Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Bid Tabs C2009-13 Youth Sports Site Paving and Lighting
BID DATE: 13 MAY 2009 CITY OF JANESVILLE PAGE 1 OF 2 PUBLIC WORKS BID SCHEDULE "E" - 2009 CONTRACT 2009-13, YOUTH SPORTS SITE PAVING AND LIGHTING BID RESULTS Rock Road Companies, Inc.Frank Bros., Inc. BID RESULTS Janesville, WIJanesville, WI APPROX. UNIT OF ITEM NO.ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEM QTY.MEASURE 1.Sawing Asphalt Pavement370L.F.$ 1.25$ 462.50$ 2.00$ 740.00 2.Asphalt Pavement Removal50S.Y.$ 1.76$ 88.00$ 1.10$ 55.00 New Concrete Curb and Gutter, 3.130L.F.$ 10.00$ 1,300.00$ 15.75$ 2,047.50 18" New Concrete Curb and Gutter, 4.400L.F.$ 10.00$ 4,000.00$ 15.75$ 6,300.00 30" Crushed Limestone Basle, Fine 5.150TON$ 8.26$ 1,239.00$ 8.65$ 1,297.50 Gradation Asphaltic Concrete Pavement, Type E-0.3, Lower Layer, PG 64-22 (Roadway, Parking Areas, 6.2,800TON$ 40.50$ 113,400.00$ 42.66$ 119,448.00 Service Drives) Asphaltic Concrete Pavement, Type E-0.3, Upper Layer, PG 64-22 (Roadway, Parking 7.2,200TON$ 40.50$ 89,100.00$ 42.66$ 93,852.00 Areas, Service Drives) Bike Trail Paving, Type E-0.3, 8.570TON$ 46.00$ 26,220.00$ 53.73$ 30,626.10 Upper Layer, PG 64-22 1 BID DATE: 13 MAY 2009 CITY OF JANESVILLE PAGE 2 OF 2 PUBLIC WORKS BID SCHEDULE "E" - 2009 CONTRACT 2009-13, YOUTH SPORTS SITE PAVING AND LIGHTING BID RESULTS Rock Road Companies, Inc.Frank Bros., Inc. BID RESULTS Janesville, WIJanesville, WI APPROX. UNIT OF ITEM NO.ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEM QTY.MEASURE 9.Pull Box, 18" x 36"6EACH$ 369.24$ 2,215.44$ 369.24$ 2,215.44 10.Non-Metallic Conduit, 2" PVC5,300L.F.$ 1.56$ 8,268.00$ 1.56$ 8,268.00 11.Street Light Bases31EACH$ 500.00$ 15,500.00$ 533.47$ 16,537.57 12.Transformer Bases31EACH$ 317.74$ 9,849.94$ 317.74$ 9,849.94 13.Limestone Shoulder260L.F.$ 1.58$ 410.80$ 1.68$ 436.80 14.Restoration10,200S.Y.$ 0.85$ 8,670.00$ 0.85$ 8,670.00 15.#4 Steel Reinforcement Bars120L.F.$ 1.01$ 121.20$ 1.00$ 120.00 16.Inlet Frame Adjustment2EACH$ 216.57$ 433.14$ 150.00$ 300.00 TOTAL AMOUNT BID - CONTRACT 2009-13:$ 281,278.02$ 300,763.85 2