#1 Award of contracts 2011-1 through 2011-7DEPARTMENT OF PUBLIC WORKS MEMORANDUM 14 March 2011 TO: City Council FROM: Mike Payne, Engineering Manager SUBJECT: AWARD OF BID SCHEDULE “A” – 2011 CONTRACT 2011-1, STREET RESURFACING CONTRACT 2011-2, CURB & GUTTER AND SIDEWALK REPLACEMENT CONTRACT 2011-3, MANHOLE REHABILITATION/RECONSTRUCTION CONTRACT 2011-4, NEW SIDEWALK CONTRACT 2011-5, SOUTH PEARL STREET RECONSTRUCTION CONTRACT 2011-6, BLACK BRIDGE WATERMAIN CONTRACT 2011-7, PALMER DRIVE & CAMDEN PARKING LOT RECONSTRUCTION Summary Bids for Public Works Bid Schedule “A” – 2011, Contracts 2011-1, -2, -3, -4, -5, 6, and -7, were opened on Wednesday, February 23, 2011. Each of the low bids was found to be responsive and acceptable. Recommendation Following review by the Council, the Engineering Division recommends award of Contracts 2011-1, -2, -3, -4, -5, -6 and -7 to the low bidders and that the City Council express their intent to include in the 2011 Note Issue $871,000 for street rehabilitation, $690,000 for curb and gutter replacement, $79,000 for manhole rehabilitation/reconstruction, $522,000 for sidewalks, $1,125,000 for water main installation, and $150,000 for parking lot reconstruction. City Manager Recommendation I recommend approval. While I have a concern about the fact that these projects will be committing toward the 2011 Note Issue, I believe they are basic capital projects that protect our infrastructure and therefore recommend approval. Suggested Motion I move to Award contracts 2011-1, 2011-2, 2011-3, 2011-4, 2011-5, 2011-6 and 2011-7 to the low bidders and express the intent to include in the 2011 Note Issue $871,000 for street rehabilitation, $690,000 for curb and gutter replacement, $79,000 for manhole rehabilitation/reconstruction, $522,000 for sidewalks, $1,125,000 for water main installation, and $150,000 for parking lot reconstruction. AWARD OF PUBLIC WORKS BID SCHEDULE “A” – 2011 14 MARCH 2011 – PAGE 2. Background Contract 2011-1, Street Resurfacing The work to be accomplished by this project includes approximately 5.2 miles of street rehabilitation and 3.6 miles of final surface on streets constructed in 2007 and 2008. The weighted average asphalt unit price decrease from last year was 7.5%. We received two (2) bids for this project, with Rock Road Companies, Inc. providing the low bid. The Engineering Division is recommending award of this contract to Rock Road Companies, Inc. of Janesville, Wisconsin, in the amount of $1,175,714.15. The bids received are shown below: 2011-1 STREET RESURFACING Rock Road Companies, Inc. Total Bid: $1,175,714.15 P.O. Box 1779 Janesville, WI 53547 Frank Bros., Inc. Total Bid: $1,477,723.44 2501 Morse Street Janesville, WI 53545 Funding for Contract 2011-1 will come from various sources: the $255,500 for final street surface will be paid from special assessments charged to properties at the time of initial street construction. Street resurfacing will be funded through a combination of operating budgets ($362,200) and the 2011 Note Issue ($560,000). The 2011 Major Capital Projects budget anticipated $975,000 would be included in the 2011 Note Issue for street maintenance which is being completed under Contracts 2011-1, 2, 5 and 7. Contract 2011-2, Curb & Gutter and Sidewalk Replacement This project provides for the replacement of sections of curb and gutter for streets that are to be resurfaced in 2011 under Contract 2011-1, Street Resurfacing. This project also includes a sidewalk maintenance program the Council requested staff implement in coordination with street rehabilitation. We received two (2) bids for this project, with Yeske Construction Co., Inc. providing the low bid. The Engineering Division is recommending award to Yeske Construction Co., Inc. of Edgerton, Wisconsin, in the amount of $658,725. The bids received are shown below: 2011-2 CURB & GUTTER AND SIDEWALK REPLACEMENT Yeske Construction Co., Inc. Total Bid: $658,725.00 P.O. Box 72 AWARD OF PUBLIC WORKS BID SCHEDULE “A” – 2011 14 MARCH 2011 – PAGE 3. Edgerton, WI 53534 E & N Hughes Co., Inc. Total Bid: $809,586.50 P.O. Box 408, N2629 Coplien Road Monroe, WI 53566 Funding for this project is a combination of sources. Sidewalk costs will be funded by $81,000 from 2011 Note Issue borrowing and $38,000 billed to affected property owners. Curb & gutter costs will be funded by $540,000 from 2011 Note Issue borrowing. The 2011 Major Capital Projects budget anticipated $975,000 for curb and gutter replacement (which is being completed under Contracts 2011-2, 5 and 7) and $200,000 for sidewalk replacement. Contract 2011-3, Manhole Rehabilitation/Reconstruction This project rehabilitates or reconstructs existing sanitary sewer, water valve, and storm sewer manholes in paved streets prior to the 2011 annual street resurfacing contract. This is the fourth year of an annual program for maintaining utility manholes in conjunction with the street maintenance program. We opened two (2) bids for this project, with Infrastructure Technologies, Inc. providing the low bid. The Engineering Division is recommending award of this contract to Infrastructure Technologies, Inc., Rogers, MN, for a total amount bid of $211,859. Part A of the bid includes work related to manhole rehabilitation/reconstruction, while Part B of the bid includes work related only to manhole chimney rehabilitation/reconstruction. The bids received are shown below: 2011-3 MANHOLE REHABILITATION/RECONSTRUCTION Infrastructure Technologies, Inc., Total Part A: $78,764.00 dba Infratech Total Part B: $133,095.00 21040 Commerce Blvd. Total Bid: $211,859.00 Rogers, MN 55374 E & N Hughes Co., Inc. Total Part A: $93,054.00 P.O. Box 408, N2629 Coplien Road Total Part B: $165,819.00 Monroe, WI 53566 Total Bid: $258,873.00 Funding for this project is from various sources. The sanitary manholes are funded with $133,665 Wastewater Utility operating funds, the storm sewer manholes ($27,525) will be included as part of the $200,000 planned for the 2011 Note Issue borrowing, and the water valve manholes ($50,669) will be included as part of the $165,000 planned for the 2011 Note Issue borrowing. The 2011 Major Capital Projects budget anticipated AWARD OF PUBLIC WORKS BID SCHEDULE “A” – 2011 14 MARCH 2011 – PAGE 4. $200,000 and $165,000 would be included in the 2011 Note Issue for storm sewer manholes and water valve manholes, respectively. Contract 2011-4, New Sidewalk This Contract includes installation of 74,000 S.F. of new sidewalk at locations included on Resolution No. 2010-742 that were approved by City Council on October 25, 2010. Four (4) bids were received for this project, with J. B. Johnson Bros. providing the low bid. The Engineering Division is recommending award of this contract to J. B. Johnson Bros, LLC, Edgerton, Wisconsin, in the amount of $408,113.75. The bids received are shown below: 2011-4 NEW SIDEWALK J. B. Johnson Bros., LLC Total Bid: $408,113.75 12 Maple Court Edgerton, WI 53534 E & N Hughes Co., Inc. Total Bid: $465,019.15 P.O. Box 408, N2629 Coplien Road Monroe, WI 53566 Ti-Zack Concrete, Inc. Total Bid: $490,524.75 39352 221st Avenue LeCenter, MN 56057 Yeske Construction Co., Inc. Total Bid: $599,992.00 P.O. Box 71 Edgerton, WI 53534 Engineering and Finance staff will calculate assessment rates using actual bid prices. Funding for this work will be provided by several sources including special assessments to the abutting property owners ($225,000), the City Funded Sidewalk account ($14,000), and 2011 Note Issue borrowing ($170,000). The Major Capital Projects budget anticipated $200,000 would be included in the 2011 Note Issue for sidewalk ramps / locations abutting public property and $480,000 for sidewalk assessable to property owners. Contract 2011-5, South Pearl Street Reconstruction The work to be accomplished by this project includes the reconstruction of S. Pearl Street between W. Court Street and Rockport Road, including total curb & gutter AWARD OF PUBLIC WORKS BID SCHEDULE “A” – 2011 14 MARCH 2011 – PAGE 5. replacement, and reconstruction of three railroad track crossings. The City will be participating in reconstructing railroad track crossings by Wisconsin & Southern and Union Pacific. These costs will be incurred outside of this contract and are estimated at $35,000. Funding for the railroad work crossings is included in the street maintenance operating budget as a specific line item. We received four (4) bids for this project, with Frank Silha & Sons Excavating, Inc. providing the low bid. The Engineering Division is recommending award of this contract to Frank Silha & Sons Excavating, Inc. of Janesville, Wisconsin, in the amount of $467,635.50. The bids received are shown below: 2011-5 SOUTH PEARL STREET RECONSTRUCTION Frank Silha & Sons Excavating, Inc. Total Bid: $467,635.50 348 Highway 14 East Janesville, WI 53546 Rock Road Companies, Inc. Total Bid: $467,900.42 P.O. Box 1779 Janesville, WI 53547 Frank Bros., Inc. Total Bid: $489,211.95 2501 Morse Street Janesville, WI 53545 E & N Hughes Co., Inc. Total Bid: $491,696.10 P.O. Box 408, N2629 Coplien Road Monroe, WI 53566 This is a Local Road Improvement Program (LRIP) project. Funding for this project is from various sources. The street improvements are funded with $152,323 of LRIP funds and $181,000 of 2011 Note Issue borrowing as part of the $975,000 planned for streets, while the curb & gutter are funded with $135,000 of 2011 Note Issue borrowing as part of the $975,000 planned for curb & gutter improvements. The 2011 Major Capital Projects budget anticipated $975,000 would be included in the 2011 Note Issue for street maintenance and $975,000 for curb & gutter replacement. Contract 2011-6, Black Bridge Watermain This Contract extends a 24” water main approximately 1 mile as phase 2 of last year’s transmission main project. Also included is all necessary restoration/replacement of curb & gutter, driveways, sidewalk and terraces and erosion control. pavement, AWARD OF PUBLIC WORKS BID SCHEDULE “A” – 2011 14 MARCH 2011 – PAGE 6. Five (5) bids were received for this project, with Rawson Contractors, Inc. providing the low bid. The Engineering Division is recommending award of this contract to Rawson Contractors, Inc., Madison, Wisconsin, in the amount of $1,121,783. The bids received are shown below: 2011-6 BLACK BRIDGE WATERMAIN Rawson Contractors, Inc. Total Bid: $1,121,783.00 P.O. Box 259539 Madison, WI 53725 Globe Contractors, Inc. Total Bid: $1,126,890.00 N50 W23076 Betker Road Pewaukee, WI 53072 A-1 Excavating, Inc. Total Bid: $1,148,142.00 408 26th Avenue, P.O. Box 90 Bloomer, WI 54724 The Wanasek Corporation Total Bid: $1,155,070.00 29606 Durand Avenue Burlington, WI 53105 R. T. Fox Contractors, Inc. Total Bid: $1,159,400.00 5628 Hwy. M Edgerton, WI 53534 Funding for this project will be the 2011 Note Issue. The 2011 Major Capital Projects budget included $1,500,000 for this project. Contract 2011-7, Palmer Drive & Camden Parking Lot Reconstruction This Contract includes reconstructing Palmer Drive between Racine Street and Mohawk Road as well as well as reconstructing the existing parking lot near Camden playground and the wading pool. The roadway project has a second phase, related to the bridge over Spring Brook. Due to required traffic control staging and the desire to avoid construction while the wading pool is open, the parking lot and roadway work will be completed in the spring and the bridge project in the fall. Four (4) bids were received for this project, with Rock Road Companies, Inc. providing the low bid. The Engineering Division is recommending award of this contract to Rock Road Companies, Janesville, Wisconsin, in the amount of $233,375.49. The bids received are shown below: AWARD OF PUBLIC WORKS BID SCHEDULE “A” – 2011 14 MARCH 2011 – PAGE 7. 2011-7 PALMER DRIVE & CAMDEN PARKING LOT RECONSTRUCTION Rock Road Companies, Inc. Total Bid: $233,375.49 P.O. Box 1779 Janesville, WI 53547 Bjoin Limestone Inc. Total Bid: $263,632.50 7308 W. State Road 11 Janesville, WI 53548 Frank Bros., Inc. Total Bid: $274,971.54 2501 Morse Street Janesville, WI 53545 Custom Ditching, Inc. Total Bid: $309,656.50 2175 Townhall Road Beloit, WI 53511 Funding for this project is from various sources. The parking lot improvements are funded with $150,000 of designated 2011 Note Issue parking lot reconstruction funds while the street rehabilitation ($80,000 streets) and ($15,000 curb & gutter) will be included as part of the $975,000 planned for streets and $975,000 planned for curb & gutter in the 2011 Note Issue borrowing. The bridge related rehabilitation which is phase 2 of this project is estimated to cost $50,000. The 2011 Major Capital Projects budget included $215,000 for the parking lot reconstruction, $975,000 for street rehabilitation, and $975,000 for curb & gutter improvements. Attachment cc: Eric Levitt Jay Winzenz Carl Weber