Loading...
#5 Approve final certified survey map 11009-C, Vineyard Land Company, 3 lots on E Milwaukee Community Development Department Memorandum September 8, 2011 TO: Janesville City Council FROM: Brad Schmidt, AICP, Associate Planner SUBJECT: CSM 11009-C, Vineyard Land Co. – 3 Lot CSM The Plan Commission recently reviewed and recommended approval of CSM 11009-C. This item was added to the September 12, 2011 Council agenda. However, the applicant has notified me that he would like to have this item removed from the Council agenda at this time. Community Development Department Memorandum September 12, 2011 TO: Janesville City Council FROM: Brad Schmidt, AICP, Associate Planner SUBJECT: Final CSM 11009-C, Vineyard Land Co., 3 Lots along E. Milwaukee St. SUMMARY Vineyard Land Co. has requested the approval of a three lot certified survey map located 4412 E. Milwaukee Street. The subject property was platted in the past as part of the Wuthering Hills Northeast Fifth Addition. The property is zoned R1, Single and Two- Family Residence District. Lot 3 of the proposed CSM includes an existing residence and two out buildings which consist of legal, non-conforming structures on the site. The applicant proposes to create two new single-family home sites on Lots 1 and 2 of the proposed CSM. DEPARTMENT RECOMMENDATION The Plan Commission and Community Development Department recommend that the City Council support a motion to approve Final CSM 11009-C. CITY MANAGER RECOMMENDATION The City Manager concurs with the Plan Commission recommendation. SUGGESTED MOTION A motion to approve Final CSM 11009-C. ANALYSIS A. The site was previously platted. The survey area contains approximately 2.4 acres of land and is zoned R1, Single and Two-Family Residence District. The site currently contains a single-family residence and two detached accessory buildings. The configurations of the lots proposed are adequate in size and shape to satisfy the zoning and subdivision ordinance requirements. B. The future land use designation for this site is Single Family Residential. The zoning of this site is consistent with this designation. C. The survey complies with the requirements of the City’s Subdivision and Zoning Ordinance. D. The final survey includes all existing utility easements and additional utility easements as requested by the utility companies having rights to serve the area. E. The site has existing sidewalks on E. Milwaukee Street. F. A drainage easement currently exists on the southern part of Lots 1,2 and 3 which is adjacent to the public greenbelt and a corresponding not indicating the existence of the public greenbelt has been added to the survey. G. This site was previously platted and therefore, no new special assessments need to be collected for the CSM. H. The applicant should contact the City Clerk’s Office regarding any outstanding taxes, special assessments, or other fees which must be paid. PLAN COMMISSION ACTION – September 6, 2011 The Plan Commission unanimously agreed to forward Final CSM 11009-C to the City Council with a favorable recommendation. cc: Eric Levitt Jay Winzenz