Loading...
Bid Schedule F Award Memo1 ENGINEERING DIVISION MEMORANDUM January 13, 2020 TO: City Council FROM: Mike Payne, City Engineer SUBJECT: Consideration and action to award contract for Bid Schedule “F” - 2019: C2019-15 Ice Age Trail Bridge Replacement C2019-16 East Side Town Square C2019-17 Oak Hill Cemetery Road Improvements C2019-18 Utility Structure Rehabilitation and Replacement C2019-19 Microturbine Electrical Distribution Project Relates to Strategic Plan Strategic Goal - Infrastructure These contracts support the City’s efforts to maintain existing infrastructure and continue to provide municipal services. Executive Summary Bids for C2019-15 Ice Age Trail Bridge Repairs, C2019-16 East Side Town Square, C2019-17 Oak Hill Cemetery Road Improvements, C2019-18 Utilty Structure Rehabilitation and Replacement, C2019-19 Microturbine Electrical Distribution Project were opened December 11, 2019. City Recommendation The City recommends rejecting contract C2019-15 Ice Age Trail Bridge Replacement and awarding contracts C2019-16 East Side Town Square, C2019-17 Oak Hill Cemetery Road Improvements, C2019-18 Utilty Structure Rehabilitation and Replacement, C2019-19 Microturbine Electrical Distribution Project. Suggested Motion I move to reject contract C2019-15 Ice Age Trail Bridge Replacement, and award contracs C2019-16 East Side Town Square, C2019-17 Oak Hill Cemetery Road Improvements, C2019-18 Utilty Structure Rehabilitation and Replacement, C2019-19 Microturbine Electrical Distribution Project as outlined in the memo. Background C2019-15 Ice Age Trail Bridge Replacement – For furnishing all labor, materials, and equipment and performing all work necessary for for the installation of a 70’ x 12’ single span prefabricated bridge kit purchased separately by the city; which work shall include removal of the existing 50’ x 10’ timber trail bridge structure with timber support piling; excavation; supply and placement of 2 heavy rip rip; reconstruction of asphalt bridge approaches; restoration; and incidental construction. There were six (6) qualified plan holders. The contract estimate was $72,495.00. Staff received two (2) bids with Concrete Structures, Inc. providing the lowest bid. The Engineering Division is recommending rejecting all bids. Concrete Structures Inc 3006 Bond Place Janesville, WI 53548 Total Base Bid: Alternate 1: Total Base Bid + Alt 1: $111,100.00 10,800.00 $121,900.00 Gilbank Construction Inc. 301 Scot Dr Clinton, WI 53525 Total Base Bid: Alternate 1 Total Base Bid + Alt 1: $107,813.00 17,500.00 $125,313.00 C2019-16 East Side Town Square – For furnishing all labor, materials, and equipment and performing all work necessary for for the base bid construction of approximately 9,000 square yards of pavement and sidewalk removal; 25,000 square feet of colored and standard concrete sidewalk; 2,200 square yards of non-reinforced concrete pavement; 1,400 linear feet of concrete curb and gutter; 1,800 square feet of cast stone pavers; 800 linear feet of storm sewer with structures; 500 linear feet of cable railing; street and pedestrian light fixtures; electrical conduit and wiring; 500 linear feet of cast-in-place reinforced wall cap; various seating and street scaping furnishings; landscaping and lawn restoration; and incidental construction with river wall repair alternative items. Alternate items are as follows: A1 - river wall masonry face restoration, A2 - river wall concrete facing, A3 - wall cap replacement at the cantilevered walk, A4 - wall cap replacement / height adjustment where the parking plaza previously connected to land, A5 - river wall replacement at the void allowing river access, A6 - canopy foundation, A7 - donor wall foundation option 1, A8 - donor wall foundation option 2, A9 - donor wall foundation option 3. Alternate Bid options A6 through A9 will be authorized by change order if private funds are secured. There were eight (8) qualified plan holders. The base bid contract estimate was $1,624,570.00. Staff received two (2) bids with Parisi Construction Co., Inc. providing the lowest bid. The Engineering Division is recommending award of this contract to Parisi Construction Co., Inc. of Verona, WI for a total base bid amount of $2,023,284.50 plus alternates 2 – River Wall Concrete Facing ($452,200), 3 – Wall Cap Type A ($135,000), 4 – Wall Cap Type B ($232,000) and 5 – River Wall Replacement ($280,000) totaling $1,099,200.00 for a total awarded contract equal to $3,122,484.50. Parisi Construction Co. Inc. 508 S. Nine Mound Rd Verona, WI 53593 Total Base Bid: Alternate 1 Alternate 2 Alternate 3 Alternate 4 Alternate 5 Alternate 6 Alternate 7 Alternate 8 Alternate 9 $2,023,284.50 $135,000.00 $452,200.00 $135,000.00 $232,000.00 $280,000.00 $12,000.00 $33,000.00 $20,000.00 $36,000.00 3 Zenith Tech, INC. bridge N6W23633 Bluemound Rd Waukesha, WI 53187 Total Base Bid: Alternate 1 Alternate 2 Alternate 3 Alternate 4 Alternate 5 Alternate 6 Alternate 7 Alternate 8 Alternate 9 $2,435,797.47 $142,200.00 $523,550.70 $188,700.30 $226,641.96 $176,201.48 $27,500.00 $100,000.00 $100,000.00 $125,000.00 Anticipated Project Costs: Contract Base Bid (will be 10% contingency) $2,023,284.50 Alternates 2, 3, 4 & 5 (riverwall – will be 5% contingency) 1,099,200.00 Contingency (8%) 259,226.50 City Force Account / City Costs 18,374.00 Engineering 15,000.00 Consulting East Side Town Square 164,590.00 Consulting For Prior ARISE Phase 117,325.00 Consulting Riverwall Repairs 15,000.00 Total $3,712,000.00 Project Funding: DOT TAP Grant 249,000.00 2020 Note – Storm Water Utility (storm sewer) 145,000.00 2020 Note – Storm Water Utility (riverwall repairs) 1,154,000.00 2020 Note – Water Utility 20,600.00 2020 Note – TID No. 36 2,143,400.00 Total $3,712,000.00 C2019-17 Oak Hill Cemetery Road Improvements – For furnishing all labor, materials, and equipment and performing all work necessary to reconstruct approximately 1,230’ of paved roads within the Oak Hill Cemetery including approximately 800 CY of unclassified excavation, 1,700 T of crushed aggregate base course, 2,000 SY of geotextile fabric, 430 T of asphalt pavement, and 600 LF of asphalt wedge curb. There were five (5) qualified plan holders. The contract estimate was $102,685.00. Staff received two (2) bids with Y.N. Yoss Construction, Inc. providing the lowest bid. The Engineering Division is recommending award of this contract to Y.N. Yoss Construction, Inc. of Janesville, WI for a total bid amount of $111,235.00. W.N. Yoss Construction, Inc. 6117 S. Cty Hwy G Janesville, WI 53546 Total: $111,235.00 Rock Road Companies, Inc. P.O. Box 1818 301 W. B-R Townline Road Total: $130,891.00 4 Anticipated Project Costs: Contract Base Bid $111,235.00 Engineering and Contingency (10%) 10,765.00 Total $122,000.00 Project Funding: Prior Note – General Fund 22,000.00 2020 Note – General Fund 100,000.00 Total $122,000.00 C2019-18 Utility Structure Rehabilitation and Replacement – For furnishing all labor, materials, and equipment and performing all work necessary for replacement and/or rehabilitation of sanitary, storm, and water structures. The work will include replacement of approximately of 18 sanitary structures, 38 storm structures, 147 storm inlets and 23 water structures and rehabilitation of approximately of 111 sanitary structures, 20 storm structures, 6 storm inlets and 35 water structures. The work under this contract is associated with the City’s 2020 Street Rehabilitation Contract. There were four (4) qualified plan holders. The contract estimate was $1,577,496.20. Staff received three (3) bids with Bjoin Limestone, Inc. providing the lowest bid. The Engineering Division is recommending award of this contract to Bjoin Limestone, Inc. of Janesville, WI for a total bid amount of $1,512,930. Bjoin Limestone Inc. 7308 W. State Road 11 Janesville, WI 53548 Total: $1,512,930.00 Maddrell Excavating, LLC N3371 W 3RD Ave Brodhead, WI 53520 Total: $1,810,300.00 Globe Contractors, Inc. N50 W23076 Betker Road Pewaukee, WI 53072 Total: $1,898,695.00 Janesville, WI 53547 5 Anticipated Project Costs: Contract Base Bid $1,512,930.00 Engineering and Contingency (15%) 224,070.00 Total $1,737,000.00 Project Funding: 2020 Operating – WW Utility 375,000.00 2020 Note – WW Utility 245,000.00 2020 Note – Water Utility 182,000.00 2020 Operating – Storm Water Utility 935,000.00 Total $1,737,000.00 C2019-19 Microturbine Electrical Distribution Project – For furnishing all labor, materials, and equipment and performing all work necessary for modifying the electrical distribution system at the Janesville Wastewater Treatment Plant to allow the microturbine generators to deliver power to the 480 v distribution system to offset plant electrical loads. There were three (3) qualified plan holders. The contract estimate was $316,000.00. Staff received three (3) bids with PDC – Electrical Contractors providing the lowest bid. The Engineering Division is recommending award of this contract to PDC – Electrical Contractors of Monroe, WI for a total bid amount of $221,501.00. PDC - Electrical Contractors P.O. Box 537 - 1065 - 5th Avenue Monroe, WI 53566 Total: $221,501.00 NEXT Electric, LLC 1121 Marlin Ct - Suite A Waukesha, WI 53186 Total: $270,000.00 Morse Electric 1390 Gateway Blvd Beloit, WI 53593 Total: $328,000.00 Anticipated Project Costs: Contract Base Bid $221,501.00 Construction Contingency (10%) 22,253.00 Consulting 30,246.00 Total $274,000.00 6 Project Funding: Focus on Energy Grant 137,000.00 2019 Note – Waste Water Utility 137,000.00 Total $274,000.00 Options • Approve City recommendation to reject C2019-15 and award contracts C2019-16, C2019-17, C2019-18 and C2019-19. • Refer back to staff with guidance on how the council wishes to proceed. • Do not take action on the contracts as recommended by staff. Analysis Included in the ‘Background’ section. Conclusions This contract supports tasks listed in the 2020-2024 Strategic Plan. Contract C2019-15, Ice Age Bridge Replacement is over budget as currently designed. Staff will consider other bridge fabricators and/or options and include this project in the 2021 CIP with the intent of bidding another project in 2021 to address the deteriorating structure. Restated City Recommendation The City recommends rejecting contract C2019-15 Ice Age Trail Bridge Replacement and awarding contracts C2019-16 East Side Town Square, C2019-17 Oak Hill Cemetery Road Improvements, C2019-18 Utilty Structure Rehabilitation and Replacement, C2019-19 Microturbine Electrical Distribution Project to the low bidders. cc: Mark Freitag, City Manager Maggie Darr, Assistant to the City Manager Paul Woodard, Director of Public Works