Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Bid Tabs C2011-4 New Sidewalk
CITY OF JANESVILLE BID DATE: 23 FEBRUARY 2011 PUBLIC WORKS BID SCHEDULE "A" - 2011 CONTRACT 2011-4, NEW SIDEWALK BID RESULTS J.B. JOHNSON BROS. LLCE & N HUGHES CO., INC.TI-ZACK CONCRETE, INC.YESKE CONST. CO. INC. BID RESULTS EDGERTON, WIMONROE, WILE CENTER, MNEDGERTON, WI ITEM APPROX. UNIT OF ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEM NO.QTY.MEASURE 1.Inlet Protection, Type A5EACH$ 50.00$ 250.00$ 51.00$ 255.00$ 75.00$ 375.00$ 100.00$ 500.00 2.Inlet Protection, Type C10EACH$ 50.00$ 500.00$ 80.00$ 800.00$ 75.00$ 750.00$ 80.00$ 800.00 3.Erosion Mat2,000S.Y.$ 1.00$ 2,000.00$ 3.06$ 6,120.00$ 3.00$ 6,000.00$ 5.00$ 10,000.00 4.Terrace Restoration4,000S.Y.$ 2.50$ 10,000.00$ 3.06$ 12,240.00$ 3.00$ 12,000.00$ 5.00$ 20,000.00 5.Clearing & Grubbing10STATION$ 50.00$ 500.00$ 105.00$ 1,050.00$ 100.00$ 1,000.00$ 1,350.00$ 13,500.00 6.Tree Trimming25EACH$ 40.00$ 1,000.00$ 52.00$ 1,300.00$ 25.00$ 625.00$ 200.00$ 5,000.00 Tree Removal (Including Stump 7.1,500I.D.$ 22.00$ 33,000.00$ 36.00$ 54,000.00$ 20.00$ 30,000.00$ 50.00$ 75,000.00 Removal and Restoration) Asphalt and Concrete Removal Only 8.5,080S.F.$ 0.60$ 3,048.00$ 0.51$ 2,590.80$ 1.25$ 6,350.00$ 1.50$ 7,620.00 (All Thicknesses) 9.Retaining Wall Removal40S.F.$ 2.00$ 80.00$ 1.05$ 42.00$ 6.00$ 240.00$ 5.00$ 200.00 10.Extra Excavation900C.Y.$ 5.00$ 4,500.00$ 15.30$ 13,770.00$ 12.00$ 10,800.00$ 15.00$ 13,500.00 1 OF 3 CITY OF JANESVILLE BID DATE: 23 FEBRUARY 2011 PUBLIC WORKS BID SCHEDULE "A" - 2011 CONTRACT 2011-4, NEW SIDEWALK BID RESULTS J.B. JOHNSON BROS. LLCE & N HUGHES CO., INC.TI-ZACK CONCRETE, INC.YESKE CONST. CO. INC. BID RESULTS EDGERTON, WIMONROE, WILE CENTER, MNEDGERTON, WI ITEM APPROX. UNIT OF ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEM NO.QTY.MEASURE 11.Extra Sand or Soil Fill600C.Y.$ 10.00$ 6,000.00$ 10.20$ 6,120.00$ 10.00$ 6,000.00$ 15.00$ 9,000.00 12.Crushed Limestone, Fine Gradation200TON$ 9.50$ 1,900.00$ 12.25$ 2,450.00$ 12.00$ 2,400.00$ 10.00$ 2,000.00 13.New Concrete Sidewalk - 4"64,765S.F.$ 3.43$ 222,143.95$ 3.57$ 231,211.05$ 4.15$ 268,774.75$ 4.40$ 284,966.00 New Concrete Sidewalk or 14.5,610S.F.$ 4.03$ 22,608.30$ 3.98$ 22,327.80$ 6.00$ 33,660.00$ 4.60$ 25,806.00 Driveway - 6" New Concrete Sidewalk or 15.3,540S.F.$ 4.65$ 16,461.00$ 4.60$ 16,284.00$ 6.25$ 22,125.00$ 5.00$ 17,700.00 Driveway - 8" Replacement Sidewalk - 4" (Including 16.500S.F.$ 4.20$ 2,100.00$ 5.60$ 2,800.00$ 5.50$ 2,750.00$ 5.40$ 2,700.00 Removal and Restoration) Replacement Sidewalk or Driveway - 6" (Including Removal 17.500S.F.$ 4.95$ 2,475.00$ 6.10$ 3,050.00$ 6.00$ 3,000.00$ 6.00$ 3,000.00 and Restoration) Replacement Sidewalk or Driveway - 8" and greater (Including 18.100S.F.$ 5.95$ 595.00$ 6.10$ 610.00$ 7.00$ 700.00$ 6.50$ 650.00 Removal and Restoration) 19.Asphalt and Concrete Sawcut850L.F.$ 3.00$ 2,550.00$ 2.05$ 1,742.50$ 2.00$ 1,700.00$ 3.50$ 2,975.00 Sawcut and Break Off of Curb (See Detail #29 in Standard 20.685L.F.$ 12.50$ 8,562.50$ 10.20$ 6,987.00$ 12.00$ 8,220.00$ 15.00$ 10,275.00 Specifications) 2 OF 3 CITY OF JANESVILLE BID DATE: 23 FEBRUARY 2011 PUBLIC WORKS BID SCHEDULE "A" - 2011 CONTRACT 2011-4, NEW SIDEWALK BID RESULTS J.B. JOHNSON BROS. LLCE & N HUGHES CO., INC.TI-ZACK CONCRETE, INC.YESKE CONST. CO. INC. BID RESULTS EDGERTON, WIMONROE, WILE CENTER, MNEDGERTON, WI ITEM APPROX. UNIT OF ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEM NO.QTY.MEASURE Detectable Warning Field Panel, 21.83EACH$ 230.00$ 19,090.00$ 204.00$ 16,932.00$ 200.00$ 16,600.00$ 300.00$ 24,900.00 2' x 4' 22.Replacement Curb and Gutter 150L.F.$ 24.00$ 3,600.00$ 30.60$ 4,590.00$ 28.00$ 4,200.00$ 35.00$ 5,250.00 23.Inlet Frame Adjustment5EACH$ 50.00$ 250.00$ 51.00$ 255.00$ 75.00$ 375.00$ 200.00$ 1,000.00 Steel Reinforcing Bars - 1/2" 24.3,000L.F.$ 0.50$ 1,500.00$ 0.77$ 2,310.00$ 0.40$ 1,200.00$ 1.00$ 3,000.00 (Per L.F. of Bar, Installed) High Early Strength Concrete 25.190C.Y.$ 10.00$ 1,900.00$ 15.30$ 2,907.00$ 12.00$ 2,280.00$ 10.00$ 1,900.00 (Additional Cost per C.Y.) 26.Interlocking Block Retaining Wall2,000S.F.$ 20.00$ 40,000.00$ 25.50$ 51,000.00$ 23.00$ 46,000.00$ 28.00$ 56,000.00 Concrete Retaining Wall 27.30S.F.$ 10.00$ 300.00$ 25.50$ 765.00$ 30.00$ 900.00$ 25.00$ 750.00 (Cast-in-place) Standard Concrete Steps 28.50S.F.$ 24.00$ 1,200.00$ 10.20$ 510.00$ 30.00$ 1,500.00$ 40.00$ 2,000.00 TOTAL AMOUNT BID - CONTRACT 2011-4:$ 408,113.75$ 465,019.15$ 490,524.75$ 599,992.00 3 OF 3