Loading...
#4 Award contracts 2009-18 and 2009-19 DEPARTMENT OF PUBLIC WORKS MEMORANDUM July 6, 2009 TO: City Council FROM: Mike Payne, Engineering Manager SUBJECT: Award of Bid Schedule “F” – 2009 Contract 2009-17, Parker Drive Parking Structure Pre-Cast Package Contract 2009-18, New and Replacement Sidewalk Contract 2009-19, South River Road Greenbelt Improvement Summary Bids for Public Works Schedule “F” were opened on Wednesday, June 17, 2009. The Engineering Division is recommending the Council reject all bids for contract 2009-17 and award contracts 2009-18, -19 to the low bidders as shown on the attached tabulation of bids, and that the City Council express their intent to include in the 2009 Note Issue $418,870 for the Sidewalk Contract. Recommendation Following Review by the Council, the Engineering Division recommends rejecting all bids for contract 2009-17 and awarding contracts 2009-18, -19 to the low bidders. Suggested Motion I move to reject all bids for contract 2009-17 and award contracts 2009-18, -19 to the low bidders and that the City Council express their intent to include in the 2009 Note Issue $418,870 for the Sidewalk Contract. Background Contract 2009-17, Parker Drive Parking Structure Pre-Cast Package This contract was the first of two bid packages related to the proposed downtown parking structure. The intent for splitting the bid into two packages was to determine the precast cost for the project since this portion of the work represents nearly 50% of the total project cost. Determining the pre-cast portion of the project before issuing the second bid package allowed for changes in the project approach for the second bid package depending on the amount of the first bid. Funding for this project is Note Issue borrowing over several years. We received four (4) bids for this project. Three of the four bidders attached exclusions and modifications to the bid form. The fourth bidder submitted an incomplete bid. After discussions with the City Attorney, all four bids should be rejected. \\petey\cojhome\agenda review\approved agenda items\2009\7-13-2009\contract award bid schedule f - memo.doc The alternate bid items for the project are the following: ? Alternate Bid Item A – substitute stained concrete brick finish in lieu of thin set brick. ? Alternate Bid Item B – furnish materials for a 3 ½ level structure in lieu of a complete 4 level structure. Contract 2009-18, New and Replacement Sidewalk This contract combines new and replacement sidewalk for 2009. The Council will be evaluating new sidewalk assessments under a separate agenda item which includes a public hearing for affected property owners. Funding for new sidewalk is from two sources: 2009 Note Issue and assessments paid by property owners benefitting from the improvements. Funding for the replacement sidewalk is also from two sources: 2009 Note Issue for City frontage and payments from property owners for sidewalk maintenance from abutting property owners. In the case of new and replacement sidewalk, property owners are granted a 5 year payment plan. We received four (4) bids for this project. with J.B. Johnson Bros., LLC providing the low bid. The Engineering Division is recommending award of this contract to J.B. Johnson Bros., LLC of Edgerton, Wisconsin in the amount of $418,870. Contract 2009-19, South River Road Greenbelt Improvement This contract restores an existing greenbelt to correct ongoing erosion. The project includes tree and brush removal, excavation, grading, installing heavy rip rap, and restoration of the work area. Engineering staff held a neighborhood meeting and the neighbors support the project. Funding for this project was included in the 2008 Note Issue. We received four (4) bids for this project. with Greener Valley Landscaping Inc. providing the low bid. The Engineering Division is recommending award of this contract to Greener Valley Landscaping Inc. of Janesville, Wisconsin in the amount of $36,440. Attachment cc: Eric Levitt Jacob J. Winzenz \\petey\cojhome\agenda review\approved agenda items\2009\7-13-2009\contract award bid schedule f - memo.doc Bid Opening: 17 June 2009 Page 1 of 1 CITY OF JANESVILLE TABULATION OF BIDS PUBLIC WORKS BID SCHEDULE “F” – 2009 2009-17 PARKER DRIVE PARKING STRUCTURE PRE-CAST PACKAGE J. W. Peters & Sons, Inc./IPC Base Bid – Materials Only: $1,465,530 500 W. Market Street Base Bid – Labor Only: $84,870 Burlington, WI 53105 Total: $1,550,400 Alternate A: $1,580,130 Alternate B: $1,452,330 Spancrete Industries, Inc. Base Bid – Materials Only: $1,412,944 N16 W23415 Stoneridge Drive Base Bid – Labor Only: $194,476 Waukesha, WI 53187 Total: $1,607,420 Alternate A: $(47,650) Alternate B: $(166,209) Stress-Con Industries, Inc. Base Bid – Materials Only: $1,597,000 50500 Design Lane Base Bid – Labor Only: $64,000 Shelby Township, MI 48315 Total: $1,661,000 Alternate A: $(148,000) Alternate B: $(216,000) Dukane Precast Base Bid – Materials Only: $1,766,410 1805 High Grove Lane Base Bid – Labor Only: $99,790 Naperville, IL 60540 Total: $1,866,200 Alternate A: $(73,800) Alternate B: $(190,000) \\Petey\COJHome\Agenda Review\Approved Agenda Items\2009\7-13-2009\Contract Award Bid Bid Schedule F - C17 Results.doc Bid Opening: 17 June 2009 Page 1 of 1 CITY OF JANESVILLE TABULATION OF BIDS PUBLIC WORKS BID SCHEDULE “F” – 2009 2009-18 NEW AND REPLACEMENT SIDEWALK J. B. Johnson Bros., LLC Total Bid: $418,870.00 12 Maple Court Edgerton, WI 53534 J. W. Schultz Construction, Inc. Total Bid: $551,710.00 43 Highway 51 Edgerton, WI 53534 Economy Cement, Inc. Total Bid: $599,570.00 1017 South Whitney Way Madison, WI 5371 Marvin Gleason Contractor, Inc. Total Bid: $818,430.00 2811 Twin Waters Lane Franksville, WI 53126 2009-19 SOUTH RIVER ROAD GREENBELT IMPROVEMENT Greener Valley Landscaping, Inc. Total Bid: $36,440.00 1702 Highland Avenue Janesville, WI 53545 Custom Ditching, Inc. Total Bid: $75,312.50 17 Auburn Drive Beloit, WI 53511 Bjoin Limestone, Inc. Total Bid: $76,236.25 7308 W. State Road 11 Janesville, WI 53548 Rock Road Companies, Inc. Total Bid: $148,182.50 P.O. Box 1779 Janesville, WI 53547 \\Petey\COJHome\Agenda Review\Approved Agenda Items\2009\7-13-2009\Contract Award Bid Bid Schedule F - C18-19 Results.doc