Loading...
C2021-8 Bid TabC2021-8 Main Street Rehabilitation (#7551347) Owner: Janesville WI, City of Solicitor: Janesville WI, City of03/03/2021 02:00 PM CST Rock Road Companies, Inc.Maddrell Excavating, LLC Section TitlLine Item Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension C2021-8 S Main Street Rehabilitation and E. Racine Street Safety Conversion $1,145,371.94 $1,214,235.0911RTraffic Control - S. Main Street LS 1 $47,274.43 $47,274.43 $87,000.00 $87,000.00 2 2R Traffic Control - E. Racine St LS 1 $5,656.00 $5,656.00 $48,000.00 $48,000.00 3 3R Remove Tree and Stump I.D.20 $106.56 $2,131.20 $65.00 $1,300.00 4 4R Sawcut Asphalt Pavement LF 3750 $1.36 $5,100.00 $3.00 $11,250.00 5 5R Sawcut Concrete LF 98 $2.12 $207.76 $5.00 $490.0066RInlet Protection EA 5 $65.00 $325.00 $100.00 $500.0077RRemove Concrete - 4", 6", 8"SF 12100 $0.36 $4,356.00 $1.00 $12,100.00 8 8R Remove Curb and Gutter LF 3800 $4.78 $18,164.00 $4.00 $15,200.00 9 9R 6" Ductile Iron Water Main Replacement LF 75 $90.88 $6,816.00 $120.00 $9,000.00 10 10R 8" Ductile Iron Water Main Replacement LF 1788 $97.68 $174,651.84 $103.00 $184,164.001111R12" Ductile Iron Water Main Replacement LF 87 $203.12 $17,671.44 $140.00 $12,180.001212RWater Main Vertical Offset EA 2 $1,341.53 $2,683.06 $3,500.00 $7,000.00 13 13R 6" Gate Valve and Valve Box EA 2 $1,331.18 $2,662.36 $1,500.00 $3,000.00 14 14R 8" Gate Valve and Valve Box EA 6 $1,777.08 $10,662.48 $1,800.00 $10,800.00 15 15R 12" Gate Valve and Valve Box EA 2 $3,052.13 $6,104.26 $2,800.00 $5,600.001616RPermanent Water Main Blow-Off Connection EA 1 $845.44 $845.44 $1,800.00 $1,800.001717RHydrant and Gate Valve with Valve Box EA 4 $6,103.15 $24,412.60 $6,000.00 $24,000.00 18 18R 6" Ductile Iron Hydrant Lead LF 38 $166.61 $6,331.18 $110.00 $4,180.00 19 19R 2" Thick Insulation SY 30 $8.09 $242.70 $40.00 $1,200.00 20 20R Reconnect Existing Water Service EA 17 $1,202.12 $20,436.04 $1,000.00 $17,000.002121RReplace and Reconnect Water Service, Short EA 4 $3,073.58 $12,294.32 $2,000.00 $8,000.002222RReplace and Reconnect Water Service, Long EA 1 $3,432.78 $3,432.78 $3,000.00 $3,000.00 23 23R Unknown Water Service Investigation EA 5 $790.87 $3,954.35 $500.00 $2,500.00 24 24R Water Service Abandonment EA 13 $790.87 $10,281.31 $500.00 $6,500.00 25 25R Water Main Abandonment EA 5 $395.43 $1,977.15 $300.00 $1,500.002626RTelevise Existing Sanitary or Storm Sewer LF 500 $2.99 $1,495.00 $6.00 $3,000.002727RTelevise Sanitary Laterals LF 500 $9.77 $4,885.00 $6.00 $3,000.00 28 28R Install New 48" Dia. Storm Structure EA 2 $2,112.08 $4,224.16 $2,500.00 $5,000.00 29 29R Install New 72" Dia. Doghouse Storm Structure EA 1 $4,138.24 $4,138.24 $3,200.00 $3,200.00 30 30R Install New Storm Inlet EA 5 $1,888.99 $9,444.95 $2,200.00 $11,000.003131RRemove Existing Storm Structure or Inlet Only EA 11 $131.21 $1,443.31 $200.00 $2,200.003232RRemove Existing Structure and Replace with 48" Dia. Inlet StruEA 2 $2,341.71 $4,683.42 $2,700.00 $5,400.00 33 33R Remove Existing Structure/Inlet and Replace with 72" Dia. Inle EA 1 $4,005.46 $4,005.46 $3,900.00 $3,900.00 34 34R Remove Existing Structure and Replace with 72" Dia. Inlet Stru EA 1 $2,375.95 $2,375.95 $3,200.00 $3,200.00 35 35R Utility Line Opening (ULO) to Determine Existing Storm Invert EA 1 $287.53 $287.53 $450.00 $450.003636RRemove and Replace Storm Inlet EA 6 $2,053.64 $12,321.84 $2,200.00 $13,200.00 37 37R Storm Inlet Chimney Repair EA 3 $839.40 $2,518.20 $1,100.00 $3,300.00 38 38R Storm Inlet Frame and Grate EA 1 $799.91 $799.91 $800.00 $800.00 39 39R Storm Inlet Grate Only EA 11 $171.93 $1,891.23 $150.00 $1,650.00 40 40R Storm Structure Invert/Bench Repair EA 1 $769.65 $769.65 $700.00 $700.004141RStorm Structure Chimney Repair EA 2 $1,423.48 $2,846.96 $1,100.00 $2,200.00 42 42R Storm Structure Frame and Lid EA 3 $588.89 $1,766.67 $500.00 $1,500.00 43 43R Remove Existing Storm Sewer Pipe LF 429 $9.87 $4,234.23 $22.00 $9,438.00 44 44R Install New 12" Reinforced Concrete Storm Sewer LF 354 $71.21 $25,208.34 $40.00 $14,160.00 45 45R Install New 15" Reinforced Concrete Storm Sewer LF 115 $69.59 $8,002.85 $46.00 $5,290.004646RTelevise New Storm Sewer LF 469 $2.87 $1,346.03 $5.00 $2,345.00 47 47R 60" Dia. Sanitary Structure Barrel and/or Cone Section, Compl EA 2 $1,058.91 $2,117.82 $1,500.00 $3,000.00 48 48R Sanitary Structure Chimney Repair, Complete EA 3 $1,038.52 $3,115.56 $1,500.00 $4,500.00 49 49R Sanitary Structure Frame and Lid EA 5 $882.14 $4,410.70 $500.00 $2,500.00 50 50R Remove 10' Street Light EA 8 $600.00 $4,800.00 $600.00 $4,800.005151RRemove 30' Street Light EA 7 $1,100.00 $7,700.00 $1,100.00 $7,700.00 52 52R Remove Traffic Signal Pole, Salvage and Reinstall Signal EquipmLS 1 $2,200.00 $2,200.00 $2,200.00 $2,200.00 53 53R Remove Handhole EA 7 $100.00 $700.00 $100.00 $700.00 54 54R Pull Box Steel, 18"x36"EA 6 $700.00 $4,200.00 $700.00 $4,200.00 55 55R 2" Conduit, Schedule 40 PVC LF 2530 $6.25 $15,812.50 $6.25 $15,812.505656R2" Conduit, Schedule 80 PVC LF 720 $7.25 $5,220.00 $7.25 $5,220.00 C2021-8 Main Street Rehabilitation (#7551347) Owner: Janesville WI, City of Solicitor: Janesville WI, City of03/03/2021 02:00 PM CST Rock Road Companies, Inc.Maddrell Excavating, LLC Section TitlLine Item Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 57 57R 10' Decorative Street Light with Concrete Base Type 5 EA 32 $3,452.77 $110,488.64 $3,452.77 $110,488.645858R30' Decorative Street Light with Concrete Base Type 3 EA 7 $9,638.65 $67,470.55 $9,638.65 $67,470.55 59 59R Electrical Wire, #12 AWG, Insulated LF 2800 $1.00 $2,800.00 $1.00 $2,800.00 60 60R Electrical Wire, #10 AWG, Insulated LF 725 $1.10 $797.50 $1.10 $797.50 61 61R Electrical Wire, #8 AWG, Insulated LF 7350 $1.20 $8,820.00 $1.20 $8,820.00 62 62R Electrical Wire, #6 AWG, Insulated LF 4800 $1.35 $6,480.00 $1.35 $6,480.006363RElectrical Wire, #4 AWG, Insulated LF 6060 $1.85 $11,211.00 $1.85 $11,211.006464RConcrete Control Cabinet Base, Type L24 EA 1 $1,200.00 $1,200.00 $1,200.00 $1,200.00 65 65R Lighting Control Cabinet 120/240 24-Inch EA 1 $6,000.00 $6,000.00 $6,000.00 $6,000.00 66 66R Meter Breaker Pedestal EA 1 $1,300.00 $1,300.00 $1,300.00 $1,300.00 67 67R Unclassified Excavation CY 500 $26.23 $13,115.00 $16.00 $8,000.006868RCoarse Gradation Aggregate T 1770 $10.96 $19,399.20 $12.00 $21,240.006969RFine Gradation Aggregate T 1350 $10.85 $14,647.50 $12.00 $16,200.00 70 70R 4" Concrete Sidewalk SF 3500 $5.40 $18,900.00 $5.10 $17,850.00 71 71R 6" Concrete Sidewalk and Driveway Approach SF 2230 $6.27 $13,982.10 $5.95 $13,268.50 72 72R 8" Concrete Sidewalk and Driveway Approach SF 2650 $7.07 $18,735.50 $6.75 $17,887.507373R6" Colored Concrete SF 5300 $7.21 $38,213.00 $6.95 $36,835.007474RDetectable Warning Field, 2'x5'EA 25 $250.00 $6,250.00 $250.00 $6,250.00 75 75R High Early Strength Concrete, Grade C or E CY 40 $20.00 $800.00 $20.00 $800.00 76 76R #4 Steel Reinforcing Bars LF 950 $1.50 $1,425.00 $1.50 $1,425.00 77 77R 30" Curb and Gutter, Type L LF 3630 $15.70 $56,991.00 $15.70 $56,991.007878R18" Curb and Gutter LF 20 $35.00 $700.00 $35.00 $700.007979RConcrete Filler Strip LF 1725 $4.75 $8,193.75 $4.75 $8,193.75 80 80R Concrete Pedestrian Island LS 1 $9,538.44 $9,538.44 $6,495.00 $6,495.00 81 81R Grass Restoration SY 850 $10.20 $8,670.00 $6.00 $5,100.00 82 82R Bark Mulch Restoration SY 60 $17.00 $1,020.00 $18.00 $1,080.008383RAsphalt Driveway Patch SY 30 $48.00 $1,440.00 $22.43 $672.908484RMill Asphalt, 2.5" Depth SY 7150 $2.08 $14,872.00 $0.98 $7,007.00 85 85R Asphaltic Concrete Pavement, 4 LT Lower Layer, 3"T 500 $58.62 $29,310.00 $66.25 $33,125.00 86 86R Asphaltic Concrete Pavement, 4 MT 58-28 H Upper Layer, 2.5"T 1200 $60.49 $72,588.00 $61.00 $73,200.00 87 87R Remove Pavement Marking, 4" Line LF 4215 $0.96 $4,046.40 $0.90 $3,793.508888RRemove Pavement Marking, 8" Line LF 85 $1.01 $85.85 $2.65 $225.258989RRemove Pavement Marking, Words EA 4 $95.95 $383.80 $160.00 $640.00 90 90R Pavement Marking, Yellow, 4" Line LF 5000 $1.15 $5,750.00 $1.15 $5,750.00 91 91R Pavement Marking, White, 4" Line LF 6720 $1.15 $7,728.00 $1.15 $7,728.00 92 92R Pavement Marking, White, 4" Diagonal LF 560 $7.00 $3,920.00 $7.00 $3,920.009393RPavement Marking, White, 6" Crosswalk or Diagonal LF 820 $10.50 $8,610.00 $10.50 $8,610.00 94 94R Pavement Marking, White, 8" Channelizing LF 280 $2.75 $770.00 $2.75 $770.00 95 95R Pavement Marking, White, 12" Crosswalk LF 324 $10.75 $3,483.00 $10.75 $3,483.00 96 96R Pavement Marking, Yellow, 12" Diagonal LF 65 $7.50 $487.50 $7.50 $487.50 97 97R Pavement Marking, 18" Stop Bar LF 95 $11.00 $1,045.00 $11.00 $1,045.009898RPavement Marking, Arrow, Type 2 EA 9 $225.00 $2,025.00 $225.00 $2,025.00 99 99R Pavement Marking, Words EA 4 $235.00 $940.00 $235.00 $940.00 100 100R Pavement Marking, Words, SCHOOL, Single Lane EA 1 $330.00 $330.00 $330.00 $330.00 101 101R Pavement Marking, Words, SCHOOL, Dual Lane EA 1 $340.00 $340.00 $340.00 $340.00 102 102R Pavement Marking, Median Nose EA 2 $225.00 $450.00 $225.00 $450.00103103RPavement Marking, Bike Symbol and Arrow EA 9 $220.00 $1,980.00 $220.00 $1,980.00 Base Bid Total:$1,145,371.94 $1,214,235.09