Bid Results Bid Schedule C-2012 (2)
*CONTRACTS AWARDED TO LOW BIDDER 4/9/2012
15 March 2012:Page 1 of 2
Bid Opening: 14 March 2012
CITY OF JANESVILLE
TABULATION OF BIDS
PUBLIC WORKS BID SCHEDULE “C” – 2012
2012-10 RIVERSIDE PARK STORAGE BUILDING
Harmony Construction Management, Inc. Total Bid: $98,500.00
*
906 Jonathon Drive
Madison, WI 53713
Gilbank Construction, Inc. Total Bid: $98,800.00
301 Scot Drive, P.O. Box 718
Clinton, WI 53525
Corporate Contractors, Inc. Total Bid: $99,967.00
655 Third Street, Suite 300
Beloit, WI 53511
Paulson Kimball Construction, LLC Total Bid: $100,625.00
917 Todd Drive
Janesville, WI 53546
Magill Construction Company, Inc. Total Bid: $108,800.00
977 Koopman Lane
Elkhorn, WI 53121
Scherrer Construction Co., Inc. Total Bid: $112,777.00
601 Blackhawk Drive
Burlington, WI 53105
J:\Development\Engineering\Public Works\Bid Results\2012\Bid Results Bid Schedule C-2012.doc
*CONTRACTS AWARDED TO LOW BIDDER 4/9/2012
15 March 2012:Page 2 of 2
Bid Opening: 14 March 2012
CITY OF JANESVILLE
TABULATION OF BIDS
PUBLIC WORKS BID SCHEDULE “C” – 2012
2012-11 SEWER AND WATER
*R. T. Fox Contractors, Inc. Total – Part A: $60,975.00
5628 Hwy. M Total – Part B: $188,805.00
Edgerton, WI 53534 Total – Part C: $79,276.00
Grand Total: $329,056.00
Alternate Bid: $29,205.00
Speedway Sand & Gravel, Inc. Total – Part A: $69,230.00
8500 Greenway Blvd., Suite 202 Total – Part B: $283,465.00
Middleton, WI 53562 Total – Part C: $102,225.25
Grand Total: $454,920.25
Alternate Bid: $47,524.50
Globe Contractors, Inc. Total – Part A: $66,155.00
N50 W23076 Betker Road Total – Part B: $309,466.00
Pewaukee, WI 53072 Total – Part C: $90,257.50
Grand Total: $465,878.50
Alternate Bid: $45,210.00
E & N Hughes Co., Inc. Total – Part A: $71,605.00
N2629 Coplien Road, P.O. Box 408 Total – Part B: $307,353.60
Monroe, WI 53566 Total – Part C: $87,046.95
Grand Total: $466,005.55
Alternate Bid: $55,782.50
Iverson Construction, LLC Total – Part A: $76,205.00
3190 County Hy. N Total – Part B: $352,550.00
Cottage Grove, WI 53527 Total – Part C: $85,713.75
Grand Total: $514,468.75
Alternate Bid: $44,566.00
J:\Development\Engineering\Public Works\Bid Results\2012\Bid Results Bid Schedule C-2012.doc