Loading...
Bid Schedule A-2023 C2023-6 Award Memo1 ENGINEERING DIVISION MEMORANDUM February 13, 2023 TO: City Council FROM: Brad Reents, City Engineer SUBJECT: Consideration and action to award contract for Bid Schedule “A” - 2023: C2023-6 Water & Sewer System Improvements II Relates to Strategic Plan Strategic Goal - Infrastructure This contract supports the City’s efforts to maintain existing infrastructure and continue to provide municipal services. Executive Summary The City opened bids for C2023-6 Water & Sewer System Improvements II on January 25, 2023. City Recommendation The City recommends awarding contract C2023-6 Water & Sewer System Improvements II as well as expressing the intent to borrow funds as outlined in the memo. Suggested Motion I move to award contract C2023-6 Water & Sewer System Improvements II with the intent to borrow funds as outlined in the memo. Background The following is a summary of the contract: C2023-6 Water & Sewer System Improvements II This is an annual contract for water and sewer improvements along streets identified in the City’s street rehabilitation program. Needs for utility improvements are based on a condition assessment completed by the City. More specifically, work under this contract includes the following: • Replacement of approximately 7,600 LF of water main and 850 LF of storm sewer • Replacement of 70 lead water services • Replacement and/or rehabilitation of 80 sanitary structures, water valve structures, storm structures, and storm inlets. Options • Approve City recommendation to award contract C2023-6. • Refer back to staff with guidance on how the Council wishes to proceed. • Do not take action on the contracts as recommended by staff. 2 Analysis C2023-6 Water & Sewer System Improvements II Staff received four (4) bids with R.T. Fox Contractors, Inc. providing the lowest bid. The contract estimate was $2,495.800.00. The Engineering Division is recommending award of this contract to R.T. Fox Contractors, Inc., Edgerton, WI for a total bid amount of $2,284,465.50. R.T. Fox Contractors, Inc. PO Box 331 Edgerton WI 53534 Total Bid: $2,284,465.50 Maddrell Excavating, LLC N3371 W 3rd Avenue Brodhead WI 53520 Total Bid: $2,597,775.40 Rock Road Companies, Inc. PO Box 1818 Janesville WI 53547 Total Bid: $2,975,660.44 Fischer Excavating 1567 N. Heine Road Freeport IL 61032 Total Bid: $3,101,229.75 Anticipated Project Costs: Contract 2,284,465.50 Engineering & Contingency (8%) 182,757.24 Total $2,467,222.74 Project Funding: 2023 Operating – Water Utility – Water Main Replacement 1,394,152.74 2023 Note – Water Utility – Lead Water Service Replacement 272,694.60 2023 Note – Water Utility – Hydrant & Hydrant Lead Replacement 126,900.00 2023 Note – Water Utility – Structure and Valve Replacement 62,424.00 2023 Operating – WW Utility – Structure Replacement / Rehabilitation 122,796.00 2023 Operating – SW Utility – Structure & Inlet Replacement/Rehab 261,738.00 2023 Operating – SW Utility – Storm Sewer Maintenance 214,817.40 2023 Note – Public Works Reimbursable 11,700.00 Total $ 2,467,222.74 Conclusions This contract supports tasks listed in the 2023-2026 Strategic Plan. Restated City Recommendation The City recommends awarding contract C2023-6 Water & Sewer System Improvements II as well as expressing the intent to borrow funds as outlined in the memo. cc: David J. Moore, Acting City Manager Ryan McCue, Deputy City Manager Nick Faust, Communications Specialist Mike Payne, Director of Public Works