Bid Schedule D Award Memo1 ENGINEERING DIVISION MEMORANDUM May 26, 2020 TO: City Council FROM: Mike Payne, City Engineer SUBJECT: Consideration and action to award contract for Bid Schedule “D” - 2020: C2020-12 Salt Brine Building / Landfill Building Construction C2020-13 Pistol Range Improvements Relates to Strategic Plan Strategic Goal - Infrastructure These contracts support the City’s efforts to maintain existing infrastructure and continue to provide municipal services. Executive Summary Bids for C2020-12 Salt Brine Building / Landfill Building Construction and C2020-13 Pistol Range Building Improvements were opened May 6, 2020. City Recommendation The City recommends awarding contracts C2020-12 Salt Brine Building / Landfill Building Construction and C2020-13 Pistol Range Building Improvements as well as expressing the intent to borrow funds as outlined in the memo. Suggested Motion I move to award contracts C2020-12 Salt Brine Building / Landfill Building Construction and C2020-13 Pistol Range Building Improvements as outlined in the memo. Background C2020-12 Salt Brine Building / Landfill Building Construction – For furnishing all labor, materials, and equipment and doing all the work necessary for the Brine Storage and Gatehouse located at 2200 U.S. Hwy 51 N, Janesville, WI 53547. The bid will include construction of a new 400 S.F. brine manufacturing building with exterior tank storage and containment. In addition, the project will construct a new 200 S.F. Landfill Building gate house with toilet room at the entrance to the City’s composting dump site. There were six (6) qualified plan holders. The contract estimate was $287,000.00. Staff received five (5) bids with KSW Construction Corporation providing the lowest bid. The Engineering Division is recommending award of this contract to KSW Construction Coroporation of Verona, WI for a total bid amount of $349,454.00. 2 KSW Construction Corporation 807 Liberty Drive Suite #106 Verona, WI 53593 Total Bid: $349,454.00 Gilbank Construction Inc. 301 Scot Dr Clinton, WI 53525 Total Bid: $363,400.00 Vogel Bros Buiding Co 5460 Fen Oak Dr Madison, WI 53718 Total Bid: $385,900.00 Joe Daniels Construction Co., Inc. 919 Applegate Road Madison, WI 53713 Total Bid: $423,000.00 Advanced Building Corporation 4125 Terminal Drive Suite 100 McFarland, WI 53558 Total Bid: $449,500.00 Anticipated Project Costs: Contract 349,454.00 Contingency (10%) 35,546.00 Engineering 5,000.00 Consulting 20,000.00 Owner provided equipment 124,000.00 Utility lateral extensions for salt brine 88,000.00 Water service estension by Operations for landfill building 50,000.00 Total $672,000.00 Project Funding: 2020 Note – General Fund 492,000.00 2020 Note – Sanitation Fund 180,000.00 Total $672,000.00 C2020-13 Pistol Range Building Improvements – For furnishing all the labor, materials, equipment, and doing all work necessary for complete safety improvements at the city’s indoor pistol range including replacement of the existing steel plate bullet trap with a rubber bullet trap system; replacement of the range ventilation system components; replacement of the range lighting and electrical components; miscellaneous building wall demolition and infill; approximately 450 square feet of concrete flatwork with approximately 90 linear feet of integral concrete cut off wall; supply and installation of a direct digital control system; and miscellaneous construction. There were four (4) qualified plan holders. The contract estimate was $543.830.00. Staff received four (4) bids with Gilbank Construction Inc. providing the lowest bid. The Engineering 3 Division is recommending award of the bid to Gilbank Construction Inc. of Clinton, WI for a total bid amount of $404,023.00. Gilbank Construction Inc. 301 Scot Dr Clinton, WI 53525 Total Base Bid: $404,023.00 Vogel Bros Buiding Co 5460 Fen Oak Dr Madison, WI 53718 Total Base Bid: $428,051.52 Joe Daniels Construction Co., Inc. 919 Applegate Road Madison, WI 53713 Total Base Bid: $443,484.00 Advanced Building Corporation 4125 Terminal Drive Suite 100 McFarland, WI 53558 Total Base Bid: $476,492.00 Anticipated Project Costs: Contract Base Bid 404,023.00 Construction Contingency (15%) 60,977.00 Engineering 5,000.00 Consulting 33,500.00 Regrading around the building 6,500.00 Arc flash study 5,000.00 Total $515,000.00 Project Funding: 2020 Note – General Fund 515,000.00 Total $515,000.00 Options • Approve City recommendation award contracts C2020-12 and C2020-13. • Refer back to staff with guidance on how the Council wishes to proceed. • Do not take action on the contracts as recommended by staff. Analysis Included in the ‘Background’ section. Conclusions This contract supports tasks listed in the 2020-2024 Strategic Plan. Restated City Recommendation The City recommends awarding contracts C2020-12 Salt Brine Building / Landfill Building Construction and C2020-13 Pistol Range Building Improvements as well as expressing the intent to borrow funds as outlined in the memo. 4 cc: Mark Freitag, City Manager Maggie Darr, Assistant to the City Manager Paul Woodard, Director of Public Works