Bid Tabs C2010-5, New and Replacement Sidewalk
CITY OF JANESVILLE
BID DATE: 10 MARCH 2010
PUBLIC WORKS BID SCHEDULE "B" - 2010
CONTRACT 2010-5, NEW AND REPLACEMENT SIDEWALK
BID RESULTS
J. B. Johnson Bros, LLCJ. W. Schultz Construction, Inc.
BID RESULTS
Edgerton, WIEdgerton, WI
ITEM APPROX. UNIT OF
ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEM
NO.QTY.MEASURE
1.New Concrete Sidewalk - 4"45,000S.F.$ 3.48$ 156,600.00 $ 4.10$ 184,500.00
New Concrete Sidewalk or
2.5,000S.F.$ 3.80$ 19,000.00 $ 4.50$ 22,500.00
Driveway - 6"
New Concrete Sidewalk or
3.500S.F.$ 4.90$ 2,450.00 $ 4.90$ 2,450.00
Driveway - 8"
Replacement Sidewalk - 4" (Including
4.8,000S.F.$ 4.40$ 35,200.00 $ 5.85$ 46,800.00
Removal and Restoration)
Replacement Sidewalk or
Driveway - 6" (Including Removal
5.1,500S.F.$ 4.90$ 7,350.00 $ 6.35$ 9,525.00
and Restoration)
Replacement Sidewalk or
Driveway - 8" and greater (Including
6.250S.F.$ 5.80$ 1,450.00 $ 6.50$ 1,625.00
Removal and Restoration)
Asphalt and Concrete
Sidewalk/Driveway Removal Only (All
7.850S.F.$ 4.00$ 3,400.00 $ 1.25$ 1,062.50
thicknesses)
Asphalt Driveway - Removal and
8.100S.Y.$ 7.00$ 700.00 $ 30.00$ 3,000.00
Replacement
1 OF 3
CITY OF JANESVILLE
BID DATE: 10 MARCH 2010
PUBLIC WORKS BID SCHEDULE "B" - 2010
CONTRACT 2010-5, NEW AND REPLACEMENT SIDEWALK
BID RESULTS
J. B. Johnson Bros, LLCJ. W. Schultz Construction, Inc.
BID RESULTS
Edgerton, WIEdgerton, WI
ITEM APPROX. UNIT OF
ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEM
NO.QTY.MEASURE
9.Concrete or Asphalt Sawcut1,000L.F.$ 3.00$ 3,000.00 $ 2.00$ 2,000.00
Sawcut and Break Off of Curb
(See Detail #29 in Standard
10.500L.F.$ 16.00$ 8,000.00 $ 5.00$ 2,500.00
Specifications)
Replacement Curb and Gutter
(Including Removal and
11.250L.F.$ 24.00$ 6,000.00 $ 28.00$ 7,000.00
Replacement)
Steel Reinforcing Bars - 1/2"
12.750L.F.$ 0.40$ 300.00 $ 0.75$ 562.50
(Per L.F. of Bar, Installed)
13.Extra Excavation100C.Y.$ 10.00$ 1,000.00 $ 20.00$ 2,000.00
14.Extra Sand or Soil Fill500C.Y.$ 10.00$ 5,000.00 $ 10.00$ 5,000.00
15.3/4" Crushed Limestone100TON$ 12.00$ 1,200.00 $ 12.00$ 1,200.00
16.Standard Concrete Steps50S.F.$ 20.00$ 1,000.00 $ 25.00$ 1,250.00
2 OF 3
CITY OF JANESVILLE
BID DATE: 10 MARCH 2010
PUBLIC WORKS BID SCHEDULE "B" - 2010
CONTRACT 2010-5, NEW AND REPLACEMENT SIDEWALK
BID RESULTS
J. B. Johnson Bros, LLCJ. W. Schultz Construction, Inc.
BID RESULTS
Edgerton, WIEdgerton, WI
ITEM APPROX. UNIT OF
ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEM
NO.QTY.MEASURE
Tree Removal (Including Stump
17.200I.D.$ 35.00$ 7,000.00 $ 35.00$ 7,000.00
Removal and Restoration)
Detectable Warning Field Panel,
18.70EACH$ 220.00$ 15,400.00 $ 200.00$ 14,000.00
2' x 4'
19.Interlocking Block Retaining Wall250S.F.$ 20.00$ 5,000.00 $ 25.00$ 6,250.00
20.Terrace Restoration2,000S.Y.$ 3.00$ 6,000.00 $ 3.00$ 6,000.00
21.Clearing & Grubbing1STATION$ 300.00$ 300.00 $ 200.00$ 200.00
Erosion Mat
22.50S.Y.$ 6.00$ 300.00 $ 1.00$ 50.00
TOTAL AMOUNT BID - CONTRACT 2010-5:$ 285,650.00$ 326,475.00
3 OF 3