL MOUNTED & CEILING SUSPENDED SCREENS. ELECTRICAL INSTALLER SHALL COORDINATE SPECIFIC REQUIREMENTS WITH AV INSTALLER. ELECTRICAL INSTALLER SHALL PROVIDE WHIP FROM BOX TO SCREEN CASE LOW VOLTAGE CONTROL CONDUIT PIPED DIRECTLY TO SCREEN HOUSING. ELECTRICAL INSTALLER SHALL COORDINATE LOCATION WITH AV INSTALLERS. REFER TO CONDUIT RISER DIAGRAM IN AV SERIES SHEETS FOR CONDUIT REQUIREMENTS. Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated STANDARD AV DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV4.9a 10/13/2023 220025.00 NTS1DISPLAY BACK BOX DETAIL - STANDARD LAYOUT FROM CEILING. NTS2DISPLAY BACK BOX DETAIL - STANDARD LAYOUT FROM BELOW NTS3DISPLAY BACK BOX ISOMETRIC DETAIL NTS8EQUIPMENT RACK CABLE MANAGEMENT DETAIL NTS7EQUIPMENT RACK CABLE MANAGEMENT DETAIL ELEVATION NTS6EQUIPMENT RACK CONDUIT CLEARANCE DETAIL 1/2" = 1'-0" MINIMUM RACK ROOM DIMENSIONS FOR EQUIPMENT CLEARANCE4 1/2" = 1'-0" LOUDSPEAKER MOUNTING DETAIL9 3" = 1'-0" 6X6 BOX MOUNTING ORIENTATION (WB-61, WB-62, WB-63)5 NTS10PROJECTION SCREEN POWER DISCONNECT DETAIL Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET PAGE MICVOLU ME PAGE MICVOLU ME PAGE MICVOLU ME Speaker KB-701Speaker Station Clear-Com OnOff Program LevelVolumeCall Talk Mic Speaker KB-701Speaker Station Clear-Com OnOff Program LevelVolumeCall Talk Mic Speaker KB-701Speaker Station Clear-Com OnOff Program LevelVolumeCall Talk Mic PAGE MIC BA CK STAGE P AGING MIC(SELECT PAGING ZONES VIA TOUCH SCREEN) Call SpeakerOnOffProgramLevelVolumeTalkVolume SidetoneNullProgramLevelSidetoneNullProgramLevelAnnouncePanel MicHeadsetPanel Mic Headset basearm arm TOP OF OPERABLE TOUCH SURFACE CENTERLINE OF BOX DO NOT EXCEED REFERENCE: ADA 2010 -308.2.1 & 308.3.14'-0"3'-10"4'-0"3'-10"WB-61, WB-62, OR WB-63 TOP OF OPERABLE TOUCH SURFACE CENTERLINE OF BOX DO NOT EXCEED REFERENCE: ADA 2010 -308.2.23'-8"3'-6"TOP OF OPERABLE TOUCH SURFACE CENTERLINE OF BOX DO NOT EXCEED REFERENCE: ADA 2010 -308.3.23'-10"3'-8"TOP OF OPERABLE TOUCH SURFACE CENTERLINE OF BOX DO NOT EXCEED REFERENCE: ADA 2010 -308.2.1 & 308.3.14'-0"3'-9"4'-0"3'-9"WB-61, WB-62, OR WB-63 TOP OF OPERABLE TOUCH SURFACE CENTERLINE OF BOX DO NOT EXCEED REFERENCE: ADA 2010 -308.2.23'-8"3'-5"TOP OF OPERABLE TOUCH SURFACE CENTERLINE OF BOX DO NOT EXCEED REFERENCE: ADA 2010 -308.3.23'-10"3'-7"TOP OF HIGHEST CONTROL CENTERLINE OF BOX DO NOT EXCEED REFERENCE: ADA 2010 -308.2.1 & 308.3.1 3'-10"4'-0"3'-10"TOP OF HIGHEST CONTROL CENTERLINE OF BOX DO NOT EXCEED REFERENCE: ADA 2010 -308.2.23'-8"3'-6"TOP OF HIGHEST CONTROL CENTERLINE OF BOX DO NOT EXCEED REFERENCE: ADA 2010 -308.3.23'-10"3'-8"4'-0"3'-11"TOP OF HIGHEST CONTROL CENTERLINE OF BOX DO NOT EXCEED WB-4 REFERENCE: ADA 2010 -308.2.1 & 308.3.13'-11"3'-8"3'-7"TOP OF HIGHEST CONTROL CENTERLINE OF BOX DO NOT EXCEED REFERENCE: ADA 2010 -308.2.2 3'-10"3'-9"TOP OF HIGHEST CONTROL CENTERLINE OF BOX DO NOT EXCEED REFERENCE: ADA 2010 -308.3.2 1'-3"1'-4"BOTTOM OF LOWEST USER ACCESSIBLE CONNECTION CENTERLINE OF BOX MAY NOT BE LOWER THAN THIS POINT WB-61, WB-62, OR WB-63 REFERENCE: ADA 2010 -308.2.1 1'-3"2'-4"BOTTOM OF LOWEST USER ACCESSIBLE CONNECTION CENTERLINE OF BOX MAY NOT BE LOWER THAN THIS POINT WB-24B REFERENCE: ADA 2010 -308.2.1 REFERENCE: ADA 2010 -308.2.1 & 902.34'-0"2'-8"2'-3"HIGHEST ACCESSIBLE CONTROL WORKSURFACE BETWEEN 28" AND 34" AFF WALL-MOUNTED EQUIPMENT RACK MAXIMUM BACK PAN MOUNTING HEIGHT 5'-0"5'-0"3'-0"1'-0"1'-0"2'-0"3'-0"ONE ARM OF T-SHAPED TURNING SPACE MAY INCLUDE KNEE AND TOE SPACE CLEARANCE PER ADA 2010 306 SPACE CLEAR OF OBSTRUCTIONS PER ADA 2010 304.3.2 LECTERN WALL 2'-6"4'-0"LECTERN WALL CLEAR FLOOR SPACE PER ADA 2010 305.3 0'-6"0'-11"4'-0"LECTERN WALL CLEAR SPACE REQUIRED PER ADA 2010 305.3 MAY INCLUDE KNEE AND TOE SPACE 2'-6" TOE SPACE PER ADA 2010 306.2 KNEE SPACE PER ADA 2010 306.2 TOE AND KNEE CLEARANCE MUST BE A MINIMUM OF 30" WIDE PER ADA 2010 305.2.5 & 306.3.5 0'-9"3'-4"2'-7"1'-2" 1'-8"TOE SPACE MUST BE A MINIMUM OF 17" UNDER ELEMENT PER ADA 2010 306.2.3 KNEE SPACE MUST BE A MINIMUM OF 11" DEEP AT 9" AFF AND 8" DEEP AT 27" AFF PER ADA 2010 306.3.3 TOE SPACE HEIGHT 0'-4"2'-3"6'-8"LIMITED PROTRUSION AREA IN CIRCULATION PATHS PER ADA 2010 307.2 WB-525 OR WB-526 WALL BOX (BY EC) ULTRA THIN DISPLAY MOUNT (BY AV CONTRACTOR) FLAT PANEL DISPLAY (BY AV CONTRACTOR)2'-3"6'-8"1'-0"1'-0" MAXIMUM PROTRUSION LIMITS FOR POST MOUNTED OBJECTS IN CIRCULATION PATHS PER ADA 2010 307.3 FLAT PANEL DISPLAY (BY AV CONTRACTOR) POST OR PYLON Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 1/2" = 1'-0" ADA DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV4.9b 10/13/2023 220025.00 NTS17" TOUCH SCREEN UNOBSTRUCTED FORWARD & SIDE REACH NTS27" TOUCH SCREEN OBSTRUCTED HIGH FORWARD REACH NTS37" TOUCH SCREEN OBSTRUCTED HIGH SIDE REACH NTS410" TOUCH SCREEN UNOBSTRUCTED FRONT AND SIDE REACH NTS510" TOUCH SCREEN OBSTRUCTED HIGH FORWARD REACH NTS610" TOUCH SCREEN OBSTRUCTED HIGH SIDE REACH NTS71- TO 3- GANG DEVICE UNOBSTRUCTED HIGH FORWARD AND SIDE REACH NTS81- TO 3-GANG DEVICE OBSTRUCTED HIGH FORWARD REACH NTS91- TO 3-GANG DEVICE OBSTRUCTED HIGH SIDE REACH NTS104-GANG DEVICE UNOBSTRUCTED FORWARD AND SIDE REACH NTS114-GANG DEVICE OBSTRUCTED HIGH FORWARD REACH NTS124-GANG DEVICE OBSTRUCTED HIGH SIDE REACH NTS131- TO 3-GANG DEVICE UNOBSTRUCTED LOW FORWARD REACH NTS14SURFACE WALL BOX UNOBSTRUCTED LOW FORWARD REACH NTS15WALL RACK UNOBSTRUCTED HIGH FORWARD REACH NTS16LECTERN TURNING SPACE PLAN NTS17LECTERN CLEAR FLOOR SPACE PLAN NTS18LECTERN TOE AND KNEE SPACE PLAN NTS19LECTERN TOE AND KNEE SPACE SECTION NTS20WALL-MOUNTED PROTRUSION LIMITS IN CIRCULATION PATHS NTS21POST-MOUNTED PROTRUSION LIMITS IN CIRCULATION PATHS NOTE: A "CIRCULATION PATH" IS DEFINED AS "AN EXTERIOR OR INTERIOR WAY OF PASSAGE PROVIDED FOR PEDESTRIAN TRAVEL, INCLUDING BUT NOT LIMITED TO, WALKS, HALLWAYS, COURTYARDS, ELEVATORS, PLATFORM LIFTS, RAMPS, STAIRWAYS, AND LANDINGS." Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET FINISHED FLOOR FINISHED FLOOR2'-3"WRK-44-32 RACK LVFD-44 VENTED DOOR CC-44-312 CABLE CHASE LF-ISO ISOLATION FEET MW-10FT-FC FAN TOP LT-1R RACK LIGHT AV CLOSET 157 ER/MUC-1 MIDDLE ATLANTIC WRK-44-32 RACK MIDDLE ATLANTIC LVFD-44 VENTED DOOR MIDDLE ATLANTIC SPN-44-312 SIDE PANELS MIDDLE ATLANTIC LF-ISO ISOLATION FEET MIDDLE ATLANTIC MW-10FT-FC FAN TOP MIDDLE ATLANTIC LT-1R RACK LIGHT AV CLOSET 157 ER/MUC-2 DWR-18-22 WALL RACK FWD-DWR-RR18 STORAGE 104 ER/LOB FRONT FRONT ID PANEL UPS 2150VA AUDIO DSP AMPLIFIER #1 (CX-Q 2K4) AMPLIFIER #2 (CX-Q 2K4) ALS TRANSMITTER (EAST) MW-10FT-FC TAN TOP W/ CONTROLLER. CONTROL MASTER BLANK BLANK MAP CC-44-312 CABLE CHASE BOND RACKS TOGETHER. MPR-8A POWER RACEWAY & W/ M-20 IGA RECEPTACLES IN REAR OF RACK. REFER TO SCHEMATICS FOR DETAILS. BLANK BLANK BLANK BLANK BLANK NETWORK SWITCH BLANK BLANK BLANK CUSTOM RACK PANEL RP/MUC-CS BLANK MPR-8A POWER RACEWAY & W/ M-20 IGA RECEPTACLES IN REAR OF RACK. SEE POWER SCHEMATICS FOR DETAILS. QIO RACK MOUNT #2 QIO RACK MOUNT #1 (6) DSP NET AUDIO INPUTS (QSC QIO-ML4i) & (1) DSP NET AUDIO OUTPUT (QIO-L4o) ON (2) QIO-RMK RACK SHELVESFRONT NETGEAR M4250-40G8X4F-PoE+ CUSTOM RACK PANEL RP/LOB-CS CRESTRON CP4 ID PANEL ALS TRANSMITTER (CENTER) ALS TRANSMITTER (WEST) BLANK BLANK CONTROLLED POWER DISTRO BLANK CONTROLLED POWER DISTRO PORTSMITH USB TO ETHERNET ADAPTER IN REAR BLANK BLANK ANTENNA DISTRO #1 ANTENNA DISTRO #2 BLANK WIRELESS #1 WIRELESS #2 WIRELESS #3 WIRELESS #4 WIRELESS #5 WIRELESS #6 BLANK AMPLIFIER #3 (CX-Q 2K4) BLANK BLANK BLANK BLANK PORTSMITH USB TO ETHERNET ADAPTER IN REAR BLANK SHELF SHELF SHELF SHELF BRIGHTSIGN PLAYERS BLANK BLANK CRESTRON DMF-CI-8 BLANK BLANK 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 48" ADA HEIGHT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 48" ADA HEIGHT48" ADA HEIGHT Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 1 1/2" = 1'-0" EQUIPMENT RACK ELEVATIONS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV5.1 10/13/2023 220025.00 EQUIPMENT RACK GENERAL NOTES 1 EMPTY SPACES ON EQUIPMENT RACK MUST BE COVERED WITH CORRECT SIZE BLANK PANELS 2 WHERE CABLES MUST PASS FROM INSIDE OF RACK TO FRONT OF RACK, A BRUSH PANEL SHALL BE USED INSTEAD OF A BLANK PANEL 3 SEE SPECIFICATION DOCUMENT 27 41 00 FOR EQUIPMENT RACK STANDARDS NTS1FIRST FLOOR EQUIPMENT RACKS Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET ER/MHA-1 FRONT AV CLOSET 210 MIDDLE ATLANTIC SR-46-28 PIVOTING WALL EQUIPMENT RACK MIDDLE ATLANTIC DWR-SR-ZL ZERO LATCH MIDDLE ATLANTIC UQFP-4RT 2RU FAN PANEL MIDDLE ATLANTIC VBK-S28 VENT BLOCK KIT MIDDLE ATLANTIC LT-1R RACK LIGHT FINISHED FLOORFINISHED FLOOR MIDDLE ATLANTIC WRK-44-32 RACK MIDDLE ATLANTIC LVFD-44 VENTED DOOR MIDDLE ATLANTIC SPN-44-312 SIDE PANELS MIDDLE ATLANTIC CC-44-312 CABLE CHASE MIDDLE ATLANTIC LF-ISO ISOLATION FEET MIDDLE ATLANTIC MW-10FT-FC FAN TOP MIDDLE ATLANTIC LT-1R RACK LIGHT AV CLOSET 167 ER/MPA-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 UPS 2150VA AUDIO DSP AMPLIFIER #3 (QSC CX-Q 8K8) AMPLIFIER #2 (QSC CX-Q 8K8) AMPLIFIER #1 (QSC CX-Q 4K8) ANTENNA DISTRO #1 ANTENNA DISTRO #2 BLANK ALS TRANSMITTER MPR POWER RACEWAY & MODULES IN REAR OF RACK. REFER TO SCHEMATICS FOR DETAILS. BLANK BLANK NETWORK SWITCH UQFP-4RT FAN PANEL. CUSTOM RACK PANEL RP/MHA-CS CONTROL MASTER FRONT ID PANEL UPS 2150VA MW-10FT-FC TAN TOP W/ CONTROLLER. BLANK MAP CC-44-312 CABLE CHASE. AMPLIFIER #1 (QSC CX-Q 4K8) AMPLFIER #2 (QSC CX-Q 4K8) BLANK BLANK NETWORK SWITCH CUSTOM RACK PANEL RP/MPA-CS CONTROL MASTER MPR-8A POWER RACEWAY & W/ M-20 IGA RECEPTACLES IN REAR OF RACK. REFER TO SCHEMATICS FOR DETAILS. BLANK BLANK BLANK BLANK BLANK BLANK SHELF LINE LEVEL RX ON SHELF (RDL TX-TPR1A) SHELF LINE LEVEL RX #1 & LINE LEVEL RX #2 ON SHELF (RDL TX-TPR1A) QIO RACK MOUNT QSC QIO-RMK WITH (2) QIO-ML4i ICOM MAIN STATION 41 42 43 44 45 46 ID PANEL BLOCK VENTS AT TOP OF RACK FAN PANEL QIO RACK MOUNT QSC QIO-RMK WITH (2) QIO-ML4i, (1) QIO-L4o WIRELESS #1 WIRELESS #2 BLANK WIRELESS #3 WIRELESS #4 WIRELESS #5 WIRELESS #6 BLANK BLANK BLANK BLANK BLANK PORTSMITH USB TO ETHERNET ADAPTER IN REAR BLANK BLANK AUDIO DSP ANTENNA DISTRO #1 ANTENNA DISTRO #2 ALS TRANSMITTER BLANK WIRELESS #1 WIRELESS #2 BLANK WIRELESS #3 WIRELESS #4 WIRELESS #5 WIRELESS #6 BLANK BLANK (1) VIDoIP MEDIA DECODER (CRESTRON DM-NVX-360) ON SHELF (PART OF VIDEO ALTERNATESHELF BLANK PORTSMITH USB TO ETHERNET ADAPTER IN REAR BLANK ID PANEL BLANK 48" ADA HEIGHT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 48" ADA HEIGHT48" ADA HEIGHT Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 1 1/2" = 1'-0" EQUIPMENT RACK ELEVATIONS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV5.2 10/13/2023 220025.00 NTS1MEZZANINE EQUIPMENT RACKS Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET RDL D-BT1A BLUETOOTH INPUT CRESTRON MPC3-102 BUTTON PANEL CRESTRON TSW-1070 CONTROL PANEL 15/16" DIAMETER HOLE WITH 3/32" RUBBER GROMMET CRESTRON TSW-1070 CONTROL PANEL RDL D-BT1A BLUETOOTH INPUT ROTATE 90-DEGREES TO INSTALL ABOVE COUNTER PAINT ANTENNA TO MATCH PANEL HOLES AND CUTOUT LOCATED TO SUPPORT SHURE UA864 MOUNTING BRACKET CRESTRON MPC3-102 BUTTON PANEL ALS ANTENNA A B INTERCOM 1 2 MIC INPUTS HDMI INPUT 1 2 LINE INPUTS TOUCH PANEL34 MIC INPUTS A B INTERCOM 1 COORDINATE WITH ARCHITECT BT/MHA-1 MERCYHEALTH NORTH BOOTH (ICE LEVEL) ALS/MHA 8"W x 8"H PANEL 6"W x 6"H x 6"D BACKBOX COORDINATE WITH ARCHITECT 1 MERCYHEALTH SOUTH WALL CUSTOM PANEL COORDINATE WITH ARCHITECT RP/MHA-CS ER/MHA AV/MHA-2 10"W x 10"H PANEL 8"W x 8"H x 4"D BACKBOX COORDINATE WITH ARCHITECT 1 MERCYHEALTH PRESS BOX 203 1 COORDINATE WITH ARCHITECT HDMI/BR BREAKROOM 109 BP/BR COORDINATE WITH ARCHITECT 1 BREAKROOM 109 DEVICE ON 3-GANG BOX 6"W x 6"H PANEL SPK/MHA-# 6"W x 6"H x 4"D BACKBOX COORDINATE WITH ARCHITECT REFER TO RCP'S MERCYHEALTH ARENA ROOF STRUCTURE CUSTOM PANEL COORDINATE WITH ARCHITECT RP/LOB-CS ER/LOB (STORAGE 104) 1 COORDINATE WITH ARCHITECT BT/MHA-2 MERCYHEALTH PRESS BOX 203 ANT/MHA-x 8"W x 8"H PANEL 6"W x 6"H x 6"D BACKBOX COORDINATE WITH ARCHITECT 2 MERCYHEALTH SOUTH WALL LOCATIONS ANT/MHA-A ANT/MHA-B BP/SS COORDINATE WITH ARCHITECT 1 SPONSOR SUITE 202 DEVICE ON 3-GANG BOX AVT/MHA-1 8"W x 8"H PANEL 6"W x 6"H x 6"D BACKBOX COORDINATE WITH ARCHITECT 1 MERCYHEALTH SCORRERS BOOTH MERCYHEALTH ARENA PANEL DETAILS LOBBY / RENTAL PANEL DETAILS BREAKROOM PANEL DETAILS RDL PAIR RDL PAIR 1-GANGPANEL SIZE PANEL COLOR LOCATION QUANTITY 8" 8" FLUSH MOUNT PANEL SIZE PANEL COLOR BOX SIZE BOX MOUNT LOCATION QUANTITY 1RU (1.75") 2RU (3.50") 3RU (5.25") 4RU (7.00") 5RU (8.75") 5RUPANEL SIZE PANEL COLOR EQUIPMENT RACK DEVICE 10" 10" FLUSH MOUNT PANEL SIZE PANEL COLOR BOX SIZE BOX MOUNT LOCATION QUANTITY 21 3 NEUTRIK 21 3 NEUTRIK 12 3 NEUTRIK PUSH 12 3 NEUTRIK PUSH 1-GANGPANEL SIZE PANEL COLOR LOCATION QUANTITY PANEL SIZE PANEL COLOR LOCATION QUANTITY SURFACE MOUNT PANEL SIZE PANEL COLOR BOX SIZE BOX MOUNT LOCATION QUANTITY 6" 6" 1RU (1.75") 2RU (3.50") 3RU (5.25") 4RU (7.00") 5RU (8.75") 5RUPANEL SIZE PANEL COLOR EQUIPMENT RACK DEVICE 12 3 NEUTRIK PUSH 12 3 NEUTRIK PUSH 2-GANGPANEL SIZE PANEL COLOR LOCATION QUANTITY 8" 8" FLUSH MOUNT PANEL SIZE PANEL COLOR BOX SIZE BOX MOUNT LOCATION QUANTITY PANEL SIZE PANEL COLOR LOCATION QUANTITY 8" 8" FLUSH MOUNT PANEL SIZE PANEL COLOR BOX SIZE BOX MOUNT LOCATION QUANTITY 12 3 NEUTRIK PUSH 12 3 NEUTRIK PUSH 21 3 NEUTRIK 21 3 NEUTRIK Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 6" = 1'-0" PANEL ELEVATIONS & DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV6.1 10/13/2023 220025.00 PANEL DRAWINGS SHOW DESIGN INTENT ONLY. AV CONTRACTOR IS RESPONSIBLE FOR VERIFYING PANEL SIZES & CONNECTOR SPACING. Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET RDL D-BT1A BLUETOOTH DEVICE CRESTRON TSW-1070 CONTROL PANEL 15/16" DIAMETER HOLE WITH 3/32" RUBBER GROMMET SEE SCHEMATIC DRAWINGS FOR CONNECTOR IDs (AV7.3a-d) DA-LITE WALL MOUNT SCREEN SWITCH ROTATE 90-DEGREES TO INSTALL ABOVE COUNTER PAINT ANTENNA TO MATCH PANEL HOLES AND CUTOUT LOCATED TO SUPPORT SHURE UA864 MOUNTING BRACKET FSR WB-X3-GNG WALL BOX 15/16" DIAMETER HOLE WITH 3/32" RUBBER GROMMET ALS ANTENNA VID NET # AUDIO NET # AUDIO NET # VIDEO NET # MIC# MIC# TIE LINE 1 LINE# LINE# TIE LINE 2 ALS/MPA 8"W x 8"H PANEL 6"W x 6"H x 4"D BACKBOX COORDINATE WITH ARCHITECT 1 MULTI-PURPOSE ARENA SOUTH WALL 1 COORDINATE WITH ARCHITECT BT/MPA MP ARENA SOUTH BOOTH (ICE LEVEL) AV/MPA-X COORDINATE WITH ARCHITECT 4 MULTIPLE - MP ARENA WALLS GANG-SIZE PLATES IN WALL BOX LOCATIONS AV/MPA-E AV/MPA-N AV/MPA-S AV/MPA-W CUSTOM PANEL COORDINATE WITH ARCHITECT RP/MPA-CS ER/MPA 6"W x 6"H PANEL SPK/MPA-# 6"W x 6"H x 6"D BACKBOX WHITE REFER TO RCP'S MP ARENA ROOF STRUCTURE 6"W x 6"H BLACK ANODIZED PANEL PRJ/MPA-# 6"W x 6"H x 6"D BACKBOX COORDINATE WITH ARCHITECT 2 MP ARENA ROOF STRUCTURE LOCATIONS PRJ/MPA-E PRJ/MPA-N 1 COORDINATE WITH ARCHITECT SW/MPA-# LOCATION LOCATIONS SW/MPA-N SW/MPA-E ANT/MPA-x 8"W x 8"H PANEL 6"W x 6"H x 6"D BACKBOX COORDINATE WITH ARCHITECT 2 MULTI-PURPOSE ARENA SOUTH WALL LOCATIONS ANT/MPA-A ANT/MPA-B MULTI-PURPOSE ARENA PANEL DETAILS RDL PAIR SCDP-FX- [COLOR] RESERVED FOR POWER RESERVED FOR DATA SCDP-FX- [COLOR]SCDP-FX- [COLOR] SCDP-FX- [COLOR] 8" 8" FLUSH MOUNT PANEL SIZE PANEL COLOR BOX SIZE BOX MOUNT LOCATION QUANTITY 1-GANGPANEL SIZE PANEL COLOR LOCATION QUANTITY PANEL SIZE PANEL COLOR LOCATION QUANTITY 1RU (1.75") 2RU (3.50") 3RU (5.25") 4RU (7.00") 5RU (8.75") 5RUPANEL SIZE PANEL COLOR EQUIPMENT RACK DEVICESURFACE MOUNT PANEL SIZE PANEL COLOR BOX SIZE BOX MOUNT LOCATION QUANTITY 6" 6" SURFACE MOUNT PANEL SIZE PANEL COLOR BOX SIZE BOX MOUNT LOCATION QUANTITY 6" 6" 1-GANGPANEL SIZE PANEL COLOR LOCATION QUANTITY 8" 8" FLUSH MOUNT PANEL SIZE PANEL COLOR BOX SIZE BOX MOUNT LOCATION QUANTITY 4-GANG 2-GANG 2-GANG 2-GANG 12 3 NEUTRIK PUSH 12 3 NEUTRIK PUSH 21 3 NEUTRIK 12 3 NEUTRIK PUSH 12 3 NEUTRIK PUSH 12 3 NEUTRIK PUSH 12 3 NEUTRIK PUSH 21 3 NEUTRIK HATCHING INDICATES EQUIPMENT REQUIRED FOR THE MULTI-PURPOSE ARENA VIDEO ADD ALTERNATE Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated PANEL ELEVATIONS & DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV6.2 10/13/2023 220025.00 PANEL DRAWINGS SHOW DESIGN INTENT ONLY. AV CONTRACTOR IS RESPONSIBLE FOR VERIFYING PANEL SIZES & CONNECTOR SPACING. Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET CRESTRON TSW-1070 CONTROL PANEL 15/16" DIAMETER HOLE WITH 3/32" RUBBER GROMMET DA-LITE WALL MOUNT SCREEN SWITCH SEE SCHEMATIC DRAWINGS FOR CONNECTOR IDs (AV7.4a) FSR WB-X3-GNG WALL BOX DRAPER WALL MOUNT SCREEN SWITCH DRAPER WALL MOUNT SCREEN KEY SWITCH DA-LITE WALL MOUNT SCREEN SWITCH ALS ANTENNA VID NET # AUDIO NET # AUDIO NET # VIDEO NET # MIC# MIC# TIE LINE 1 LINE# LINE# TIE LINE 2 WIRELESS MIC ANTENNA ALS/MUC-# 8"W x 8"H PANEL 6"W x 6"H x 6"D BACKBOX COORDINATE WITH ARCHITECT MULTIPLE - MU CONVENTION WALLS LOCATION 6"W x 6"H BLACK ANODIZED PANEL PRJ/MUC-# 6"W x 6"H x 6"D BACKBOX COORDINATE WITH ARCHITECT 3 MU CONVENTION ROOF STRUCTURE LOCATIONS PRJ/MUC-E PRJ/MUC-W PRJ/MUC-N CUSTOM PANEL COORDINATE WITH ARCHITECT RP/MUC-CS ER/MUC 6"W x 6"H PANEL SPK/MUC-# 6"W x 6"H x 4"D BACKBOX WHITE REFER TO RCP'S MU CONVENTION ROOF STRUCTURE LOCATIONS ALS/MUC-1 ALS/MUC-2 ALS/MUC-3 2 COORDINATE WITH ARCHITECT SW/MUC-# MULTIPLE - MU CONVENTION WALLS LOCATIONS SW/MUC-W SW/MUC-E AV/MUC-X COORDINATE WITH ARCHITECT 6 MULTIPLE - MU CONVENTION WALLS GANG-SIZE PLATES IN WALL BOX LOCATIONS AV/MUC-E AV/MUC-S1 AV/MUC-S2 AV/MUC-S3 AV/MUC-W AV/MUC-N ANT/MUC-# 8"W x 8"H PANEL 6"W x 6"H x 6"D BACKBOX COORDINATE WITH ARCHITECT 6 MULTIPLE - MU CONVENTION WALLS LOCATIONS ANT/MUC-A1 ANT/MUC-B1 ANT/MUC-A2 ANT/MUC-B2 ANT/MUC-A3 ANT/MUC-B3 1 COORDINATE WITH ARCHITECT SW/MUC-N MULTIPLE - MU CONVENTION WALLS MULTI-USE CONVENTION SPACE PANEL DETAILS SCDP-FX- [COLOR]RESERVED FOR POWER RESERVED FOR DATA SCDP-FX- [COLOR]SCDP-FX- [COLOR] SCDP-FX- [COLOR] OFFUPDOWN 8" 8" FLUSH MOUNT PANEL SIZE PANEL COLOR BOX SIZE BOX MOUNT LOCATION QUANTITY SURFACE MOUNT PANEL SIZE PANEL COLOR BOX SIZE BOX MOUNT LOCATION QUANTITY 6" 6" 1RU (1.75") 2RU (3.50") 3RU (5.25") 4RU (7.00") 5RU (8.75") 5RUPANEL SIZE PANEL COLOR EQUIPMENT RACK DEVICESURFACE MOUNT PANEL SIZE PANEL COLOR BOX SIZE BOX MOUNT LOCATION QUANTITY 6" 6" 1-GANGPANEL SIZE PANEL COLOR LOCATION QUANTITY PANEL SIZE PANEL COLOR LOCATION QUANTITY 4-GANG 2-GANG 2-GANG 2-GANG 12 3 NEUTRIK PUSH 12 3 NEUTRIK PUSH 21 3 NEUTRIK 12 3 NEUTRIK PUSH 12 3 NEUTRIK PUSH 12 3 NEUTRIK PUSH 12 3 NEUTRIK PUSH 21 3 NEUTRIK 8" 8" FLUSH MOUNT PANEL SIZE PANEL COLOR BOX SIZE BOX MOUNT LOCATION QUANTITY 3-GANGPANEL SIZE PANEL COLOR LOCATION QUANTITY Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 6" = 1'-0" PANEL ELEVATIONS & DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV6.3 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 1 2 34 5 6 1+ 1-2+ 2- 3+ 3-4+ 4- SPADE LUG AND SCREW TERMINAL STRIP SHIELD LIFTED 2" MAX 1/2" 1/16"1/16" 1/2" SPADE SIZE 22-16 USE HEAT SHRINK TUBING USE SELF-LAMINATING WIRE LABELS USE HEAT SHRINK TUBING RED BLACK USE CLEAR, WHITE OR GREEN NON-SHRINK TUBING ON DRAIN WIRE LABEL SCREW TERMINAL CONNECTOR 3/16"2" MAX 1/2" 1/16" LABEL RED BLACK SHIELD USE WHITE, GREEN OR CLEAR NON-SHRINK TUBING ON DRAIN WIRE USE SELF-LAMINATING WIRE LABELS USE HEAT SHRINK COLLAR TUBING SPADE LUG AND SCREW TERMINAL STRIP SPADE SIZE 22-16 2" MAX LABEL 1/2" 1/16" USE SELF-LAMINATING WIRE LABELS USE HEAT-SHRINK TUBING COLLAR REDBLACK USE CLEAR, WHITE, OR GREEN NON-SHRINK TUBING ON DRAIN WIRE SHIELD SCREW TERMINAL CONNECTOR SHIELD LIFTED LABEL 3/16"2" MAX 1/2" 1/16"1/16" 1/2" USE HEAT SHRINK TUBING USE SELF-LAMINATING WIRE LABELS USE HEAT SHRINK TUBING COLLAR RED BLACK USE WHITE,GREEN OR CLEAR NON-SHRINK TUBING ON DRAIN WIRE FEMALE XLR CONNECTOR LABEL 1/2" USE HEAT-SHRINK TUBING 1/2" RED BLACK SHIELD USE WHITE OR CLEAR NON-SHRINK TUBING ON DRAIN WIRE USE SELF-LAMINATING WIRE LABELS 1" FEMALE XLR CONNECTOR - 6 PIN LABEL YELLOW WHITE THICK BLACK BLUE THIN BLACK RED U891RC TAIL 1" USE SELF-LAMINATING WIRE LABELS MALE XLR CONNECTOR SHIELD LIFTED LABEL 1/2" USE WHITE OR CLEAR NON-SHRINK TUBING ON DRAIN WIRE USE BLACK HEAT-SHRINK TUBING 1/2" SHIELD BLACK RED 1" USE SELF-LAMINATING WIRE LABELS 1/8" TRS STEREO CONNECTOR UNBALANCED TO BALANCED LABEL LABEL 1" 1" 1/16" 1/2" 2" MAX 3/16" USE SELF-LAMINATING WIRE LABELS USE BLACK HEAT-SHRINK TUBING COLLAR BLACK SHIELD RED SHIELD RIGHT BLACK LEFT RED USE CLEAR, GREEN OR WHITE NON-SHRINK TUBING ON DRAIN WIRE LABEL 1/2" 1/16" 1/2" 1/16" BLACK RED USE SELF-LAMINATING WIRE LABELS USE BLACK HEAT SHRINK TUBING USE BLACK HEAT SHRINK TUBING COLLARUSE WHITE OR CLEAR NON-SHRINK TUBING ON DRAIN WIRE LABEL LABEL 1" 1" USE SELF-LAMINATING WIRE LABELS USE BLACK HEAT SHRINK TUBING BLACK SHIELD RED USE SELF-LAMINATING WIRE LABELS 1/4" TIP SLEEVE CONNECTOR 1/2" BLACK SHIELD RED USE BLACK HEAT-SHRINK TUBING COLLAR LABEL 1" USE SELF-LAMINATING WIRE LABELS RED SHIELD BLACK 1/2" 1/2" USE HEAT-SHRINK TUBING COLLAR USE SELF-LAMINATING WIRE LABELS LABEL LABEL BODY CRIMP SLEEVE CENTER PIN 3/16" 1/8" 9/32" USE SELF-LAMINATING WIRE LABELS 1" NL4 CONNECTOR LABEL 1" USE SELF-LAMINATING WIRE LABELS SPEAKON CONNECTOR - 8 CONTACT SPEAKON CONNECTOR NL8 TYPE USE BLACK HEAT-SHRINK TUBING LABEL 3/16"2" MAX 1/2" 1/16" LABEL BLACK RED SHIELD USE GREEN SHRINK TUBING ON DRAIN WIRE USE SELF-LAMINATING WIRE LABELS USE HEAT SHRINK COLLAR TUBING LABEL 1" 2nd/RX-RED 3rd/TX-BLACK 5th/GND-SHIELD FEMALE - SOLDER SIDE LABEL RED BLACK SHIELD USE WHITE, GREEN OR CLEAR NON-SHRINK TUBING ON DRAIN WIRE USE SELF-LAMINATING WIRE LABELS USE HEAT SHRINK COLLAR TUBING RED BLACK BLACK (-) RED (+) SHIELD 1/2" 1/16" USE CLEAR, WHITE OR GREEN NON-SHRINK TUBING ON DRAIN WIRE 1/2" 1/16"1/16" 1/2" LABEL LABEL PAGING/HOUSE MIC PANEL SIDE - 5 PIN SHIELD TYPICAL STAR QUAD TO XLR WIRING BLUE WHITE BLUE WHITE SHIELD BLUE WHITE SHIELD STAR QUAD STAR QUAD XLR CONNECTOR CONFIRM WIRE COLORS WITH WIRE TYPE USED IN PROJECT (2) 2-CONDUCTOR WIRES OR (1) 4-CONDUCTOR WIRE MAY BE USED. COORDINATE WITH WIRE TYPES USED IN PROJECT. TYPICAL CABLE PREPARATION & NOTES GENERAL BALANCED & UNBALANCED SCHEMATIC DIAGRAMS RJ45 PINOUT TABLE FIBER CABLE COLOR TABLE TYPICAL RS-232 WIRING 1 2 3 4 5 11 12 10 9 8 7 6 13 14 15 16 17 18 19 22 21 20 1/4" TIP RING SLEEVE (TRS) CONNECTOR 1/4" TIP RING SLEEVE (TRS) CONNECTOR - SHIELD LIFTED MALE PHONO (RCA) CONNECTOR BNC CONNECTOR (TYPICAL 3 PIECE) RJ45 PINOUT PIN # TIA/EIA 568B TIA/EIA 568A 1 ORANGE / WHITE GREEN / WHITE 2 ORANGE GREEN 3 GREEN / WHITE ORANGE / WHITE 4 BLUE BLUE 5 BLUE/WHITE BLUE / WHITE 6 GREEN ORANGE 7 BROWN / WHITE BROWN / WHITE 8 BROWN BROWN NOTE: TIA/EIA 568B SHALL BE USED UNLESS NOTED OTHERWISE NOTES: 1. WIRE LABEL SHALL BE APPLIED TO CABLE WITH TEXT STARTING CLOSEST TO CONNECTOR. 2. RCA AND 1/4" PHONE CONNECTORS SHALL BE CLAMPED ON HEAT-SHRINK TUBING OVER CABLE JACKET. 3. SHIELD IS TIED AT BOTH ENDS FOR ALL MICROPHONE LINES. 4. SHIELD IS TIED AT BOTH ENDS FOR ALL INTERCOM SYSTEMS. 5. SHIELD IS LIFTED AT ONE END FOR ALL LINE LEVEL AUDIO LINES. + - S + - S + - S + - S 1 2 3 2 1 3 + LEFT - LEFT S - RIGHT + RIGHT RX TX G 5 432 1 SOLDER SIDE (FEMALE) 1 2 3 NL4 PANEL CONNECTORSOLDER SIDE FIBER COLOR CODE STRAND COLOR 1A BLUE 1B ORANGE 2A GREEN 2B BROWN 3A SLATE 3B WHITE 4A RED 4B BLACK 5A YELLOW 5B VIOLET 6A PINK 6B AQUA SHIELDED CABLE SHIELDED CABLE SHIELDED CABLE ACTIVE BALANCED OUTPUT TO UNBALANCED INPUT UNBALANCED OUTPUT TO UNBALANCED INPUT TRANSFORMER BALANCED OUTPUT TO ACTIVE BALANCED INPUT ACTIVE BALANCED OUTPUT TO TRANSFORMER BALANCED INPUT UNBALANCED OUTPUT TO TRANSFORMER BALANCED INPUT TRANSFORMER BALANCED OUTPUT TO UNBALANCED INPUT ACTIVE BALANCED OUTPUT TO ACTIVE BALANCED INPUT UNBALANCED OUTPUT TO BALANCED INPUT TRANSFORMER BALANCED OUTPUT TO TRANSFORMER BALANCED INPUT Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" AUDIO TERMINATIONS WIRING WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.0 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET LOBBY & SKATE RENTAL SIGNAL FLOW LOBBY VIDEO DISPLAY VD/LOB-2 VIDEO DISPLAY VD/LOB-1 HDMI ER/LOB (NETWORK SWITCH)AV7.1d P STP ER/LOB (NETWORK SWITCH)AV7.1d VIDoIP MEDIA DECODER HDMI ER/LOB (NETWORK SWITCH)AV7.1d P STP ER/LOB (NETWORK SWITCH)AV7.1d VIDoIP MEDIA DECODER HDMI ER/LOB (NETWORK SWITCH)AV7.1d P STP ER/LOB (NETWORK SWITCH)AV7.1d VIDoIP MEDIA DECODER HDMI ER/LOB (NETWORK SWITCH)AV7.1d P STP ER/LOB (NETWORK SWITCH)AV7.1d VIDoIP MEDIA DECODER HDMI ER/LOB (NETWORK SWITCH)AV7.1d P STP ER/LOB (NETWORK SWITCH)AV7.1d VIDoIP MEDIA DECODER HDMI ER/LOB (NETWORK SWITCH)AV7.1d P STP ER/LOB (NETWORK SWITCH)AV7.1d VIDoIP MEDIA DECODER VIDEO DISPLAY VD/LOB-3 VIDEO DISPLAY VD/LOB-5 VIDEO DISPLAY VD/LOB-6 VIDEO DISPLAY VD/LOB-4 STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) 55" PORTRAIT DISPLAY 55" PORTRAIT DISPLAY 55" PORTRAIT DISPLAY 55" PORTRAIT DISPLAY 55" PORTRAIT DISPLAY 55" PORTRAIT DISPLAY PREMIER LMVSP DISPLAY MOUNT PREMIER LMVSP DISPLAY MOUNT PREMIER LMVSP DISPLAY MOUNT PREMIER LMVSP DISPLAY MOUNT PREMIER LMVSP DISPLAY MOUNT PREMIER LMVSP DISPLAY MOUNT HDMI USB A (HOST) USB B (DEVICE) USB C HDMI . . AUD L AUD R COM IR 2 IR 1 LAN 1 (PoE+) LAN 2 24V DC . LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) USB B (DEVICE) USB C HDMI . . AUD L AUD R COM IR 2 IR 1 LAN 1 (PoE+) LAN 2 24V DC . LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) USB B (DEVICE) USB C HDMI . . AUD L AUD R COM IR 2 IR 1 LAN 1 (PoE+) LAN 2 24V DC . LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) USB B (DEVICE) USB C HDMI . . AUD L AUD R COM IR 2 IR 1 LAN 1 (PoE+) LAN 2 24V DC . LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) USB B (DEVICE) USB C HDMI . . AUD L AUD R COM IR 2 IR 1 LAN 1 (PoE+) LAN 2 24V DC . LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) USB B (DEVICE) USB C HDMI . . AUD L AUD R COM IR 2 IR 1 LAN 1 (PoE+) LAN 2 24V DC . LAN 3 CRESTRON DM-NVX-360 HDMI 1 (ARC) HDMI 3 AUDIO AUDIO RS232C RS232C RJ45 (LAN) AC POWER USB 1 (1.0A) HDMI 2 USB 2 (0.5A) IR SAMSUNG QB55B-N HDMI 1 (ARC) HDMI 3 AUDIO AUDIO RS232C RS232C RJ45 (LAN) AC POWER USB 1 (1.0A) HDMI 2 USB 2 (0.5A) IR SAMSUNG QB55B-N HDMI 1 (ARC) HDMI 3 AUDIO AUDIO RS232C RS232C RJ45 (LAN) AC POWER USB 1 (1.0A) HDMI 2 USB 2 (0.5A) IR SAMSUNG QB55B-N HDMI 1 (ARC) HDMI 3 AUDIO AUDIO RS232C RS232C RJ45 (LAN) AC POWER USB 1 (1.0A) HDMI 2 USB 2 (0.5A) IR SAMSUNG QB55B-N HDMI 1 (ARC) HDMI 3 AUDIO AUDIO RS232C RS232C RJ45 (LAN) AC POWER USB 1 (1.0A) HDMI 2 USB 2 (0.5A) IR SAMSUNG QB55B-N HDMI 1 (ARC) HDMI 3 AUDIO AUDIO RS232C RS232C RJ45 (LAN) AC POWER USB 1 (1.0A) HDMI 2 USB 2 (0.5A) IR SAMSUNG QB55B-N Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" LOBBY / BREAKROOM SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.1a 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET CHECK-N RENTAL 107 BREAKROOM 109 VD/BR (VIDEO DISPLAY) VD/RENT (VIDEO DISPLAY) HDMI/BR (AV I/O BOX) BP/BR (BUTTON PANEL) CHIEF TILT WALL MOUNT LTM1U CUSTOM PANEL HDMI HDMI HDMI CHECK-IN/RENTAL 107 SIGNAL FLOW 55" FLAT PANEL - LANDSCAPE HDMI STPER/LOB (NETWORK SWITCH)AV7.1d P STP STP (PoE) ER/LOB (NETWORK SWITCH)AV7.1c ER/LOB (NETWORK SWITCH)AV7.1d 85" DISPLAYVIDoIP MEDIA DECODER STP ER/LOB (NETWORK SWITCH)AV7.1d CHIEF TILT WALL MOUNT XTM1U BREAKROOM 109 SIGNAL FLOW BUTTON PANEL HDMIOFE CABLE TUNER HDMI 2.0 HDMI 2.0 . HDMI 2.0 . . . . . STEREO MINI . . RS232 OUT RS232 IN USB 1 USB 2 LAN AC 100-240V . . . . SAMSUNG QB55R HDMI 1 HDMI 2 D.PORT AUD L/R IN DVI-D . . . . . . AUD L/R OUT . IR IN RS232 OUT RS232 IN USB 1 USB 2 LAN AC 120V . . . . SAMSUNG QB85R HDMI USB A (HOST) USB B (DEVICE) USB C HDMI . . AUD L AUD R COM IR 2 IR 1 LAN 1 (PoE+) LAN 2 24V DC . LAN 3 CRESTRON DM-NVX-360 . . NET COM RELAY . . . IR LAN (POE) CRESTRON MPC3-102-B Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" LOBBY / BREAKROOM SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.1b 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET LOBBY & SKATE RENTAL SIGNAL FLOW WALL MOUNT EQUIPMENT RACK ER/LOB STORAGE 104 VIDoIP CARD FRAME STP STP STP STP STP STP STP POWER SUPPLY SIGNAGE PLAYER (SP/LOB-1) P STP HDMI POWER SUPPLY SIGNAGE PLAYER (SP/LOB-2) P STP HDMI POWER SUPPLY SIGNAGE PLAYER (SP/LOB-3) P STP HDMI POWER SUPPLY SIGNAGE PLAYER (SP/LOB-4) P STP HDMI POWER SUPPLY SIGNAGE PLAYER (SP/LOB-5) P STP HDMI POWER SUPPLY SIGNAGE PLAYER (SP/LOB-6) P STP HDMI POWER SUPPLY SIGNAGE PLAYER (SP/RENT) P STP HDMI NETWORK SWITCH (SW/LOB-1)AV7.1d NETWORK SWITCH (SW/LOB-1)AV7.1d NETWORK SWITCH (SW/LOB-1)AV7.1d NETWORK SWITCH (SW/LOB-1)AV7.1d NETWORK SWITCH (SW/LOB-1)AV7.1d NETWORK SWITCH (SW/LOB-1)AV7.1d NETWORK SWITCH (SW/LOB-1)AV7.1d NETWORK SWITCH (SW/LOB-1)AV7.1d NETWORK SWITCH (SW/LOB-1)AV7.1d NETWORK SWITCH (SW/LOB-1)AV7.1d NETWORK SWITCH (SW/LOB-1)AV7.1d NETWORK SWITCH (SW/LOB-1)AV7.1d NETWORK SWITCH (SW/LOB-1)AV7.1d NETWORK SWITCH (SW/LOB-1)AV7.1d UPS P AC 120V USB SERIAL USB CONSOLESLOT 1SLOT 2SLOT 3SLOT 4SLOT 5SLOT 6SLOT 7SLOT 8CRESTRON DMF-CI-8 HDMI 1 HDMI 2 USB A (HOST) AUD L USB B (DEVICE) AUD R HDMI . . . LAN 1 . LAN 2 LAN 3 (SFP) . . . . . . . .DM-NVX-351C HDMI 1 HDMI 2 USB A (HOST) AUD L USB B (DEVICE) AUD R HDMI . . . LAN 1 . LAN 2 LAN 3 (SFP) . . . . . . . .DM-NVX-351C HDMI 1 HDMI 2 USB A (HOST) AUD L USB B (DEVICE) AUD R HDMI . . . LAN 1 . LAN 2 LAN 3 (SFP) . . . . . . . .DM-NVX-351C HDMI 1 HDMI 2 USB A (HOST) AUD L USB B (DEVICE) AUD R HDMI . . . LAN 1 . LAN 2 LAN 3 (SFP) . . . . . . . .DM-NVX-351C HDMI 1 HDMI 2 USB A (HOST) AUD L USB B (DEVICE) AUD R HDMI . . . LAN 1 . LAN 2 LAN 3 (SFP) . . . . . . . .DM-NVX-351C HDMI 1 HDMI 2 USB A (HOST) AUD L USB B (DEVICE) AUD R HDMI . . . LAN 1 . LAN 2 LAN 3 (SFP) . . . . . . . .DM-NVX-351C HDMI 1 HDMI 2 USB A (HOST) AUD L USB B (DEVICE) AUD R HDMI . . . LAN 1 . LAN 2 LAN 3 (SFP) . . . . . . . .DM-NVX-351C AC . + - 12VDC PSU ETHERNET USB 12V 1.5A AUDIO HDMI GPIO SERIAL IR BRIGHTSIGN HD1025 AC . + - 12VDC PSU ETHERNET USB 12V 1.5A AUDIO HDMI GPIO SERIAL IR BRIGHTSIGN HD1025 AC . + - 12VDC PSU ETHERNET USB 12V 1.5A AUDIO HDMI GPIO SERIAL IR BRIGHTSIGN HD1025 AC . + - 12VDC PSU ETHERNET USB 12V 1.5A AUDIO HDMI GPIO SERIAL IR BRIGHTSIGN HD1025 AC . + - 12VDC PSU ETHERNET USB 12V 1.5A AUDIO HDMI GPIO SERIAL IR BRIGHTSIGN HD1025 AC . + - 12VDC PSU ETHERNET USB 12V 1.5A AUDIO HDMI GPIO SERIAL IR BRIGHTSIGN HD1025 AC . + - 12VDC PSU ETHERNET USB 12V 1.5A AUDIO HDMI GPIO SERIAL IR BRIGHTSIGN HD1025 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" LOBBY / BREAKROOM SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.1c 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET MERCYHEALTH ARENA EQUIPMENT RACK ER/MHA AV CLOSET 210 BLUETOOTH INPUT BT/MHA-1 BLUETOOTH INPUT BT/MHA-2 NETWORK SWITCH (SW/MHA)AV7.2d NETWORK SWITCH (SW/MHA)AV7.2d STP STP BLUETOOTH INTERFACE LINE LEVEL RX #1 STP STP BLUETOOTH INTERFACE LINE LEVEL RX #2 STP STP ANTENNA ALS/MHA ANT CUSTOM PANEL ANTANT LINELINE ALS TRANSMITTER CABLES & ACCESSORIES: (45) LR-4200-072 DSP RF RECEIVER (45) LA-401 UNIVERSAL EAR SPEAKER (12) INTELLIGENT EAR PHONE/LANYARD (45) RECHARGEABLE AA NiMH BATTERIES (2) INTELLIGENT 12-UNIT CHARGING TRAY WIRELESS MIC RECEIVER #1 AV7.2b LINE WIRELESS MIC RECEIVER #2 AV7.2b LINE WIRELESS MIC RECEIVER #3 AV7.2b LINE WIRELESS MIC RECEIVER #4 AV7.2b LINE WIRELESS MIC RECEIVER #5 AV7.2b LINE WIRELESS MIC RECEIVER #6 AV7.2b LINE LINE DSP/MHA LINE LINE LEVEL RX #1 LINE LINE LEVEL RX #2 LINE ALS TRANSMITTER PSU UPS P MERCYHEALTH ARENA CAPACITY 1,416 PART OF [NAME] MIC 1 MIC 2 LINE 1 LINE 2 ICOM A ICOM B TOUCH PNL AV I/O BOX AV/MHA-2 CUSTOM PANEL ICOM A ICOM B MIC 3 MIC 4 AV I/O BOX AV/MHA-1 24VDC POWER SUPPLY 24VDC POWER SUPPLY P P MIC MIC LINE LINE MIC MIC LINE LINE ICOM ICOM ICOM MAIN STATIONAV7.2d ICOM MAIN STATIONAV7.2d ICOM ICOM ICOM MAIN STATIONAV7.2d ICOM MAIN STATIONAV7.2d PAGING FEED FROM PHONE SYSTEM DSP/MHA LINE DSP/MHA UPS P NETWORK SWITCH (SW/MHA)AV7.2dSTP PORTABLE TOUCH SCREEN CONTROL PANEL 10.1" TOUCH SCREEN PROVIDE SJO TYPE UMBILICAL CABLE 25' RJ-45 MIC MIC MIC MIC ALS ANTENNA . . (LOOP IN) FORMAT A (OUT) FORMAT A RDL D-BT1A . . FORMAT A VDC 24V LINE OUT FORMAT A RDL TX-TPR1A . . (LOOP IN) FORMAT A (OUT) FORMAT A RDL D-BT1A . . FORMAT A VDC 24V LINE OUT FORMAT A RDL TX-TPR1A IN 2 L IN 2 R DC 15V MIX L . ANT 50Ω MIX R IN 1 MIC/LINE LISTEN LT-800-072-01 DC 15V AC 120V . . LISTEN LA-201 . . +24V GROUND RDL PS-24AS . . +24V GROUND RDL PS-24AS M/L 1 M/L 2 M/L 3 M/L 5 M/L 4 M/L 6 M/L 7 FLEX 1 M/L 1 M/L 3 M/L 4 M/L 5 M/L 2 M/L 6 M/L 7 FLEX 2 FLEX 3 FLEX 4 FLEX 5 FLEX 6 FLEX 8 FLEX 7 . . PHONE HDMI RS232 +12V DC IN LAN A LAN B USB A1 USB A2 USB A3 USB A4 USB B AC 120V M/L 8 M/L 8 QSC CORE 110F V2 LAN (POE+). . USB CRESTRON TS-1070-x-S ANT . LISTEN LA-122 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MERCYHEALTH ARENA SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.2a 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET ANTENNA ANT/MHA-A ANTENNA ANT/MHA-B ANTENNA DISTRO #1 EQUIPMENT RACK ER/MHA AV CLOSET 210 ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT-50 ANT-50 WIRELESS MIC RECEIVER #1 STP NETWORK SWITCH (SW/MHA)AV7.2d STP NETWORK SWITCH (SW/MHA)AV7.2d STP NETWORK SWITCH (SW/MHA)AV7.2d STP NETWORK SWITCH (SW/MHA)AV7.2d STP NETWORK SWITCH (SW/MHA)AV7.2d STP NETWORK SWITCH (SW/MHA)AV7.2d WIRELESS SYSTEM CABLES & ACCESSORIES: (6) SHURE SB900B RECHARGABLE BATTERIES (1) SHURE SBC200-US/SBC200 CHARGER W/ PS45US POWER SUPPLY (2) SHURE SBC200 CHARGER W/O POWER SUPPLY (3) MX150 SHURE LAVALIER MICROPHONES (3) BETA87A HANDHELD TRANSMITTER (3) QLXD1 BODYPACK TRANSMITTER MERCYHEALTH ARENA LINE NET AUDIO IN #1AV7.2a LINE NET AUDIO IN #1AV7.2a LINE NET AUDIO IN #1AV7.2a LINE NET AUDIO IN #1AV7.2a LINE NET AUDIO IN #2AV7.2a LINE NET AUDIO IN #2AV7.2a ANT DIST PSU #2 ANT DIST PSU #1 UPS P WIRELESS MIC ANTENNA WIRELESS MIC ANTENNA UPS P ANTENNA DISTRO #2 WIRELESS MIC RECEIVER #2 WIRELESS MIC RECEIVER #3 WIRELESS MIC RECEIVER #4 WIRELESS MIC RECEIVER #5 WIRELESS MIC RECEIVER #6 ANT A ANT B . . . . . . RF 1A DC 15V 1 RF 2A RF 2B RF 1B DC 15V 2 RF 3A DC 15V 3 RF 3B . RF 4A. . . RF 4B DC 15 4 . DC 15V CASCADE B CASCADE A SHURE UA844+SWB ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 DC 15V AC 120V . . SHURE PS60 DC 15V AC 120V . . SHURE PS60 . RF SHURE UA864US . RF SHURE UA864US ANT A ANT B . . . . . . RF 1A DC 15V 1 RF 2A RF 2B RF 1B DC 15V 2 RF 3A DC 15V 3 RF 3B . RF 4A. . . RF 4B DC 15 4 . DC 15V CASCADE B CASCADE A SHURE UA844+SWB ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MERCYHEALTH ARENA SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.2b 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET JBL CONTROL 322CT (WHITE) SPK/MHA-1SPK12 JBL CONTROL 322CT (WHITE) SPK/MHA-2 JBL CONTROL 322CT (WHITE) SPK/MHA-3 SPK12 SPK12 JBL CONTROL 322CT (WHITE) SPK/MHA-4 SPK12 JBL CONTROL 322CT (WHITE) SPK/MHA-5 JBL CONTROL 322CT (WHITE) SPK/MHA-6 SPK12 SPK12 JBL CONTROL 322CT (WHITE) SPK/MHA-7 SPK12 JBL CONTROL 322CT (WHITE) SPK/MHA-8 JBL CONTROL 322CT (WHITE) SPK/MHA-9 SPK12 SPK12 JBL CONTROL 322CT (WHITE) SPK/MHA-10 SPK12 JBL CONTROL 322CT (WHITE) SPK/MHA-11 JBL CONTROL 322CT (WHITE) SPK/MHA-12 SPK12 SPK12 JBL CONTROL 322CT (WHITE) SPK/MHA-13 SPK12 JBL CONTROL 322CT (WHITE) SPK/MHA-14 JBL CONTROL 322CT (WHITE) SPK/MHA-15 SPK12 SPK12 DANLEY SH50-I (WHITE) SPK/MHA-32 DANLEY SH50-I (WHITE) SPK/MHA-33 DANLEY SH50-I (WHITE) SPK/MHA-34 DANLEY SH50-I (WHITE) SPK/MHA-19 DANLEY SH50-I (WHITE) SPK/MHA-20 DANLEY SH50-I (WHITE) SPK/MHA-21 DANLEY SH50-I (WHITE) SPK/MHA-22 DANLEY SH50-I (WHITE) SPK/MHA-23 DANLEY SH50-I (WHITE) SPK/MHA-24 DANLEY SH50-I (WHITE) SPK/MHA-25 DANLEY SH50-I (WHITE) SPK/MHA-26 DANLEY SH50-I (WHITE) SPK/MHA-27 DANLEY SH50-I (WHITE) SPK/MHA-28 DANLEY SH50-I (WHITE) SPK/MHA-29 DANLEY SH50-I (WHITE) SPK/MHA-30 DANLEY SH50-I (WHITE) SPK/MHA-31 SPK12 SPK12 SPK12 SPK12 SPK12 SPK12 SPK12 SPK12 SPK12 SPK12 SPK12 SPK12 SPK12 SPK12 SPK12 SPK12 EQUIPMENT RACK ER/MHA AV CLOSET 210 AMPLIFIER #1 (8CH. 4k) NETWORK SWITCH/MHA AV7.2d NETWORK SWITCH/MHA AV7.2d STP STP NETWORK SWITCH/MHA AV7.2d NETWORK SWITCH/MHA AV7.2d STP STP INSTALL EACH LOUDSPEAKER WITH A JBL MTC-300BB12 SPEAKER CABINET AND JBL MTC-300SG12 GRILLE INSTALL EACH LOUDSPEAKER WITH APE RIGGING HANGERS AS SHOWN ON AV4.2/2 MERCYHEALTH ARENA AMPLIFIER #3 (8CH. 1250) NETWORK SWITCH/MHA AV7.2d NETWORK SWITCH/MHA AV7.2d STP STP CONSTANT POWER P CONSTANT POWER P CONSTANT POWER P MERCY HEALTH ARENA (MHA) - OVERHEAD SPEAKERS MERCY HEALTH ARENA (MHA) - BLEACHER COVERAGE SPEAKERS AMPLIFIER #2 (8CH. 1250) JBL CONTROL 322CT (WHITE) SPK/MHA-16 JBL CONTROL 322CT (WHITE) SPK/MHA-17 JBL CONTROL 322CT (WHITE) SPK/MHA-18 SPK12 SPK12 SPK12 FIRE ALARM CONTACT CLOSURE FOR SYSTEM MUTE M/L 1 CH A(4/8Ω/70V) CH C(4/8Ω/70V) CH D(4/8Ω/70V) CH B(4/8Ω/70V) GPIO LAN A (Q-SYS) LAN B (Q-SYS) AC 120V . . . . CH E(4/8Ω/70V) CH F(4/8Ω/70V) CH G(4/8Ω/70V) CH H(4/8Ω/70V) M/L 2 M/L 3 M/L 4 M/L 5 M/L 6 M/L 7 M/L 8 QSC CX-Q 4K8 M/L 1 CH A(4/8Ω/70V) CH C(4/8Ω/70V) CH D(4/8Ω/70V) CH B(4/8Ω/70V) GPIO LAN A (Q-SYS) LAN B (Q-SYS) AC 120V . . . . CH E(4/8Ω/70V) CH F(4/8Ω/70V) CH G(4/8Ω/70V) CH H(4/8Ω/70V) M/L 2 M/L 3 M/L 4 M/L 5 M/L 6 M/L 7 M/L 8 QSC CX-Q 8K8 M/L 1 CH A(4/8Ω/70V) CH C(4/8Ω/70V) CH D(4/8Ω/70V) CH B(4/8Ω/70V) GPIO LAN A (Q-SYS) LAN B (Q-SYS) AC 120V . . . . CH E(4/8Ω/70V) CH F(4/8Ω/70V) CH G(4/8Ω/70V) CH H(4/8Ω/70V) M/L 2 M/L 3 M/L 4 M/L 5 M/L 6 M/L 7 M/L 8 QSC CX-Q 8K8 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MERCYHEALTH ARENA SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.2c 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET EQUIPMENT RACK ER/MHA AV CLOSET 210 VD/SS (SPONSOR SUITE 202) CUSTOM RACK PANEL RP/MHA-CS STP STP STPWIRELESS MIC RECEIVER #1 AV7.2b STPWIRELESS MIC RECEIVER #2 AV7.2b STPWIRELESS MIC RECEIVER #3 AV7.2b STPWIRELESS MIC RECEIVER #4 AV7.2b STPWIRELESS MIC RECEIVER #5 AV7.2b STPWIRELESS MIC RECEIVER #6 AV7.2b STPAUDIO DSP LAN A AV7.2a STPAMPLIFIER #1 AV7.2c STPAMPLIFIER #2 AV7.2c STPAMPLIFIER #3 AV7.2c STP STP MERCYHEALTH ARENA AUD VLAN CTRL VLAN UPS P POWER PACK UPS P STPAUDIO DSP LAN B AV7.2a SMFER/LOB (NETWORK SWITCH)AV7.1c HDMI STP P STP ICOM MAIN STATION ICOM ICOM ICOM ICOM AV/MHA-2AV7.2a AV/MHA-2AV7.2a AV/MHA-1AV7.2a AV/MHA-1AV7.2a P 10.1" TOUCH SCREEN VIDoIP MEDIA DECODER SFP ID COM 55" FLAT PANEL - LANDSCAPE PROVIDE NETGEAR AXM762 SINGLEMODE SFP+ MODULES AS REQUIRED CONTROL MASTER USB TO ETHERNET USBBUILDING LAN STP INCLUDE USB - ETHERNET LICENSE COORDINATE INTERFACE WITH OWNER'S LAN SO THAT CRESTRON IPAD APP CAN CONTROL THE SYSTEM VIA THE OWNER'S WI-FI NETWORK BUTTON PANEL STP (PoE)ER/LOB (NETWORK SWITCH)AV7.2a NETWORK SWITCH 26+4 INCLUDE: (4) CLEAR-COM RS-701 BELT-PACKS (4) CLEARCOM CC-300 HEADSETS (4) 25' XLR3 CABLES STPAV/MHA-2 AV7.2a DC 24V . AC 120V . CRESTRON PW-2420RU HOT MIC/IFB PANEL MIC AUX PRGM IN AC 120V CHAN A CHAN B CHAN A CHAN B ANNOUNCE HEADSET CHAN A CHAN B RELAY OUT CLEAR-COM MS-702 LAN (POE+). USB USB CRESTRON TSW-1070-x-S HDMI USB A (HOST) USB B (DEVICE) USB C HDMI . . AUD L AUD R COM IR 2 IR 1 LAN 1 (PoE+) LAN 2 24V DC . LAN 3 CRESTRON DM-NVX-360 HDMI 1 HDMI 2 AUD L/R IN DVI-D . . . . . AUD L/R OUT . IR IN RS232 OUT RS232 IN USB 1 USB 2 LAN AC 120V . . . . SAMSUNG QB55R-B IO 1 IO 2 IO 3 IO 5 IO 4 IO 6 IO 7 IO 8 COM 1 COM 3 IR 1 IR 2 COM 2 IR 3 IR 4 IR 6 IR 5 IR 7 USB LAN NET IR 8 RLY 2 RLY 3 RLY 4 RLY 1 RLY 5 RLY 6 RLY 8 RLY 7 DC 24V COMPUTER CRESTRON CP4 LAN USB-B PORTSMITH PSA1U1E . . NET COM RELAY . . . IR LAN (POE) CRESTRON MPC3-102-B 8 10/100/1000 POE+ 7 10/100/1000 POE+ 6 10/100/1000 POE+ 5 10/100/1000 POE+ 4 10/100/1000 POE+ 3 10/100/1000 POE+ 2 10/100/1000 POE+ 1 10/100/1000 POE+ 27 1G/10G BASE-X SFP PSU AC 120V 16 10/100/1000 POE+ 15 10/100/1000 POE+ 14 10/100/1000 POE+ 13 10/100/1000 POE+ 12 10/100/1000 POE+ 11 10/100/1000 POE+ 10 10/100/1000 POE+ 9 10/100/1000 POE+ 24 10/100/1000 POE+ 23 10/100/1000 POE+ 22 10/100/1000 POE+ 21 10/100/1000 POE+ 20 10/100/1000 POE+ 19 10/100/1000 POE+ 18 10/100/1000 POE+ 17 10/100/1000 POE+ 25 10/100/1000BASE-T 26 10/100/1000BASE-T CONSOLE (USB-C) STORAGE (USB) CONSOLE (RJ45) OOB (RJ45) 28 1G/10G BASE-X SFP 29 1G/10G BASE-X SFP 30 1G/10G BASE-X SFP NETGEAR M4250-26G4XF-POE+ (GSM4230PX-100NAS) Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MERCYHEALTH ARENA SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.2d 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET EQUIPMENT RACK ER/MHA-1 AV CLOSET 210 POWER RACEWAY MIDDLE ATLANTIC MPR-8A CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) MERCYHEALTH ARENA NETWORK SWITCHP CONTROL MASTERP AMPLIFIER #1P AMPLIFIER #2P AMPLIFIER #3P ANT DISTO #1 PSUP ANT DISTO #2 PSUP AUDIO DSPP ALS PSUP LINE LEVEL RX #1P LINE LEVEL RX #2P ER/MHA CIRCUIT #1 ER/MHA CIRCUIT #2 ER/MHA CIRCUIT #3 ER/MHA CIRCUIT #4 UPS 1500VA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA . . . RS-232 . USB EPO AC 120V NON-CRIT 1 NON-CRIT 3 NON-CRIT 4 CRITICAL 5 NON-CRIT 2 CRITICAL 6 CRITICAL 7 RELAY OUT EXPANSION SLOT NETWORK LAN . LAN . CRITICAL 8 MIDDLE ATLANTIC UPS-OL1500R Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MERCYHEALTH ARENA SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.2e 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET MULTI-PURPOSE ARENA ANTENNA ALS/MHA EQUIPMENT RACK ER/MPA AV CLOSET 167 ANT CUSTOM PANEL MIC 5 MIC 6 LINE 5 LINE 6 A.NET 5 A.NET 6 PART OF AV I/O BOX AV/MPA-N CUSTOM PANEL MIC 3 MIC 4 LINE 3 LINE 4 A.NET 3 A.NET 4 PART OF AV I/O BOX AV/MPA-S CUSTOM PANEL MIC 1 MIC 2 LINE 1 LINE 2 A.NET 1 A.NET 2 PART OF AV I/O BOX AV/MPA-E MIC MIC LINE LINE MIC MIC LINE LINE MIC MIC LINE LINE STP STP STP STP STP STP NETWORK SWITCHAV7.3e NETWORK SWITCHAV7.3e NETWORK SWITCHAV7.3e NETWORK SWITCHAV7.3e NETWORK SWITCHAV7.3e NETWORK SWITCHAV7.3e NETWORK SWITCH AV7.3e NETWORK SWITCH AV7.3e CUSTOM PANEL ANTANT LINE ALS TRANSMITTER CABLES & ACCESSORIES: (36) LR-4200-072 DSP RF RECEIVER (36) LA-401 UNIVERSAL EAR SPEAKER (9) INTELLIGENT EAR PHONE/LANYARD (36) RECHARGEABLE AA NiMH BATTERIES (2) INTELLIGENT 12-UNIT CHARGING TRAY BLUETOOTH INPUT BT/MPA BLUETOOTH INTERFACE LINE LEVEL RX STP STP SEE AV6.2 FOR PANEL LAYOUTS MULTI-PURPOSE ARENA CAPACITY 1,554 LINE DSP/MPA LINE LEVEL RX 24VDC POWER SUPPLY P ALS TRANSMITTER PSU UPS P SEE AV6.2 FOR PANEL LAYOUTS SEE AV6.2 FOR PANEL LAYOUTS SEE AV6.2 FOR PANEL LAYOUTS LINE LINE PART OF AV I/O BOX AV/MPA-E PART OF AV I/O BOX AV/MPA-S PART OF AV I/O BOX AV/MPA-N CUSTOM PANEL TIE LINE 1 TIE LINE 1 TIE LINE 2 TIE LINE 2 CUSTOM PANEL TIE LINE 1 TIE LINE 1 TIE LINE 2 TIE LINE 2 CUSTOM PANEL TIE LINE 1 TIE LINE 1 TIE LINE 2 TIE LINE 2 LINE LINE STP STP LINE LINE LINE LINE LINE LINE LINE LINE MIC MIC LINE LINE AUDIO DSP LINE UPS P NETWORK AUDIO INPUT CUSTOM PANEL MIC 7 MIC 8 LINE 7 LINE 8 A.NET 7 A.NET 8 PART OF AV I/O BOX AV/MPA-N MIC MIC LINE LINE STP STP NETWORK SWITCHAV7.3e NETWORK SWITCHAV7.3e SEE AV6.2 FOR PANEL LAYOUTS ALS ANTENNA IN 2 L IN 2 R DC 15V MIX L . ANT 50Ω MIX R IN 1 MIC/LINE LISTEN LT-800-072-01 . . (LOOP IN) FORMAT A (OUT) FORMAT A RDL D-BT1A . . FORMAT A VDC 24V LINE OUT FORMAT A RDL TX-TPR1A . . +24V GROUND RDL PS-24AS DC 15V AC 120V . . LISTEN LA-201 M/L 1 M/L 2 M/L 3 M/L 5 M/L 4 M/L 6 M/L 7 FLEX 1 M/L 1 M/L 3 M/L 4 M/L 5 M/L 2 M/L 6 M/L 7 FLEX 2 FLEX 3 FLEX 4 FLEX 5 FLEX 6 FLEX 8 FLEX 7 . . PHONE HDMI RS232 +12V DC IN LAN A LAN B USB A1 USB A2 USB A3 USB A4 USB B AC 120V M/L 8 M/L 8 QSC CORE 110F V2 ML/1 ML/2 ML/3 LAN (POE) ML/4 24VDC IN LAN (THRU) 24VDC OUT QSC QIO-ML4i ANT . LISTEN LA-122 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MULTI-PURPOSE ARENA SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.3a 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET ANTENNA ANT/MHA-A ANTENNA ANT/MHA-B EQUIPMENT RACK ER/MPA AV CLOSET 167 ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT-50 ANT-50 STP NETWORK SWITCHAV7.3e STP NETWORK SWITCHAV7.3e STP NETWORK SWITCHAV7.3e STP NETWORK SWITCHAV7.3e STP NETWORK SWITCHAV7.3e STP NETWORK SWITCHAV7.3e WIRELESS SYSTEM CABLES & ACCESSORIES: (6) SHURE SB900B RECHARGABLE BATTERIES (1) SHURE SBC200-US CHARGER W/ PS45US POWER SUPPLY (2) SHURE SBC200 CHARGER W/O POWER SUPPLY (3) SHURE QLXD1 BODYPACK TRANSMITTER (3) MX150 SHURE LAVALIER MICROPHONES (3) BET87A HANDHELD TRANSMITTER MULTI-PURPOSE ARENA WIRELESS MIC ANTENNA WIRELESS MIC ANTENNA NET AUDIO IN #1 LINE LINE LINE LINE LINE LINE LINE LINE NETWORK SWITCH AV7.3e NET AUDIO IN #2 LINE LINE NETWORK SWITCH AV7.3e ANT DIST PSU #2 UPS P ANT DIST PSU #1 UPS P ANTENNA DISTRO #1 ANTENNA DISTRO #2 WIRELESS MIC RECEIVER #1 WIRELESS MIC RECEIVER #2 WIRELESS MIC RECEIVER #3 WIRELESS MIC RECEIVER #4 WIRELESS MIC RECEIVER #5 WIRELESS MIC RECEIVER #6 STP (PoE) STP (PoE) . RF SHURE UA864US . RF SHURE UA864US ML/1 ML/2 ML/3 LAN (POE) ML/4 24VDC IN LAN (THRU) 24VDC OUT QSC QIO-ML4i ML/1 ML/2 ML/3 LAN (POE) ML/4 24VDC IN LAN (THRU) 24VDC OUT QSC QIO-ML4i DC 15V AC 120V . . SHURE PS60 DC 15V AC 120V . . SHURE PS60 ANT A ANT B . . . . . . RF 1A DC 15V 1 RF 2A RF 2B RF 1B DC 15V 2 RF 3A DC 15V 3 RF 3B . RF 4A. . . RF 4B DC 15 4 . DC 15V CASCADE B CASCADE A SHURE UA844+SWB ANT A ANT B . . . . . . RF 1A DC 15V 1 RF 2A RF 2B RF 1B DC 15V 2 RF 3A DC 15V 3 RF 3B . RF 4A. . . RF 4B DC 15 4 . DC 15V CASCADE B CASCADE A SHURE UA844+SWB ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MULTI-PURPOSE ARENA SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.3b 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET JBL CONTROL 322CT (WHITE) SPK/MPA-1 JBL CONTROL 322CT (WHITE) SPK/MPA-2 JBL CONTROL 322CT (WHITE) SPK/MPA-3 SPK12 SPK12 JBL CONTROL 322CT (WHITE) SPK/MPA-4 JBL CONTROL 322CT (WHITE) SPK/MPA-5 JBL CONTROL 322CT (WHITE) SPK/MPA-6 SPK12 SPK12 JBL CONTROL 322CT (WHITE) SPK/MPA-7 JBL CONTROL 322CT (WHITE) SPK/MPA-8 JBL CONTROL 322CT (WHITE) SPK/MPA-9 SPK12 SPK12 JBL CONTROL 322CT (WHITE) SPK/MPA-10 JBL CONTROL 322CT (WHITE) SPK/MPA-11 JBL CONTROL 322CT (WHITE) SPK/MPA-12 SPK12 SPK12 JBL CONTROL 322CT (WHITE) SPK/MPA-13 JBL CONTROL 322CT (WHITE) SPK/MPA-14 JBL CONTROL 322CT (WHITE) SPK/MPA-15 SPK12 SPK12 EAW MK5394 (WHITE) SPK/MPA-22 EAW MK5394 (WHITE) SPK/MPA-23 EAW MK5394 (WHITE) SPK/MPA-24 EAW MK5394 (WHITE) SPK/MPA-26 EAW MK5394 (WHITE) SPK/MPA-27 EAW MK5394 (WHITE) SPK/MPA-28 EAW MK5394 (WHITE) SPK/MPA-29 SPK12 SPK12 SPK12 SPK12 SPK12 SPK12 SPK12 EQUIPMENT RACK ER/MPA AV CLOSET 167 SPK12 SPK12 SPK12 SPK12 SPK12 NETWORK SWITCH AV7.3e STP NETWORK SWITCH AV7.3e STP INSTALL EACH LOUDSPEAKER WITH A JBL MTC-300BB12 SPEAKER CABINET AND JBL MTC-300SG12 GRILLE INSTALL EACH LOUDSPEAKER WITH AN EAW MK2(5)000 U-BRACKET MULTI-PURPOSE ARENA CONSTANT POWER P CONSTANT POWER P MULTI-PURPOSE ARENA (MPA) - OVERHEAD SPEAKERS AMPLIFIER #1 (8CH. 4k) AMPLIFIER #2 (8CH. 4k) FIRE ALARM CONTACT CLOSURE FOR SYSTEM MUTE PRJ/MPA-N AV7.3d LINE PRJ/MPA-E AV7.3d LINE JBL CONTROL 322CT (WHITE) SPK/MPA-16 JBL CONTROL 322CT (WHITE) SPK/MPA-17 JBL CONTROL 322CT (WHITE) SPK/MPA-18 SPK12 SPK12 JBL CONTROL 322CT (WHITE) SPK/MPA-19 JBL CONTROL 322CT (WHITE) SPK/MPA-20 JBL CONTROL 322CT (WHITE) SPK/MPA-21 SPK12 SPK12 SPK12 SPK12 SPK12 M/L 1 CH A(4/8Ω/70V) CH C(4/8Ω/70V) CH D(4/8Ω/70V) CH B(4/8Ω/70V) GPIO LAN A (Q-SYS) LAN B (Q-SYS) AC 120V . . . . CH E(4/8Ω/70V) CH F(4/8Ω/70V) CH G(4/8Ω/70V) CH H(4/8Ω/70V) M/L 2 M/L 3 M/L 4 M/L 5 M/L 6 M/L 7 M/L 8 QSC CX-Q 4K8 M/L 1 CH A(4/8Ω/70V) CH C(4/8Ω/70V) CH D(4/8Ω/70V) CH B(4/8Ω/70V) GPIO LAN A (Q-SYS) LAN B (Q-SYS) AC 120V . . . . CH E(4/8Ω/70V) CH F(4/8Ω/70V) CH G(4/8Ω/70V) CH H(4/8Ω/70V) M/L 2 M/L 3 M/L 4 M/L 5 M/L 6 M/L 7 M/L 8 QSC CX-Q 4K8 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MULTI-PURPOSE ARENA SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.3c 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET PRJ/MPA-E PRJ/MPA-N PANASONIC ET-D3LEW60 9.0-1.1:1 ZOOM LENS PANASONIC ET-D3LEW60 9.0-1.1:1 ZOOM LENS PG4AW CHIEF PROJECTOR CAGE KITPF018024 CHIEF PROJECTOR MOUNT KIT PG4AW CHIEF PROJECTOR CAGE KITPF018024 CHIEF PROJECTOR MOUNT KIT PART OF AV I/O BOX AV/MPA-S PART OF AV I/O BOX AV/MPA-E PART OF AV I/O BOX AV/MPA-N MOUNT MEDIA ENCODER TO AV I/O ENCLOSURE DOOR ADDITIONAL WALL BOX CONNECTIONS SHOWN ON AV7.3a SEE AV6.2 FOR PANEL LAYOUTS CUSTOM PANEL V.NET # MOUNT MEDIA ENCODER TO AV I/O ENCLOSURE DOOR MOUNT MEDIA ENCODER TO AV I/O ENCLOSURE DOOR ADDITIONAL WALL BOX CONNECTIONS SHOWN ON AV7.3a SEE AV6.2 FOR PANEL LAYOUTS CUSTOM PANEL V.NET # ADDITIONAL WALL BOX CONNECTIONS SHOWN ON AV7.3a SEE AV6.2 FOR PANEL LAYOUTS CUSTOM PANEL V.NET # NETWORK SWITCHAV7.3e NETWORK SWITCHAV7.3e NETWORK SWITCHAV7.3e NETWORK SWITCH AV7.3e PROJECTOR HDMI CTRL PROJECTOR HDMI CTRL CUSTOM PANEL V.NET # NETWORK SWITCH AV7.3e CUSTOM PANEL V.NET # MEDIA ENCODER SFP ID MEDIA ENCODER SFP ID MEDIA ENCODER SFP ID MULTI-PURPOSE ARENA VIDoIP MEDIA DECODER SFP ID STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) VIDoIP MEDIA DECODER SFP ID STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) P P LINE AMP/1AV7.3c AUD-L/R-SUM LINE AUD-L/R-SUM AMP/1AV7.3c HDMI REMOTE 2 REMOTE 1 REMOTE 1 RS-232C RS-232C LAN POWER USB DIGILINK SYNC IN SYNC OUT SLOT 1 PANASONIC PT-RQ25KU HDMI REMOTE 2 REMOTE 1 REMOTE 1 RS-232C RS-232C LAN POWER USB DIGILINK SYNC IN SYNC OUT SLOT 1 PANASONIC PT-RQ25KU HDMI USB A (HOST) AUD L USB B (DEVICE) AUD R USB C HDMI . . IR 2 IR 1 LAN 2 24V DC . COM (PoE+) LAN 1 LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) AUD L USB B (DEVICE) AUD R USB C HDMI . . IR 2 IR 1 LAN 2 24V DC . COM (PoE+) LAN 1 LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) AUD L USB B (DEVICE) AUD R USB C HDMI . . IR 2 IR 1 LAN 2 24V DC . COM (PoE+) LAN 1 LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) USB B (DEVICE) USB C HDMI . . AUD L AUD R COM IR 2 IR 1 LAN 1 (PoE+) LAN 2 24V DC . LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) USB B (DEVICE) USB C HDMI . . AUD L AUD R COM IR 2 IR 1 LAN 1 (PoE+) LAN 2 24V DC . LAN 3 CRESTRON DM-NVX-360 LINE L LINE (MONO) LINE R EXTRON ASA 141 LINE L LINE (MONO) LINE R EXTRON ASA 141 HATCHING INDICATES EQUIPMENT REQUIRED FOR THE MULTI-PURPOSE ARENA VIDEO ADD ALTERNATE Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated MULTI-PURPOSE ARENA SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.3d 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET EQUIPMENT RACK ER/MPA AV CLOSET 167 CUSTOM RACK PANEL RP/MPA-CS AV/MPA-E (AUDIO NETWORK)AV7.3a AV/MPA-S (AUDIO NETWORK)AV7.3a AV/MPA-N (AUDIO NETWORK)AV7.3a STP STP STP STPWIRELESS MIC RECEIVER #1 AV7.3b STPWIRELESS MIC RECEIVER #2 AV7.3b STPWIRELESS MIC RECEIVER #3 AV7.3b STPWIRELESS MIC RECEIVER #4 AV7.3b STPWIRELESS MIC RECEIVER #5 AV7.3b STPWIRELESS MIC RECEIVER #6 AV7.3b STPAUDIO DSP LAN A AV7.3a STPAMPLIFIER #1 AV7.3c STPAMPLIFIER #2 AV7.3c STP NET AUDIO IN #1 AV7.3b NET AUDIO IN #2 AV7.3b MULTI-PURPOSE ARENA PROJECTION SCREEN PROJECTION SCREEN PROJECTION SCREEN SCN/MPA-E CTRL CTRL CTRL CTRL PROJECTION SCREEN SCN/MPA-N AV/MPA-N (VIDEO NETWORK)AV7.3d AV/MPA-S (VIDEO NETWORK)AV7.3d AV/MPA-E (VIDEO NETWORK)AV7.3d STPAUDIO DSP LAN B AV7.3a UPS P POWER PACK UPS/1500VA/MPA P STP STP STP AUD VLAN VID / CTRL VLAN SMFER/LOB (NETWORK SWITCH)AV7.1c STP HDMI TO OFE STREAMING EQUIPMENT SCREEN SWITCH SW/MPA-E SCREEN SWITCH SW/MPA-N CTRL CTRL NETWORK SWITCH 40+8 10.1" TOUCH SCREEN PROVIDE NETGEAR AXM762 SINGLEMODE SFP+ MODULES AS REQUIRED STP (PoE) STP (PoE) CONTROL MASTER USB TO ETHERNET USBBUILDING LAN STP INCLUDE USB - ETHERNET LICENSE COORDINATE INTERFACE WITH OWNER'S LAN SO THAT CRESTRON IPAD APP CAN CONTROL THE SYSTEM VIA THE OWNER'S WI-FI NETWORK STP (PoE) STP (PoE)PRJ/MPA-N AV7.3d STP (PoE)PRJ/MPA-E AV7.3d STP (PoE) STP (PoE) STP (PoE) STP (PoE)STP (PoE) STP (PoE) VIDoIP MEDIA DECODER SFP ID CTRL CTRL UP AC 120V . . DOWN . PROJECTION SCREEN UP AC 120V . . DOWN . PROJECTION SCREEN DC 24V . AC 120V . CRESTRON PW-2420RU UP DOWN . AC AC UP . . AC DOWN LVC DA-LITE 40973 UP DOWN . AC AC UP . . AC DOWN LVC DA-LITE 40973 8 10/100/1000 POE+ 7 10/100/1000 POE+ 6 10/100/1000 POE+ 5 10/100/1000 POE+ 4 10/100/1000 POE+ 3 10/100/1000 POE+ 2 10/100/1000 POE+ 1 10/100/1000 POE+ 45 1G/10G SFP+ PSU AC 120V 16 10/100/1000 POE+ 15 10/100/1000 POE+ 14 10/100/1000 POE+ 13 10/100/1000 POE+ 12 10/100/1000 POE+ 11 10/100/1000 POE+ 10 10/100/1000 POE+ 9 10/100/1000 POE+ 24 10/100/1000 POE+ 23 10/100/1000 POE+ 22 10/100/1000 POE+ 21 10/100/1000 POE+ 20 10/100/1000 POE+ 19 10/100/1000 POE+ 18 10/100/1000 POE+ 17 10/100/1000 POE+ CONSOLE (USB-C) STORAGE (USB) CONSOLE (RJ45) OOB (RJ45) 32 10/100/1000 POE+ 31 10/100/1000 POE+ 30 10/100/1000 POE+ 29 10/100/1000 POE+ 28 10/100/1000 POE+ 27 10/100/1000 POE+ 26 10/100/1000 POE+ 25 10/100/1000 POE+ 40 10/100/1000 POE+ 39 10/100/1000 POE+ 38 10/100/1000 POE+ 37 10/100/1000 POE+ 36 10/100/1000 POE+ 35 10/100/1000 POE+ 34 10/100/1000 POE+ 33 10/100/1000 POE+ 46 1G/10G SFP+ 47 1G/10G SFP+ 48 1G/10G SFP+ 41 1G/10G SFP+ 42 1G/10G SFP+ 43 1G/10G SFP+ 44 1G/10G SFP+ NETGEAR M4250-40G8XF-POE+ LAN (POE+). USB USB CRESTRON TSW-1070-x-S IO 1 IO 2 IO 3 IO 5 IO 4 IO 6 IO 7 IO 8 COM 1 COM 3 IR 1 IR 2 COM 2 IR 3 IR 4 IR 6 IR 5 IR 7 USB LAN NET IR 8 RLY 2 RLY 3 RLY 4 RLY 1 RLY 5 RLY 6 RLY 8 RLY 7 DC 24V COMPUTER CRESTRON CP4 LAN USB-B PORTSMITH PSA1U1E HDMI USB A (HOST) USB B (DEVICE) USB C HDMI . . AUD L AUD R COM IR 2 IR 1 LAN 1 (PoE+) LAN 2 24V DC . LAN 3 CRESTRON DM-NVX-360 HATCHING INDICATES EQUIPMENT REQUIRED FOR THE MULTI-PURPOSE ARENA VIDEO ADD ALTERNATE Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated MULTI-PURPOSE ARENA SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.3e 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET EQUIPMENT RACK ER/MPA-1 AV CLOSET 167 POWER RACEWAY MIDDLE ATLANTIC MPR-8A CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) MULTI-PURPOSE ARENA NETWORK SWITCHP CONTROL MASTERP ANT DISTO PSU #1P ANT DISTO PSU #2P AUDIO DSPP ALS PSUP AMPLIFIER #1P AMPLIFIER #2P LINE LEVEL RXP ER/MPA CIRCUIT #1 ER/MPA CIRCUIT #2 ER/MPA CIRCUIT #3 UPS 1500VA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA . . . RS-232 . USB EPO AC 120V NON-CRIT 1 NON-CRIT 3 NON-CRIT 4 CRITICAL 5 NON-CRIT 2 CRITICAL 6 CRITICAL 7 RELAY OUT EXPANSION SLOT NETWORK LAN . LAN . CRITICAL 8 MIDDLE ATLANTIC UPS-OL1500R Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MULTI-PURPOSE ARENA SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.3f 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET MULTI-USE CONVENTION SPACE AUDIO DSP DSP AV I/O BOX ALS/MUC-3 EQUIPMENT RACKS ER/MUC-1 & ER/MUC-2 AV CLOSET 157 DSP NET AUDIO OUTPUT STP STP NETWORK SWITCH AV7.4e NETWORK SWITCH AV7.4e STPNETWORK SWITCH AV7.4e STPNETWORK SWITCH AV7.4e STPNETWORK SWITCH AV7.4e STPNETWORK SWITCH AV7.4e STPNETWORK SWITCH AV7.4e STPNETWORK SWITCH AV7.4e MIC MIC LINE LINE CUSTOM PANEL MIC 11 MIC 12 LINE 11 LINE 12 A.NET 11 A.NET 12 PART OF AV I/O BOX AV/MUC-N CUSTOM PANEL MIC 9 MIC 10 LINE 9 LINE 10 A.NET 9 A.NET 10 PART OF AV I/O BOX AV/MUC-W CUSTOM PANEL MIC 7 MIC 8 LINE 7 LINE 8 A.NET 7 A.NET 8 PART OF AV I/O BOX AV/MUC-S3 CUSTOM PANEL MIC 5 MIC 6 LINE 5 LINE 6 A.NET 5 A.NET 6 PART OF AV I/O BOX AV/MUC-S2 CUSTOM PANEL MIC 3 MIC 4 LINE 3 LINE 4 A.NET 3 A.NET 4 PART OF AV I/O BOX AV/MUC-S1 CUSTOM PANEL MIC 1 MIC 2 LINE 1 LINE 2 A.NET 1 A. NET 2 PART OF AV I/O BOX AV/MUC-E MIC MIC LINE LINE MIC MIC LINE LINE MIC MIC LINE LINE MIC MIC LINE LINE MIC MIC LINE LINE MIC MIC LINE LINE MIC MIC LINE LINE MIC MIC LINE LINE MIC MIC LINE LINE STP STP STP STP STP STP STP STP STP STP STP STP NETWORK SWITCHAV7.4e NETWORK SWITCHAV7.4e NETWORK SWITCHAV7.4e NETWORK SWITCHAV7.1c NETWORK SWITCHAV7.4e MIC MIC LINE LINE NETWORK SWITCHAV7.1c ANT CUSTOM PANEL ANTANT LINE ALS TRANSMITTER (WEST) CABLES & ACCESSORIES: (36) LR-4200-072 DSP RF RECEIVER (36) LA-401 UNIVERSAL EAR SPEAKER (9) INTELLIGENT EAR PHONE/LANYARD (36) RECHARGEABLE AA NiMH BATTERIES (2) INTELLIGENT 12-UNIT CHARGING TRAY SEE AV6.3 FOR PANEL LAYOUTS MULTI-USE CONVENTION SPACE CAPACITY 1,475 UPS P QIO-PSU/1 MUC UPS P QIO-PSU/2 MUC UPS P ALS PSU (WEST) UPS P AV I/O BOX ALS/MUC-2 ANT CUSTOM PANEL ANTANT ALS TRANSMITTER (CENTER) ALS PSU (CENTER) UPS P AV I/O BOX ALS/MUC-1 ANT CUSTOM PANEL ANTANT ALS TRANSMITTER (EAST) ALS PSU EAST UPS P LINE LINE DSP NET AUDIO INPUT #1 DSP NET AUDIO INPUT #2 DSP NET AUDIO INPUT #3 DSP NET AUDIO INPUT #4 DSP NET AUDIO INPUT #5 TO NEXT DSP I/O POWER INPUTFROM DSP I/O POWER PORT OUT FROM DSP I/O POWER PORT OUT TO NEXT DSP I/O POWER INPUT SEE AV6.3 FOR PANEL LAYOUTS SEE AV6.3 FOR PANEL LAYOUTS SEE AV6.3 FOR PANEL LAYOUTS SEE AV6.3 FOR PANEL LAYOUTS SEE AV6.3 FOR PANEL LAYOUTS STPNETWORK SWITCH AV7.4e MIC MIC LINE LINE DSP NET AUDIO INPUT #6 TO NEXT DSP I/O POWER INPUTFROM DSP I/O POWER PORT OUT TO NEXT DSP I/O POWER INPUT TO NEXT DSP I/O POWER INPUTFROM DSP I/O POWER PORT OUT FROM DSP I/O POWER PORT OUT PART OF AV I/O BOX AV/MUC-N PART OF AV I/O BOX AV/MUC-W PART OF AV I/O BOX AV/MUC-S3 PART OF AV I/O BOX AV/MUC-S2 PART OF AV I/O BOX AV/MUC-S1 CUSTOM PANEL TIE LINE 1 TIE LINE 1 TIE LINE 2 TIE LINE 2 PART OF AV I/O BOX AV/MUC-E SEE AV6.3 FOR PANEL LAYOUTS LINE LINE LINE LINE LINE CUSTOM PANEL TIE LINE 1 TIE LINE 1 TIE LINE 2 TIE LINE 2 CUSTOM PANEL TIE LINE 1 TIE LINE 1 TIE LINE 2 TIE LINE 2 CUSTOM PANEL TIE LINE 1 TIE LINE 1 TIE LINE 2 TIE LINE 2 CUSTOM PANEL TIE LINE 1 TIE LINE 1 TIE LINE 2 TIE LINE 2 CUSTOM PANEL TIE LINE 1 TIE LINE 1 TIE LINE 2 TIE LINE 2 LINE LINE LINE LINE LINE ALS ANTENNA ALS ANTENNA ALS ANTENNA . LAN A LAN B AC 120V iDRAC RS232 AUX LAN 2 AUX LAN 1 . . . . . . QSC CORE 610 LAN (POE) 24VDC IN 1 3 4 LAN (THRU) 2 24VDC OUT QSC QIO-L4o IN 2 L IN 2 R DC 15V MIX L . ANT 50Ω MIX R IN 1 MIC/LINE LISTEN LT-800-072-01 DC 24V AC 120V . POWER SUPPLY DC 24V AC 120V . POWER SUPPLY DC 15V AC 120V . . LISTEN LA-201 IN 2 L IN 2 R DC 15V MIX L . ANT 50Ω MIX R IN 1 MIC/LINE LISTEN LT-800-072-01 DC 15V AC 120V . . LISTEN LA-201 IN 2 L IN 2 R DC 15V MIX L . ANT 50Ω MIX R IN 1 MIC/LINE LISTEN LT-800-072-01 DC 15V AC 120V . . LISTEN LA-201 ML/1 ML/2 ML/3 LAN (POE) ML/4 24VDC IN LAN (THRU) 24VDC OUT QSC QIO-ML4i ML/1 ML/2 ML/3 LAN (POE) ML/4 24VDC IN LAN (THRU) 24VDC OUT QSC QIO-ML4i ML/1 ML/2 ML/3 LAN (POE) ML/4 24VDC IN LAN (THRU) 24VDC OUT QSC QIO-ML4i ML/1 ML/2 ML/3 LAN (POE) ML/4 24VDC IN LAN (THRU) 24VDC OUT QSC QIO-ML4i ML/1 ML/2 ML/3 LAN (POE) ML/4 24VDC IN LAN (THRU) 24VDC OUT QSC QIO-ML4i ML/1 ML/2 ML/3 LAN (POE) ML/4 24VDC IN LAN (THRU) 24VDC OUT QSC QIO-ML4i ANT . LISTEN LA-122 ANT . LISTEN LA-122 ANT . LISTEN LA-122 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MULTI-USE CONVENTION SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.4a 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET EQUIPMENT RACKS ER/MUC-1 & ER/MUC-2 AV CLOSET 157 ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT ANT STP NETWORK SWITCHAV7.4e STP NETWORK SWITCHAV7.4e STP NETWORK SWITCHAV7.4e STP NETWORK SWITCHAV7.4e STP NETWORK SWITCHAV7.4e STP NETWORK SWITCHAV7.4e WIRELESS SYSTEM CABLES & ACCESSORIES: (6) SHURE SB900B RECHARGABLE BATTERIES (1) SHURE SBC200-US CHARGER W/ PS45US POWER SUPPLY (2) SHURE SBC200 CHARGER W/O POWER SUPPLY (3) MX150 SHURE LAVALIER MICROPHONES (3) BET87A HANDHELD TRANSMITTER MULTI-USE CONVENTION SPACE ANT DIST PSU #2 UPS P ANT DIST PSU #1 UPS P ANTENNA ANT/MUC-B1 MUC EAST WALL WIRELESS MIC ANTENNA WIRELESS MIC ANTENNA ANT ANT ANTENNA ANT/MUC-A1 ANTENNA ANT/MUC-B2 WIRELESS MIC ANTENNA WIRELESS MIC ANTENNA ANT-50 ANTENNA ANT/MUC-A2 ANTENNA ANT/MUC-B3 WIRELESS MIC ANTENNA WIRELESS MIC ANTENNA ANTENNA ANT/MUC-A3 MUC WEST WALL ANTENNA DISTRO #1 ANTENNA DISTRO #2 WIRELESS MIC RECEIVER #1 WIRELESS MIC RECEIVER #2 WIRELESS MIC RECEIVER #3 WIRELESS MIC RECEIVER #4 WIRELESS MIC RECEIVER #5 WIRELESS MIC RECEIVER #6 ANTENNA COMBINER ANT ANT ANT-50 ANT-50 ANT-50 LINE AMP/1AV7.4c LINE AMP/1AV7.4c LINE AMP/1AV7.4c LINE AMP/1AV7.4c LINE AMP/2AV7.4c LINE AMP/2AV7.4c DC 15V AC 120V . . SHURE PS60 DC 15V AC 120V . . SHURE PS60 . RF SHURE UA864US . RF SHURE UA864US . RF SHURE UA864US . RF SHURE UA864US . RF SHURE UA864US . RF SHURE UA864US ANT A ANT B . . . . . . RF 1A DC 15V 1 RF 2A RF 2B RF 1B DC 15V 2 RF 3A DC 15V 3 RF 3B . RF 4A. . . RF 4B DC 15 4 . DC 15V CASCADE B CASCADE A SHURE UA844+SWB ANT A ANT B . . . . . . RF 1A DC 15V 1 RF 2A RF 2B RF 1B DC 15V 2 RF 3A DC 15V 3 RF 3B . RF 4A. . . RF 4B DC 15 4 . DC 15V CASCADE B CASCADE A SHURE UA844+SWB ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 ANT A ANT B DC 12V XLR (MIC) LAN 1/4" SHURE QLXD4 A1 A2 . . . . . . OUT A . AC 120V A3 A4 B1 B2 B3 B4 OUT B RF VENUE 4 ZONE Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MULTI-USE CONVENTION SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.4b 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET JBL CONTROL 322CT (WHITE) SPK/MUC-1SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-2 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-3 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-4 JBL CONTROL 322CT (WHITE) SPK/MUC-5 SPK12 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-6 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-7 JBL CONTROL 322CT (WHITE) SPK/MUC-8 SPK12 SPK12 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-9 JBL CONTROL 322CT (WHITE) SPK/MUC-10 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-21SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-22 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-23 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-24 JBL CONTROL 322CT (WHITE) SPK/MUC-25 SPK12 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-26 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-27 JBL CONTROL 322CT (WHITE) SPK/MUC-28 SPK12 SPK12 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-29 JBL CONTROL 322CT (WHITE) SPK/MUC-30 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-11SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-12 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-13 JBL CONTROL 322CT (WHITE) SPK/MUC-14 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-15 JBL CONTROL 322CT (WHITE) SPK/MUC-16 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-17 JBL CONTROL 322CT (WHITE) SPK/MUC-18 SPK12 JBL CONTROL 322CT (WHITE) SPK/MUC-19 JBL CONTROL 322CT (WHITE) SPK/MUC-20 SPK12 SPK12 SPK12 SPK12 EQUIPMENT RACKS ER/MUC-1 & ER/MUC-2 AV CLOSET 157 AMPLIFIER #2 (4CH. 2K) NETWORK SWITCH AV7.4c STP NETWORK SWITCH AV7.4c STP NETWORK SWITCH AV7.4c STP INSTALL EACH LOUDSPEAKER WITH A JBL MTC-300BB12 SPEAKER CABINET AND JBL MTC-300SG12 GRILLE MULTI-USE CONVENTION SPACE CONSTANT POWER P CONSTANT POWER P CONSTANT POWER P MULTI-USE CONVENTION SPACE(MUC) - OVERHEAD SPEAKERS AMPLIFIER #1 (4CH. 2K) AMPLIFIER #3 (4CH. 2K) WIRELESS RECEIVER#1 AV7.4b LINE WIRELESS RECEIVER#2 AV7.4b LINE WIRELESS RECEIVER#3 AV7.4b LINE WIRELESS RECEIVER#4 AV7.4b LINE WIRELESS RECEIVER#5 AV7.4b LINE WIRELESS RECEIVER#6 AV7.4b LINE FIRE ALARM CONTACT CLOSURE FOR SYSTEM MUTE PRJ/MUC-E AV7.4d LINE PRJ/MUC-W AV7.4d LINE PRJ/MUC-N AV7.4d LINE M/L 1 CH A(4/8Ω/70V) CH C(4/8Ω/70V) CH D(4/8Ω/70V) CH B(4/8Ω/70V) GPIO LAN A (Q-SYS) LAN B (Q-SYS) AC 120V . . . . M/L 2 M/L 3 M/L 4 QSC CX-Q 2K4 M/L 1 CH A(4/8Ω/70V) CH C(4/8Ω/70V) CH D(4/8Ω/70V) CH B(4/8Ω/70V) GPIO LAN A (Q-SYS) LAN B (Q-SYS) AC 120V . . . . M/L 2 M/L 3 M/L 4 QSC CX-Q 2K4 M/L 1 CH A(4/8Ω/70V) CH C(4/8Ω/70V) CH D(4/8Ω/70V) CH B(4/8Ω/70V) GPIO LAN A (Q-SYS) LAN B (Q-SYS) AC 120V . . . . M/L 2 M/L 3 M/L 4 QSC CX-Q 2K4 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MULTI-USE CONVENTION SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.4c 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET PRJ/MUC-E PRJ/MUC-N PRJ/MUC-W PANASONIC ET-D3LEW60 9.0-1.1:1 ZOOM LENS PANASONIC ET-D3LEW60 9.0-1.1:1 ZOOM LENS PG4AW CHIEF PROJECTOR CAGE KITPF018024 CHIEF PROJECTOR MOUNT KIT PG4AW CHIEF PROJECTOR CAGE KITPF018024 CHIEF PROJECTOR MOUNT KIT PG4AW CHIEF PROJECTOR CAGE KITPF018024 CHIEF PROJECTOR MOUNT KIT MULTI-USE CONVENTION SPACE AV I/O BOX AV/MUC-S1 AV I/O BOX AV/MUC-S2 AV I/O BOX AV/MUC-S3 AV I/O BOX AV/MUC-W AV I/O BOX AV/MUC-N AV I/O BOX AV/MUC-E ADDITIONAL WALL BOX CONNECTIONS SHOWN ON AV7.4a SEE AV6.3 FOR PANEL LAYOUTS CUSTOM PANEL V.NET 1 MOUNT MEDIA ENCODER TO AV I/O ENCLOSURE DOOR ADDITIONAL WALL BOX CONNECTIONS SHOWN ON AV7.4a SEE AV6.3 FOR PANEL LAYOUTS CUSTOM PANEL V.NET 6 MOUNT MEDIA ENCODER TO AV I/O ENCLOSURE DOOR ADDITIONAL WALL BOX CONNECTIONS SHOWN ON AV7.4a SEE AV6.3 FOR PANEL LAYOUTS CUSTOM PANEL V.NET 5 MOUNT MEDIA ENCODER TO AV I/O ENCLOSURE DOOR ADDITIONAL WALL BOX CONNECTIONS SHOWN ON AV7.4a SEE AV6.3 FOR PANEL LAYOUTS CUSTOM PANEL V.NET 4 MOUNT MEDIA ENCODER TO AV I/O ENCLOSURE DOOR ADDITIONAL WALL BOX CONNECTIONS SHOWN ON AV7.4a SEE AV6.3 FOR PANEL LAYOUTS CUSTOM PANEL V.NET 3 MOUNT MEDIA ENCODER TO AV I/O ENCLOSURE DOOR ADDITIONAL WALL BOX CONNECTIONS SHOWN ON AV7.4a SEE AV6.3 FOR PANEL LAYOUTS CUSTOM PANEL V.NET 2 MOUNT MEDIA ENCODER TO AV I/O ENCLOSURE DOOR NETWORK SWITCH (SW/MUC)AV7.4e NETWORK SWITCH (SW/MUC)AV7.4e ER/LOB (NETWORK SWITCH)AV7.1c ER/LOB (NETWORK SWITCH)AV7.1c NETWORK SWITCH (SW/MUC)AV7.4e NETWORK SWITCH (SW/MUC)AV7.4e PROJECTOR HDMI CTRL PANASONIC ET-D3LEW60 9.0-1.1:1 ZOOM LENS PROJECTOR HDMI CTRL PROJECTOR HDMI CTRL NETWORK SWITCH (SW/MUC)AV7.4e CUSTOM PANEL V.NET 7 NETWORK SWITCH (SW/MUC)AV7.4e CUSTOM PANEL V.NET 9 ER/LOB (NETWORK SWITCH)AV7.1c CUSTOM PANEL V.NET 8 MEDIA ENCODER SFP ID ROUTE AES67 NETWORK AUDIO TO DSP, TYPICAL OF ALL MEDIA ENCODERS MEDIA ENCODER SFP ID MEDIA ENCODER SFP ID MEDIA ENCODER SFP ID MEDIA ENCODER SFP ID MEDIA ENCODER SFP ID STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) VIDoIP MEDIA DECODER SFP ID VIDoIP MEDIA DECODER SFP ID VIDoIP MEDIA DECODER SFP ID P P P AUD-L/R-SUM LINE LINE LINE AMP/3AV7.4c AMP/3AV7.4c AMP/3AV7.4c AUD-L/R-SUM AUD-L/R-SUM CTRL CTRL KEY SWITCH SHOW SWITCH RS232 CONTROL MASTER AV7.4e PROJECTOR LIFT HDMI REMOTE 2 REMOTE 1 REMOTE 1 RS-232C RS-232C LAN POWER USB DIGILINK SYNC IN SYNC OUT SLOT 1 PANASONIC PT-RQ25KU HDMI REMOTE 2 REMOTE 1 REMOTE 1 RS-232C RS-232C LAN POWER USB DIGILINK SYNC IN SYNC OUT SLOT 1 PANASONIC PT-RQ25KU HDMI REMOTE 2 REMOTE 1 REMOTE 1 RS-232C RS-232C LAN POWER USB DIGILINK SYNC IN SYNC OUT SLOT 1 PANASONIC PT-RQ25KU HDMI USB A (HOST) AUD L USB B (DEVICE) AUD R USB C HDMI . . IR 2 IR 1 LAN 2 24V DC . COM (PoE+) LAN 1 LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) AUD L USB B (DEVICE) AUD R USB C HDMI . . IR 2 IR 1 LAN 2 24V DC . COM (PoE+) LAN 1 LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) AUD L USB B (DEVICE) AUD R USB C HDMI . . IR 2 IR 1 LAN 2 24V DC . COM (PoE+) LAN 1 LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) AUD L USB B (DEVICE) AUD R USB C HDMI . . IR 2 IR 1 LAN 2 24V DC . COM (PoE+) LAN 1 LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) AUD L USB B (DEVICE) AUD R USB C HDMI . . IR 2 IR 1 LAN 2 24V DC . COM (PoE+) LAN 1 LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) AUD L USB B (DEVICE) AUD R USB C HDMI . . IR 2 IR 1 LAN 2 24V DC . COM (PoE+) LAN 1 LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) USB B (DEVICE) USB C HDMI . . AUD L AUD R COM IR 2 IR 1 LAN 1 (PoE+) LAN 2 24V DC . LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) USB B (DEVICE) USB C HDMI . . AUD L AUD R COM IR 2 IR 1 LAN 1 (PoE+) LAN 2 24V DC . LAN 3 CRESTRON DM-NVX-360 HDMI USB A (HOST) USB B (DEVICE) USB C HDMI . . AUD L AUD R COM IR 2 IR 1 LAN 1 (PoE+) LAN 2 24V DC . LAN 3 CRESTRON DM-NVX-360 LINE L LINE (MONO) LINE R EXTRON ASA 141 LINE L LINE (MONO) LINE R EXTRON ASA 141 LINE L LINE (MONO) LINE R EXTRON ASA 141 WALL RS-485 AC 120V . . AC TO PRJ . KEY . RS-232 . LVT DRAPER SLX24 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MULTI-USE CONVENTION SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.4d 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET EQUIPMENT RACKS ER/MUC-1 & ER/MUC-2 AV CLOSET 157 CUSTOM RACK PANEL RP/MUC-CS STP STP STP AUDIO DSP LAN A AV7.4a AUDIO DSP LAN B AV7.4a STPNET AUDIO IN #1 AV7.4e STPNET AUDIO IN #2 AV7.4e STPNET AUDIO IN #3 AV7.4e STPNET AUDIO IN #4 AV7.4e STPNET AUDIO OUT AV7.4e STPNET AUDIO IN #5 AV7.4e AV/MUC-E (AUDIO NETWORK)AV7.4a AV/MUC-S1 (AUDIO NETWORK)AV7.4a AV/MUC-S2 (AUDIO NETWORK)AV7.4a AV/MUC-N (AUDIO NETWORK)AV7.4a STP STP STP STP STPWIRELESS MIC RECEIVER #1 AV7.3b STPWIRELESS MIC RECEIVER #2 AV7.3b STPWIRELESS MIC RECEIVER #3 AV7.3b STPWIRELESS MIC RECEIVER #4 AV7.3b STPWIRELESS MIC RECEIVER #5 AV7.3b STPWIRELESS MIC RECEIVER #6 AV7.3b STPAMPLIFIER #1 AV7.4c STPAMPLIFIER #2 AV7.4c STPAMPLIFIER #3 AV7.4c STPAMPLIFIER #4 AV7.4c STP STP STP MULTI-USE CONVENTION SPACE PROJECTION SCREEN PROJECTION SCREEN PROJECTION SCREEN PROJECTION SCREEN SCN/MUC-E CTRL PROJECTION SCREEN SCN/MUC-N PROJECTION SCREEN SCN/MUC-W PRJ/MUC-E (VIDEO NETWORK)AV7.4d PRJ/MUC-N (VIDEO NETWORK)AV7.4d AUD VLAN VID / CTRL VLAN CTRL CTRL POWER PACK UPS/1500VA/MPA P UPS P SMFER/LOB (NETWORK SWITCH)AV7.1c AV/MUC-N (VIDEO NETWORK)AV7.4d AV/MUC-E (VIDEO NETWORK)AV7.4d AV/MUC-S1 (VIDEO NETWORK)AV7.4d AV/MUC-S2 (VIDEO NETWORK)AV7.4d STP STP STP STP CTRL SCREEN SWITCH SW/MUC-N CTRL SCREEN SWITCH SW/MUC-E CTRL CTRL 10.1" TOUCH SCREEN NETWORK SWITCH 40+8 PROVIDE NETGEAR AXM762 SINGLEMODE SFP+ MODULES AS REQUIRED COMBINE VLAN'S AS NEEDED IN ORDER TO ROUTE NETWORK AUDIO FROM MEDIA ENCODERS TO AUDIO DSP. STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) STP (PoE) CONTROL MASTER USB TO ETHERNET USBBUILDING LAN STP INCLUDE USB - ETHERNET LICENSE COORDINATE INTERFACE WITH OWNER'S LAN SO THAT CRESTRON IPAD APP CAN CONTROL THE SYSTEM VIA THE OWNER'S WI-FI NETWORK STPNET AUDIO IN #6 AV7.4e STPNET AUDIO IN #7 AV7.4e STPNET AUDIO IN #8 AV7.4e CTRL PROJECTOR LIFTAV7.4d LOW VOLTAGE SWITCH CTRL LOW VOLTAGE SWITCH SCREEN SWITCH SW/MUC-W CTRL LOW VOLTAGE SWITCH UP AC 120V . . DOWN . PROJECTION SCREEN UP AC 120V . . DOWN . PROJECTION SCREEN UP AC 120V . . DOWN . PROJECTION SCREEN DC 24V . AC 120V . CRESTRON PW-2420RU UP DOWN . AC AC UP . . AC DOWN LVC DA-LITE 40973 UP DOWN . AC AC UP . . AC DOWN LVC DA-LITE 40973 UP DOWN . AC AC UP . . AC DOWN LVC DA-LITE 40973 LAN (POE+). USB USB CRESTRON TSW-1070-x-S 8 10/100/1000 POE+ 7 10/100/1000 POE+ 6 10/100/1000 POE+ 5 10/100/1000 POE+ 4 10/100/1000 POE+ 3 10/100/1000 POE+ 2 10/100/1000 POE+ 1 10/100/1000 POE+ 45 1G/10G SFP+ PSU AC 120V 16 10/100/1000 POE+ 15 10/100/1000 POE+ 14 10/100/1000 POE+ 13 10/100/1000 POE+ 12 10/100/1000 POE+ 11 10/100/1000 POE+ 10 10/100/1000 POE+ 9 10/100/1000 POE+ 24 10/100/1000 POE+ 23 10/100/1000 POE+ 22 10/100/1000 POE+ 21 10/100/1000 POE+ 20 10/100/1000 POE+ 19 10/100/1000 POE+ 18 10/100/1000 POE+ 17 10/100/1000 POE+ CONSOLE (USB-C) STORAGE (USB) CONSOLE (RJ45) OOB (RJ45) 32 10/100/1000 POE+ 31 10/100/1000 POE+ 30 10/100/1000 POE+ 29 10/100/1000 POE+ 28 10/100/1000 POE+ 27 10/100/1000 POE+ 26 10/100/1000 POE+ 25 10/100/1000 POE+ 40 10/100/1000 POE+ 39 10/100/1000 POE+ 38 10/100/1000 POE+ 37 10/100/1000 POE+ 36 10/100/1000 POE+ 35 10/100/1000 POE+ 34 10/100/1000 POE+ 33 10/100/1000 POE+ 46 1G/10G SFP+ 47 1G/10G SFP+ 48 1G/10G SFP+ 41 1G/10G SFP+ 42 1G/10G SFP+ 43 1G/10G SFP+ 44 1G/10G SFP+ NETGEAR M4250-40G8XF-POE+ IO 1 IO 2 IO 3 IO 5 IO 4 IO 6 IO 7 IO 8 COM 1 COM 3 IR 1 IR 2 COM 2 IR 3 IR 4 IR 6 IR 5 IR 7 USB LAN NET IR 8 RLY 2 RLY 3 RLY 4 RLY 1 RLY 5 RLY 6 RLY 8 RLY 7 DC 24V COMPUTER CRESTRON CP4 LAN USB-B PORTSMITH PSA1U1E . UP DOWN . DALITE 40975 . UP DOWN . DALITE 40975 . UP DOWN . DALITE 40975 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MULTI-USE CONVENTION SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.4e 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET EQUIPMENT RACKS ER/MUC-1 AV CLOSET 157 POWER RACEWAY - MIDDLE ATLANTIC MPR-8A CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) CONSTANT POWER (IG) EQUIPMENT RACKS ER/MUC-2 AV CLOSET 157 MULTI-USE CONVENTION SPACE AUDIO DSP/MUCP QIO PSU#1/MUCP QIO PSU#2/MUCP AMPLIFIER #1P AMPLIFIER #3P AMPLIFIER #4P CM/MUCP SW/MUCP LINE LEVEL RXP ALS PSU/MUC NP ALS PSU/MUC CP ALS PSU/MUC SP CONTROLLED POWER DISTRO ANT DIST PSU/MUC 1P ANT DIST PSU/MUC 2P ER/MUC CIRCUIT #1 ER/MUC CIRCUIT #2 ER/MUC CIRCUIT #3 POWER RACEWAY - MIDDLE ATLANTIC MPR-8A ER/MUC CIRCUIT #4 ER/MUC CIRCUIT #5 ER/MUC CIRCUIT #6 AMPLIFIER #2P UPS 1500VA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA AC (IG) . AC (IG) AC (IG) MIDDLE ATLANTIC M-20IGA CONTROL RLY STATUS SURGE STAT . SW AC FRONT . . AC 120V AC 1 AC 3 AC 4 AC 5 AC 2 AC 6 UNSW AC 1 UNSW AC 2 MIDDLE ATLANTIC PDC-915R-6 . . . RS-232 . USB EPO AC 120V NON-CRIT 1 NON-CRIT 3 NON-CRIT 4 CRITICAL 5 NON-CRIT 2 CRITICAL 6 CRITICAL 7 RELAY OUT EXPANSION SLOT NETWORK LAN . LAN . CRITICAL 8 MIDDLE ATLANTIC UPS-OL1500R Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MULTI-USE CONVENTION SCHEMATICS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV7.4f 10/13/2023 220025.00 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET HATCHING INDICATES EQUIPMENT REQUIRED FOR THE MULTI-PURPOSE ARENA VIDEO ADD ALTERNATE Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 3" = 1'-0" AV POWER, DATA, & BOX SCHEDULES WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV9.1 10/13/2023 220025.00 STANDARD BOX SCHEDULE WITH DESCRIPTIONS - FURNISHED BY ELECTRICAL CONTRACTOR QUANTITY BOX TYPE ASSOCIATED BOX DESCRIPTION 6 WB-1 1-GANG MASONRY BOX 4 WB-2 2-GANG MASONRY BOX 1 WB-3 3-GANG MASONRY BOX 6 WB-4A 4" X 4" X 4" JUNCTION BOX - NO KNOCKOUTS 1 WB-6 6-GANG MASONRY BOX 93 WB-6A 6" X 6" X 4" JUNCTION BOX - NO KNOCKOUTS 17 WB-6B 6" X 6" X 6" JUNCTION BOX - NO KNOCKOUTS 1 WB-8A 8" X 8" X 4" JUNCTION BOX - NO KNOCKOUTS 2 WB-61 6" X 6" X 3-1/2" JUNCTION BOX W/ 1-GANG DEVICE COVER 1 WB-63 6" X 6" X 3-1/2" JUNCTION BOX W/ 3-GANG DEVICE COVER 11 WB-526 CHIEF PAC 526 W/ FLANGE 10 WB-X3 FSR WB-X3-GNG W/ FLUSH MOUNT COVER AND CABLE EXIT DOOR (WHITE) SPECIALTY BOX SCHEDULE WITH DESCRIPTIONS - FURNISHED BY AV CONTRACTOR QUANTITY BOX TYPE ASSOCIATED BOX DESCRIPTION AV POWER REQUIREMENTS DEVICE ID POWER TYPE CIRCUIT QTY RECEPTACLE TYPE RECEPTACLE QTY PER CCT LOCATION NOTES HDMI/BR NTP 1 DUPLEX 1 ADJACENT VD/BR NTP 1 DUPLEX 1 IN AV BOX ER/LOB NTP 3 DUPLEX 1 ADJACENT VD/LOB-1 NTP 1 DUPLEX 1 IN AV BOX VD/LOB-2 NTP 1 DUPLEX 1 IN AV BOX VD/LOB-3 NTP 1 DUPLEX 1 IN AV BOX VD/LOB-4 NTP 1 DUPLEX 1 IN AV BOX VD/LOB-5 NTP 1 DUPLEX 1 IN AV BOX VD/LOB-6 NTP 1 DUPLEX 1 IN AV BOX ER/MHA NTP 6 HARDWIRED 1 HARDWIRE DIRECTLY TO VERTICAL RACEWAY PROVIDED BY AV CONTRACTOR WITHIN RACK. COORDINATE TERMINATION WITH AV CONTRACTOR AV/MPA-E NTP 1 DUPLEX 2 IN AV BOX REFER TO AV6.x FOR WALL BOX PANEL DETAILS AV/MPA-N NTP 1 DUPLEX 2 IN AV BOX REFER TO AV6.x FOR WALL BOX PANEL DETAILS AV/MPA-S NTP 1 DUPLEX 2 IN AV BOX REFER TO AV6.x FOR WALL BOX PANEL DETAILS AV/MPA-W NTP 1 DUPLEX 2 IN AV BOX REFER TO AV6.x FOR WALL BOX PANEL DETAILS ER/MPA NTP 6 HARDWIRED 1 HARDWIRE DIRECTLY TO VERTICAL RACEWAY PROVIDED BY AV CONTRACTOR WITHIN RACK. COORDINATE TERMINATION WITH AV CONTRACTOR PRJ/MPA-E NTP 1 DUPLEX 1 ADJACENT PRJ/MPA-N NTP 1 DUPLEX 1 ADJACENT SCN/MPA-E NTP 1 HARDWIRED 0 IN AV BOX SEE AV4.9a/7 FOR POWER DETAIL SCN/MPA-N NTP 1 HARDWIRED 0 IN AV BOX SEE AV4.9a/7 FOR POWER DETAIL AV/MUC-E NTP 1 DUPLEX 2 IN AV BOX REFER TO AV6.x FOR WALL BOX PANEL DETAILS AV/MUC-N NTP 1 DUPLEX 2 IN AV BOX REFER TO AV6.x FOR WALL BOX PANEL DETAILS AV/MUC-S1 NTP 1 DUPLEX 2 IN AV BOX REFER TO AV6.x FOR WALL BOX PANEL DETAILS AV/MUC-S2 NTP 1 DUPLEX 2 IN AV BOX REFER TO AV6.x FOR WALL BOX PANEL DETAILS AV/MUC-S3 NTP 1 DUPLEX 2 IN AV BOX REFER TO AV6.x FOR WALL BOX PANEL DETAILS AV/MUC-W NTP 1 DUPLEX 2 IN AV BOX REFER TO AV6.x FOR WALL BOX PANEL DETAILS ER/MUC-1 NTP 6 HARDWIRED 1 HARDWIRE DIRECTLY TO VERTICAL RACEWAY PROVIDED BY AV CONTRACTOR WITHIN RACK. COORDINATE TERMINATION WITH AV CONTRACTOR PRJ/MUC-E NTP 1 DUPLEX 1 ADJACENT PRJ/MUC-N NTP 1 DUPLEX 1 ADJACENT PRJ/MUC-W NTP 1 DUPLEX 1 ADJACENT SCN/MUC-E NTP 1 HARDWIRED 0 IN AV BOX SEE AV4.9a/7 FOR POWER DETAIL SCN/MUC-N NTP 1 HARDWIRED 0 IN AV BOX SEE AV4.9a/7 FOR POWER DETAIL SCN/MUC-W NTP 1 HARDWIRED 0 IN AV BOX SEE AV4.9a/7 FOR POWER DETAIL VD/RENT NTP 1 DUPLEX 1 IN AV BOX VD/SS NTP 1 DUPLEX 1 IN AV BOX AV DATA DROP REQUIREMENTS DEVICE ID QTY LOCATION NOTES VD/BR 1 IN AV BOX ER/LOB 8 LAND DATA AT EQUIPMENT RACK, COORDINATE TERMINATION WITH AV CONTRACTOR VD/LOB-1 2 IN AV BOX VD/LOB-2 2 IN AV BOX VD/LOB-3 2 IN AV BOX VD/LOB-4 2 IN AV BOX VD/LOB-5 2 IN AV BOX VD/LOB-6 2 IN AV BOX ER/MHA 2 LAND DATA AT EQUIPMENT RACK, COORDINATE TERMINATION WITH AV CONTRACTOR AV/MPA-E 1 IN AV BOX AV/MPA-N 1 IN AV BOX AV/MPA-S 1 IN AV BOX AV/MPA-W 1 IN AV BOX ER/MPA 2 LAND DATA AT EQUIPMENT RACK, COORDINATE TERMINATION WITH AV CONTRACTOR PRJ/MPA-E 1 ADJACENT PRJ/MPA-N 1 ADJACENT AV/MUC-E 1 IN AV BOX AV/MUC-N 1 IN AV BOX AV/MUC-S1 1 IN AV BOX AV/MUC-S2 1 IN AV BOX AV/MUC-S3 1 IN AV BOX AV/MUC-W 1 IN AV BOX ER/MUC-1 2 LAND DATA AT EQUIPMENT RACK, COORDINATE TERMINATION WITH AV CONTRACTOR PRJ/MUC-E 1 ADJACENT PRJ/MUC-N 1 ADJACENT PRJ/MUC-W 1 ADJACENT VD/RENT 2 IN AV BOX VD/SS 2 IN AV BOX NO SPECIALTY BOXES INCLUDED ON THIS PROJECT Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET GROUP CABLING TYPE A MICROPHONE LEVEL B LINE LEVEL C SPEAKER LEVEL (INCLUDES BOTH LOW & HIGH IMPEDANCE TYPES) D CONTROL & DATA E VIDEO F FIBER OPTIC G HEARING LOOP R RF AV CABLES ARE DIVIDED INTO GROUPS BY SIGNAL LEVEL. CABLES FROM DIFFERENT GROUPS MAY NOT BE COMBINED TOGETHER IN THE SAME CONDUIT, UNLESS INDICATED ON DRAWINGS.SEPARATION OF METALLIC CONDUIT FOR AV CABLING GROUP A B C D E F G R A ADJACENT 6" 12" 12" 12" ADJACENT 24" 12" B - ADJACENT 6" 6" 6" ADJACENT 24" 6" C - - ADJACENT 6" 6" ADJACENT 12" 6" D - - - ADJACENT 6" ADJACENT 24" 6" E - - - - ADJACENT ADJACENT 24" 6" F - - - - - ADJACENT ADJACENT ADJACENT G - - - - - - ADJACENT 12" R - - - - - - - ADJACENT POWER < 60A 24" 24" 24" 24" 24" ADJACENT 24" 24" POWER < 120A 48" 48" 48" 48" 48" ADJACENT 48" 48" POWER > 120A 64" 64" 64" 64" 64" ADJACENT 64" 64" TO MINIMIZE NOISE AND INTERFERENCE WITHIN AV SYSTEMS, PATHS THROUGH THE BUILDING FOR AV WIRE, CABLE, AND CONDUITS SHALL BE COORDINATED BY REFERENCING THE TABLES TO THE RIGHT AGAINST THE GROUP DIVISIONS TABLE ABOVE. DUE TO SENSITIVITY OF AUDIO-VIDEO SYSTEMS, HIGH-CURRENT DEMANDS OR LONG PARALLEL CONDUIT RUNS MAY NECESSITATE LARGER SEPARATIONS BETWEEN CONDUITS. SEPARATION OF NON-METALLIC CONDUIT & FREE AIR AV CABLING GROUP A B C D E F G R A ADJACENT 12" 18" 18" 18" ADJACENT 36" 18" B - ADJACENT 12" 12" 12" ADJACENT 36" 12" C - - ADJACENT 12" 12" ADJACENT 18" 12" D - - - ADJACENT 12" ADJACENT 36" 12" E - - - - ADJACENT ADJACENT 36" 12" F - - - - - ADJACENT ADJACENT ADJACENT G - - - - - - ADJACENT 18" R - - - - - - - ADJACENT POWER < 60A 36" 36" 36" 36" 36" ADJACENT 36" 36" POWER < 120A 72" 72" 72" 72" 72" ADJACENT 72" 72" POWER > 120A 96" 96" 96" 96" 96" ADJACENT 96" 96" CONDUITS AND CABLE TYPES FOR AV SYSTEMS MUST BE COORDINATED TO PREVENT ELECTRICAL INTERFERENCE. ALL WIRING AND CABLING FOR AV SYSTEMS MUST BE CONTAINED IN CONTINUOUSLY GROUNDED FERROUS METALLIC CONDUITS, EXCEPT WHERE NOTED. PVC CONDUITS ARE NOT AN ACCEPTABLE SUBSTITUTION EXCEPT WHERE USE OF PVC CONDUITS IS REQUIRED BY CODE. CONDUITS MUST BE SIZED, SPACED, AND UTILIZED ACCORDING TO CONDUIT SIZING REQUIREMENTS, ROUTING AND SEPARATION, AND GROUP DIVISIONS. AV CABLING MAY NOT BE COMBINED IN RACEWAYS WITH WIRE AND CABLING FOR OTHER TRADES. SIZING OF CONDUIT TO BE BASED ON NEC (NATIONAL ELECTRICAL CODE) REQUIREMENTS. MINIMUM CONDUIT SIZE FOR AV CABLING TO BE 3/4". DETERMINATION OF CONDUIT SIZE FOR A PARTICULAR RUN OF AV CABLING SHALL BE MADE AS FOLLOWS. SEE ADDITIONAL REQUIREMENTS ON THIS SHEET FOR CIRCUMSTANCES WHERE CONDUITS SHALL BE UPSIZED. NO. OF CABLES 1 2 3+ 1) SQUARE THE O.D. (OUTER DIAMETER) OF EACH CABLE AND TOTAL THE RESULTS (REFER TO CABLE MANUFACTURER'S SPECIFICATIONS FOR O.D.) 2) MULTIPLY THE TOTAL FROM STEP 1 BY THE FACTOR LISTED IN THE CONDUIT FILL TABLE: 3) FIND THE PERMISSIBLE AREA OF THE CONDUIT TYPE USED THAT IS EQUAL TO OR GREATER THAN TOTAL AREA CALCULATED IN STEP 2. REFERENCE CHAPTER 9 OF NEC FOR PERMISSIBLE AREA OF VARIOUS CONDUIT TYPES AND SIZES. % OF CONDUIT CROSS-SECTION ALLOWED FOR CABLES 53 31 40 FACTOR .5927 1.0134 .7854 POWER CONDUITS "A" CONDUITS CONDUITS OF DIFFERENT SIGNAL TYPES MAY CROSS PERPENDICULAR TO ONE ANOTHER WITHOUT SEPARATION. 2'-0" 0'-6" 0'-6" 0'-6" "A" CONDUITS "B" CONDUITS "C" CONDUITS "D" CONDUITS POWER CONDUITS, <60A LOW-VOLTAGE CONDUITS OF DIFFERENT SIGNAL LEVELS MUST BE PHYSICALLY SEPARATED FROM EACH OTHER AT A MINIMUM OF CERTAIN DISTANCES. EXAMPLE GROUPINGS AND SEPARATIONS SHOWN. REFERENCE CONDUIT SEPARATIONS TABLE ON THIS THIS SHEET FOR COMPREHENSIVE CHART OF SEPARATION DISTANCES BETWEEN SIGNAL GROUPS. TROUGHS MAY BE INSTALLED AS A COMMON PULL BOX FOR MULTIPLE SIGNAL TYPES. "A" CONDUITS "B" CONDUITS "C" CONDUITS "D" CONDUITS METALLIC DIVIDERS MUST BE INSTALLED BETWEEN SIGNAL TYPES, AND PATHWAYS FOR EACH SIGNAL TYPE MAY NOT CROSS OTHER SIGNAL TYPES WITHIN BOX. 0'-6" 0'-6" 0'-6" CONDUIT SEPARATIONS MUST BE MAINTAINED "A" CONDUITS "B" CONDUITS "C" CONDUITS "D" CONDUITS CONDUIT SEPARATIONS MUST BE MAINTAINED0'-6" 0'-6" 0'-6" MULTIPLE, ISOLATED BOXES MAY BE INSTALLED AS PULL BOXES, EACH FOR THEIR RESPECTIVE SIGNAL TYPES. MAXIMUM 100' BETWEEN PULL BOXES 90.00° 90.00° MAXIMUM 180° CONDUIT BENDS BETWEEN PULL BOXES WHERE MEETING THESE REQUIREMENTS IS EITHER NOT POSSIBLE OR PRACTICAL, INCREASE CONDUIT SIZE TO REDUCE PULL TENSION APPLIED TO CABLE DURING INSTALLATION. CONDUIT RUNS GREATER THAN 50' BETWEEN PULL BOXES MUST BE INCREASED TO NEXT CONDUIT SIZE UP. CONDUIT BENDS MUST ACCOMODATE MINIMUM BEND RADII OF CABLES FOR THAT CONDUIT. 2'-0" POWER CONDUITS MAY RUN PERPENDICULAR TO LOW- VOLTAGE CABLING WITHOUT SEPARATION. SEPARATION REQUIRED WHERE POWER CONDUITS RUN PARALLEL TO LOW- VOLTAGE CABLING. CABLE PATHWAY INTO A/V EQUIPMENT RACK PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR. LOW-VOLTAGE A/V CABLING JUNCTION BOX ABOVE RACK FOR CONNECTING POWER TO EQUIPMENT RACK. BOX PROVIDED AND MOUNTED TO RACK BY A/V CONTRACTOR. POWER CONDUIT A/V SYSTEMS EQUIPMENT RACK MINIMUM HEIGHT BELOW CONDUIT 84" A.F.F. FOR ACCESSIBILITY COMPLIANCE 0'-6" 0'-6" 0'-6" "A" CONDUITS "B" CONDUITS "C" CONDUITS "D" CONDUITS CONDUIT SEPARATION NOT REQUIRED AT CONNECTION TO BOX WHERE MULTIPLE SIGNAL TYPES TERMINATE WHEN APPROACHING BOX WITH MULTIPLE SIGNAL TYPES, CONDUIT SEPARATIONS MUST BE MAINTAINED UNTIL AS CLOSE TO BOX AS PRACTICAL. 45.00° CONDUIT FOR LOW- VOLTAGE AV CABLING DROP-CEILING STUD WALL BUSHING AV CABLING EMT CONDUIT ELECTRICAL CONTRACTOR SHALL INSTALL BUSHINGS WHERE AV CABLING PATHWAY TRANSITIONS FROM EMT CONDUIT TO FREE AIR. BUSHING Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated AV CONDUIT SPECIFICATIONS & DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV9.2 10/13/2023 220025.00 3 AV CONDUIT SIZING2NO SEPARATION FOR PERPENDICULAR CONDUITS 8 CONDUIT SEPARATION EXAMPLE 6 PULL TROUGH EXAMPLE5PULL BOX PER GROUP EXAMPLE 10 PULL BOX REQUIREMENTS 11 SEPARATION AT RACK EXAMPLE 4 SEPARATION AT COMMON BOX 7 CONDUIT STUB DETAIL 9 TRANSITIONING EMT CONDUIT TO FREE AIR THIS SHEET CONTAINS GENERAL CONDUIT REQUIREMENTS FOR AV IN THIS PROJECT. ADDITIONAL CONDUIT RISERS AND DETAILS FOR CONDUIT AND PATHWAY REQUIREMENTS ARE PROVIDED ELSEWHERE IN THIS SHEET SET 1 AV CONDUIT REQUIREMENTS & GROUP SEPARATION Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET LOBBY CONDUIT RISER BREAKROOM CONDUIT RISER VD/BR VD/LOB-1 VD/LOB-2 VD/LOB-3 VD/LOB-4 VD/LOB-5 VD/LOB-6 VD/RENT MAIN LOBBY BREAK ROOM STORAGE 104 PART OF ER/LOB SKATE RENTAL STORAGE 104 PART OF ER/LOB HDMI/BR BP/BR D: 1"D: 1 1/4"D: 1" D: 1"D: 1 1/4"D: 1" D: 1" E: 1 1/4" D: 1" D: 1" SEE AV9.6 FOR ADDITIONAL STORAGE ROOM 104 CONDUIT REQUIREMENTS. SEE AV9.6 FOR ADDITIONAL STORAGE ROOM 104 CONDUIT REQUIREMENTS. D: 1-1/4" D: 1-1/4" ER/MPAAV9.5 ER/MHAAV9.4 TYPE: X" TYPE: X: CABLE TAG LEGEND SIGNAL TYPE (REFER TO SIGNAL GROUP SEPARATION SCHEDULES ON AV9.1) CONDUIT SIZE (INCHES) Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" LOBBY AV CONDUIT RISER WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV9.3 10/13/2023 220025.00 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. AV CONTRACTOR IS RESPONSIBLE FOR VERIFYING CONDUIT PATHS AND SIZES PRIOR TO INSTALLATION. CONDUIT NOTES 1 FINAL CONDUIT ROUTING & SIZING TO BE DETERMINED BY INSTALLING CONTRACTOR. 2 REFER TO AV CONDUIT SPECIFICATIONS & DETAILS ON SHEET AV910. 3 QUANTITIES INDICATED TO NOT INCLUDE SPARE RUNS. 4 DEVICE PLUG BOXES CANNOT BE USED FOR PULL BOXES OR JUNCTION BOXES. CONDUIT ROUTING SHOWN BETWEEN THE PLUG BOXES PRESUMES AN INTERMEDIARY PULL / JUNCTION BOX. 5 LIKE GROUPS CAN BE COMBINED AND THE SIZE OF THE CONDUIT INCREASED TO MINIMIZE THE QUANTITY OF SAME RUNS. 6 THE INSTALLING CONTRACTOR SHALL FIELD COORDINATE THE ACTUAL LAYOUT, GROUPING, AND SIZING WITH THE AV CONTRACTOR AND SUBMIT A CONDUIT ROUTING PLAN AS PART OF THE SUBMITTAL PROCESS FOR REVEIW AND APPROVAL. 7 CONDUIT SHOWN IS FOR AV SIGNAL CABLES ONLY. ADDITIONAL CONDUIT WILL BE REQUIRED FOR POWER, BUILDING LAN, AND OTHER SYSTEMS NOT IN THE AV CONTRACTOR'S SCOPE. Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET MERCYHEALTH ARENA CONDUIT RISER BT/MHA-1 SCORER'S BOOTH ARENA PRESS BOX BT/MHA-2 ER/MHA ALS/MHA ANT/MHA-A ANT/MHA-B VD/SS SPONSOR'S SUITE SEATING/MEZZANINE LEVELSEATING/MEZZANINE LEVEL SPK/MHA-26 (ABOVE) SPK/MHA-30 (ABOVE) SPK/MHA-25 (ABOVE) SPK/MHA-29 (ABOVE) SPK/MHA-24 (ABOVE) SPK/MHA-28 (ABOVE) SPK/MHA-23 (ABOVE) SPK/MHA-27 (ABOVE) SPK/MHA-19 (ABOVE) SPK/MHA-31 (ABOVE) SPK/MHA-20 (ABOVE) SPK/MHA-32 (ABOVE) SPK/MHA-21 (ABOVE) SPK/MHA-33 (ABOVE) SPK/MHA-22 (ABOVE) SPK/MHA-34 (ABOVE) SPK/MHA-1 (ABOVE)SPK/MHA-2 (ABOVE) SPK/MHA-3 (ABOVE) SPK/MHA-4 (ABOVE) SPK/MHA-5 (ABOVE) SPK/MHA-6 (ABOVE) SPK/MHA-7 (ABOVE) SPK/MHA-8 (ABOVE) SPK/MHA-9 (ABOVE) SPK/MHA-10 (ABOVE) SPK/MHA-11 (ABOVE) SPK/MHA-12 (ABOVE) SPK/MHA-13 (ABOVE) SPK/MHA-14 (ABOVE) SPK/MHA-15 (ABOVE) AV CLOSET 210 D: 1" D: 1" R: 1" R: 1" R: 1" C: 1-1/4" C: 1-1/4" C: 1 1/4"C: 1"C: 1" D: 1" AV/MHA-2 AV/MHA-1 A: 1" B: 1" D: 1-1/4" D: 1-1/4" D: 1-1/4" C: 1"C: 1" C: 1"C: 1" C: 1" C: 1" C: 1"C: 1" C: 1 1/4" ER/LOBAV9.3 ER/MPAAV9.5 ER/MUCAV9.6 C: 1"C: 1" C: 1 1/4" C: 1 1/2" C: 1 1/4" C: 1 1/4" C: 1" C: 1" C: 1"C: 1" C: 1 1/4" C: 1"C: 1" C: 1 1/4" C: 1 1/2" C: 1 1/2" C: 1 1/2" A: 1" B: 1" SPK/MHA-16 (ABOVE) SPK/MHA-17 (ABOVE) SPK/MHA-18 (ABOVE) C: 1"C: 1" TYPE: X" TYPE: X: CABLE TAG LEGEND SIGNAL TYPE (REFER TO SIGNAL GROUP SEPARATION SCHEDULES ON AV9.1) CONDUIT SIZE (INCHES) Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MERCYHEALTH ARENA AV CONDUIT RISER WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV9.4 10/13/2023 220025.00 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. AV CONTRACTOR IS RESPONSIBLE FOR VERIFYING CONDUIT PATHS AND SIZES PRIOR TO INSTALLATION. CONDUIT NOTES 1 FINAL CONDUIT ROUTING & SIZING TO BE DETERMINED BY INSTALLING CONTRACTOR. 2 REFER TO AV CONDUIT SPECIFICATIONS & DETAILS ON SHEET AV910. 3 QUANTITIES INDICATED TO NOT INCLUDE SPARE RUNS. 4 DEVICE PLUG BOXES CANNOT BE USED FOR PULL BOXES OR JUNCTION BOXES. CONDUIT ROUTING SHOWN BETWEEN THE PLUG BOXES PRESUMES AN INTERMEDIARY PULL / JUNCTION BOX. 5 LIKE GROUPS CAN BE COMBINED AND THE SIZE OF THE CONDUIT INCREASED TO MINIMIZE THE QUANTITY OF SAME RUNS. 6 THE INSTALLING CONTRACTOR SHALL FIELD COORDINATE THE ACTUAL LAYOUT, GROUPING, AND SIZING WITH THE AV CONTRACTOR AND SUBMIT A CONDUIT ROUTING PLAN AS PART OF THE SUBMITTAL PROCESS FOR REVEIW AND APPROVAL. 7 CONDUIT SHOWN IS FOR AV SIGNAL CABLES ONLY. ADDITIONAL CONDUIT WILL BE REQUIRED FOR POWER, BUILDING LAN, AND OTHER SYSTEMS NOT IN THE AV CONTRACTOR'S SCOPE. Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET MULTI-PURPOSE ARENA CONDUIT RISER ARENA SPK/MPA-22 (ABOVE) SPK/MPA-23 (ABOVE) SPK/MPA-24 (ABOVE) SPK/MPA-25 (ABOVE) SPK/MPA-26 (ABOVE) SPK/MPA-27 (ABOVE) SPK/MPA-28 (ABOVE) SPK/MPA-29 (ABOVE) SPK/MPA-3 (ABOVE) SPK/MPA-2 (ABOVE) SPK/MPA-1 (ABOVE) SPK/MPA-6 (ABOVE) SPK/MPA-5 (ABOVE) SPK/MPA-4 (ABOVE) SPK/MPA-9 (ABOVE) SPK/MPA-8 (ABOVE) SPK/MPA-7 (ABOVE) SPK/MPA-15 (ABOVE) SPK/MPA-14 (ABOVE) SPK/MPA-13 (ABOVE) SPK/MPA-18 (ABOVE) SPK/MPA-17 (ABOVE) SPK/MPA-16 (ABOVE) BT/MPA ALS/MPA ANT/MPA-B ANT/MPA-A ER/MPA AV CLOSET 167 (B) STRATEGICALLY LOCATE PULL BOXES AS NECESSARY TO ACCOMODATE SPEAKER CABLING, TYPICAL AV/MPA-S AV/MPA-N AV/MPA-E R: 1" R: 1" R: 1" B: 1" A: 1" D: 1-1/4" D: 1" B: 1" A: 1" D: 1-1/4" A: 1" B: 1" D: 1-1/4" C: 1" C: 1-1/2" C: 1"C: 1" C: 1"C: 1"C: 1" C: 1" C: 1"C: 1" C: 1"C: 1"C: 1" C: 1"C: 1"C: 1" C: 1-1/2" C: 1-1/2" C: 1-1/4" C: 1-1/4" C: 1" C: 1" C: 1" SCN/MPA-E (ABOVE) PRJ/MPA-E (ABOVE) D: 1" D: 1" SCN/MPA-N D: 1" PRJ/MPA-N D: 1" D: 1-1/4" D: 1-1/4" D: 1-1/4" B: 1" B: 1" B: 1" ER/LOBAV9.3 ER/MHAAV9.4 ER/MUCAV9.6 AV/MPA-S B: 1" A: 1" D: 1-1/4" B: 1" SW/MPA-E D: 1" SPK/MPA-21 (ABOVE) SPK/MPA-20 (ABOVE) SPK/MPA-19 (ABOVE) C: 1"C: 1"C: 1" SPK/MPA-12 (ABOVE) SPK/MPA-11 (ABOVE) SPK/MPA-10 (ABOVE) C: 1"C: 1"C: 1" TYPE: X" TYPE: X: CABLE TAG LEGEND SIGNAL TYPE (REFER TO SIGNAL GROUP SEPARATION SCHEDULES ON AV9.1) CONDUIT SIZE (INCHES) HATCHING INDICATES EQUIPMENT REQUIRED FOR THE MULTI-PURPOSE ARENA VIDEO ADD ALTERNATE Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: As indicated MULTI-PURPOSE ARENA AV CONDUIT RISER WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV9.5 10/13/2023 220025.00 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. AV CONTRACTOR IS RESPONSIBLE FOR VERIFYING CONDUIT PATHS AND SIZES PRIOR TO INSTALLATION. CONDUIT NOTES 1 FINAL CONDUIT ROUTING & SIZING TO BE DETERMINED BY INSTALLING CONTRACTOR. 2 REFER TO AV CONDUIT SPECIFICATIONS & DETAILS ON SHEET AV910. 3 QUANTITIES INDICATED TO NOT INCLUDE SPARE RUNS. 4 DEVICE PLUG BOXES CANNOT BE USED FOR PULL BOXES OR JUNCTION BOXES. CONDUIT ROUTING SHOWN BETWEEN THE PLUG BOXES PRESUMES AN INTERMEDIARY PULL / JUNCTION BOX. 5 LIKE GROUPS CAN BE COMBINED AND THE SIZE OF THE CONDUIT INCREASED TO MINIMIZE THE QUANTITY OF SAME RUNS. 6 THE INSTALLING CONTRACTOR SHALL FIELD COORDINATE THE ACTUAL LAYOUT, GROUPING, AND SIZING WITH THE AV CONTRACTOR AND SUBMIT A CONDUIT ROUTING PLAN AS PART OF THE SUBMITTAL PROCESS FOR REVEIW AND APPROVAL. 7 CONDUIT SHOWN IS FOR AV SIGNAL CABLES ONLY. ADDITIONAL CONDUIT WILL BE REQUIRED FOR POWER, BUILDING LAN, AND OTHER SYSTEMS NOT IN THE AV CONTRACTOR'S SCOPE. Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET MULTI-USE CONVENTION SPACE CONDUIT RISER CONVENTION SPACE SPK/MUC-3 (ABOVE) SPK/MUC-4 (ABOVE) SPK/MUC-5 (ABOVE) SPK/MUC-9 (ABOVE) SPK/MUC-1 (ABOVE) SPK/MUC-6 (ABOVE) SPK/MUC-7 (ABOVE) SPK/MUC-8 (ABOVE) SPK/MUC-10 (ABOVE) SPK/MUC-2 (ABOVE) SPK/MUC-13 (ABOVE) SPK/MUC-15 (ABOVE) SPK/MUC-17 (ABOVE) SPK/MUC-19 (ABOVE)SPK/MUC-11 (ABOVE) SPK/MUC-14 (ABOVE) SPK/MUC-16 (ABOVE) SPK/MUC-18 (ABOVE) SPK/MUC-20 (ABOVE)SPK/MUC-12 (ABOVE) SPK/MUC-23 (ABOVE) SPK/MUC-24 (ABOVE) SPK/MUC-25 (ABOVE) SPK/MUC-29 (ABOVE) SPK/MUC-21 (ABOVE) SPK/MUC-26 (ABOVE) SPK/MUC-27 (ABOVE) SPK/MUC-28 (ABOVE) SPK/MUC-30 (ABOVE) SPK/MUC-22 (ABOVE) SW/MUC-E PRJ/MUC-E (ABOVE) PRJ/MUC-N (ABOVE) SCN/MUC-N (ABOVE) PRJ/MUC-W (ABOVE) SCN/MUC-W (ABOVE) AV/MUC-N AV/MUC-EANT/MUC-B1ALS/MUC-1ANT/MUC-A1 AV/MUC-S1 AV/MUC-S2 AV/MUC-S3 AV/MUC-W ER/MUC-1 & ER/MUC-2 AV CLOSET 157 (A) C: 1-1/4" C: 1" C: 1" C: 1" C: 1" C: 1-1/4" C: 1" C: 1-1/4" C: 1" C: 1" C: 1" C: 1" STORAGE 104 PART OF ER/LOB D: 1" D: 1" D: 1" A: 1" B: 1" D: 1" D: 1" A: 1" B: 1" D: 1-1/4" A: 1" B: 1" D: 1-1/4" A: 1" B: 1" D: 1-1/4" R: 1" D: 1" D: 1" SEE AV9.3 FOR ADDITIONAL STORAGE ROOM 104 CONDUIT REQUIREMENTS. SCN/MUC-E (ABOVE) D: 1" ANT/MUC-B3ALS/MUC-3ANT/MUC-A3 ANT/MUC-B2 ALS/MUC-2 ANT/MUC-A2 SW/MUC-W SW/MUC-N D: 1" A: 1" B: 1" D: 1-1/4" D: 1" D: 1" D: 1 1/4" B: 1" B: 1" B: 1" B: 1" ER/MHA AV9.4 D: 1-1/4" ER/MPA AV9.5 D: 1-1/4" R: 1 1/4" R: 1 1/4" R: 1 1/4" R: 1 1/4" R: 1 1/4" R: 1 1/4" C: 1-1/4" C: 1-1/4" C: 1" C: 1-1/4"C: 1" C: 1-1/4" C: 1-1/4" C: 1" C: 1" D: 1" C: 1-1/4" C: 1" C: 1-1/4" C: 1-1/4" R: 1" R: 1" D: 1" C: 1-1/4" D: 1 1/4" C: 1-1/4" A: 1" B: 1" C: 1-1/4" D: 1" TYPE: X" TYPE: X: CABLE TAG LEGEND SIGNAL TYPE (REFER TO SIGNAL GROUP SEPARATION SCHEDULES ON AV9.1) CONDUIT SIZE (INCHES) Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 12" = 1'-0" MULTI-USE CONVENSTION SPACE AV CONDUIT RISER WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 PLAN REVIEW RESUBMITTAL AV9.6 10/13/2023 220025.00 GENERAL SHEET NOTES 1 REFERENCE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON DEVICE LOCATION. 2 COORDINATE ALL AV DEVICE LOCATIONS & MOUNTING HEIGHTS WITH ARCHITECT AND / OR OWNER & FURNITURE LAYOUT PRIOR TO ROUGH-IN. 3 AV FLOOR, WALL, & CEILING BOXES ARE SHARED BETWEEN AV, ELECTRICAL, & DATA. TRADES SHALL COORDINATE TO CONFIRM CONDUIT LANDS IN APPROPRIATE LOCATIONS IN AV BOXES. 4 REFER TO ARCHITECTURAL DRAWINGS FOR CEILING AND WALL TYPES. ALL JUNCTION BOXES AND STUBS ABOVE CEILING SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. AV CONTRACTOR IS RESPONSIBLE FOR VERIFYING CONDUIT PATHS AND SIZES PRIOR TO INSTALLATION. CONDUIT NOTES 1 FINAL CONDUIT ROUTING & SIZING TO BE DETERMINED BY INSTALLING CONTRACTOR. 2 REFER TO AV CONDUIT SPECIFICATIONS & DETAILS ON SHEET AV910. 3 QUANTITIES INDICATED TO NOT INCLUDE SPARE RUNS. 4 DEVICE PLUG BOXES CANNOT BE USED FOR PULL BOXES OR JUNCTION BOXES. CONDUIT ROUTING SHOWN BETWEEN THE PLUG BOXES PRESUMES AN INTERMEDIARY PULL / JUNCTION BOX. 5 LIKE GROUPS CAN BE COMBINED AND THE SIZE OF THE CONDUIT INCREASED TO MINIMIZE THE QUANTITY OF SAME RUNS. 6 THE INSTALLING CONTRACTOR SHALL FIELD COORDINATE THE ACTUAL LAYOUT, GROUPING, AND SIZING WITH THE AV CONTRACTOR AND SUBMIT A CONDUIT ROUTING PLAN AS PART OF THE SUBMITTAL PROCESS FOR REVEIW AND APPROVAL. 7 CONDUIT SHOWN IS FOR AV SIGNAL CABLES ONLY. ADDITIONAL CONDUIT WILL BE REQUIRED FOR POWER, BUILDING LAN, AND OTHER SYSTEMS NOT IN THE AV CONTRACTOR'S SCOPE. Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET ABBREVIATIONS ALT AMP APPROX ARCH BHP BLDG BTU C CFM CO CONN CW DEMO DIA DWG DX EA ELEC ELEV EQUIP EX EXH F FD FFE FT GAL GPM HDR HDPE HT HR HP HVAC HX HZ ID ALTERNATE AMPERE APPROXIMATE ARCHITECT / ARCHITECTURAL BREAK HORSEPOWER BUILDING BRITISH THERMAL UNIT CELSIUS CUBIC FEET PER MINUTE CLEANOUT CONNECTION COLD WATER DEMOLITION DIAMETER DRAWING DIRECT EXPANSION EACH ELECTRIC ELEVATION EQUIPMENT EXISTING EXHAUST EXPANSION FAHRENHEIT FLOOR DRAIN FINISHED FLOOR ELEVATION FOOT OR FEET GALLONS GALLONS PER MINUTE HEADER HIGH DENSITY POLYETHYLENE HEIGHT HOURS HORSEPOWER HEATING, VENTING, AIR CONDITIONING HEAT EXCHANGER HERTZ INSIDE DIAMETER INV KW KWH LBS LF MAX MBH MCC MIL MIN MECH NA NC NO NTS OC OD PH POLY PSI PVC REBAR REQ'D RH RM RPM SF SPEC SS STD TEMO TP TYP V VFD W/ W/O INVERT KILOWATT KILOWATT HOUR POUNDS LINEAR FEET MAXIMUM THOUSAND BTU'S/HOUR MOTOR CONTROL CENTER MIL MINIMUM MECHANICAL NOT APPLICABLE NORMALLY CLOSED NORMALLY OPEN NOT TO SCALE ON CENTER OUTSIDE DIAMETER PHASE (ELECTRIC) POLYETHYLENE PIPE POUNDS PER SQUARE INCH POLYVINYL PIPE REINFORCEMENT REQUIRED RELATIVE HUMIDITY ROOM REVOLUTIONS PER MINUTE SQUARE FEET SPECIFICATION STAINLESS STEEL STANDARD TEMPERATURE TEMPERATURE TYPICAL VOLTS VARIABLE FREQUENCY DRIVE WITH WITHOUT EQUIPMENT TAGS P2 B C CP CU EH EF H L BOILER COMPRESSOR CHEMICAL FEED PUMP CONDENSING UNIT ELECTRIC UNIT HEATER EXHAUST FAN HEAT EXCHANGER LOUVER PUMP PUMPER DRUM SUMP PUMP TANK VESSEL WATER HEATER WATER SOFTNER P PU SP T V WH WS LINE LEGEND WARM GLYCOL SUPPLY WGS WARM GLYCOL RETURN (UNDERGROUND)WGR COLD GLYCOL SUPPLY (UNDERGROUND) CGS COLD GLYCOL RETURN CGR WARM GLYCOL SUPPLY (UNDERGROUND)WGS WARM GLYCOL RETURN WGR COLD GLYCOL SUPPLY CGS COLD GLYCOL RETURN (UNDERGROUND)CGR SYMBOLS PS s AV FS SAIR SEPARATOR (INLINE) AUTOMATIC VENT BALL VALVE BUCKET TRAP CHECK VALVE FLOW ARROW FLOW SWITCH FLOAT SWITCH PRESSURE SWITCH REDUCER RELIEF VALVE SIGHT GLASS (IN-LINE) SOLENOID VALVE LONG RADIUS ELBOW EQUIPMENT TAG CONTROL SYSTEM NOTE P-2 1 CONT. NOTE (SAME SHEET) CONT. NOTE (SEPERATE SHEET)1 1 REVISION NOTE FLANGE FLEXIBLE CONNECTOR T PSD GAS DETECTOR GATE VALVE GLOBE VALVE W/ SEAL CAP GLOBE VALVE W/ SEAL CAP, ANGLE PRESSURE GAGE AND COCK PRESSURE REGULATING VALVE STRAINER (REFRIGERANT) STRAINER (BRINE/GLYCOL) SUCTION DIFFUSER THERMOMETER THERMOSTAT, ELECTRIC THREE-WAY VALVE SHORT RADIUS ELBOW UNION WATER METER M LEVEL EYE LIQUID DRAINER SIGHT GLASS (EXTERNAL) 1 FLOAT SWITCH (PILOT TYPE) BUTTERFLY VALVE EXPANSION VALVE, THERMOSTATIC EXPANSION VALVE, AUTOMATIC EXPANSION VALVE, HAND FLOAT VALVE, HIGH SIDE AIR LINE A CHECK , SPRING VALVE S NEEDLE VALVE AIR VENT, MANUAL MV PITCH OF PIPE, RISE (R) DROP (D)R THERMOMETER WELL, ONLY TWFLOAT VALVE, LOW SIDE THERMAL BULB BACK PRESSURE REGULATING VALVE TTHERMOSTAT, SELF-CONTAINED THERMOSTAT, REMOTE BULB T FILTER AND DRIER VIBRATION ABSORBER OIL SEPARATOR RUPTURE DISK FLOW CONTROL VALVE TDVTRIPLE DUTY VALVE Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 2211 O' Neil Road -Hudson, WI 54016 Phone: (651) 256-3090 www.B32eng.com C2023-15 12" = 1'-0" ICE RINK LEGEND AND SYMBOLS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 Bid Set Documents R0.1 10-4-23 220025.00 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 1 R5.0 __________ 2 R5.0 __________ 2 3 4 6 5 5 6 6 234 6 5 5 6 6 CIRCUIT # 14CIRCUIT # 13CIRCUIT # 12CIRCUIT # 11CIRCUIT # 10CIRCUIT # 9CIRCUIT # 8CIRCUIT # 7CIRCUIT # 6CIRCUIT # 5CIRCUIT # 4CIRCUIT # 3CIRCUIT # 2CIRCUIT # 1CIRCUIT # 14CIRCUIT # 13CIRCUIT # 12CIRCUIT # 11CIRCUIT # 10CIRCUIT # 9CIRCUIT # 8CIRCUIT # 7CIRCUIT # 6CIRCUIT # 5CIRCUIT # 4CIRCUIT # 3CIRCUIT # 2CIRCUIT # 111 1111 11 1 1 1 1 12 1 R5.0 __________ 2 R5.0 __________ 3 R5.1 __________ 2 R5.1 __________ 4 R5.0 __________ 3 R5.0 __________ 1 R5.1 __________ 4 R5.1 __________ MERCYHEALTH ARENA MULTIPURPOSE ARENA 4 R5.0 __________ 3 R5.0 __________ 7 10 87 8 9 8 7 109 10 9 12 79 8 10 5 R5.1 __________ KEYNOTES:X GENERAL NOTES: 1. FIELD VERIFY LENGTH OF EACH CIRCUIT PRIOR TO ORDERING MATERIALS. 2. FIELD VERIFY ALL DIMENSIONS. 3. GENERAL CONTRACTOR TO PROVIDE BENCHMARK FOR NEW RINK FLOOR AND PERIMETER CONCRETE. 4. PREPARE SUB-GRADE AS SPECIFIED PRIOR TO PLACEMENT OF SUBFLOOR RINK PIPING. 5. PROVIDE ADDITIONAL SAND FOR SUB-GRADE AND RINK FLOOR AS REQUIRED. REMOVE AND DISPOSE OF EXCESS SOIL OFF SITE. 6. PIPING SHOWN IN SCHEMATIC FORM 7. PROVIDE PENETRATION SLEEVES OR CORE DRILLED OPENINGS FOR ALL PIPE PENETRATIONS. COORDINATE EXACT LOCATION OF PENETRATIONS THROUGH PRECAST PANELS WITH CM AND PRECAST SUPPLIER. 1. 1" POLYETHYLENE TUBING @ 18" OC. 2. 3" POLYETHYLENE SUPPLY HEADER. 3. 3" POLYETHYLENE RETURN HEADER. 4. 3" POLYETHYLENE REVERSE RETURN HEADER. 5. ICE AND SUB-FLOOR TEMPERATURE SENSOR BOX & CONDUIT. SEE DETAIL ICE-83. (TYP. OF 2 PER RINK) 6. 3/4" SCH. 80 PVC CONDUIT & CABLES BELOW FLOOR INSULATION TO REFRIGERATION ROOM. 7. 3" BURIED POLYETHYLENE SUBFLOOR TRANSMISSION MAINS TO/FROM MERCYHEALTH ARENA AND REFRIGERATION ROOM. SEE TRENCH SECTIONS FOR PIPE LOCATION AND CONFIGURATION. 8. 8" BURIED INSULATED POLYETHYLENE TRANSMISSION MAINS TO/FROM MERCYHEALTH ARENA AND REFRIGERATION ROOM. SEE R101 FOR CONTINUATION. 9. 3" BURIED POLYETHYLENE SUBFLOOR TRANSMISSION MAINS TO/FROM MERCYHEALTH ARENA AND REFRIGERATION ROOM. SEE TRENCH SECTIONS FOR PIPE LOCATION AND CONFIGURATION. 10. 8" BURIED INSULATED POLYETHYLENE TRANSMISSION MAINS TO/FROM MERCYHEALTH ARENA AND REFRIGERATION ROOM. SEE R101 FOR CONTINUATION. 11. #4 REBAR (TYP.). TIE PIPE TO REBAR AT EACH CROSSING WITH NYLON TIE (TYP.). 12. 3" UNDERGROUND INSULATED POLYETHYLENE SNOWMELT TRANSMISSION MAINS TO/FROM REFRIGERATION ROOM. SEE TRENCH SECTIONS FOR PIPE LOCATION AND CONFIGURATION. 13. 2 1/2" STAINLESS STEEL SNOWMELT COIL WITH LONG RADIUS ELBOWS @7 1/2" O.C. PIPE SHALL BE MOUNTED TO 3" HIGH STAINLESS STEEL PIPE SUPPORTS @ 24" O.C. MIN. CIRCUIT # 1. 701'-9" 2. 863'-8" 3. 781'-5" 4. 786'-5" 5. 802'-2" 6. 802'-2" 7. 802'-4" 8. 802'-5" 9. 802'-6" 10. 802'-6" 11. 790'-7" 12. 786'-0" 13. 859'-7" 14. 724'-10" LENGTH 12 13 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 2211 O' Neil Road -Hudson, WI 54016 Phone: (651) 256-3090 www.B32eng.com C2023-15 As indicated ICE RINK SUBFLOOR PLAN WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 Bid Set Documents R1.0 10-4-23 220025.003/32" = 1'-0"1 ICE RINK SUBFLOOR PLAN SEE PLAN VIEW 2/R1.1 1/4" = 1'-0"2 SNOWMELT PIT 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET HC HC HC HC HC HC HC HC HC HC DN DN HC HC HC HC HC HC DN 7 8 9 10 13 14 14 13 13 15 12 11 15 12 11 1717 16 16 789 10 13 14 14 13 13 15 12 11 15 12 11 123456123456 19 20 1819 18 21 1 R5.0 __________ 1 R5.0 __________ 2 R5.0 __________2 R5.0 __________ 22 23 40' - 0" TYP.86' - 4" TO PERIMETER CONCRETE 85' - 0" TO FACE OF DASHERS 201' - 4" TO PERIMETER CONCRETE200' - 0" TO FACE OF DASHERS40' - 0" TYP.3' - 1"3' - 1" 23 3' - 1"3' - 1" 3 R5.1 __________ 2 R5.1 __________ MERCYHEALTH ARENA MULTIPURPOSE ARENA 1 R5.1 __________ 4 R5.1 __________TO FACE OF DASHERS11' - 1"201' - 4" TO PERIMETER CONCRETE200' - 0" TO FACE OF DASHERS86' - 4" TO PERIMETER CONCRETE 85' - 0" TO FACE OF DASHERS 28'-8" TO PE R IM ETE R C O N C R ETE R 28' - 0" TO FAC E O F D A SH ER S 4 R5.0 __________ 3 R5.0 __________ 4 R5.0 __________ 3 R5.0 __________ 18 19 2021 20 21 22 TO FACE OF DASHERS11' - 1"1921 18 20 100' - 0" 100' - 0" 102' - 0" 100' - 0" 102' - 0" 102' - 0" 100' - 0" 100' - 0" 102' - 10" 102' - 10" 100' - 0" 100' - 0" 100' - 0" 102' - 0" 17' - 3 3/8" KEYNOTES:X GENERAL NOTES: 1. FIELD VERIFY ALL DIMENSIONS. 2. PIPING SHOWN IN SCHEMATIC FORM. 3. PROVIDE PENETRATION SLEEVES OR CORE DRILLED OPENINGS FOR ALL PIPE PENETRATIONS. COORDINATE EXACT LOCATION OF PENETRATIONS THROUGH PRECAST PANELS WITH CM AND PRECAST SUPPLIER. 4. PROVIDE EXTRUDED POLYSYRENE INSULATION BARRIER BETWEEN ALL STORM, WATER AND SANITARY SEWER CROSSINGS, 1 1/2" THICK, 4'-0"X8'-0" SHEETS, 25 PSI. 1. CONCRETE: 5" THICK 2. WIRE MESH: 6" X 6" X W2.1 X W2.1. 6" MINIMUM OVERLAP BETWEEN SHEETS. TIE TO REBAR EVERY 24". TERMINATE 2" FROM RINK EDGE. 3. RINK PIPING: 1" POLYETHYLENE PIPE @ 4" O.C. FUSION WELDED CONNECTIONS. 4. REINFORCEMENT: #4 BARS @ 16" O.C. PARALLEL WITH RINK PIPING AND 12" O.C. PERPENDICULAR WITH RINK PIPING. MINIMUM LAP OF 25". 5. PIPE AND REBAR SUPPORT CHAIRS @ 3'-0" O.C. THE ENTIRE LENGTH OF THE RINK. CHAIR SPCING SHALL BE 2'-0" O.C. IF MOTORIZED EQUIPMENT WILL BE DRIVEN ON RINK PIPING FOR CONCRETE PLACEMENT OR SCREEDING. SUPPORT CHAIR SECTIONS SHALL OVERLAP A MINIMUM OF TWO RINK PIPES. SEE DETAIL ICE-74. 6. FLOOR INSULATION: TWO (2) LAYERS OF 1 1/2" THICK, 25 PSI, 4'-0" X 8'-0" SHEETS . STAGGER JOINTS. FINISHED INSULATION THICKNESS SHALL BE 3". COVER INSULATION WITH VAPOR BARRIER AND TAPE ALL HOLES AND JOINTS. 7. 8" POLYETHYLENE SUPPLY HEADER. 8. 8" POLYETHYLENE RETURN HEADER. 9. 8" POLYETHYLENE REVERSE RETURN HEADER. 10. SUB-FLOOR HEATING SYSTEM HEADERS. SEE SHEET R1.0. 11. EXPANSION JOINT AROUND ENTIRE PERIMETER OF RINK FLOOR. SEE DETAIL ICE-81. 12. 1" POLYETHYLENE PERIMETER RINK PIPE AROUND ENTIRE PERIMETER OF RINK FLOOR. 13. 3/4" SCH. 80 PVC CONDUIT & CABLES TO/FROM REFRIGERATION ROOM. 14. ICE AND SUB-FLOOR TEMPERATURE SENSOR, BOX AND CONDUIT. SEE DETAIL ICE-83. (TYP. OF 2 PER RINK) 15. DASHER BOARD SYSTEM ON RINK FLOOR. ICE RINK CONTRACTOR TO COORDINATE WITH DASHER BOARD CONTRACTOR FOR INSTALLATION OF PRECAST ANCHORS. 16. SEE DETAIL ICE-52. 17. SEE DETAIL ICE-76 AND ICE-162 @ RADII. 18. 8" BURIED INSULATED POLYETHYLENE TRANSMISSION MAINS TO/FROM MERCYHEALTH ARENA AND REFRIGERATION ROOM. 19. 3" BURIED POLYETHYLENE SUBFLOOR TRANSMISSION MAINS TO/FROM MERCYHEALTH AREANA AND REFRIGERATION ROOM. SEE SHEET R1.0. 20. 8" BURIED INSULATED POLYETHYLENE TRANSMISSION MAINS TO/FROM MULTIPURPOSE ARENA AND REFRIGERATION ROOM. 21. 3" BURIED POLYETHYLENE SUBFLOOR TRANSMISSION MAINS TO/FROM MULTIPURPOSE AREANA AND REFRIGERATION ROOM. SEE SHEET R1.0. 22. VOLLEYBALL POST INSERTS. SEE DETAIL ICE-204 (TYP. 8 FOR THE MULTIPURPOSE ARENA). SEE ARCHETICURAL SHEET A8.2 FOR LAYOUT. COORDINATE EXACT LOCATION AND PLACEMENT WITH GENERAL CONTRACTOR. VERIFY NET ANCHOR WITH OWNER BEFORE ORDERING. 23. GOAL POST INSERTS FOR THE MERCY HEALTH ARENA ONLY. SEE DETAIL ICE-200 (TYP. OF 4). 3/32" = 1'-0"1 ICE RINK FLOOR PLAN Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 2211 O' Neil Road -Hudson, WI 54016 Phone: (651) 256-3090 www.B32eng.com C2023-15 As indicated ICE RINK FLOOR PLAN WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 Bid Set Documents R1.1 10-4-23 220025.00 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET 5' - 5" P7 P1 P2 P3 H1 H2 H3 H4 T5 V2 V3 V4 C1 C2 C3 H4 V5 1 9 9 13 11 19 20 9 10 133 22 65 4 4 5 6 6 2 13 3 13 14 6 8 12 22 9 13 15 21 CLEAR MIN. 3' - 6" 7 25 15 P5P6 P4 V1 V6 REFRIGERATION VESTIBULE 965 SF H1 1718 16 GENERAL NOTES: 1. VERIFY DIMENSIONS OF ALL CONCRETE EQUIPMENT PADS WITH EQUIPMENT MANUFACTURERS. ALL CONCRETE EQUIPMENT PADS FOR ICE SYSTEM BY ICE RINK CONTRACTOR. 2. PIPES SHOWN WITHOUT INSULATION AND VALVES FOR CLARITY. 3. COORDINATE LOCATION OF FLOOR DRAINS IN REFRIGERATION ROOM WITH MECHANICAL. 4. ALL PIPE SHALL BE INSTALLED WITH A MINIMUM CLEARANCE OF 7'-6" BETWEEN FLOOR AND BOTTOM OF PIPE INSULATION. 5. SEE PIPING SCHEMATICS ON SHEETS R6.0 - R6.2. 6. PROVIDE ELECTRICAL AND CONTROLS FOR ALL ICE RINK EQUIPMENT AS SPECIFIED. WORK SHALL BE COMPLETED IN ACCORDANCE TO ALL APPLICABLE ELECTRICAL CODES. 7. VERIFY LOCATION OF ALL UTILITIES PRIOR TO EXCAVATION. 8. VERIFY EQUIPMENT DIMENSIONS AND LAYOUT IS ACCURATE PRIOR TO INSTALLATION. INSTALL EQUIPMENT AND VESSELS TO MAXIMIZE ACCESSIBILITY AND SERVICEABILITY. 9. CEILING HEIGHT IN ICE MEP ROOM = +/-11'-3" (SEE STRUCTURAL) 10. COORDINATE WITH ALL OTHER TRADE CONTRACTORS FOR OVERHEAD ROUTING OF PIPES, DUCTS, ETC 11. MOUNT EXPANSION TANKS SO SITE GLASS BE EASILY READ. 12. PROVIDE PENETRATION SLEEVES OR CORE DRILLED OPENINGS FOR ALL PIPE PENETRATIONS. COORDINATE EXACT LOCATION OF PENETRATIONS THROUGH PRECAST PANELS WITH CM AND PRECAST SUPPLIER. KEYNOTES:X 1. MOTOR CONTROL CENTER. 2. ICE RINK SYSTEM CONTROL SYSTEM WITH WALL MOUNTED KEYBOARD SHELF, CABINET AND MONITOR. 3. COMBINATION EYEWASH/SHOWER. (TYP. OF 2). SEE MECHANICAL. 4. DOOR SIGN. (TYP. OF 2) SEE DETAIL ICE-125. SEE ALSO ARCHITECTURAL SIGNAGE REQUIREMENTS. 5. EMERGENCY SHUT OFF SWITCH FOR REFRIGERATION SYSTEM. (TYP. OF 2). 6. STROBE LIGHT AND AUDIBLE ALARM FOR GAS MONITORING SYSTEM. (TYP. OF 4) 7. GAS MONITORING SYSTEM MAIN CONTROL PANEL WITH DISPLAY. 8. PERSONAL PROTECTIVE EQUIPMENT AND WALL CABINET AS SPECIFIED. 9. 4" HIGH CONCRETE EQUIPMENT PAD. SEE DETAIL ICE-105. 10. 6" HIGH CONCRETE EQUIPMENT PAD. SEE DETAIL ICE-105. 11. WATER TREATMENT CHEMICAL FEED AREA INCLUDING WATER TREATMENT SYSTEM, TANK MOUNTED SHELF, PUMPS, AND CHEMICALS. 12. PVC TANK DRAIN PIPE WITH VALVE TO FLOOR DRAIN. 13. FLOOR DRAINS BY OTHERS. SEE MECHANICAL. COORDINATE EXACT LOCATION WITH MECHANICAL CONTRACTOR. 14. 8" BURIED INSULATED POLYETHYLENE TRANSMISSION MAINS TO/FROM ICE RINK FLOOR. SEE SHEET R1.1 FOR CONTINUATION. 15. 3" BURIED INSULATED POLYETHYLENE TRANSMISSION MAINS TO/FROM SNOW MELT PIT. SEE SHEET R1.0 FOR CONTINUATION. 16. 3" BURIED POLYETHYLENE TRANSMISSION MAINS TO/FROM ICE RINK SUBFLOOR HEATING SYSTEM. SEE SHEET R1.0 FOR CONTINUATION. 17. 8" SCH. 40 PVC CONDENSER DRAIN PIPE. SLOPE PIPE 1% MIN. FROM CONDENSER TO TANK. 18. 6" STEEL CONDENSER WATER SUPPLY PIPE. SLOPE PIPE 1% MIN. FROM CONDENSER TO TANK. 19. 8" INSULATED STEEL PIPE. 20. 10" INSULATED STEEL PIPE. 21. MAKE-UP AIR LOUVER BY OTHERS. SEE MECHANICAL 22. WATER LINE FOR TANK FILL BY OTHERS. SEE MECHANICAL. 23. CONDENSER SUPPORT SYSTEM. SEE STRUCTURAL 24. CONDENSER LADDER, PLATFORM AND RAILING AS SPECIFIED. 25. KEEP SPACE CLEAR FOR REFRIGERATION EQUIPMENT INSTALLATION AND FUTURE MAINTENANCE. 26. REFRIGERATION EXHAUST SYSTEM. SEE MECHANICAL. GENERAL CODE REQUIREMENTS: PRIMARY REFRIGERANT: AMMONIA (R-717) SECONDARY REFRIGERANT: 35% ETHYLENE GLYCOL SECONDARY REFRIGERANT FOR WASTE HEAT RECOVERY: 35% ETHYLENE GLYCOL REFRIGERATION SYSTEM SHALL BE CONSTRUCTED IN ACCORDANCE TO WISCONSIN STATE MECHANICAL, ELECTRICAL, FIRE, AND LIFE SAFETY CODES, WISCONSIN HIGH PRESSURE PIPING CODE, AND ALL OTHER APPLICABLE LOCAL, STATE, AND FEDERAL CODE REQUIREMENTS. A REFRIGERATION MACHINERY ROOM IS BEING PROVIDED. CHARGING OF SYSTEMS AND START-UP OF THE REFRIGERATION SYSTEM SHALL NOT PROCEED UNTIL ALL CODE RELATED REQUIREMENTS FOR THE REFRIGERATION SYSTEM, ROOM, MECHANICAL SYSTEMS, AND SAFETY SYSTEMS ARE INSPECTED AND APPROVED BY ALL LOCAL GOVERNING AUTHORITIES AND CONTROL AND NOTIFICATION SYSTEMS HAVE BEEN TESTED.24 23 18 17 CU 1 CLEAR MIN.4' - 6"26 3/8" = 1'-0"1 REFRIGERATION ROOM Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 2211 O' Neil Road -Hudson, WI 54016 Phone: (651) 256-3090 www.B32eng.com C2023-15 As indicated ICE EQUIPMENT ROOM PLAN WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 Bid Set Documents R2.0 10-4-23 220025.00 3/8" = 1'-0"2 REFRIGERATION ROOM ROOF 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET ICE RINK FLOOREL. 100'-0"TO FACE OF DASHERS - SEE PLAN VIEWTO PERIMETER CONCRETE - SEE PLAN VIEW6"6"1'-6" (TYP)5"3"6"EXISTING SUB GRADE.1" SDR 11 POLY SUB-FLOORHEATING SYSTEM PIPECLEAN SANDPIPE AND REBAR SUPPORT CHAIRS @ 3'-0" O.C. THE ENTIRELENGTH OF THE RINK. CHAIR SPCING SHALL BE 2'-0" O.C. IFMOTORIZED EQUIPMENT WILL BE DRIVEN ON RINK PIPINGFOR CONCRETE PLACEMENT OR SCREEDING. SUPPORTCHAIR SECTIONS SHALL OVERLAP A MINIMUM OF TWO RINKPIPES. SEE DETAIL ICE-74.WIRE MESH#4 REBAR @ 16" O.C.25" MIN. LAP LENGTHCONCRETE(2) LAYERS OF 1 12" INSULATION1" SDR 11 POLY PIPEVAPOR BARRIER#4 REBAR @ 12" O.C.25" MIN. LAP LENGTH114" PIPE COVER(TYP.)EXPANSION JOINT. SEE DETAIL ICE-81.POLY PERIMETER RINK PIPE1.SUPPORT RINK PIPING OVER HEADER TRENCH ASNECESSARY TO PREVENT DEFLECTION.2.ANCHOR HEADER PIPES AS NECESSARY TO PREVENTFLOATING DURING PLACEMENT OF CONCRETE.3.EXTRA PIPE SUPPORTS MAY BE REQUIRED OVER HEADERTRENCH.4.PREPARE SUBGRADE AS SPECIFIED PRIOR TO INSTALLINGRINK FLOOR MATERIALS. PROVIDE ADDITIONAL SAND FILLAS NECESSARY TO BRING TO SUBGRADE TO REQUIREDELEVATION FOR NEW RINK FLOOR.NOTESRINK FLOOR SECTION (MERCYHEALTH ARENA)SCALE: N.T.S.2R5.0RINK FLOOR SECTION (MERCYHEALTH ARENA)SCALE: N.T.S.1R5.0DASHER BOARD SYSTEM.SEE DASHER DRAWINGS.DASHER BOARD SYSTEM.SEE DASHER DRAWINGS.PERIMETER CONCRETE.SEE STRUCTURAL.PERIMETER CONCRETE.SEE STRUCTURAL.EXPANSION JOINT. SEE DETAIL ICE-81.POLY PERIMETER RINK PIPE8"TO FACE OF DASHERS - SEE PLAN VIEWTO PERIMETER CONCRETE - SEE PLAN VIEW1.SUPPORT RINK PIPING OVER HEADER TRENCH ASNECESSARY TO PREVENT DEFLECTION.2.ANCHOR HEADER PIPES AS NECESSARY TO PREVENTFLOATING DURING PLACEMENT OF CONCRETE.3.EXTRA PIPE SUPPORTS MAY BE REQUIRED OVER HEADERTRENCH.4.PREPARE SUBGRADE AS SPECIFIED PRIOR TO INSTALLINGRINK FLOOR MATERIALS. PROVIDE ADDITIONAL SAND FILLAS NECESSARY TO BRING TO SUBGRADE TO REQUIREDELEVATION FOR NEW RINK FLOOR.NOTESEXISTING SUB GRADE1" SDR 11 POLY SUB-FLOORHEATING SYSTEM PIPECLEAN SAND1'-3"8"3"8"2'-0"4'-8" TRENCH WIDTH1'-4"(1) #4 REBARCONTINUOUSEACH SIDEPIPE AND REBAR SUPPORT CHAIRS @ 3'-0" O.C. THE ENTIRELENGTH OF THE RINK. CHAIR SPACING SHALL BE 2'-0" O.C.IF MOTORIZED EQUIPMENT WILL BE DRIVEN ON RINKPIPING FOR CONCRETE PLACEMENT OR SCREEDING.SUPPORT CHAIR SECTIONS SHALL OVERLAP A MINIMUM OFTWO RINK PIPES. SEE DETAIL ICE-74.WIRE MESH#4 REBAR @ 16" O.C.25" MIN. LAP LENGTHCONCRETE(2) LAYERS OF 1 12" INSULATION1" SDR 11 POLY PIPEVAPOR BARRIER#4 REBAR @ 12" O.C.25" MIN. LAP LENGTHSDR 11 POLY RETURN HEADER PIPE#4 REBAR @ 16" O.C.25" MIN. LAP LENGTHSDR 11 POLY SUPPLY HEADER PIPESDR 11 POLY REVERSE RETURN HEADER PIPESUPPORT BLOCK OR STEELCHANNEL(4) #4 REBAR CONTINUOUS EQUALLYSPACED ACROSS BOTTOM ON TRENCHAND 1" MIN. CLEAR FROM HEADER PIPES5"3"6"5"3"6"114" PIPE COVER(TYP.)EXPANSION JOINT. SEE DETAIL ICE-81.POLY PERIMETER RINK PIPEDASHER BOARD SYSTEM.SEE DASHER DRAWINGS.EXPANSION JOINT. SEE DETAIL ICE-81.POLY PERIMETER RINK PIPESEE DETAILICE-50RINK FLOOR SECTION (MULTIPURPOSE ARENA)SCALE: N.T.S.4R5.0RINK FLOOR SECTION (MULTIPURPOSE ARENA)SCALE: N.T.S.3R5.0EXISTING SUB GRADE1" SDR 11 POLY SUB-FLOORHEATING SYSTEM PIPECLEAN SANDDASHER BOARD SYSTEM.SEE DASHER DRAWINGS.PERIMETER CONCRETE.SEE STRUCTURAL.PERIMETER CONCRETE.SEE STRUCTURAL.SEE DETAIL5/DB500 (TYP.)ICE RINK FLOOREL. 100'-0"1'-1"RAISEDSTADIA. SEESTRUCTURALAND ARCH.RAISEDSTADIA. SEESTRUCTURALAND ARCH.3"ICE RINK FLOOREL. 100'-0"ICE RINK FLOOREL. 100'-0"1'-6" (TYP)EXISTING SUB GRADE.1" SDR 11 POLY SUB-FLOORHEATING SYSTEM PIPECLEAN SANDICE RINK FLOOREL. 100'-0"TO FACE OF DASHERS - SEE PLAN VIEWTO PERIMETER CONCRETE - SEE PLAN VIEW6"6"1'-6" (TYP)5"3"6"EXISTING SUB GRADE.1" SDR 11 POLY SUB-FLOORHEATING SYSTEM PIPECLEAN SANDPIPE AND REBAR SUPPORT CHAIRS @ 3'-0" O.C. THE ENTIRELENGTH OF THE RINK. CHAIR SPCING SHALL BE 2'-0" O.C. IFMOTORIZED EQUIPMENT WILL BE DRIVEN ON RINK PIPINGFOR CONCRETE PLACEMENT OR SCREEDING. SUPPORTCHAIR SECTIONS SHALL OVERLAP A MINIMUM OF TWO RINKPIPES. SEE DETAIL ICE-74.WIRE MESH#4 REBAR @ 16" O.C.25" MIN. LAP LENGTHCONCRETE(2) LAYERS OF 1 12" INSULATION1" SDR 11 POLY PIPEVAPOR BARRIER#4 REBAR @ 12" O.C.25" MIN. LAP LENGTH114" PIPE COVER(TYP.)EXPANSION JOINT. SEE DETAIL ICE-81.POLY PERIMETER RINK PIPE1.SUPPORT RINK PIPING OVER HEADER TRENCH ASNECESSARY TO PREVENT DEFLECTION.2.ANCHOR HEADER PIPES AS NECESSARY TO PREVENTFLOATING DURING PLACEMENT OF CONCRETE.3.EXTRA PIPE SUPPORTS MAY BE REQUIRED OVER HEADERTRENCH.4.PREPARE SUBGRADE AS SPECIFIED PRIOR TO INSTALLINGRINK FLOOR MATERIALS. PROVIDE ADDITIONAL SAND FILLAS NECESSARY TO BRING TO SUBGRADE TO REQUIREDELEVATION FOR NEW RINK FLOOR.NOTESDASHER BOARD SYSTEM.SEE DASHER DRAWINGS.DASHER BOARD SYSTEM.SEE DASHER DRAWINGS.PERIMETER CONCRETE.SEE STRUCTURAL.PERIMETER CONCRETE.SEE STRUCTURAL.EXPANSION JOINT. SEE DETAIL ICE-81.POLY PERIMETER RINK PIPE8"TO FACE OF DASHERS - SEE PLAN VIEWTO PERIMETER CONCRETE - SEE PLAN VIEW1.SUPPORT RINK PIPING OVER HEADER TRENCH ASNECESSARY TO PREVENT DEFLECTION.2.ANCHOR HEADER PIPES AS NECESSARY TO PREVENTFLOATING DURING PLACEMENT OF CONCRETE.3.EXTRA PIPE SUPPORTS MAY BE REQUIRED OVER HEADERTRENCH.4.PREPARE SUBGRADE AS SPECIFIED PRIOR TO INSTALLINGRINK FLOOR MATERIALS. PROVIDE ADDITIONAL SAND FILLAS NECESSARY TO BRING TO SUBGRADE TO REQUIREDELEVATION FOR NEW RINK FLOOR.NOTESEXISTING SUB GRADE1" SDR 11 POLY SUB-FLOORHEATING SYSTEM PIPECLEAN SAND1'-3"8"3"8"2'-0"4'-8" TRENCH WIDTH1'-4"(1) #4 REBARCONTINUOUSEACH SIDEPIPE AND REBAR SUPPORT CHAIRS @ 3'-0" O.C. THE ENTIRELENGTH OF THE RINK. CHAIR SPACING SHALL BE 2'-0" O.C.IF MOTORIZED EQUIPMENT WILL BE DRIVEN ON RINKPIPING FOR CONCRETE PLACEMENT OR SCREEDING.SUPPORT CHAIR SECTIONS SHALL OVERLAP A MINIMUM OFTWO RINK PIPES. SEE DETAIL ICE-74.WIRE MESH#4 REBAR @ 16" O.C.25" MIN. LAP LENGTHCONCRETE(2) LAYERS OF 1 12" INSULATION1" SDR 11 POLY PIPEVAPOR BARRIER#4 REBAR @ 12" O.C.25" MIN. LAP LENGTHSDR 11 POLY RETURN HEADER PIPE#4 REBAR @ 16" O.C.25" MIN. LAP LENGTHSDR 11 POLY SUPPLY HEADER PIPESDR 11 POLY REVERSE RETURN HEADER PIPESUPPORT BLOCK OR STEELCHANNEL(4) #4 REBAR CONTINUOUS EQUALLYSPACED ACROSS BOTTOM ON TRENCHAND 1" MIN. CLEAR FROM HEADER PIPES5"3"6"5"3"6"114" PIPE COVER(TYP.)EXPANSION JOINT. SEE DETAIL ICE-81.POLY PERIMETER RINK PIPEDASHER BOARD SYSTEM.SEE DASHER DRAWINGS.EXPANSION JOINT. SEE DETAIL ICE-81.POLY PERIMETER RINK PIPESEE DETAILICE-50EXISTING SUB GRADE1" SDR 11 POLY SUB-FLOORHEATING SYSTEM PIPECLEAN SANDDASHER BOARD SYSTEM.SEE DASHER DRAWINGS.PERIMETER CONCRETE.SEE STRUCTURAL.PERIMETER CONCRETE.SEE STRUCTURAL.SEE DETAIL5/DB500 (TYP.)ICE RINK FLOOREL. 100'-0"1'-1"RAISEDSTADIA. SEESTRUCTURALAND ARCH.3"ICE RINK FLOOREL. 100'-0"ICE RINK FLOOREL. 100'-0"1'-6" (TYP)EXISTING SUB GRADE.1" SDR 11 POLY SUB-FLOORHEATING SYSTEM PIPECLEAN SANDNo:Consultant:Project:Location:Sheet:CONVENTION CENTER(WSCC)2500 Milton AvenueJanesville, WI 53545Bid Set DocumentsKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:AS INDICATEDDate:Project No.:Sheet No.:Revisions:(Owner) Project No.:10-4-2023220025.00Date:Description:2211 O' Neil Road - Hudson, WI 54016Phone: (651) 256-3090www.B32eng.comWOODMAN'S SPORTS &C2023-15R5.0ICE RINK DETAILS ANDSECTIONS10/13/2023Location:2510 Milton AvenueJanesville, WI 5354510/04/2023BID DOCUMENT SET FIRST FLOOR PLAN 100' -0" 3" HDPE SUBFLOOR TRANSMISSION MAINS. (TYP. OF 2 PER RINK) CLEAN SAND 8" INSULATED HDPE RINK FLOOR TRANSMISSION MAINS. (TYP. OF 2) 3/4" SCH 80 PVC CONDUIT AND WIRE FOR RINK FLOOR TEMP. SENSORS. (TYP. OF 2 PER RINK) SUBGRADE 1' - 4"1' - 4"1' - 4" 0' - 6"0' - 8"3' - 6"3' - 4"2' - 6"0' - 8"0' - 8" PERIMETER CONCRETE. SEE STRUCTURAL. FIRST FLOOR PLAN 100' -0"2' - 6"3' - 4"3" HDPE SUBFLOOR TRANSMISSION MAINS. (TYP. OF 2 PER RINK) CLEAN SAND 8" INSULATED HDPE RINK FLOOR TRANSMISSION MAINS. (TYP. OF 2) 3/4" SCH 80 PVC CONDUIT AND WIRE FOR RINK FLOOR TEMP. SENSORS. (TYP. OF 2 PER RINK) SUBGRADE 1' - 4"1' - 4"1' - 4"0' - 8"0' - 8"3' - 6"PERIMETER CONCRETE. SEE STRUCTURAL. FIRST FLOOR PLAN 100' -0" 3" HDPE SUBFLOOR TRANSMISSION MAINS. (TYP. OF 2 PER RINK) CLEAN SAND 8" INSULATED HDPE RINK FLOOR TRANSMISSION MAINS. (TYP. OF 2) 3/4" SCH 80 PVC CONDUIT AND WIRE FOR RINK FLOOR TEMP. SENSORS. (TYP. OF 2 PER RINK) SUBGRADE 1' - 4"1' - 4"1' - 4" 0' - 6"0' - 8"3' - 6"3' - 4"2' - 6"0' - 8"0' - 8" PERIMETER CONCRETE. SEE STRUCTURAL. FIRST FLOOR PLAN 100' -0" 3" HDPE SUBFLOOR TRANSMISSION MAINS. (TYP. OF 2 PER RINK) CLEAN SAND 8" INSULATED HDPE RINK FLOOR TRANSMISSION MAINS. (TYP. OF 2) 3/4" SCH 80 PVC CONDUIT AND WIRE FOR RINK FLOOR TEMP. SENSORS. (TYP. OF 2 PER RINK) SUBGRADE 1' - 4"0' - 8"0' - 8"3' - 6"3' - 4"2' - 6"PERIMETER CONCRETE. SEE STRUCTURAL. FIRST FLOOR PLAN 100' -0"2' - 0"0' - 8"0' - 6" 3" INSULATED HDPE SNOWMELT TRANSMISSION MAINS (TYP. OF 2) PERIMETER CONCRETE. SEE STRUCTURAL. 0' - 6" Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 2211 O' Neil Road -Hudson, WI 54016 Phone: (651) 256-3090 www.B32eng.com C2023-15 1" = 1'-0" ICE RINK DETAILS AND SECTIONS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 Bid Set Documents R5.1 10-4-23 220025.00 1" = 1'-0"2 MAINS TRENCH SECTION - MERCYHEALTH ARENA HALLWAY 1" = 1'-0"3 MAINS TRENCH SECTION - MULTIPURPOSE ARENA 1" = 1'-0"1 MAINS TRENCH SECTION - MERCYHEALTH ARENA 1" = 1'-0"4 MAINS TRENCH SECTION - TO MERCYHEALTH ARENA HALLWAY 1" = 1'-0"5 SNOWMELT MAINS TRENCH SECTION 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET BEND PIPES IN RADII TO ALLOWFOR MAXIMUM PIPE COVERAGE(TYP.)PERIMETER RINK PIPEFACE OF DASHERSEXPANSION JOINT3" POLY HEADER PIPE1" POLY PIPING3" x 1" SADDLE FUSION FITTINGSUBGRADE (BY OTHERS)CONCRETEINSULATIONCLEAN SANDSEE RINKFLOOR SECTIONS1'-0"1'-0"3'-0"1'-6"PERIMETER CONCRETE1" POLY SUB-FLOOR HEATING PIPING#4 REBAR UNDER POLYPIPING @ ENDS AND RADIIZIP-TIES AT @ EACHINTERSECTION/ (TYP.)WIRE MESHCONCRETE RINK FLOORREBARBASE PLATEWIRE SUPPORTS3" MINIMUMSEE PLANSEE PLANCHAIR DIMENSIONS ASREQUIRED FOR CONCRETETHICKNESS AND 114" COVEROVER RINK PIPES.NOTE:PIPE AND REBAR SUPPORTS SHALL OVERLAP A MINIMUM OF (2) RINK PIPES.PIPE AND REBAR SUPPORT CHAIRS SHALL BE IN 6'-0" LONG SECTIONS.SECTIONELEVATION114" COVER114" COVERSEEPLANSEEPLANSEEPLANSEEPLANSEEPLANSEEPLANSEEPLANSEEPLANSEEPLANSEEPLANPERIMETER CONCRETEEXPANSION JOINT. SEE EXPANSION JOINT DETAIL.NYLON TIE. (TYP.)PERIMETER RINK PIPE1" PRE-MOLDED POLYSOCKET U-BEND FITTINGPERIMETER CONCRETEEXPANSION JOINT. SEE EXPANSION JOINT DETAIL.NYLON TIE. (TYP. OF 2)PERIMETER RINK PIPE1" POLY MOLDED SOCKETFUSION FITTINGS.3 1/2" (TYP.)3 1/2" (TYP.)COMPRESSION SEALRIGID POLYSTYRENEINSULATIONVAPOR BARRIERICE RINK FLOOR CONCRETEICE RINK FLOOR INSULATIONTHICKENED PERIMETERCONCRETE EDGE.SEE ICE RINKFLOOR SECTIONS1"LUBRICANT ADHESIVE (TYP. ALLSIDES)TO PERIMETER CONCRETE14"NOTE:1.EXPANSION JOINT SYSTEM SHALL BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS.2.CONTRACTOR SHALL FIELD VERIFY WIDTH OF JOINT PRIOR TO ORDERING MATERIALS.12"34" ALUMINUM CONDUIT BODY STYLE TBWITH REMOVABLE FLAT TOP COVER PLATE ANDGASKET. RECESS 18" BELOW F.F. ELEVATION12" x 6" LONG GALV. NIPPLETREADED GALV. CAP34" x 12" BUSHINGRTD ELEMENTFOR SUB-FLOORSEAL PENETRATIONS W/EXPANDING FOAMRTD ELEMENT FORRINK FLOOR12" GALV. NIPPLESEAL ALL OPENINGSW/ DUCT PUTTY34" SCH. 80 PVC CONDUIT TOREFRIGERATION ROOM.CABLES TOREFRIGERATION ROOMSUB-FLOOR SAND LAYERRINK FLOOR INSULATIONRINK FLOOR CONCRETE12" PVC TO 12" STEELCONDUIT COUPLING34" x 12" REDUCERPOLY HEADER PIPES1" POLY SOCKETFUSION TEE FITTING1" POLY RINK PIPE1" POLY RINK PIPE8"x1" POLY SERVICESADDLE W/ RECTANGULARBASE & SOCKET OUTLETSECTIONELEVATION1'-4"HEADER TRENCHSEE FLOOR SECTIONSPERIMETER CONCRETEPOLY HEADER PIPESPOLY RETURN BENDS.SEE POLY RETURN BEND DETAIL.SEE HEADER CONNECTION DETAIL.1" POLY RINK PIPING1" POLY PERIMETER RINK PIPE312"8"4"(TYP.)FACE OF DASHER BOARDS ABOVEEXPANSION JOINT. SEE EXPANSION JOINT DETAIL.INSULATE END OF HEADER TRENCH WITH112" INSULATION BELOW EXPANSIONJOINT TO BOTTOM ON HEADER TRENCH.2'-0"TYPICAL RINK PIPING DETAIL @ RADIUSSCALE: N.T.S.ICE162ICE RINK HEADER PIPE CONNECTION DETAILSCALE: N.T.S.ICE50ICE RINK PIPE AND REBAR SUPPORT DETAILSCALE: N.T.S.ICE74ICE RINK EXPANSION JOINT DETAILSCALE: N.T.S.ICE81ICE RINK SUBFLOOR HEATING SYSTEM HEADER DETAILSCALE: N.T.S.ICE23ICE RINK SUBFLOOR HEATING SYSTEM PIPING DETAILSCALE: N.T.S.ICE24ICE RINK TEMPERATURE SENSOR DETAILSCALE: N.T.S.ICE83ICE RINK HEADER PIPE CONNECTION DETAILSCALE: N.T.S.ICE52ICE RINK PIPING DETAILSCALE: N.T.S.ICE76No:Consultant:Project:Location:Sheet:CONVENTION CENTER(WSCC)2500 Milton AvenueJanesville, WI 53545Bid Set DocumentsKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:AS INDICATEDDate:Project No.:Sheet No.:Revisions:(Owner) Project No.:10-4-2023220025.00Date:Description:2211 O' Neil Road - Hudson, WI 54016Phone: (651) 256-3090www.B32eng.comWOODMAN'S SPORTS &C2023-15R5.2ICE RINK DETAILS ANDSECTIONS10/13/2023Location:2510 Milton AvenueJanesville, WI 53545BID DOCUMENT SET REFRIGERATIONMACHINERYROOMAUTHORIZED PERSONAL ONLY330-REFRIGERATIONMACHINERYSHUTDOWNEMERGENCY USEONLYCAUTIONEYE AND EARPROTECTION REQUIREDIN THIS AREAREFRIGERATIONMACHINERY ROOMVENTILATIONEMERGENCY USEONLYWHEN ALARMS ARE ACTIVATEDREFRIGERANT HAS BEEN DETECTED:1. LEAVE ROOM IMMED IATELY.2. DO NOT ENTER EXCEPT BY TRAINED & AUTHOR IZED PERSONNEL .3. DO NOT ENTER W ITHOUT PERSONAL PROTECTIVE EQU IPMENT WARNING!CONTRACTOR NAMEADDRESSCITY, STATE PHONE # STATE L ICENSE # H IGH S IDE TEST XXX PSI LOW SIDE TEST XXX PSI SYSTEM CHARGE XXX LBS H IGH S IDE TEST XXXX H IGH S IDE TEST XXXXFACILITY NAMECONTRACTOR NAMEADDRESSCITY, STATE PHONE # STATE LICENSE # HIGH SIDE TEST XXX PSI LOW SIDE TEST XXX PSI SYSTEM CHARGE XXX LBSNOTES:1. THIS DETAIL APPLIES TO ALL REFRIGERATION ROOM DOORS.2. ALL SIGNAGE SHALL BE PER ANSI/IIAR, IMC, ASHRAE, NFPA 704 AND ANSI Z535.2 GUIDELINES.3. SEE ALSO ARCHITECTURAL SIGNAGE REQUIREMENTS.4. FURNISH AND INSTALL "WARNING" SIGNAGE NEXT TO EACH STROBE/AUDIBLE ALARM FOR LEAK DETECTION SYSTEM REFRIGERANT XXXX LUBRICANT/QTY XXXXIN THE EVENT OF AN EMERGENCY:1. PUSH BUTTON FOR REFRIGERATION MACHINERY SHUTDOWN.2. PUSH BUTTON TO START REFR IGERAT ION MACHINERY ROOMVENTILATION.3. EVACUATE PREMISES AND CALL 911 .IN THE EVENT OF AN EMERGENCY:1. PUSH BUTTON FOR REFRIGERATION MACHINERY SHUTDOWN.2. PUSH BUTTON TO START REFRIGERATION MACHINERY ROOMVENTILATION.3. EVACUATE PREMISES AND CALL 911.VARIES (SEE ICE EQUIPMENT SCHEDULE)VARIES(SEE ICE EQUIPMENT SCHEDULE)6"SCH. 80 PVC SPARGER LINE(SIZE BASE ON RELIEF LINE)PROVIDE 18" Ø HOLE ABOVE WATERLINE TO PREVENT WATER SIPHONNORMAL WATER LEVEL(PER CODE REQUIREMENTS)14" Ø HOLES @1" O.C. HORIZONTALLY& 112" O.C. VERTICALLY AND ASREQUIRED FOR SYSTEM CAPACITYAPPROX.13 TANK HEIGHTTANK COVER W/ ACCESS HOLEDRAIN LINEGALLONAGEMARKERS(TYP.)VENT LINE. MUST BEROUTED THROUGHFIRE RATED CHASEOUTSIDE OF ROOM.FLUID LEVELGAUGEC/L6" x 6" x 12" STAINLESS STEEL PLATEWELDED TO BOTTOM OF INSERT.CONCRETE RINK FLOOR14"14" STAINLESS STEEL FLOOR PLATE WITHHINGED COVER. SPORTS IMPORT KA-25F ORAPPROVED EQUAL.CONTINUOUS WELD. (TYP.)OFFSET RINK PIPES AS NECESSARY.14" LESS THAN FULL DEPTH OF RINK FLOOR.SHIM ANCHOR TO 18" BELOW FFE.DRILL HOLES IN OPPOSITE CORNERSOF ANCHOR PLATE FORINSTALLATION OF NAIL OR SCREWFOR ANCHORING. (TYP.)3 116" ID x .140" THICK STAINLESS STEEL PIPE INSERT.SPORTS IMPORTS KA25-S OR APPROVED EQUAL.ICE RINK FLOORCONCRETE HOUSEKEEPING PADW/ #4 BARS @ 12" O.C. EACH WAY@ MID DEPTH#3 @ 48" O.C. W/ STANDARD HOOK.DRILL AND EPOXY INTO CONRETESLAB USING HILTI HIT HY200 EPOXY(2" MIN. EMBEDMENT)#4 BARS CONTINUOUSAT PERIMETER34" CHAMFER. TYP.ROUGHEN CONCRETE SURFACEEXISTING CONCRETE SLABEQUIPMENT ANCHORS AND VIBRATION ISOLATION,PER MANUF. RECOMMENDATIONS.EQUIPMENT SIZE3"3"PER PLANPAINT ALL SIDES AND TOP 4"OF PAD SAFETY YELLOW PERSHU STANDARDS.TYPICAL SIGNAGE DETAILSCALE: N.T.S.ICE125PIPE INSULATION SCHEDULEPIPE SIZEINSULATION TYPEINSULATIONTHICKNESSJACKET TYPEJACKET COLORABOVE GROUNDCOLD BRINE / GLYCOL & REFRIGERANT PIPES< 1 14"51 1/2"2WHITE1 12" TO 4"52"2WHITE5" TO 8"52 1/2"2WHITE> 8"53"2WHITEVALVES5MATCH PIPE2WHITEWARM BRINE/GLYCOL PIPES (SUBFLOOR / SNOWMELT)< 1 14"51 1/2"2RED1 12" TO 4"52"2REDVALVES5MATCH PIPE2RED BELOW GROUNDCOLD BRINE / GLYCOL PIPES6" TO 8"5A/5B2 1/2"SEE SPECSEE SPEC10"5A/5B3"SEE SPECSEE SPECWARM BRINE / GLYCOL PIPES (SNOWMELT)2" TO 4"5A/5B2"SEE SPECSEE SPECEQUIPMENT / VESSEL INSULATION SCHEDULEITEMINSULATION TYPEINSULATIONTHICKNESSJACKETTYPEJACKETCOLORRINK PUMPS32"N/AN/ACHILLER / SURGE DRUM52"2WHITEWASTE HEAT RECOVERYHEAT EXCHANGERS52"2REDPIPE AND EQUIPMENT INSULATION SCHEDULESCALE: N.T.S.ICE163AMMONIA DIFFUSION TANK DETAILSCALE: N.T.S.ICE213SCALE: N.T.S.ICE204VOLLEYBALL NET INSERT DETAILNo:Consultant:Project:Location:Sheet:CONVENTION CENTER(WSCC)2500 Milton AvenueJanesville, WI 53545Bid Set DocumentsKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:AS INDICATEDDate:Project No.:Sheet No.:Revisions:(Owner) Project No.:10-4-2023220025.00Date:Description:2211 O' Neil Road - Hudson, WI 54016Phone: (651) 256-3090www.B32eng.comWOODMAN'S SPORTS &C2023-15R5.3ICE RINK DETAILS ANDSCHEDULEPUMP SCHEDULEN0.DESCRIPTIONMANUF.MODELGPMTDH (FT)MOTORRPMV/P/HZMIN. EFF.FLUIDP1MERCYHEALTHRINK PUMPP2RINK PUMPREMARKS EXPANSION, COMPRESSION AND OTHER TANKSN0.DESCRIPTIONMANUF.CAP.(GAL)SIZET1MERCYHEALTH RINKACCESSORIEST2TANK FITTINGSITE GLASSEXPANSIONCOMPRESSORSNO.C1C2C3TYPEMANUF.MODELCAPACITYTONSMOTORHPMOTORRPMSUCTIONTEMPCONDTEMPCONTROLSN0.DESCRIPTIONMANUF.MODELCAP.(MBH)HOT SIDECOLD SIDEH1HEAT RECOVERYGPMTEMPINTEMPOUTPSIMAXFLUIDCOND. TEMPREF.DIFFUSIONSEE DETAIL ICE-128REMARKSREMARKSREMARKSV/P/HZREF.MULTIPURPOSERINKP7WATERCONDENSERN0.MODELREFCONDTEMPWETBULBFANHPEVAPTEMPCU1TYPEMANUF.THR(MBH)REMARKSFANRPMV/P/HZVFDREMOTE SUMPSTRAINER, FLOAT, ETC.EVAPHEAT EXCHANGERSREMARKS1. SIZE CONDENSER FOR MINIMUM DRY OPERATION OF 2093 MBH @ 35F.EXPANSIONT6T7BAC35505 F96 F12535503550125460/3/60460/3/60460/3/605 F5 F96 F96 F125CHIL-CONBELL&GOSSETT100AFTLYESTHREE - 3" DIABELL&GOSSETT100AFTLYESNON/APOLYN/A--CHILLER SCHEDULE (INFORMATION BASED ON CHIL-CON VESSELS)NO.CAP(TN)NO.PASSESDIMENSIONSSHELLTUBEWIDTHLENGTHREF.TEMPTYPEMATERIALFLUIDGPMFPSPSIV1REMARKSINTEMPOUTTEMPINTEMPOUTSECONDARY CONDITIONSNO.DIA.LENGTHNO. OF RISERSV2REMARKSDIA. OF RISERSV1ADESCRIPTIONCAP. (LBS)TANK FITTINGSITE GLASSV3V4V1BSURGE DRUMOIL POTH.P. RECEIVER2R-7175.0FPLAIN35% EGSTEEL96.0FAFTLYES*PER MANUF. RECOM.RISER SIZED FOR 96F CONDHORIZONTAL18095851,00016.61490016.61424"156"1,90016.6148.110.416% EXCESS24"108"210"N/AN/AN/ASAME AS ABOVESAME AS ABOVE**N/AN/AN/AN/A35% EGBELL&GOSSETTe1510 5EB30HPPROVIDE VFDBACK-UP, PROVIDE VFD100075BELL&GOSSETT460/3/6010001770460/3/60BELL&GOSSETTR-71796 F78 F5 F1800460/3/60YES10PCC-0246-1012N010368435%R717E.G.48096 F75 F85 F108CA-08132-2102.6WATER460/3/605041,90013605'-6" x 5'-6" x6'-0" HT2000SCREWSCREWSCREWBITZERBITZERBITZEROSKA 8561-KOSKA 8561-KOSKA 8561-K61.161.161.1R717R717R717P3MULTIPURPOSERINK PUMPBELL&GOSSETT460/3/60900PROVIDE VFDH2HEAT RECOVERYTHERMASTORWATERR7178096 F---11-1A-H3HEAT RECOVERYTHERMASTORWATERR7178096 F-11-1A-V5PRIMARYOIL SEPARATORSIZED FOR FULL LOADH4HEAT RECOVERYTHERMASTORWATERR7178096 F-11-1A-T3MERCYHEALTHSUBFLOORBELL&GOSSETT60AFTLYES-P4SUBFLOOR MERCYHEALTHBELL&GOSSETT460/3/6080P5SUBFLOORMULTIPURPOSEBELL&GOSSETT460/3/6080VESSEL SCHEDULEPOLYPROVIDE VFD ON FAN W/BYPASS CONTACTORP6SNOW MELTBELL&GOSSETT460/3/6010835% EG35% EG35% EG35% EG35% EG30HP25HP17701770177017501750175010HP5HP5HP5HPN0.DESCRIPTIONMANUF.MODELCAP.(MBH)COLD SIDEHOT SIDEGPMTEMPINTEMPOUTPSIMAXFLUIDCOND. TEMPREF.REMARKSPLATE AND SHELL HEAT EXCHANGERH5OIL COOLERVAHTERUSR71747496 F175F115F*4HH-168/2/1*OILTHERMOSYPHON OIL COOLERT4 MULTIPURPOSESUBFLOOREXPANSIONBELL&GOSSETT60AFTLYES-T5SNOWMELTEXPANSIONBELL&GOSSETT60AFTLYES-EXPANSION5'-4" Ø12'-0" HTV6THERMOSYPHONRECEIVERSIZED FOR FULL LOAD474ACP COMPRESSOR PACKAGE83.5%e1532 1.5BC*** PER MANUFACTURES RECOMMENDATION4.33.419% EXCESS3.82.814% EXCESS----e1510 5BDe1510 4BDe1532 1.5BCe1532 1.5BC7583.5%6086.0%6458.2%6758.4%6460.1%4582.1%14" LESS THAN FULL DEPTH OF FLOOR, SHIM TO 18" LESS THAN FULL DEPTH OF FLOOR 4"x 4"x 1/2" THICK2 38" O.D.4"34"STEEL OR STAINLESSSTAINLESS STEEL SHAFT,THAT ACCEPTS 1 7/8"O.D. MARSH PEGS.CONTINUOUS WELD2" THREADED STAINLESSSTEEL PLUG. WHEN INSERTEDPLAN VIEWSECTION2" DEEP THREADS FOR CAP.STAINLESS STEEL SHAFT,THAT ACCEPTS 1 7/8"O.D. MARSH PEGS.2 38"CLCLCLSHALL BE FLUSH WITH RINKFLOOR SURFACE.SEE PLAN VIEW 316"4"STEEL BASE PLATE.4"x 4"x 1/2" THICKSTEEL OR STAINLESSSTEEL BASE PLATE.12"NOTE:1. INSTALL PLUG FLUSH WITHF.F. ELEVATION.GOAL POST INSERT DETAILSCALE: N.T.S.ICE200ALTERNATE BID #6SEE SPECSSEE SPECSSEE SPECSALTERNATE BID #6ALTERNATE BID #6e1510 5EBF.S. PACKINGMATERIAL MIN1" THICKCONCRETE OR CMU ASSEMBLY1-1/2, 2,AND 3 HR RATINGF.S. CAULK MIN 2" THICKWITH 2" INSUL. MIN 1" THICKWITH 1-1/2" OR LESSINSULATIONINSULATIONPIPEPIPEF.S. CAULKBACKER RODCONCRETE OR CMUASSEMBLY 2,3, AND4 HR RATINGPIPE PENETRATIONS AT FLOOR OR WALLSCALE: N.T.S.ICE115PIPE MARKINGS DETAILSCALE: N.T.S.ICE1173/4 to 1-1/481/2Outside Diameter ofPipe or Covering, (in.)Table 2Size of Legend LettersSize of LettersB, (in.)1-1/2 to 283/42-1/2 to 6121-1/48 to 10242-1/2over 10323-1/2LEGENDTable 1Examples of LegendsGLYCOL SUPPLYGLYCOL RETURNH.P. REF. RETURNABLength of ColorField A, (in.)LEGENDLEGENDSCALE: N.T.S.ICE105CONCRETE EQUIPMENT PAD10/13/2023Location:2510 Milton AvenueJanesville, WI 53545BID DOCUMENT SET V1V2VENTDRAINDRAINVENT6" STEELSLOPE TOWARD SUMP1'-0"TO FLOOR DRAIN BYDIVISION 22 CONTRACTORCHARGINGVALVEVENT OUTSIDE OF BUILDING WITH DIFFUSERDUAL RELIEFVALVES (TYP)P7T71V3DRAINFLOOR2INSULATION8" PVC, SLOPE TOWARD SUMP (1/4 IN/FT MIN)1.5" NON-POTABLEWATER LINE BY DIVISION22 CONTRACTOR2" PVC6" STEEL4" PVC 4" PVCDRAIN 3/4" PIPENO INSULATION5T6CONNECT TO 1.5"WATER LINE1.5" COPPER CU122MEET CURRENT MECHANICALCODES FOR SEPARATION OFDIFFUSER FROM GROUND ANDOTHER OPENINGS AND EQUIPMENT.WALL/ROOF INSULATIONNO INSULATIONINSULATIONNO INSULATION3/4"DIP TUBE CUTEND AT 45°8" CLEARSTEEL SUPPORTS3/4" DRAINLINEV43/4"LIFTING ROD LUG(TYP. OF 2) STEEL1" CROSSOVER LINE1COMBINATIONOIL SEPARATORV51HIGH LEVELFLOAT SWITCHC11C211TDV STEELSTEELSTEELSTEELSTEEL STEEL STEEL FLOOR20 EQUALIZING LINE PERMANUFACTURERSRECOMMENDATIONSV6LEVELPROBEDRAIN3SLOPE TOWARDRECEIVEROPERATING LEVEL6' MIN.AS REQUIRED FOR THERMOSYPHON H5C31VALVEPOSITIONINDICATOR1.THE REFRIGERATION FLOW DIAGRAM SHOWS GENERAL SYSTEM REQUIREMENTS ONLY. CONTRACTOR TO FURNISH AND INSTALL ALL MATERIALSAND EQUIPMENT FOR A COMPLETE OPERATING SYSTEM AND AS NECESSARY TO MEET CURRENT STATE AND LOCAL MECHANICAL CODES.2.PIPING MATERIAL AS SPECIFIED. INSULATE ALL PIPING AS SPECIFIED IN INSULATION SCHEDULE. SEE DETAIL ICE-1633. CHILLER ARRANGEMENT MAYBE DIFFERENT THAN PICTURED ABOVE. SEE ICE EQUIPMENT SCHEDULE.4. INSTALL PIPE UNIONS ON EACH SIDE OF ALL EQUIPMENT AND VALVES FOR MAINTENANCE.5. PROVIDE CRANKCASE OIL EQUALIZATION LINES BETWEEN COMPRESSORS WITH ALL ASSOCIATED VALVES, FLOATS, GAUGES, ETC. ASRECOMMENDED BY THE MANUFACTURER.6. ALL VALVES AND PIPING SPECIALTIES SHALL BE FULL LINE SIZE.7.ALL GAUGES SHALL BE MOUNTED AT EYE LEVEL WHERE POSSIBLE.8.LENGTH OF DRIP LEGS SHALL MEET LOCAL CODE REQUIREMENTS.9.THE CONTRACTOR IS RESPONSIBLE FOR PLACEMENT AND DESIGN OF ALL HANGERS AND SUPPORT SYSTEMS AND SHALL VERIFY THAT BUILDINGSTRUCTURE IS DESIGNED TO SUPPORT SYSTEM LOADS.10.1" CROSS OVER LINE MAY NOT BE REQUIRED IF INTERNAL TO COMPRESSORS.GENERAL NOTESCONTROL SYSTEM KEY NOTES123CONTROLLED BY COMPRESSOR OPERATION.(SEE SPECIFICATIONS FOR CONTROL REQUIREMENTS)3-WAY OIL TEMPERATURE VALVE TO MAINTAIN MIN. 115F OIL TEMPERATURE.STEEL STEEL MFLOATSWITCH1/2" DRAINMBLEED WATERSAMPLING FORWATER TREATMENTSEESHEETR6.1PRESSURE SWITCH IN LOCK BOX ON EXTERIOROF BUILDING FOR MANUAL OPERATION OF THEEMERGENCY PRESSURE CONTROL SYSTEM.CLEARLY LABEL SWITCH WITH "AMMONIA - FIREDEPARTMENT - EMERGENCY CONTROL BOX"CONTROLLED BY COMMON DISCHARGE PRESSURE. PRESSURE SWITCH CONTROLLING SOLENOID VALVE SHALL OPEN SOLENOID AT 235 PSI. CONTROL RELAY FORCOMPRESSOR SHALL BE DE-ENERGIZED UPON OVER PRESSURIZATION. ISOLATION VALVES SHALL BE LOCKED IN THE OPEN POSITION.CONTROLLER34" FILL VALVE(TYP. OF 2)34EXTENTS OF ACP COMPRESSOR PACKAGE.CONTRACTOR TO VERIFY WITH MANUFACTURE.SITE GLASS @ EYE LEVEL4" HIGH CONCRETE CONTAINMENTCURB AROUND FLOOR DRAIN.LPVRLPVR LPVR LPVR LPVRLPVR LPVR LPVR HPLRHPLRHPLRHPVRHPVRHPVRHPVR HPVRHPVRHPVR ORLORLATVATVATVATV ATV ATV LPLR LPLRLPLRHPLROCLOCLOCLOCLOCLOCLOCL OCL EQEQORLORLCR CRCSCSCS CSHPVRORL 1A1B1A1BPURGEVALVE(TYP).4CONTROLLED BY CHILLER FLOAT SYSTEM.5545PROVIDE STUB AND ISOLATION VALVE CAPPED FOR FUTURE CONNECTION IF ALTERNATE BID 6 IS NOT ACCEPTED.No:Consultant:Project:Location:Sheet:CONVENTION CENTER(WSCC)2500 Milton AvenueJanesville, WI 53545Bid Set DocumentsKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:AS INDICATEDDate:Project No.:Sheet No.:Revisions:(Owner) Project No.:10-4-2023220025.00Date:Description:2211 O' Neil Road - Hudson, WI 54016Phone: (651) 256-3090www.B32eng.comWOODMAN'S SPORTS &C2023-15R6.0AMMONIA FLOW DIAGRAM10/13/2023Location:2510 Milton AvenueJanesville, WI 5354510/04/2023BID DOCUMENT SET V1V2VENTDRAINDRAINVENTT2SITEGLASSP-1P-2P-3FLOORTTDO NOT ISOLATE RINK FLOORFROM EXPANSION TANKS.8" STEEL2PSD8" STEEL S2" FILL8" STEEL 8" STEEL 8" STEEL 8" STEEL STEEL T1SITEGLASSSTDV 110" STEELPOLYSTEEL8" STEEL 8" STEEL STEELTDV TDV AVT10" STEELMERCYHEALTHRINK2" FILL8" POLY 8" STEEL8" STEEL312" TYP.N.C.N.C.MULTIPURPOSERINK8" STEEL T28" POLY8" POLY8" POLY8" POLY8" POLY 8" POLY 8" POLY 8" STEELPSDPSDFSCGRCGR CGS CGS CGSCGSCGSCGS CGR CGSCGRCGR CGR CGSCGRCGS8" POLY8" POLY8" POLY10" STEELCGS8" STEELCGS8" STEELCGS8" STEELCGS8" POLY2" DRAIN (TYP 4)PRECAST WALL OPENINGAV8" POLY8" POLY8" POLY2TEMPORARYCHILLERCONNECTION (TYP 4)SCALE:SCALE:N.T.S.1SECONDARY REFRIGERANT FLOW DIAGRAM1.SEE SHEET R6.0.GENERAL NOTESKEY NOTES(SEE SPECIFICATIONS FOR CONTROL REQUIREMENTS)1.GLYCOL SUPPLY TEMPERATURE2.GLYCOL RETURN TEMPERATURE3.FLOW SWITCH. CONNECT TO CONTROL SYSTEM FOR MONITORING AND DISPLAYNo:Consultant:Project:Location:Sheet:CONVENTION CENTER(WSCC)2500 Milton AvenueJanesville, WI 53545Bid Set DocumentsKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:AS INDICATEDDate:Project No.:Sheet No.:Revisions:(Owner) Project No.:10-4-2023220025.00Date:Description:2211 O' Neil Road - Hudson, WI 54016Phone: (651) 256-3090www.B32eng.comWOODMAN'S SPORTS &C2023-15R6.1SECONDARY REFRIGERANTFLOW DIAGRAM10/13/2023Location:2510 Milton AvenueJanesville, WI 5354510/04/2023BID DOCUMENT SET FLOORMERCYHEALTHRINKPOLYSTEELMULTIPURPOSERINK3" STEEL HEADER3" STEEL HEADERH11225AV3" STEEL HEADER3" STEEL HEADERP4T2 1/2" STEEL TDVP5 T2 1/2" STEEL TDV T4S T3S 2 1/2" STEEL 2 1/2" STEEL 2 1/2" STEEL 3" STEEL 2 1/2" STEEL 2 1/2" STEEL 11P62 1/2" STEEL 2 1/2" STEEL2 1/2" STAINLESS STEEL SNOWMELT PIT COILSTEELSTAINLESS STEELSNOW MELT PITTDV FLOORT5S 2 1/2" STEEL3" POLY3" POLY3" POLYWGSWGRATVATVHPLRLPLRLPLRWGR WGR WGR WGR WGS WGR WGR WGSWGSWGRWGS WGS WGSWGSWGSWGR WGSWGRWGR WGSWGSWGRWGS2 1/2" STEEL2"2"3" POLY3" POLY3" POLY3" POLY3" POLY3" POLY3" POLY 2 1/2" STEEL2 1/2" STEEL2 1/2" STEELDO NOT ISOLATE RINK FLOORSFROM EXPANSION TANKS.2 1/2" STEELSEE PLANS FOR ACTUALCONFIGURATION OFSNOW MELT PIPING.AVAVPOLYSTEEL2"2"FLOORPRECAST WALL OPENINGWGSWGR3" STEEL HEADER3" STEEL HEADER3" POLY3" POLY3" POLY3" POLY2"3" POLY3" POLY3" POLY3" POLY2"WGSWGRWGSWGRWGSWGRPOLYSTEELWGRWGRWGSWGS WGSWGR2 1/2" STEEL WGR WGS WGS 2 1/2" STEELWGSWGR WGR3" POLY3" POLYH3H2LPLR LPLR 4HPVRsHPVRHPVRHPVR3120 GALHPVRHPVRHPVRNOTES:WATER TEMPERATURE SENSOR FORICE RINK CONTROL SYSTEM.TEMPERATURE SENSOR TO BECONNECTED TO THE THERMASTORMID-PORT CONNECTION.SOLENOID VALVE REGULATED BY ICERINK CONTROL SYSTEM. SEESPECIFICATION SECTION 131817 FORCONTROL SEQUENCE.COLD WATER PIPING. SEEMECHANICALHOT WATER PIPING. SEE MECHANICALEQUALIZATION PIPEABCDTABCCDDH4LPLR CDEE120 GAL120 GALTATASCALE:SCALE:N.T.S.1SUBFLOOR/SNOWMELT - WASTE HEAT RECOVERY FLOW DIAGRAMSCALE:SCALE:N.T.S.2WATER PREHEAT WASTE HEAT RECOVERY FLOW DIAGRAM (ALTERNATE BID #6)1.SEE SHEET R6.0.GENERAL NOTESKEY NOTES(SEE SPECIFICATIONS FOR CONTROL REQUIREMENTS)1.TEMPERATURE CONTROL FOR 3-WAY VALVE.2.CONTROLLED BY COMPRESSOR OPERATION.No:Consultant:Project:Location:Sheet:CONVENTION CENTER(WSCC)2500 Milton AvenueJanesville, WI 53545Bid Set DocumentsKey Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.com TELEPHONE [414] 4 7 6 . 9 5 0 0 FACSIMILE [414] 4 7 6 . 8 5 8 2Scale:AS INDICATEDDate:Project No.:Sheet No.:Revisions:(Owner) Project No.:10-4-2023220025.00Date:Description:2211 O' Neil Road - Hudson, WI 54016Phone: (651) 256-3090www.B32eng.comWOODMAN'S SPORTS &C2023-15R6.2WASTE HEAT RECOVERYFLOW DIAGRAM10/13/2023Location:2510 Milton AvenueJanesville, WI 5354510/04/2023BID DOCUMENT SET HC HC HC HC HC HC HC HC HC HC HC HC HC HC HC HC HC HC HC HC HC HC DN 11' - 0"11' - 0"7' - 0"7' - 6"7' - 6"31' - 10 1/2"31' - 10 1/2"5' - 0"32' - 0"8' - 0"8' - 0"8' - 0"32' - 0"5 2 1 4 5 88 8 8 8 8 7 6 7 51 4 51 1 5 1 5 1 5 5 3 9 9 5 2 1 5 6 7 6 7 8 3 5 2 4 51 41 1 5 1 1 DB5.0 __________ 2 DB5.0 __________ 3 DB5.1 __________ TO FACE OF DASHERS 85' - 0"6' - 0"6' - 0"2 DB5.1 __________ 1 DB5.1 __________ 5' - 0" 5' - 0"64' - 4"11' - 0"64' - 0"25' - 0"25' - 0"64' - 0"11' - 0"TO FACE OF DASHERS200' - 0"64' - 0"25' - 0"25' - 0"64' - 0"4 DB5.1 __________ 5 DB5.1 __________ 7 DB5.1 __________ 10 10 10 10 5 6 DB5.1 __________ B C B C A D A A E D C B B B C C BB C E A C C TO FACE OF DASHERS 85' - 0"TO FACE OF DASHERS200' - 0"T O F A C E OF D A S H E R S R 2 8' - 0" T O F ACE OF D A S H E R SR 2 8' - 0" 16' - 0" 10 10 16' - 0" MERCYHEALTH ARENA MULTIPURPOSE ARENA 3 DB5.0 __________ 2 DB5.0 __________ A 1 DB5.0 __________ 4 DB5.1 __________ 3 DB5.1 __________ 8 DB5.1 __________ 9 DB5.1 __________ 6 DB5.1 __________ 6 DB5.1 __________ 6 DB5.1 __________ 7 DB5.1 __________ 8 DB5.1 __________ MERCYHEALTH ARENA KEYNOTES: X GENERAL NOTES: 1. FIELD VERIFY ALL DIMENSIONS PRIOR TO MANUFACTURING. 2. SPECIFIED SHIELDING HEIGHT SHALL BE MEASURED FROM TOP OF TOPSILL TO TOP OF SHIELDING. 3. RUBBER FLOORING TO BE FURNISHED AND INSTALLED IN ALL PLAYER, PENALTY, CAMERA AND OFFICIALS BOXES. (TYP.) VERIFY COLOR WITH ARCHITECT. 4. ANCHORS SHALL BE INSTALLED IN RINK FLOOR PRIOR TO PLACEMENT OF CONCRETE. COORDINATE INSTALLATION WITH ICE RINK CONTRACTOR. 5. SEE SPECIFICATIONS FOR ALTERNATE BID ITEMS. 1. 6'-0" HIGH TEMPERED GLASS SHIELDING WITH ALUMINUM SUPPORT POST SYSTEM. 2. 6'-0" HIGH ALUMINUM SUPPORTED TEMPERED GLASS SHIELDING @ BACK AND SIDE WALLS OF PLAYERS BOXES. NO GLASS @ FRONT WALL. 3. 6'-0" HIGH ALUMINUM SUPPORTED TEMPERED GLASS SHIELDING @ FRONT WALL, BACK AND SIDE WALLS OF PENALTY AND OFFICALS BOXES. 4. 15'-0" HIGH BLACK NYLON NETTING AND SUPPORTS. 5. FULL BACKER PANEL AROUND ENTIRE PERIMETER OF RINK WITH POLY GAP FILLER ALONG ALL RAISED SURFACES. 6. SCORERS BOX WITH 1'-8" X 7'-0" LONG POLY TABLE. SEE SECTION FOR MORE DETAIL. 7. PENALTY BOX WITH 6'-0" LONG BENCH. SEE SECTIONS FOR MORE DETAIL. 8. PLAYERS BOX WITH 25'-0" LONG BENCHES AND RAISED COACHES WALKWAY. SEE SECTIONS FOR MORE DETAIL. 9. EXTERNAL SUPPORT POSTS ON EACH SIDE OF GATE. (TYP. OF 2) 10. CAMERA HOLE IN SHEILDING. (TYP. OF 4) MULTI PURPOSE ARENA KEYNOTES: X 1. 6'-0" HIGH TEMPERED GLASS SHIELDING WITH ALUMINUM SUPPORT POST SYSTEM. 2. 6'-0" HIGH ALUMINUM SUPPPORTED TEMPERED GLASS SHIELDING @ BACK AND SIDE WALLS OF PLAYERS BOXES. NO GLASS @ FRONT WALL. 3. 6'-0" HIGH ALUMINUM SUPPORTED TEMPERED GLASS SHIELDING @ FRONT WALL ,BACK AND SIDE WALLS OF PENALTY AND OFFICIALS BOXES. 4. 15'-0" HIGH BLACK NYLON NETTING AND SUPPORTS. 5. FULL QUICK RELEASE BACKER PANEL WITH POLY GAP FILLER ALONG ALL RAISED SURFACES. ALTERNATE BID #5: ADD PERIMETER OF RINK AS SHOWN. 6. SCORERS BOX WITH 1'-8" X 8'-0" LONG POLY TABLE. SEE SECTION FOR MORE DETAIL. 7. PENALTY BOX WITH 6'-0" LONG BENCH. SEE SECTIONS FOR MORE DETAIL. 8. PLAYERS BOX WITH 28'-0" LONG BENCHES AND RAISED COACHES WALKWAY. SEE SECTIONS FOR MORE DETAIL. 9. EXTERNAL SUPPORT POSTS ON EACH SIDE OF GATE. (TYP. OF 2) 10. TWO 8FT REMOVABLE DASHER BOARD FRAMES FOR ARENA SOCCER. (TYP. OF 2). FURNISH GAP FILLER FRAMES TO BE INTERGRATED WITH DASHER BOARD SYSTEM AND 12FT X 4FT ROLL IN PLACE TYPE SOCCER NET. DASHER GATE SCHEDULE GATE MARK GATE WIDTH THRESHOLD HEIGHT POLY THICKNESS 3"3'-0"A 1 1/4"4'-0"D 1" 3/4" 9"3'-0"B 1" 9"2'-6"C 1" 2"10'-0"E 3/4" Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 2211 O' Neil Road -Hudson, WI 54016 Phone: (651) 256-3090 www.B32eng.com C2023-15 As indicated ICE RINK DASHER BOARD PLAN WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 Bid Set Documents DB1.0 10-4-23 220025.00 1/8" = 1'-0"1 DASHER BOARD PLAN 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET FIRST FLOOR PLAN 100' -0" 0' - 6" 2 1 24 4 22 3 26 1516 3/4" TREATED PLYWOOD RUBBER FLOORING 20 2431 23 20 29 18 17 19 2' - 0"0' - 8"3' - 6"0' - 8"2' - 10"6' - 0"5' - 0" 1' - 2"1' - 0"6' - 0"24 0' - 6" DB5.0 5 DB5.0 4 FIRST FLOOR PLAN 100' -0" 2 1 24 4 22 3 26 16 20 24 31 23 20 29 18 17 19 15 17 6' - 0"3' - 6"0' - 6"0' - 8"2' - 0"1' - 0" 23 3/4" TREATED PLYWOOD RUBBER FLOORING6' - 0"0' - 6"6' - 0"0' - 6" 5' - 0" DB5.0 4 DB5.0 5 ELEVATION SECTION 40 SUCTION CUPS 46 42 48 41 50 47 45 SHIELDING 46 45 45 43484744 50 41 42 46 8 1 23 48 444043 49 SHIELDING SEAM POLY CLIP 40 KEY NOTES: 40 3/16" COATED AIRCRAFT CABLE41 4042 4043 4044 4045 4046 4047 4048 4049 4050 1/8" COATED AIRCRAFT CABLE BOUNDED EDGE BRASS GROMMET NETTING CABLE CLAMP CONTINUOUS RIGID CONDUIT METAL CLIPS EYE BOLT IN SUPPORT POST ROOF STRUCTURE ITEM THICKNESS (IN.)WIDTH/HEIGHT (IN.)LENGTH (IN.) BOX MATERIAL KEY NOTE POLYETHYLENE MATERIAL ROUTED EDGE (IN.)COLOR * FLOOR AND COACHES WALK: BENCH SUPPORTS: KEY NOTE COMPONENT DIMENSIONS (INCHES) -MIN. REQ.SHAPE ALUMINUM FRAME SYSTEM (BASE BID) DIMENSIONS (INCHES) -MIN. REQ. SHAPE STEEL SYSTEM FACING LINE MARKINGS KICKPLATE TOP SILL BACKER SCORER'S TABLE BENCHES 1/2 1/2 1/2 3/4 3/8 1 FULL PANEL 2 GOAL, 12 OTHER 8 FULL PANEL INCL. FACE AND BACKER FULL PANEL 20 x 96 12 FULL PANEL FULL PANEL HEIGHT FULL PANEL FULL PANEL FULL PANEL FULL BOX SEE DRAWING 1/4 TOP EDGE 1/4 TOP OF KICKPLATE 1/4 FRONT AND BACK NONE 1/4 ON FRONT TOP 3/8 TOP EDGES, 1/4 BOTTOM EDGE WHITE PER PLAN YELLOW RED WHITE 1 1/2 x 1 1/2 x 1/8 @ 16" O.C.TUBE 1 1/2 x 2 1/2 x 1/8 TUBE 2 1/2 x 2 1/2 x 1/8 ZINC PLATED STEEL HSS 3 1/2 x 3 1/2 x 1/4 ZINC PLATED STEEL ANGLE 1/8 x WIDTH OF BENCH PLANK 15 BASE FRAME 16 ADJUSTABLE LEGS 17 VERTICAL SUPPORTS (REMOVABLE WITH SLEEVE) 4'-0" O.C. MIN. 18 HORIZONTAL SUPPORTS 19 UNDERSTRUCTURE TOP FRONT STRINGER, STRAIGHT SECTION (HORIZONTAL) 2 3 TOP BACK STRINGER (HORIZONTAL) 5 BOTTOM BACK STRINGER (HORIZONTAL) END PLATES (VERTICAL) 1 INTERMEDIATE POSTS (VERTICAL)-PANELS OVER 48" IN LENGTHNOT SHOWN 1 TOP FRONT STRINGER, CURVED SECTION (HORIZONTAL.) 4 BOTTOM FRONT STRINGER (HORIZONTAL) 1 1/2 x 3 x 1/8 TUBE 1 1/2 x 3 x 1/8 TUBE 1/4 x 6 WITH 1 1/2 FLANGE FOR FRONT SIDE ONE 1 1/2 x 3 x 3/16 AND 3" FLANGE FOR GATE HARDWARE ON BACK. TUBE REINFORCED CORNERS, SLOTTED FOR SHIELDING. PIECE EXTRUSION 1 1/2 x 3 x 1/8 1 x 3 x 1/8 TUBE 1 1/2 x 3 x 3/16 CHANNEL CHANNEL 10 ANCHOR PLATES (2 PER PANEL) 5 1/4 x 4 1/2 WITH 3/4 HOLE IN CENTER PLATE INTERMEDIATE POST FOR BACKER PANELS INTERMEDIATE POSTS (VERTICAL)-PANELS OVER 60" IN LENGTH 20 22 23 24 25 28 MIDDLE FRONT STRINGER, STRAIGHT SECTION (HORIZONTAL) TUBE1 1/2 x 3 x 1/8 MIDDLE BACK STRINGER, STRAIGHT SECTION (HORIZONTAL)TUBE1 1/2 x 3 x 1/8 6 11 BACKER 1/2 FULL PANEL FULL PANEL NONE WHITE 29 ANCHOR BOLTS AND WASHER (2 PER PANEL)5/8 x 2 BOLT 12 ANCHOR INSERT - THREADED 3 BOLT 13 GAP CLOSURE-POLY 1/4 3 X 3 SEE SPEC FRONT EDGE WHITE31 1 1/2 x 3 x 1/8 1 1/2 x 3 x 1/8 TUBE TUBE 1 1/2 NOT SHOWN NOT SHOWN NOT SHOWN WHITE BLACK WATER BOTTLE SHELVES WHITE 26 1/4 TOP EDGE PRECAST ANCHOR INSERTS - THREADED FULL DEPTH OF FLOOR BOLT14 1/2 FULL PANEL FULL PANEL NONE 1 1/2 x 1 1/2 x 1/8 @ 16" O.C. TUBE 1 1/2 x 2 1/2 x 1/8 TUBE 2 1/4 x 2 1/4 x 12 GAUGE TUBE 3 1/2 x 3 1/2 x 1/4 ANGLE ZINC PLATED STEEL 1/8 x WIDTH OF BENCH PLANK ANGLE TUBE ANGLE ANGLE 2 x 2 x 3/16 2 x 2 x 3/16 1 x 1 x 14 GAUGE 2 x 2 x 1/4 2 x 1 1/2 x 1/4 ANGLE 2 x 6 x 11 GAUGE W/ 3/4" CHANNEL RETURN EDGES 5 x 5 x 1/2 PLATE 1 x 2 x 14 GAUGE TUBE 3 x 2 x 11 GAUGE TUBE ANGLE2 x 2 x 3/16 ANGLE2 x 2 x 3/16 5/8 x 2 BOLT 3 BOLT DASHER BOARD MATERIAL SCHEDULE 3/8" 6" 1/2" 8" 5 22 25 6 11 12 14 PERIMETER CONCRETE. SEE STRUCTURAL EXPANSION JOINT. SEE DETAIL ICE-81 1/2" 6" 1/2" 5 25 6 13 11 12 25 FIRST FLOOR PLAN 100' -0" 5' - 0" 0' - 6" 0' - 6"3' - 6"6' - 0"6' - 0"6' - 0"2 1 24 4 22 3 10 23 20 28 (3 TOTAL) 16 20 24 31 15 23 3/4" TREATED PLYWOOD RUBBER FLOORING0' - 8"0' - 8"3" DIA. SPEAKER HOLE 5'-0" ABOVE ICE SURFACE DB5.0 4 DB5.0 5 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 2211 O' Neil Road -Hudson, WI 54016 Phone: (651) 256-3090 www.B32eng.com C2023-15 As indicated ICE RINK DASHER BOARD SECTIONS AND DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 Bid Set Documents DB5.0 10-4-23 220025.00 3/4" = 1'-0"1 MERCYHEALTH ARENA @ PLAYERS BOX 3/4" = 1'-0"2 MERCYHEALTH ARENA @ PENALTY BOX 3" = 1'-0"5 DASHER BOARD ANCHOR DETAIL 3" = 1'-0"4 DASHER BOARD ANCHOR DETAIL 2 3/4" = 1'-0"3 MERCYHEALTH ARENA @ OFFICALS BOX 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET FIRST FLOOR PLAN 100' -0" 0' - 6"0' - 8"3' - 6"6' - 0"2 1 24 4 22 3 23 20 DB5.0 5 FIRST FLOOR PLAN 100' -0" 0' - 6"3' - 6"0' - 8"6' - 0"2 1 24 4 22 3 23 20 31BEGIN AT RAMPS IN CORNERS DB5.0 5 FIRST FLOOR PLAN 100' -0"2' - 10"0' - 6"0' - 8"3' - 6"6' - 0"2 1 24 4 22 3 23 20 31 DB5.0 5 FIRST FLOOR PLAN 100' -0" 0' - 6"0' - 8"3' - 6"0' - 6"3' - 6"6' - 0"2' - 10"1' - 2"1' - 0" 1516 5' - 0"0' - 8"2' - 0"0' - 8"1' - 4" 2 1 24 4 22 3 26 1516 20 23 23 20 29 18 17 19 3/4" TREATED PLYWOOD RUBBER FLOORING ALTERNATE BID AS SPECIFIED 24 DB5.0 4 DB5.0 5 FIRST FLOOR PLAN 100' -0" 0' - 6"0' - 8"3' - 6"6' - 0"2 1 24 4 22 3 23 20 DB5.0 51' - 6"FIRST FLOOR PLAN 100' -0" 0' - 6"0' - 8"3' - 6"6' - 0"2' - 0"2 1 24 4 22 3 23 20 DB5.0 51' - 6"FIRST FLOOR PLAN 100' -0" 0' - 6"0' - 8"3' - 6"6' - 0"2 1 24 4 22 3 23 20ALTERNATE BID AS SPECIFIED DB5.0 5 FIRST FLOOR PLAN 100' -0" 2 1 24 4 22 3 10 23 20 28 1615 5' - 0" 0' - 6"0' - 6"0' - 8"3' - 6"6' - 0"6' - 0"3' - 6"0' - 8"3/4" TREATED PLYWOOD RUBBER FLOORING 2024 23 ALTERNATE BID AS SPECIFIED (3 TOTAL) DB5.0 4 DB5.0 5 3" DIA. SPEAKER HOLE 5'-0" ABOVE ICE SURFACE FIRST FLOOR PLAN 100' -0" 15160' - 8"15162' - 0"0' - 6" 0' - 6" 1' - 0"0' - 8"6' - 0"3' - 6"5' - 0" 3' - 6" 0' - 6"3' - 6"6' - 0"2 1 24 4 22 3 26 20 24 23 20 29 18 17 19 17 23 3/4" TREATED PLYWOOD RUBBER FLOORING ALTERNATE BID AS SPECIFIED DB5.0 4 DB5.0 5 Consultant: Project: Location: Sheet: Key Plan:2122 W. Mount Vernon Avenue | Milwaukee, WI 53233 | zastudios.comTELEPHONE [414] 4 7 6 . 9 5 0 0FACSIMILE [414] 4 7 6 . 8 5 8 2Scale: Date: Project No.: Sheet No.: Revisions: (Owner) Project No.: No:Date:Description: 2211 O' Neil Road -Hudson, WI 54016 Phone: (651) 256-3090 www.B32eng.com C2023-15 3/4" = 1'-0" ICE RINK DASHER BOARD SECTIONS AND DETAILS WOODMAN'S SPORTS & CONVENTION CENTER (WSCC) 2500 Milton Avenue Janesville, WI 53545 Bid Set Documents DB5.1 10-4-23 220025.00 3/4" = 1'-0"1 MERCYHEALTH ARENA @ FLOOR (N) 3/4" = 1'-0"2 MERCYHEALTH ARENA @ FLOOR (S) 3/4" = 1'-0"5 MULTIPURPOSE ARENA @STADIA 3/4" = 1'-0"7 MULTIPURPOSE ARENA @ PLAYERS BOX 3/4" = 1'-0"3 MERCYHEALTH ARENA @ STADIA (E) 3/4" = 1'-0"4 MERCYHEALTH ARENA @ STADIA (W) 3/4" = 1'-0"6 MULTIPURPOSE ARENA @ FLOOR 3/4" = 1'-0"9 MULTIPURPOSE ARENA @ OFFICALS BOX3/4" = 1'-0"8 MULTIPURPOSE ARENA @ PENALTY BOX 10/13/2023 Location: 2510 Milton Avenue Janesville, WI 53545 10/04/2023 BID DOCUMENT SET