Loading...
#5 Approve final certified survey map 10002-C Community Development Department Memorandum February 8, 2009 TO: City Council FROM: Duane Cherek, Manager of Planning Services SUBJECT: Final CSM 10002-C, Donald & Leo Marklein, 2 lots along Autumn Lane and Lucey Street. I. RECOMMENDATION The Plan Commission and Community Development Department recommend that the City Council support the release of existing utility easements within the survey area and then support a motion to approve Final CSM 10002-C. II. REQUEST Don and Leo Marklein have submitted a two lot survey of land located along Autumn Lane and Lucey Street. The survey has been prepared to reflect a lot line adjustment on two previously platted lots (Lot 50 & 51) in the Meadows Northeast Second Addition. The common lot line between the subject lots is being shifted approximately 10 feet to the south to accommodate the applicant’s building plans for the construction of a two-family residence on proposed Lot 1. The lot line adjustment and CSM will also require City Council approval of a release of two existing six-foot wide utility easements located along the common lot line. III. ANALYSIS A. The survey area includes two vacant platted lots zoned R1-Single and Two- Family Residence District. Both lots were previously granted a conditional use permit to allow for the construction of a two-family residence on each lot. The proposed lots comply with the standards of the Zoning and Subdivision Ordinances. B. The applicant is requesting the release of existing 6-foot utility easements on proposed Lot 1. No utility lines or services are currently located within the existing easement. The easement was originally dedicated on the subdivision plat to provide electric service for a street light situated in the terrace area adjoining the lots, however, electric service was extended from an alternative source and the easement is no longer necessary for public purposes. The applicant has secured a separate release from the other private utility service providers having rights to the easement. The final survey includes a note releasing the City’s interest in the easement. C. Since the property has been previously platted, land division assessments for street lights, sidewalks, and storm sewer were previously levied. The survey includes the standard sidewalk note referencing the planned installation of sidewalk improvements along the Autumn Lane and Lucey Street frontage of the lots. The survey also delineates the location of an existing sanitary sewer easement located along the west property line of Lot 2. D. The applicant should contact the City Clerk’s Office regarding any outstanding taxes, special assessments, or other fees which must be paid. IV. PLAN COMMISSION ACTION – 1 FEBRUARY 2010 The Plan Commission unanimously agreed to forward Final CSM 10002-C to the City Council with a favorable recommendation. cc: Eric Levitt, City Manager Jay Winzenz, Dir. of Administrative Services/Assistant City Manager Brad Cantrell, Community Development Director