Loading...
Bid Schedule B Award Memo1 ENGINEERING DIVISION MEMORANDUM March 25, 2019 TO: City Council FROM: Mike Payne, City Engineer SUBJECT: Consideration and action to award contract for Bid Schedule “B” - 2019: C2019-4 Hedberg Public Library Transformation Project C2019-5 Oakhill Cemetery Road Improvements C2019-6 Water and Sewer System Improvements II C2019-7 Street Rehabilitation Relates to Strategic Plan Strategic Goal - Infrastructure These contracts support the City’s efforts to maintain existing infrastructure and continue to provide municipal services. Executive Summary Bids for C2019-4 – Hedberg Public Library Transformation Project, C2019-5 – Oakhill Cemetery Road Improvements, C2019-6 – Water and Sewer System Improvements II, and C2019-7 Street Rehabilitaion were opened February 27, 2019. City Recommendation The City recommends awarding contracts C2019-4 – Hedberg Public Library Transformation Project, C2019-5 – Oakhill Cemetery Road Improvements, C2019-6 – Water and Sewer System Improvements II, and C2019-7 Street Rehabilitaion to the low bidders and expresses intent to borrow the necessary funding in the 2019 and 2020 Note Issue. Suggested Motion I move to award contracts C C2019-4 – Hedberg Public Library Transformation Project, C2019-5 – Oakhill Cemetery Road Improvements, C2019-6 – Water and Sewer System Improvements II, and C2019-7 Street Rehabilitaion to the low bidders as described in the memo. Background C2019-5 – Hedberg Public Library Transformation Project – For furnishing all the labor, materials, equipment, and doing all the work necessary for the single prime contract to renovate 33,500 sf of an existing two-story, 67,000 sf library. Renovations consist of but are not limited to: demolition of non-structural walls, acoustical and gypsum ceilings and soffits; new flooring and ceiling finishes; metal framed partition walls; wall finishes of painted gypsum board, acoustic felt, and wood wall panel; modifications to sprinkler and fire alarm systems, VAV boxes, plumbing and electrical systems, including LED lighting at new ceilings. 2 There were ten (10) qualified plan holders. The contract estimate was $1,732,000.00. Staff received four (4) bids with Progressive Construction Services LLC providing the lowest bid. The Engineering Division is recommending award of this contract to Progressive Construction Services LLC of Janesville, WI for a total bid amount of $1,660,000.00. Alternate 1 substituted 2’x2’ acoustical ceiling tile for linear ceiling tile along the walkway corridors. Alternate 2 allowed the contractor to close the library to the public for 14 days while performing work. Alternate 3 eliminates adding plumbing and a sink to the mothers room (this alternate was accepted). Alternate 4 did not realign the existing book return wall at the main entrance. Alternate 5 eliminated the mobile book cases. Alternate 6 substituted can lights in lieu of linear fixtures included throughout the project. Progressive Construction Services LLC 944 N Parker Dr Janesville, WI 53545 Total: Alt 1 Alt 2 Alt 3 Alt 4 Alt 5 Alt 6 $1,660,000.00 ($1,969.01) ($13,731.24) ($5,098.69) ($34,242.09) ($21,969.98) ($4,767.07) Klobucar Construction 3127 East Tortoise Lane Beloit, WI 53511 Total: Alt 1 Alt 2 Alt 3 Alt 4 Alt 5 Alt 6 $1,732,000.00 ($1,900.00) ($2,250.00) ($3,570.00) ($31,275.00) ($41,000.00) ($4,100.00) Gilbank Construction Inc. 301 Scot Dr Clinton, WI 53525 Total: Alt 1 Alt 2 Alt 3 Alt 4 Alt 5 Alt 6 $1,832,400.00 ($2,410.00) ($6,250.00) ($4,420.00) ($40,582.00) ($39,135.00) ($4,100.00) Advanced Building Corporation 3624 Pioneer Road Verona, WI 53593 Total: Alt 1 Alt 2 Alt 3 Alt 4 Alt 5 Alt 6 $1,839,444.00 ($2,014.00) ($6,625.00) ($3,784.00) ($25,655.00) ($25,440.00) ($4,346.00) Anticipated Project Costs: Contract Base Bid 1,660,000.00 Acceptance of Deductive Alternate 3 (5,098.69) 2018 Roof Replacement 340,000.00 Consulting 206,050.00 Technology Additions 100,000.00 Furniture/Furnishings/Equipment 270,548.69 Collection and Shevling Relocation 86,500.00 Engineering and Contingency (9.7%) 160,000.00 3 Total $2,818,000.00 Project Funding: 2018 Note -- Library 383,000.00 2019 Note – Library 600,000.00 2020 Note – Library 200,000.00 2018 Operating – Library 97,000.00 Library Undesignated Fund Balance 448,000.00 Library Capital Campaign 1,080,000.00 Focus on Energy Rebate 10,000.00 Total $2,818,000.00 C2019-5 Oakhill Cemetery Road Improvements – For furnishing all the labor, materials, equipment, and doing all the work necessary for the reconstruction of approximately 1,430’ of paved roads within the Oak Hill Cemetery including approximately 1,250 CY of unclassified excavation, 2,200 T of crushed aggregate base course, 550 T of asphalt pavement, 2,780 LF of asphalt wedge curb, and seed restoration. There were five (5) qualified plan holders. The contract estimate was $111,406.00. Staff received three (3) bids with W.N. Yoss Construction, Inc. providing the lowest bid. The Engineering Division is recommending award of this contract to W.N. Yoss Construction, Inc. of Janesville, WI for a total bid amount of $111,664.20. W.N. Yoss Construction, Inc. 6117 S. Cty Hwy G Janesville, WI 53546 Total: $111,664.20 Maddrell Excavating LLC N3371 W 3rd Avenue Brodhead, WI 53520 Total: $147,690.00 Rock Road Companies, Inc. P.O. Box 1818 301 W. B-R Townline Road Janesville, WI 53547 Total: $172,923.29 Anticipated Project Costs: Contract Base Bid 111,664.20 Engineering and Contingency (9.3%) 8,335.80 Total $120,000.00 Project Funding: 2019 Note – General Fund 120,000.00 Total $120,000.00 4 C2019-6 Water and Sewer System Improvements II – For furnishing all the labor, materials, equipment, and doing all the work necessary for construction of the following approximate quantities: 8,800 L.F. of existing 1 ½“-8” water main replacement and abandonment; 50 L.F. of replacement 12” diameter storm sewer; replacement of 15 lead/steel water services; and replacement or rehabilitation of 75 sanitary, storm structures, and storm inlets; and associated street and non-paved surface restoration. There were four (4) qualified plan holders. The contract estimate was $2,002,675.00. Staff received three (3) bids with R.T. Fox Contractors, Inc. providing the lowest bid. The Engineering Division is recommending award of this contract to R.T. Fox Contractors, Inc. of Edgerton, WI for a total bid amount of $1,785,350.00. R.T. Fox Contractors, Inc PO Box 331 Edgerton, WI 53534 Total: $1,785,350.00 Maddrell Excavating LLC N3371 W 3rd Avenue Brodhead, WI 53520 Total: $1,957,215.00 Globe Contractors, Inc. N50 W23076 Betker Road Pewaukee, WI 53072 Total: $2,215,310.00 C2019-7 Street Rehabilitation – For furnishing all the labor, materials, equipment, and doing all the work necessary for the construction and completion of approximately 32,200 TONS asphalt paving on existing streets, including 242,700 S.Y. milling; 18,500 S.Y pavement removal; 15,000 C.Y. unclassified excavation; 28,000 TONS aggregate base; 13,200 L.F. epoxy pavement markings; and miscellaneous construction items. There were two (2) qualified plan holders. The contract estimate was $3,666,014.41. Staff received one (1) bid from Rock Road Companies, Inc. The Engineering Division is recommending award of this contract to Rock Road Comapanies, Inc. of Janesville, WI for a total bid amount of $3,619,660.14. Anticipated Project Costs: Contract Base Bid 1,785,350.00 Add Hyacinth Pontiac to Ontario 200,000.00 Engineering and Contingency (7%) 123,650.00 Total $2,109,000.00 Project Funding: Prior Note – Water Utility – Hyacinth Main Replacement 200,000.00 2019 Note – Water Utility -- Main Replacement 1,615,000.00 2019 Note – Water Utility – Lead Service Replacement 24,000.00 2019 Operating – WW Utility – Structure Replacement 120,000.00 2019 Operating – SW Utility – Structure / Inlet Replacement 150,000.00 Total $2,109,000.00 5 Options • Approve City recommendation to award contracts C2019-4, C2019-5, C2019-6 and C2019-7. • Refer back to staff with guidance on how the council wishes to proceed. • Do not award the contracts as recommended by staff. Analysis Included in the ‘Background’ section. Conclusions These contracts support tasks listed in the 2019-2023 Strategic Plan. Restated City Recommendation The City recommends awarding contracts C2019-4 – Hedberg Public Library Transformation Project, C2019-5 – Oakhill Cemetery Road Improvements, C2019-6 – Water and Sewer System Improvements II, and C2019-7 Street Rehabilitaion to the low bidders and expresses intent to borrow the necessary funding in the 2019 and 2020 Note Issue. cc: Mark Freitag, City Manager Maggie Darr, Assistant to the City Manager Paul Woodard, Director of Public Works Rock Road Companies, Inc. P.O. Box 1818 301 W. B-R Townline Road Janesville, WI 53547 Total: $3,619,660.14 Anticipated Project Costs: Contract Base Bid 3,619,660.14 Engineering and Contingency (8%) 287,339.86 Total $3,907,000.00 Project Funding: Wheel Tax – Enhanced Street Program 1,027,000.00 LRIP Reimbursement from DOT (E. Milwaukee Street) 302,000.00 2019 Operating – Street Maintenance 65,000.00 2018 Note – General Fund -- Street Rehabilitation 220,000.00 2019 Note – General Fund -- Street Rehabilitation 2,165,000.00 2019 Note – Water Utility – Main Breaks Pavement Repairs 76,000.00 2018 Note – General Fund – C&G Replacement 14,000.00 2019 Note -- General Fund – C&G Replacement 28,000.00 Public Works Reimbursible 10,000.00 Total $3,907,000.00