Loading...
C2019-12 Landfill Phase 6 Construction Bid TabsC2019-12 Landfill Phase 6 Construction (#6337906) Owner: Janesville WI, City of Solicitor: Janesville WI, City of 06/05/2019 02:01 PM CDT Section Titl Line Item Item Code Item DescriUofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension PRECONSTRUCTION AND SITE PREPARATION $155,000.00 $220,000.00 $226,920.00 $166,500.00 1 1R Provide Inf LS 1 $5,000.00 $5,000.00 $100,000.00 $100,000.00 $118,220.00 $118,220.00 $4,500.00 $4,500.00 2 2R Mobilizatio LS 1 $150,000.00 $150,000.00 $120,000.00 $120,000.00 $108,700.00 $108,700.00 $162,000.00 $162,000.00 SUBBASE AND GRADIENT CONTROL $2,508,920.00 $2,165,933.40 $2,466,622.30 $2,701,765.00 3 3R Excavate, P CY 34620 $3.50 $121,170.00 $3.50 $121,170.00 $3.03 $104,898.60 $4.50 $155,790.00 4 4R Provide Ma CY 153785 $15.00 $2,306,775.00 $12.40 $1,906,934.00 $14.42 $2,217,579.70 $15.50 $2,383,667.50 5 5R 8" Dia. Perf LF 2090 $30.00 $62,700.00 $55.66 $116,329.40 $59.35 $124,041.50 $63.00 $131,670.00 6 6R 8" Dia. Solid LF 430 $42.50 $18,275.00 $50.00 $21,500.00 $46.75 $20,102.50 $71.25 $30,637.50 COMPOSITE LINER $1,059,603.60 $1,136,040.00 $1,131,840.80 $1,144,217.00 7 7R Excavate, H CY 77480 $5.00 $387,400.00 $7.00 $542,360.00 $6.97 $540,035.60 $6.75 $522,990.00 8A 8AR 60-mil HDP LS 1 $320,000.00 $320,000.00 $320,000.00 $320,000.00 $320,000.00 $320,000.00 $320,000.00 $320,000.00 8B 8BR 60-mil HDP SF 580120 $0.28 $162,433.60 $0.20 $116,024.00 $0.19 $110,222.80 $0.25 $145,030.00 9 9R Anchor Tre LF 1460 $10.00 $14,600.00 $12.00 $17,520.00 $10.69 $15,607.40 $15.00 $21,900.00 10 10R Geotextile T SF 583900 $0.30 $175,170.00 $0.24 $140,136.00 $0.25 $145,975.00 $0.23 $134,297.00 LEACHATE COLLECTION/CONVEYANCE SYSTEM $795,492.50 $967,179.80 $1,070,906.50 $1,352,797.25 11 11R 8" Dia. Perf LF 1920 $24.00 $46,080.00 $39.38 $75,609.60 $35.90 $68,928.00 $36.50 $70,080.00 12 12R 8" Dia. Solid LF 1250 $26.00 $32,500.00 $37.07 $46,337.50 $33.70 $42,125.00 $57.00 $71,250.00 13 13R Provide Ma CY 21000 $25.00 $525,000.00 $21.00 $441,000.00 $28.47 $597,870.00 $40.55 $851,550.00 14 14R 24" Dia. Sid LS 1 $35,000.00 $35,000.00 $53,324.00 $53,324.00 $50,797.00 $50,797.00 $67,100.00 $67,100.00 15 15R 4" Dia. Leac LF 540 $20.00 $10,800.00 $30.00 $16,200.00 $27.00 $14,580.00 $26.75 $14,445.00 16 16R Leachate M EACH 1 $32,750.00 $32,750.00 $73,365.00 $73,365.00 $67,155.00 $67,155.00 $36,000.00 $36,000.00 17 17R Leachate G LF 165 $40.00 $6,600.00 $78.98 $13,031.70 $71.80 $11,847.00 $54.15 $8,934.75 18 18R Leachate Tr EACH 1 $20,000.00 $20,000.00 $59,025.00 $59,025.00 $53,803.00 $53,803.00 $40,755.00 $40,755.00 19 19R All Weathe LS 1 $17,500.00 $17,500.00 $55,027.00 $55,027.00 $41,527.00 $41,527.00 $45,800.00 $45,800.00 20 20R Site Energiz LS 1 $30,000.00 $30,000.00 $60,000.00 $60,000.00 $53,790.00 $53,790.00 $75,900.00 $75,900.00 21 21R Leachate P LS 1 $35,000.00 $35,000.00 $60,000.00 $60,000.00 $54,674.00 $54,674.00 $56,800.00 $56,800.00 22 22R Electrical C LF 155 $27.50 $4,262.50 $92.00 $14,260.00 $89.10 $13,810.50 $91.50 $14,182.50 GENERAL SITE IMPROVEMENTS AND STORMWATER DRAINAGE $467,520.00 $579,332.10 $570,465.45 $463,875.50 23 23R Excavate, H SY 12930 $2.50 $32,325.00 $1.37 $17,714.10 $2.04 $26,377.20 $1.85 $23,920.50 24 24R Temporary AC 1 $750.00 $750.00 $1,000.00 $1,000.00 $850.00 $850.00 $800.00 $800.00 25 25R Silt Fence, I LF 500 $2.00 $1,000.00 $3.00 $1,500.00 $5.00 $2,500.00 $2.00 $1,000.00 26 26R Erosion Ma SY 5250 $4.00 $21,000.00 $4.00 $21,000.00 $2.00 $10,500.00 $1.50 $7,875.00 27 27R Provide Ma CY 1780 $15.00 $26,700.00 $14.00 $24,920.00 $15.00 $26,700.00 $17.50 $31,150.00 28 28R 30' All-Wea LF 290 $34.00 $9,860.00 $35.20 $10,208.00 $37.00 $10,730.00 $39.25 $11,382.50 29 29R 18' All-Wea LF 1610 $31.00 $49,910.00 $32.00 $51,520.00 $30.00 $48,300.00 $23.25 $37,432.50 30 30R 18" Dia. HD LF 140 $38.00 $5,320.00 $50.00 $7,000.00 $85.00 $11,900.00 $43.75 $6,125.00 31 31R Riprap Slop LS 1 $10,000.00 $10,000.00 $12,000.00 $12,000.00 $16,000.00 $16,000.00 $12,350.00 $12,350.00 32 32R Phase 4 Ge CY 560 $16.00 $8,960.00 $20.00 $11,200.00 $19.00 $10,640.00 $20.25 $11,340.00 33 33R North Tran CY 3980 $7.50 $29,850.00 $20.00 $79,600.00 $11.00 $43,780.00 $8.05 $32,039.00 34 34R North Tran CY 6250 $15.50 $96,875.00 $15.00 $93,750.00 $18.00 $112,500.00 $5.15 $32,187.50 35 35R North Tran LF 600 $21.00 $12,600.00 $15.00 $9,000.00 $15.00 $9,000.00 $16.90 $10,140.00 36 36R Temporary LF 740 $20.00 $14,800.00 $50.00 $37,000.00 $37.00 $27,380.00 $39.50 $29,230.00 Engineer Estimate Meise Construction Inc Frank Silha & Sons Excavating, Inc RiverView Construction Inc. C2019-12 Landfill Phase 6 Construction (#6337906) Owner: Janesville WI, City of Solicitor: Janesville WI, City of 06/05/2019 02:01 PM CDT Section Titl Line Item Item Code Item DescriUofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Engineer Estimate Meise Construction Inc Frank Silha & Sons Excavating, Inc RiverView Construction Inc. 37 37R 8' Chainlink LF 1085 $30.00 $32,550.00 $40.00 $43,400.00 $42.00 $45,570.00 $45.10 $48,933.50 38 38R 25' Litter Fe LF 780 $130.00 $101,400.00 $169.00 $131,820.00 $153.00 $119,340.00 $168.00 $131,040.00 39 39R Monitoring LF 360 $14.00 $5,040.00 $20.00 $7,200.00 $49.49 $17,816.40 $43.00 $15,480.00 40 40R Gas Probe I LF 195 $44.00 $8,580.00 $100.00 $19,500.00 $156.83 $30,581.85 $110.00 $21,450.00 Base Bid Total:$4,986,536.10 $5,068,485.30 $5,466,755.05 $5,829,154.75