Bid Tabs C2009-15 Ice Center Renovation
CITY OF JANESVILLE 13, 2009
BID DATE: MAY
PUBLIC WORKS BID SCHEDULE "E" - 2009PAGE 1 OF 1
CONTRACT 2009-15, ICE CENTER RENOVATION
BID RESULTS
Corporate Paulson Kimball
ContractorsMagill ConstructionMaas Bros. Const.Gilbank Constr.Harmony Constr.Const.Klobucar Constr.
BID RESULTS
Beloit, WIElkhorn, WIWatertown, WIClinton, WIMadison, WIJanesville, WIBeloit, WI
APPROX. UNIT OF
TOTAL FOR ITEMTOTAL FOR ITEMTOTAL FOR ITEMTOTAL FOR ITEMTOTAL FOR ITEMTOTAL FOR ITEMTOTAL FOR ITEM
ITEM NO.ITEM
QTY.MEASURE
General Construction - Drawings and
Divisions 0 - 33 of the Project Manual,
Excluding Alternates A-1,
BID NO. 1$166,847.00$167,990.00$184,400.00$186,300.00$187,044.00$195,275.00$198,600.00
A-2, A-3 and A-4
1L.S.
ALTERNATES:
Plastic Laminate Casework and
Countertops Located in N.A.H.L.
Concessions
A-1$1,936.00$2,263.00$2,100.00$830.00$1,691.00$1,950.00$2,200.00
(Add or Deduct)
1L.S.
Plastic Laminate Casework and
Countertops Located in Youth Hockey
Concession Room
A-2$5,409.00$6,954.00$7,355.00$9,300.00$7,188.00$8,450.00$6,800.00
(Add or Deduct)
1L.S.
Plastic Laminate Skate Shelving
A-3$8,681.00$2,800.00$8,900.00$3,900.00$10,928.00$1,550.00$4,800.00
(Add or Deduct)
1L.S.
All Painting Included in Section 09 90
00 Paints and Coatings
A-4$6,071.00$4,200.00$5,100.00$4,600.00$5,984.00$4,060.00$4,780.00
(Add or Deduct)
1L.S.
New Wall Fin Radiators in Existing
Team Rooms A, B, C, and D Including
Associated Piping, Valves,
thermostatic Control and Accessories
M-1$7,482.00$8,500.00$8,100.00$8,200.00$9,786.00$7,558.00$4,900.00
(Add or Deduct)
1L.S.
New Infrared Radiant Heater to East
Bleacher Section, Including Natural
Gas Piping, Combustion Air and Flue
Duct, and Thermostatic Control
M-2$4,439.00$5,853.00$5,600.00$5,800.00$7,238.00$5,350.00$5,070.00
(Add or Deduct)
1L.S.
1