Loading...
#4 Award of contracts 2012-10 (Riverside Park Storage building) and 2012-11 (sewer & water along Sandhill Drive) DEPARTMENT OF PUBLIC WORKS MEMORANDUM 30 March 2012 TO: City Council FROM: Mike Payne, Engineering Manager SUBJECT: AWARD OF BID SCHEDULE “C” – 2012 CONTRACT 2012-10, RIVERSIDE PARK STORAGE BUILDING CONTRACT 2012-11, SEWER AND WATER Summary Bids for Public Works Bid Schedule “C” – 2012, Contracts 2012-10, and -11 were opened on Wednesday, March 14, 2012. Each of the low bids was found to be responsive and acceptable. Recommendation Following review by the Council, the Engineering Division recommends award of Contracts 2012-10, and -11 to the low bidders and that the City Council express their intent to include necessary funding in the 2012 note issue. City Manager Recommendation The City Manager recommends approval. Suggested Motion I move to award the base bid for Contract 2012-10 and base bid plus alternate bid for Contract 2012-11 to the low bidders and express the intent to include in the 2012 Note Issue $401,250 for the Contract 2012-11. Background Contract 2012-10, Riverside Park Storage Building This project includes construction of a 36 ft x 32 ft park storage building in Riverside Park. The proposed building is similar to previous buildings constructed in Palmer and Rockport parks. The building will be located at the south end of the park near the public restroom building and will incorporate similar materials and color scheme. We received six (6) bids for this project, with Harmony Construction Management providing the low bid. The Engineering Division is recommending award of this contract to Harmony Construction Management, Inc., Madison, WI, in the amount of $98,500. The bids received are shown below: Harmony Construction Management, Inc. Total Bid: $98,500.00 906 Jonathon Drive Madison, WI 53713 AWARD OF BID SCHEDULE “C” – 2012 CONTRACT 2012-10, RIVERSIDE PARK STORAGE BUILDING CONTRACT 2012-11, SEWER AND WATER 30 MARCH 2012 – PAGE 2. Gilbank Construction, Inc. Total Bid: $98,800.00 301 Scot Drive, P.O. Box 718 Clinton, WI 53525 Corporate Contractors, Inc. Total Bid: $99,967.00 655 Third Street, Suite 300 Beloit, WI 53511 Paulson Kimball Construction, LLC Total Bid: $100,625.00 917 Todd Drive Janesville, WI 53546 Magill Construction Company, Inc. Total Bid: $108,800.00 977 Koopman Lane Elkhorn, WI 53121 Scherrer Construction Co., Inc. Total Bid: $112,777.00 601 Blackhawk Drive Burlington, WI 53105 Funding for Contract 2012-10 was included in the 2010 Note Issue. At that time, $200,000 was included for the Riverside Park storage building and a maintenance building for Oakhill cemetery. There are no immediate plans to construct a cemetery building at this time. Contract 2012-11, Sewer and Water This project provides a sewer and water extension along Sandhill Drive immediately west of N. Wright Road to serve a proposed Agrace HospiceCare facility to be constructed in 2012. The contract also includes a sewer extension through Riverside Park to connect public buildings to sewer as well as Wedges and the Elks Lodge. We received five (5) bids for this project, with R. T. Fox Contractors providing the low bid. The Engineering Division is recommending award of the base bid plus alternate bid to R. T. Fox Contractors Inc., Edgerton, WI, in the amount of $358,261. Part A of the contract is water main and water laterals. Part B of the contract is sanitary sewer and sanitary laterals. Part C of the contract is storm sewer and miscellaneous contract items. The alternate bid item includes the Sandhill Drive street excavation and base construction. Curb and gutter and asphalt paving will be completed under separate contracts to complete the street construction. The bids received are shown below: R. T. Fox Contractors, Inc. Total – Part A: $60,975.00 5628 Hwy. M Total – Part B: $188,805.00 Edgerton, WI 53534 Total – Part C: $79,276.00 Grand Total: $329,056.00 Alternate Bid: $29,205.00 AWARD OF BID SCHEDULE “C” – 2012 CONTRACT 2012-10, RIVERSIDE PARK STORAGE BUILDING CONTRACT 2012-11, SEWER AND WATER 30 MARCH 2012 – PAGE 3. Speedway Sand & Gravel, Inc. Total – Part A: $69,230.00 8500 Greenway Blvd., Suite 202 Total – Part B: $283,465.00 Middleton, WI 53562 Total – Part C: $102,225.25 Grand Total: $454,920.25 Alternate Bid: $47,524.50 Globe Contractors, Inc. Total – Part A: $66,155.00 N50 W23076 Betker Road Total – Part B: $309,466.00 Pewaukee, WI 53072 Total – Part C: $90,257.50 Grand Total: $465,878.50 Alternate Bid: $45,210.00 E & N Hughes Co., Inc. Total – Part A: $71,605.00 N2629 Coplien Road, P.O. Box 408 Total – Part B: $307,353.60 Monroe, WI 53566 Total – Part C: $87,046.95 Grand Total: $466,005.55 Alternate Bid: $55,782.50 Iverson Construction, LLC Total – Part A: $76,205.00 3190 County Hwy. N Total – Part B: $352,550.00 Cottage Grove, WI 53527 Total – Part C: $85,713.75 Grand Total: $514,468.75 Alternate Bid: $44,566.00 Anticipated Project Costs: Contract $358,261 Force Account, Engineering, & Contingency (12%) $42,989 Total = $401,250 Project Funding: 2012 Note Issue – Special Assessments (Water Utility) $51,000 2012 Note Issue – Special Assessments (WW Utility) $124,000 2012 Note Issue – Special Assessments (SW Utility) $45,250 2012 Note Issue – Wastewater Utility $148,000 2012 Note Issue – Street Special Assessments (G. F.) $33,000 Total = $401,250 cc: Eric Levitt, Jay Winzenz, Carl Weber