Bid Schedule B Award Memo1 ENGINEERING DIVISION MEMORANDUM March 22, 2021 TO: City Council FROM: Mike Payne, City Engineer SUBJECT: Consideration and action to award contract for Bid Schedule “B” - 2021: C2021-4 Landfill Phase 4 Gas System C2021-6 Water & Sewer System Improvements II C2021-7 Street Rehabilitation C2021-8 Main Street Rehabilitation C2021-9 Public Lead Service Replacements Relates to Strategic Plan Strategic Goal - Infrastructure These contracts support the City’s efforts to maintain existing infrastructure and continue to provide municipal services. Executive Summary Bids for C2021-4 Landfill Phase 4 Gas System, C2021-6 Water & Sewer System Improvements II, C2021-7 Street Rehabilitation, C2021-8 Main Street Rehabilitation and C2021-9 Public Lead Service Replacements were opened on March 3, 2021. Contract C2021-5 WWTP Headworks Project was moved to Bid Schedule C at the request of Utility Director Dave Botts. City Recommendation The City recommends awarding contracts C2021-4 Landfill Phase 4 Gas System, C2021-6 Water & Sewer System Improvements II, C2021-7 Street Rehabilitation, C2021-8 Main Street Rehabilitation and C2021-9 Public Lead Service Replacements as well as expressing the intent to borrow funds as outlined in the memo. Suggested Motion I move to award contracts C2021-4 Landfill Phase 4 Gas System, C2021-6 Water & Sewer System Improvements II, C2021-7 Street Rehabilitation, C2021-8 Main Street Rehabilitation and C2021-9 Public Lead Service Replacements, as outlined in the memo. Background C2021-4 Landfill Phase 4 Gas System – For furnishing all the labor, materials, equipment, and doing all the work necessary for construction of a landfill gas system to include: gas well installation, gas header and laterals, gas well heads, valve and control assemblies, well repairs and abandonment, leachate cleanout modification, site restoration, and incidentals for Landfill Phase 4 Gas System Improvements. There were six (6) qualified plan holders. The contract estimate was $210,300.00. Staff received one (1) bid with Landfill Drilling & Piping, Inc. providing the lowest bid. The Engineering Division 2 is recommending award of this contract to Landfill Drilling & Piping, Inc. of Sun Prairie, WI for a total bid amount of $170,036.50. Landfill Drilling & Piping, Inc. 772 Lois Drive Sun Prairie, WI 53590 Total Bid: $170,036.50 Anticipated Project Costs: Contract 170,036.50 Engineering & Contingency (11%) 18,963.50 Consulting 36,000.00 Total $225,000.00 Project Funding: 2021 Note – Sanitation Fund 225,000.00 Total $225,000.00 C2021-6 Water and Sewer System Improvements II – For furnishing all the labor, materials, equipment, and doing all the work necessary for the construction of the following approximate quantities: 6,750 LF of 6”-8” replacement water main; reconnection, replacement, or abandonment of 95 water services; 350 LF of new 8” water main; 690 LF of new 8” sanitary sewer; 610 LF of new 12” storm sewer; replacement or rehabilitation of 50 sanitary structures, water valve structures, storm structures, and storm inlets; and associated street and non-paved surface restoration. There were five (5) qualified plan holders. The contract estimate was $1,810,461.00. Staff received three (3) bids with R.T. Fox Contractors, Inc. providing the lowest bid. The Engineering Division is recommending award of this contract to R.T. Fox Contractors, Inc. of Edgerton, WI for a total bid amount of $1,507,207.70. R.T. Fox Contractors, Inc. PO Box 331 Edgerton, WI 53534 Total Bid: $1,507,207.70 Maddrell Excavating, LLC N3371 W 3RD AVENUE Brodhead, WI 53520 Total Bid: $1,694,234.70 Fischer Excavating, Inc. 1567 N Heine Rd Freeport, IL 61032 Total Bid: $1,986,172.70 Anticipated Project Costs: Contract 1,507,207.70 Engineering & Contingency (10%) 152,792.30 Total $1,660,000.00 3 Project Funding: 2021 Operating – Water Utility – Water Main Replacement 1,056,000.00 2021 Note – Water Utility – Lead Service Replacement 30,000.00 2021 Note – Water Utility – Hydrant & Lead Replacement 76,000.00 2021 Note – Water Utility – Valve & Structure Replacement 3,000.00 2021 Operating – WW Utility – Structure Rehabilitation & Replacement 130,000.00 2021 Operating – SW Utility – Structure / Inlet Rehab & Replacement 90,000.00 2021 Note – SW Utility – Beloit Ave Storm Sewer Extension 145,000.00 2021 Note – WW Utility – Assessable Sanitary on Summit Drive 55,000.00 2021 Note – WW Utility – Assessable Sanitary on E. Russell Road 37,000.00 2021 Note – Water Utility – Assessable Water Main on E. Russell Road 38,000.00 Total $1,660,000.00 C2021-7 Street Rehabilitation – For furnishing all the labor, materials, equipment, and doing all the work necessary for the construction and completion of approximately 34,700 TONS asphalt paving on existing streets, including 225,000 S.Y. milling; 30,000 S.Y pavement removal; 22,000 C.Y. unclassified excavation; 45,000 TONS aggregate base; 19,000 L.F. epoxy pavement markings; and miscellaneous construction items. There were four (4) qualified plan holders. The contract estimate was $4,383,689.40. Staff received two (2) bids with Rock Road Companies, Inc. providing the lowest bid. The Engineering Division is recommending award of this contract to Rock Road Companies, Inc. of Janesville, WI for a total bid amount of $3,586,510.75. Rock Road Companies, Inc. P.O. Box 1818 301 W. B-R Townline Road Janesville, WI 53547 Total Bid: $3,586,510.75 Payne & Dolan, Inc. 6295 Lacy Road Fitchburg, WI 53593 Total Bid: $3,641,757.12 Anticipated Project Costs: Contract $3,586,510.75 Reconstruct S. Harmony & Hillcrest after water main replacement 235,000.00 Bridge Deck Surface Polymer Overlays 80,000.00 Contingency (11%) 413,489.25 Total $4,315,000.00 Project Funding: Wheel Tax 970,000.00 2021 Note – General Fund – Street Rehabilitation 2,515,000.00 Prior Note – General Fund – Street Rehabilitation (carryover) 500,000.00 2021 Operating – Storm Water Utility – C&G Replacement 45,000.00 2021 Note – General Fund - C&G Replacement 45,000.00 2021 Operating - Storm Water Utility - Storm Sewer Replacement 5,000.00 2021 Note – Water Utility – Main Break Repairs 11,000.00 2021 Operating – Water Utility – Main Replacements 214,000.00 Public Works Reimbursable – Plumbers Ditches 10,000.00 4 Total $4,315,000.00 C2021-8 Main Street Rehabilitation – For furnishing all the labor, materials, equipment, and doing all the work necessary for the construction and completion of a Local Road Improvement Program (LRIP) project on S. Main St., from St. Lawrence to E. Racine St., and safety improvements on E. Racine St., from Forest Park Blvd to Randall Ave including approximately 8,400 S.F. concrete sidewalk and driveway removal and replacement; 5,300 S.F. colored concrete; 1 L.S. concrete pedestrian island, 3,700 L.F. concrete curb and gutter removal and replacement, 500 C.Y. unclassified excavation; 3,200 TONS aggregate base; 1,520 TONS asphalt paving, 7,600 S.Y. milling; 39 decorative street lights and concrete bases; 3,250 L.F. PVC conduit; 24,400 L.F. electrical wire; 1,940 L.F. water main replacement; 30 water service reconnections, replacements or abandonments; 470 L.F. storm sewer replacement; 35 utility structure replacements, removals, rehabilitations or installations; 4,300 L.F. pavement marking removals; 13,800 L.F. epoxy pavement markings; and 820 S.Y. grass restoration. There were seven (7) qualified plan holders. The contract estimate was $1,362,835.75. Staff received two (2) bids with Rock Road Companies, Inc. providing the lowest bid. The Engineering Division is recommending award of this contract to Rock Road Companies, Inc. of Janesville, WI for a total bid amount of $1,145,371.94. Rock Road Companies, Inc. P.O. Box 1818 301 W. B-R Townline Road Janesville, WI 53547 Total Bid: $1,145,371.94 Maddrell Excavating, LLC N3371 W 3RD Avenue Brodhead, WI 53520 Total Bid: $1,214,235.09 Anticipated Project Costs: Contract 1,145,371.94 Reconstruct the pavement following water main replacement 223,641.82 Engineering & Contingency (7%) 97,486.24 Total $1,466,500.00 Project Funding: 2021 Operating - Storm Water Utility – Structure & Inlet Rehabilitation 58,000.00 2021 Note - Storm Water Utility - Storm Sewer Replacement 63,000.00 2021 Operating – WW Utility – Structure Rehabilitation 10,500.00 2021 Operating – Water Utility – Main Replacement 408,000.00 2021 Note – Water Utility – Lead Service Replacement 17,000.00 2021 Note – Water Utility – Hydrant & Lead Replacement 33,000.00 2021 Note – General Fund – Main Street Rehabilitation 800,000.00 2021 Note – General Fund – E. Racine Street Safety Conversion 43,000.00 2021 Note – General Fund – C&G Replacement 21,500.00 2021 Note – General Fund – Assessable C&G Replacement 12,500.00 Total $1,466,500.00 5 C2021-9 Public Lead Service Replacement – For furnishing all the labor, materials, equipment, and doing all the work necessary for the replacement of approximately 125 public side lead water services in locations throughout the City which includes associated traffic control, street restoration, and terrace restoration. There were eight (8) qualified plan holders. The contract estimate was $902,720.00. Staff received five (5) bids with E&N Hughes Co., Inc. providing the lowest bid. The Engineering Division is recommending award of this contract to E&N Hughes Co., Inc. of Monroe, WI for a total bid amount of $765,526.39. E & N Hughes Co. Inc. N2629 Coplien Rd Monroe, WI 53566 Total Bid: $765,526.39 Maddrell Excavating, LLC N3371 W 3RD AVENUE Brodhead, WI 53520 Total Bid: $766,514.50 Five Star Energy Services, LLC W228S7055 Enterprise Drive Big Bend, WI 53103 Total Bid: $785,980.00 R.T. Fox Contractors, Inc PO Box 331 Edgerton, WI 53534 Total Bid: $796,610.00 Mid City Corporation 12930 W. Custer Avenue Butler, WI 53007 Total Bid: $953,057.50 Anticipated Project Costs: Contract 765,526.39 Contingency (4.5%) 34,473.61 Total $800,000.00 Project Funding: 2021 Note – Waste Water Utility 800,000.00 Total $800,000.00 Options • Approve City recommendation award contracts C2021-4, C2021-6, C2021-7, C2021-8 and C2021-9. • Refer back to staff with guidance on how the Council wishes to proceed. • Do not take action on the contracts as recommended by staff. Analysis Included in the ‘Background’ section. 6 Conclusions This contract supports tasks listed in the 2021-2025 Strategic Plan. Restated City Recommendation The City recommends awarding contracts C2021-4 Landfill Phase 4 Gas System, C2021-6 Water & Sewer System Improvements II, C2021-7 Street Rehabilitation, C2021-8 Main Street Rehabilitation and C2021-9 Public Lead Service Replacements as well as expressing the intent to borrow funds as outlined in the memo. cc: Mark Freitag, City Manager Erin Davis, Assistant to the City Manager Paul Woodard, Director of Public Works