Consent #6 Waiver for CSM 07009
DEPARTMENT OF PUBLIC WORKS MEMORANDUM ~
ENGINEERING DIVISION
May 21,2007
TO: Herb Stinski, Director of Administrative Services/
Assistant City Manager
FROM: Christina Betz, Engineering Manager C It>
SUBJECT: For Council Agenda on May 29, 2007, Waiver of Procedure for
Special Assessments for storm sewer and sidewalk charges for
CSM 07009 - D&B Janesville, LLC.
The final certified survey creating lots and blocks triggers charges for
storm sewer and sidewalk. The storm sewer charges are based upon the rate of
$6,730.00 per acre over the entire area of the survey. The sidewalk charges are
based upon an estimate of installation costs by the Engineering Department.
These charges may be spread over a period of five years with interest like all
other special assessments for public improvements when approved by City
Council. The owner/developer must sign a waiver of special assessment
procedure thereby agreeing to the charges and thus allowing them to be spread
over five years.
CSM 07009 was presented to the Council on May 14, 2007, with approval of the
survey recommended by the Plan Commission. The proposed waiver must be
approved before the survey can be signed and recorded.
D&B Janesville, LLC, the developer, has signed the necessary waiver form which
allows the charges to be spread over five years with interest at 7.25% on the
unpaid balance. The Clerk's Office has these documents.
The following chart shows assessment charges:
CSM
CSM 07009
Owner/Developer
D&B Janesville, LLC
Storm Sewer
$9,610.44
Sidewalk
$25,852.50
cc: Jack Messer