Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Bid Tabs C2011-7, Palmer Drive Camden Parking Lot
CITY OF JANESVILLE BID DATE: FEBRUARY 23, 2011 PUBLIC WORKS BID SCHEDULE "A" - 2011 CONTRACT 2011-7, PALMER DRIVE & CAMDEN PARKING LOT RECONSTRUCTION BID RESULTS ROCK ROAD COS.BJOIN LIMESTONE, INC.FRANK BROS., INC.CUSTOM DITCHING, INC. BID RESULTS JANESVILLE, WIJANESVILLE, WIJANESVILLE, WIBELOIT, WI ITEM APPROX. UNIT OF UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR ITEM NO.QTY.MEASUREPRICEITEMPRICEITEMPRICEITEMPRICEITEM 1Traffic Control & One-Way Detour1L.S. $ 1,811.88 $ 1,811.88 $ 3,375.00 $ 3,375.00 $ 3,250.00 $ 3,250.00 $ 4,000.00 $ 4,000.00 2Clearing & Grubbing240I.D. $ 4.16 $ 998.40 $ 10.00 $ 2,400.00 $ 6.00 $ 1,440.00 $ 25.00 $ 6,000.00 Sawing Asphalt Pavement, 380L.F. $ 4.45 $ 356.00 $ 2.50 $ 200.00 $ 6.00 $ 480.00 $ 6.50 $ 520.00 Full Depth 4Asphalt Pavement Removal5,600S.Y. $ 0.43 $ 2,408.00 $ 1.00 $ 5,600.00 $ 1.35 $ 7,560.00 $ 2.50 $ 14,000.00 5Concrete Sidewalk Removal1,500S.F. $ 0.44 $ 660.00 $ 1.00 $ 1,500.00 $ 0.93 $ 1,395.00 $ 0.50 $ 750.00 6Salvaged Topsoil3,700S.Y. $ 1.99 $ 7,363.00 $ 4.50 $ 16,650.00 $ 1.92 $ 7,104.00 $ 3.00 $ 11,100.00 7Unclassified Excavation1,964C.Y. $ 7.55 $ 14,828.20 $ 10.50 $ 20,622.00 $ 7.58 $ 14,887.12 $ 8.00 $ 15,712.00 8Proof Rolling6STATIONS $ 24.62 $ 147.72 $ 65.00 $ 390.00 $ 23.00 $ 138.00 $ 50.00 $ 300.00 9Base Aggregate, Dense, 3"3,100TON $ 9.14 $ 28,334.00 $ 7.83 $ 24,273.00 $ 9.55 $ 29,605.00 $ 10.00 $ 31,000.00 10Base Aggregate, Dense, 1.25"2,900TON $ 9.14 $ 26,506.00 $ 8.08 $ 23,432.00 $ 9.55 $ 27,695.00 $ 10.00 $ 29,000.00 1 OF 5 CITY OF JANESVILLE BID DATE: FEBRUARY 23, 2011 PUBLIC WORKS BID SCHEDULE "A" - 2011 CONTRACT 2011-7, PALMER DRIVE & CAMDEN PARKING LOT RECONSTRUCTION BID RESULTS ROCK ROAD COS.BJOIN LIMESTONE, INC.FRANK BROS., INC.CUSTOM DITCHING, INC. BID RESULTS JANESVILLE, WIJANESVILLE, WIJANESVILLE, WIBELOIT, WI ITEM APPROX. UNIT OF UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR ITEM NO.QTY.MEASUREPRICEITEMPRICEITEMPRICEITEMPRICEITEM 11New Concrete Curb and Gutter, 30"1,230L.F. $ 8.91 $ 10,959.30 $ 9.75 $ 11,992.50 $ 11.00 $ 13,530.00 $ 10.25 $ 12,607.50 12New Concrete Curb and Gutter, 18"1,225L.F. $ 9.00 $ 11,025.00 $ 10.80 $ 13,230.00 $ 11.00 $ 13,475.00 $ 11.35 $ 13,903.75 13New Concrete Sidewalk - 4" 3,750S.F. $ 2.00 $ 7,500.00 $ 2.75 $ 10,312.50 $ 3.43 $ 12,862.50 $ 2.90 $ 10,875.00 14New Concrete Sidewalk - 6" 150S.F. $ 3.87 $ 580.50 $ 3.76 $ 564.00 $ 4.00 $ 600.00 $ 3.95 $ 592.50 15New Concrete Sidewalk - 8" 900S.F. $ 4.14 $ 3,726.00 $ 4.00 $ 3,600.00 $ 4.65 $ 4,185.00 $ 4.20 $ 3,780.00 Remove Inlet & 12" Concrete Storm 161LUMP SUM $ 953.03 $ 953.03 $ 800.00 $ 800.00 $ 1,400.00 $ 1,400.00 $ 1,000.00 $ 1,000.00 Sewer, Complete Storm Sewer Pipe, Reinforced 17260L.F. $ 26.80 $ 6,968.00 $ 28.00 $ 7,280.00 $ 41.50 $ 10,790.00 $ 45.00 $ 11,700.00 Concrete, Class III, 12" Storm Sewer Pipe, Reinforced 1840L.F. $ 26.70 $ 1,068.00 $ 29.00 $ 1,160.00 $ 41.50 $ 1,660.00 $ 45.00 $ 1,800.00 Concrete, Class V, 12" Storm Sewer Pipe, Reinforced 1942L.F. $ 31.51 $ 1,323.42 $ 31.00 $ 1,302.00 $ 47.00 $ 1,974.00 $ 45.00 $ 1,890.00 Concrete, Class III, 15" 2 OF 5 CITY OF JANESVILLE BID DATE: FEBRUARY 23, 2011 PUBLIC WORKS BID SCHEDULE "A" - 2011 CONTRACT 2011-7, PALMER DRIVE & CAMDEN PARKING LOT RECONSTRUCTION BID RESULTS ROCK ROAD COS.BJOIN LIMESTONE, INC.FRANK BROS., INC.CUSTOM DITCHING, INC. BID RESULTS JANESVILLE, WIJANESVILLE, WIJANESVILLE, WIBELOIT, WI ITEM APPROX. UNIT OF UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR ITEM NO.QTY.MEASUREPRICEITEMPRICEITEMPRICEITEMPRICEITEM 20New Storm Sewer Inlet5EACH $ 1,332.25 $ 6,661.25 $ 1,130.00 $ 5,650.00 $ 1,500.00 $ 7,500.00 $ 1,050.00 $ 5,250.00 2' x 4' Detectable Warning Field 214EACH $ 254.17 $ 1,016.68 $ 250.00 $ 1,000.00 $ 230.00 $ 920.00 $ 262.50 $ 1,050.00 Panel Asphaltic Concrete Pavement, Type E-0.3, Lower Layer, 22960TON $ 47.00 $ 45,120.00 $ 50.35 $ 48,336.00 $ 50.35 $ 48,336.00 $ 52.90 $ 50,784.00 AC PG 58-28 Asphaltic Concrete Pavement, Type E-0.3, Upper Layer, 23760TON $ 47.00 $ 35,720.00 $ 50.15 $ 38,114.00 $ 50.15 $ 38,114.00 $ 52.70 $ 40,052.00 AC PG 58-28 Pavement Markings, Epoxy, 4" 241,180L.F. $ 0.40 $ 472.00 $ 0.30 $ 354.00 $ 0.40 $ 472.00 $ 0.45 $ 531.00 Yellow Pavement Markings, Epoxy, White, 25500L.F. $ 0.91 $ 455.00 $ 0.76 $ 380.00 $ 0.90 $ 450.00 $ 0.95 $ 475.00 8" Channelizing Pavement Markings, Epoxy, White, 2655L.F. $ 4.03 $ 221.65 $ 4.00 $ 220.00 $ 4.00 $ 220.00 $ 4.25 $ 233.75 18" Stop Bar Pavement Markings, Epoxy, White, 275EACH $ 120.79 $ 603.95 $ 120.00 $ 600.00 $ 120.00 $ 600.00 $ 126.00 $ 630.00 Arrow, Type 2 Pavement Markings, Epoxy, White, 288EACH $ 120.79 $ 966.32 $ 150.00 $ 1,200.00 $ 120.00 $ 960.00 $ 126.00 $ 1,008.00 Word 3 OF 5 CITY OF JANESVILLE BID DATE: FEBRUARY 23, 2011 PUBLIC WORKS BID SCHEDULE "A" - 2011 CONTRACT 2011-7, PALMER DRIVE & CAMDEN PARKING LOT RECONSTRUCTION BID RESULTS ROCK ROAD COS.BJOIN LIMESTONE, INC.FRANK BROS., INC.CUSTOM DITCHING, INC. BID RESULTS JANESVILLE, WIJANESVILLE, WIJANESVILLE, WIBELOIT, WI ITEM APPROX. UNIT OF UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR ITEM NO.QTY.MEASUREPRICEITEMPRICEITEMPRICEITEMPRICEITEM Pavement Markings, Epoxy, White, 291,840L.F. $ 1.00 $ 1,840.00 $ 3.00 $ 5,520.00 $ 2.40 $ 4,416.00 $ 2.55 $ 4,692.00 4", Parking Stall Lines Pavement Markings, Epoxy, White, 308EACH $ 80.53 $ 644.24 $ 40.00 $ 320.00 $ 80.00 $ 640.00 $ 85.00 $ 680.00 Disabled Parking Stall Symbol 31Medium Rip Rap, Complete22S.Y. $ 31.16 $ 685.52 $ 30.00 $ 660.00 $ 16.36 $ 359.92 $ 25.00 $ 550.00 32Restoration, Prairie Grass1,950S.Y. $ 1.06 $ 2,067.00 $ 1.55 $ 3,022.50 $ 2.50 $ 4,875.00 $ 6.00 $ 11,700.00 33Restoration, Urban Lawn1,700S.Y. $ 1.12 $ 1,904.00 $ 1.25 $ 2,125.00 $ 2.24 $ 3,808.00 $ 5.00 $ 8,500.00 34Tracking Pad1L.S. $ 837.61 $ 837.61 $ 500.00 $ 500.00 $ 1,200.00 $ 1,200.00 $ 1,200.00 $ 1,200.00 35Inlet Protection, Type D6EACH $ 130.45 $ 782.70 $ 100.00 $ 600.00 $ 110.00 $ 660.00 $ 100.00 $ 600.00 36Inlet Protection, Type C4EACH $ 100.13 $ 400.52 $ 96.00 $ 384.00 $ 75.00 $ 300.00 $ 60.00 $ 240.00 37Silt Fence1,800L.F. $ 1.49 $ 2,682.00 $ 1.50 $ 2,700.00 $ 1.50 $ 2,700.00 $ 2.50 $ 4,500.00 4 OF 5 CITY OF JANESVILLE BID DATE: FEBRUARY 23, 2011 PUBLIC WORKS BID SCHEDULE "A" - 2011 CONTRACT 2011-7, PALMER DRIVE & CAMDEN PARKING LOT RECONSTRUCTION BID RESULTS ROCK ROAD COS.BJOIN LIMESTONE, INC.FRANK BROS., INC.CUSTOM DITCHING, INC. BID RESULTS JANESVILLE, WIJANESVILLE, WIJANESVILLE, WIBELOIT, WI ITEM APPROX. UNIT OF UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR ITEM NO.QTY.MEASUREPRICEITEMPRICEITEMPRICEITEMPRICEITEM 38Erosion Mat1,950S.Y. $ 1.10 $ 2,145.00 $ 1.52 $ 2,964.00 $ 2.10 $ 4,095.00 $ 3.00 $ 5,850.00 Erosion Bales $ 21.12 $ 633.60 $ 10.00 $ 300.00 $ 10.50 $ 315.00 $ 20.00 $ 600.00 3930EACH TOTAL AMOUNT BID - CONTRACT 2011-7: $ 233,375.49 $ 263,632.50 $ 274,971.54 $ 309,656.50 5 OF 5