Loading...
Bid Tabs C2011-5 South Pearl Street Reconstruction CITY OF JANESVILLE BID DATE: FEBRUARY 23, 2011 PUBLIC WORKS BID SCHEDULE "A" - 2011 CONTRACT 2011-5, SOUTH PEARL STREET RECONSTRUCTION BID RESULTS FRANK SILHA & SONS ROCK ROAD COS., INC.FRANK BROS., INC.E & N HUGHES CO., INC. EXCAV. INC. BID RESULTS JANESVILLE, WIJANESVILLE, WIMONROE, WI JANESVILLE, WI ITEM APPROX. UNIT OF UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR TOTAL FOR ITEMUNIT PRICE NO.QTY.MEASUREPRICEITEMPRICEITEMPRICEITEMITEM 1Traffic Control & Detour1L.S. $ 4,000.00 $ 4,000.00 $ 1,153.00 $ 1,153.00 $ 6,925.00 $ 6,925.00 $ 10,050.00 $ 10,050.00 2Clearing & Grubbing70I.D. $ 73.00 $ 5,110.00 $ 9.44 $ 660.80 $ 6.00 $ 420.00 $ 36.75 $ 2,572.50 Sawing Asphalt Pavement, 3340L.F. $ 3.00 $ 1,020.00 $ 1.51 $ 513.40 $ 1.80 $ 612.00 $ 2.20 $ 748.00 Full Depth 4Asphalt Pavement Removal8,120S.Y. $ 0.50 $ 4,060.00 $ 1.19 $ 9,662.80 $ 1.06 $ 8,607.20 $ 1.88 $ 15,265.60 5Curb and Gutter Removal5,250L.F. $ 0.75 $ 3,937.50 $ 2.01 $ 10,552.50 $ 3.95 $ 20,737.50 $ 1.25 $ 6,562.50 Concrete Sidewalk, Step, and Driveway Approach Removal 69,400S.F. $ 0.39 $ 3,666.00 $ 0.42 $ 3,948.00 $ 0.45 $ 4,230.00 $ 0.75 $ 7,050.00 12" Concrete Storm Sewer Removal, Complete 7150L.F. $ 8.00 $ 1,200.00 $ 7.87 $ 1,180.50 $ 18.00 $ 2,700.00 $ 10.00 $ 1,500.00 8Inlet Removal3EACH $ 500.00 $ 1,500.00 $ 139.54 $ 418.62 $ 200.00 $ 600.00 $ 150.00 $ 450.00 9Excavation, Non-Clay Materials2,700C.Y. $ 6.05 $ 16,335.00 $ 8.34 $ 22,518.00 $ 5.36 $ 14,472.00 $ 5.20 $ 14,040.00 10Excavation, Clay Material3,300C.Y. $ 9.20 $ 30,360.00 $ 8.34 $ 27,522.00 $ 6.78 $ 22,374.00 $ 6.60 $ 21,780.00 1 OF 5 CITY OF JANESVILLE BID DATE: FEBRUARY 23, 2011 PUBLIC WORKS BID SCHEDULE "A" - 2011 CONTRACT 2011-5, SOUTH PEARL STREET RECONSTRUCTION BID RESULTS FRANK SILHA & SONS ROCK ROAD COS., INC.FRANK BROS., INC.E & N HUGHES CO., INC. EXCAV. INC. BID RESULTS JANESVILLE, WIJANESVILLE, WIMONROE, WI JANESVILLE, WI ITEM APPROX. UNIT OF UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR TOTAL FOR ITEMUNIT PRICE NO.QTY.MEASUREPRICEITEMPRICEITEMPRICEITEMITEM 11Proof Rolling26STATIONS $ 25.00 $ 650.00 $ 28.96 $ 752.96 $ 23.00 $ 598.00 $ 20.00 $ 520.00 12Geogrid7,700S.Y. $ 2.00 $ 15,400.00 $ 2.60 $ 20,020.00 $ 3.40 $ 26,180.00 $ 3.50 $ 26,950.00 13Base Aggregate, Dense, 3"6,500TON $ 7.98 $ 51,870.00 $ 8.55 $ 55,575.00 $ 8.25 $ 53,625.00 $ 7.65 $ 49,725.00 14Base Aggregate, Dense, 1.25"4,100TON $ 11.60 $ 47,560.00 $ 8.55 $ 35,055.00 $ 8.40 $ 34,440.00 $ 8.98 $ 36,818.00 15Dust Control, Surface Treatment5,500S.Y. $ 0.72 $ 3,960.00 $ 0.52 $ 2,860.00 $ 0.65 $ 3,575.00 $ 1.04 $ 5,720.00 16Inlet Frame Adjustment90INCHES $ 40.00 $ 3,600.00 $ 51.63 $ 4,646.70 $ 56.00 $ 5,040.00 $ 62.00 $ 5,580.00 17New Concrete Curb and Gutter, 30"4,700L.F. $ 8.94 $ 42,018.00 $ 9.53 $ 44,791.00 $ 8.94 $ 42,018.00 $ 10.00 $ 47,000.00 New Concrete Curb and Gutter, 30", 18500L.F. $ 12.00 $ 6,000.00 $ 13.64 $ 6,820.00 $ 12.00 $ 6,000.00 $ 13.30 $ 6,650.00 with 10" Gutter 19New Concrete Sidewalk - 4" 2,500S.F. $ 3.70 $ 9,250.00 $ 4.36 $ 10,900.00 $ 3.70 $ 9,250.00 $ 4.25 $ 10,625.00 New Concrete Sidewalk or Driveway 203,350S.F. $ 3.60 $ 12,060.00 $ 3.60 $ 12,060.00 $ 3.55 $ 11,892.50 $ 4.10 $ 13,735.00 Approach - 6" New Concrete Sidewalk or Driveway 213,850S.F. $ 4.05 $ 15,592.50 $ 4.11 $ 15,823.50 $ 4.05 $ 15,592.50 $ 4.60 $ 17,710.00 Approach - 8" 2 OF 5 CITY OF JANESVILLE BID DATE: FEBRUARY 23, 2011 PUBLIC WORKS BID SCHEDULE "A" - 2011 CONTRACT 2011-5, SOUTH PEARL STREET RECONSTRUCTION BID RESULTS FRANK SILHA & SONS ROCK ROAD COS., INC.FRANK BROS., INC.E & N HUGHES CO., INC. EXCAV. INC. BID RESULTS JANESVILLE, WIJANESVILLE, WIMONROE, WI JANESVILLE, WI ITEM APPROX. UNIT OF UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR TOTAL FOR ITEMUNIT PRICE NO.QTY.MEASUREPRICEITEMPRICEITEMPRICEITEMITEM 22New Concrete Steps150S.F. $ 31.00 $ 4,650.00 $ 31.29 $ 4,693.50 $ 30.00 $ 4,500.00 $ 31.00 $ 4,650.00 23Loop Detector Conduit, 1" PVC220L.F. $ 8.00 $ 1,760.00 $ 5.64 $ 1,240.80 $ 8.20 $ 1,804.00 $ 7.35 $ 1,617.00 24Pull Box, Steel, 18" x 30"2EACH $ 500.00 $ 1,000.00 $ 677.68 $ 1,355.36 $ 717.00 $ 1,434.00 $ 330.00 $ 660.00 2' x 4' Detectable Warning Field 2513EACH $ 210.00 $ 2,730.00 $ 203.31 $ 2,643.03 $ 200.00 $ 2,600.00 $ 210.00 $ 2,730.00 Panel 26Asphalt Pavement Milling, 2" Depth350S.Y. $ 9.00 $ 3,150.00 $ 10.98 $ 3,843.00 $ 7.38 $ 2,583.00 $ 8.30 $ 2,905.00 Asphaltic Concrete Pavement, Type, E-3, Lower Layer, 271,650TON $ 49.00 $ 80,850.00 $ 42.00 $ 69,300.00 $ 49.00 $ 80,850.00 $ 50.90 $ 83,985.00 AC PG 58-28 Asphaltic Concrete Pavement, Type, E-3, Upper Layer, 281,100TON $ 49.00 $ 53,900.00 $ 43.00 $ 47,300.00 $ 49.00 $ 53,900.00 $ 50.90 $ 55,990.00 AC PG 58-28 Asphalt Driveway Approach, Type 1 292,300S.F. $ 1.61 $ 3,703.00 $ 3.69 $ 8,487.00 $ 2.25 $ 5,175.00 $ 1.65 $ 3,795.00 (Residential) Asphalt Driveway Approach, Type 2 302,250S.F. $ 2.15 $ 4,837.50 $ 6.15 $ 13,837.50 $ 3.03 $ 6,817.50 $ 2.20 $ 4,950.00 (Commercial) Pavement Markings, Epoxy, Yellow, 314,720L.F. $ 0.70 $ 3,304.00 $ 0.81 $ 3,823.20 $ 0.80 $ 3,776.00 $ 0.85 $ 4,012.00 4" Pavement Markings, Epoxy, White, 3260L.F. $ 3.00 $ 180.00 $ 2.01 $ 120.60 $ 2.00 $ 120.00 $ 2.10 $ 126.00 8" Channelizing 3 OF 5 CITY OF JANESVILLE BID DATE: FEBRUARY 23, 2011 PUBLIC WORKS BID SCHEDULE "A" - 2011 CONTRACT 2011-5, SOUTH PEARL STREET RECONSTRUCTION BID RESULTS FRANK SILHA & SONS ROCK ROAD COS., INC.FRANK BROS., INC.E & N HUGHES CO., INC. EXCAV. INC. BID RESULTS JANESVILLE, WIJANESVILLE, WIMONROE, WI JANESVILLE, WI ITEM APPROX. UNIT OF UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR TOTAL FOR ITEMUNIT PRICE NO.QTY.MEASUREPRICEITEMPRICEITEMPRICEITEMITEM Pavement Markings, Epoxy, White, 3330L.F. $ 9.00 $ 270.00 $ 5.94 $ 178.20 $ 5.90 $ 177.00 $ 6.20 $ 186.00 18" Stop Bar Pavement Markings, Epoxy, White, 341EACH $ 200.00 $ 200.00 $ 201.29 $ 201.29 $ 200.00 $ 200.00 $ 210.00 $ 210.00 Arrow, Type 2 Pavement Markings, Epoxy, White, 351EACH $ 200.00 $ 200.00 $ 201.29 $ 201.29 $ 200.00 $ 200.00 $ 210.00 $ 210.00 Word Pavement Markings, Epoxy, White, 366EACH $ 650.00 $ 3,900.00 $ 452.91 $ 2,717.46 $ 450.00 $ 2,700.00 $ 468.00 $ 2,808.00 Railroad Crossing 37#4 Steel Reinforment Bars4,125L.F. $ 0.80 $ 3,300.00 $ 0.76 $ 3,135.00 $ 0.75 $ 3,093.75 $ 0.78 $ 3,217.50 38Adjusting Manhole Frames10EACH $ 250.00 $ 2,500.00 $ 186.54 $ 1,865.40 $ 400.00 $ 4,000.00 $ 245.00 $ 2,450.00 39Inlet Protection, Type D19EACH $ 150.00 $ 2,850.00 $ 75.49 $ 1,434.31 $ 85.00 $ 1,615.00 $ 112.00 $ 2,128.00 40Inlet Protection, Type C7EACH $ 50.00 $ 350.00 $ 50.32 $ 352.24 $ 60.00 $ 420.00 $ 25.00 $ 175.00 41Topsoil100C.Y. $ 20.00 $ 2,000.00 $ 8.05 $ 805.00 $ 18.00 $ 1,800.00 $ 18.00 $ 1,800.00 42Tracking Pad3EACH $ 100.00 $ 300.00 $ 704.54 $ 2,113.62 $ 1,200.00 $ 3,600.00 $ 1,200.00 $ 3,600.00 43Silt Fence, Undistributed200L.F. $ 2.00 $ 400.00 $ 2.01 $ 402.00 $ 1.50 $ 300.00 $ 1.80 $ 360.00 4 OF 5 CITY OF JANESVILLE BID DATE: FEBRUARY 23, 2011 PUBLIC WORKS BID SCHEDULE "A" - 2011 CONTRACT 2011-5, SOUTH PEARL STREET RECONSTRUCTION BID RESULTS FRANK SILHA & SONS ROCK ROAD COS., INC.FRANK BROS., INC.E & N HUGHES CO., INC. EXCAV. INC. BID RESULTS JANESVILLE, WIJANESVILLE, WIMONROE, WI JANESVILLE, WI ITEM APPROX. UNIT OF UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR TOTAL FOR ITEMUNIT PRICE NO.QTY.MEASUREPRICEITEMPRICEITEMPRICEITEMITEM 44Erosion Bales, Undistributed20EACH $ 11.00 $ 220.00 $ 10.06 $ 201.20 $ 10.50 $ 210.00 $ 17.00 $ 340.00 45Additional Terrace Restoration2,500S.Y. $ 4.60 $ 11,500.00 $ 3.91 $ 9,775.00 $ 5.88 $ 14,700.00 $ 3.00 $ 7,500.00 Stump Removal $ 9.00 $ 432.00 $ 9.18 $ 440.64 $ 57.25 $ 2,748.00 $ 5.00 $ 240.00 4648I.D. TOTAL AMOUNT BID - CONTRACT 2011-5: $ 467,635.50$ 467,900.42$ 489,211.95$ 491,696.10 5 OF 5