Loading...
5. March Meeting Followup March Meeting follow up Water meter Bob stated that they would like to have a second water meter installed at the Sports Complex to track the water consumption used for the Rock Soccer irrigation system. I checked with the water utility and the plumbing inspector. If you wish to have another meter installed, please contact a private plumber to make an installation plan. The plan should be shared with Jim Karow, the city’s plumbing inspector (755-3064). Once approved, the permit would be $50 and the meter would be free (because it is a revenue generating meter). Installation costs would be the responsibility of Rock Soccer. Soccer practice needs Trevor explained that YMCA soccer practice begins March 30. Rebecca will make sure the gate is unlocked and the bathrooms are open by then, as well as have the garbage disposal turned on. Parks opened the gates March 24. Based on weather, water may not be available until early April. Building follow up Bob asked whether a timer could be set on the lights at the building near the Y and soccer fields. He also mentioned a pipe may be leaking at the storage shed behind the bathroom. He also needs sprinkler box keys for the groundskeeper by the next meeting. Tech Services adjusted the timer and installed an over-ride button. If the lights do not turn on, simply click the over-ride switch and the lights will turn on. If you continue to have problems, let me know. The Water Utility was asked to check on the pipe when they turned on the water. Keys will be given to Bob at the April 14 meeting. Playground The group asked if a playground will be installed at the complex. The remaining pieces will be installed and some sand will be put in place in early May.