Loading...
Addendum No. 1 (2 Pages) 24 April 2009 PUBLIC WORKS BID SCHEDULE “D” – 2009 CONTRACT 2009-11, WATER SYSTEM IMPROVEMENTS ADDENDUM NO. 1 (Page 1 of 2) Make the following additions and modifications to the Contract Documents as follows: (1) Attached is Revised Plan Sheet 1 of 3 which eliminates the full width intersection water main replacement on three side streets intersecting Centerway. Those side streets include Cornelia, Caroline and Eisenhower. This reduction requires testing of the new water main on Centerway prior to making any connections of side street pipes. The Revised Bid Proposal reflects a reduction in new pipe, valve and street restoration quantities. (2) Attached is Revised Plan Sheet 3 of 3. This revised plan eliminates the full width water main reconnection at the intersection of Wilson Street and Park Avenue, as shown on the plan. This will require testing and approval of the water main on Wilson Street prior to the Park Street connection. The Revised Bid Proposal reflects a reduction in new pipe, valve and street restoration quantities. (3) Added to the Contract is replacement of water main at the intersection of Milwaukee Street and Martin Road. The Addendum includes an 8-1/2 x 11 plan sheet showing the replacement work at that intersection. The Revised Bid Proposal includes quantities for new pipe, valves and street restoration at this location. (4) Attached is a Revised Bid Proposal and Revised Contract Quantities Spreadsheet that shall be used by the Contractor to present their Proposal. The revised Proposal reflects adjustment in quantities affected by the plan changes and additions, as noted in Items 1 through 3 above. Quantities impacted by these changes include but may not be limited to water main pipe, valves, street restoration, sawcutting, and curb and gutter replacement. J:\Development\Engineering\Contracts\2009\C2009-11, Water System Improvements\Contract Documents\Addendum No. 1.doc 24 April 2009 PUBLIC WORKS BID SCHEDULE “D” – 2009 CONTRACT 2009-11, WATER SYSTEM IMPROVEMENTS ADDENDUM NO. 1 (Page 2 of 2) (5) There are two items the Contractor shall make note of because of the changes in Items 1 through 3 above: The first is all connections to side streets cannot be made until the main line pipe, either on Centerway on Wilson Street, has been completed and tested; whereas the original design with new valve installation allowed for all interconnects prior to testing of the main. The Contractor shall re-evaluate the cost for traffic control because of the changes in Items 1 through 3 above. The elimination of full width side street connections on Wilson and Centerway should reduce traffic control costs. The addition of the Milwaukee Street/Martin Road intersection will add work to the traffic control item. J:\Development\Engineering\Contracts\2009\C2009-11, Water System Improvements\Contract Documents\Addendum No. 1.doc