#3 Award of contracts for public works bid schedule EDEPARTMENT OF PUBLIC WORKS MEMORANDUM 15 September 2011 TO: City Council FROM: Mike Payne, Engineering Manager SUBJECT: AWARD OF BID SCHEDULE “E” – 2011 CONTRACT 2011-17, SANITARY SEWER LATERAL LINING CONTRACT 2011-18, VARIABLE FREQUENCY DRIVE UPGRADES CONTRACT 2011-19, SANITARY SEWER REPAIR CONTRACT 2011-20, MONTEREY DAM EARTHEN EMBANKMENT Summary Bids for Public Works Bid Schedule “E” – 2011, Contracts 2011-17 -18 -19, and -20, were opened on Wednesday, September 14, 2011. Each of the low bids was found to be responsive and acceptable. Recommendation Following review by the Council, the Engineering Division recommends award of Contracts 2011-17, -18 (base bid plus alternates 1 & 2), -19 and -20 to the low bidders and that the City Council express their intent to include in the 2011 Note Issue $205,150 for sanitary sewer lateral lining; $331,100 for variable frequency drives; and $34,000 for sanitary sewer repairs. Assistant City Manager Recommendation I concur with the staff recommendation. Suggested Motion I move to award Contracts 2011-17, -18 (base bid plus alternates 1 & 2), -19 and -20 to the low bidders as recommended and express the intent to include in the 2011 Note Issue $205,150 for sanitary sewer lateral lining; $331,100 for variable frequency drives; and $34,000 for sanitary sewer repairs. Background Contract 2011-17, Sanitary Sewer Lateral Lining This project includes work for the lining of approximately 40 sanitary sewer lateral connections on sewer mains under existing paved streets. We received three (3) bids for this project, with McCann’s Underground providing the low bid. The Engineering Division is recommending award of the contract to McCann’s Underground, Oregon, Wisconsin, in the amount of $205,150. The bids received are shown below: AWARD OF PUBLIC WORKS BID SCHEDULE “E” – 2011 15 SEPTEMBER 2011 – PAGE 2. 2011-17 Sanitary Sewer Lateral Lining McCann’s Underground Total Bid: $205,150.00 611 N. Burr Oak Avenue Oregon, WI 53575 Musson Brothers, Inc. Total Bid: $213,335.00 4215 N. 124th Street Brookfield, WI 53005 Performance Pipelining, Inc. Total Bid: Incomplete Bid 1551 W. Norris Drive Ottawa, IL 61350 Funding for this project is included the 2011 Note Issue. Contract 2011-18, Variable Frequency Drive Upgrades This project includes installation of 17 variable frequency drives and associated controls at Pumping Stations 4, 5, 7, 10, 12 and 14. The work includes installation of equipment within existing motor control center structures for well and booster pumps at each site. We received three (3) bids for this project, with L. W. Allen Inc. providing the low bid. The Engineering Division is recommending award of the base bid plus alternates 1 & 2 to L. W. Allen Inc., Madison, Wisconsin, in the amount of $469,100. The base bid includes work at pumping stations 12, 4, 14, and 7. Alternate 1 includes work at pumping station 10. Alternate 2 includes work at pumping station 5. Alternate 3 eliminates work at pumping station 4. Alternate 4 eliminates work at pumping station 12. The bids received are shown below: 2011-18 Variable Frequency Drive Upgrades L. W. Allen Inc. Base Bid: $335,600.00 4633 Tompkins Drive Alternative No. 1: $106,200.00 Madison, WI 53716 Alternative No. 2: $27,300.00 Alternative No. 3: $(36,400.00) Alternative No. 4: $(98,000.00) Automation Solutions of America, Inc. Base Bid: $370,325.00 1390 Gateway Blvd. Alternative No. 1: $91,200.00 Beloit, WI 53511 Alternative No. 2: $27,155.00 Alternative No. 3: $(84,800.00) Alternative No. 4: $(49,150.00) Instrument Control Systems, Inc. Base Bid: $412,585.00 AWARD OF PUBLIC WORKS BID SCHEDULE “E” – 2011 15 SEPTEMBER 2011 – PAGE 3. 13005 16th Avenue North Alternative No. 1: $96,810.00 Plymouth, MN 55441 Alternative No. 2: $29,247.00 Alternative No. 3: $(33,287.00) Alternative No. 4: $(110,621.00) Funding for this project includes $138,000 in Focus on Energy monies and $331,100 in the 2011 Note Issue. Contract 2011-19, Sanitary Sewer Repair This project consists of excavated repair/replacement and associated street restoration of approximately 15 point repairs on existing 8” sanitary sewer and manholes under existing paved streets. We received three (3) bids for this project, with Bjoin Limestone, Inc. providing the low bid. The Engineering Division is recommending award of the contract to Bjoin Limestone, Inc., Janesville, Wisconsin, in the amount of $102,963.20. The bids received are shown below: 2011-19 Sanitary Sewer Repair Bjoin Limestone, Inc. Total Bid: $102,963.20 7308 W. State Road 11 Janesville, WI 53548 E & N Hughes Co., Inc. Total Bid: $177,854.50 N2629 Coplien Road, P.O. Box 408 Monroe, WI 53566 Speedway Sand & Gravel Inc. Total Bid: $184,080.00 8500 Greenway Blvd., Suite 202 Middleton, WI 53562 Funding for this contract include $34,000 in the 2011 Note Issue and $68,963.20 in Wastewater Utility operating funds. Contract 2011-20, Monterey Dam Earthen Embankment This project is necessary for the construction of an approximately 180 L.F. water retaining dam structure on an impoundment adjacent to the Rock River, including excavation and gravel backfill, rock fill, vinyl sheet piling, and other items including steel walers, tie rod anchors, and timber cap. We received three (3) bids for this project, with Speedway Sand & Gravel, Inc. providing the low bid. The Engineering Division is recommending award of the contract to Speedway Sand & Gravel, Inc., Middleton, Wisconsin, in the amount of $296,800. The bids received are shown below: AWARD OF PUBLIC WORKS BID SCHEDULE “E” – 2011 15 SEPTEMBER 2011 – PAGE 4. 2011-20 Monterey Dam Earthen Embankment Speedway Sand & Gravel, Inc. Total Bid: $296,800.00 8500 Greenway Blvd., Suite 202 Middleton, WI 53562 Terra Engineering & Construction Total Bid: $398,100.00 Corporation 2201 Vondron Road Madison, WI 53718-6795 McMullen & Pitz Construction Company Total Bid: $420,720.00 17 Maritime Drive Manitowoc, WI 54220 Funding for this project is Emergency Assistance Program federal monies to as a result of damage that occurred during the 2008 flood. There will be no local funds used for this project. cc: Eric Levitt Jay Winzenz Carl Weber