#2 Award of Contracts for Public Works Bid Schedule A-2010 DEPARTMENT OF PUBLIC WORKS MEMORANDUM 22 February 2010 TO: City Council FROM: Mike Payne, Engineering Manager SUBJECT: AWARD OF BID SCHEDULE “A” – 2010 CONTRACT 2010-1, STREET RESURFACING CONTRACT 2010-2, CURB & GUTTER REPLACEMENT CONTRACT 2010-3, MANHOLE REHABILITATION/RECONSTRUCTION Summary Bids for Public Works Bid Schedule “A” – 2010, Contracts 2009-1, -2, -3, were opened on Wednesday, February 24, 2010. The Engineering Division is recommending award of these contracts to the low bidders, as shown on the attached tabulation of bids, and that the City Council express their intent to include in the 2010 Note Issue $250,000 for street resurfacing, $600,000 for curb and gutter replacement, and $38,150 for manhole rehabilitation/reconstruction. Background and Analysis ? Contract 2010-1, Street Resurfacing The work to be accomplished by this project includes approximately 6.80 miles of street rehabilitation and 3.63 miles of final surface on streets constructed in 2007. The asphalt unit prices for this contract increased 3.8% from last year. We received two (2) bids for this project, with Rock Road Companies, Inc. providing the low bid. The Engineering Division is recommending award of this contract to Rock Road Companies, Inc. of Janesville, Wisconsin, in the amount of $1,247,075.56. Funding for Contract 2010-1 will come from various sources: special assessments, operating budget, and Note Issue borrowing. The $316,000 for final street surface will be paid from special assessments charged to properties at the time of initial street construction. Street resurfacing will be funded through a combination of operating budgets ($529,654) and the 2010 Note Issue ($550,000). The 2010 Major Capital Projects budget anticipated $650,000 would be included in the 2010 Note Issue for Street Maintenance. An additional $300,000 of the street maintenance borrowing will be brought back to Council at a later date. This work includes repairs to pavement at the roundabout in the Sandstone Drive and Sandhill Drive intersection. \\petey\cojhome\agenda review\approved agenda items\2010\3-8-2010\award of contracts - memo.doc AWARD OF BID SCHEDULE “A” – 2010 CONTRACT 2010-1 STREET RESURFACING CONTRACT 2010-2, CURB AND GUTTER REPLACEMENT CONTRACT 2010-3, MANHOLE REHABILITATION/RECONSTRUCTION _ _______________ 22 FEBRUARY 2010 – PAGE 2. ? Contract 2010-2, Curb & Gutter Replacement This project provides for the replacement of sections of curb and gutter for streets that are to be resurfaced in 2010 under contract 2010-1, Street Resurfacing. When the Council adopted the 2010 Budget, the Council approved a budget enhancement for the general fund to pay all costs associated with curb and gutter replacement, therefore there are no assessments related to the street resurfacing program in 2010. This project includes the complete replacement of curb and gutter on Carrington Street from S. Garfield Avenue to Logan Street; Avenue; and Wilson Avenue from Chestnut Street to Park Street. We received two (2) bids for this project, with Yeske Construction Co., Inc. providing the low bid. The Engineering Division is recommending award to Yeske Construction Co., Inc. of Edgerton, Wisconsin, in the amount of $563,149.50. Funding for this project is a combination of $20,000 from utility budgets and $600,000 from 2010 Note Issue borrowing. The 2010 Major Capital Projects budget anticipated $500,000 would be included in the 2010 Note Issue for curb and gutter replacement. Because the curb and gutter portion of the street rehabilitation exceeds the amount in the Major Capital Projects budget, the resurfacing portion of the 2010 street rehabilitation program will be reduced by the same amount. This ensures the combined street resurfacing and curb & gutter replacement remains within the 2010 Major Capital Projects budget. ? Contract 2010-3, Manhole Rehabilitation/Reconstruction This project rehabilitates or reconstructs existing sanitary sewer, water valve, and storm sewer manholes in paved streets prior to the 2010 annual resurfacing contract. This is the third year of an annual program for maintaining utility manholes in conjunction with the street maintenance program. We opened two (2) bids for this project with E&N Hughes Co., Inc. providing the low bid. The Engineering Division is recommending award of this contract to E&N Hughes Co., Inc, Monroe, WI, for a total amount bid of $154,838. Part A of the bid includes work related to manhole rehabilitation/reconstruction while Part B of the bid includes work related only to manhole chimney rehabilitation/reconstruction. Funding for this project is from various sources: the sanitary manholes are funded with $116,709 Wastewater Utility operating funds; the storm sewer manholes AWARD OF BID SCHEDULE “A” – 2010 CONTRACT 2010-1 STREET RESURFACING CONTRACT 2010-2, CURB AND GUTTER REPLACEMENT CONTRACT 2010-3, MANHOLE REHABILITATION/RECONSTRUCTION _ _______________ 22 FEBRUARY 2010 – PAGE 3. ($24,752) will be included as part of the $250,000 planned for the 2010 Note Issue borrowing; and the water valve manholes ($13,377) will be included as part of the $165,000 planned for the 2010 Note Issue borrowing. The 2010 Major Capital Projects budget anticipated $250,000 and $165,000 would be included in the 2010 Note Issue for storm sewer manholes and water valve manholes respectively. Recommendation Following review by the Council, the Engineering Division recommends award of Contracts 2010-1, -2, -3 to the low bidders and that the City Council express their intent to include in the 2010 Note Issue $550,000 for street resurfacing, $600,000 for curb and gutter replacement, and $38,150 for manhole rehabilitation/reconstruction. City Manager Recommendation The City Manager recommends approval of the award of bids. The Street Resurfacing bid came in lower than the budgeted amount by approximately $400,000. We recommend that $100,000 be used on curb & gutter, that $150,000 be planned for use for the roundabout on Sandstone Drive and that $150,000 of the savings be used to reduce the use of the reserve in the General Fund. Suggested Motion I move to Award contracts 2010-1, 2010-2, and 2010-3 to the low bidders and express intent to include in the 2010 Note Issue $550,000 for street resurfacing, $600,000 for curb and gutter replacement, and $38,150 for manhole rehabilitation/reconstruction. Attachment cc: Eric Levitt, City Manager Jay Winzenz, Director of Administrative Services/Asst. City Manager Bid Opening: 25 February 2010 Page 1 of 1 CITY OF JANESVILLE TABULATION OF BIDS PUBLIC WORKS BID SCHEDULE “A” – 2010 2010-1 STREET RESURFACING Rock Road Companies, Inc. Total Bid: $1,247,075.56 P.O. Box 1779 Janesville, WI 53547 Frank Bros., Inc. Total Bid: $1,420,695.72 2501 Morse Street Janesville, WI 53545 2010-2 CURB AND GUTTER REPLACEMENT Yeske Construction Co., Inc. Total Bid: $563,149.50 P.O. Box 71, 472 West High Street Edgerton, WI 53534 J. W. Schultz Construction, Inc. Total Bid: $676,635.00 43 Highway 51 Edgerton, WI 53534 2010-3 MANHOLE REHABILITATION/RECONSTRUCTION E & N Hughes Co., Inc. Part A: $74,130.00 N2629 Coplien Road, P.O. Box 408 Part B: $80,708.00 Monroe, WI 53566 Total Bid: $154,838.00 Infrastructure Technologies, Inc. Part A: $84,220.00 21040 Commerce Blvd. Part B: $75,340.00 Rogers, MN 55374 Total Bid: $159,560.00 \\Petey\COJHome\Agenda Review\Approved Agenda Items\2010\3-8-2010\Award of Contracts - Attach.doc