Loading...
C2022-7 Bid TabC2022‐7 Street Rehabilitation (#8122207)Owner: Janesville WI, City ofSolicitor: Janesville WI, City of03/02/2022 02:00 PM CSTPayne & Dolan, Inc.Section Title Line Item Item Code Item DescriptionUofM Quantity Unit Price Extension Unit Price ExtensionC2022‐7$3,922,566.01 $4,671,383.051 1R Asphaltic Concrete Pavement, Type 4 LT, Lower LayerTON 8065 $54.65 $440,752.25 $60.25 $485,916.252 2R Asphaltic Concrete Pavement, Type 5 LT, Upper LayerTON 19003.3 $55.00 $1,045,181.50 $63.30 $1,202,908.893 3R Asphaltic Concrete Pavement, Type 4 MT, Upper LayerTON 9638.9 $53.85 $519,054.77 $60.25 $580,743.734 4R Tack CoatGAL 16713 $2.77 $46,295.01 $2.00 $33,426.005 5R Miscellaneous Asphalt Paving (Machine Method), 1.5" or ThickerTON 50 $100.57 $5,028.50 $150.00 $7,500.006 6R Miscellaneous Asphalt Paving (Hand Method), 1.5" or ThickerTON 31 $139.37 $4,320.47 $175.00 $5,425.007 7R Leveling Layer (At Unspecified Locations, In Addition to Per Ton Price for Upper Layer Pavements)TON 903 $7.15 $6,456.45 $8.00 $7,224.008 8R Asphalt Pavement Milling, Full Width,  0"‐2.0" Depth SY 173853 $1.00 $173,853.00 $1.00 $173,853.009 9R Asphalt Pavement Milling, Full Width, 2.1"‐2.5" Depth SY 26482 $1.10 $29,130.20 $1.00 $26,482.0010 10R Extra Depth MillingSY 360 $2.51 $903.60 $4.00 $1,440.0011 11R Street Resurfacing Base/Subgrade RepairCY 150 $22.97 $3,445.50 $22.00 $3,300.0012 12R Asphalt Pavement Milling, Variable Depth (Driveway Ends and / or Butt Joints) SY 10 $7.53 $75.30 $24.00 $240.0013 13R Miscellaneous MillingSY 150 $7.53 $1,129.50 $7.50 $1,125.0014 14R Concrete Pavement Milling, Full Width, 2.0" Depth SY 100 $7.53 $753.00 $7.50 $750.0015 15R Void Reducing Asphalt Membrane (VRAM) LF 23729 $2.04 $48,407.16 $1.97 $46,746.1316 16R Cast Iron Adjusting Rings, 1.5"EA 30 $184.46 $5,533.80 $200.00 $6,000.0017 17R Cast Iron Adjusting Rings, 2.0"EA 10 $192.20 $1,922.00 $200.00 $2,000.0018 18R 4.0" Asphaltic Pavement Patching,  General SY 50 $92.00 $4,600.00 $92.00 $4,600.0019 19R 5.0" Asphaltic Pavement Patching,  General SY 50 $115.00 $5,750.00 $115.00 $5,750.0020 20R 4.0" Asphaltic Pavement Patching,  Special SY 25 $190.00 $4,750.00 $190.00 $4,750.0021 21R 5.0" Asphaltic Pavement Patching,  Special SY 25 $200.00 $5,000.00 $200.00 $5,000.0022 22R Marking Island Nose, Epoxy, YellowEA 4 $145.64 $582.56 $145.00 $580.0023 23R Marking Parking Stall, Epoxy, 4‐Inch, White LF 300 $5.27 $1,581.00 $5.25 $1,575.0024 24R Marking Line, Epoxy, 4‐Inch, WhiteLF 28865 $0.48 $13,855.20 $0.48 $13,855.2025 25R Marking Line, Epoxy, 4‐Inch, YellowLF 17714 $0.48 $8,502.72 $0.48 $8,502.7226 26R Marking Line, Epoxy, 8‐Inch, WhiteLF 695 $0.94 $653.30 $0.94 $653.3027 27R Marking Stop Line, Epoxy, 18‐Inch, White LF 346.8 $13.56 $4,702.61 $13.50 $4,681.8028 28R Marking Crosswalk, Epoxy, 6‐Inch, White LF 1779 $7.28 $12,951.12 $7.25 $12,897.7529 29R Marking Crosswalk, Epoxy, 12‐Inch, White LF 850 $9.79 $8,321.50 $9.75 $8,287.5030 30R Marking Crosswalk, Epoxy, 24‐Inch, White LF 101 $15.32 $1,547.32 $15.25 $1,540.2531 31R Marking Diagonal, Epoxy, 12‐Inch, White LF 155 $9.79 $1,517.45 $9.75 $1,511.2532 32R Marking Diagonal, Epoxy, 12‐Inch, Yellow LF 380 $9.79 $3,720.20 $9.75 $3,705.0033 33R Marking Arrow, Type 2, Epoxy, White EA 33 $261.14 $8,617.62 $260.00 $8,580.0034 34R Marking Arrow, Type 3, Epoxy, White EA 4 $341.49 $1,365.96 $340.00 $1,360.0035 35R Marking Word, "ONLY",  Epoxy, White EA 3 $286.25 $858.75 $285.00 $855.0036 36R Marking Arrow, Bike Lane Arrow, Epoxy, White EA 34 $130.57 $4,439.38 $130.00 $4,420.0037 37R Marking Symbol, Bike Lane Symbol, Epoxy, White EA 34 $225.99 $7,683.66 $225.00 $7,650.0038 38R Marking Railroad Crossing, Epoxy, White EA 4 $622.73 $2,490.92 $620.00 $2,480.0039 39R Sawing Concrete or Composite Asphalt over Concrete Pavement, Full DepthLF 742 $4.36 $3,235.12 $5.00 $3,710.0040 40R Sawing Asphalt Pavement, Full Depth LF 1843 $2.37 $4,367.91 $2.33 $4,294.1941 41R Remove Existing Concrete Collar From Existing Structure CastingEA 12 $84.74 $1,016.88 $110.00 $1,320.0042 42R Asphalt Pavement RemovalSY 33734 $2.30 $77,588.20 $2.90 $97,828.6043 43R Concrete or Composite Asphalt over Concrete Pavement Removal SY 9852 $5.82 $57,338.64 $7.30 $71,919.6044 44R Curb & Gutter RemovalLF 8488 $3.89 $33,018.32 $5.80 $49,230.4045 45R Concrete Sidewalk / Driveway Removal SF 20468 $0.59 $12,076.12 $0.75 $15,351.0046 46R Unclassified ExcavationCY 28971 $14.75 $427,322.25 $20.00 $579,420.0047 47R Excavation Below SubgradeCY 200 $15.98 $3,196.00 $23.00 $4,600.0048 48R Coarse Gradation AggregateTON 43960 $10.70 $470,372.00 $15.60 $685,776.00Rock Road Companies, Inc. 49 49R Fine Gradation AggregateTON 18754 $15.69 $294,250.26 $19.00 $356,326.0050 50R Proof RollingSTATION 25 $19.70 $492.50 $60.00 $1,500.0051 51R Structure Frame ResettingEA 10 $769.39 $7,693.90 $950.00 $9,500.0052 52R Structure Reconstruction IN 24 $118.87 $2,852.88 $150.00 $3,600.0053 53R Chimney SealEA 5 $500.42 $2,502.10 $1,000.00 $5,000.0054 54R Maintain and Remove Inlet Protection, Type C or Type D Installed by OthersEA 40 $15.22 $608.80 $15.00 $600.0055 55R Inlet Protection, Type CEA 33 $55.79 $1,841.07 $55.00 $1,815.0056 56R Erosion MatSY 50 $1.78 $89.00 $1.75 $87.5057 57R RestorationSY 4157 $9.42 $39,158.94 $7.07 $29,389.9958 58R Aggregate Wedge ShoulderLF 350 $4.79 $1,676.50 $8.00 $2,800.0059 59R Traffic Control, For Josephine Street Closure and ReconstructionLS 1 $1,004.40 $1,004.40 $3,000.00 $3,000.0060 60R Traffic Control, For Sycamore Street and Douglas Street Closure and ReconstructionLS 1 $1,707.47 $1,707.47 $3,700.00 $3,700.0061 61R Traffic Control, For Madison Street Closure & Reconstruction LS 1 $1,807.91 $1,807.91 $3,700.00 $3,700.0062 62R Traffic Control, For S. Locust Street Closure and ReconstructionLS 1 $3,013.19 $3,013.19 $4,600.00 $4,600.0063 63R Traffic Control, For E. Centerway Closure and ReconstructionLS 1 $1,205.28 $1,205.28 $3,200.00 $3,200.0064 64R Traffic Control, For Elida Street Closure and ReconstructionLS 1 $2,711.87 $2,711.87 $3,500.00 $3,500.0065 65R Traffic Control, For E. Memorial Drive Closure and Reconstruction LS 1 $2,008.79 $2,008.79 $2,700.00 $2,700.0066 66R Traffic Control, for W. Rugby Road &  E. Rugby Road Closure & Reconstruction LS 1 $2,510.99 $2,510.99 $3,400.00 $3,400.0067 67R Traffic Control, For N. Sumac Drive Closure and Reconstruction LS 1 $3,515.39 $3,515.39 $5,200.00 $5,200.0068 68R Traffic Control, For Hawthorne Ave Closure and Reconstruction LS 1 $2,209.67 $2,209.67 $3,200.00 $3,200.0069 69R Traffic Control and PCMS, For E. Milwaukee Street ResurfacingLS 1 $7,300.00 $7,300.00 $6,800.00 $6,800.0070 70R Traffic Control and PCMS, For Kellogg Avenue ResurfacingLS 1 $9,320.00 $9,320.00 $7,000.00 $7,000.0071 71R Railroad Insurance, Right of Entry, and Flaggers for WSOR Railroad Crossings on S. Arch & W. RotamerLS 1 $7,820.39 $7,820.39 $9,000.00 $9,000.00Base Bid Total:$3,922,566.01 $4,671,383.05