Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Bid Results Bid Schedule F-2009, Contract -17
Bid Opening: 17 June 2009 Page 1 of 1 CITY OF JANESVILLE TABULATION OF BIDS PUBLIC WORKS BID SCHEDULE “F” – 2009 2009-17 PARKER DRIVE PARKING STRUCTURE PRE-CAST PACKAGE J. W. Peters & Sons, Inc./IPC Base Bid – Materials Only: $1,465,530 500 W. Market Street Base Bid – Labor Only: $84,870 Burlington, WI 53105 Total: $1,550,400 Alternate A: $1,580,130 Alternate B: $1,452,330 Spancrete Industries, Inc. Base Bid – Materials Only: $1,412,944 N16 W23415 Stoneridge Drive Base Bid – Labor Only: $194,476 Waukesha, WI 53187 Total: $1,607,420 Alternate A: $(47,650) Alternate B: $(166,209) Stress-Con Industries, Inc. Base Bid – Materials Only: $1,597,000 50500 Design Lane Base Bid – Labor Only: $64,000 Shelby Township, MI 48315 Total: $1,661,000 Alternate A: $(148,000) Alternate B: $(216,000) Dukane Precast Base Bid – Materials Only: $1,766,410 1805 High Grove Lane Base Bid – Labor Only: $99,790 Naperville, IL 60540 Total: $1,866,200 Alternate A: $(73,800) Alternate B: $(190,000) J:\Development\Engineering\Public Works\Bid Results\2009\Bid Results Bid Schedule F-2009 C17.doc