Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Bid Tabs C2009-2 Landfill Construction Phase 2
CITY OF JANESVILLEBID DATE: JANUARY 28, 2009 PUBLIC WORKS BID SCHEDULE "A" - 2009PAGE 1 OF 8 CONTRACT 2009-2, LANDFILL PHASE 3 CONSTRUCTION BID RESULTS Iverson & SonsTown & CountryFrank Silha ExcavatingMeise ConstructionRyan Inc. CentralIntegrity Grading BID RESULTS Stoughton, WIMayville, WIJanesville, WIPlain, WIJanesville, WIRothschild, WI ITEM APPROX. UNIT OF TOTAL FOR TOTAL FOR TOTAL FOR TOTAL FOR TOTAL FOR TOTAL FOR ITEMUNIT PRICEUNIT PRICEUNIT PRICEUNIT PRICEUNIT PRICEUNIT PRICE NO.QTY.MEASUREITEMITEMITEMITEMITEMITEM PHASE 2 LINER CONSTRUCTION Providing Information for 1.Preconstruction Report, Complete1L.S.$ 3,500.00$ 3,500.00 $ 25,300.00$ 25,300.00 $ 3,600.00$ 3,600.00$ 12,500.00$ 12,500.00 $ 250.00$ 250.00 $ 4,250.00$ 4,250.00 Clear and Grub Trees, Clay Borrow 2.Fence Line, Complete32STATIONS$ 487.25$ 15,592.00 $ 500.00$ 16,000.00 $ 240.00$ 7,680.00$ 200.00$ 6,400.00 $ 550.00$ 17,600.00 $ 346.12$ 11,075.84 3.Strip and Stockpile Topsoil, Complete18,000C.Y.$ 1.18$ 21,240.00 $ 1.55$ 27,900.00 $ 1.30$ 23,400.00$ 1.20$ 21,600.00 $ 1.60$ 28,800.00 $ 2.19$ 39,420.00 Unclassified Excavation (Structural Material), Base and 3H:1V Side Slope, 4.Complete35,000C.Y.$ 1.65$ 57,750.00 $ 1.85$ 64,750.00 $ 2.21$ 77,350.00$ 2.07$ 72,450.00 $ 2.00$ 70,000.00 $ 2.49$ 87,150.00 5.Unclassified Excavation, Service Road785C.Y.$ 2.47$ 1,938.95 $ 2.50$ 1,962.50 $ 5.00$ 3,925.00$ 5.00$ 3,925.00 $ 5.40$ 4,239.00 $ 3.56$ 2,794.60 Unclassifeid Excavation, GC Layer, 6.Complete8,400C.Y.$ 2.61$ 21,924.00 $ 1.95$ 16,380.00 $ 2.25$ 18,900.00$ 1.69$ 14,196.00 $ 4.00$ 33,600.00 $ 2.19$ 18,396.00 Clay Liner and 3H:1V Sidewall 7.Construction, Complete47,700C.Y.$ 3.81$ 181,737.00 $ 4.15$ 197,955.00 $ 4.12$ 196,524.00$ 4.40$ 209,880.00 $ 4.50$ 214,650.00 $ 6.25$ 298,125.00 Smooth Surface Geomembrane Liner, 8.Complete237,400S.F.$ 0.47$ 111,578.00 $ 0.49$ 116,326.00 $ 0.49$ 116,326.00$ 0.50$ 118,700.00 $ 0.55$ 130,570.00 $ 0.47$ 111,578.00 Textured Surface Geomembrane, 9.Complete81,000S.F.$ 0.57$ 46,170.00 $ 0.62$ 50,220.00 $ 0.57$ 46,170.00$ 0.61$ 49,410.00 $ 0.66$ 53,460.00 $ 0.55$ 44,550.00 Geotextile Fabric Over Gradient 10.Control Layer, Complete227,700S.F.$ 0.16$ 36,432.00 $ 0.09$ 20,493.00 $ 0.16$ 36,432.00$ 0.16$ 36,432.00 $ 0.20$ 45,540.00 $ 0.16$ 36,432.00 Geotextile Fabric Over Geomembrane, 11.Complete318,400S.F.$ 0.21$ 66,864.00 $ 0.20$ 63,680.00 $ 0.21$ 66,864.00$ 0.21$ 66,864.00 $ 0.25$ 79,600.00 $ 0.20$ 63,680.00 6" Perforated Gradient Control Pipe, 12.Complete980L.F.$ 16.25$ 15,925.00 $ 16.21$ 15,885.80 $ 19.00$ 18,620.00$ 30.00$ 29,400.00 $ 18.30$ 17,934.00 $ 19.39$ 19,002.20 6" Solid Wall Gradient Control Pipe 13.Cleanout, Complete370L.F.$ 17.55$ 6,493.50 $ 14.00$ 5,180.00 $ 42.00$ 15,540.00$ 20.00$ 7,400.00 $ 16.90$ 6,253.00 $ 63.35$ 23,439.50 6" Perforated Leachate Collection Pipe, 14.Complete1,070L.F.$ 16.50$ 17,655.00 $ 10.00$ 10,700.00 $ 13.00$ 13,910.00$ 19.00$ 20,330.00 $ 17.50$ 18,725.00 $ 14.29$ 15,290.30 1 CITY OF JANESVILLEBID DATE: JANUARY 28, 2009 PUBLIC WORKS BID SCHEDULE "A" - 2009PAGE 2 OF 8 CONTRACT 2009-2, LANDFILL PHASE 3 CONSTRUCTION BID RESULTS Iverson & SonsTown & CountryFrank Silha ExcavatingMeise ConstructionRyan Inc. CentralIntegrity Grading BID RESULTS Stoughton, WIMayville, WIJanesville, WIPlain, WIJanesville, WIRothschild, WI ITEM APPROX. UNIT OF TOTAL FOR TOTAL FOR TOTAL FOR TOTAL FOR TOTAL FOR TOTAL FOR ITEMUNIT PRICEUNIT PRICEUNIT PRICEUNIT PRICEUNIT PRICEUNIT PRICE NO.QTY.MEASUREITEMITEMITEMITEMITEMITEM 6" Solid Wall Leachate Collection PHASE 2 LINER CONSTRUCTION 15.Pipe/Cleanout, Complete250L.F.$ 16.75$ 4,187.50 $ 10.30$ 2,575.00 $ 19.00$ 4,750.00$ 17.00$ 4,250.00 $ 17.80$ 4,450.00 $ 19.99$ 4,997.50 3" Leachate Forcemain Pipe With 6" 16.Casing, Complete330L.F.$ 29.00$ 9,570.00 $ 29.90$ 9,867.00 $ 45.00$ 14,850.00$ 21.00$ 6,930.00 $ 32.00$ 10,560.00 $ 25.36$ 8,368.80 4" HDPE Leachate Headwells, 17.Complete1,050L.F.$ 12.00$ 12,600.00 $ 5.00$ 5,250.00 $ 12.00$ 12,600.00$ 13.29$ 13,954.50 $ 9.90$ 10,395.00 $ 11.05$ 11,602.50 Leachate Discharge Manhole 18.(LMH-1), Complete1EACH$ 8,275.00$ 8,275.00 $ 6,500.00$ 6,500.00 $ 10,000.00$ 10,000.00$ 6,850.00$ 6,850.00 $ 8,200.00$ 8,200.00 $ 10,950.67$ 10,950.67 Haul and Place Drainage Layer 19.Material, Complete11,650C.Y.$ 3.25$ 37,862.50 $ 4.30$ 50,095.00 $ 3.23$ 37,629.50$ 4.12$ 47,998.00 $ 4.40$ 51,260.00 $ 3.85$ 44,852.50 20.Leachate Collection Sump, Complete1L.S.$ 13,125.00$ 13,125.00 $ 16,800.00$ 16,800.00 $ 14,000.00$ 14,000.00$ 300.00$ 300.00 $ 17,200.00$ 17,200.00 $ 11,531.07$ 11,531.07 21.Leachate Pump System, Complete1L.S.$ 7,725.00$ 7,725.00 $ 8,500.00$ 8,500.00 $ 10,000.00$ 10,000.00$ 11,000.00$ 11,000.00 $ 16,200.00$ 16,200.00 $ 5,033.15$ 5,033.15 Leachate Pump Dsiconnect and Signal 22.Wire Disconnect Panels, Complete1L.S.$ 3,130.00$ 3,130.00 $ 3,150.00$ 3,150.00 $ 3,100.00$ 3,100.00$ 11,090.00$ 11,090.00 $ 3,600.00$ 3,600.00 $ 3,009.00$ 3,009.00 23.1" Signal Wire Conduit, Complete900L.F.$ 2.00$ 1,800.00 $ 1.98$ 1,782.00 $ 2.30$ 2,070.00$ 3.00$ 2,700.00 $ 2.25$ 2,025.00 $ 1.88$ 1,692.00 24.2" Power Cable Conduit, Complete900L.F.$ 2.32$ 2,088.00 $ 2.33$ 2,097.00 $ 2.50$ 2,250.00$ 3.00$ 2,700.00 $ 2.66$ 2,394.00 $ 2.23$ 2,007.00 25.Power Cable, Complete300L.F.$ 3.55$ 1,065.00 $ 3.57$ 1,071.00 $ 4.25$ 1,275.00$ 5.00$ 1,500.00 $ 4.07$ 1,221.00 $ 3.41$ 1,023.00 26.Signal Wire, Complete300L.F.$ 3.00$ 900.00 $ 3.00$ 900.00 $ 3.40$ 1,020.00$ 3.00$ 900.00 $ 3.50$ 1,050.00 $ 2.85$ 855.00 Place 6 Inches of Topsoil, Seed, Mulch, 27.Fertilizer, Berm, Complete3,000S.Y.$ 1.66$ 4,980.00 $ 1.85$ 5,550.00 $ 2.50$ 7,500.00$ 2.37$ 7,110.00 $ 1.70$ 5,100.00 $ 2.74$ 8,220.00 28.Temporary Seeding, Complete3ACRE$ 1,200.00$ 3,600.00 $ 325.00$ 975.00 $ 750.00$ 2,250.00$ 740.00$ 2,220.00 $ 1,795.00$ 5,385.00 $ 281.00$ 843.00 29.Silt Fence, Complete800L.F.$ 1.35$ 1,080.00 $ 1.45$ 1,160.00 $ 1.35$ 1,080.00$ 1.50$ 1,200.00 $ 2.40$ 1,920.00 $ 1.55$ 1,240.00 2 CITY OF JANESVILLEBID DATE: JANUARY 28, 2009 PUBLIC WORKS BID SCHEDULE "A" - 2009PAGE 3 OF 8 CONTRACT 2009-2, LANDFILL PHASE 3 CONSTRUCTION BID RESULTS Iverson & SonsTown & CountryFrank Silha ExcavatingMeise ConstructionRyan Inc. CentralIntegrity Grading BID RESULTS Stoughton, WIMayville, WIJanesville, WIPlain, WIJanesville, WIRothschild, WI ITEM APPROX. UNIT OF TOTAL FOR TOTAL FOR TOTAL FOR TOTAL FOR TOTAL FOR TOTAL FOR ITEMUNIT PRICEUNIT PRICEUNIT PRICEUNIT PRICEUNIT PRICEUNIT PRICE NO.QTY.MEASUREITEMITEMITEMITEMITEMITEM PHASE 2 LINER CONSTRUCTION FENCE INSTALLATION: 8-Foot Chain Link Fence With 2-Foot Overhang, With Restoration, Complete 30.510L.F.$ 27.00$ 13,770.00 $ 27.94$ 14,249.40 $ 27.00$ 13,770.00$ 26.20$ 13,362.00 $ 31.20$ 15,912.00 $ 26.10$ 13,311.00 EVERGREEN PLANTS/TREES: 31.Techny Arborvitae12EACH$ 150.00$ 1,800.00 $ 245.00$ 2,940.00 $ 95.00$ 1,140.00$ 100.00$ 1,200.00 $ 108.00$ 1,296.00 $ 227.00$ 2,724.00 32.Eastern Red Cedar12EACH$ 150.00$ 1,800.00 $ 265.00$ 3,180.00 $ 150.00$ 1,800.00$ 150.00$ 1,800.00 $ 175.00$ 2,100.00 $ 309.00$ 3,708.00 33.Densata (Black Hills) Spruce4EACH$ 195.00$ 780.00 $ 280.00$ 1,120.00 $ 155.00$ 620.00$ 160.00$ 640.00 $ 182.00$ 728.00 $ 525.00$ 2,100.00 34.Austrian Pine2EACH$ 195.00$ 390.00 $ 265.00$ 530.00 $ 160.00$ 320.00$ 160.00$ 320.00 $ 182.00$ 364.00 $ 571.00$ 1,142.00 35.Norway Spruce2EACH$ 195.00$ 390.00 $ 265.00$ 530.00 $ 170.00$ 340.00$ 152.00$ 304.00 $ 182.00$ 364.00 $ 463.00$ 926.00 1" CALIPER BARE ROOT STOCK: 36.Skyline Honey Locust4EACH$ 140.00$ 560.00 $ 145.00$ 580.00 $ 110.00$ 440.00$ 150.00$ 600.00 $ 115.00$ 460.00 $ 740.00$ 2,960.00 37.Burr Oak2EACH$ 145.00$ 290.00 $ 135.00$ 270.00 $ 145.00$ 290.00$ 150.00$ 300.00 $ 152.00$ 304.00 $ 692.00$ 1,384.00 38.Swamp White Oak2EACH$ 140.00$ 280.00 $ 135.00$ 270.00 $ 140.00$ 280.00$ 150.00$ 300.00 $ 152.00$ 304.00 $ 346.00$ 692.00 39.Autumn Gold Ginkgo2EACH$ 265.00$ 530.00 $ 165.00$ 330.00 $ 150.00$ 300.00$ 150.00$ 300.00 $ 167.00$ 334.00 $ 401.00$ 802.00 40.Autumn Fantasy Maple2EACH$ 140.00$ 280.00 $ 135.00$ 270.00 $ 140.00$ 280.00$ 150.00$ 300.00 $ 152.00$ 304.00 $ 278.00$ 556.00 3 CITY OF JANESVILLEBID DATE: JANUARY 28, 2009 PUBLIC WORKS BID SCHEDULE "A" - 2009PAGE 4 OF 8 CONTRACT 2009-2, LANDFILL PHASE 3 CONSTRUCTION BID RESULTS Iverson & SonsTown & CountryFrank Silha ExcavatingMeise ConstructionRyan Inc. CentralIntegrity Grading BID RESULTS Stoughton, WIMayville, WIJanesville, WIPlain, WIJanesville, WIRothschild, WI ITEM APPROX. UNIT OF TOTAL FOR TOTAL FOR TOTAL FOR TOTAL FOR TOTAL FOR TOTAL FOR ITEMUNIT PRICEUNIT PRICEUNIT PRICEUNIT PRICEUNIT PRICEUNIT PRICE NO.QTY.MEASUREITEMITEMITEMITEMITEMITEM PHASE 2 LINER CONSTRUCTION SERVICE ROAD: 41.Removals1L.S.$ 2,325.00$ 2,325.00 $ 1,800.00$ 1,800.00 $ 2,700.00$ 2,700.00$ 3,700.00$ 3,700.00 $ 4,450.00$ 4,450.00 $ 2,601.18$ 2,601.18 42.General Fill875C.Y.$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ - 43.New Curb and Gutter112L.F.$ 29.00$ 3,248.00 $ 35.00$ 3,920.00 $ 3.00$ 336.00$ 39.00$ 4,368.00 $ 34.00$ 3,808.00 $ 40.00$ 4,480.00 44.12" CMCP Extension40L.F.$ 23.00$ 920.00 $ 31.58$ 1,263.20 $ 35.00$ 1,400.00$ 24.00$ 960.00 $ 24.30$ 972.00 $ 23.24$ 929.60 45.15" CMCP Extension40L.F.$ 28.00$ 1,120.00 $ 32.10$ 1,284.00 $ 35.00$ 1,400.00$ 26.00$ 1,040.00 $ 22.00$ 880.00 $ 22.27$ 890.80 46.New Catch Basin1EACH$ 1,800.00$ 1,800.00 $ 1,600.00$ 1,600.00 $ 1,500.00$ 1,500.00$ 900.00$ 900.00 $ 1,530.00$ 1,530.00 $ 2,165.49$ 2,165.49 47.Sanitary Sewer Manhole Adjustments2EACH$ 300.00$ 600.00 $ 1,135.00$ 2,270.00 $ 250.00$ 500.00$ 250.00$ 500.00 $ 350.00$ 700.00 $ 203.29$ 406.58 48.Base Course, Coarse Material300TONS$ 17.00$ 5,100.00 $ 9.00$ 2,700.00 $ 14.00$ 4,200.00$ 10.00$ 3,000.00 $ 25.00$ 7,500.00 $ 9.03$ 2,709.00 49.Base Course, Fine Material150TONS$ 20.00$ 3,000.00 $ 9.00$ 1,350.00 $ 15.00$ 2,250.00$ 13.00$ 1,950.00 $ 23.00$ 3,450.00 $ 11.10$ 1,665.00 Asphalt Binder Material 50.270TONS$ 70.00$ 18,900.00 $ 75.00$ 20,250.00 $ 62.00$ 16,740.00$ 61.00$ 16,470.00 $ 81.20$ 21,924.00 $ 88.07$ 23,778.90 GRAND TOTAL AMOUNT BID - $ 774,670.45$ 809,710.90$ 820,221.50 $ 842,503.50$ 929,865.00$ 961,340.18 CONTRACT 2009-2: 4