Loading...
C2022-8 Bid TabC2022‐8 Black Bridge Reconstruction (MSID) (#8122183) Owner: Janesville WI, City of Solicitor: Janesville WI, City of 03/02/2022 02:00 PM CST Section Title Line Item Item Code Item Description UofM Quantity Unit Price Extension C2022‐8 Black Bridge Road Reconstruction (MSID)$773,348.64 1 1R Traffic Control & Detour LS 1 $62,000.00 $62,000.00 2 2R Temporary Mailboxes LS 1 $2,120.96 $2,120.96 3 3R Sawing Pavement, Full Depth LF 450 $2.70 $1,215.00 4 4R Inlet Protection, Type C EA 17 $55.00 $935.00 5 5R Stone Tracking Pad EA 6 $273.73 $1,642.38 6 6R Int.Curb and Gutter 24" or 30" with Terrace Restoration LF 380 $43.00 $16,340.00 7 7R Int.Curb and Gutter 24" or 30" w/o Terrace Restoration LF 80 $38.00 $3,040.00 8 8R Int.Curb and Gutter 24" with 10" Gutter w/o Terrace Restoration LF 70 $45.00 $3,150.00 9 9R Sidewalk Removal, 4" SF 465 $2.00 $930.00 10 10R Sidewalk or Driveway Removal, 6" to 8" SF 1290 $2.00 $2,580.00 11 11R New Sidewalk, 4" SF 465 $6.00 $2,790.00 12 12R New Sidewalk Curb Ramp, 6" SF 230 $7.50 $1,725.00 13 13R New Sidewalk or Driveway Approach, 6" SF 280 $7.50 $2,100.00 14 14R New Sidewalk or Driveway Approach, 8" SF 660 $8.00 $5,280.00 15 15R Detectable Warning Field Panel, 2'x5' EA 7 $375.00 $2,625.00 16 16R Pavement Removal SY 10500 $3.94 $41,370.00 17 17R 6" Ductile Iron Hydrant Lead LF 45 $171.03 $7,696.35 18 18R Water Main Vertical Offset EA 6 $2,103.45 $12,620.70 19 19R Imported Trench Backfill TON 1920 $1.65 $3,168.00 20 20R New 6" Gate Valve and Valve Box EA 2 $1,868.32 $3,736.64 21 21R New 8" Gate Valve and Valve Box EA 5 $2,488.40 $12,442.00 22 22R Remove Valve Structure Only EA 6 $645.78 $3,874.68 23 23R New Valve Box Only EA 6 $639.61 $3,837.66 24 24R Hydrant and Gate Valve with Valve Box EA 3 $6,893.97 $20,681.91 25 25R Utility Line Opening (ULO) To Determine San. Sewer Service Elev. EA 3 $250.00 $750.00 26 26R Water Main or Service Insulation SY 70 $11.61 $812.70 27 27R Reconnect Existing Water Service EA 20 $1,646.75 $32,935.00 28 28R Water Main Abandonment (Per Street Block) EA 7 $241.87 $1,693.09 29 29R Water Service Abandonment EA 3 $241.87 $725.61 30 30R Water Valve Access Structure Chimney Repair EA 1 $1,668.40 $1,668.40 31 31R Water Valve Access Structure Frame and Lid Only EA 3 $927.60 $2,782.80 32 32R Storm Inlet Structure Removal EA 7 $169.40 $1,185.80 33 33R Storm Access Structure Removal EA 2 $222.45 $444.90 34 34R New Storm Access Structure, 60" Diam., Excluding Frame & Lid EA 1 $7,058.59 $7,058.59 35 35R New Storm Inlet/Access Structure, 72" Diam., Excluding Frame & Grate EA 1 $7,331.94 $7,331.94 36 36R New Storm Inlet, 2'x3', Excluding Frame & Grate EA 4 $5,219.53 $20,878.12 37 37R New Storm Inlet, 2' x 3' with 18" Sump, Excluding Frame & Grate EA 2 $5,203.03 $10,406.06 38 38R Storm Access Structure Frame & Lid Only EA 2 $724.37 $1,448.74 39 39R Storm Inlet Frame and Type VB Grate (Combined) EA 1 $864.96 $864.96 40 40R Storm Inlet Grate Only, Type V EA 3 $315.82 $947.46 41 41R Storm Inlet Grate Only, Type VB EA 5 $315.82 $1,579.10 42 42R Storm Access Structure Invert/Bench Repair EA 1 $1,592.23 $1,592.23 43 43R Remove Storm Sewer, 18" LF 22 $24.96 $549.12 44 44R Sanitary Access Structure, 48", Replace Barrel Section, Complete EA 3 $3,356.75 $10,070.25 45 45R Unclassified Excavation CY 4800 $11.79 $56,592.00 46 46R Proof Rolling STA. 22 $16.03 $352.66 47 47R Subgrade Stabilization Geogrid (Undistributed) SY 4400 $1.58 $6,952.00 48 48R Crushed Limestone Base, 3" Dense TON 8760 $11.07 $96,973.20 49 49R Crushed Limestone Base, 3/4" Dense TON 2900 $11.68 $33,872.00 50 50R Adjusting Storm and Water Valve Access Structure Frame EA 11 $258.98 $2,848.78 51 51R Adjusting Sanitary Access Structure Frame EA 8 $462.10 $3,696.80 52 52R Asphaltic Concrete Pavement, 4 LT Lower Layer, 3.5" TON 2260 $57.24 $129,362.40 53 53R Asphaltic Concrete Pavement, 4 MT Upper Layer, 2.5" TON 1600 $60.85 $97,360.00 54 54R Void Reducing Asphalt Membrane (VRAM) LF 3630 $2.57 $9,329.10 55 55R Asphalt Driveway or Parking Lot Restoration SF 60 $1.85 $111.00 56 56R Terrace Restoration (Non sidewalk or curb replacement) SF 800 $4.61 $3,688.00 57 57R Pavement Marking, Epoxy, Yellow, 4" LF 1420 $1.75 $2,485.00 58 58R Pavement Marking, Epoxy, Yellow, 4" Skip LF 365 $1.75 $638.75 59 59R Pavement Marking, Epoxy, White, 6" Crosswalk LF 150 $8.90 $1,335.00 60 60R Pavement Marking, Epoxy, White, 8" Channelizing, Solid LF 330 $2.50 $825.00 61 61R Pavement Marking, Epoxy, White, 8" Channelizing, Skip LF 90 $2.50 $225.00 62 62R Pavement Marking, Epoxy, White, 18" Stop Bar LF 34 $16.20 $550.80 63 63R Pavement Marking, Epoxy, White, Arrow, Type 2 EA 6 $260.00 $1,560.00 64 64R Pavement Marking, Epoxy, White, Arrow, Type 3 EA 2 $340.00 $680.00 Rock Road Companies, Inc. 65 65R Pavement Marking, Epoxy, White, Words EA 1 $285.00 $285.00 Alternate 1 $198,784.60 66 66A New 8" Ductile Iron Water Main LF 1700 $108.59 $184,603.00 67 67A New 6" Ductile Iron Water Main LF 120 $118.18 $14,181.60 Alternate 2 $165,125.20 68 68A New 8" PVC C900 Pipe LF 1700 $89.84 $152,728.00 69 69A New 6" PVC C900 Pipe LF 120 $103.31 $12,397.20 Base Bid Total:$1,137,258.44 $938,473.84Total Engineer Est. vs. Contractor (Base bid + PVC) =