Bid Tabs C2009-3 Curb Gutter Replacement CITY OF JANESVILLEBID DATE: JANUARY 28, 2009 PUBLIC WORKS BID SCHEDULE "A" - 2009PAGE 1 OF 5 CONTRACT 2009-3, INTERMITTENT CURB REPLACEMENT BID RESULTS Yeske ConstructionJ. W. Schultz Constr. Edgerton, WIEdgerton, WI BID RESULTS APPROX.UNIT OF ITEM NO.ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEM QTY.MEASURE Intermittent Curb and Gutter Replacement, Complete (With Terrace Restoration and 1.5,900L.F.$ 31.90$ 188,210.00$ 35.50$ 209,450.00 Pavement Restoration) Intermittent Integral Curb and Gutter 2.230L.F.$ 35.00$ 8,050.00$ 39.00$ 8,970.00 Replacement Intermittent Curb and Gutter Replacement 3.1,650L.F.$ 31.50$ 51,975.00$ 31.50$ 51,975.00 (Without Terrace Restoration) Intermittent or Replacement Curb and Gutter, 10-Inch Gutter (Without Terrace 4.530L.F.$ 32.00$ 16,960.00$ 37.00$ 19,610.00 Restoration) Intermittent Curb and Gutter Replacement 5.1,560L.F.$ 30.00$ 46,800.00$ 32.50$ 50,700.00 (Without Pavement Restoration) Intermittent Curb and Gutter Replacement, 6.250L.F.$ 50.00$ 12,500.00$ 50.00$ 12,500.00 Special 7.Total Curb and Gutter Replacement5,080L.F.$ 15.75$ 80,010.00$ 14.40$ 73,152.00 1 CITY OF JANESVILLEBID DATE: JANUARY 28, 2009 PUBLIC WORKS BID SCHEDULE "A" - 2009PAGE 2 OF 5 CONTRACT 2009-3, INTERMITTENT CURB REPLACEMENT BID RESULTS Yeske ConstructionJ. W. Schultz Constr. Edgerton, WIEdgerton, WI BID RESULTS APPROX.UNIT OF ITEM NO.ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEM QTY.MEASURE 8.Curb and Gutter Removal5,080L.F.$ 4.00$ 20,320.00$ 3.75$ 19,050.00 9.Tree Removal, Including Stumps182I.D.$ 45.00$ 8,190.00$ 30.00$ 5,460.00 Standard Concrete Sidewalk - 4" 10.9,300S.F.$ 4.30$ 39,990.00$ 3.35$ 31,155.00 (Excluding Removal) Standard Concrete Sidewalk - 6" 11.13,785S.F.$ 4.50$ 62,032.50$ 3.85$ 53,072.25 (Excluding Removal) Standard Concrete Sidewalk - 8" 12.3,925S.F.$ 4.95$ 19,428.75$ 4.35$ 17,073.75 (Excluding Removal) 13.Sidewalk Removal - 4"9,300S.F.$ 1.00$ 9,300.00$ 1.70$ 15,810.00 Sidewalk and Driveway Removal - 14.17,710S.F.$ 1.25$ 22,137.50$ 1.85$ 32,763.50 6" and/or 8" 15.2' x 4' Detectable Warning Field Panel 74EACH$ 300.00$ 22,200.00$ 300.00$ 22,200.00 2 CITY OF JANESVILLEBID DATE: JANUARY 28, 2009 PUBLIC WORKS BID SCHEDULE "A" - 2009PAGE 3 OF 5 CONTRACT 2009-3, INTERMITTENT CURB REPLACEMENT BID RESULTS Yeske ConstructionJ. W. Schultz Constr. Edgerton, WIEdgerton, WI BID RESULTS APPROX.UNIT OF ITEM NO.ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEM QTY.MEASURE Saw Cutting Asphalt Pavement, 16.5,150L.F.$ 3.00$ 15,450.00$ 1.50$ 7,725.00 2"-5" Depth Full Depth Concrete or Asphalt Over 17.1,710L.F.$ 3.50$ 5,985.00$ 2.00$ 3,420.00 Concrete Pavement Sawcut 18.Full Depth Concrete Pavement Patching110S.Y.$ 90.00$ 9,900.00$ 120.00$ 13,200.00 19.Miscellaneous Pavement Removal515S.Y.$ 12.00$ 6,180.00$ 45.00$ 23,175.00 20.Additional Restoration300S.Y.$ 7.50$ 2,250.00$ 4.00$ 1,200.00 21.Unclassified Excavation50C.Y.$ 10.00$ 500.00$ 25.00$ 1,250.00 22.Pavement Ties40EACH$ 8.00$ 320.00$ 8.00$ 320.00 23.Dowel Bars40EACH$ 10.00$ 400.00$ 14.00$ 560.00 3 CITY OF JANESVILLEBID DATE: JANUARY 28, 2009 PUBLIC WORKS BID SCHEDULE "A" - 2009PAGE 4 OF 5 CONTRACT 2009-3, INTERMITTENT CURB REPLACEMENT BID RESULTS Yeske ConstructionJ. W. Schultz Constr. Edgerton, WIEdgerton, WI BID RESULTS APPROX.UNIT OF ITEM NO.ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEM QTY.MEASURE High Early Strength Concrete 24.20C.Y.$ 10.00$ 200.00$ 8.00$ 160.00 (Additional Cost Per Cubic Yard) 25.#4 Steel Reinforcement Bars5,000L.F.$ 1.25$ 6,250.00$ 1.25$ 6,250.00 26.Valley Gutter70L.F.$ 50.00$ 3,500.00$ 37.00$ 2,590.00 27.Concrete Filler Strip, Special4,820L.F.$ 3.00$ 14,460.00$ 3.00$ 14,460.00 Traffic Control - Total Replacement 28.1LUMP SUM$ 3,000.00$ 3,000.00$ 4,000.00$ 4,000.00 Curb & Gutter Streets Traffic Control - Intersection Modifications 29.1LUMP SUM$ 1,000.00$ 1,000.00$ 2,500.00$ 2,500.00 at Franklin and Washington Streets 30.Concrete Base Patching 200S.Y.$ 36.00$ 7,200.00$ 120.00$ 24,000.00 Manhole Frame Resetting 31.5EACH$ 250.00$ 1,250.00$ 650.00$ 3,250.00 (With Concrete Collar) 4 CITY OF JANESVILLEBID DATE: JANUARY 28, 2009 PUBLIC WORKS BID SCHEDULE "A" - 2009PAGE 5 OF 5 CONTRACT 2009-3, INTERMITTENT CURB REPLACEMENT BID RESULTS Yeske ConstructionJ. W. Schultz Constr. Edgerton, WIEdgerton, WI BID RESULTS APPROX.UNIT OF ITEM NO.ITEMUNIT PRICETOTAL FOR ITEMUNIT PRICETOTAL FOR ITEM QTY.MEASURE 32.Inlet Frame Adjustment50EACH$ 85.00$ 4,250.00$ 275.00$ 13,750.00 33.Topsoil50C.Y.$ 20.00$ 1,000.00$ 35.00$ 1,750.00 34.Erosion Control at Inlets10EACH$ 50.00$ 500.00$ 100.00$ 1,000.00 35.Silt Fence50L.F.$ 3.00$ 150.00$ 3.00$ 150.00 Erosion Bales 36.8EACH$ 5.00$ 40.00$ 10.00$ 80.00 TOTAL AMOUNT BID - CONTRACT 2009-3:$ 691,888.75 $ 747,731.50 5