Loading...
Bid Tabs C2009-15 Ice Center Renovation CITY OF JANESVILLE 13, 2009 BID DATE: MAY PUBLIC WORKS BID SCHEDULE "E" - 2009PAGE 1 OF 1 CONTRACT 2009-15, ICE CENTER RENOVATION BID RESULTS Corporate Paulson Kimball ContractorsMagill ConstructionMaas Bros. Const.Gilbank Constr.Harmony Constr.Const.Klobucar Constr. BID RESULTS Beloit, WIElkhorn, WIWatertown, WIClinton, WIMadison, WIJanesville, WIBeloit, WI APPROX. UNIT OF TOTAL FOR ITEMTOTAL FOR ITEMTOTAL FOR ITEMTOTAL FOR ITEMTOTAL FOR ITEMTOTAL FOR ITEMTOTAL FOR ITEM ITEM NO.ITEM QTY.MEASURE General Construction - Drawings and Divisions 0 - 33 of the Project Manual, Excluding Alternates A-1, BID NO. 1$166,847.00$167,990.00$184,400.00$186,300.00$187,044.00$195,275.00$198,600.00 A-2, A-3 and A-4 1L.S. ALTERNATES: Plastic Laminate Casework and Countertops Located in N.A.H.L. Concessions A-1$1,936.00$2,263.00$2,100.00$830.00$1,691.00$1,950.00$2,200.00 (Add or Deduct) 1L.S. Plastic Laminate Casework and Countertops Located in Youth Hockey Concession Room A-2$5,409.00$6,954.00$7,355.00$9,300.00$7,188.00$8,450.00$6,800.00 (Add or Deduct) 1L.S. Plastic Laminate Skate Shelving A-3$8,681.00$2,800.00$8,900.00$3,900.00$10,928.00$1,550.00$4,800.00 (Add or Deduct) 1L.S. All Painting Included in Section 09 90 00 Paints and Coatings A-4$6,071.00$4,200.00$5,100.00$4,600.00$5,984.00$4,060.00$4,780.00 (Add or Deduct) 1L.S. New Wall Fin Radiators in Existing Team Rooms A, B, C, and D Including Associated Piping, Valves, thermostatic Control and Accessories M-1$7,482.00$8,500.00$8,100.00$8,200.00$9,786.00$7,558.00$4,900.00 (Add or Deduct) 1L.S. New Infrared Radiant Heater to East Bleacher Section, Including Natural Gas Piping, Combustion Air and Flue Duct, and Thermostatic Control M-2$4,439.00$5,853.00$5,600.00$5,800.00$7,238.00$5,350.00$5,070.00 (Add or Deduct) 1L.S. 1