Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
C2017-23 Bike Trail Replacementl BID TABS
C2017-23 Bike Trail Pavement Replacement (#5435684) Owner: City of Janesville, WI Solicitor: City of Janesville, WI 12/13/2017 02:00 PM CST Section Title Bid Items Base Bid Total: Line Item 1 2 3 4 5 6 7 8 Item Code 1A 2A 3A 4A 5A 6A 7A 8A Item Description TRAFFIC CONTROL - PEDESTRIAN /TRAIL USER & VEHICULAR ASPHALT TRAIL PAVEMENT REMOVAL PULVERIZE AND RELAY TRAIL PAVEMENT NEW ASPHALT TRAIL PAVEMENT, 2" TRAIL EDGE RESTORATION (INCLUDES 2" TOPSOIL, FERTILIZER, SEED, & MULCH) PAVEMENT MARKING, 4" YELLOW, 3' LINE W/ 9' GAP CURB AND GUTTER REPLACEMENT TRAIL CURB RAMP (INCLUDES 6" CONCRETE RAMP, 2'X 10' DETECTABLE WARNING PANEL, RESTORATION) UofM LS SY SY SY LF LF LF SF Quantity 1 285 4380 4665 3934 1050 52 305 Engineer Estimate Unit Price 3000 10 3 12 1 1 50 18 Extension 88044 3000 2850 13140 55980 3934 1050 2600 5490 88044 W.N. Yoss Construction, Inc. Unit Price 300 10.15 2.35 9.85 2.22 0.5 70 14.87 Extension 76869.83 300 2892.75 10293 45950.25 8733.48 525 3640 4535.35 76869.83 Rock Road Companies, Inc. Unit Price 1400 12.5 3.75 8.75 6.25 0.55 83.25 13.5 Extension 95817.75 1400 3562.5 16425 40818.75 24587.5 577.5 4329 4117.5 95817.75 Poblocki Paving Corporation Unit Price 2700 4.28 3.01 14.47 3 1.08 112.62 17.72 Extension 108802.99 2700 1219.8 13183.8 67502.55 11802 1134 5856.24 5404.6 108802.99 Frank Bros, Inc Unit Price 1500 6.2 3.5 15 7.47 2 45 10 Extension 125448.98 1500 1767 15330 69975 29386.98 2100 2340 3050 125448.98