Bid Tabs C2009-6 East River Walkway Repairs
CITY OF JANESVILLEBID DATE: MARCH 11, 2009 PUBLIC WORKS BID SCHEDULE "B" - 2009PAGE 1 OF 2 CONTRACT 2009-6, EAST RIVER WALKWAY REPAIRS BID RESULTS GILBANK MARVIN GLEASON J.W. SCHULTZ CONSTRUCTION JB JOHNSON BROS. PARISI CONSTR., INC. CONTR., INC CONCRETE STRUCTURES DRAEVING CONSTR., INC. BID RESULTS EDGERTON, WICLINTON, WIEDGERTON, WIVERONA, WIFRANKSVILLE, WIJANESVILLE, WIBELOIT, WI ITEM APPROX. UNIT OF UNIT TOTAL FOR TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR UNIT PRICE ITEM NO.QTY.MEASUREPRICEITEMITEMPRICEITEMPRICEITEMPRICEITEMPRICEITEMPRICEITEM PART A - EAST RIVER WALKWAY 1.Full Depth Saw Cut70L.F.$ 3.00$ 210.00 $ 6.05$ 423.50 $ 3.00$ 210.00$ 2.60$ 182.00$ 6.00$ 420.00$ 10.00$ 700.00$ 5.00$ 350.00 2.Removing Sidewalk, Concrete798S.Y.$ 15.85$ 12,648.30 $ 10.70$ 8,538.60 $ 31.50$ 25,137.00$ 17.00$ 13,566.00$ 11.00$ 8,778.00$ 16.00$ 12,768.00 $ 22.50$ 17,955.00 Removing Sidewalk, 3.Brick Pavers105S.Y.$ 15.85$ 1,664.25 $ 22.00$ 2,310.00 $ 31.50$ 3,307.50$ 16.00$ 1,680.00$ 50.00$ 5,250.00$ 16.00$ 1,680.00 $ 22.50$ 2,362.50 4.Removing Sidewalk, Asphalt19S.Y.$ 15.85$ 301.15 $ 5.50$ 104.50 $ 9.00$ 171.00$ 26.00$ 494.00$ 11.00$ 209.00$ 16.00$ 304.00$ 22.50$ 427.50 5.Removing Trash Receptacle1EACH$ 150.00$ 150.00 $ 110.00$ 110.00 $ 40.00$ 40.00 $ 185.00$ 185.00$ 250.00$ 250.00$ 200.00$ 200.00$ 50.00$ 50.00 6.Tree Removal5EACH$ 300.00$ 1,500.00 $ 220.00$ 1,100.00 $ 500.00$ 2,500.00$ 900.00$ 4,500.00$ 950.00$ 4,750.00$ 500.00$ 2,500.00 $ 250.00$ 1,250.00 Non-Metallic Conduit, 7.Sch. 40, 1-1/4"100L.F.$ 34.12$ 3,412.00 $ 4.40$ 440.00 $ 4.00$ 400.00$ 5.60$ 560.00$ 4.25$ 425.00$ 4.00$ 400.00$ 20.15$ 2,015.00 Non-Metallic Conduit, 8.Sch. 40, 2"1,350L.F.$ 4.64$ 6,264.00 $ 4.95$ 6,682.50 $ 5.25$ 7,087.50$ 5.70$ 7,695.00$ 4.80$ 6,480.00$ 4.50$ 6,075.00 $ 8.03$ 10,840.50 9.Pull Box, Steel (18" x 36")18EACH$ 505.00$ 9,090.00 $ 605.00$ 10,890.00 $ 550.00$ 9,900.00$ 750.00$ 13,500.00$ 590.00$ 10,620.00$ 550.00$ 9,900.00 $ 396.00$ 7,128.00 10.Granular Backfill50C.Y.$ 12.00$ 600.00 $ 55.00$ 2,750.00 $ 15.00$ 750.00$ 27.00$ 1,350.00$ 40.00$ 2,000.00$ 25.00$ 1,250.00 $ 30.00$ 1,500.00 Base Aggregate 11.Dense, 3/4"110C.Y.$ 15.00$ 1,650.00 $ 38.50$ 4,235.00 $ 15.00$ 1,650.00$ 44.00$ 4,840.00$ 36.00$ 3,960.00$ 25.00$ 2,750.00 $ 25.00$ 2,750.00 12.Concrete Sidewalk, 4"7,358S.F.$ 3.75$ 27,592.50 $ 3.47$ 25,532.26 $ 5.00$ 36,790.00$ 4.15$ 30,535.70$ 5.30$ 38,997.40$ 7.00$ 51,506.00 $ 6.65$ 48,930.70 Concrete Sidewalk, 13.4" Colored943S.F.$ 5.00$ 4,715.00 $ 4.51$ 4,252.93 $ 7.00$ 6,601.00$ 5.15$ 4,856.45$ 6.80$ 6,412.40$ 8.50$ 8,015.50 $ 8.50$ 8,015.50 14.Wire Mesh1,488S.F.$ 0.50$ 744.00 $ 0.83$ 1,235.04 $ 0.30$ 446.40$ 0.45$ 669.60$ 0.40$ 595.20$ 1.00$ 1,488.00 $ 0.75$ 1,116.00 Remove and Replace 15.Curb Head26L.F.$ 25.00$ 650.00 $ 49.50$ 1,287.00 $ 35.00$ 910.00$ 60.00$ 1,560.00$ 27.00$ 702.00$ 50.00$ 1,300.00 $ 35.00$ 910.00 Pavement Restoration, 16.Parking Lot10S.Y.$ 85.00$ 850.00 $ 33.00$ 330.00 $ 130.00$ 1,300.00$ 135.00$ 1,350.00$ 200.00$ 2,000.00$ 150.00$ 1,500.00 $ 160.00$ 1,600.00 1 CITY OF JANESVILLEBID DATE: MARCH 11, 2009 PUBLIC WORKS BID SCHEDULE "B" - 2009PAGE 2 OF 2 CONTRACT 2009-6, EAST RIVER WALKWAY REPAIRS BID RESULTS GILBANK MARVIN GLEASON J.W. SCHULTZ CONSTRUCTION JB JOHNSON BROS. PARISI CONSTR., INC. CONTR., INC CONCRETE STRUCTURES DRAEVING CONSTR., INC. BID RESULTS EDGERTON, WICLINTON, WIEDGERTON, WIVERONA, WIFRANKSVILLE, WIJANESVILLE, WIBELOIT, WI ITEM APPROX. UNIT OF UNIT TOTAL FOR TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR UNIT TOTAL FOR UNIT PRICE ITEM NO.QTY.MEASUREPRICEITEMITEMPRICEITEMPRICEITEMPRICEITEMPRICEITEMPRICEITEM PART A - EAST RIVER WALKWAY 17.Manhole Adjustment1EACH$ 375.00$ 375.00 $ 550.00$ 550.00 $ 200.00$ 200.00$ 185.00$ 185.00$ 150.00$ 150.00$ 500.00$ 500.00$ 250.00$ 250.00 18.Terrace Restoration75S.Y.$ 4.00$ 300.00 $ 49.50$ 3,712.50 $ 25.00$ 1,875.00$ 22.00$ 1,650.00$ 12.00$ 900.00$ 7.75$ 581.25$ 9.00$ 675.00 19.Topsoil Only60S.Y.$ 3.50$ 210.00 $ 38.50$ 2,310.00 $ 45.00$ 2,700.00$ 6.25$ 375.00$ 11.00$ 660.00$ 5.00$ 300.00$ 9.00$ 540.00 20.Bark Mulch (Match Existing)1C.Y.$ 150.00$ 150.00 $ 110.00$ 110.00 $ 100.00$ 100.00$ 100.00$ 100.00$ 250.00$ 250.00$ 200.00$ 200.00$ 50.00$ 50.00 21.Repainting Railing782L.F.$ 22.38$ 17,501.16 $ 34.40$ 26,900.80 $ 30.15$ 23,577.30$ 65.00$ 50,830.00$ 71.00$ 55,522.00$ 60.00$ 46,920.00 $ 56.48$ 44,167.36 Remove and Reset Railing Post 22.2EACH$ 150.00$ 300.00 $ 165.00$ 330.00 $ 150.00$ 300.00$ 250.00$ 500.00$ 200.00$ 400.00$ 500.00$ 1,000.00 $ 100.00$ 200.00 SUB-TOTAL - PART A:$ 90,877.36 $ 104,134.63 $ 125,952.70 $ 141,163.75 $ 149,731.00$ 151,837.75$ 153,083.06 PART B - WEST RIVER WALKWAY Non-Metallic Conduit, 23.Sch. 40, 2"75L.F.$ 5.11$ 383.25 $ 6.05$ 453.75 $ 5.50$ 412.50$ 5.70$ 427.50$ 5.90$ 442.50$ 5.50$ 412.50$ 8.03$ 602.25 24.Pull Box, Steel (18" x 36")2EACH$ 534.00$ 1,068.00 $ 605.00$ 1,210.00 $ 550.00$ 1,100.00$ 750.00$ 1,500.00$ 590.00$ 1,180.00$ 550.00$ 1,100.00 $ 418.00$ 836.00 25.Base Aggregate Dense, 3/4"10C.Y.$ 15.00$ 150.00 $ 60.50$ 605.00 $ 12.00$ 120.00$ 44.00$ 440.00$ 36.00$ 360.00$ 25.00$ 250.00$ 25.00$ 250.00 26.Concrete Sidewalk, 4"750S.F.$ 3.75$ 2,812.50 $ 3.52$ 2,640.00 $ 4.00$ 3,000.00$ 5.20$ 3,900.00$ 5.30$ 3,975.00$ 7.00$ 5,250.00 $ 6.65$ 4,987.50 Terrace Restoration 27.600S.Y.$ 4.00$ 2,400.00 $ 6.16$ 3,696.00 $ 5.00$ 3,000.00$ 10.00$ 6,000.00$ 12.00$ 7,200.00$ 7.75$ 4,650.00 $ 9.00$ 5,400.00 SUB-TOTAL - PART B:$ 6,813.75$ 8,604.75$ 7,632.50$ 12,267.50 $ 13,157.50$ 11,662.50$ 12,075.75 TOTAL AMOUNT BID - CONTRACT 2009-6:$ 97,691.11$ 112,739.38$ 133,585.20$ 153,431.25$ 162,888.50$ 163,500.25$ 165,158.81 2