Loading...
#5 Award of contracts DEPARTMENT OF PUBLIC WORKS MEMORANDUM 10 March 2010 TO: City Council FROM: Mike Payne, Engineering Manager SUBJECT: AWARD OF BID SCHEDULE “B” – 2010 CONTRACT 2010-4, WATER AND SEWER SYSTEM IMPROVEMENTS CONTRACT 2010-6, BLACK BRIDGE WATERMAIN Summary Bids for Public Works Bid Schedule “B” – 2010, Contracts 2009-4 and 2010-6, were opened on Wednesday, March 10, 2010. The Engineering Division is recommending award of these contracts to the low bidders, as shown on the attached tabulation of bids, and that the City Council express their intent to include in the 2010 Note Issue $658,263.50 for Water and Sewer System Improvements and $1,307,395 for Black Bridge water main. Recommendation Following review by the Council, the Engineering Division recommends award of Contracts 2010-4 and 2010-6 to the low bidders and that the City Council express their intent to include in the 2010 Note Issue $658,263.50 for Water and Sewer System Improvements and $1,307,395 for Black Bridge water main. City Manager Recommendation The City Manager recommends approval. Suggested Motion I move to Award Contracts 2010-4 and 2010-6 to the low bidders and express intent to include in the 2010 Note Issue $658,263.50 for Water and Sewer System Improvements and $1,307,395 for Black Bridge water main. Background Contract 2010-4, Water and Sewer System Improvements the replacement and associated street restoration of This project includes approximately 6,000 L.F. of undersized water main, replacement of associated lead/steel water services, and replacement of approximately 800 L.F. of sanitary sewer. \\petey\cojhome\agenda review\approved agenda items\2010\3-22-2010\award of contracts bid schedule b - memo.doc AWARD OF BID SCHEDULE “B” – 2010 CONTRACT 2010-4, WATER AND SEWER SYSTEM IMPROVEMENTS CONTRACT 2010-6, BLACK BRIDGE WATERMAIN _ _______________ 10 MARCH 2010 – PAGE 2. We received two (2) bids for this project, with Globe Contractors, Inc. providing the low bid. The Engineering Division is recommending award of this contract to Globe Contractors, Inc. of Pewaukee, Wisconsin, in the amount of $761,833.50 for the total amount bid. The bid for this project includes three parts which are described below: ? Part A – Replacement water main and laterals ? Part B – Replacement sanitary sewer and laterals ? Part C – Ruger Avenue utility relocation prior to bridge replacement Funding for Contract 2010-4 will be 2010 Note Issue borrowing. Part A of the contract ($602,693.50) will be part of the $700,000 planned for the 2010 Water Utility Note Issue borrowing. Part B of the contract ($55,570) will be part of the $750,000 planned for the 2010 Wastewater utility borrowing. Part C of the contract ($103,570) will be funded with Note Issue borrowing from 2009. Contract 2010-6, Black Bridge Water Main This project includes construction and completion of approximately 7,750 L.F. of water main and associated pavement restoration, curb and gutter, driveway, sidewalk, and terrace restoration. We received four (4) bids for this project with R.T. Fox Contractors, Inc. providing the low bid. The Engineering Division is recommending award of this contract to R.T. Fox Contractors, Inc, Edgerton, WI, $1,307,395. Funding for this project is 2010 Note Issue borrowing. The 2010 Major Capital Projects budget anticipated $1,500,000 would be included in the 2010 Note Issue for this project. Attachment cc: Eric Levitt Jay Winzenz Carl Weber Bid Opening: 10 March 2010 Page 1 of 1 CITY OF JANESVILLE TABULATION OF BIDS PUBLIC WORKS BID SCHEDULE “B” – 2010 2010-4 WATER AND SEWER SYSTEM IMPROVEMENTS Globe Contractors, Inc. Part A: $602,693.50 N50 W23076 Betker Road Part B: $55,570.00 Pewaukee, WI 53072 Part C: $103,570.00 Grand Total: $761,833.50 R. T. Fox Contractors, Inc. Part A: $667,516.00 5628 Highway M Part B: $36,775.00 Edgerton, WI 53534 Part C: $87,430.00 Grand Total: $791,721.00 2010-5 NEW AND REPLACEMENT SIDEWALK J. B. Johnson Bros., LLC Total Bid: $285,650.00 12 Maple Court Edgerton, WI 53534 J. W. Schultz Construction, Inc. Total Bid: $326,475.00 43 Highway 51, P.O. Box 248 Edgerton, WI 53534 2010-6 BLACKBRIDGE WATERMAIN R. T. Fox Contractors, Inc. Total Bid: $1,307,395.00 5628 Highway M Edgerton, WI 53534 Speedway Sand & Gravel, Inc. Total Bid: $1,416,505.00 8500 Greenway Blvd. #202 Madison, WI 53562 Globe Contractors, Inc. Total Bid: $1,554,005.00 N50 W23076 Betker Road Pewaukee, WI 53072 Merryman Excavation, Inc. Total Bid: $1,645,287.50 1501 Lamb Road Woodstock, IL 60098 \\Petey\COJHome\Agenda Review\Approved Agenda Items\2010\3-22-2010\Award of Contracts Bid Schedule B - Attach.doc