Loading...
C2023-15 Bid TabC2023‐15 Woodman's Sports & Convention Center (#8729547)Owner: Janesville WI, City ofSolicitor: Janesville WI, City of12/19/2023 02:00 PM CSTJP Cullen & Sons, Inc. Miron Construction Co., Inc. Pepper Construction of Wisconsin Sports ImportsSection TitlLine Item Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price ExtensionBase Bid ‐ Lump Sum$35,612,538.00 $36,297,073.00 $36,900,000.00 $0.0011RAll labor and miscellaneous products, materials, equipment and appliances necessary to complete all the Work as described in Divisions 00 thru 33 and all project documents. LS 1 $35,612,538.00 $35,612,538.00 $36,297,073.00 $36,297,073.00 $36,900,000.00 $36,900,000.00Mandatory Alternate Bid Items$2,478,445.00 $2,680,223.00 $2,555,780.00 $0.001A 1AAmount to be added to Base Bid for construction required for the inclusion of a fourth basketball court in the Project Scope, as described in the project documents. LS 1 $1,497,090.00 $1,497,090.00 $1,549,858.00 $1,549,858.00 $1,400,273.00 $1,400,273.002A 2AAmount to be added to Base Bid to construct a new core and shell space to the south of the building for a future locker room expansion, as described in the project documents.  LS 1 $592,417.00 $592,417.00 $636,822.00 $636,822.00 $670,564.00 $670,564.003A 3AAmount to be added to Base Bid to construct three (3) separate locker rooms with coaches offices to a previously built core and shell space, as described in the project documents.  LS 1 $366,725.00 $366,725.00 $471,161.00 $471,161.00 $453,412.00 $453,412.004A 4AAmount to be added to Base Bid to furnish and install a reverse osmosis system in Mechanical Rm 168.  Note: Installation of required plumbing lines for the system shall be included in the Base Bid. LS 1 $55,722.00 $55,722.00 $56,108.00 $56,108.00 $54,662.00 $54,662.005A 5AAmount to be added to Base Bid to furnish and install backer panel with quick release fastener system for Multipurpose Arena as described in the project documents. (Refer to Sheet DB100.) LS 1 $5,117.00 $5,117.00 $5,160.00 $5,160.00 $14,762.00 $14,762.006A 6AAmount removed from the Base Bid to remove water preheat waste heat recovery system as described in the project documents.  (Enter unit price as positive.) LS‐1 $38,626.00($38,626.00)$38,886.00($38,886.00)$37,893.00($37,893.00)Base Bid Total:$35,612,538.00 $36,297,073.00 $36,900,000.00 $0.00