DEPARTMENT OF PUBLIC WORKS MEMORANDUM ~
ENGINEERING DIVISION
May 15, 2007
TO: Herb Stinski, Director of Administrative Services/
Assistant City Manager
FROM: Christina Betz, Engineering Manager C, \ '0
SUBJECT: For Council Agenda on May 29, 2007, Waiver of Procedure for
Special Assessments for storm sewer, sidewalk and street light
charges for CSM 07003 - Boettcher.
The final certified survey creating lots and blocks triggers charges for
storm sewer, sidewalk and street lighting. The storm sewer charges are based
upon the rate of $9,245.00 per acre over the entire area of the survey. The
sidewalk and street light charges are based upon an estimate of installation costs
by the Engineering Department.
These charges may be spread over a period of five years with interest like all
other special assessments for public improvements when approved by City
Council. The owner/developer must sign a waiver of special assessment
procedure thereby agreeing to the charges and thus allowing them to be spread
over five years.
CSM 07003 was presented to the Council on 5/14/07, with approval of the survey
recommended by the Plan Commission. The proposed waiver must be approved
before the survey can be signed and recorded.
David Boettcher, the developer, has signed the necessary waiver form which
allows the charges to be spread over five years with interest at 7.25% on the
unpaid balance. The Clerk's Office has these documents.
The following chart shows assessment charges:
CSM
CSM 07003
Owner/Developer
David Boettcher
Storm Sewer
$5,704.17
Sidewalk
$7,217.73
Street Liq ht
$1,246.03