#1 Discuss/possible action on ice rink evaluation report
CITY MANAGER DEPARTMENT MEMORANDUM
July 12, 2010
TO: City Council
FROM: Eric J. Levitt, City Manager
SUBJECT: Discussion/possible action on report from Rink Management
Services Corporation on the ice rink evaluation.
Summary / Background
In 2008, the City performed some preliminary evaluations of issues and possible
deficiencies at the ice rink. During the spring of 2009, the City experienced
several small failures and one large failure of the ice cooling system. In addition,
there have been some continual structural concerns with the facility including the
roof. Temporary repairs have been completed over the last year while a review
of the current ice rink status has been on-going.
A group of Janesville residents, now affiliated with the Janesville Youth Hockey
Association, began developing a proposal to form a partnership with the City of
Janesville to build a new rink rather than renovate the current rink. The proposed
rink is located adjacent to the Youth Sports Complex and built on 11 acres of City
owned land. The proposed partnership evolved over the summer into the
th
attached proposal. The proposal on October 26 had the following elements:
?
The building and one sheet of ice would cost approximately $4 million (not
including land).
?
The expansion to a second sheet of ice would cost approximately an
additional $1 million.
?
The City is requested to commit an initial $2 million and an additional
$500,000 when funds are raised for a second sheet of ice.
?
The proposal projected the City to close its current $85,000 actual subsidy
to a $0 operational subsidy when 2 sheets of ice are operational.
?
The proposal discusses the expansion of users at the current rink over the
last year
?
The City Manager indicated to the group that due to concerns with
competitive bidding, it would be his recommendation that if the City had
ownership and responsibility for the operations of the facility that he
believes that it would be best to competitively bid the project management
and construction.
The City Council in October approved $2 million in public funds for a one-sheet
ice rink and up to $2.5 million in public funds for a two-sheet ice rink if private
funds were raised to complete the facility. It was also approved to place the rink
on the South side after discussion on location. The City currently has $2 million
available for the rehabilitation of the current rink, the construction of a new rink or
other eligible uses.
The City contracted with an outside firm, Rink Management Services
Corporation, this Spring for approximately $10,000 to do an overview evaluation
of the current rink and the plans to construct a new rink. Typically to perform an
intensive study of the current rink and evaluate the feasibility of a new facility
would cost between $30,000 and $60,000. However, the City Manager believed
that an abbreviated study for under $10,000 would provide enough valid
information to provide an informed decision.
Possible Motion
rd
I move to continue this agenda item to August 23 to allow for the Ice Center
Advisory Committee to provide comment.
City Manager Recommendation
As the City Council is aware this project has been an evolving concept or project
since the Spring of 2009. Due to that there have been a variety of issues that
have arisen during this dialogue.
Issues of focus included:
?
Location of a new rink (currently the Council has designated a south side
site as the preferred site.)
?
Whether to renovate the current rink or build a new facility.
?
Whether to financially support constructing one sheet or two sheets.
Rink Management Services Corporation prepared a report that provided an
overview of the following issues:
1. An overview of the current rink and the ability for it to continue to operate.
2. Evaluation of the current design of the proposed rink from an operational
standpoint and capital.
3. An overview of a Revenue/Expenditure evaluation for both current rink
and a 2 sheet ice rink.
After reviewing the attached report and having discussions with the firm, the City
Manager has the following recommendations.
?
It appears that the current expenses would be close to $1 million for the
basic renovation of the rink. This does not include any major
enhancements.
2
?
If the City could limit its contribution to $2 million and the contribution of
City owned land for a new rink, I believe that would be the best course of
action if it also meant that the new Central Fire Station would be included
at the current rink location.
?
If land needed to be purchased for the Central Fire Station, I recommend
that renovation of the current rink be evaluated as the best option.
?
I believe based on the report that the City should limit the contribution to a
single sheet rink at this time with expansion capability. If other parties
prefer a two sheet rink, the additional costs should be paid for from non-
city funds. The reason for this recommendation is that I am not convinced
that the property tax subsidy will be eliminated and am concerned that
two-sheets may even place more burden on the subsidy if certain
assumptions don’t play out.
?
If the private group wants the City to revisit the site location of the south
side, I would recommend that this occur at a future meeting.
?
The City should maintain ownership of the current or a new rink in the
near term.
Finally, in the report, the City was advised of an alternate approach to purchasing
a new Zamboni. This approach would save the City approximately $85,000 in its
Vehicle Operation and Maintenance fund in the short-term.
3