Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
C2019-11 NE Regional Trail Bid Tabs
C2019-11 Northeast Regional Trail (#6337856) Owner: Janesville WI, City of Solicitor: Janesville WI, City of 06/05/2019 02:01 PM CDT Section TitleLine Item Item Code Item DescriptionUofM Quantity Unit Price Extension Unit Price Extension Section Title $549,020.50 $535,146.45 1 1R Clearing STA 37 $200.00 $7,400.00 $415.67 $15,379.79 2 2R Grubbing STA 37 $300.00 $11,100.00 $211.00 $7,807.00 3 3R Removing Asphaltic SurfaceSY 110 $200.00 $22,000.00 $9.00 $990.00 4 4R Removing Concrete SidewalkSY 131 $10.00 $1,310.00 $8.00 $1,048.00 5 5R Excavation CommonCY 3082 $25.00 $77,050.00 $28.50 $87,837.00 6 6R Finishing Roadway (project)EACH 1 $3,500.00 $3,500.00 $5,200.00 $5,200.00 7 7R Base Aggregate Dense 1 1/4-InchTON5378 $26.00 $139,828.00 $21.50 $115,627.00 8 8R Asphaltic SurfaceTON 1120 $90.00 $100,800.00 $95.00 $106,400.00 9 9R Asphaltic FlumesSY 20 $60.00 $1,200.00 $72.00 $1,440.00 10 10R Apron Endwalls for Culvert Pipe Steel 12-InchEACH8$400.00 $3,200.00 $600.00 $4,800.00 11 11R Culvert Pipe Corrugated Steel 12-InchLF86 $70.00 $6,020.00 $102.00 $8,772.00 12 12R Concrete Curb & Gutter 30-Inch Type DLF104 $60.00 $6,240.00 $54.00 $5,616.00 13 13R Concrete Sidewalk 4-InchSF 359 $6.00 $2,154.00 $7.75 $2,782.25 14 14R Concrete Sidewalk 6-InchSF 298 $8.00 $2,384.00 $7.85 $2,339.30 15 15R Maintenance and Repair of Haul Roads (project)EACH 1 $1,500.00 $1,500.00 $0.01 $0.01 16 16R MobilizationEACH 1 $10,000.00 $10,000.00 $38,000.00 $38,000.00 17 17R Concrete Median Sloped NoseSF102 $10.00 $1,020.00 $10.00 $1,020.00 18 18R Water MGAL 36 $30.00 $1,080.00 $31.00 $1,116.00 19 19R Topsoil SY 9420 $5.00 $47,100.00 $1.75 $16,485.00 20 20R Silt Fence LF 2025 $2.10 $4,252.50 $1.90 $3,847.50 21 21R Silt Fence MaintenanceLF 2025 $0.20 $405.00 $0.20 $405.00 22 22R Mobilization Erosion ControlEACH 3 $250.00 $750.00 $300.00 $900.00 23 23R Mobilization Emergency Erosion ControlEACH3 $250.00 $750.00 $300.00 $900.00 24 24R Erosion Mat Class II Type CSY 1105 $6.00 $6,630.00 $4.65 $5,138.25 25 25R Inlet Protection Type DEACH 5 $125.00 $625.00 $165.00 $825.00 26 26R Culvert Pipe ChecksEACH 4 $25.00 $100.00 $120.00 $480.00 Engineer Estimate Rock Road Companies, Inc. 27 27R Tracking PadsEACH 5 $700.00 $3,500.00 $1,000.00 $5,000.00 28 28R Fertilizer Type BCWT 1 $200.00 $200.00 $100.00 $100.00 29 29R Seeding Mixture No. 40LB 19 $20.00 $380.00 $8.00 $152.00 30 30R Seeding Mixture No. 70LB 34 $140.00 $4,760.00 $170.00 $5,780.00 31 31R Seeding TemporaryLB 60 $6.00 $360.00 $3.50 $210.00 32 32R Sod Erosion ControlSY 18 $15.00 $270.00 $25.00 $450.00 33 33R Posts Wood 4x6-Inch x 12-FTEACH 4 $70.00 $280.00 $65.00 $260.00 34 34R Signs Type II Reflective HSF 14.5 $20.00 $290.00 $19.50 $282.75 35 35R Field Office Type BEACH 1 $3,500.00 $3,500.00 $11,000.00 $11,000.00 36 36R Marking Line Epoxy 4-Inch (White)LF 212 $2.00 $424.00 $11.50 $2,438.00 37 37R Marking Line Epoxy 4-Inch (Yellow)LF 212 $2.00 $424.00 $11.50 $2,438.00 38 38R Marking Arrow EpoxyEACH 2 $275.00 $550.00 $250.00 $500.00 39 39R Marking Symbol EpoxyEACH 2 $200.00 $400.00 $250.00 $500.00 40 40R Marking Yield Line Epoxy 18-InchEACH12 $300.00 $3,600.00 $130.00 $1,560.00 41 41R Marking Crosswalk Paint Ladder Pattern 24-InchLF192$16.00 $3,072.00 $50.00 $9,600.00 42 42R Marking Curb EpoxyLF 20 $10.00 $200.00 $30.00 $600.00 43 43R Marking Island Nose EpoxyEACH 2 $175.00 $350.00 $310.00 $620.00 44 44R Marking Removal Special MarkingEACH4 $150.00 $600.00 $150.00 $600.00 45 45R Sawing AsphaltLF 164 $2.75 $451.00 $1.55 $254.20 46 46R Sawing ConcreteLF 60 $3.00 $180.00 $2.55 $153.00 47 47R Miss Kim LilacEACH 47 $250.00 $11,750.00 $85.00 $3,995.00 48 48R River Birch, Single StemEACH 2 $500.00 $1,000.00 $545.00 $1,090.00 49 49R Redpointe MapleEACH 2 $500.00 $1,000.00 $545.00 $1,090.00 50 50R Common HackberryEACH 1 $500.00 $500.00 $545.00 $545.00 51 51R Emerald Green ArborvitaeEACH 8 $500.00 $4,000.00 $390.00 $3,120.00 52 52R Profile Curb CutLF 94 $22.00 $2,068.00 $25.00 $2,350.00 53 53R 3-Rail Split Rail Fence, 42-inchLF200 $28.00 $5,600.00 $18.70 $3,740.00 54 54R Staked WattlesLF 150 $3.00 $450.00 $8.00 $1,200.00 55 55R Traffic ControlLS 1 $3,000.00 $3,000.00 $9,250.00 $9,250.00 56 56R Construction StakingLS 1 $10,000.00 $10,000.00 $9,000.00 $9,000.00 57 57R Concrete Sidewalk 8-InchSF 952 $9.00 $8,568.00 $8.00 $7,616.00 58 58R Curb Ramp Detectable Warning Field Cast Iron UnpaintedSF160$40.00 $6,400.00 $50.00 $8,000.00 59 59R Heavy HydromulchingSY 8330 $1.50 $12,495.00 $0.78 $6,497.40 Base Bid Total:$549,020.50 $535,146.45