Loading...
#10 Introduce ordinance to amend wastewater rates (File Ord. #2009-442) ADMINISTRATIVE SERVICES MEMORANDUM October 16, 2009 TO: City Council FROM: Patty Lynch, Comptroller SUBJECT: Introduce and schedule a public hearing on a proposed Ordinance Amending the City’s Wastewater Facility and Sewer Use Ordinance in Order to Adjust Rates as Set Forth in Chapter 13.18 of the Code of Ordinances of the City of Janesville (File Ord. No. 2009-442) Summary A Wastewater User Charge System was prepared as a result of the City’s proposed wastewater treatment plant upgrade and the 2010 annual budget. The user charge system is designed on a cash basis to meet projected expenses for debt service, operations and maintenance, and provide funding for the replacement of mechanical equipment at the treatment plant (maintain the replacement fund).The user charge system revisions will enable the City to collect revenue to meet the cash requirement of the Utility from customers in proportion to their use of services. As such, adjustments in the rates have occurred. This rate adjustment will generate an additional $2,125,200 in revenue in fiscal year 2010, or an overall increase in rates of 30.3%, effective January 1, residential 2010. The proposed rate adjustment will result in the average wastewater bill increasing by 29.3%, or $18.05 per quarter. Recommendation The Administrative Services Department recommends that following the first reading of Ordinance No. 2009-442 to amend the wastewater rates a public hearing be scheduled on November 9, 2009. City Manager Recommendation The City Manager concurs with the Administrative Services Department based on the wastewater treatment plant construction planned for the coming year. The combined water/wastewater rate remains one of the lower rates among Janesville’s peer cities. Background The wastewater rates were last adjusted on January 1, 2009, when an overall increase of 8.8% was implemented. In 2010, there is a budgeted decline in user charge revenue of 5% ($366,200) primarily due to the staggered removal of GM’s wastewater flow and a decline in residential usage trends. Operations and maintenance expenses have remained level with a $12,000 decrease from 2009. 1 The largest impact on this rate increase is the cash required the fund the $32,745,000 Wastewater treatment plant upgrade and expansion. Additional funding is required for the annual debt service payments and equipment replacement refunding. The treatment plant project is financed primarily by a Wisconsin Department of Natural Resources Clean Water Fund Loan. The annual debt service increase in the 2010 budget including this low interest loan program is projected to be $1,570,000. The equipment replacement fund will also need an additional annual deposit of $420,000. Wastewater Rate Comparisons Although our recommendation calls for an overall rate increase of 30.3% effective January 1, 2009, the impact on “average” residential and “typical” commercial and industrial consumers would be as follows: Janesville Wastewater Utility Rate Comparison Average Customer Volume Existing Proposed Percentage Meter Size CCF/Qtr Qtrly Rate Qtrly Rate Increase Residential 5/8” Meter 25 $ 61.60 $ 79.65 29.3% Commercial 6” Meter 1,250 $ 2,012.00 $ 2,663.50 32.4% Industrial (9” Flume) 50,000 $18,291.00 $24,309.00 32.9% Overall 30.3% Based upon this proposal, the average quarterly residential customer bill will increase by $18.05. The fixed charges and flow charges are increasing disproportionately which will cause the large users to experience a greater increase. Under the new rates large volume users will experience a greater increase than small volume customers because the volume (variable) charge is increasing to a greater degree than the meter (fixed) charge. In addition, the attached peer city comparison compares our average residential water and wastewater utility bill to that of our peer cities. This table shows that after the implementation of our proposed wastewater rate increase, an average residential water and wastewater utility bill will be $120.40, which is still 17% below the average of our peer cities. Analysis The wastewater utility rates are designed to generate sufficient cash to meet projected operating and maintenance expenses, debt service payments, and replacement of plant equipment. The wastewater user charge system has been developed to collect revenue from the system users in direct proportion to their 2 use and impact on costs. The proposed wastewater rate adjustment is necessary to maintain the financial integrity of the Utility because of an upgrade to the wastewater treatment plant facility and a decline in sales revenue. With the proposed rate adjustment, it is projected that in 2010 the Utility will maintain an adequate cash reserve and have adequate funds to make the revenue bond payments to pay for the capital improvements. /Attachments cc: Jacob J, Winzenz, Director of Admin. Services / Assistant City Manager Eric J. Levitt, City Manager 3 ORDINANCE NO. 2009-442 An Ordinance Amending the City’s Wastewater Facility and Sewer Use Ordinance in Order to Adjust Rates as Set Forth in Chapter 13.18 of the Code of Ordinances of the City of Janesville THE COMMON COUNCIL OF THE CITY OF JANESVILLE DO ORDAIN AS FOLLOWS: SECTION I. Section 13.18.030 A. (“Fixed Charges (Minimum)”) of the Code of General Ordinances of the City of Janesville is hereby amended in the manner set forth in the attachment hereto. SECTION II. Section 13.18.030 B. (“Volume Charges”) of the Code of General Ordinances of the City of Janesville is hereby amended in the manner set forth in the attachment hereto. SECTION III. Section 13.18.040 C. 1. and 2. (“Rates”) of the Code of General Ordinances of the City of Janesville is hereby amended in the manner set forth in the attachment hereto. SECTION IV. Section 13.18.060 B. of the Code of General Ordinances of the City of Janesville is hereby amended to read as follows: B. Revenue raised by the operation, maintenance and replacement (O. M.& R.) rates are to be used only to defray utility expenses for O. M. & R. The replacement fund is to be funded at the level of $887,000 per year. Monies allocated for replacement are to be used only for replacement. SECTION V. This ordinance and the above rates and local limits shall take effect on the st 1 day of January 2010. ADOPTED: Motion by: Second by: APPROVED: Councilmember Aye Nay Pass Absent Brunner McDonald Eric J. Levitt, City Manager Perrotto Rashkin ATTEST: Steeber Truman Voskuil Jean Ann Wulf, City Clerk-Treasurer APPROVED AS TO FORM: City Attorney, Wald Klimczyk Proposed by: Accounting/Utilities Prepared by: Finance A. Fixed Charges (Minimum): QUARTERLY CHARGES SIZE METER TYPE Present Rates* New Rates** () inches Water 5/8 $26.10 $32.40 Water 3/4 $28.20 $35.30 Water 1 $33.00 $42.00 Water 1-1/2 $43.00 $54.00 Water 2 $56.00 $71.00 Water 3 $86.00 $109.00 Water 4 $129.00 $164.00 Water 6 $237.00 $301.00 Water 8 $368.00 $465.00 Water 10 $541.00 $684.00 Parshall Flume 3 $204.00 $257.00 Parshall Flume 6 $403.00 $509.00 Parshall Flume 9 $888.00 $1,123.00 Parshall Flume 12 $888.00 $1,123.00 B. Volume Charges: QUARTERLY CHARGES Present Rates* New Rates** For all flow (per 100 cubic foot increment) $1.42 $1.89 * Effective 1/1/2009 ** Effective 1/1/2010 13.18.040 Industrial and Commercial Surcharge A. Imposition. All persons, firms, corporations, institutions, or organizations discharging wastes into the public sewers shall, if their sewage has a concentration greater than “normal” concentrations, be considered an industrial discharger and subject to the requirements of Section 13.16.150 of this Chapter. The amount of surcharge shall reflect the cost incurred by the City in removing the excess biochemical oxygen demand (BOD) and suspended solids. B. Computation. The excess pounds of BOD and suspended solids will be computed by multiplying the flow volume in million gallons per day (MGD) by the constant 8.345, and then multiplying the product by the difference between the person’s concentrations of BOD and suspended solids and the aforementioned “normal” concentrations in parts per million by weight. This product will then be multiplied by the number of days in the billing period to determine the surcharge. C. Rates. The rates of surcharge for each of the constituents mentioned in the Subsection B. of this section will be at the prevailing rate at the time. The prevailing rate at the time is as follows: 1. For biochemical oxygen demand: Present Rates* New Rates** Per Pound $0.28 $0.34 2. For suspended solids: Present Rates* New Rates** Per Pound $0.20 $0.24 * Effective 1/1/2009 ** Effective 1/1/2010