Loading...
Bid Schedule C-2023 Award Memo1 ENGINEERING DIVISION MEMORANDUM April 24, 2023 TO: City Council FROM: Brad Reents, City Engineer SUBJECT: Consideration and action to award contract for Bid Schedule “C” – 2023: C2023-13 Water Utility Cold Storage Building C2023-14 Hedberg Public Library Children’s Room Renovation Relates to Strategic Plan Strategic Goal - Infrastructure These contracts support the City’s efforts to maintain existing infrastructure and continue to provide municipal services. Executive Summary Bids for C2023-13 Water Utility Cold Storage Building and C2023-14 Hedberg Public Library Children’s Room Renovation were opened on Wednesday, March 29, 2023. City Recommendation The City recommends awarding contracts C2023-13 Water Utility Cold Storage Building and C2023-14 Hedberg Public Library Children’s Room Renovation as well as expressing the intent to borrow funds as outlined in the memo. Suggested Motion I move to award contracts C2023-13 Water Utility Cold Storage Building and C2023-14 Hedberg Public Library Children’s Room Renovation. Background The following is a summary of the two (2) contracts: C2023-13 Water Utility Cold Storage Building This contract is for constructing a new 7,500 square foot pre-engineered metal building with an exterior 1,250 square foot covered storage area. The new building will provide additional vehicle, equipment, and material storage for the Water Utility. Currently, a significant number of items are being stored inside the existing building, thus hindering operational efficiency. The proposed structure will add storage capacity to help free up much-needed space for items requiring climate-controlled storage. In addition, this building will store materials currently stored outside, protecting the Utility’s investment and improving access to these materials during winter months. The Plan Commission completed an architectural review of the proposed building on January 3, 2023, and unanimously endorsed the architectural design by a 6-0 vote. 2 C2023-14 Hedberg Public Library Children’s Room Renovation This contract is for replacing approximately 11,000 square feet of acoustic ceiling tile, installing new LED lighting, and painting walls within the children’s room at the Hedberg Public Library. The new lighting and acoustical ceiling tiles will match previous library renovations. Options • Approve City recommendation to award contracts C2023-13 and C2023-14. • Refer back to staff with guidance on how the Council wishes to proceed. • Do not take action on the contracts as recommended by staff. Analysis C2023-13 Water Utility Cold Storage Building – Staff received two (2) bid(s), with Gilbank Construction Inc. providing the lowest bid. The consultant’s contract estimate was $800,000.00. The Engineering Division is recommending award of this contract to Gilbank Construction Inc., Clinton, WI, for a total contract amount of $517,700.00. Gilbank Construction, Inc. 301 Scot Drive Clinton WI 53525 Total Bid: $517,700.00 Advanced Building Corporation 4125 Terminal Drive, Suite 100 McFarland WI 53558 Total Bid: $751,700.00 Anticipated Project Costs: Contract $517,700.00 A/E Consulting Fees $40,000.00 Construction Contingency (8%) $42,300.00 Total $600,000.00 Project Funding: 2023 Note – Water Utility Borrowing $350,000.00 2024 Note – Water Utility Borrowing $250,000.00 Total $600,000.00 C2023-14 Hedberg Public Library Children’s Room Renovation – Staff received three (3) bid(s), with Corporate Contractors, Inc. providing the lowest bid. The consultant’s contract estimate was $429,133.00. The Engineering Division is recommending award of this contract to Corporate Contractors Inc., Beloit, WI, for a total bid amount of $345,240.00. Corporate Contractors, Inc. 3800 Gateway Blvd., Suite 200 Beloit WI 53511 Total Bid: $345,240.00 Glen Fern Construction, LLC 705 Madison St., #101 Lake Geneva WI 53147 Total Bid: $395,700.00 3 Gilbank Construction Inc. 301 Scot Drive Clinton WI 53525 Total Bid: $469,300.00 Anticipated Project Costs: Contract Base Bid $345,240.00 A/E Fees $88,900.00 Construction Contingency (10%) $34,534.00 Total $468,674.00 Project Funding: 2022 Hedberg Public Library Operating Funds $70,400.00 2023 Hedberg Public Library Friends and Foundation Funds $25,000.00 2023 Hedberg Public Library Fund Balance $373,274.00 Total $468,674.00 Conclusions These contract support tasks listed in the 2023-2027 Strategic Plan. All low-bid contractors have completed projects for the City in the past. Restated City Recommendation The City recommends awarding contracts C2023-13 Water Utility Cold Storage Building and C2023-14 Hedberg Public Library Children’s Room Renovation as well as expressing the intent to borrow funds as outlined in the memo. cc: David J. Moore, Acting City Manager Ryan McCue, Deputy City Manager Erin Davis, Assistant to the City Manager Mike Payne, Director of Public Works