Loading...
Bid Schedule E Award Memo1 ENGINEERING DIVISION MEMORANDUM October 25, 2021 TO: City Council FROM: Mike Payne, City Engineer SUBJECT: Consideration and action to award contract for Bid Schedule “E” - 2021: C2021-14 Sanitary and Storm Sewer Lining Relates to Strategic Plan Strategic Goal - Infrastructure This contract supports the City’s efforts to maintain existing infrastructure and continue to provide municipal services. Executive Summary Bids for C2021-14 Sanitary and Storm Sewer Lining were opened on October 6, 2021. City Recommendation The City recommends awarding contracts C2021-14 Sanitary and Storm Sewer Lining as well as expressing the intent to borrow funds as outlined in the memo. Suggested Motion I move to award contract C2021-14 Sanitary and Storm Sewer Lining, as outlined in the memo. Background C2021-14 Sanitary and Storm Sewer Lining – For furnishing all labor, materials, equipment, and performing all work necessary for the cured-in-place (CIP) trenchless lining rehabilitation and selective joint grouting of approximately 26,200 LF of 8”-27” diameter sanitary and storm sewer in various locations. There were five (5) qualified plan holders. The contract estimate was $1,103,107.00. Staff received two (2) bids with Visu Sewer Inc. providing the lowest bid. The Engineering Division is recommending award of this contract to Visu Sewer, Inc. of Pewaukee, WI for a total bid amount of $942,771.15. Visu Sewer, Inc. W230 N4855 Betker Drive, Pewaukee, WI-53072 Total Bid: $942,771.15 Insituform Technologies 580 Goddard Ave Chesterfield, MO-63005 Total Bid: $2,028,928.10 2 Anticipated Project Costs: Contract 942,771.15 Contingency (10%) 92,228.85 Total $1,035,000.00 Project Funding: 2021 – WW Utility (lining) 800,000.00 2020 and 2021 Operating Budget SW Utility (lining) 235,000.00 Total $1,035,000.00 Options • Approve City recommendation award contracts C2021-14. • Refer back to staff with guidance on how the Council wishes to proceed. • Do not take action on the contract as recommended by staff. Analysis Included in the ‘Background’ section. Conclusions This contract supports tasks listed in the 2020-2024 Strategic Plan. Restated City Recommendation The City recommends awarding contract C2021-14 Sanitary and Storm Sewer Lining as well as expressing the intent to borrow funds as outlined in the memo. cc: Mark Freitag, City Manager Ryan McCue, Deputy City Manager Erin Davis, Assistant to the City Manager Paul Woodard, Director of Public Works