Loading...
Advertisement For Bids Schedule H 15 July 2009 PART #1 CITY OF JANESVILLE ADVERTISEMENT FOR BIDS PUBLIC WORKS BID SCHEDULE “H” – 2009 The City of Janesville, Wisconsin hereby gives notice that it will receive sealed bids for the following listed Public Work: C2009-22 Storm Sewer Improvements – For furnishing all the labor, materials, equipment, and doing all the work necessary for construction replacement of approximately 1,000 L.F. of 12”-30” storm sewer and associated street and non-paved surface restoration. C2009-23 Parker Drive Parking Structure – For furnishing all the labor, materials, equipment, and completing site demolition, excavation, and shoring; concrete formwork, placing and finishing; reinforcing and structural steel material and installation; design, fabrication and installation of precast concrete panels; providing and installing metal doors, frames and hardware; waterproofing, coating, caulking, sealant, drywall; providing and installing elevators; HVAC, plumbing, electrical, and fire protection systems for a complete 4-level parking structure accommodating approximately 235 parking spaces. C2009-24 Highridge Greenbelt Improvement – For furnishing all the labor, materials, equipment, and doing all the work necessary for restoration of greenbelt, including clearing and grubbing, 550 L.F. storm sewer, 100 gabion baskets, 1,500 C.Y. rip-rap, 3,500 S.Y. geotextile fabric, 5,000 C.Y. excavation and grading, and erosion control. 2:00 P.M. LOCAL TIME ON WEDNESDAY, THE 12TH Sealed bids will be received until DAY OF AUGUST, 2009. All bids shall be addressed to the City Clerk’s Office, City of Janesville Municipal Building, 18 North Jackson Street, Janesville, Wisconsin, 53548, and shall be enclosed in a SEALED ENVELOPE, marked with the name and address of the Bidder and Contract Title for which the bid is being submitted. All bidders shall bid in accordance with, and shall bid upon, the bid forms included in the Contract Documents. Bids will be opened in the Council Chambers at 2:01 P.M. on the same date. The above Public Work will be let to the lowest responsible bidder and must be performed in accordance with the plans, specifications, and contracts on file with the City Clerk. 1 PART #1 CITY OF JANESVILLE ADVERTISEMENT FOR BIDS PAGE 2 . PUBLIC WORKS BID SCHEDULE “H” – 2009 15 JULY 2009 No bid will be read or considered unless accompanied by a certified check equal to 10 percent of the bid or a bid bond in equal amount, payable to the City as guaranty that if the bid is accepted, the bidder will execute and file the proper contract and bond within ten days from the date the lowest responsible bidder's bid is accepted. In case the bidder fails to execute such contract and bond within the time set by the City, the check or bid bond shall be forfeited to the City as liquidated damages. The form of contract and bond and questionnaire to show bidder's proof of responsibility in accordance with Section 66.29(2) Wisconsin Statutes, as well as the plans and specifications, are on file and may be obtained at the City Engineer's Office, Municipal Building. WEDNESDAY, JULY Plans and detailed specifications are scheduled to be available on 22, 2009 . Contract Documents and Drawings will be issued on a CD for a $10.00 non-refundable fee per Contract requested. The wage scales to be paid on these projects are enclosed in the Contract Documents, as well as on file in the City Clerk’s Office, and all work is subject to Section 66.293 of Wisconsin’s Statutes. PROOF OF RESPONSIBILITY forms for this project must be filed in the Engineering 12:00 NOON, WEDNESDAY, JULY 29, 2009 Division Office not later than . Forms are located in the Contract Documents and available at www.ci.janesville.wi.us (Documents & Maps; Document Library; Engineering Department; Bidder’s Proof of Responsibility). Forms shall show sufficient financial ability, equipment, and experience to perform the Contract. The decision regarding qualifications shall be final. A plan holder list is also available on the City’s web site, updated as necessary. Said work shall be commenced by, and shall be entirely completed by, the dates set in the proposal for the specific work. The determination of the lowest and best bid will be decided by the City Engineer, subject to review by the City Council. The Council reserves the right to reject any and all bids. No bidder may withdraw his bid within 45 days after the actual date of the bid opening. JULY 20 & JULY 27, 2009 Published in The Janesville Gazette on . 2